Loading...
HomeMy WebLinkAboutContract 28282, � J i r CO�ICMUP�IT1r F�ICILI�'j�� �►�R�EI�IYENT THE STATE OF TEXAS � City Secreiary COUNTY OF TARRP,NT § Contract No. O�Qo���� V1IHEREAS Ramey A�enue, �.P., called "Develope�", desires to make certain impro�emenfs to Ramey Place Addition, an addition to fihe City of For� Worth, Texas; and WHEREAS, the said Developer has requested the Cify of Fort Worfh, a municipal corparation of Tarrant and Denton Coun#ies, Texas, hereinafter called "City", to c4o certain work in eonnection with said impro�ements; NOW, THEREFORE, KN�W ALL BY THESE PRESENTS: That said De�eloper, ac�ing I�er�in by and through ShefField Asset Managemen� Compa�y, through Gary D. Sheffield, its General Partner, and the City, acting he�-ein by and through Marc Ott, its duiy authorized Assistant Cify Manager, for and �n consideration of the covenants and candifions contained herein, do hereby agree as follows: � � � � '���4'�'i���� %�u�li��� . n+�'ai7n ^ ��`�' ���.,�i�=� n � ��t���fi!� ��, - � SECTION ONE COMMUNITY FACILITIES AGR�EiV1ENT to install WATER AND SEWER SERVICES for �AI1��Y PLI�C�, �LOCF�S 'i � � , , , , A. The City agrees to permit the Developer to let a contract for, in accordance with its accepted practices, ordinances, regulations, and the provisions of #he Ci�y Charter, and subject to the req�airements of the City's Charter, and subject to ihe requirements of the City's Pol9cies ar�d Reguia�ions for Installat�an ofi Community Facilities, all as current at ihe time of installation: l�dAiEa t�A�lLl�l�S senre the lots as shown on tt�e aitached Exhibit 1� , and ��NI�ARY �Elfil�� �AC{L1TI�S to ser�e the lots as shown on the attached Exhi�it �0'9 ail in accordance with plans and specificatior�s to be prepared by privat� engineers employed by ti�e De�eloper and approved by the Water Departmen#. B. The City agrees to allow the De�eloper to install, at his expense, at �he irime a11 other water mains in this addi#ion are ir�stalled, a serv9ce lirie for each lot as sho�,vn on the attached Ex�ibit �. The estimated cast af these .service lines is $ 22,8'T5. The City agrees to record the location o# each said service line in respect ta the corr�er of the iot served, and to r�tain said records ir� its possession. C. The construction cos# of #he water'facilii�es herein concerned, exclusi�e of service lines and engineering is es�ima#ed to be Sev�nt��Fi�e ihousand, [�ine Hundred �iff,y-i�ide Dollars (���,9��) . D. The Gity agrees to allow #he De�eloper to instail, a# hjs expense, at the time afl other sanitary sew�r mains in this addition are ir�stalled, a service iine for each loi as shown on the attached Exhibit ��9 . The estimat�d cost of these senrice lines is $$,000. The City agrees to record the lacation of each said service IEn� i� respect to fhe c�rner of the lot s�rved, and to reiain said records in its passession. E. The construction cas# of ihe sanitary sewer faciiities to be installed hereu�der, excj�sive of serv�ce lines and engineering, is estEmated to be Eiqhive�ive Thou�and, �ive Hundred_�hi�fiy-ih��e Dollars f$��.�331. I-1 �ROJ��i F��414��. �11��Y ��A��, �L0�1�� 1-4 F. Prior to allowance .of the cor�str�ct�on cantract by D�v�laper, the De�eloper agrees to pro�ide acc�ptable finar�cial guarantee to the city for 10Q percenf of the construction o# �h� construc#ion costs along with payment a� any Ordinance casts and fees that ar� applicable. Prior to the award of the construction contract by the City or the cammencing of any work by the City or its cvntractars, the Developer agrees to pay to the City: �1) (a) One Hundred percent (100%) ofi the De�eloper's cost o� all water and sanit�ry sewer� fiacilities within the development, exclusive of er�gineering and sen►ice costs, sized to pra�ide water and sanitary sewer senrice within the de�elopment. (b) One F�undred perc�nt (100%) of the Developer's cost af all approach water and sanitary sev�er facilities oUtside the iirr�its of the development sized ta provide wat�r and sanitary sewer service ta the dev�lapment. (c) One h�ndred percent (100%} of the De�eloper's eosf of any approach water main facility or water faeiiity within the development that is 8-inches in size far non-industrial devefapment and 'i2-iriches in size for industrial development. (d)�ne hundred percent ('100%) of the Developer's cost of any approach sar�itary sewer main facili#y or sanifiary sew�:r facili�y wi�i�i� the de�elopment tt�a# is S-inches in size. (2} An additiona! ten �e�cent (10%) of t�e� total of the Develop�rs co�t of these water and sanitary sewer facili#ies, exclusi�e of cos# of serrrice lines, is required fior design er�gineering i� such engineering is perFormed by the City at t�e Deueloper's request. (3) �ne hundred percent {100%) o� the De�eioper's cnst of all serrice lines, esfimated under 1-B and 1-D abo�e, in accordance with the provisions of the current Fort Worth City Code. (4) A construciior� lnspection Fee equal to two (2%) oi t1�e D��elaper's ac#ual cosi share of the constructian cos� (including ali senrices) of the wa#er andlor sar�itary sewer facilit�es. G. The distribution of es�imated constructian cast betwe�r� the City'and t�e De�e�oper, as per paragraph 1-F above, for all wa#er ar�d san�fiary sewer fiacilities to be consiructed I�er�unde� is estima�ed as foilows: � I-2 ** CITY F�AR�'ICIPAiION �f��AK-DOV11N FOR: �R���C�' NAI4��; F�IR��I� �LACE. ��OCKS ��44 t•� i �� � , OVERSIZED WATER MAIN �Developer is rehabilitating the 12" water line for the City which pays the 12" water fine, gafe �alve and fittings. The water services are being replaced as they would on a rehabiiitated wa#er line �ecause this is a Neighborhood Empowerment Zan�} 12" Water �ine ($26) 1,272 L.F. x $26 = $ 33,Oi2 8" Wafer Line {$17) 5QQ L.F. X $17 = $ �,5Q0 6" Water L�ne {$15) 5 L.F. x $15= � 75 12" Gafie Valve ($1,223) 2 Each x $ 1,223 = $ �,44fi 1" Copper 5ervice ($375 each) 24 Eacf� x$ 375 = � 9,000 Cast Iron Fittings ($2,9691 TN} 2 TN x $2,969 = $ a,93� Subtotal $ �9,031 SEWER MAIIV (Developer is lowering the sewer fine for the City which was a newer line put in ta serve a bank in the northwesf corrter of the area. {This is a Neighborhood Empowerment Zone}. 8" Sewer Line {$25) 475 L.F. x $25 � $ 1'I,��� �4' Dia Sewer Manhole ($1,293) 1 Each x$ 1,293= $ 1,293 Subt�tal $ 13,16� The cost difference is based on estimate only. Actual re#'und to Develo�er shall be based on Water and Sewer City Pariicipation CFA Unit P�ices attached herewith an page I-5. city participatian is limited to tY�ose elemer�ts of materials contained in Ordinance No. 14552 and the amount of participation shall be based upon the acfual quantiti�s as measurad in the field multiplied by the applicable cost cantained in said ordinance." �O�'A� �I�Y �AR�I�I��e�IOiV FOR l�I�i�R D���Rifi��N� = ��+ ���,�s� �. � 5�,0� � � � �,1 R� I-4 � , � (�} ��T�R FAC[LITIES : Estimated Developer Cost (a) Mains, Within De�elopment $ 25,924 Approach $ -0- (b) Easements� $ -Q- (c) Services 61 - single 1") $ 13,875 (d)Park Participation $ -0- Sub-Totals, Water $ 39,799 (�) �ANIT'�1RY S�llir!li�R �/�CILIiI�S: {a) Develapment $ 72,365 Approach $ -0- (b) Easements * $ -0- (c} Services ( 25 -4") $ S,D00 (d}Park Participation $ -0- Sub-Tatals, Se►�ver $ 80,385 (3) i�7°AL COP�S��UC�'I��1 CB�i: $ 120,164 {4) COft�ST�l1��18A� IfdSPECTIO� FE� : $ 2,403 *to �e dedicafied by the developer. ** see Page I-4 for City Cost �* Estimated Cifiy Cost $ 5D,031 $ -0- � -a- � s,00a $ -Q- $ 59,031 $ 13,168 $ -0- $ -0- $ -0- $ -0- $ 13,168 $ 72,199 Total cost $ 75,955 � -a- � -a- $ 22,875 � -o- $ 98,830 $ $ $ $ � $ 85,533 -0- -0- 8,000 -0- 93,533 $ 192,363 $ 1,444� $ 3,847 I-3 IdVAi�R Pay Item 1 2 3 4 5 6 7 � 8 9 'I 0 1 'i 12 � SI�W�R � �ay Item � � � -- 3 � 4 � � �� 7 � � � 9 10 ,` 1�ate� and. ��v��� �ity �ar�ieipation CFA Unit �eices U�it Description LF 6" Water Pipe __ LF 8" Water Pipe L�' 10" Wate� Pip� LF 12" Water P��e _ � LF 16" Water Pipe EA 8" Gate Va1�e wlCast fran box & Lid EA 1 Q" Gate Va1ve wlCast Iro� box & Lid EA 'i2" Gate Valve wlCast Iron box & Lid �A 16" Gate Valve wlCast Iron box & Lid TN Cast IronlDuctile Iron Fittings Instafl T' Air & Vacuum Release Valve �A wNault _ Inskall 4" b�ow-Offw14" Gate Valve 8� EA Sump Manhole Unit Descriptior� LF 6" Sanitary Sewer Pipe LF 8" 5anitary� Sewer Pipe LF 10" Sanitary Sewer Pipe LF 12° Sa�itary Sewer Pipe _ LF 15" Sanitary Sewer Pipe LF 18" Sa�itary Sewer Pipe LF 21" Sanitary Sewer Pipe LF 24" Sanitary Sewer Pipe �A 5tandard 4' Diarnet�r Manhole �A Standard 5" Diameter Manhole �-5 L�nit Pr�ce #pom �eveloper's Pr�ojects . $ 1 �.00 — $ 17.Q4 $ 24.00 � _ Zs.oa $ �40.Q0 $ 676.00 $ 9,1$2.00 $ 1,223.00 $ 6,587.00 � 2,969,00 $ 3, 534, 00 $ 3,624A0 Unifi Price from ��velQper's �rojects $ 24.00 $ 25.OQ $ _ _ 26.00 $ 27.00 — $ 28.D4 $ 38,00 $ 45.Oa � 4a.ao - $ 1,293.00 $ 3,125.00 � �RBJ�Ci NA��: �Al�d��Y P�+C�, ��aCKS_'i �4 H. The abo�e charges do not include any front foot charges for connection to existing or proposed water andlor sanitary sewer mains construc#ed or fo be cons#ructed under the pro�isions of the "APPR4ACH MAlN OPTION" as described in Section lli of the Policy for the "�NSTALLATfON �F C�MMU N ITY FAC! LITI ES" adopted in September, � 992. These addit�o�al charges are as foliows: �. Applicable �o this Coritract in #he amount of $ by Cor�tract No. NIA A�piicabie GFA Name Da#e: NIA dated NIA Number _ NIA. NIA NlA l. The De�eioper is re�abilifating t�e 12" water {ine for the City which pays the 12" wa�er line, gate �alve and �ittings. The wa�er services are being repiaced as th�y would on a rehabilitaied wat�r line because this is a Neighborhood Empowermen# Zone. In addition, meter boxes must conform City standards. J. Within a reasonable time after campietion of the a�ove referenced facifities ta be constr�cted by contracf awar�ed by the �e�eloper, pro�i�ed al� conditions for City participa#ian ha�e been met, the City agEees t� pay the Developer the "EstEmated City Cos#" set out in 1-G a�ove; provided, however, that said payment shall be calculated using the actual cons�ruction costs and actual service costs un�er #he provisions of the cufrenf Fort Warth City Code, (said paymer�t to be calculated as in 1- G above}, based on acfivai quantit��s as refikected in fhe final estimate paid ta the Contrac#ar by #he Developer and on the ac#uai records o# cost kept by the City as. a park of its customary procedures. Ir� the e�ent the differenc� in the d�posit and the actual cos#s exceeds $25, DEveloper agrees to pay to the City and underpaym�nt which said adjustment might indicate. as being due, and the City agrees to pay to Devefoper any overpaymen#. I-6 r � � � r ` ��o�r�e� N���: ���v ����, B�o��� �� K. Work hereunder shall be completed within two (2} years from date hereaf, and it is understood tnat any obiigation on the part of the Ci#y to make any refunds with respect to water ar�dlor sanitary sewer facilities shall cease upon the expiratEon of two {2) years from date hereof, except for refunds due from "front faot charges" o� water and sar�itary sewer mains, which refunds may continue fo be mad� for a period of ten (� 0} y�ars commencing on th� date �hat approach mains are accepted by the Director. If less than 7U% of the eligibie coliections due to the de�eloper has been collected, the Derreloper may request in writ�ng an extensio� of up to an additional 1 Q years for collec�ion of front charges. 1n the ev�nt water andlor sanitary sew�r facifities work is nat com�ieted wi#hin the (2) year period, Ci�y may, at its election, complete sucf� work at Developer's expense. L. !t is further agreed and understaod that any additional payment required of Developer is to co�er only s�ch additionai work andlor materials as may be made ne�essary by conditions encount�red during canstructEan, and shal! not inc{ude any change in scope of the project. RECOMMENDED: � G�,� _ � Dale A. Fissel�r, P.E. Water Directot � ����� Date I-7 co�r�run�r�v ��c��a���� ����r����vT to install STRI���', S�'��lU� ��I�1, ST'F�E�T LICHT �►N�} �����T f�/�Nl€ 51(�N I��ROV��GAl7S FOR Ri4fVI�Y 1�LAC� AD�f�18A� A. The Developer{s} agree to install or �o cause to ha�e installed, the street, storm drainage, street lighting, stree� name sign and ather commu�ify facilities impro�ements shown as "current improvements" on the attached Exhibi#s _�, �1 t Ai�D �. - - B: The �Developer agrees to comply with alf city accepted practices, ordinances, regulations, as well as provisions of the City Charter, the City Subdi�ision Ordinance, City Design S#andard� and the current Poiicy far Installation of Community Faciiities in the design, contrac�ing and installation of required "current impravements". C. The Developer agrees to comply with t�e General Requiremer�ts contained herein (Attachment A). D. As shawn on the attached "Summary of Cost", the Developer agrees to fund his share of "current improvements" and to pay the City for his share of #he cost of street, storm drainage, s�reet li�hting, street name signs as shown on the attached Exhibits �, �1, and C. E. Payment is d�a� at the time this agreement is execufied by the City and the Devefoper. F. T�e estimated total cost of current improvements and rela�e� support se�vices specified in thi� agreement, including design, construcfion a�d inspectian is estima#ed to �3�6,�6�.d0. In accordance with the Ciiy's current Policy for Installation of Community Facilities as shown in the Cost Summary on page 3. The De�eloper shall contribute �oflars ���6.�fi�.QO of #he to#al amount. The City shall confribute �ollars �'i OO.00Q.00. G. Developer agrees to provide, at his expense, a11 r�ecessary rigi�ts of way and easements required �o construct current and future improvements pro�ide� fior in this agreement. 1 � , H. Dev�loper agrees to the preiiminary plans this contract. relieve the City of any respansibilities far any inadequacies rn , specifications and cost estimates su�plied for ihe purpose of i. De�e�aper also agrees to ins�all or a�just all af the r�quired taiili�ies to serve the develo�ment or to cons#ruct the improvements required herein. J, De�eloper agrees that City Counc�l approval Ordinance 7234). no street construction or storm drainage wi11 begin prior to of this Communi�y �acilities agreement. (Article 104.100, K. Developer agrees that no lot sha11 be occupied unfik improveme�ts required herein have been construct�d (Article 104.�00, Ordir�ance 7234}. L. Developer agrees to complete tF�e impro�ements covered by this agreement within 90 caien�ar days after ha�ing been instructed ta do so, in writing, by the Direetor o# Transpor�atian and Public �rorks. it is understood �hat the develaper will ini#iate the construction of all improvements to conform wifih his own scheduie, excep# for those impro�ements which th� TransportatEon and Public Works Directar deems necessary for the proper and orderly deveiapment of the area. In #he event Devefoper fails to carry out any such instructions within the 9Q-day period, the �e�eloper gives the City the right #o design and award a contract, and inspect the impro�ements in ques�ion, and agrees to pay to the City prior to the award of the con�ract, the amount of the low bi�. M. City participation in "current impro�ements" shalf not exceed 125% of cost shown in Summary of Cost. 2 . � � � � . �. �� -• Ifem A. Construct9on 1. Streets 2. Storm Drainage 3. Streei Lights �. 5treet Name Signs B. �ngineering Design C. Canstruction �ngineering and Managemeni by DOE (2%} TDTALS t7kJIYlfYf1'4!'C ! �� ���� f��1�I1�Y �L�CE ,�DDI il�1V fleveloper Casg $ $ $ $ $ 255,237.00 $ 7,869.00 $ 18,OOa.00 $ 50D.00 $ - $ 5,262A0 286,$68.a0 � $ $ $ �ify Cosf 1fl0,000.OQ $ _ � - $ - $ _ � t*) $ 100,000.00 $ iata! Cost � 355,237A0 7,869.00 18,OOO.QO 500.00 � 5,262.d0 386,868_00� NOT�'S: 1. All Prelimir�ary Plats fled affer July 11, 2000 wifl require sidewalks on af� streets. Forty-two {42} fe�t and widef street include sidewalk cost, Sidewalk cost is included und�r street cost. Sidewalks are the developer's respo�sibifiky. 2. Constr�ction items (1-2) cost inciudes 10% confingencies for C]eveloper and City. 3. De�eloper's col�mn for ltem C represents two percent {2%) casts for construction inspectior� and materials testing. (*) Re�resents City participation for construction fees. 4. City not preparing plans and specifications. The City af Fort Warth will pravide $'f00,000 to the development cost of the praposeci single-family project. These funds will be disb�rsed wF�en the contracts are awared for street construction in accordand with plans and specifications a}�proved by the City. This project is inciuded in the recen#ly established City of Fort Wor�h Empowerment Zone. Developer is respor�sible for cost of street lights and street signs. � CFA COD�: a0186 PPd1023 Appror►ed �I�31�OD7 3 E. STREEx LIGHT5: 1. STREET LIGHT COST �STIMATE TNTERSECTZONS M�D-BLOCK RES�DENTIAL CHANGE OF DIREC'I'��N RESIDENTIAL M�T]-BLOCK COLT�EC�'OR M�D-BI�OCK ARTERTAL PARKWAY MID-BLOCK ARTERIAL fviEDIAN RELOCATE EXISTING L,IGHT 0 EA $ 1500 TOTAL COST $8.000.00 $D,000.00 $1Q,000.00 �--0-- $--0-- $--0-- $_..p__ Subtotal City's Cast Developer's Subtio�al 10a Contingencies Projec� Total Adjacent Developer's Cost Developer's Cost 2% Inspection Fee Devel.opar's Responsibili�y See PG II�-1, ••Line 7•' RAMFY PLACE Oatober 17, 2001 DEVELOPERS COST $�9,$00.04 (REVISED 2-2$-02) Fort Worth, �'exa� QUANTITY UN�T COST � 4 EA $ 2,000 0 EA $ 2,000 5 �A $ 2,000 0 EA $ 2,0�0 0 EA $ 2,$00 0 EA $ 2,200 $18,000.00 $OO,OQ0.00 $i8,000.0� $1,800.d0 $1$.004.04 $o.000.ao $19,800.00 $O,OO.OD February 28, 2002 IIZ- � 2. STREE� LIGHTS WORK DESCRIPTION: 1. The Developer shall provide £or the installa�xon af streetlights at th� approximate locations shown in ��hibit "G", �mmediately after final accep�ance of the street construction, in accordance with engineering plans and specifications approved by the Transpartation and Public Woxks Department. 2. Streetlights on residential and /or col�ector streets can be installed using overhead a� underground conduc�ors wiCh the app�oval of the Director of Transpoxtation and Pub�ic Works. 3. Streetlights on arterial streets shall be install�d with undexground conduit and conduc�ors. g. The Developer sha11 provide far �he installation o� a 2-inch schedule 4Q PVC conduit at a depth not les� than 30 inches and a� leas� 18-inch behind the Gurb, "cl.ear �ram all other u�ili�ies". 5. The Develpper shall pravide for the instiallation of a 2-in�h schedule �� PVC canduit be�ween s�reetlights proposed for a.nstallation and the power �ource to b�come operational. 6. A 3-inch schedule 80 PVC condui.� is required when crossing street� at a depth not less �han �Q inch�:s, unles� indicated o�herwise on the plans concrete pu11 boxes sha1.1 be provided at the crossing points. 7. S�reet �.ight coriduit and footings shall be installed by �he developer's con��'actor as part of and at the �ime af st�eet canstruction. The city will ob�ain e].ec�ric service and comple�e �he streat ].ight constructi.o7ri in aceordance with approved pXans, 8. The developer or their cantracto� shal.l contact City's street Iigh� divisian 48 hours prior to s�arCing any ins�allation of candui� and/or s�.reet�ights aG (81'7) 871-5100 to insure proper inspac�ion of work. 9.The procedure for i.nstaliing condui� and �ootings wi11 be wx�h the inspea�or on �he jak� site or you aan reques� a copy by cal.Zing 817- $71-6596. RAM�'St PLACE, DEVELOP�RS C05T $19,800.04 October ].7, 2fl01, (REVISED 2-28-02) "STREE� T,IGHTS" INTERSECTZONS III- 2 S iNGLETON GT & LxTCAS DR , MCCASKLE DR & �UCAS DR MCCASKLE DR & DIVER CT RAMEY AV & LIICAS DR CHANGE OF DIRECTIONS MCCASKLE DR------- 3 SINGLETON CT------ 1 DIVER CT---------- 1 RAMEY PT,ACE zv STREET NAME 5TC�NS 1. The City wi].1 install the s�reet name signs upon final approval. of �he s�reet construction. The street n.ame signs will remain the property of, and wil], be maintained by, the City. 2. The Developer w�11 pay for the street.name sign installa�i.ons required for this development to the extent oi $100.00 per intersection. This unit Cost wi11 b� revised annually by �he Depa�tmen� ai Transpa��ation and Public Works to r�fl.ect prev�ailin.g costs of matex-ials and labar. 3. This developmen� creates the following five (5) intersectiona at a cost to the Cxty ot $5Qfl.OQ: StreEt A and Ramey Avenue Stree� A ancl Caurt S Street A and Str�et C Stree� C and Caur� D S�xeet C and Caurt E 7?AMEY PI,ACE �'ort Warth, Texas March 4, 2002 IV-1 � �4►ii/��Hfl�{1�Ni �1 �s�N�#�►L ���lUl�d�iV9�N�S A. (t is agreed and understaod by the parties hereto #hat the deveioper shall employ a civil er�gineer, iicensed to practice in the State of Texas, for the design and �reparatian � o# plans and specifications for the constructian of all current impro�ements ca�ered by �his contract, subject to Paragraph B. B. For any praject estimated to cost less than $10,L1a0 ar for any project designed to senre a single lot ar tract, fhe developer may at his option request the City to provide the design engir��ering, and if such request is granted, the developer shall pay to the City an amount equal to 10 percent af the final construction cast of s�ch project for suct� engineering services. C. !n the event the develop�r employs h�s own e�gineer ta prepare pfans a�d specifications for any or all c�rre�t improvem�n#s, the plans and specifications sQ prepared shal! be subject to approval by the department having jurisd'+ction. One (1 j reproducible set of p�ans with 15 prints and 35 specifcations fiar each facility shall be furnis�ed the d�partrnent ha�ing �urisdiction. It is agreed an� understaod that ir� the event of any disagreement on the plans an� specificatians, the decision of the TransportatianlPublic Works Department birector, andlor Water Depar�ment Director will be fiinal. D. !t is fu�fher agreed and understood �y the parties hereto that upon accepiance by the City, t�tle to all fa�ifities and im�rovements meni9on�d her�tnabove sha!{ be vesfied at all �imes in the City of Fort Worth, and de�eloper hereby relinquishes any right, titie, or infi�rest 1� �nd t� said facifit�es or�any pa�t hereof. E. It is fu�her agreed ihat #he decision af the City to nat coilect funds for "future impravements" reqU�red in pre�iot�s CFA agreements does not constitute an obligation on the pa� of the City to construct s�ch "fUture improvements" at its expense. A-"f F, Worlc hereunde� shalf be completed w9th�n iwo (2} years from date hereof, and it is understood that any obligatian on the pa�t of #he C9ty to make any refun�s witl� respect to water and/or sanitary sewer facilities or street, starm drain, street IigY�t and street name sig� shali cease upon the expiration of two {2} years from date hereof, except �'or refunds due fifom "front foot charges" on watar and san+tary sewer mains, which refunds may coniinue to E�e made far a periad of ten (10} years commencing on the daf� that approach mains are accepted by the Director. If less than 70% of the eligible coliections due to the de�reloger has beer� collected, the Devefoper may request in writing an extension o€ up ta an additiona{ 1� y�ars for colf�ct��n of front charges. If the coristruction under tF�� Commun�ty Facilities Contract shalE ha�e starked within the twayear period, fhe life vf ihe Community Fac�fit9es Ca�tract shall b� extended for an additiona! one-year period. Community Facility Gantrac�s not carr�}�le#ed within fhe i9me periods stated above uvill require renewal of #he contrac# with all updated agreements being in compliance with the palicies in �ffect ai the tirne of such renewai. Oevelopers must recagniz� that City funds may not be available to pay aN or a portion ot the normal City share for renewal contracts. It must be understaod by all parties to the Community Facilities Coniract that any of the fiacilit9es or requirements included in t�e con#ract that are t� be per�ormed by the developer, bu# nnt per�ormed by the developer withir� �he time periads sta#ed above, may be compieted by #he City afi t�e develaper's expense. ►"he City o# Fort Warth shall not be obligated to make any refunds due #o the developer on any facilities constructed under #hts agreement �nti{ a!1 provisions af the agreement are fulfilled. G. PERFORMANCE AND pAYMENT GUARANTEES 1. For Sfire�t, S�orm Qrain, S�ree� Liah� and Street Name �ian Imarov�menfs io be Consfruc�ed b� the D�veloper or Ci�v on �eha{fi� o� �he �Jevefoqer: Performance and Payment E�o�ds or cash d�posits acceptable to tl�e City are required tv be �urnished by �he developer for the installation of streets, siarm drains, s#reet lights, and s�re�t name signs, Qn a non-ass�ssment basis, and must be furnished to the City prior to execution af this corttract. A-2 The perFo�mance and payment bonds shali be in the amo�nt of one t�undred pel'Ce�t (�00%) of #he dev�laper's estimated share of the cost of the streets, storm drains, stre�t ligh�s, and street name signs. If the deposit is in the form of cash, the deposit sh�ll be in the a�ou�t of one hundreci twen#y five percent t925°/a) of the dev�loper's estimated cost of the streets, storm dra�ns, street lights, street name signs, and change orders {during the cours� of the project), 2. Far �u�ure improvement: Performar�ce and paymen� bonds ar cash deposits, accep�abl� fio #he City are required to be furnished by the developer for on� hundred percent (� 00%) of the de�e�oper's est9mate� cast resul#�ng from the pa�irig, drainage, �ighting and name signage of border s#reefs on an a�sessment paving basis. {Refer�nce Section VI, Item 3, Development Procedures Manual.) �Said performance and payment bonds or cash deposits must be fiurnished to tl�e City pric�r to execution of th�s canfiract. Wh�re the City lets ti�e contract, perfarmance and payment bonds shall �e depasited, in the amount of one hundred percent (i00%) of the estimated cost of constructior� as sfated in the constructio� cantract, is required prior fo issuance o� a work order by the Ctty. 3. �or l�ila�er and Sani�ary Sewer F'ac�lities: PerForma�ce and paymen� bonds, or eash deposits, acceptable to the Cify are required to be furnished by the developer for the installa�io� of water and sanitary sewer facilEt�es. a. Where the de�ela�sr I�t� th� constr�ction contract for water arul sa�i#ary sewer facilities, pe�Formar�ce and payment bon�s shall be deposited, �in the amount of one hundred percent (100%) of the estimated cost of construction, cash deposiied shal� be in �he amounf of one Y�undred twenty-fve percent (125°!0), as stat�d ir� the constnac�ion contract, is required to be furr�ished simuitaneous with ex�cution of fihe construction co�trac#. /� b. Where the City lets the contract, performat�ce and paym�nt bonds shall be deposited, in the amount o# one hundred percent (�00°/n) of the estimated cost of consiruction as stated in the construction contract, is required prior to issuance of a work order by the City, 4, ivpes of� Cuaran�ees: a. Performance and Pavment Bands: Are required #or the construction of streets, storm drains, street lights, and street name signs, the follawing terms and conditions shall apply: (ti } The bonds wiif �e sta�dard perFarmance and payment bonds provided by a ficensed sure#y campany on forms fu�nished by that sureiy company. (2� The bonds wil! be subject ta the rE�iew a�d approval by the City Attarney. {3) The performance bond s�all be payable to the City and shall guarantee pet#ormance of the str�et, s#orm c�rain, s#reet light, and si�-eet name sign construction contemplat�d under thi5 contract. {4} The Paym�nt Bond shall guarar�tee payment for all labor, materials and equipment fu�r�ished in connection wiih the street, storm drair�, street light, and stree# name sign construction contemplated undar this contract. (5) In order for a surety company to be acce.pt�ble, the r�ame of #he sur�ty shal� be included on the current Lf.S. Treasury list of acc�ptabfe sureties, and tfie amount of bond written by any one accepta��e company shall not exceed th�e amot�nt shouvn on the Treasury list for that campany. �. Cash D�pasits: A cash daposit shail be acceptable with verification that an attempt to secure a bond has been d�nie�, such deposit shall be ma�e in the Treasury of t�e City of Fort Worth. The City of Fort 1lVorth wiH not pay interest on any such cash deposEt. A-4 (1) At such time that the contract is bid for projects oth�r than assessment projects, the cash deposit si�all be adjusted to one hundred twenty five p�rcent (125%) of the actua! �bid price. No contract shall be awarded and rto war�C ordEr shall be issued untif sucn adjustmen# is made. (2} When a cas� deposit �s made, the additional fwenty-fi�e percent {25%} b�yond th� one hundred percent ('l40%) of the estimated de�eloper's si�are represents additiona� f�r�ds far change orders during the course of the pro�ecf. This twenty five pe�cent (25°!0) shaH be considered the d�veloper's change order fund. (3) If tF�e de�eloper mak�s a cash deposit with the Ci�y, the developer may make timely withdrawais fram the cash funds in order to pay fihe cantractor andlor subcontractar based on . amount af construction work compl�ted as approved and verified by the City Engineer vr authorized representativ�. For projects whose actual tota! contract cost is $400,�00 or greater, such release of security shall equa! the percenta�e of work campieted for that period multiplied by ninety-five percent (95%). This percentage shall b� appfi�d to the actual current total coniract cost �o deiermine t�e �mount that may be reduced u�an request of developer. Fvr proJects whose actual tota! contract cost is less than $400,000, such release o� security sha11 equal fhe percentage of work completed for #hat period multipiied by ninety percent (9Q%). This percentage shall then be a�plied to the actual current �otal cor�traci cost to determine the amount af secur�ty that may be �educed upan request of �evelo�er. Th� remaining sec�ri#y, five percent �5%} for prajects of $400,{}00 or greater and ten percen# {1 �%) for prajects less than $400,U00 A-5 � i ' � � , � together w�th the remaining funds �rom� #he Developer's Change Ordar Fund, if any, wil{ be reieased to the developer after the projeci Y�as bee� accepted by fhe Gity. Parkial refease of funds shall be limi#ed to once per: month. T�ere shaH be no partial release of funds for prajects o� less than $25,004. Proof that the de�eloper has paid the coniractar shall be required for partiaf releases. 5. Purpose, `�erm �nd R�newal o� Guaranfees: a. PerFormance and �aymen# bands, ar�d cash deposits furnished hereunder shall be for the pur�os�s of guaranteeing s�tisfactory com�liance by the develaper with all requirements, terms and conditions of this agreemeni, including, but not limit�d tn, the satisfactary completion of the improvernents prescribed herein, and �he malcing of payments to any persan, firm, corporatian ar other enti#y with whom the ��veloper has a d9rect contractual relationship for the pe�€ormance of work hereunder. b. Devefop�r s�a11 keep said pe�Formance and payment bonds, an�lor cash deposiis in full force and effee� u�tii such time as dev�laper has fiully complied wi�h the terms and conditions of this agreement, and tailure ta keep same in force and effect shall constitufe a default and breach of this agreement. H. The City shall assume its share of the cast of the improvemenis covared by this agreement alarrg with the engineering fe� only if funds are avaifable for such participation. In the evenfi that no #unds are availab4e for City participation, t�e devefoper sha11 award the contract and deposit wit� the City a perfarmance and paymer�t bonds or cash for 100 percent of the estimated total construction cost of fhe improvements [plus ten percen# �10%} for enginEering and miscelfaneous cos#s ifi tf�e City prepares the piansj. i. On a!I facilities included in this agreement for which the developer awards its own construction cor�tract, the deve�op�r agrees to fallow the following proc�dures: .� �. musf be advertised, �id and awarded in accordance with S atut�s prescribing the requirements for the lettir�g of contr r the construction � of public work. This includes advertising 9 cal newspaper at least twice � in one or more newspapers af circulat9on in the cour�ty or counties in which the wark is fo erformed. The second publication must be on or � befare fh �10th) day before the first date bids may he submitteci. The �f the Cit)► a� �r in ���rp of the Gity. 2. To employ a construction �vntractar, wha is approved by the Director of the Depa�ment having �urisdiction over the facility to be so constructed, said contractor #o meet City's requirements for being insured, licensed ��� bonded to do work in public right of way. 3. To requEre th� contracior to furnish to the City paym�nt, Qerfnrmance and maintenance bonds in the names of tf�e City and �F�� de�elaper for one hundred �ercent {100%) of the contract price of the facility, sai� bonds �o be furn�shed before work is commence. Developer fur�her shaN require the contractor to provide public liability insurance in the amounts required !�y tt�e City's specific�tions covering that particular wor{c. 4. To gi�e 48 haurs notice to the de�artment having jurisdici9on of intent to comme�ce cor�struction of the facility so that City inspection personne! wi1E be available; and #o require the contractor ta aliow the construction to be subject to i�sp�ction a# any and all times by City inspection forces, ar�d not to instaN ar�y pa�ing, sanitary sewer, storm drain, or water pip� unless a responsible City inspector is present and gi�es his corrsent fa proceed, and to malte such 1a�oratory tests of materials being us�d as may be required by tt�e City. 5, To secure approval by the D9rector o# the Department havi�g }urisdic�ian of any ar�d af! partial and fin�! payments to tF�e eontractor. Said approval shall be subject to and in accordance with requireme�#s of this agreement, and is not to consti�ute appro�al of the auantifies of wt�ich paymeni is based. �� � 6. To delay connections of buildings to service lines of sewer and water mains constructed under this can�ract untif sa�d sewer a�d water mains and service lines have been completed to the saiisfaction of the Watef Department. 7. it is expressly und�rstood by and between the d��eloper and �he City of ForE Worth, that in the e�ent #he dEveloper elec#s io award one single construction contract for sta�m dra�nage and pa�ement, said cantract sha11 be separate� in tF�e bidding and City participation, if any, shafl be iimited to the lowest pos�ible combi�ation of bi�s as +f each af #he abave were awarded as se�arate cantracts. J. Anything ta �he contrary F�erein notwithstanding, for and i� consideration of the promises and the covenants herein made by the City, the developer covenanis and agrees as follows; 1. The developer shall make separate elections with regard to water andlor sanitary sewer facilities, sto�m drainage, stree# improvements a�d street l�ghts as ta whether ti�e work prescribed herein shall be performed by the City, or by its contractor, or by fihe de�eloper, throug� its con�rac#or. �ach separate eleGtion shall �e made in writing and delivered to Cifiy no later than six {6) months prior to ihe expiration of this agreement. In tl�e event any of such separate eleCtions has not be�r� made and delivered to Ci�y by such d�te, it shafl he conclusively presumed t1�at the developer has efected that such work be Qerformed by the City in accordance with all of the te�ms of this agreement, and in par#icufar Paragraph V-F hereof. 2. frres�ective of any such election and whether t�e work is to be perFormed by the City, ar by its contractor or by the developer through its cantractor, the developer covenants and agrees to deliver to the City a perfarmance and payment guarantee in accordance with the provisions ofi Paragrapf� VdF of this agr�emenf. 3. In addifion to the guarantee required in the preceding paragraph, in the event developer �lects fha# t�e work be performed by the Cify, or by the City`s cor�tractor, or such efec#ivn is presumed as provaded above, the de�eloper covenan#s and agrees fo pa� to th� City tl�e deveiaper's share of the estimated onstftac�ian costs. Tl�e amoun� of such estimated payment .; shall be cornpuied as set out on ihe Summary of Cosf hereof, bas�d upon the lawest responsive bid #or st�cl� work, as determined by Ciiy, or uporr a cosfi es#imated to be perFormed �y City forces prepared by #he Ctty, as appropriate, a�d shall be subject #o adjus#m�nt to actual c�sts upon final campletian of the subjec� work. Such estimated paymer�t shall be made prom�tly upan d�mand by City, it being understoa� t�tafi such payment will be rnade after the receipt of bids far work, but in e�ery c�se prior to the awarci of any canstruction contrac�, unless otherwise specifically set out herein. 4. Developer fur�her co�enants and agrees #o, and by these pr�sents �oes her�by fully indemnify, hold harmless ana detend the Gity, its officers, agents and em�foyees from and against any and all claims, suits or causes of action of any nature whatsoever, whe#her reaf or asserted, brought for or on account of an� injuries or damages #o persons or property, including death, resulting from, or in any way con�ected witF�, t#�is agreement, or the cor�struc#io�t of the i+�r�provements or facilities describ�d herein, whe�her or nofi caused, in whole or in part, bv the neqliqence ofi officers, aqents, or emplovees, o�r fhe Citv. In additian, the develo�er covenants #o indemnify, hold harmless and defend the City, its officers, agents and employees from ar�d against a11 claims, suits, ar causes or action of any na#ure whatsoever brought far, or ort account of any injuries or damages to p�rsons or property, including death, resulfing from any failure to properly sa#eguard �he work or an acco�nt of any ac�, intentional or otherwise, neglect or misconduct of the developer, its contractors, subcontractors, agents or employees, whefi��r _ or nofi caused, in whofe or in part, bv fhe nealiaence af o#r�cers, aqen�s, or emplov�es o� the �itv. 5. Deve[oper co�enants an� agrees that if discriminates against na individual involving employment as prohibited by the terms of Ordi�ance No. 7278 {as amended by �rdina�ce No. 7400), an ordir�ance grohibiting discrimination irt employment practice b�cause of race, creed, cofor, re�igian, r�ational orig�n (except for illegai aliens), �ex or age, unless sex or age is a bortafide occupational qualificatiop, s�bcontractor or employm��t agency, either fiumishing or referring applicants to such developer, nor any agent of devefoper is discriminating against any indivit�ual involving employment as prohibited by the terms of s�c� Ordinance No. 7278 (as amende� by Ordinance No. 7400). .. J K. VenUe of any action brought he�eunder shafl be in Fort Warth, Tarrant County, Texas. L. The City's Policy for the installation of Community Facilities, as adopted by the City Co�ncil on September 1992, is hereby incorporated herein by reference, and D�veloper covenants and agrees #o camply with said Policy as a condition of thi5 contract and as a condiiion to #he platting of the s�abject property. M. The following descripfions of wark ap�ly, as appropria#e, to the areas included in the Community Facilities Agreement: 1. STREETS 5treets as shown in Exhibit B will be in accordance with plans and specifications prepar�d �y the Own�r's engineer and approved by the Director of Engineering. 2. STORM DRAkNAGE S#orm drain as shown in Exhibit B— 1 will be in accordance with plans and specifications prepared by the Owner's engineer and ap�ra�ed by the Director of Engineering. 3. STREET LSGHTING a. The developer shall p�ovide for the instalkation of streetlights at the approximate lacatior�s shown in exhibif "C', immed'tately after final acceptance o'F the street constructinn in accardance with engineering plans and specifications approved by the Transpor�ation and Public Works Department. b. Streetl�ghts on residen#�al a�d 1 ar collec�or stree#s car� be installed using overhead or underground conductors wi�h the ap�roval of #F�e Director Qf Transpo�tation and Pub�ic Works. c, Streetlights on arterial streets shall be installed wi#h undergroun� conduit and conductors. d. The Developer sha11 pro�ide for the insfiailation o� a 2-inch schedule 40 PVC conduit at th� depth not less thain 3D inches and at leasi 1 S inches behind the curb, "ciear from ali other utilities". A�10 e. The Developer shall provide for the insta�lation of a 2-inch schedule �0 PVC condu9i between streetlights proposed far ins#allatio� an� the power source to became operatEonal. � f. A 3-inch schedule SD PVC conduit is req�ired when crossing streefs at de�th nat less than 30 inches, unless indicated o#herwise on the plans. Concrete pull boxes shalf be provided a# fiY�e crossing poin�s. g. Luminaire �baflas# sf�a�l be rated for muititap operation and each luminaire shal[ have it's own photocell. 4. TRAFFIC C�NTROL DEVICES a. The Developer agrees ta pay for the stree# name sign ir�stallat9ons required by tf�is deve�opment to th� �xtent of $80.Q0 per ins�ectior�. This unit cost will be revised anr�ually by th� Departmer�# of Transportation and Public Works to reflect prevailing costs af materiais ar�d �abor. b. This development creates #he following number in#ersect�ons at a total cost as shown �o the Developer. c. The Developer may either deposit cash fun�s with the City equal to�the following amount at #h� time of Community Facilities Agreement ap�ro�a! or wait until the street name signs are to be installed. If the Deveioper elects to wait, tF�e cost of street name signs wil! b� at t�e rate prevailing when the De�eloper deposits funcfs witi� the City. d. The Ci#y will i�stall the street nam� signs upon finai approval of th� stre�t construction. The s#reet name signs wil� remain the pro�erty of, and wifl b� maintained by, the Gity. 5. OTHER WORKS In the event that other works is required it will be include� as s�ecif�c requirem�nts to Community Facilities Agreement. N, Developer and City agree that #his Agreem�nt represents �he complete and exc�usi�e statement of �h� mut�af un�erstandings of the parties ar�� ihat this A�reement supersedes an� cancels and previous written and oral agreements and cornmunications related to the s�abject matter of this Agreement. A-11 .t ' � IN TESTIM�NY WHERE�F, the City of Fort Worth has caused �his instrum�ntfo be executed in triplicate in its name and on its beha�f by its City Manager, attesfed by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed fhis instrument in quadn.�plicate, at Fo�t Worth, Texas this the �� day of �� C. , 20 �. APPROV�D AS TO FORM AND I�EGAI.lTY: ( _ �I `--, , ` � --� . _ Gary J. �einberge� Assistant Gity Attorney ATTEST: ' �r . �� . � . � G�oria Pear �n City 5ecret�ry � ��� �� ..�__..,....._. con�ract 1�u�horiaat�o�c t�a'�� .. . �� � �� � b a �� ,� - _-� REC�MMENDED: �� � � a, Director Trar�sportion and Pu ` � Wor�Cs Department CITY QF FORT WORTH, TE S B t� � MAF�C A. O � �-- ,ASSI�TAN7 CI7Y MANAGER �E1l�L,OP�F�S: �anne,�� F}�e.nu e. �• P. � D:: r�;�e� B /c�� . / Gary D. S1��ield, Preside She.�fie.t�d f�ss� t'nan� C��n� r� P a..rir-n e-r A-12 �� C� ,i�, �'-�`ir D�VELO���: �arne�y I�ve-��e- �. P• ��I�! I�� � ' �� ,. ./�/ v� � � Gary D. Sh ield, President s1ne��et �-5�se�k-1�1'�a.-nc+�e.+n�e�l+- C.� • ^ C. C.�e-�er�a- �a-.rk n Q-r . �/ A-13 iuuu �i � v � r f�1 � n �. v� `� ' � y i �� � t �u��i� , ' - Pl� '���t �� r r � ; � y_ �1AL'E0 � � � �� � �� � i � . Q I.� �-% J I � � � itit a � �i z � l'A�LI� ! I � � . � _ i =�� / RA� � ; -�``� �' � ��r�che Q .: �::=::;=:::;:=:::=:;�;;:=:=:::;;:;;;::::� i PROJ �CT . �ar�r � � �`::i�t���:::'::`-�`:�:`� J �OCA`�ION _ _�—� ', � ��i� � �LIZA�ETN ; , ,, 1 8�D --+ V % , � � � z � � DOWD�LL � i a � � � U �� f/� 1 /� �� u � / i �� � ��.� ..� �� ��� ���it����� �� � .. NOT TO SCAi.� ��. .� � L��Ai'IC�N 1V�,P � ��HI�I� � R�E�Y PL�i.CE OGM���\Jab\010921\c1v1B211ofa.dqn ��� � a CARTER & BURGE55, It+1C. m nw� sr�r FqR Yr`00.iF� 1% 761D2 PR4JECi N4. 010821.610.I.OflO AAGE 1 OF fi Il SGALE� 1" = 20p' RAMEY AVENU� � � �� � � .� �. �� ���. ,: ! � f� „ ! 16 15 �* �. � 2 3 � o : a -� .., rs 3 z !: :� ra z � �� �` `• � : + - . , . .,. '.. 1 � w.c ac �+ua w.riowu. �ssoc. � !Z 1 s � f 11 Q 3 •` •• •, 5 ra.��tii.ra.i2et � ., :/M ♦� : LOr �. sLaM t � �r�, 1E�QO�BROpC Y4LL�CE � 1! { f�:rl • • i c.�e. 0. se19t ��s� rr � 9 .� W : � � � �.�� g � b � 10 5 ,� 10 5 {� ■/; -- � 1 �� y 6� X' 9 6 p�;� o � 3 � � ra rr 12 r� f e � Y,r � r :1' / . � � Y srzt�r c ,Y ` ! • .. .. ... ... .r .. ./ +♦ '�s r■ •■ ��� „r� y•wa•r�i,�/ _'�n•• `� ♦ 3 O .. .� r' s r a s �o rr rz �s 1+ rs f6 i� is �.� ���.�;��..� I "� �"� ..� .� � � � � i � s ! FTIZHUGH ST�T, ,� N . cb pO _� h,i e� : � �� r� STR��iS �X���IT � RAMEY PLACE LEG�N� PROP. 29' 8—S ROADWAY/ 50` ROW ��/� L 1 M I iS DF PFi0JEC7 �..�, ��, PROP. 4' S I QEWALK •••••••••••••••••••� OCN�p� \ J o41010621\a�+� B21 I a�o. alqn ��t� � ���� CARTER & BURGESS, IIVC. m rrw+ s,s��r �� ��rT%7Gi02 PRflJECT N0. 010821. �t0� 1.400! PAGE 5 t1F 6 I •c- �� � SCALE� 1" W 20Q' �16 li J5 � !� RAMBY AVENUE � ������ �� 1 � !d I ..� Z 3 � 1 r p � � !3 p � � I ` rz O � � � � � !2 , � � r� * �! � rr 4 S� \I W I Q p ' � 10 g I !0 � 5 � 2 �+ � .7 � g 6� I 9 6 10 !! rO !3 � � � 5,�FLk�M � e � I �ST'RBET C 7 / ' s ---- --- ---�-� . 6' F L UME � O � � 6 r a 9 ►o rr r2 rs ra i5 r5 �� ie I .....,.M..._._..... .,.. �, � � ElJIR OY[ lC%AR MMIIONIL A570C. ; YGI.! IT11.0417l7 co, i. etou i ra+ono�oo4 r�u►ai r.e. �, si.io� nai ,� ^. ....�„u .. � � i �� � �� `� �� G� - � fR � �`�' �� �+ � �b" ? : � � � � �� N � � � � 4' , ��. � ` �3 P r 't FTTZHUGH ���, =• �' r - �,�#' � I LEG�ND 'ROP. 5i0RM DRAIN LINE �RaP, i �v��-r PRQP. MANH4LE ?ROP. HEADWALL =XI5T. STORM DRAIN LIN� � I N1I TS OF PROJECT — � ---� �-�-�-- ,. L ��:.���� }GNag�\JoC\8108211c1v�B211afo.d�n ST� RiV� C� �� N �Xi���IT �=� R�Y�Y PI,ACE ��� _� � CAfiTER d BURGE55, INC. . :ir n� m�r WG(f 1WR1H.t717'6W2 , ?ROJECT Ha, 010821. 01 �. 1. 00� I �PAGE � OF 6 � i SCALE� I" = 200' �• , � 6UK d� ,�IG�. h,.T�fX�L .650C. � I 12 t 3 � { !2 Q� � � 5 'M1.11T11.�0.121T r.ar L lLGCR i , ' ! , �cfoo.aaoarc ruua� 5'T'RJr� j c.�. �. siioc ii�i , . . 4� ,: x�Y Av�rr� � � �/ . _ ,.� � � .� � �� ►s J� � f�� r{ r r z a � � ` 1 � � rs � z rs z � ` i !1 � A � r! . 4 I 9 8 '. � �+ 6 W ro a � +o s � u� � � 9 6 �" O � � 3 � p fi fn 10 !1 r2 !3 1 4 � 8 ' �,srx��r c ' � �. .� � • � 3 -- o � I z ,�_ e � a 9 io rr r2 ra r� rs rs �� !a � ��� -- E � �� �'^ �� .�,, � FTTZHUGH SZ���., LEGEND PROP. S I NGL� STftE�� L I GHT EXI57. SINGLE STREET LIGHT f ON STEEI. PO�,� WITH STRE�7 AND 570P $IGNS ATTACHEDI � � Pf�OP, STRE�7 $ ! GiJ �. EXIST. STREET SIGN � ���nirs oF f'F20JEC7 _,_,��� OGk�p�\Jab�0IQ821\o1v�8211ofa.dQn � �Y pO N � �� � SiR��T ��C�HTS �X�I�lY � RAMEY PLACE ��� z� �u�^�� r.u�r�a & euRc�ss, ��vc. m +awN s��r fORT WORFN,1% 761 dl PROJ�CT N0. 01082S.Ot4•1•Oa PAGE B OF t C&B No. Q10821 010 �A�T�R � �I��C���, ll���. }i7 �`�►I}�1N S�'RE�T, FO�� 1N�R7F�, T���4S 761�? ���!�F �v�. �a��� ���-�aao o� ����� ����� a���v��� � -, - � � , e� I �, i — 'i.' s il � � _ - J�NU�I�Y �, �00� PAV1N� �i-���n� �����i�Yion� � 1 6" l.ime Stabilized Subgrade 2 Lime for Subgrade 3 5" Reinforced Concrete Pa�ement 4 Handicap Ramp 5 4' Sidewalks I 6 Sawe�tlRemo�e 90 L.F. Existing Concrete Curb and Gutter ���'OiAL �I�,VIiVG ��v 9,257 139 9,0�� 2 17,734 1 u�rY S.Y. TN S.Y. EA. 5. F. L.S. ��ic� 1.65 10Q.�0 20.50 500.00 2.25 600A0 P�ge 4 ��o��� 15,274.05 13,900.00 184,561.50 1,000.00 39,901.5p * 6Q�AQ � 5idewalks to be canstructed by home builder $�55,237.05 �� �AVIf�� n �ITY ������I��e�101� l���1�# �Parti�pa�on�from T/PW Department � ��� �L SI.� � 100,0 0� 00� 1 0�00� 00 ��O�AL P�+Vi�G $900,000.00 � ** �etter from the Transport�tionll�ublEc Worl�s �epariment is attached, g:ljob101 Q8211estlrameycfa5.xls � c�B �vo. o� os�� o� a_ �1��41�# ��S�R��iIOA,� 1 5' FLUME 2 6' FLUME �iOTAL SiO�M DR�41A6 SY�iE�IA �� �� � ��� � s���r����� �s, 2oa� SYBRlV� ��lN �Y�T�� QYY Uhlli 121 �,.F. 70 L.F. G:W 0 814108211�S�IRAM EYC FA.XLS PRIC� 39.00 45.00 P�ge 4 _-- ---� �.f�i0U1�T 4,7'� 9.00 3,150.00 $�,869.Q0 � , ��� �� � ��� � SEPi�{V���R 28, �009 SiR��i L��b�� � S!(��� �Ii�NI#� Q�S��IPTIOfV QiY Uf�IT � STREET LIGHTS (SINGLE ARM) 9 EA. 2 STREET 51GNS 4 EA. ��pi��, SiR,��Y ��CHTS & S1Gf�S ���c� 2,500.00 100 AO �n�oUs�i 22,500.00 4Q0.00 $��,900,�0 � G:1J0B101082 � lEST1RAM �YC �A.XLS . G&B iVo. 01D821 090 , Pa,c�e 5 � `..s �.�� .r.�ia �� ' � �3AIY�i (}lti�, 1�2A - 1719 f4'1�1�r' S'rRL;�T, ��3}[ FT1C1[�lR, I�ALLASF'1'I��rl� 7�rl�e '1'F1Ll;i'��t}h!€? 1-8�38-5�;-935� A1�I F f�17�14'f�,?�?"?"1'C? Lf�:': TER €]F C��UI E f�'�3 MRs� ]t ,ST�0353 ��r�'r��.{ �c.xv�n���:r� z�, zri�ra n ���.������: l�,#MEY AV�!'ii�i?, [„i'. {;iil} G�n�1FCl]RV [TW�'. ��i�,t���ri����fxr�, -��c �r�u�'� BFIYFT�'IC'lr'1FtV: f`1TY [)F f'C1itT �Vfi�'4��1, `i-t�r'4l�'�l'tlRT�i3'Ziil� 1��fU FU�3�.IC' �4'(}C#fCS Url'�,I;'I'14q r�l-I' r o��n •r� �c�c�imc����c�:� �rur�,�'�' rc�rt�r�v�i�•4•F�.T�c �r,�r�� AT�i'N: RrIC�['E�1 V�;TaA�(��:�?J �1h'lE�_�����r•,�•r ��an��r�r•.re c��M�' {t� c��-�ti7 [_LIv11:;�]' k'LL'AS�. �]�: �iUVl��f} "eTi�T�TI��. Sl r�J�C'7" ]1����1��� c)E' c'�}�,�)iT HAS �}�L?� Ah��rl[�F,D }l� r�7i�i.(�1�`�: . fr'��}�Ir 5'PT'.'CfrI1. C(}.+V1�1i'IC�N,S; flfi'�_{•: Tli; f�'.•����i'J�1.�!'if��C.'7'1���:5'.-3L'G'f�r�fP.��r1�'}�'f�4'ff il f)��dl�'��1+{: �Fr4!)L•T�i 7'FITF4fi1?TT*h' O�''C'��l:l1}T YfF�.7f.���5"�' 71f.•11' !'.•i 1 �1�fsN!!4 'T�) F; � r�l,�#1�lG' �3�" 1J4.•lr1�'I-!?H Tf7 ri14 :1CCC��.FN!' f�l'}�!# #1�5' (Jf( .�'!',•�:�'fJ77fL'1�t f�,•irl�'fi. Fffl:' .#r1�'�1![]�{ �S'f.+�'1} [I'}}!f'!� 1���irV� r�f,4 Y !��'f �1 f' (1�'+�.-1N ,�,lL'C'[��1,�'!' rV�?,1�1ffI:'f[ J!'Ii('!!'!1_"D �rV ,S'f.T('!! J�YS'71�[f�C'71{���`�5' !'I'I:�4` l� 7{f�' f4�Jh�l�#_�1{ �17F:r1'�'{}•'1�',S .-I �"�:�?��[lrl�' C11t L�.v77T'S� Dfl�'f'F'T���V7' l=1frl;l�f �f�1�}�" 1,�� �l�,�'�17-f} Prl YF.F,. 114r.S'���7f f�: ! �'",-11\'' ]' f,�'.STF: �:'f '!'�f?r� �S- .rl � '�:'�i��11? 11 ��' �'L'�'(r' _d � f��-I � �'!,'1' C' �i r 4`�ll: �i" �� �}�.5' 1.I:'1 "7l:�t [.�F C'h' � Ci7T h1:"��L,�l�S'T �Il,•I T f',•� � i� �f;;�'Y' �,S Y7l ti�: r1•1,-i DL•' � i' Tl;,�I f1��S'J4'F,R 'f {l ,,t�l+ .-I�.'C'[!L'r�7' �i'JTH fT.S' fJI# .•1 T,-�r�'f7T#!Fh' If,-I �'k. J�J��'s : i.'1'�)rUR S�!['N ��7',f{F:�+ 1��31�'h` RL�1 Y' �'�!:'L}' OrV :1N ,�I{'C'�1fr;'4T .+V��'r��fiif�'J4 .SPf=�'fI''!I:}7 {�'4 ,�'i.�C"�! 1.�'S'!'}�i.�C!'Jf7��:S' �:`i�fs'�V IF 171�' �1+i?�I�ll3L•'.i{ fI1�'NTI�'IES r7 PI:IfS��1N [)R FJ4`TlTY f)}T'�'f._'��f�'11'1' ���4f�,i•� 7'h►F. INTT;�,[��;'1.1,!''A5'#�"�:; T1�3i� A1ui1' h�lUl�}i�"i� ]5 TC� I�F� i.0}�#�Ii��REII �,S Y��It'�� ��;� THr i+.ot�VF �'??Bn!Z' :�ND MUST BE A' I"1`f�L: �� E�� i? '1"� 1F' �tFi�_ r'� I,1._ f�-r�LT_i{ "1���h+k� A�D L'.{7I�1DI'�IDhiS �?F ;rHE CREDIT 1�MA.I1� iTrrc�HANGED. LSA�fC c)I�IL, NA J � . ����'�: �1 f�E-�i�k [f,}���) S1CiC�", 'L���L�. ���� ,��i Cetelo}� R Q9846 {8+89) C'ity of �o�t �o�t`hp 2'exas i�l�yar ��d Council Co�mun«��io� DATE REF�RENC� NUMBER LOG NAME FAG� 1 ��29�02 ��� �3�� 20RAMEY 1 of 2 suB��cr COMMUNITY FACIL.ITIES AGREEMENT W1TH RAMEY AVENUE, L.P. FOR THE INSTALLATION OF COMMUNITY FACIL�TIES FOR RAMEY PLACE ADDITION RECOMMENDATIQN: It is recommended that the City C�uncil: 1. Authorize the Ci#y Manager to execute a Community Faciiities Agreement with Ramey Avenue, L.P. for the installation af community facifities for Ramey Place Addition; and 2. Authorize the City Manager to deviat� from ihe current poEicy �y a[Iowing a Letter of Cr�dit for �100%, rather #han 125% as stated in the Palicy far Installation af Community Facilities Agreement, and allow monthly withdrawals on the �etter af Credit. DISCUS510N: Ramey Avenue, L.P communiiy facili�ies lacated in southeast attached map}. ., the de�re[oper of Ramey Place Addition, has executed a proposed cantract for to sarve a single-family der�elopment (61 residential lots and 2 commer�ial lots) Fari Worth, on ti�e southeast carner af FitzF�ugh A�enue and �oop 820 (see the The propased community facilities agr�ement is in compliance with City �olicy except for the following: � T�e d��elaper's financiaf guarantee is in the amount af 1 a�%, rather than 125% as stated in the Policy for lnstallation of Community Facilities Agreement; and o Mont�ly withdrawals from #he financial g�ara�tee. The de�eloper rec}uested these changes to assist him in obtairting his financing. City siaff concurs with th�ese exceptions. This development has five (5) interior streeis. The developer's share for street , improvemer�ts is $255,237, plus $5,105 for construcfion insp�ctioR fees. T�e Ciiy participation will be $100,000 as part� of the City af Fort Warth Empowerment Zone far the rev�talization of inner-city de�elopmer�t. The deve[aper's estimated cost for storm drains is�$7,869, plus $957 for construcfion �nspectian fees. Nine (9} street lights will be installed in this development. The developer's cost far the installation vf str�et lights is $18,QOQ. There will �e fiv�e {5) in#ersectians where street signs will be ins#alled at a cost ta t�e de�eloper of $500. Waterf5ewer Casts The develop�r's esiimated cast for water and s�w�r is $120, � 64, plus .$2,403 f4r construction inspection fees. The Water Department's participation is $72, � 99: C`i�y o, f 1�'o�t �orthg Texas f�i�yor �r�� Co�r�ci[ C�n�nlur�i��-tior� DATE REFERENCE NUMBER LOG NAM� PAG� � 0129102 C�'� 932� 2aRAMEY 2 of 2 SUBJ�C7 COMMUNITY FAC1LITiES AGREEMENT WITH RAME AVENLJE, L.P, FOR THE INSTALLATI�N OF COMMUNITY FACILiTIES FOR RAMFY P�ACE ADDITION Tvtal Proiect Costs Tf�e total project cos# for this development is $581,�34. Th� develope�'s participation is $409,435, and the tatal City participation is $172,199. PLAN COMMISSI�N APPROVAL - On May 23, 2001, the Plan Cammissian approved the preliminary plat (PP01 D23). The final plat has been submitted to City staff far review. This dev�lopment is Eocated in COUNCIL DISTRICT 5. FiSCAL INFORMATIONICERT[FICATION: The Finance Direcfor certifi�s that funds are available in the current capital budgets, as appropriat�d, ot the Critical Capital Projects Fund and the Wa#er and Sewer Capital Prajects Fund. ►�iC��i7 Submitted for City Manager's Office 6y: Marc Ott Originating Depar4meut Heac�: Roher# Goode Addifional Information Contact: I F'UNI3 � ACCOUNT � � {to) � 8�476 I — 7804 Rabert Croode 7804 � {£rom) P'[ 62 — P172 I C116 CENT�R � AMOi1�TT 53914d 06a162151220 $ 59,031.00 53914D 470172131210 $ 13,168.a0 541200 Q20116136367 $100,000.00 CITX SECRETARY APPROVED 10/29/02