Loading...
HomeMy WebLinkAboutContract 28303THE STATE QF TEXAS COUNTY OF TARRANT �liY �������� �������� �e �8��� AMENDMENT No. 3 � -. — § CITY SECRETARY CONTRACT NO. (No M&C Neer�ed) �� WHEREA�, the City af Fort Worth (City) and Dunaway Associates, Inc., (Engineer} made and entered into City Secretary Contract No. 26599, (the Contract) which was authorized by the Czty Council by M&C 18456 on the 13"' day of February, 2001; anci WHEREAS, ihe Contraet �involves engineering services for the �ollowing project: Engine�ring contract for the Saniiary Sewer Main 1-I-1 Condition Assessment and Drainage Area Evaluation Study. WHEREAS, it has becorne nece�sary to execute Amendrnent No. 3 ta said Contract to inc�ude an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized represeniatives, enter into the following agreement which amends the Contract: 1. Article I of the Cantract is amended to include the additional engimeering services specified in the proposal letter dated Septernber 4, 2002, a copy of which is attached hereto and incorporated herein. The cost for the additianal professional services to be performed by the Engineer total $24,942.2Q. 2. Article II of the Cantract is amended to provide for an increase i� the maximum fee ta be paid the Engineex far all work and services nnder the Contract, as amended, so that the total fee paid by the City for a11 work and servi�es shall not exceed $848,770.73. All otl�er provisions of the Contzact which are not expressly amended herein shall remain in full force and effect. ��� EXECUTED on this � —� 20� in Foxt Warth, Tarrant County, Texas. 3 day of � � �� i i� � � � � � "���� : ��� DiJNAWAY ASSOCIAT�S, INC, ENGINEEBS • PLANNERS e 5[1RVEYORS DAI No. 20Q0181 September 4, 2002 Mr. Chris Harder, P,E. City ofi For� INbrth Wat�r Depar�ment 1000 Throckmorton Fort Worth, Texas 761 a2 Reference: r4met�dmenf iVo. 3 Sanitary 5ewer Main M-1-I-1 Condition Assessment and Drainage Area Eval�ation 5tudy Sewer Projec� No. PS 170-070� 7041 Q020 Water Proj�ct No. PW � fi2-06�1 621 41 020 D.O.E. No. 3783 Dear Mr. Harder: D�naway Associates fnc. is pleased to present Amendment No. 3 for the following additional serv€ces that are beyond our origina[ scope ofi services. Caihoun Wateriine ��,254 LF of additional surrrey and design for nevvly constructed and replacement of water line for: o fi'h S#reet 6etween Commerce and Calha�n 0 7" Str�et between Commerce and Calhoun o Calhoun between 8�' and 7"' Street � 5eparate plans for Emmediat� constructi9n �f 94 LF 9f 2_0-inch ►n�at�r frr�� in C4mmPrce, • Preparation of up to 1 naw Temporary Right-of Entry, • Coordination, afignment analysis, capacity sizing, utility research, and right-of-way research for water design. � Reimbursables. Phase � e i 34 LF of additional actual design for repiacement of sewer line for M-132 Sta. 10+76 to i 2+10. � 584 LF of additional sur�ey far repiacement of sewer line for M-� 32 Sta. 10+76 to 16+6Q. 1501 METtRTMAC CTRCLE � SUITE 100 • F�RT WORTH, TEXAS T6107-fia72 �(817) 336-1121 o METRO (817} �29-2l3S � FAX {817) 335-7437 • Amendment IVo. 3 September 4, 2002 Page 2 Not included for Phase 1: o Preparation of 2 new Tem�arary Right-of-Entries. o Adcfitional reproductian for reviews o Additional coardination, alfgriment analysis, utility research, and right-of-way research for sewer design, o Additional r�imbursables. � A summary of t�e proposed budg�t for this amen�ment is as follows: �ee Cali�oun Waterline I $ 21,675A0 Phase 1 $ 3,26720 7'DiA� FROPOSED AFi��N�M�PIT I $ �4,942.20 Attached is a breakdown of the sUmmary for the scope of work in the amendment. A summary af the total project fees is as follows: Contract �escription Origina! Contract SSES Evaluation Amendment No. � Perform Boundary Survey Services for platiing Amendmer�t No. 2 Design of 14,536 LF of Sewer & Water f mprovements Amendment No. 3 Calho�an Waterline, & Phase 1 TOTAI� pROJ�CY Fee $ 509,997.�3 � � a�,000.ao $ 299,831.4fl $ 24,942.20 $ �4�,770.73 Please review the enclosed inforr�ation and da not hesitate to call me if you have any questians or require additiona! informafiPon regarding this re�ised proposal. Sincerely, D�JPlp►Wl�Y ASSOCIAi�S, IiV�. � Brian S. Dar�y, P.E. Associa�e 20001B103_LtrAinend#3_CHarder 02-0904_BS�.doc Attach�nents � AUNAWAY ASSOCIATES, INC, ENGINEBR3 � PLANHERS o 3URVEYOR3 Amendment Na. S Sanitary Sewer Main M-1-l-1 Condition Assessment and Drainage Area E�a�uation Stt�dy Sewer F'roject No. PS 170-fli0�70410020 Water Project No, PW 162-060162t4102d D.O.�, No. 3783 Calhoun Wateriine ' — c Design of 1,25U LF of sewer & water ($Z D.ODILFj M/WBE Suroey (1,250 LF x $3A0} Suh-consvEtan# adminlstration (10%) Separate plans for 90 LF of 2Q-Inoh water Ilne In Commerce Easement Prepara#ian Tetnporary Right-of-Entry ($501 ea) Coprdinatlon, alignment analysls, capacity sfzing, utiliiy research, & right-of-way researc Relrnbursabies 5lJB-TOTAL _^c __ , Phase 1 � Design o# 134 LF af sewer & water {$10.00RF) M11NBE Survey {584 LF x $3.00j Sub-consuitant administration (1 U%) SUB-ibTAL �TOTAL 12,50Q.U0 3,750A0 375.00 1,000.00 $ 50,�0 h $ 3,eoo,ao � 504,00 __ 2i.67S,00 $ 7,340.00 $ 'l,752.00 $ 175.2D I $ 3,2G7.20 _ I $ 24,942.20 � 200D�81�3 Amend#3 CHarder 02-0904 BSI],xls