HomeMy WebLinkAboutContract 57087-FP1-FP1 FORT WORTH. City Secretary Contract No. 57087 Date Received 10/19/2023 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Wayfare Multifamily City Project No.: 103516 Improvement Type(s): M Paving Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: W. Keith 9ov� W. Keith Jones (Oct A, 2023 13:18 CDT) Contractor President Title IMS Construction Company Name Adtlian At anda Adrian Aranda (Oct 19, 202314:18 CDT) Project Inspector T e66� 9. Project Manager -X&IJ"` Rebecca Diane Owen (Oct 19.202316:35 CDT) CFA Manager _A Lauren Pneur (Oct 19.202316:47 CDT) TPW Director William John-n(O 20.202311:11CDT) Asst. City Manager 0 Drainage N Street Lights ❑ Traffic Signals $1, 904, 324.69 $41,634.00 $1,945,958.69 $1,945,958.69 Oct 19, 2023 Date Oct 19, 2023 Date Oct 19, 2023 Date Oct 19, 2023 Date Oct 19, 2023 Date Oct 20, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Wayfare Multifamily City Project No.: 103516 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 120 WD Work Start Date: 3/21 /2022 Completed number of Soil Lab Test: 573 Completed number of Water Test: 23 Days Charged: 293 Work Complete Date: 9/15/2023 Page 2 of 2 FORT WO 1T H CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) Contract Limits Project Type DRAINAGE & PAVING City Project Numbers 103516 DOE Number 3516 Estimate Number 1 Payment Number 1 For Period Ending 9/15/2023 WD City Secretary Contract Number Contract Time 12WD Contract Date 12/6/2021 Days Charged to Date 293 Project Manager NA Contract is 100.00 Complete Contractor 1MS CONSTRUCTION 5690 WATERMELON ROAD, SUITE 400 NORTHPORT, AL 35473 Inspectors D. WATSON / A. ARANDA Wednesday, October 18, 2023 Page 1 of 6 City Project Numbers 103516 DOE Number 3516 Contract Name WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) Estimate Number I Contract Limits Payment Number 1 Project Type DRAINAGE & PAVING For Period Ending 9/15/2023 Project Funding UNIT III: DRAINAGE IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE RIP RAP 1706 $2.06 $3,514.36 1706 $3,514.36 2 REMOVE HEADWALL/SET 1 $4,150.00 $4,150.00 1 $4,150.00 3 LARGE STONE RIPRAP DRY (CO #1) 270 $90.00 $24,300.00 270 $24,300.00 4 TRENCH SAFETY (CO #1) 2621 $1.00 $2,621.00 2621 $2,621.00 5 21" RCP CLASS lII 193 $56.00 $10,808.00 193 $10,808.00 6 21" RCP CLASS IV 8 $66.00 $528.00 8 $528.00 7 24" RCP CLASS lII 1280 $68.00 $87,040.00 1280 $87,040.00 8 30" RCP CLASS III 183 $125.00 $22,875.00 183 $22,875.00 9 30" RCP CLASS IV 248 $135.00 $33,480.00 248 $33,480.00 10 42" RCP CLASS III (CO #1) 339 $175.00 $59,325.00 339 $59,325.00 11 7X3 BOX CULVERT 370 $475.00 W5,750.00 370 $175,750.00 12 4' STORM JUNCTION BOX 9 $7,600.00 $68,400.00 9 $68,400.00 13 5' STORM JUNCTION BOX 1 $9,500.00 $9,500.00 1 $9,500.00 14 4' MANHOLE RISER 2 $6,500.00 $13,000.00 2 $13,000.00 15 10' RECESSED CURB INLET 9 $5,100.00 $45,900.00 9 $45,900.00 16 20' RECESSED CURB INLET 1 $8,100.00 $8,100.00 1 $8,100.00 17 HEADWALL (CH-FW-O) (DIA=42 IN) 1 $6,200.00 $6,200.00 1 $6,200.00 18 WINGWALL (PW-1) (HW=3FT) 1 $41,350.00 $41,350.00 1 $41,350.00 Sub -Total of Previous Unit $616,841.36 $616,841.36 UNIT IV: PAVING IMPROVEMENTS Item Description of Items No. 1 REMOVE SIDEWALK 2 REMOVE CONC CURB & GUTTER 3 SITE CLEARING 4 UNCLASSIFIED EXCAVATION 5 EMBANKMENT BY PLAN 6 SWPPP 1 ACRE 7 LAREGE STONE RIPRAP DRY 8 HYDRATED LIME Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total 49 SF $1.00 $49.00 49 $49.00 1016 LF $12.00 $12,192.00 1016 $12,192.00 1 LS $2,640.00 $2,640.00 1 $2,640.00 12656 CY $3.50 $44,296.00 12656 $44,296.00 5573 CY $3.00 $16,719.00 5573 $16,719.00 1 LS $18,700.00 $18,700.00 1 $18,700.00 24 SY $90.00 $2,160.00 24 $2,160.00 179 TN $160.40 $28,711.60 179 $28,711.60 Wednesday, October 18, 2023 Page 2 of 6 City Project Numbers 103516 DOE Number 3516 Contract Name WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) Estimate Number I Contract Limits Payment Number 1 Project Type DRAINAGE & PAVING For Period Ending 9/15/2023 Project Funding 9 8" LIME TREATMENT 8530 SY $3.25 $27,722.50 8530 $27,722.50 10 4" CONC SIDEWALK 2750 SY $55.13 W1,607.50 2750 $151,607.50 11 BARRIER FREE RAMP, TYPE R-1 2 EA $1,942.50 $3,885.00 2 $3,885.00 12 BARRIER FREE RAMP, TYPE P-1 2 EA $1,942.50 $3,885.00 2 $3,885.00 13 4" SLD PVMT MARKING HAS (W) 712 LF $1.33 $946.96 712 $946.96 14 4" BRK PVMT MARKING HAS (W) 4304 LF $1.33 $5,724.32 4304 $5,724.32 15 8" SLD PVMT MARKING HAS (W) 712 LF $2.65 $1,886.80 712 $1,886.80 16 24" SLD PVMT MARKING HAE (W) 176 LF $16.10 $2,833.60 176 $2,833.60 17 LANE LEGEND ARROW 8 EA $247.25 $1,978.00 8 $1,978.00 18 LANE LEGEND ONLY 8 EA $287.50 $2,300.00 8 $2,300.00 19 REFL RAISEDE MARKER TY II-C-R 108 EA $4.92 $531.36 108 $531.36 20 6" TOPSOIL 650 CY $13.80 $8,970.00 650 $8,970.00 21 SEEDING, HYDROMULCH 5714 SY $1.17 $6,685.38 5714 $6,685.38 22 FURNISH/INSATLL ALUM SIGN GROUND 12 EA $416.98 $5,003.76 12 $5,003.76 MOUNT CITY STD. 23 REMOVE SIGN PANEL AND POST 1 EA $169.76 $169.76 1 $169.76 24 TRAFFIC CONTROL 1 MO $3,750.00 $3,750.00 1 $3,750.00 25 RAIL (HANDRAIL) (TY E) 108 LF $162.00 $17,496.00 108 $17,496.00 26 10.5" CONC PAVEMENT 7793 SY $95.03 V40,568.79 7793 $740,568.79 27 10.5" COMMERCIAL DRIVE APPROACH 2 EA $22,575.00 $45,150.00 2 $45,150.00 28 END OF ROAD BARRICADE 1 EA $914.25 $914.25 1 $914.25 29 CURB RAMP AT CIBOLO HILLS PKWY AND 2 EA $1,942.50 $3,885.00 2 $3,885.00 BUS 287 Sub -Total of Previous Unit $1,161,361.58 $1,161,361.58 - - - - - - - - - - - - - - - - - - - UNIT V: STREET LIGHTING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 2" CONDT PVC SCH 80 (T) 1105 LF $22.00 $24,310.00 1105 $24,310.00 2 RDWY ILIUM FOUNDATION TY 3,5,6, AND 8 19 EA $1,600.00 $30,400.00 19 $30,400.00 3 FURNISH/INSTALL RDWAY ILIUM TY 18 POLE 15 EA $2,555.00 $38,325.00 15 $38,325.00 4 FURNISH/INSTALL TYPE 33A ARM 16 EA $479.00 $7,664.00 16 $7,664.00 5 FURNISH/INSTALL LED LIGHTING FIXTURE 16 EA $700.00 $11,200.00 16 $11,200.00 (137 WATT ATB2) 6 RELOCATE STREET LIGHT POLE 4 EA $1,970.00 $7,880.00 4 $7,880.00 7 GROUND BOX TYPE B W/APRON 19 EA $1,000.00 $19,000.00 19 $19,000.00 Wednesday, October 18, 2023 Page 3 of 6 City Project Numbers 103516 DOE Number 3516 Contract Name WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTING For Period Ending 9/15/2023 Project Funding 8 RECONNECT CONDUCTOR 40 EA $155.00 $6,200.00 40 $6,200.00 9 NO 10 INSULATED ELEC CONDR 2330 LF $1.55 $3,611.50 2330 $3,611.50 10 NO 6 INSULATED ELEC CONDR 6695 LF $2.65 $17,741.75 6695 $17,741.75 11 REMOVE EXISTING GROUND BOX 1 EA $400.00 $400.00 1 $400.00 12 REMOVE EXISTING CONDUIT AND 890 LF $1.15 $1,023.50 890 $1,023.50 CONDUCTORS Sub -Total of Previous Unit $167,755.75 $167,755.75 Wednesday, October 18, 2023 Page 4 of 6 City Project Numbers 103516 Contract Name WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) Contract Limits Project Type STREET LIGHTING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number I DOE Number 3516 Estimate Number I Payment Number 1 For Period Ending 9/15/2023 $1,904,324.69 $41,634.00 Total Contract Price $1,945,958.69 Total Cost of Work Completed $1,945,958.69 Less % Retained $0.00 Net Earned $1,945,958.69 Earned This Period $1,945,958.69 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $1,945,958.69 Wednesday, October 18, 2023 Page 5 of 6 City Project Numbers 103516 Contract Name WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) Contract Limits Project Type STREET LIGHTING Project Funding Project Manager NA Inspectors D. WATSON / A. ARANDA Contractor IMS CONSTRUCTION 5690 WATERMELON ROAD, SUITE 400 NORTHPORT , AL 35473 DOE Number 3516 Estimate Number I Payment Number I For Period Ending 9/15/2023 City Secretary Contract Number Contract Date 12/6/2021 Contract Time 120 WD Days Charged to Date 293 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $1,945,958.69 Less % Retained $0.00 Net Earned $1,945,958.69 Earned This Period $1,945,958.69 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $1,945,958.69 Wednesday, October 18, 2023 Page 6 of 6 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Wavfare Multifamilv CONTRACT: CS 57087 ICFA# 21-0104 I CITY PARTICIPATION:( Yes ICITY PROJECT # 103516 IFID # 30114-0200431-103516-EO7685 FILE # X-27026, W-2790 INSPECTOR: PROJECT MANAGER: (ORIGINAL CONTRACT EXTRAS TO DATE ICREDITS TO DATE ICONTRACT TO DATE (AM�OODUNTT O�F PPRROP. CH ANGE ORDER TA� REVISED NNTRACT AMOUNT REVISED COST SHARE TOTAL REVISED CONTRACT Jesse Davis Phone No: 817-863-3705 Debbie Willhelm Phone No: 817-392-2481 CHANGE ORDER No: CSC No. 57087-CO1 CONTRACT UNIT I WATER SEWER PAVING DRAINAGE STREET LIGHTS & SIGNS I CONTRACT Developer Developer Developer Developer DAYS Cost City Cost Developer Cost City Cost Cost Citv Cost Cost City Cost Cost City Cost $495,729.42 $148,017.70 $165,850.39 $0.00 $1,161,361.58 $0.00 $575,207.36 $0.00 $167,755.75 $0.00 120 III $575,207.36 $167,755.75 $0.00 120 $41,634.00 $0.00 $0.00 0 $616,841.36 $167,755.75 $0.00 120 $616,841.36 $187,765.75 $148,017.70 1,361.58 $0.00 0.00 $0.00 1,361.58 $0.00 $1,161,361.58 City Cost: $2,843,126.20 Revised 10-12-2011 Page 1 are directed to make the following changes in the c ntract docurtlents IYou CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost UNIT IA -]HATE] IMPROVEMENT (CITY -DEVELOPER COST SHARE) I NEW 3312.2203 3 I EA Y'Water Service $4,350.00 Yv13.050.00 �0:00 1 3 3305.0109 120 I LF I Trench Safety $1.00 $120.00 $a 00 I Subtotal Unit [A -Water Improvements (City -Developer Cost Share $13,170.00 $0.00 You are directed to make the following c anges in the cpntract docu�}ents CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE Developer Cast City Cost I I UNIT I([[[ -SEWER I I NEW 3305.1104 1 160 I LF 1 24" Casing by Other Than Open Cut $465.00 $74 400.00 $0.00 1 Subtotal Unit II Sanitary Sewer Improvements $74,�00.00 $0.00 1 You are directed to make the following changes in the cPntract documIllents CITY BID ITEM I PAY ITEM # I QUANTITY I UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost 1 UNIT III - DRAINACr IMPROVEMENTS 1 1 3 3137.0102 5 SY Large Stone Ripmp, dry $90.00 $450.00 $0.00 1 1 4 3305.0109 234 LF Trench Safety $1.00 $234.00 $0.00 1 10 3341.0402 234 LF 42" RCP, Class III $175.00 $40.950.00 $0.00 1 Subtotal Unit III - Dminage Improvements $41,634.00 $0.00 GRAND TOTALI 1$129,204.00 1 $0.00 1 Asterisk (") indicates New Pay Rem REASONS FOR CHANGE ORDER Portion of the sanitary sewer under private parking lot will be installed by bore. Added irrigation services to private development. Extend storm pipe to provide cover for water line. Changes correspond to Plan Revision 02, 03, and 04 as shown on Sheets 8, 10, 11, 12, 17, 18, 20, 35, 37, 40, and 46 of the construction plans. No additional days are requested for this change order. This project has City Participation. This change order does not affect City Participation. Developer is responsible for 100 % of the change order cost and no reimbursement from the City will be sought by the Developer. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] Revised 10-12-2011 Page 2 e.nm nNI'olutions A 4 LmanLda M�� By Amanda —.(Apr I7,203309 Do CDT) Name: Amanda Mats, PE Title Project Manager APPROVAL RECOMMENDED: CFW- Water Department By 0 Name Taylor Gunderman, PE Title: Engineering Manager RECOMMENDED: CFW- *Contrect Compliance Manager D.66a By: 9 Name: Debbie J. Willhelm. PE Title Senior Professional Engineer M&C Number: M&C21-0769 M&C Date Approved 9/28/2021 APPROVED: Wayfare Development Group- Cibolo Hills, LLC By � 1.3fltit�a P, ..,3 o.IDTI Name: Jackson Wallace Title President & CEO APPROVED: CFW - Assistant City Manager D �re L By: .171 Name: Dana Burghdoff Title: Assistant City Manager APPROVED: IMS Construction By ke¢nst22/'6'Af5'f3EDn Name: Keith Jones Title President APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By, 101mh,,,..,1.-1.1<— Name: Richard McCracken Title: Semor Assistant City Attorney ATTEST * Contract Compliance Manager (Project Manager): A By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑There are NO City Funds associated with this Contract ❑' There are City Funds associated with this Contract Revised: 10-12-2011 Page 3 FORTWORTH. M" TRANSPORTATION AND PUBLIC WORKS 9/15/2023 IMS Construction 5690 Watermelon Rd., Suite 400 Northport, AL 35473 RE: Acceptance Letter Project Name: Cibolo Hills Wayfare Multi -Family Project Type: Water/Sewer/Drainage/Paving/Street Lighting City Project No.: 103516 To Whom It May Concern: On June 20, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on September 15, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on September 15, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 871- 392-2481. Sincerely, T e66� Cy ui�'D,�,z Debbie Willhelm , Project Manager Cc: Adrian Aranda , Inspector Donald Watson , Inspection Supervisor Aaron Ybarra , Senior Inspector Jeff Hicks , Program Manager Thomas C. Bartowski , Consultant Bandera Utility Contractors Inc, Contractor Wayfare Cibolo Hills LCC , Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVIT STATE OF ALABAMA COUNTY OF TUSCALOOSA Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared William Keith Jones, President of fMS Construction, LLC., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as: Wayfare Multifamily Cibolo Hills Parkway BY: i V�illiam Keit ones, President Subscribed mud s►i'orn before nic on this date 19"' of Oetober, 2023. 4NoaryPublic � J�_C� I Tuscaloosa, Alabama qi8� 9 a C��r, ev A R ,1����•aee roe' ��? i � � w SUS LIC' ` �a Q' CONSENT OF SURETY TO FINAL PAYMENT NA Document G7M Bond No. CIC907794 TO OTM. (Mawandaikew City of Fort Worth, Texas 200 Texas Street Fort Worth, Texas 76102 PROIBCT. (Nonewrdeddn) WAYFARE MULTIFAMILY (CIBOLO HILLS PARKWAY) TRAFFIC SIGNAL MODIFICATION TO SERVE BUSINESS 287 AND CIBOLO HILLS PARKWAY OWNER ARCHITECT CONTRACTOR supsl y Onm ARCIn xrs PROJECT NO.: CONTRACT FOR; Development/Subdivision CONTRACT DATED: In Mardance with the provisions of the Contract between the Owneranci the Coniswr(w as ind sted above, the lJwont r�ormaarad add�sgjSlaerrJ CAPITOL INDEMNITY CORPORATION P.O. BOX 5900 Madison, WI 53705 on bond of Onaerr name and ad&=gjCownraur) WAYFARE DEVELOPMENT GROUP-CIBAOLO HILLS, LLC 5690 Watermelon Rd Suite 400 Northport, AL 35473 j■ sm ■ is SURM, , CONTRACTOR hereby approves of the fmai payment to the Contractor, and agrees that final payment to the Contractor shall not neiieve the Surety of any of its obligations to (Insw nave medaddrerr gromer) City of Fort Worth, Texas 200 Texas Street Fort Worth, Texas 76102 as set ftth In said Surety's bond. , OWNKk IN VYrDM V HB MF, the Snrety has hereunto set its hand on this date: October 19, 2023 (lr,.aw fir x+AfrE rbr wa�ete)bfteamib,�,6e muec{c dmr ax/Xem:l Captial Indemnity Corporation )4 By. l� (5{gosMargjatNborizrd+tprrttn lkrJ Debra Johnson, ttomey-in-Fact 0wmd Aaronmld 4*) Surety Phone No. 813-498-6275 0707-1994 Lock Fields CAPITOL INDEMNITY CORPORATION GIC907794 POWER OF ATTORNEY Bond Number KNOW ALL MEN BY THESE PRESENTS, That the CAPITOL INDEMNITY CORPORATION, a corporation of the State of Wisconsin, having its principal offices in the City of Middleton, Wisconsin, does make, constitute and appoint ------------DEBRA JOHNSON, DOUGLAS L. RIEDER-, JAMES C. CONGELIO; JAMES NASH CONGELIQ; MARGARET S. MEYERS------------_- -.-------- - -----.----•---------- -- -- ---- W WESLEY HAMILTON: MICHAEL J. BROWN------ ----------- . --------------- -- --- - its true and lawful Attorney(s)-in-fact, to make, execute, seal and deliver for and on its behalf, as surety, and as its act and deed, any and all bonds, undertakings and contracts of suretyship, provided that no bond or undertaking or contract of suretyship executed under this authority shall exceed in amount the sum of ALL WRITTEN INSTRUMENTS IN AN AMOUNT NOT TO E XCEED: This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of CAPITOL INDEMNITY CORPORATION at a meeting duly called and held on the 15th day of May, 2002. "RESOLVED, that the President, Executive Vice President, Vice President, Secretary or Treasurer. acting individually or otherwise, be and they hereby are granted the power and authorization to appoint by a Power of Attorney for the purposes only of executing and attesting bonds and undertakings, and other writings obligatory in the nature thereof, one or more resident vice-presidents, assistant secretaries and attorney(s)-in-fact, each appointee to have the powers and duties usual to such offices to the business of this company; the signature of such officers and seal of the Company may be affixed to any such power of attorney or to any certificate relating thereto by facsimile, and any such power of attorney or certificate bearing such facsimile signatures or facsimile seat shall be valid and binding upon the Company, and any such power so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking or other writing obligatory in the nature thereof to which it is attached. Any such appointment may be revoked, for cause, or without cause, by any of said officers, at any time" In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attorney - in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in - Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. IN WITNESS WHEREOF, the CAPITOL INDEMNITY CORPORATION has caused these presents to be signed by its officer undersigned and its corporate seal to be hereto affixed duly attested, this Ist day of September, 2022. Attest: T % Ryan J. Byrnes Senior Vice President, Chief Financial Officer and Treasurer —7 . Todd Burrick Chief Underwriting Officer CAPITOL INDEMNITY CORPORATION 6 V44� 1/1e Adam L. Sills Chief Executive Officer and President STATE OF WISCONSIN COUNTY OF DANE j S.S.: On the 1st day of September, 2022 before me personally came Adam L. Sills, to me known, who being by me duly swom, did depose and say: that he resides in the County of New York, State of New York; that he is Chief Executive Officer and President of CAPITOL INDEMNITY CORPORATION, the corporation described in and which executed the above instrument; that he knows the seat of the said corporation; that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said corporation and that he signed his name thereto by like order. \\�\9+!�! David J. Regele STATE OF WISCONSIN Notary Public, Dane Co., WI COUNTY OF DANE S.S.:// "din l 111+111111 �\\\\ My Commission Is Permanent 1, the undersigned, duly elected to the office stated below, now the incumbent in CAPITOL INDEMNITY CORPORATION, a Wisconsin Corporation, authorized to make this certificate, DO HEREBY CERTIFY that the foregoing attached Power of Attorney remains in full fskse •and• -had not been revoked; and furthermore, that the Resolution of the Board of Directors, set forth in the Power of Attorney is now in force. � = Signed and sealed at the City of Middleton, State of Wisconsin this 19th day of October - Suzanne M.Broadbent.` •... �j ��� ` Assistant Secretary �O4j°�rrnrnuu�mni�+`0��ao THIS DOCUMENT HAS BEEN GENERATED FOR A SPECIFIC BOND. IF YOU HAVE ANY QUESTIONS CONCERNING THE AUTHENTICITY OF THIS DOCUMENT CALL 800-475-4450. CIC-ePOA-M (Rev. 09-2022)