Loading...
HomeMy WebLinkAboutContract 30808 ; - -- ' CITY SECRETARY l0-20-04P0l :41 RCVD CONTRACT NO, INFORMAL DEVELOPER AGREEMENT TO BE EXECUTED BY DEVELOPERS WISHING TO LET THEIR OWN CONTRACTS FOR CONSTRUCTION OF PAVING AND STORM DRAIN IMPROVEMENTS �. The undersigned DEVELOPER has familiarized himself with the City of Fort Worth's"Policy for the |nnto||aUnn of Community Foci|itiea"governing street paving, storm drain, ntneAt|ightsi and street name signs facility installations and fully understands all the provioionn, terms and conditions of that po|icy, and vviohae to exercise the option contained in that policy permitting o DEVELOPER to let his own contracts for construction of such street paving, storm drain, street lights, and street name signs. In addition to all other requirements of the City's Policy for the Installation of Community Facilities, the DEVELOPER specifically agrees to follow the procedures set forth below: 1. To employ a construction contractor who is approved by the Director Transportation and Public Works Department and who is licensed and bonded to do work in public streets. 2. To require the Contractor tnfurnish the City of Fort Worth dual obligee performance and payment bonds in the name of the DEVELOPER and the City, and, if required, a maintenance bond in the name of the City on forms provided by the City, for 10096 of the contract price of the facility, said pedormonoe, payment, and maintenance bonds to be furnished to the City before work incommenced. 3. DEVELOPER shall pay to the City in cash for the construction inspection a fee equal to two percent(2%)of the DEVELOPER's share of the construction cost of related street, storm drain, streetlight and/or street sign facilities as stated in the construction contract. 4. To require the Contractor to give 48 hours notice to Director of the Department of Engineering prior to commencing construction of the facility or facilities so that inspection personnel will be available. 5. To make this agreement, as well as the Standard Specifications for Street and Storm Drain Construction an integral part of any contract with a contractor to construct any or all of the facilities involved. G. To require the Contractor to allow the construction to be subject to inspection ot any and all times by City inspection forces. 7. To require the Contractor to have such laboratory tests made as the City may require. 8. To secure approval by the Director of the Engineering Department of any and all partial and final payments to the Contractor, such approval to pertain only to satisfactory completion of the work for which payment is made and not to constitute approval of the quantities on which payment isbased. 9. To furnish simultaneously with the execution of the construction contract let by the DEVELOPER developer's bond in the name of the City ofone hundred percent (10096)of the estimated contract cost of the related community facilities, as stated in the construction contract, ~1~ 10. to guarantee timely payments to the Contractor for completed work and/or to guarantee satisfactory performance of this agreement and substantial completion of the community facilities to be installed. In lieu of the developer's bond, the Developer may deposit cash one hundred twenty-five percent(125%)of the estimated DEVELOPER's share of the cost of the community facilities. 11. DEVELOPER agrees to complete all the improvements covered by this agreement within 90 calendar days after having been instructed to do so, in writing, by the Director of Transportation and Public works. It is understood that the DEVELOPER will initiate the construction of all improvements to conform to his own schedule, except for those improvements which the Transportation and Public Works Director deems necessary for the proper and orderly development of the area. In the event DEVELOPER fails to carry out any such instructions within the 90-day period, the DEVELOPER gives the City the right to design and award a contract, and inspect the improvements in question, and agrees to pay to the City prior to the award of the contract, the amount of the low bid. 12. The DEVELOPER further covenants and agrees to, and by these presents does hereby,fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death)or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said DEVELOPER, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub- contractors, officers, agents or employees,whether or not such injuries, death or dama_pes are caused,in whole or in part, by the alleged nepli_gence of the City of Fort Worth, its officers, servants, or employees 13. It is expressly understood and agreed by the parties hereto that execution of this agreement does not bind the City of Fort Worth to participate in or contribute to the cost of any of the improvements described herein; nor shall the City of Fort Worth be responsible or liable for any portion of the costs incurred by the DEVELOPER, its officers, agents, employees, contractors or sub-contractors for the design and construction of the improvements described herein, unless and until the parties hereto execute a Formal Community Facilities Agreement, duly authorized by the City Council at a regular meeting, signed by the City Manager, and providing for the City's participation in the costs of said improvements. G��U �� CRY SUMMARY OF COST Villas of Remington Point Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ 218,435.75 $ 218,435.75 2. Storm Drainage $ 116,238.50 $ 116,238.50 3. Street Lights $ 11,000.00 $ 11,000.00 4. Street Name Signs $ 200.00 $ 200.00 B. Engineering Design $ - C. Construction Engineering $ - and Management by DOE 4% $13,978.28 $ 13,978.28 TOTALS $ 359,852.53 $ - $ 359,852.53 This agreement pertains to those community facilities required to serve the following described property: Paving and Storm Drain Improvements for The Villas of Remington Point ACCEPTED FOR THE DEVELOPER NAME: Remington Point, L.P. By Zena GP2. L.L.C. Its General Partner 6 Robert D. Goode, P.E., Director DEPARTMENT OF TRANSPORTATION By: AND PUBLIC WORKS SigrAture Print Name: Robert Betancur,Vice President DATE DATE (J ✓ J CFA CODE APPROVED AS TO FORM AND CITY OF FORT WORTH, TEXAS LEGALITY: By: / -•� ���/`— ary J. Steinberger Marc Ott Assistant City Attorney Assistant City Mana er Contract Authorization ATTEST: D e Marty Hendrib rFFCI1 I Q,EC1�ni1D 3 r '��U &K-1�lL�IUt� City Secretary Uo Li'°�U°11i J Q 9 VEX. B287 z P \ i X t F � rr ` ♦ `:♦my !SAGINAW \ i STAREE_to Im ` 1 \\ w 35W w r 1 ' 3 1 \ \ it \ 1 ♦� 1 11 9r, I _` ` Ii p — o I BLUE MOUND \ � \9 N li EAST It�OUSTRIAL — -� — — — tt — \ I 4/>r� \\ J` 'z \\` 1♦ Y 820 \ 820 l ltz 156 r\\\\ry to r \` p 7 i 11-t1 3rd\ 820 MARINE ♦ �� �\ o� CREEK PA \� \ MEACHAM \ LAKE / FORT ( WORTH MEACHAM AIRPORT 35W z 1 \ 0 8 > 0 28 1 s \ 9 VICINITY -MAP N.T.S. (,-',''nil l�t i1 O rh'•"�yr"I J�� tiJ.'v'1:UUL�9 u�G�10 0 Z4x m a. = o� '" Z ." w CL N rt r,..",-".."".--...._,�W3�d 3 `•-°°..,,•_,..� -- 1 ^ ' t Y 7 ' ' c '�`'�. ! `'� �y�Y ( O� n _ o ct Pi 9 Rug (( s � i N Y WAY W ° _ /r l,r U n• in w ` n /�fl�O��rr' ? Z °u j �� rr r L v w'•.,P, t a ty� m o o $ ^ Z o o W z :34—��a rt"`�.� � •-....{ - y`74 '(jf`jf� '....-... �' msµ! (jt! N � N t m ! Y "' �"-`^..... ——at � �- � ...._`.`.^•_._,_—__"_-^_-_.::"':�.,.�^+_,__� 1, � .. 1 In co � m \ d Ln ' n l N ~ m /�-^__-� "'_�•�"`�.", H N N n r'r 'f r1, N U 10 t Z v� .0 C11 ~.ji,(W�O o d aW - t%...,,...., a ---•�� CL '�. ..,.,.....�,� •-....� i 1 Ism W Q. r/ r'" ,,/'�//'f/ � M I �p Q r �� ✓� rr'�r tD M n U a ry its; ✓"'�r' r'f J• � f rr v .�:�h••J ,U oa N H J (� zdZ az dn� x C, w �uj Ul to N w z o'�car o --.....�,'r � ' •a,� fJ - �,w � �, /J�� yr _a o S3 ' m �]' _ t S ' r,I ' I \,1 C et• 2 ' Sb9,09 0 n n n Al LO 3 n •U{ / N s• r o o•��O � .._.1 ' t m h, 0�2 jn'` �Q� ,-,.,��' �---"�m y 'W N N N N �, N '0 0 �� \ •�O N n r/�/ Jam...- Q rL 1~• h , N N N N \ N //',/r r,/ m O P W EL O M1 w r'r J Jr Z / rrf N /rr rr 4 O Z W - O f- ''' �'•�7 1;ti1 f�rrl:^�^ Z z � 0 N DIDSCHEDULE ZENA LAND DEYEL0rf1IENT VILLAS OF REMINMON POINT-FORT NORTH,TEXAS UTILITY CONTRACT Ron Estimated Total Total No, Quantity Unit Desetipdon ofltem with Total Unit Price Written in Wonis Unit Nee Anoint STORM SSW ER ITEMS-ONSTTE 8. 96 LF Finnish&Install 2l-Inch Reinforced Cnoacie Pipe.including exeavadn.embedment and baek(fli.complete in place. foe Forty Five dollars and no centsper Lioeer Fent S 45.(10 S 4.12n tin 9. 119 LF Famish&Ima1127-itch Rainfia—d Concrck Apo.including axeavation.embedment and backfili,enmpiete in place. rot Fifty dollars and no cents per Linea Foot S 50.00 5 10. 40 LF Finnish&Install 30-inch Reinforced Concrete Pipes including tareavndnn.mhednum and haekftlt cnmplev In place. for Sixty dollars WWI an cents pa LigeaT Foot S 60.00 S 2.400.00 11. 51 LF Furnish&Itma11364ach Reinforced Concrete Plpa including meavation.embedmrnt and backliili.complete in places fns Seven'y dollars and no .1113 per Linear Foot S 70.00 S 3.570.00 12. 105 LF Finnish&lmtall39-inch Reinforced Concrete Pipe.including excavation,embedment and hacklill.complete in place. (hr Eight.Five dollars and no cents per Linear Fool S 85.00 S 8.925.00 13. 395 LF Furnish&Install 42-inch Rcinferced Concrete Pipe,including escavutioa euDaintod ind la'aliil.—uplae it place. for Nincry Five dollars and no =13 pay Linea Foot S 95.00 S 37423.00 14. 1 EA FumBh&ImmU 10-Foot Standard Curb lnkt.including exevvadtt.backml ltd materiaie complete in place. for Three Thousand One Hundred Eighty dollars and no cents per Each S 3.180.00 S 3.180.00 Is. 2 EA Furnish&Instill Concrete Collar.including excavation baclfull and smtcriols,co mplete in place. Tot Three Hundred FiM dollars and an .ass pet Each S 350.00 S 700.00 16, 3 EA Fumish&Imbsil Recessed 10-Foot Curb WeL inclod'utg exca mfon.baekftll and m3n7ialL comptek in place. Tot Three thousand Six Hundred delta. and no centspa Each S 3.600.00 S IR800.00 17. 1 E4 Furnish&Install Its'x 4'hinction Box.including excavation bxk011 and matcrialL compkte in place (or Seven Tbousgnd Five Hundred dollars and no cents per Each S 7.500.00 S 7900.00 18. 18.5 CY Furnish and Install Sion Rip-Rip.as indicated in plain. compktc in Place. for Three Hundred Fifiew dollars and no cents per Cubic Yard S 315.00 S 5.527.50 19. 806 LF Trcmh Safety For One dollars and no cots pet Linear Foot S 100 S WOOD SUBTOTAL STORM SEWER ITEMS-ONSITE S 91303.50 z •d 0 169TZbLTB Uw3z d0s :60 60 80 des DID SCHEDULE ZENA LAND DEVELOPMENT VILLAS OF REh11NGTON POINT-PORT ivOwrtL TESr1S UTILITY CONTRACT Item Rslnry IN Total Total No. Quantity Unit Description oflt msvilb Total Unit Price Written in Words Unit Prim Amount STORM SEIVER ITEMS-REMINGTON PHASE FOUR 20. 17 LF Furnish&Ins a0 21-inch Reinforced Concrcic Pipe Including dnvalioo,embcdmem and backfill.compdem in puce for Forty Five .dollars .4 no mats per Linger Foot S 45.00 S 765.Oo 21. 13 LF Furnish&Install 104nch Reinforced Concrete pipe,including excavation.embedment and backfill.complete In Plata for Sixty dollars and n0 cents per Linar Foot S 60.00 S 750.00 2-1. - LF Furnish.!Install3&inch Reinforced Concrete Pipe.ImInding excavation,embedment and backfill.complete in place, for Seventy dollars and no cents per Linear Foot S 70.00_,..S 0.00 21 95 LP Furnish&1m1.1139-inch Reinforced Concrete Pipe,iechulios exavulion.emCedmcnl and backfill.complete in place. W Eighty Five doll.. and no cents per linear Foot S non S 8.075.00 24 115 LF Furnish&Insult 42-inch Reinforced Concrete Pipe,including .cavadno,cmhcdntent and buckf ll.complete m puce for NkKiy FN. doll— amt no cents per Linear Foot S 9.sm S 10.925.00 25. - EA Famish&Install 10-Foot Standard Curb Inlet.including .,..don.back(M and materiaR cmuplete in place for Throe Thousand One Hundred Eiabty dollars and no cents per Each S 3.180.00 S 0000 26. I EA Famish&Itutall Concrete Collar.including —.1i..buck rill amt u.neri.h.complete inpW:a for Three Hundred Filly donut and no cents per Each S 350.00 S 350.00 27. I EA Furnish&Install 10�Foot Recessed Curb In1eL including cur—ti.a.backfill and materials.complete in puce. for Three Thousand Six Hundred dollars .4 cents per Each S 3.600.00 S 3.600.00 28. 240 LF Trench Safety lot One dollm and a tx per Eoeb S 1.0o S 240.00 SUBTOTAL STORM SEIVERITE0IS-REMINGTON PHASE FOUR S 244735600 GRAND TOTAL STORM S 116,13850 E 'd OT69TZbLT6 dN3Z d0S =60 60 60 daS BIDSCHEDULE ZENA LAND DEVELOPMENT VILLAS OF REMINGTON POINT-FORT NORTH,TEXAS PAVING CONTKACI' Item Estimated Total Total No. Quantity Unit Description of Item with Total Unit Price Written in Words Unit Price Amount PAVING-ONSITE 1 . 3,405 SY Fumisb&Install Six-inch 3,000 PSI Reinforced Concrete Paving, Including 7-inch curb,complete in place, for Twenty One dollars and Thirty Five cents per Square Yard S 21.35 $ 72,696.75 2. 542 SY Famish&Install Four Foot Reinforced Concrete Sidewalk, complete in place, for fwettty Five dollars and Fifteen cents per Square Yard $ 25.15 $ 13,631.30 3. .3,643 SY Pcrfomi Lime Stabilized Subgrade Preparation, complete in place, for One dollars and Fifty cents per Square Yard $ 1.50 $ 5,464.50 4. 69 TON Furnish Hydrated Line(30lbs/SY)for Subgrade Stabilization, for Eighty One dollars and No cents per Ton $ 81.00 $ 5,589.00 TOTAL BID FOR VILLAS OF REMINCTON POINT PAVING-ONSITE S S 97,38155 +, 'd OT69TZbGiB W43Z dis:60 60 80 des BID SCHEDULE ZENA LAND DEVELOPMENT VILLAS OF REMINGTON POINT-FORT WORTH,TEXAS PAVING CONTRACT Item Fstimatcd Total Total No. Qunntity Unit Description of Item with Total Unit Pricc Written in Words Unit Price Amount PAVING-OLD DECATUR ROAD-OFFSITE 1 542 SY Furnish&install Four Foot Reinforced Concrete Sidewalk, complete in place, for twenty Five dollars and Fifteen cents per Square Yard S 25.15 $ 13,631.30 2. 3,510 SY Furnish&Install Seven-inch 3,000 PSI Reinforced Concrete PaAng, including 7-incb curb,complete in place, for Twenty One dollars and Fifty Five cents per Square Yard $ 21.55 3 75,640.50 3. 1 3,791 SY Perfonn Lime Stabilized Subgrade Preparation, complete in place, fur One dollars and Fifty ccnLe per Square Yard 3 1.50 $ 5,686.50 4. 72 TON Fumisb Hydrated Lime(30lbs/SY)for Subgmde Stabilization, for Eighty One dollars and No cents per Ton S 81.00 $ 5,832.00 5. 96 SY 6"HMAC Pavement Transition for wenty Seven dollars and Twenty cents per Tan $ 27.20 $ 2.611.20 6. 150 SY Sawcut and Remove Concrete pavement,complete complete in place. for Fourteen dollars and Forty Five cents per Square Yard S 14.45 S 2,167.50 TOTAL BID FOR VILLAS OF REMINGTON POINT PAVING-OLD DECATUR RR-OFFSITE $ S 105 569.00 C; 'd 0 169TZfrLTB UW3Z dTS =EO 60 BO d8S I BID SCHEDtJLE ZENA LAND DEVELOPMENT VILLAS OF REMINGTON POINT-FORT WORTH,TEXAS PAVING CONTRACT. item Estimated Total 'Dotal No. Quantity Unit Description of Itcm with Total Unit Price Written in Words Unit Price Amount PAVING-OLD DECATUR ROAD-PHASE FOUR 1 590 SY Foolish S Install Scvcn-inch 3,000 PSI Rciuforccd Cuncrnte Paving, including 7-inch curb,complete in place, for rwenly One dollars and _Fifty Five cents per Square Yard S 21.55 S 12,714.50 2. 637 SY Perform Lime Stabilized Subgrade Preparation, complete in place, for One dollars and Fitly cents per Square Yard 3 1.50 S 955.50 3 . 12 TON Furnish Hydrated Lime(30HWSY)for Subgrade Stabilization, for Eighty One dollars and No cents per Ton $ 81.00 S 972,00 6. 31 SY 6"HMAC PavemcntTransition for Twetlty Seven dollars and Twenty cents per'ron S 27.20 S 843,20 TOTAL BID FOR VILLAS OF REMINGTON POINT PAVING-OLD DECATUR RD-PHASE 4 $ S 15,485.20 GRAND TOTAL PAVING S 218,43575 (Unit prices ore to be shown in bolo words and figtwtL In care of d'ucRpancy,the unit price in writing will prevail.Prices listed above am the only eompmsation to be made.All iteow if—A is pimd m complote the work u shoo in the plan and as Mmuiaed,which are not listed w a pay ltom in this proposal,am considered subsidiary to the itan and the cost of thesubsidiary work should be Included) Contractor Authorized Signature Date a •d nis9ipt z.ia UW3Z dTS =EO EO 80 daS III. STREET LIGHTS: 1. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 2 EA $ 2, 000 $4, 000 .00 MID-BLOCK RESIDENTIAL 2 EA $ 2, 000 $4, 000 .00 CHANGE OF DIRECTION RESIDENTIAL 1 EA $ 2, 000 $2, 000 .00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $0, 000 .00 MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 500 $0, 000 . 00 MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2,500 $0, 000 . 00 RELOCATE EXISTING LIGHT 0 EA $ 1, 500 $0, 000 .00 Subtotal $10,000.00 City's Cost $00, 000 . 00 Developer's Subtotal $10, 000.00 10% Contingencies $1, 000.00 Project Total $11, 000.00 Adjacent Developer's Cost $0, 000.00 Developer's Cost $11, 000.00 2% Inspection Fee $0,00.00 DEVELOPER'S COST: $11,000.00 THE VILLAS OF REMINGTON POINT , September 24, 2003 Fort Worth, Texas September 24, 2003 PAGE 1 OF Exhibit C 2 . STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department. 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works. 3 . The Developer's shall pay the amount shown below to the City of Fort Worth at the time after execution of the Communities Facilities Agreement. 4 . Streetlights on arterial streets shall be installed with underground conduit and conductors . S . The Developer agrees to dedicate all easements required for the installation and maintenance of the street lights and to provide for the installation of any electrical transformers required for the proper operation of the street lights 6. A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points . 7 . The developer or their contractor shall contact City' s street light division 48 hours prior to starting any installation of conduit .and/or streetlights at (817) 871-8100 to insure proper inspection of work. DEVELOPER'S COST: $11,000.00 THE VILLAS OF REMINGTON POINT FORT WORTH, TEXAS September 24, 2003 Page 2 of Exhibit C "STREET LIGHTS" INTERSECTIONS OLD DECATUR RD & STREET A 1 OLD DECATUR RD & STREET B 1 MID - BLOCK STREET A 1 STREET B 1 CHANGE OF DIRECTION STREET A 1 THE VILLAS OF REMINGTON POINT Page 3 of Exhibit C Fort Worth, Texas Date: IV-1 IV STREET NAME SIGNS 1 . The Developer will install the *street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City. 2 . The Developer will pay for the street name sign installations required for this development to the extent of $100 .00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This -development creates the following two (2) intersections at a cost to the Developer of $200.00 : NOTE: Reported zero (0) on exhibit . Old Decatur Rd & (Street A) Old Decatur Rd & (Street B) The Villas of Remington Point CFA code: 2003124 Date: September 23, 2003