HomeMy WebLinkAboutContract 30956 Attachment A-2 Water Information Technology Program, Phase 2 Implementation of the Capital Project Management System (CPMS) Contract No. 29129 - Amendment No. 2 Scope of Services The role of MWH Americas, Inc ("ENGINEER") under this contract amendment will be to provide Program Management, Provision of Best Practice Recommendations, Quality Assurance/Quality Control, Sub Contractor Management and MBE/WBE Compliance and Monitoring Services associated with the implementation of the Capital Project Management System (CPMS) and integration of the CPMS with key City business systems. The ENGINEER commits to achieving a 22% MBE/WBE participation goal in accordance with the City of Fort Worth's requirements and guidelines. The contract amendment is scheduled for completion in December, 2005. The ENGINEER's scope of services under the contract amendment is described in Task 8 through Task 13. Task 8-CPMS Program Management The role of the ENGINEER shall be to facilitate, coordinate, and manage the implementation of the CPMS system and integration of the CPMS with key City of Fort Worth (City) systems during the contract period, scheduled for completion in December, 2005. Task 8.1. Development of a Program Management Plan(i.e. baseline procedures and methodologies) The ENGINEER will be responsible for the development, execution, and administration of the CPMS baseline work schedule, resource schedule, budget, MBE/WBE compliance, and communications plans together with the formal reporting guidelines that will be incorporated into a Program Management Plan (PMP). 8.1.1 Developing the CPMS Schedule Plan — the ENGINEER shall identify activities (critical path, work breakdown structures, etc.), sequence the activities (dependent upon interactivity dependencies), estimate the duration, and schedule all significant activities required to implement the CPMS. The program schedule will be developed electronically using MS ProjeptTM; 8.1.2 Developing the CPMS Resource Plan— the ENGINEER shall identify all the necessary external consultant resources, hardware, software, and equipment resources necessary to carry out the tasks identified in Item 8.1.1; 8.1.3 Developing the CPMS Budget Plan — the ENGINEER shall prepare the cost budget required to implement the CPMS based on the activities identified in Item 8.1,I and Item 8.1.2; 81.4 L7gvelopinrr the CPMS Ccmrrruricaticn Plan — the ENGINEER shall prepare a communication plan for the CPMS. The Communication shall include the formal protocols and procedures for written, oral, and electronic communication within the CPMS implementation; 8.1.5 Developing the Formal CPMS Bi-Weekly Reporting Guidelines - the ENGINEER shall develop the formal guidelines to be used in the bi-weekly reporting to the CPMS Executive Steering Committee. The guidelines will include the structure of the report and the key performance metrics to assess the progress and acceptance of the CPMS; 8.1,6 DeveJcpin the CPMS ACC Pion the ENGINEER shall prepare a QA/QC plan for the CPMS. The OA/QC shall include the formal protocols and procedures to nduct Quality Mwff su�i,f -7 Assurance/Quality Control (QA/QC) activities; 8.1.7 Developing the CPMS MBEIWBE Compliance Reportinq Guidelines — the ENGINEER shall document the formal MBE/WBE reporting guidelines to be used in the monthly reporting to the City's Minority Business Office; 8.1.8 Developing the Formal Process for Identifying, Assigning and Closing Out of CPMS Issues — the ENGINEER shall develop the procedure and methodology to be implemented for identifying, documenting, assigning, escalation, and closing out issues as they arise throughout the CPMS implementation; and 8.1.9 Meetings with City Staff— CPMS — the ENGINEER shall meet with all necessary City Staff to develop and document the plans, guidelines, and procedures identified in Item 8.1.1 through Item 8.1.8. Task 8.1 Deliverables - • • requency 8.1 Program Management Plan (PMP)that incorporates the MS Word, Single outcomes from Tasks 8.1.1 to 8.1.8 contains: MS Excel, deliverable Master Program Schedule Plan MS Project (3 hard Master Program Resource Plan copies and 1 Master Program Budget Plan electronic Master Program Communication Plan copy) Master Program Bi-Weekly Reporting Guidelines Master Program QA/QC Master Program MBE/WBE Reporting Guidelines Master Program Issues Guidelines Task 8.2. MBEIWBE Program Monitoring and Reporting The ENGINEER implement the MBE/WBE monitoring and reporting guidelines developed in Task 8.1 within the CPMS. This would include the following tasks. 8.2.1 Developing the CPMS MBEIWBE Compliance Reporting 7 the ENGINEER shall prepare the monthly MBE/WBE reports for the CPMS in accordance with the guidelines developed under Task 8.1.7 and submit these to the City's Minority Business Office. The ENGINEER is committed to achieving a 22% MBE/WBE participation goal in accordance with the City of Fort Worth's requirements and guidelines; and 8.2.2 CPMS MBEIWBE Compliance Report—the ENGINEER will prepare and submit quarterly reviews of the MBE/WBE compliance goals. The review shall include the number of participating MBE/WBE firms, ethnic and gender breakdown, status of the CPMS implementation goals, recommended refinements to the plan, and other information relating to the success or failure of the MBE/WBE plan. Task 8.2 Deliverables I Task Description Format Frequency 82.1 MB BE Monthly Report MS Word Multiple deliverable (3 hard copies and 1 electronic copy) 8,2.2 MB BE Compliance Report MS Word Multiple deliverable (3 hard copies and I electronic co Task 8.3. CPMS Program Management The ENGINEER shall be responsible for the routine management and reporting of progress throughout the duration of the CPMS using the management guidelines, procedures, and methodologies developed under Tasks 8.1 and 8-2 of this Scope of Services= I Program Management would include the following tasks. NIWH sow 1. , 8.3.1 weekly progress reports for the CPMS using the procedures and methodologies defined in Task 8.1. Where appropriate, the ENGINEER shall identify any corrective actions required such that the CPMS is suitably resourced, remains on schedule and within budget and that the MBE/WBE Compliance Plan objectives are achieved. The ENGINEER shall convene and facilitate the bi-weekly CPMS meetings and will provide any immediate advice and assistance requested by the CPMS Executive Steering Committee members to clarify and resolve any issues contained in the performance 83.2 CPMS Weekly Executive Steering Committee Meetkggs– the ENGINEER shall schedule the weekly meeting, prepare the weekly meeting agenda and supporting documentation, facilitate the weekly meeting, and develop meeting minutes for the CPMS Executive Steering Committee meetings; 8.3.3 Contracting of Sub Consultants Involved with the CPMS Implementation – the ENGINEER shall complete the following contract documentation for the IMPLEMENTATION ENGINEER (Skire, Inc) and all other firms engaged by the ENGINEER in implementation of the CPMS: identify the required MBE/WBE compliance goals, prepare the contract Scope of Services, prepare the contract terms and conditions, carry out and complete negotiations, prepare and execute the contract paperwork, and submit all necessary paperwork to the City's CPMS Program Manager and the Minority Business Off ice; and 8.34 CPMS Routine Program Management the ENGINEER shall provide the necessary resources and carry out the routine day-to-day program management activities including QA/QC and contract administration of all sub consultants required to successfully implement the CPMS. The ENGINEER will identify and manage all necessary consultant resources necessary to carry out the tasks identified in Item 8.1 The ENGINEER will be responsible for identifying and escalating significant potential risks to schedule and will take appropriate actions necessary to meet the approved schedule. Task 8.3 Deliverables Task Description Format Frequency .1 Bi-weekly Progress Reports Multiple deliverable (3 hard—i copies and 1 electronic MS W!7 Task 9-CP&KS Business Process Development and Organizational Change Management Planning The ENGINEER shall be responsible for designing, documenting, and defining best practice capital project management business processes and practices, and developing and deploying an organizational change management communication program. This process would involve the following tasks. 9A Chgnge Readiness and Baseline Training Needs Assessment,and Train�q�Plan – the ENGINEER shall, in conjunction with key City staff members, conduct an assessment of training needs through the use of various media including workshops, surveys, and individual sessions. The task will use the ENGINEER's capital project management and enterprise system deployment experience to determine the readiness and ability of City departments to change process and systems and the establish the aspects of a baseline training program. The basis for the change and training assessment will be the documented City interim capital project solution and methods used by other City departments. The output from this process will be a summary-level report documenting current levels knowledge, skills and comprehension of project and financial management aspects associated with implementing the new CPMS, discoveMd impediments to cmange recommendations, A Master Training Plan will be prepared that identifies the MWB SoYV 3-18 , baseline training needs in the areas cd project and financial management concepts. The Master Training Plan will lay out the olaaeea, participants and schedules to conduct the identified training. The Training Plan will form the basis for all Qh/ staff training to be conducted under Task 12of the CPyWS; 9.2 Current State Business Process Research and Assessment – the ENGINEER shall convene a series of workshops and one-on-one meetings to determine the current business processes and supporting tools and technology used to identify, define, estimate, fund, execute, manage, and close capital projects. Identification of gaps, inefficient processes, and current tools and technology will be documented for consideration of replacement with the CPMS implementation. The basis for the assessment will be the current CPMS and capital project processes and the interim City capital project management process. Key business process improvements and efficiencies will be identified based on input from the City and experience of the ENGINEER. The output from this process will be a logical process flowchart identifying aspects under consideration for improvement or replacement by the CPMS 8.3 Capital Proiect Management Business Process Des – the ENGINEER shall in conjunction with CPMS Implementation ENGINEER (Skire, Inc.) design an effective business process to manage capital projects from inception through completion. Through a best practice design from previous municipal government and CPMS implementation experience a revised, enterprise business process will be developed to support capital project management. The ENGINEER will conduct workshops with City departments focusing on both project and financial management processes that will be included in the CPMS implementation. The processes will take into account efficiencies and measurements desired by the City. The basis for the assessment will be current CPK4S and capital project process assessment outcomes and the desired capabilities of the (}PK8S implementation as outlined in the functional requirements. The output from this process will beabusiness process model and supporting documentation outlining ro/ea, responsibilities, and enabling system functionality; 9.4 ENGINEER in conjunction with the L/rxxS Implementation ENGINEER (8kine. Inc) will provide support for CPK8S configuration within the City. Consulting support will be directed a1 meeting the requirements set forth in the new capital project management business processes over the course of the CPK8G implementation. The outcomes of the capital project management process will be the functional requirements of the uyatnma, and configuration requirements of the [}PK8S. The output from this process will be on-going consulting expertise and support until the CPyWS implementation is completed for the City; and 9.5 Change Management Communication Progra –the ENGINEER shall develop achange management communication program to be used for the CPM8 implementation. The plan will include a City communication strategy and media designed to inform and discuss the CPK88 deployment, evente, and changes affecting Qty staff. The communications will be delivered on a regular basis using various mediums such as Internet web sites, newsletters, and status reports. The ENGINEER will be responsible for developing the content ofthe communications and the City will be responsible for incorporating the content vvbh|n the Qty Internet web s|0es, news|ette,o, etc. communication med|ums. The communication program developed by the ENGINEER will support the CPKHS program from a technical and business perspective to keep the appropriate City employees informed ofproject activities. The output from this process will be achonQe management communication plan for CPyNStoprovide implementation support to the City. Task 9 Defiverables 1 Task Description Format Frequency 1 Organizational Change Readiness Report. MS Word, Excel Single deliverable Baseline Traini Needs Assessment (3 hard cop— and_J1 ' MUVB 8'� Report, and Master Training Plan 1 electronic copy) 9.2 Current State Capital Project Management MS Word, Visio Single deliverable Business Process and Improvement (3 hard copies and Opportunities Report 1 electronic copy) 9.3 Future State Capital Project Management MS Word, Visio Single deliverable Business Process Model Report (3 hard copies and 1 electronic copy) 9.5 Organizational Change Management MS Word Single deliverable Communication Plan (3 hard copies and 1 electronic copy) Task Y0-Procurement and Installation of theKPMS Software The ENGINEER shall be responsible for the procurement of the Unifier Enterprise Edition software required toimplement theCPK8S and the subsequent assignment ofthiaaofbwaretuthe City. This process would involve the following tasks, 10.1 Procurement of the CPMS Software- the ENGINEER shall procure the CPK89software licenses (Unifier Enterprise Edition) for up to four hundred (400) users from the IMPLEMENTATION ENGINEER (Gkire. Inc) and arrange for these to be delivered to the Chv/o Chief Information Officer (CIO). The base price (1.e. exclusive of all prime contract markups and profit) incorporated within the CPK88 pricing for the CpK4G software has been based un the information provided in the IMPLEMENTATION ENGINEERS (Skive. Inc) proposal dated June 10. 2004. All ouftvvana obtained under this task will be licensed and assigned directly tothe City; and 10.2 The IMPLEMENTATION ENGINEER (8kine). under direction of the ENGINEER, shall install the standard configuration of the CPMS software (Unifier Enterprise Edition) on the City's environment. The base price (ie. exclusive ofall prime contract markups and profit) incorporated within the CPK88 pricing for the CPK4S software installation has been based on the information provided in the IMPLEMENTATION ENGINEERS (Bkire, Inc) proposal dated June 1O. 20U4. Task 10 Task Description Format Frequency 10.1 =MS Software-agreed upon number --MgWord -9iingle deliverable of licenses, signed license agreement, (3 hard copies and and signed assignment letter. 1 electronic copy) Task y1-CPMS Implementation, Data Conversion, and Systems Integration The ENGINEER and the IMPLEMENTATION ENGINEER (8kine. Inc) ahuU be responsible for the configuration and integration of the Unifier Enterprise Edition with a number of key City business systems including the Financial Data Warehouse, Project Scheduling and Reporting (MS Project), Human Resource Management (Genemys), Geographic Information System (ESR| /\ncG|S), and the City web-site. The ENGINEER nasen*as the right to review the allocated Task 11 budget based on the agreed outcomes from Task 9.3 and, where appropriate and following written agreement with the City's Executive Steering Comm|ttee, adjust the allocated Task budget to accommodate the agreed "To- Be"' CPK4S end-to-end business processes. This process would involve the following tasks. Task 11.1, System Configuration The ENGINEER and the IMPLEMENTATION ENGINEER (Skinm, Inc) shall be responsible for the design, configuration, testing, and deployment of the Unifier Enterprise Edition application. System Configuration m/oV|d include the following tasks. 11.1,1 - The ENGINEER and the MWB8o\Y5-l8 IMPLEMENTATION ENGINEER (Skire. Inc) shall provide system configuration design services. Included in the design services will be the documentation of a Customer Requirements Document (CR0and Business Requirement Documents (BRD's)' Data Dictionaries and Workflow Gohemao. All design work will be done in coordination with Citywide business process activities outlined in Tasks 9.2 and 9.3. The Unifier Enterprise Edition will be configured for nine (S) workflow activity business processes (BP). nine (H) custom Crystal repVds, and mobile report viewing using Personnel Data Assistants (POA'o) ina dock and walk mode; 11.1.2 CPMS System Hardware Requirements - the ENGINEER and the IMPLEMENTATION ENGINEER (Gkire, Inc) ah8U provide the City with the required specifications and architecture recommendations for the server/hardware environment (excluding network infrastructure, communications, and system backup protocols) on which the Unifier Enterprise Edition will behosted; 11.1.3 the ENGINEER and the IMPLEMENTATION ENGINEER (Sk/nu, Inc) shall develop design documents and configure the Unifier Enterprise Edition to meet those design specifications based on the priorities determined in the CR[} and the BFlD'a developed in Task 11.1.1. 8yaham configuration would include building all necessary forms and vvo/kj/ovvo, appropriate fields and field types on (onno, and workflows based upon parameters defined in Task 11.1.1. and in accordance with the system functionality documented in Attachment B. The ENGINEER, the IMPLEMENTATION ENGINEER (Skire, Inc), and the City shall develop the Functional Acceptance Teat Plan. Configuration of the Unifier Enterprise Edition will not include any customization; 111.4 Functional Acceptance Testing of the ConAgured CPMS System - theENG(NEERand the IMPLEMENTATION ENGINEER (Skire, Inc) shall execute the Functional Acceptance Test Plan developed in Task 11.13. These unit tests will be performed against test environments according tothe Functional Acceptance Test Plan. The City subject matter experts will sign-off and testing will be complete upon achievement of the Functional Acceptance Test Plan outcomes; and 11.1.5 Customer Acceptance Testing and Deployment of the Configured CPMS System-the Acceptance ENGINEER and the IMPLEMENTATION ENGINEER (Skire, Inc) shall develop the Customer in conjunction - the key - .' staff. The ENGINEER, the IMPLEMENTATION ENGINEER (8kina. Inc) and key City staff shall execute the criteria documented in the Customer Acceptance Test Plan.The City will sign-off and testing will be complete upon achievement of the Customer Acceptance Test Plan outcomes. Task 11.1 Defiverables Task Description Format Frequency 11.1.1 tomer Requirements Document MS Word Single deliverable (3 hard (CRD), Business Requirement copies and 1 electronic Documents (BRDs), Data Dictionaries copy) and Workflow Activity Schemas 1112 Server Hardware Environment MS Word Single deliverable (3 hard Architecture and Recommendations copies and I electronic Report 11 1.3 System Configuration Functional MS Word Single deliverable (3 hard Acceptance Test Plan and System Design copies and I electronic Documentation COPY) Systems Configuration Functional MS Word Single deliverable(3 hard Acceptance Test Plan execution results I copies and I electronic and corrective actions I copy) 11.1.5 System Configuration Customer MS Word Single deliverable (3 hard Acceptance Test Plan, City Sign-off, and 1 copies and I electronic , N19V8��V(�is� Task 11.2. CP&0S Data Conversion and Fund Account Center (FAC) Consulting Services The ENG/NEER, in conjunction with the IMPLEMENTATION ENGINEER (Skire. Inc.) shall he responsible for data conversion of the 2004 capital projects and for providing consulting and facilitation aen/imaa to provide an effective means to restructure FAC data required to meek the new 2OO4 format and project management criteria. This process would involve the following tasks: 1121 CPMS Data Conversion Services — the ENGINEER aha|/' in conjunction with the IMPLEMENTATION ENGINEER (Skine' Inc) and key City staff members will identify 2OO4 capital projects, limited to the Financial Data VVenahouae and the Department of Engineering (DOE) Database, for conversion into the CPK88 (Unifier Enterprise Edition). Data conversion will consist of loading active or closed 2004 oapdu/ projects via inteQstion, up to a maximum of 150 projects, where the FAC data structure does not conform to the 2OO4 CPKAS standard. Populating data will not require executing full Unifier business processes. The IMPLEMENTATION ENGINEER (Gkine` Inc.) shall create the project shells for the 2004 capital projects to be converted and allow the integration between the Financial Data Warehouse and Unifier to export the appropriate data contentand . 11.2.2 -the ENGINEER will provide consulting and facilitation services, limited to four(4)workshops, one (1) DOE database conversion/end-of-life plan, and one (1) FAC restructure conversion progrgm, to provide an effective means to restructure FAC data required to meet the new 2004 format and project management criteria. Services include consulting for grants and other non-bond funding sources that require a conversion format to the FAC. Task 11.2 Deliverables Task Description Format Frequency 11.2.1 Project shell (template) and converted MS Word Single deliverable (3 hard project data into Unifier (up to 100 copies and 1 electronic projects) and DOE database conversion copy) plan 11.2.2 FAC Technical Memorandums (where MS Word Multiple deliverables (3 required) hard copies and 1 1 1 electronic copy) Task 11'3. CP@YS Systems Integration The ENGINEER and the IMPLEMENTATION ENGINEER (Shire. Inc) shall be responsible for the deaign, testing, and deployment ofasystem integration solution between the Unifier Enterprise Edition application and a number of key City business systems including the Financial Data VVanmhouae, Project Scheduling and Reporting (MS Project), Human Resource Management (8enesys). Geographic Information System (ESR| ArcG|S), and the [}hv web-site, System Integration would include the following tasks. 11.11 System InLegration Interface Requirements Documentation — The ENGINEER and the IMPLEMENTATION ENGINEER (Skine. Inc) shall organize and execute workshops with the key City stakeholders and City subject matter experts to identify the system interface requirements. The outcome of these workshops will be to produce a comprehensive Interface Control Document that will contain the myatem, entity and attribute requirements in enough detail to build adaia integration solution for the identified applications. The ENGINEER and the IMPLEMENTATION ENGINEER (Sk|re. inc) will review the Interface Control Document with key City staff to refine and validate the interface document ' � . B�YYR xr|8' s °`^"�"`� ~r� ' - � outcomes; 11.12 Design and Development of the Integration Solution — the ENGINEER and the IMPLEMENTATION ENGINEER (Skire, Inc) shall design and develop the integration solution based on the Interface Control Document produced in Task 11.3.1. The ENGINEER and the IMPLEMENTATION ENGINEER (Skire, Inc) shall develop the Functional Acceptance Test Plan including all unit tests. Deliverables from this Task will include the Functional Acceptance Test Plan (including all unit tests), scripts, and design documentation; 11.3.3 Functional Acceptance Test Plan for the Integration Solution the ENGINEER, the IMPLEMENTATION ENGINEER (Skire, Inc), and key City staff shall execute the unit tests for the scripts and any executable solution components developed in Task 11.3.2. These unit tests will be performed against test environments according to the Functional Acceptance Test Plan. The City subject matter experts will sign-off and testing will be complete upon achievement of the Functional Acceptance Test Plan outcomes; and 11.3.4 Customer Acceptance Test Plan and Deployment of the System Integration Solution— the ENGINEER and the IMPLEMENTATION ENGINEER (Skire, Inc) shall develop the Customer Acceptance Test Plan in conjunction with the key City staff. The ENGINEER, the IMPLEMENTATION ENGINEER (Skire, Inc), and key City staff shall execute the criteria documented in the Customer Acceptance Test Plan. The City will sign-off and the system shall be accepted upon achievement of the Customer Acceptance Test Plan outcomes. Task 11.3 Deliverables Task Description Format Frequency 11.3.1 Systems Integration Interface Control MS Word Single deliverable (3 hard Document copies and 1 electronic copy) 11.3.2 System Integration Functional MS Word Single deliverable (3 hard Acceptance Test Plan, Design copies and 1 electronic Documentation and Scripts copy) 11.3.3 Systems Integration Functional MS Word Single deliverable (3 hard Acceptance Test Plan execution results copies and 1 electronic and corrective actions copy) 11.3.4 System Integration Customer Acceptance MS Word Single deliverable (3 hard Test Plan, City sign-off, and Solution copies and 1 electronic De to t copy) Task 12—City Staff Training The ENGINEER shall be responsible for implementing the project management and software systems training recommendations identified in the Task 9.1 deliverable (i.e. Master Training Plan)for City staff, The City will be responsible for providing the required training facilities including all supporting computer hardware, infrastructure, projection equipment, etc. in support of these activities. The ENGINEER reserves the right to review the allocated Task 12 budget based on the agreed outcomes from Task 9.1 and, where appropriate and following written agreement with the City's Executive Steering Committee, adjust the allocated Task budget to accommodate the agreed training requirements. This process would involve the following tasks. 12.1 CPMS Software and 61S Enterprise Project Software TrainLncl - the ENGINEER in conjunction with City shall identify the appropriate training firms to provide the agreed training and would be responsible for the overall coordination, management, and scheduling of the training for the CPMS and MS Enterprise Project software systems. These training sessions would accommodate management level, day-to-day user level, and system administration level classes and could comprise a mixture of formal classroom, web based, or one-on-one sessions as identified in the Task 9.1 deliverable (Master Tr a ining Plan' and agreed to with the CPMS Executive Steering Commit-tee; and NfWHSoW8-l$', 12.2 Proiect Management Trainin - the ENGINEER shall identify the appropriate training firms and assume responsibility for the overall coordination, management, and scheduling of the program management training for City staff who manage capital projects. These training sessions could comprise e mixture of fonnal c|aaeroom, web based, orone-on-unesessions as identified in the Task 8.1 deliverable (Master Training Plan) and agreed bz with the CPKU8 Executive Steering Committee. Task 12 Deliverables Task Description Format Frequency 12.1 CPMS and MS Enterprise Project training MS Word, M Multiple deliveries sessions including all necessary training PowerPoint per the training materials session 12.2 Program management training sessions MS Word, MS Multiple deliveries including all necessary training materials PowerPoint per the training session Task Y3—Supplementary Services The ENGINEER will provide the following additional aon/icea to the City upon written authorized agreement up to the amount budgeted for Task 13. Any additional services beyond the budgeted Task 13 allowance or that would extend the project duration, will be performed through Amendments to the Contract.The ENGINEER, if authorized in writing by the City, can provide the following general external consulting, software, and hardware procurement services: Li Additional program management services for the CPyW8implementation; Li Additional consulting services relating to the planning, design, configuration, integration, data conversion, and deployment o(the CPW18 software system; L) Additional CPK88' M8 Enterprise Project, and the K88 SC)L Server 2000 database software licenses and associated midd!eware. adapters, etc; Li Additional hardware for hosting the CPK8S. MS Enterprise Project, and the K48 SQL Server 2UOO software applications; Li Price escalation of the CPyWG, yWS Enterprise Project, andtheK8S8(3LSen/er2OOOda1ohaae software licenses; . Li Additional CPK88, K8S Enterprise Project, and YWSSQL Server 2OOO software training; and Ll Additional business process development and organizational change management support. CPKNS Implementation Assumptions The ENGINEER's and the City's ability to complete the CPMS implementation is predicated on the following assumptions. General: ,j The majority of activities in the project plan will be performed jointly by the ENGINEER's and City resources, so that the team can effectively leverage the knowledge of City personnel, that the final design represents the City's business needs, and to maximize the opportunity for knowledge transfer b)City emnp|oyees-, J The City has contracted with ENGINEER to be the prime contractor for the overall implementation nf the CPW1S and will work directly with the ENGINEER as the primary contact for the work included in this Scope of Services" 0 The ENGINEER and the IMPLEMENTATION ENGINEER (Skire, Inc.) will perform some tasks off site msappropriate; -i The ENGINEER will develop the Citywide business process directly related to the Project Management activities for City Departments directly involved with managing and implementing capital projects, The ENGINEER has allowed for the development ofuptofive (5) City-wide end-to-end business process within this Scope of Services including: project initiation and budget set'Up. project Ufecyc/e management, change orders and pending r- - ` ., MWBsn$/ changes, and project cloee-out' audit, and completion; a The ENGINEER will configure the Unifier processes and nine (9) custom reports, The ENGINEER has allowed for two(2) high level complexity, two(2) medium level complexity, and five (5) low level complexity custom reports (total Vf &H nine custom reports; a The ENGINEER shall provide data conversion for active or closed 2004 capital projects via integration for uptoamaximum of 150 projects, where the FAC data structure does not conform tothe 20O4CpKABstandard; o The preparation of Standard Operating Procedures (SOP's) documenting the end-to-end business processes and workflow activity processes are excluded from this Scope of Services; [3 The ENGINEER will provide a GIS integration that provides a Web based GIS map display launched from within Unifier as either as ased nfJewa8uript-enab|ed HTKALframen or as a J8vgapp|*t embedded inanHTKALpaQe. itiaeaaumedthedembeddingtheVVab-basedmap display in 3'~ party applications is outside the Scope of Services; [B The City will maximize the use of web-based collaborative design, testing, and communication tools and technology such as WebEx to reduce the amount of travel required by the IMPLEMENTATION ENGINEER (8kire, Inc.); zi For tasks and activities where the ENGINEER is dependent on the completion of work by the City, the respective City and ENGINEER Project Managers will assess the impact of any delay in the completion of work by the City and will determine if any adjustment to the CPMS schedule iarequired; 0 The ENGINEER will provide City staff with two weeks advance notice when they are required to attend workshops, meetings, etc.The ENGINEER will be responsible for inviting padiuiponta, booking individual ueiendana, reserving rooms, etc in support of these activities. The City will be required to ensure that City staff required to attend these workshops, meetings, etc when provided with two weeks advance notice make these requests apriority in their work schedule; ca The City will provide resolution onCPK88 issues presented to the City's Project Manager and/or the City's CPMS Executive Steering Committee within five (5) business days; and o The City will provide written comments on CPMS deliverables within ten (10) business days following submission of these to the City Project Manager. City Resources: Li The City will make appropriate resources, systems, process documentation, etc available 0m the ENGINEER to answer questions and respond to project issues raised by the ENGINEER ina timely manner; zi The City resources assigned to the CPMG will have the business and technical skills necessary to provide relevant technical, functional, process, and business partner knowledge; i The City will make available staff 8oco-ordinate the delivery cdthe communication plan outcomes within the City. The City will provide staff to incorporate the communications content developed by the ENGINEER within the various City communication mediums such as Internet web sites, newsletters, etc; and i The City will provide meeting rooms, training environments, and office facilities with DSL and telephone access for the ENGINEER and the IMPLEMENTATION ENGINEER (Skimo. Inc) personnel directly responsible for the implementation of the CPKxS. Technical: Li The City will be responsible for procuring the required number of MS Project, MS SOL Server 20]Q. Crystal Reports, and any other required third party software licenses; ,j The City will be responsible for procuring the required server hardware and all P[)A's on which the Unifier Enterprise Edition will behosted and deployed; J The City will be responsible for the installation, configuration, maintenance, and support of all MWR8oW 10-18 technical infrastructure components for the development, test, training, and production environments for the CPM8, including the timely application of any software fixes and patches; Ll The ENGINEER has assumed that the GIS integration will be deployed on ESRI ArcGIS version 8.3 or 9.0, will utilize the ESRI ArcIMS Web publishing product, the City's GIS data is complete and ina readily accessible format(i.m. AnoG|S geodatabaae)' any data conversion or migration efforts are not required ao part ofthis Scope od Services, and that G|S geodatebase data resides on feature classes without joins h)external database tables. The ENGINEER has also assumed that Geocoding within the G|8 integration (i.e. feature lookup by street address) is excluded from the Scope ofServices; u The City will be responsible for providing the network infrastructure, including Local Area Networks (LAN'e)'Wide Area Networks NVAN'm>, controllers, routers, communication protocols, speed and capacity of the network infrastructure, backup and disaster recovery procedures and systems, load balancing and monitoring procedures and tools, etc. to support the CPK8Simplementation; and U Any unique software or tools used by City will be made available to the ENGINEER, with training provided aa appropriate, sdno additional cost to the ENGINEER. Legacy Systems and Data Conversion: i The legacy applications test databases will be made available to the ENGINEER during the design, development and testing phases of the project. The City will maintain responsibility for legacy system operations and maintenance; 0 The City will provide legacy data(download files)to the ENGINEER in extract file formats and will prepare the data conversion plan and the reconciliation procedures in accordance with project timelines. The ENGINEER will provide extract file formats to the City, and the City will provide files which will load in to databases "As-Is" - using load applications delivered with each application; -zi The City shall provide technical support and delivery of data file extractions, database formats and creations of extract programs/jobs to input legacy City system information into the Unifier application in conformance to data formats as prescribed by the IMPLEMENTATION ENGINEER (Shine' Inc.); 0 The ENGINEER will provide City staff with three weeks advance notice when they require legacy data in extract file format. The City will be required to ensure that City staff allocated to provide legacy data when given three weeks advance notice make these requests a priority in their work oohodu|e ' J The City will be responsible for the setup and execution of any batch jobs associated with the legacy system applications; and Li The City is responsible for all data purification, data verification, and manual data loading activities. Legacy system data integrity issues will be resolved prior to execution of the data conversion programs. City Staff Training: Li The City will beresponsible for the provision of all facilities necessary hr support the Task 12 Training requirements, including training rooms, PC's, network connect|ons, projection equipment, and all application software. r- - - - - ' . ' MYVBSoxV )l-l9 `' '. Attachment B System Functionality The following are the system functionality that will be included in the system configuration of the Unifier Enterprise Edition under this Scope of Services. Configuration will of the Unifier Enterprise edition will not include any ouatmnnizationcUthe software application. ';Portfolio Management Generate grand totals by project covering all expenditures rolled up to the fund level,totals of all funds, and total of all propositions Incorporate a rule-based Citywide project priority ranking method and project linkage across all departments for maintenance of priority list Track all funding including budget amount, appropriations, encumbrance, expenditures with contracts and super-projects roll-ups Capture completed project fund account financial data for historical reference prior to fund accounts being closed out and rolled up Add change order amounts to original budget and track new budget and change orders combined and separately at the project level Generate cost estimates and details for total project funds available on projects instead of just by budget appropriated to date versus allocations. Automated tracking for fund appropriation according to project type and work phase Roll-up all costs on a project/contract across all departments charging to the project/contract; with fund and proposition level visibility. Link all related projects sharing funding across department lines; report/track at a project, department, fund, and proposition level View bond fund transfers (to/from) and show total appropriations versus to total budget, including change orders. Track commercial paper, cash and bond fund transactions at project, program, proposition and fund rack/report bond fund transfers from unspecified (surplus account)to specified fund accounts. Project Controls Relate individual projects to funds and sub-funds showing all funding sources for the project. Track down to the work phase level in the project hierarchy with drill-down capability to detailed tasks. Associate costs to specific work phases with ability to link to specific tasks and associated expenditures Automatically reduce/increase estimated proiect costs associated with pending and approved change orders I rack developer contributions and calculate in to total job cost-, also accurately track/report City 1contributions to developer projects, FProject details of funding shortfalls, overruns throughout the project duration based on budget bottom line labor expenses by project work phase �Oaintajn appropriate change order sequence to track budget and scope changes in the release order D1WASoYP12'18 Itemize costs for each project work phase by fund account and generate detail projections regarding budget status Track/report developer and outside agency contributions and revenue at a project/contract and fund level Forecast cash flow based on remaining budgets (spends/invoices) Executive Dashboard View funding allocations and expenditure total by Council District at a project level. Maintain and allow access to master list of projects and the ability to view all projects across all departments Configurable top project home page settings, screen tickers/message crawlers, and notification windows specifically tailored to a named user. Associate projects to geographic boundaries, streets, Council Districts, and other spatial features. Accessible through City internet and intranet sites based on site security rules, using Microsoft Internet Explorer client browsers. Provide City Council, advisory boards, managers, directors, etc. with access to reports and status updates from all departments Provide web-based access to high-level project statistics, red/yellow/green status and pie chart reports Selectable pre-configured dashboard information with download capabilities to handheld devices for �iewinq purposes. Reporting Easy access to the information for data queries and reporting Pre-configured report formats and templates with logos, proper reference footers, etc. with a professional appearance Report or provide access to project status and schedule timing report for City Council and citizens Generate standard project management health check reports, like "S"curves, earned value analysis, percent spent/complete, etc. Generate report listing cost breakdown associated with each project or contract Generate and publish standard financial and project reports automatically from the system Optional report field filtering for any condition that applies to the report Standardized reporting to produce project status, invoice payments, retainage, and expenditures to date across various fund account centers and ability to sum by vendor, contract, project, etc. ompatible with City standard Microsoft Office 2000 export and printing of reports, embedding of spreadsheets, tables, and charts Export data to MS Excel for custom report creation that includes data from sources other than the system Selectable pre-configured standard report with download capabilities to handheld devices for viewing Wposes Library of pre-configured reports available for user to select, based on security access, from a menu ith snapshot examples Contract Management 'Report project and/or contract status concerning invoice payments, partial pays and track/report i�,rack a variety of contract types such as unit price, lump sum, and time and materials 4 MWH SoW 13-18 Add change order amounts to original budget and track new budget and change orders combined and separately Maintain appropriate change order sequence to contracts and track budget and scope changes in the release order Track critical dates such as bid date, award date, notice to proceed, contract date, change order dates, and completion date Reference all change orders, revised contract amounts, and changes in contract schedule Summary of contract billing status including total to date, total retention, balance to complete, and current due Record history of change order to include the estimate, proposal, and the approved amounts on the ud et and cost sides Allow for billing to be applied to each contract Now for multiple retainage on each line item by percentage or lump sum basis at a payment level Plan for and track, reimbursement requests from outside agencies rack request for information process, questions, answers, costs and links to documents. Management Link to the project actual contract, M&C communications, drawing submittals, bid packages, and purchase orders. Link proof of minority subcontract payment to projects. Attach associated designs, drawings, and alternatives to projects and awarded contracts ftach reasons for scope, schedule or budgets changes to project notes and associated corresponding documents Compliance . Add change order amounts minority business goals and track original goals and new change order pals combined and separately at a project level Validate payments to minority business firms from City and prime contractors and report against project goals Identify and track Federal funded projects including all Federal government mandated compliance, pals, and reporting requirements Account for partial payments on a timely basis;track payments to prime and subcontractors against minority business project goals utomaticaNy calculate percent of contribution goal from minority business subcontract payment to projects Track expenditure for public art percentage content based on City Council contribution requirements for project Workflow Automation Centralized. single source of project number assignment in the system that will be linked to iund/account/center and project management Set event triggers, approval thresholds, and escalation notifications. Provide advance notice on amendments and change orders; project impact to contracts/projects Route work for approval and digital signatures in the system. E Provide configurable triggers, thresholds, and notifications to manage project scope, schedule, or budget slippage/out of tolerance Notification and appointments to the City email and calendar system MW SoW 15-18 Attachment C Task Budgets The following are the budget allocations for each ofthe taahoasdefinedinAtt@chmerdA - Soope of Services. These budged allocations represent the ENG|NEEH'a estimate for each task. Transfers between 1eak allocations must be authorized by the Qty after notification by ENGINEER before transfer can occur, providing transfers do not change the Total Budget amount. Changes to the Total Budget will be performed through Amendments tn the Contract. Task# Task Title Cost Budget Allocation 8 CPK8S Program Management $385.490 9 CPyW8Buainess Process Development and Organizational Change Management $241.400 10 Procurement and Installation ofCPK8SSoftware $483.630 11 CPK8S Implementation and Integration $1,461.980 12 City Staff Training $227.780 13 Supplementary Services _$459,930 Total Budget $3,270,100 ' ^ MW88oW 16,18 Attachment D Task Deliverables The following are the deliverables for each of the separate tasks as defined in Attachment A — Scope of Services. The final timings for the task deliverables will be based on the agreed Water IT Program Schedule developed under Attachment A-2 - Scope of Services, Task 8.1.1. Changes to the scheduled timing for the task deliverables can be authorized after notification by the ENGINEER to the City, providing the revised timings do not change the total project duration. The completion date for the CPMS project is December, 2005. The nominated timing for the task deliverables have been based on the ENGINEER receiving Notice to Proceed (NTP) by the 17th November, 2004. The ENGINEER has assumed that all written documents will be submitted in draft format, an allowance of a two weeks for review and comments by the City, with final documents to be submitted within two weeks after receipt of all comments from the City. TASK 8— CPMS PROGRAM MANAGEMENT Task 8 Deliverables 8.1 Program Management Plan January, 2005 8.2.1 MBE/WBE Compliance Reporting Monthly 8.2.2 MBE/WBE Compliance Monitoring Report Quarterly 8.3.1 Bi -Weekly CPMS Reporting and Meetings Bi-weekly 8.3.2 CPMS Executive Committee Meetings Weekly TASK 9—CPMS BUSINESS PROCESS DEVELOPMENT AND ORGANIZATIONAL CHANGE MANAGEMENT Task 9 Deliverables 9.1 OCM Readiness Report and Training Plan March, 2005 9.2 Current CPMS Business Process Report January, 2005 9.3 Future CPMS Business Process Report April, 2005 9.5 OCM Communications Plan April, 2005 TASK 10—PROCUREMENT AND INSTALLATION OF CPMS SOFTWARE Task 10 Deliverables 10.1 CPMS Software Procurement December, 2004 TASK 11—CPMS IMPLEMENTATION, DATA CONVERSION, AND INTEGRATION Task 11 Deliverables 111-1 Business Requirement Document (BRD), June, 2004 Data Dictionaries and Workflow Activity Schemas 1112 Server Hardware Environment Recommendations Report May, 2005 11,1.3 System Configuration Functional Acceptance Test Plan August, 2005 and System Design Documentation 11 AA Systems Configuration Functional Acceptance Test Plan October, 2005 execution results and corrective actions 11.1.5 System Configuration Customer Acceptance Test Plan, November, 2005 City sign-off, and System Deployment 11,2.1 Project shell (template) and converted project data November, 2005 into Unifier (up to 150 projects',and DOE database conversion plan MWH SoW 17-18 - 11-2.2 FAC Technical Memorandums (where required) November, 2005 11 3 � � otenom |nteg�dion |rde�aoe (�on1vm| Document Jun�. �0O� 11.3.2 System Plan, Design Documentation and Scripts November, 2005 11.3.3 Syatenno |ntagmdionFun(tiona| AcceptanmaTestp|an ov� , execution results and corrective actions 11.3.4 8y��emIntegration Customer Acceptance Test Plan, December, 2005 City sign-off, and Deployment TASK/2-CITY STAFF TRAINING Task 12 Deliverables dW18Project En(e,priaeTr�ining November, 2005 121 {��N1ban ' ~ '`'~ - '� - November 2005 12.2 Project K8anogementTn�ning . ` N1\VBSow 18-18 ' \ _-_ ---- -�-- '-- City of Fort Worth., Texas Mayor and Council Communication COUNCIL ACTION: Approved on 81512004 - Ordinance No. 16059 DATE: Thursday, August 05, 2004 LOG NAME: 60MWH2 REFERENCE NO.: C-20183 SUBJECT: Appropriation Ordinance and Amendment No. 2 to Agreement with MWH Americas, Inc. for Acquisition, Program Management and Implementation Services for a Capital Project Management System RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Capital Project Fund by $926,526, in the Sewer Capital Project Fund by $926,526, in the Aviation Improvement Fund by $396,262, and in the New Equipment Purchases Fund by $1,188,786 from funds to be obtained through the City's Equipment Note Program; and 2. Authorize the City Manager to execute Amendment No. 2 to the agreement with MWH Americas, Inc. (City Secretary No. 29129) for acquisition of a capital project management system, including software and maintenance, for a total cost not to exceed $3,438,100; and 3. Authorize the Program Manager, MWH Americas, Inc., to execute a purchase agreement with Skire, Inc. for software and maintenance of a capital projects management system; and 4. Authorize payment of funds to MWH Americas, Inc. for payment to Skire, Inc. under the contract. -DISCUSSION: In the current environment, managing capital projects across the organization is facilitated through a variety of fragmented, inefficient systems. With the passage of the 2004 Bond Program, the City will manage over $200 million in capital projects each year. In an effort to effectively manage these projects, a comprehensive capital projects management system is recommended. On August 12, 2003 (M&C C-19708), the City Council authorized the execution of an agreement with MWH Americas Inc, ("MWH") to assist in the implementation of the Water Information Technology Program (WIT), Phase 1, Phase I included the deployment of a Maintenance Management System and a Geographic Information System. The agreement also provided funds for an assessment of the Water Department's current ability to manage and monitor spending for capital projects, and to make recommendations on the need for a Capital Project Management system. During the assessment process, it was determined that the consultant's scope of work should be accelerated and expanded to include other departments, in order to effectively manage the capital projects in the 2004 bond program and other capital projects across the organization. On April 13, 2004 (M&C C-20031), the City Council authorized Amendment No- I to the agreement with MWH to provide additional services related to the acquisition of a capital project tracking system to be used Citywide. The additional work approved under this amendment Included the preparation of a Request for Logname: 60MNVH2 D--- 1 -4�1 Proposal for CIP software vendors, assistance in the analysis of the proposals submitted and the development of a business case for the program. On May 26, 2004, the Purchasing Division issued a Request for Proposals to solicit capital project tracking software system proposals. Six responses were received. Based on vendor presentations during the demonstration process, the CIP selection committee, made up of representatives from the City Manager's Office, IT Solutions, Water, Transportation and Public Works, Engineering, Parks and Community Services, Finance, and the M/WBE Office, recommended Skire's Unifier system. Skire's Unifier system has the functionality to allow the City to better manage and track capital projects across departments. The primary functions include: Portfolio Management Project Control Executive Dashboards Report Generation Contract Management Field Inspection Document Management MAIVBE Compliance Tracking Workflow Automation Implementation of the system will enable effective tracking and instant communication of capital project expenditures and projections to provide real-time decision-making support in monitoring and controlling projects, to eliminate multiple sources of input into the capital project process and to consolidate disparate systems into a single, central database. Under the terms of the program agreement, MWH will execute a purchase agreement with Skire, Inc. and manage the system installation. Payments will be reviewed and recommended to the City for approval by MWH, which will then be paid by the City for payment to the vendor. In addition to the acquisition of the software and maintenance from Skire, Inc., Amendment No. 2 will authorize MWH to provide the following additional services to ensure successful implementation. Capital Projects Program Management Contract Management of Capital Projects Implementation Project Management of Capital Projects Management Systems Implementation and Integration firm Development of Capital Projects Program Management Procedures and Methodologies Capital Planning Business Process Modeling Organizational Readiness Preparation Capital Projects Management System Implementation and Technical Services Procurement of Capital Projects Management System Implementation Services Procurement of associated hardware and software Integration with other City systems and data conversion Employee Training CIP Software and Microsoft Enterprise Project Software Training Project Management Training MWH Americas, Inc, is in compliance with the City's M/WBE Ordinance by committing to an additional 22% M/WBE participation on this amendment for all hardware and professional services. The General Fund, Municipal Airports Fund, and Water and Sewer Fund will share the total cost of system acquisition and implementation, Logmame: 60MWH2 Naf. ? of, FISCAL INFORMATIONXERTIFICATION: The Finance Director certifies that funds for this purchase will be obtained through the City's Equipment Note Program. TO FundfAccount/Centers FROM Fund/Account/Centers P162 539120 060162151030 $926,526.00 P172 539120 070172131010 $926 526.00 P162 485200 060162151030 $926 52600 P172 485200 070172131010 $926,526.0{} G193 485200 020193020020 $1 188,78�600 G193 539120 020193020020 $I-V88 786.00 GC24 485200 055240450010 $396.262.00 GC24 539120 055240450010 $396262.00 Submitted for Q#y-Manager's Office y ice b - Marc Oft (8476) — - -- Originatft-D"artment Head. Frank Crumb (Acting) (8243) Additional Information Contact: Frank Crumb (Acting) (8243) Lounarne: 60MWH2 Page 3 of 3