Loading...
HomeMy WebLinkAboutContract 60328Date Received: 10/19/2023 Time Received: 11:35 am Permit No.: SWFMA-23-0050 City Secretary No.: 60328 STORMWATER FACILITY MAINTENANCE AGREEMENT THIS AGREEMENT, made and entered into this 19th day of October 20 23 , by and between MK Davis Enterprises, LLC, hereinafter referred to as "Landowner", and the City of Fort Worth, hereinafter referred to as "City". WITNESSETH WHEREAS, the Landowner is the owner of certain real property described as a tract of land situated in the David Odum Survey, Abstract 1184, and being a portion of Lot 1, Block 19, Mark IV Business Park Phase A-R, Tarrant County, Texas according to the deed recorded of Tarrant County, Texas, by instrument D214189285, Deed Records, Tarrant County, Texas, hereinafter called the "Property". WHEREAS, the Landowner is proceeding to build on and develop the Property according to the Site Plan/Subdivision Plan known as Cowser Tire Retread Facilitv, hereinafter called the "Plan", which is expressly made a part hereof, as approved or to be approved by the City and the Landowner provides for management of storm water within the confines of the Property; and; WHEREAS, the City and the Landowner, and their successors and assigns, agree that the health, safety and welfare of the residents of the City of Fort Worth, Texas require that on -site Stormwater Management Facilities be constructed and maintained on a portion of the Property; and WHEREAS, the City requires that on -site Stormwater Management Facilities ("Facility") as shown on the Plan be constructed and adequately maintained by the Landowner, its successors and assigns, the location and dimensions of which is shown and OFFICIAL RECORD STORMWATER FACILITY MAINTENANCE AGREEMENT CITY SECRETARY Rev. 03/01/2022 BN FT. WORTH, TX more particularly described by metes and bounds in the attached Exhibit "A" ("Facility Property"); and NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows: 1. The Landowner, its successors and assigns, shall adequately construct and maintain the on -site Stormwater Management Facility ("Facility") at no expense to the City of Fort Worth in accordance with the design specifications for the Facility, attached as Exhibit `B", and the current standards then in force and effect in the City of Fort Worth and with the Operations and Maintenance Plan attached to this Agreement as Exhibit "C". The Stormwater Facility includes all pipes, channels or other conveyances built to convey Stormwater to the facility, as well as all structures, improvements, and vegetation provided to control the quantity and quality of the Stormwater. Adequate maintenance is herein defined as good working condition so that these facilities are performing their design functions. The Stormwater Structural Control Maintenance Checklists, attached to this Agreement as Exhibit "D", are to be used to establish what good working condition is acceptable to the City. 2. The Landowner, its successors and assigns, shall inspect the Facility and submit an inspection report to the City annually. The purpose of the inspection is to assure safe and proper functioning of the Facility. The inspection shall cover the entire Facility, berms, outlet structure, pond areas, access roads, etc. Components of the Facility, which need maintenance or replacement to perform their design function, shall be noted in the inspection report along with the corrective actions to be taken. 3. The Landowner, its successors and assigns, hereby grant permission to the City, its authorized agents and employees, to enter upon the Property and to inspect the Facility Property whenever the City deems necessary. The purpose of inspection is to follow-up on reported deficiencies and/or to respond to STORMWATER FACILITY MAINTENANCE AGREEMENT 2 Rev. 03/01/2022 BN citizen complaints. The City shall provide the Landowner, its successors and assigns, copies of the inspection findings and a directive to commence with the repairs if necessary. 4. In the event the Landowner, its successors and assigns, fails to maintain the Facility in good working condition as specified herein, the City, its authorized agents and employees, may enter upon the Facility Property and take whatever steps necessary to correct deficiencies identified in the inspection report and to charge the costs of such repairs to the Landowner, its successors and assigns. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair said Facility, and in no event shall this Agreement be construed to impose any such obligation on the City, such obligation is Landowner's. 5. The Landowner, its successors and assigns, will perform the work necessary to keep the Facility in good working order as appropriate. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the Landowner, its successors and assigns, shall reimburse the City upon demand, within thirty (30) days of receipt thereof for all actual costs incurred by the City hereunder. In the event that Landowner or its successors or assigns fail to pay the City for the costs incurred under this section, the City shall impress a lien for the costs of such work upon other lots owned by the Landowner. Such lien shall be perfected by filing in the office of the County Clerk of Tarrant County, Texas an affidavit identifying the property to be charged with such lien, stating the amount thereof, and making reference to this Agreement. 6. This Agreement imposes no liability of any kind whatsoever on the City. THE LANDOWNER AGREES TO HOLD THE CITY HARMLESS FROM ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO OPERATE PROPERLY. LANDOWNER COVENANT AND AGREE AND DOES HEREBY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH, ITS AGENTS, SERVANTS AND STORMWATER FACILITY MAINTENANCE AGREEMENT 3 Rev. 03/01/2022 BN EMPLOYEES FROM AND AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH MIGHT ARISE, FROM THE FAILURE OF LANDOWNER OR ANY FUTURE OWNERS OF THE ABOVE FACILITITY PROPERTY TO MAINTAIN THE FACILITY, INCLUDING, BUT NOT LIMITED TO THE BED AND BANKS OF THE DETENTION POND; ANY DAMAGES CAUSED TO PERSON OR PROPERTY DUE TO (1) FLOODING OF THE POND AND ITS BANKS, (2) SLOPE FAILURE OF THE BANKS OF THE POND, OR (3) FAILURE OF THE POND OR ITS BANKS TO OPERATE IN A MANNER CONSISTENT WITH CITY OF FORT WORTH CRITERIA TO PERFORM ANY OTHER DUTIES OR OBLIGATIONS HEREUNDER. 7. Landowner covenants and agrees that no habitable building shall be erected within the boundaries of the Property in which the Facility is located as outlined on Exhibit "A" but this paragraph shall not preclude construction of other improvements within the boundaries of the Property in which the Facility is located, which do not impede drainage. Landowner covenants and agrees that no habitable building shall be erected on the above property abutting such boundaries of the Property in which is Facility is located, which shall have a finished floor at an elevation less than two feet above the maximum depth of water in the detention pond which would occur during a 100-year frequency flood. 8. This Agreement shall be recorded among the land records of Tarrant County, Texas, shall constitute a covenant running with the land, and shall be binding on the Landowner, its administrators, executors, assigns, heirs and any other successors in interests, including any property owner's association. STORMWATER FACILITY MAINTENANCE AGREEMENT 4 Rev. 03/01/2022 BN Executed this 19th day of October CITY OF FORT WORTI3 Dana Bu rghdoff (Oct-f% 202A4:55 CDT) Dana Burghdoff Assistant City Manager City of Fort Worth Date: Oct 19, 2023 Approved as to Form and Legality: - Thomas Royce Hansen, Assistant City Attorney II City Attorney's Office Date: Oct 18, 2023 4d4404q� apF F�Rr�ad ATTEST: DooQaoo o GP Ov8 8=d P Boa aoo� Oaa� nEXA?op ll 3annette S. Goodall City Secretary Date: Oct 19, 2023 STORMWATER FACILITY MAINTENANCE AGREEMENT Rev. 03101/2022 BN 2023 LANDOWNER MK Davis Enterprises, LLC a Texas limited liability company Michael Kevin Davis Manager Date: =.GI ---. Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Rebecca Dine Owen (Oct 18, 202310:36 CDT) Rebecca Owen Planning Manager Date: Oct 18, 2023 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX STATE OF TEXAS COUNTY OF TARRANT This instrument was acknowledged before me on October 19th, 2023 by Dana Burghill Assistant City Manager of the City of Fort Worth, on behalf of the City of Fort Worth. o�PRYP�e, BROOKE BONNELL z Notary Public * * STATE OF TEXAS P Notary I.D. 134009525 My Comm. Exp. Oct. 11, 2026 LANDOWNER STATE OF _ ,�X%0ti, _ COUNTY OF i, Digitally signed by Brooke Brooke Bonnell Bonnell ' Date: 2023.10.19 10:02:16-05'00' Notary Public, State of Texas BEFORE ME, the undersigned authority, a Not y P bli n and f the State of n , on this + erson lly ppeared Ybk P." lfl ���f'�j ii•� f _ r - 0/0( �PA (title), known to me '- be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he%lto executed the same for the purposes and consideration therein expressed, as the act and deed of MK Davis Enterprises, LLC (entity), a Texas limited liability (entity type) and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 2 of f Ny CRECSHIA GASAWAY - Notary ID #130740563 9 0>� My Commission Expires JU(y 15, 2024 STORMWATER FACILITY MAINTENANCE AGREEMENT Rev. 03/01/2022 BN day EXHIBIT "A" INSERT LEGAL DESCRIPTION STORMWATER FACILITY MAINTENANCE AGREEMENT Rev. 03/01/2022 BN N O N a 0 Q 8 W ❑ I w a a nr i En z Z ❑ i Ir F t4 U 0 O N 0 V3 6 z 3 ❑ L=98,47' R=4381.70' -A=001 ° 17' 15" CB=S 81 °05'53" E CD=98.46' 6'P.U.E� INST. NO. D21601954J ti P. R. T. C. T. _ suit cv t1 4 LU Go r to YJ Q Q r. LEGEND: ruo POINT OF BEGINNING POC POINT OF COMMENCING IRF IRON ROD FOUND PUE PUBLIC UTILITY FJSMENT NOTES: 1. LEGAL DESCRIPTION OF EVEN DATE ACCOMPANIES THIS EASEMENT DRAWING. 2. BEARINGS REFERENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONE, NAD '83. ALL DISTANCES ARE GROUND DISTANCES. EXHIRIT � 4 r>' STORMWAMEW, ACf TTYMAIIVTENANCEAREA 42,368SQITOR a973ACRESOFL".D LOT11?1, BLOCKI9, MARAW.RU57NESSPARIC DA VID ODUMSU7MEY, ABSTR4CT-1184 CITYOFFORT WORTH, TARRANTCOUNTYTEXAS L=37.24' NORTH,6AST R=35377.85' a=000° 03' 37" (VAR ABLE W brH CB=S 78°28'02" E r�x WAY) CD=37.24' R t=28y,4g 78.28. P.O.B. 1283,49 W P.O.C. PKF 1 1/2 CIR "KAZ" a c) 35' S.S.E. ` INST. NO. D21601954J 0 P. R. T. C. T. 10)11AI<ATITAN 4:4273Ni4111V MAINTENANCE AREA 42,368 SQUARE FEET] OR 0.973 ACRES �f _J LOT IR1, BLOCK 19 r� MARK IV PARK �' / S 89048'15" W PHASE AR rNST. NO. D216019543 o W Q o 133.45' P.R.T.C.T. , z m�WC) °� I �mz ` 5' AERIAL EASEMENT f I. ~` 1 RA1LR0 1 VOL. 389-44, PG. 24 P. P. R. T. C. T, �04 U41£ 8 & CI 4 R" S!8 IRF1 � RPLS 0j�,. _ � 0 80 160 tE.OF TF' G �Q GRAPHIC SCALE IN FEET lum SHIELD ENGINEERING GROUP TBPE FIRM 91`41039 - TBLS FIRM t110193090 1600 West 7th Street, Suite 400, Fort Woith, TX 70102 • 817.010,0696 ROBERT P. ALLEN 6495 9ti°�ess�o��o� S60 4"K�LPEN R.P.L.S. No. 6495 DATED: 09-27-2023 lg EXHIB.lT fA " STORM WA TER FA CILITYMAINTENANCEAREA 42,368SQFlOR a973ACRESOFLAND LOTrRr,131,0CKr9 MARKLVBUSLNESSPARK DA VID ODUMSURVEY, ABSTRACTrr84 CITYOFFORT WORTH, TARRANTCOUNIYTEXAS BEING A TRACT OF LAND SITUATED IN THE DAVID ODUM SURVEY, ABSTRACT NUMBER 1184, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 1111, BLOCK 19, PHASE A-R, MARK IV BUSINESS PARK ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN ON PLAT THEREOF AND RECORDED IN INSTRUMENT NO. D216019543, OFFICIAL PUBLIC RECORDS, TARRANT COUNTY, TEXAS, {O.P.R.T.C.T.) AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING ATA 1/2 INCH CAPPED IRON ROD -MARKED "KAZ" FOUND AT THE NORTHEAST CORNER OF THE SAID LOT 1111, BEING IN THE WEST LINE OF LOT 1R, BLOCK 19, MARK IV BUSINESS PARK PHASE A-R ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN ON PLAT THEREOF AND RECORDED IN INSTRUMENT NO. D208131635, O.P.R.T.C.T., AND BEING IN THE SOUTH RIGHT OF WAY LINE OF NORTHEAST PARKWAY (A VARIABLE WIDTH RIGHT OF WAY), ALSO, BEING THE BEGINNING OF A CURVE TO THE LEFT, FROM WHICH A 5/8 INCH CAPPED IRON ROD MARKED "RPLS 6014" FOUND FOR THE SOUTHEAST CORNER OF THE SAID LOT 1R1 BEARS SOUTH 05-04'18" WEST, A DISTANCE OF 377.97 FEET; THENCE WITH THE NORTH LINE OF THE SAID LOT 1R1 AND BEING COMMON WITH THE SOUTH RIGHT OF WAY LINE OF THE SAID NORTHEAST PARKWAY, WITH SAID CURVE TO THE LEFT AN ARC LENGTH OF 289.49 FEET, HAVING A RADIUS OF 28,949 FEET, A CENTRAL ANGLE OF 00°28'08", A CHORD BEARING AND DISTANCE OF NORTH 78-12'09" WEST, 289,49 FEET TO THE POINT OF BEGINNING; THENCE OVER AND ACROSS SAID LOT 1111, THE FOLLOWING COURSES AND DISTANCES: SOUTH 01°03'03" WEST, A DISTANCE OF 304.37 FEETTO A POINT; SOUTH 89°48'15" WEST, A DISTANCE OF 133,45 FEET TO A POINT; NORTH 00°55'18" EAST, A DISTANCE OF 327.50 FEET TO A POINT IN THE NORTH LINE OF THE SAID LOT 1R1 AND BEING IN SOUTH RIGHT OF WAY LINE OF THE SAID NORTHEAST PARKWAY, ALSO, BEING THE BEGINNING OF A NON -TANGENT CURVE TO THE RIGHT; THENCE WITH THE NORTH LINE OF THE SAID LOT 1R1 AND BEING COMMON WITH THE SOUTH RIGHT OF WAY LINE OF THE SAID NORTHEAST PARKWAY, THE FOLLOWING COURSES AND DISTANCES: WITH SAID NON -TANGENT CURVE TO THE RIGHTAN ARC LENGTH OF 98.47 FEET, HAVING A RADIUS OF 4,381.70 FEET, A CENTRAL ANGLE OF D1°17'15", AND A CHORD BEARING AND DISTANCE OF SOUTH 81°05'53" EAST, 98.46 FEET TO A POINT BEING THE BEGINNING OF A NON -TANGENT CURVE TO TH E RIGHT; WITH SAID NON -TANGENT CURVE TOT HE RIGHT AN ARC LENGTH OF 37.24 FEET, HAVING A RADIUS OF 35,377.85 FEET, A CENTRAL ANGLE OF 00-03'37", AND A CHORD BEARING AND DISTANCE OF SOUTH 78°28102", 37.24 FEET TO THE POINT OF BEGINNING AND CONTAINING 42,368 SQUARE FEET OR 0.973 ACRES, MORE OR LESS. NOTES: I. EASEMENT DRAVANG OF EVEN DATE ACCOMPANIES THIS LEGAL CESCRIPTION, 2. BE'ARkNGS REFERENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONE, NAD '83. ALL DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TBPE FIRM #F-11039 - TBLS FIRM 8101W890 1600 West 7th Street, Sutte 400, Fort Woi1h, TX 76102 - 817.810.0606 OBERT P. ALL IV R.P,L.S. No. 6495 DATED: 09-27-2023 A.oT rF�� ROBERT P, ALLEN I �. ado 6 9 aPv�q . EXHIBIT "B" DESIGN PLAN AND SPECIFICATIONS STORMWATER FACILITY MAINTENANCE AGREEMENT Rev. 03/01/2022 BN m" C. y CD gF 3g S ell s �= HUM IVNI Ai � cAcarr �F�??.HpCpO�YE_ Rb7 !� Fes' X 2 5 s 1-4 ' mwun onaros[a nuM°s �n.�cuzn°Ms I •tp ... €"�!r . A.fi � �_wM f--� � 3-n � �d !°ml �� I .. 16—w 9 s a I f' 4 EXHIBIT B ..F LEGENO sMisrMMn x.wwcovme ___ _ SHIELD ?RPIIMIRPRY-R RREVIEW.ONLY MIIDd 555/&A.Arakd RiNIanE W16 TX ]<i ErsgMMDmm rT°r orvaNr � BUMM lSi.763&0006 SraNvrwn®oOaaamm cx3 srow.. rxvwm.�nruz r�c�ss orm.e.MmtMicWmP,..rMamm 'AumuM Fwru. p�eare�» P•w.e f No_ i Des 01p Data 1 i I I 1 r 1 t —00 Cowser Tire Retread Fadlity I�R� 2ozxioD.oil Auqu 20231 FJV I CFDi 7OS7 DEVELOPMEt:7 I]RNKAGE AREA MAP r. F` '�—...... lYpp! B }ur`p1TPAKfCWAy f � a 1� # own,/ ,s fw•�0 sad ���a amrt sw��pm�u!yb� �wm�ywRuv Fa, � =III• Mu.m+#rw it � - .I � i Y.iar EXHIBIT B i 14 ukx �"eF "� .. +»so o-m «m zm 3.w xw �T a,acr ♦ .aurmcA rnovaffu rrttsaE'•,1�Wan,E �aeafumvsasTye0.41 'mE6 =�xr �RV,m�wRwLA® IwRR'I,NV Y:va, a�ivspLL EKNr, 5U T NG rw— . . ccks+� lopSHIELD tixwm.n�-FOF FE1TcW ONLY e<s HIM �BCMsenE, W l.lv (BIYI2}19,� N�EPB,�a (+,+1�3v0o6 �,euu�avnAvvl �Ivm Eynee9�-o9 s,.e.pa !v¢ Wvua Tx R,m � �Wmf Amnsv No. $ Da ipUoft i Me 0 7 Cowser Tire Retread Facility =210oa1 September 21F3 �^ + Flu! omm. CFO DETE"ON POND SHEET { J_,- „o 4 w ,u,r M EnraE �snx ,R rY1wE xrvE 'C cau',E NEENAH�FOUNDRY JNF-35sT a95 IE oRxrv,mv�rnwa if rs span ��v1re 1 YZ= I DIN", 11 EXHIBIT B I pE¢n war«.n„w„rx. EMa®MIXT PoR RLP 3— 8EY/ER� a:, s® ssmfaawt --------------- I i I El Pu °M'oorvi � dr �s{.o E SECTI71 A -A eamn vn Li - �--I SECTION`C-C KMOs9-9 1 CONCRETE APRON SLOPING HEADWALL + oM, •p. HILL RESIGN ISIJII.0 1 SHIELD EMLLINFEEINn nEOLLE P9EL WM RY-FOR REVIEW ONLY Ioova eEsr�rere ww�a e•w rx nr en�u� x� ,s,m area.,Rme, em Ittxu.7xrRw R,41✓O^� ss`em� o"'m @xm GI W EumQStrJaN ag�arxgmn Pare I No- pesWption pate I I I 1 Comer Tire Retread Facility �°�1°a- 2022tQQD1 do AL2eus12023 ° LL' FJV _ CFD STORM pRAIN DETAILS %+p x.ra awz LEGEND ,cvm FlNIB��:OmeE.TEpTT9x 1"wu SHIELD py�„p�p�y�ygy�� Nnav-FOA PENEw•' ONLY W.�ruwEl�uonr-roe. 44�ir: ww�sran� w.aua+.w,w .a� qµ nr.snl:saonro'Tx1a,aE Ysn � �xrnasrcarsonaz.•� raP �I9e,9,NrteTx.r cv-nbeu�s swr a Wva�9RRfiAOR®:AG9.Ne: YR,xIN n,qR ' ,xeu.m...r qe s•s Mi09 R�uu mx�im+�i� s8,w E� i �g400�n �--o'nwwR mawb.nM eye ia, N.,s sr Ssww a.b�im nroe+o-0eae101@ E9m.tlu�.Mkga.ynaMpme s� N� I No. I Deptien Date `y{iI I 1` ! E o x�J m Cowser Tire N Retread Facility eeC0H'"0.GOf1$� Aug ust 2023 masge�aum+ceuurma+cwwxo Inax unmaeroo-,xwxmcs.-n.wq 11„&, FN °on`s.a+oEn a,•�mLrtrwrxe �'°"`°�' CFD Fe�•n,e ooN�w'c`,��ne ix,cem�npi vIIum�.ssuun GRADING PLAN! I EXHIBIT B 77 • - • • --� � •Ny-• �} •� �:s �.t ;N!-46�'6vL` KET� -E[ °MRTOIIOIfRxf . s'"#A-j��rA?!¢[v+csaNna:¢r � M,spfggtg„W.[N$pp#Y pzwon�am ��t: •"..'.. - - Af [iNmss¢Imrswec ----- ¢uFn-u,Aaeq mccmUGrONbl,YN� O4V W saFalrnertmlrtm:A26 t Ia6T6,rvd�ir�g,S1�NYA. Y4 �RO WIOROfPdI.1- TervIMGT¢A6Nru Tm�wxytn�wR w+Amn Mav¢Iu6Rr¢eodG PRJ.IM! WRY FOR REVIEW 61r1Y s Gl® HT[MNNLEA [A1[�GE,NIILTI Nav¢cT[tw[TO[[IX.r®GYANA�.ATM fbAYl6iexMvl. a- V�T.,4LGwNEIs.¢w1ttoGHVAY3 ar, weUapx�v.6� xwm ryy�e AN¢6g9Lwof10�eEMMNdMmwESwuaeE� �p�0. ,nea..nwe �. Ai! 2 AUPN¢®¢aF,A,ms.,e.Ma [+®FCR[R91¢NOSI. vY[ tNN.�A.amrECeYa.. GY¢FeuNT�R[ CP.Mwctw 6ga°IS WlM NR m¢suua6Ag lL wnN®*Fr6::e 6NP'A. MTI E %R"B..¢ CiMN M1 [RsoN 2Nrn1 Awrn.n[[ roFwxnorswaaaalar ca«Taasur C¢vxelFry THE WN Cry W TIl�[.�E¢IOe I>:EMGB�� ExoiIM¢�wn fA�rv.ceoanwcEmmrxauN ms¢enu,:r� w�u`n.,�m+ras+a.eruT¢ ��.�=m Ins.MAnana.eareAmwa ¢weAw ffiealr�""�wn ey�:a+s. m+,As�cccov mm a.a>n wc, ror sor�e,nmre mm:rce¢N:w.naNrA�x+.se.�s6ra.. w..nmee xw,®a.vwawNnewwroNasn�rrw¢a�zrn. 9 °a:n�langea®mn .mr¢ R�w.�nm�`wvx xOE•�ma¢Nero�wN�olwa x aw[KronvrwAs.�e`o "`N"`�.w,oA�"•,"" croam��,o.wmra.moa.m„ �asl�r mrtronammm�r,ur. erreaA.r:�.r aanx6NraF-wnY. P,o.n ,. rt� eE,N[eomxA�a�°[•saFa=¢nseanrrG¢[E � Na Description 1 Data ,o wNmxAmuMrs¢�r [tf pE,3.LtP'¢. SIPFwW. ffit09., gWM619Tf1MNC � I o�:snW E40.91W+OB'ffiIs, a lui¢paRNR¢°MR6TDBEIN¢va4m.c�Np I NAL.aee�l6.��..cd.fN,. ,¢ cas,w,R.A�AR[ne[¢eTAu®Ar,��INT6 �AxE4 Tl Gx¢Fii G3e�6GV:c"�EMAINC T+. P3ay�rr� awrt�Nwf.a .d¢�Ee.asr PEChM �errgri-:.•AwSBFEMS4TNN[I1� �Ia BE.IwRAM® a I�iMreLOt9[101®IIBEgYfmpTE•�6.wen9Ri ��jl���. r\/ ¢ M a� aweu�ev Cowser Tire Retread Facility 2122110.Ot 1 nugvsc 20$3 e- FJV EROSION CONTROL PLAN JsaN,.m wa.q EXHIBIT B '1--, � r w rm a.a sr�s n��ma Kra m.s uss.m S,. e � ee �•—��� cm 1 7=oEr4--; .,1.k .. R=sue\ _aaeEROSION COPMOL LOG �'I �� .�arur..-ew.os amo�Auo:z�e ,9�e9mc�,�Nw-X� MM FLOW LT llMCAL717�71� F7LLTER FABRICVOTHWIRE FASM rxvw®cwH,R. ^., ue.cBaa+ray 0 I cc.Yvu,m ,�Ir�n. �swuee+wm�rolrsuxm+.,oc.,x.. a eoa.,uc,vPNw..�m..r�9a.�.moc.�ow��r.e.rsePs.�wave.�awm..,»sowou.or..l..,� .��r.awae ��ev..m®rnewaxeeue��r.�.ra.r�eaw�elea '�" t-•��•xan an°rae TREE PROTECTION riFm $ CONSFRZ=ON ENTRANCE NTS m '--� H D Jean I11LF. 31E511;\ I: LfI I.0 SHIELD 4411N9 o4°9e PtistJPllRaxr-EdR REVIEW ataY XYNS 655, Bakes BIM. B„1'A1y5NAiB i6, i6 e�mNnw.m,,, eoNw� em>tw�aw..tt sl�� in.ai,S Gmip aaae.. No. D-lloon Daft Cowser Tire Retread Facility 2022100.01 August 2023 I°ax g+ F.N �C1ef1m'B�' CFD EROSION CONTROL DETAILS M 4% e r,;,,-- 0 IT NIP % 6 I-'— CZ7-1 1 i 17 I-r M. r UA BYk H 77 � mamv�j rT T . .. .. LT .' ma 1.14 AIIT PM 7Ir T .. . .... .... .. �T eXt ?144 r T— L p A U14 71: Z .. ... .. . ... i. Lrn r, o iM14 M 71"11 AI}I I{1 I 1 1111Fr M V. 4T, I L IN ... ... iwtl tom.sn.. O.Iwao . .... .... ... Lea J ma 7 Jill 11 rn t 11 ;.2 A-01NSF r • UI: 140 1�1 .TA stuMl nL%vv Or m, NFLUT 5. No al) wN 19 f iq El A w C: r In to co rn w-: p EXHIBIT B I STA. 1+27.50 5D TAT Al \ iAIOSGTPIN6 � 8' CNI(7k"tE \ � SCAPxR+G . \'A FfN1SFi FLOOR = 650:00. Nupltl RETAININN WALL T"%J ^\\\ r�\-.,.n •• Y _ -.i I�w ..f,o- �-:L ern- \\V UME r �n T c Cd1,R.OWR 91ALL t4K'I TxE -W—W m,m.cTOP sxAu .vaFr we Loundx L sa. aMs M.sFw.� of Au Ezsmc unul�s AIL Ta�A-c ..o cr,ovww srE c�wme, ,wu.,e spAdcq aNd 9ulRassTluc asws N(ECIfD xY ,px451xY:pOw AX10A A Xn.MpNEPTio. �uwx.F.-mR alNi moTaer. Op.R]®'IEMF tp a„ E�ouiga M TrE Rxr, of A.n mu u1c 1.� To 1Xem,nurdp a xaws PNpF m . m.�len ff.N,• caXKTwcvaL CG,ptXLCnwI IwEou>ar [ntsT IRE D1ONF]R z M1xE EMopnGrM SMALL BE pRflT Xtsvetmu c T. [s�Iox 9lNXE w P,A� Rppt TO Fd, ISL E'.lK uenaa a�uG Ix rscwm.w¢ iH THE IPPJV9l£ FTTPRA4 61ATE .ItO SOCAL IN TIp olslufle.vGE riry WS+uW s�xFA� REWIFM➢fF FEW1wna�9, SfXN1&L sree+WADSd. TENSIQNS sFE F, S OF pfpp �C.,IG+S .GE CF 0.33R.PxG 1 CP.,FACIet SXXgL nm,[er ousels coxep x A E'�ms aw.mw sxwl x..2 „sN's I . 41" 1 APIs sNUL POINTS e,IW 1HE ('nIX1X.CT0A pE„ETES Y1LL pE �.us OFSSMt(D SVAIE ravE pFTEEf IOp115 FSTAsusen pr rxE mx PRIER 10 ,q ADO 6CG' 10 ALL SPOT CRA06 EIEYATNI6 A A1s aaw,nons sNmn Is,.nestxr M"TAX cau,xlcllca. sXrc IXOIwMEnTAnc« ffsrsmw FF GoumAsrIXr B,.Lt pE STFSiraus•EO .r �_"Touas c*=^ y w,F.a �dTm on+r_aMsc IS FJmtVX. . wy., xG PARgnG Sinus. Ax0 ,. wAlx A�Es aXAu �.aP, Aw a. 9NLL PXonT ALL R UT- ro nw,R MDSis AO SHm pE1tlr. IC,SORACTRk N iK OM,SfR11C110N i T11, L" E . OIL MAX (,:.* ,SwG1T .., 368E i CARDIwOXX OPR.LWS. PAW a NA%(Y-Sd1—"4.S GR 0 SLOPE +aSTAMAIIOM. LTG �.. CbpeW w XXIS fiD1W,MXJI XTIR%(E 12 CN6na,nldx n. TOT. ,IAI IHD A PA .y PEWT. 9 SECTION A -A � I V i� U ov � Y ��\ STA,+00.28 SD �; ' Imo _?13 oVry X^ ' �bs 11 °oa CONS IXCT xF1R SCR �iWwrv�•O T.�� —R 644 11,421640 gaof l .q p:` 84Zm�/o6'cpW �/ .538 C X40 1 �'sasiv OF 21. "itf . T1dLr. OaPJ : Zdlsk 1 • f ` � `" A•0.6f. ST-R01IR/17 jA+0.dH1 v�,11 v. e.IseF V•4 II SD LINEB PROFILE SD LINE CPROFTLE :X ' '4 5TA. 0+00 SO ME B WN— IM [1p— STORM DRAIN MANHOLE B_GIN 21' RCP E:TprALL *1. 571 C.. S0 LINE-L— ti - CONSTRUCT TO. SET HEAGKAL4—'v \ 6EON 13 - HOPE .� 1x5TAu?RL�}' DF�7� �1 / 12" RopE CLtAM.}m.) \ (0• MIN_ "'QQQ444666--- 1 � LEGEND PROP GROUND ELEV OF 641.2C MATCH EX GROUND E'-E4 OF 64150 PROP CDNTDUR EIEY F� OF 642 CA N CdNMACidt N Og fk IAOAYGx aF ALL EA'Ie"Ipq IIW'IFS' PpRt ro adIr5lAvcnsN. Exhibit "C" CITY OF FORT WORTH STORMWATER FACILITY OPERATION AND MAINTENANCE PLAN The only responsibility the City of Fort Worth has in the operation and maintenance of this Facility is inspection. General Maintenance Procedures The structural and functional integrity of the Facility shall be maintained at all times by removing and preventing drainage interference, obstructions, blockages, or other adverse effects into, through, or out of the system. Periodic silt removal shall occur when standing water conditions occur or the pond's storage volume is reduced by more than 10%. Silt shall be removed and the pond/basin returned to original lines and grades shown on the approved engineering plans. In addition, corrective measures are required any time a basin does not drain completely within 72 hours of cessation of inflow. NO STANDING WATER IS ALLOWED in basins designed for dry detention purposes. Accumulated litter, sediment, and debris shall be removed every d months or as necessary to maintain proper operation of the basin. Disposal shall be in accordance with federal, state and local regulations. Detention facilities shall be mowed monthly between the months of April and October or anytime vegetation exceeds 12-inches in height. To prevent debris from entering and clogging the downstream storm sewer system a wire mesh screen or similar screening device shall be installed over the outlet until final acceptance. 4. PREVENTIVE MAINTENANCE/INSPECTION Visual inspections of all components will be conducted every G months. A log shall be kept of maintenance actions, and inspections. The log should document the condition of the detention system's primary components, mowing, and silt, litter and debris removal dates. Document aeration of the basin bottoms and replanting to prevent the sealing of the basin bottom. Written maintenance and repair records shall be maintained by the party or parties signing the attached Agreement and shall be provided to the City upon request. STORMWATER FACILITY MAI NTENANCE AG RE EMENT 11 Rev. 1111912020 JLE WESTERN ����NI EXHIBIT C 4609 E. Boonville -- New Harmony Rd. Evansville, IN 47725 J Westerngreen.com Western Green TRM/HPTRM Maintenance Guidelines TRM/HPTRIVI Maintenance Guidelines This document is to include the proper maintenance of Turf Reinforcement Mats (TRM) and High -Performance Turf Reinforcement Mats (HPTRM's). These are general guidelines for maintenance post installation and long -tern of your TRM's and HPTRM's. These maintenance guidelines can be project dependent and may require modification or different techniques considering local regulation practice/procedural requirements. These TRM's and HPTRM's include: 1. Western Green 1.1, Triple Net TRM's 1.1.1, ECSC-3 1.1.2. ECC-3 1.1.3, ECP-3 1.2. Stitch Bonded 1.2.1. ECP-2 1.2.2, ECP-210oz 1.2.3. PPS — 80z 1.2.4. PP5 — I0oz 1.2.5. PP5 -- 12oz 1.3. HPTRM's 1.31. PPS — Pro 1.3.2. PPS - Xtreme 2. North American Green 2.1. Triple Net TRM's 2.1.1. VMAX S200 2.1.2. VMAX SC250 2.1.3. VMAX C350 2.1 A VMAX P550 2.2. Stitch Bonded TRM's 2.2.1. P30OLW 2.2.2. P300 2.3. HPTRM's 2.3.1, TMAX 3K 2.3.2. TMAX Post-Proiect Short Term Maintenance Correct installation of material should result in good vegetative coverage with the appropriate seed blend and soil conditions as appropriate for the site. If you notice a lack of vegetation taking root, please check for possible tenting or areas in which the TRM is not making appropriate soil contact. This lack of soil contact could result in poor vegetation growth or establishment, If you notice this occurring, maintenance should be done by back filling material possible TRM repair where applicable including providing new fill material and seed along with TRM/HPTRM repair after soil correction has been made. Bernville, PA I Evansville, IN J Lake City, SC I Macon, GA I McPherson, KS I Poseyville, IN �fG WESTERN REEN 4609 E. Boonville-- New Harmony Rd. � EXHIBIT C Evansville, IN 47725 1 West erngreen.com Once vegetative coverage has begun to establish at this point this care must be ongoing. This includes watering, mowing (if required), and fertilizing all ground on which vegetation has been established. To prevent TRM/HPTRM being uprooted maintenance should include pruning/mowing/cutting of saplings that may result in trees growing underneath the mat. Trees may be including but should be accounted for in pre -installation preparation after or a post installation allowing the tree to grow through (See Bush/Tree Installation Cut Sheet) to make sure the TRM/HPTRM is not being uprooted. Continued Vegetation Maintenance The continued performance of TRM/HPTRM installation for its designed lifecycle predicated on good vegetation coverage continued intimate soil contact. After immediate installation soil for both TRM/HPTRM infill and underlying subsoil should be watered. Avoid excessive watering that may result in sediment run off. This helps with initial soil loss while also promoting seed growth. Continued watering methods should be based upon recommendations of both the soil type and seed selection by the project's designer. Once vegetation has become well established no additional watering may be required. Application of fertilizers may required in this scenario depending on soil composition to maintain appropriate nutrients for vegetation used. Sod may be used instead of seed for vegetative purposes. Make sure all sod panels are moist upon installation and are anchored correctly into the HPTRM so that there is no separation between the sod itself and the TRM/HPTRM. Proper watering of sod should continue until root structure has been appropriately established through TRM/HPRTM. Mowing post vegetation establishment is designed for HPTRM applications. Please prevent vehicles that use tracks or are aggressive on soil off of the HPTRM after immediate installation. All mowing heights are dependent on desired vegetation density and seed type or required vegetation establishment per design/plans. Mowing heights should be a minimum of 6-8 inches above the HPTRM to prevent cutting or damaging the underlying HPTRM. Please utilize caution when mowing after a rainfall event. Mowing should occuring when vegetation and soil are dry. Height of mowers should be increased on slope crowns to avoid cutting or damaging HPTRM in those locations. If for some reason the HPTRM is damaged, please repair HPTRM in that area before mowing is continued. Bernville, PA I Evansville, IN I Lake City, SC I Macon, GA I McPherson, KS I Poseyville, IN Exhibit "D" Stormwater Structural Maintenance CHECKLIST FREQUENT INSPECTION Mowing Remove Trash and debris Inspect irrigation system operation Remove grass clippings Violations Noted MINOR INSPECTION Condition of Pond Amount of silt in pond Amount of silt in flume Amount of ponded water Amount of wetland vegetation Location of Erosion Percent of vegetation Condition of trash guard Location of Erosion MAJOR INSPECTIONS Condition of Stormwater Quality Structure Type of Stormwater Quality Structure Structure type and Condition Condition of Rip -Rap Condition of filtration system REPAIRS REPAIRS DATE NOTES REQUIRED MADE STORMWATER FACILITY MAINTENANCE AGREEMENT Rev. 03/01/2022 BN Berm or Embankment Settlement Location of erosion Evidence of Animals Evidence of Aquatic life Condition of Aeration Foundation STORMWATER FACILITY MAINTENANCE AGREEMENT Rev. 03/01/2022 BN