HomeMy WebLinkAboutContract 51009-A5CSC No. 51009-A5
AMENDMENT No.FIVE
TO CITY SECRETARY CONTRACT No. 51009
WHEREAS, the City of Fort Worth (CITY) and Wier & Associates, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 51009, (the
CONTRACT) which was authorized by M&C No. C-28764 on the 26th day of June,
2018 in the amount of $225,000.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $574,237.00 which was authorized by M&C #20-0232 on
April 16, 2020, Amendment Number 2 in the amount of $62,482.00 which was
administratively authorized on March 24, 2021, Amendment Number 3 in the
amount of $7,263.00 which was administratively authorized on December 27,
2021, Amendment Number 4 in the amount of $33,502.00 which was authorized
by M&C #22-1049 on March 28, 2023; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Golden Triangle Boulevard (from approximately 500 feet Northeast of
Misty Redwood Trail to I-35W), CPN 101013; and
WHEREAS, it has become necessary to execute Amendment No. 5 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $80,941.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $983,425.00.
OFFICIAL RECORD
3. CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Golden Triangle Boulevard - Misty Redwood Trl
Prof Services Agreement Amendment Template CPN 101013
Revision Date: November 23, 2021
Page 1 of 4
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City"s
designated Assistant City Manager.
APPROVED:
City of Fort Worth
William Johnson (O 24,202314:15 CDT)
William Johnson
Assistant City Manager
DATE: Oct 24, 2023
APPROVAL RECOMMENDED:
A_
Lauren Prieur (Oct 19, 2023 08:47 CDT)
Lauren L. Prieur, Director
Transportation and Public Works Department
ENGINEER
Wier & Associates, Inc.
Cal-6 s1 :
Carlo Silvestri, P.E.
President
DATE: Oct 12, 2023
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Bereket Birhane (Oct 12, 202311:20 CDT)
Bereket Birhane, P.E.
Sr. Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Golden Triangle Boulevard - Misty Redwood Trl
Prof Services Agreement Amendment Template CPN 101013
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
i
DBlack (Oct 20, 202316:31 CDT)
Douglas W. Black
Sr. Assistant City Attorney
4,d4444nnn
ATTEST: p F FceT°9�o
�o
Pv8 g=0
Pia* o, oog*�d
U�OR0044
Jannette Goodall
City Secretary
M&C: N/A
Date: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 3 of 4
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
FUNDING BREAKDOWN SHEET
City Secretary No. 51009
Amendment No. 5
Department Fund -Account -Center Amount
TPW 39008-0060419-5330500-101013-002330 $80,941.00
Total: $80,941.00
City of Fort Worth, Texas Golden Triangle Boulevard - Misty Redwood Trl
Prof Services Agreement Amendment Template CPN 101013
Revision Date: November 23, 2021
Page 4 of 4
WIER & ASSOCIATES, INC.
V//At ENGINEERS
SURVEYORS
LAND PLANNERS
August 8, 2023
Mr. David Kastendick, P.E.
City of Fort Worth
Transportation & Public Works Department
200 Texas Street
Fort Worth, Texas 76102
Via Email to: David.Kastendick@fortworthtexas.gov
PRINCIPALS
JOHN P. WIER, P.E., R. P. L. S.
U LYS LANE III, P.E., R.P.L.S., CFM
CARLO SILVESTRI, P.E.
GRESS MADSEN, R.P.L.S.
RANDALL S. EARDLEY, P.E.
SENIOR ASSOCIATES
PHILIP L. GRAHAM, P.E.
PRIYA ACHARYA, P.E.
ASSOCIATES
TOBY W. RODGERS
CASEY D. YORK
RE: W&A#17011: CONTRACT AMENDMENT NO. 5; CITY CONTRACT NO. 51009;
GOLDEN TRIANGLE BOULEVARD (FROM 500' NE OF MISTY REDWOOD
TRAIL TO I.H. 35-W), CITY OF FORT WORTH, TEXAS
Dear Mr. Kastendick:
The contract for engineering services related to City Contract No. 51009 was
authorized by M&C No. C-28764 on June 26t", 2018 for the design of a Roundabout
Intersection at the approximate location of the existing Golden Triangle Boulevard /
Harmon Road "T" intersection. This contract was amended on May 27, 2020 to delete
the roundabout, alter the alignment to follow the right-of-way dedications of the R&S Miller
Family Addition and include design of the entire roadway from approximately 500'
northeast of the Misty Redwood Trail intersection to I.H. 35W. The contract was amended
again in March, 2023 to add the design of a traffic signal at the Golden Triangle Boulevard
and Golden Heights intersection. It has now been requested by staff to include Franchise
Utility Relocation Coordination services to the project scope. A full scope anticipated to
be provided by this amendment is provided in Attachment "A" to the Amendment Five
request.
Wier & Associates, Inc. requests that our design services contract be modified as
follows:
Base Design Services fee stated in our contract be modified by an increase of
$80,941.00 to a total of $983,425.00 for the Utility Relocation Coordination services.
Very truly yours,
Carlo Silvestri, P.E.
President
CS:plg
2201 E. LAMAR BLVD., SUITE 200E ARLINGTON, TEXAS 76006-7440 (81 7) 467-7700 FAX (81 7) 467-771 3
TEXAS ENGINEERING FIRM NO. F-2776 • WIERASSOCIATES.COM • TEXAS LAND SURVEYING FIRM NO. 113033900
Page 1 of 1
FORT WORTH
ATTACHMENT "A"
Scope for Enaineerina Design Related Services for Arterial Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in completing
the project. Both the CITY and ENGINEER have attempted to clearly define the work to be
performed and address the needs of the Project.
OBJECTIVE
Franchise utility coordination was not included in the original scope of work. This task is being
added to facilitate the coordination and relocation of franchise utility infrastructure that will
require relocation for the reconstruction and widening of Golden Triangle Boulevard from
approximately 500 feet Northeast of Misty Redwood Trail to I-35W.
WORK TO BE PERFORMED
Task ?. Con Optusl D9Si�,gR (30%�
Task ^Z. DrViminary Resign (G 0%)
Task " . Final llooigR (90 and 100,1%
Task 5. IZid Phase Se RdGes
Task 6 C D s Se N*Ges
���Et+on , ao ��
Task 4 SNryJ � S/ab3NrfaGe Utility EFlgineeFiRw Se Winos-
Taolc 9. FR.�g
Task 10. Quality GE)RtFGIi vuran e
Task 11. Franchise Utility Coordination
Task 1— 10 are included in Original Scope of Services.
City of Fort Worth, Texas
Attachment A Golden Triangle Boulevard
Release Date: 07.22.2021 101013
Page 1 of 3
FORT WORTH
Task 11. FRANCHISE UTILITY COORDINATION
11.1 Utility Clearance
• The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
private utilities, and government agencies to determine the approximate location
of above and underground utilities, and other facilities (current and future) that
have an impact or influence on the project.
• ENGINEER will develop the design of CITY facilities to avoid or minimize conflicts
with existing utilities, and where known and possible consider potential future
utilities in designs.
• The ENGINEER shall schedule a kickoff meeting with all known franchise utility
companies after the 90% submittal to begin utility coordination process.
• The ENGINEER shall prepare conflict analysis matrix and provide a PDF set of
plans with the utility conflicts highlighted and provide to utility companies.
• The ENGINEER shall meet with utility companies to review conflict analysis. The
ENGIEER shall update plans to avoid conflicts where possible.
• The ENGINEER shall prepare a franchise utility coordination status report
documenting contacts, schedule, and progress in As format.
• The ENGINEER shall coordinate with franchise utility companies to obtain
relocation schedule and work plan.
• The ENGINEER shall contact franchise utility companies on a monthly basis to
obtain progress report. Update franchise utility status report each month.
• The ENGINEER shall upload a .KMZ and PDF file of the approved 90% plan set
to the designated project folder in BIM 360 for forwarding to all utility companies
which have facilities within the limits of the project. The .KMZ and .PDF file should
be created directly from the CAD files.
• At each design milestone, the City PM will issue a Utility Clearance Letter to be
accompanied by said plans and table to all utility companies which have facilities
within the limits of the project for coordination. The ENGINEER will coordinate
directly with the private utility provider if that provider needs to undertake design
to adjust their utility's location. The ENGINEER will coordinate the location of the
new facilities, abandonment and removal of old facilities and schedule and
workplan.
CITY will provide to ENGINEER private utility permit requests, that are applicable
to the project, for review prior to CITY approval. ENGINEER will review private
utility permit requests for conformance with the project scope.
• The ENGINEER will host individual meetings with franchise utility companies as
needed to coordinate the design.
City of Fort Worth, Texas
Attachment A Golden Triangle Boulevard
Release Date: 07.22.2021 101013
Page 2 of 3
FORT WORTH
ASSUMPTIONS
• One (1) kickoff meeting is assumed
• Up to three (3) individual meetings per franchise utility company are
assumed
• Monthly progress reports for up to twelve (12) months
• Up to 6 plans reviews of franchise utility relocation plans
• DELIVERARBLES
• Meeting Agendas and Notes
• Schedule and Progress Reports
• Plan Review Comments
• Utility conflict matrix
• PDF of plans highlighting conflicts
• Franchise Utility Relocation plans
City of Fort Worth, Texas
Attachment A Golden Triangle Boulevard
Release Date: 07.22.2021 101013
Page 3 of 3
ATTACHMENT B
COMPENSATION
Design Services for
Golden Triangle Boulevard (from approximately 500 feet Northeast
Of Misty Redwood Trail to 1-35W)
City Project No. 101013
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Cateqory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
2023 Rate
2024 Rate
($/hour)
($/hour)
Principal PE or RPLS
$285.00
$291.00
Senior Project Manager PE or RPLS
$243.00
$248.00
Project Manager PE or RPLS
$226.00
$231.00
Senior Registered Professional PE/RPLS or Team
$205.00
$209.00
Leader
Registered Professional PE or RPLS
$180.00
$184.00
Graduate Engineer/Surveyor-in-Training (EIT/SIT)
$159.00
$162.00
Senior CADD Technician
$150.00
$153.00
CADD Technician
$130.00
$133.00
Junior CADD Technician
$111.00
$113.00
Admin / Support
$89.00
$91.00
One-man Field Survey Crew
$130.00
$133.00
One-man Robotic Field Survey Crew
$161.00
$164.00
Two -man Field Survey Crew
$183.00
$187.00
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
B-1
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
ATTACHMENT B
COMPENSATION
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
B-2
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Wier & Associates, Inc. Utility Relocation Coordination
Services Management
Proposed MWBE Sub -Consultants
The Rios Group, Inc. Utility Relocation Coordination
Services
Non-MWBE Consultants
Project Number & Name
CPN 101013 — Golden Triangle Boulevard
City MWBE Goal = 25%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
TOTAL
Total Fee
$80,941.00
Fee Amount
$7,451.00 9.2%
$73,490.00 90.8%
$80, 941.00 100%
MWBE Fee MWBE %
$73,490.001 90.8%
Consultant Committed Goal = 90.8%
B-3
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
B-4
Golden Triangle Boulevard - Misty Redwood TO
CPN 101013
Professional Services Invoice Project Manager:
I Bereket Birhane, P.E. Summary
Project:
(Golden Triangle Blvd (Misty Redwood to 1-35W)
City Project #:
1101013 I
City Sec Number:
151009 I
Supplier Instructions:
Purchase Order #:
FW020-0000004361
Fill in green cells including Invoice Number, From and To Dates and the included worksheets.
Company Name:
I Wier & Associates, Inc.
When your Invoice is complete, save and close, start Buzzsaw and Add your invoice
to the
Consultant folder within Project's folder.
Supplier's PM:
Philip Graham, P.E. email:
philipg@wierassociates.cwm
Supplier Invoice #:
22810 Office Address 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Payment Request #: 50 Telephone:
817-467-7700
Service Date:From
5/27/2023 Fax:
817-467-7713
Service Date:To
6/30/2023
Invoice Date:
7/20/2023 Remit Address: 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Agreement LTD
Agreement Amendment Amount to Completed Percent
($) Invoiced Current Remaining
Sheet
FID and Work Type Description
Amount Amount Date Amount Spent
Previously Invoice Balance
Work Type 1
TO#1:34018-0200431-5330500-101013-002330-9999-18010199
$159,347.20 $159,347.20 $159,347.20 100.00000000%
$159,347.20
Work Type 2
TO#2:34018-0200431-5330500-101013-002330-9999-18010199
$36,751.52 $36,751.52 $36,751.52 100.00000000%
$36,751.52
Work Type 3
TO#2:39008-0060-101013-002330
$28,901.28 $758,425.00 $787,326.28 $505,313.08 64.18089842%
$499,150.18 $6,162.90 $282,013.20
Work Type 4
Work Type 5
Work Type 6
Totals This Invoice $225,000.00 $758,425.00 $983,425.00 $701,411.80 $695,248.90 $6,162.90 $282,013.20
Overall Percentage Spent: 71.32336477%
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
Wier & Associates, Inc. 1817-467-7700
817-467-7713
2201 E. Lamar Blvd., Suite 2201 E. Lamar Blvd., Suite 200E,
200E, Arlington, Texas 76006 Arlington, Texas 76006
CFW Project Manager Bereket Birhane, P.E.
Supplier's Project Manager: (Philip Graham, P.E. 1
Supplier's PM email: Iphilipg@wierassociates.com I
Name of Project: Golden Triangle Blvd (Misty Redwood to I-
35W)
Labor Cateaory
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Total Labor
Subcontract Service
I
I
I
I
Name
Subcontractor Subtotal
10 Percent Markup on Subcontract Services
Nonlabor Expenses
I
I
I
I
I
Invoice
22810
Supplier Project No.1 17011
Proj. Invoice No.1 50
Invoice date:1 07/20/23
Period Service Date:From1 5/27/20231
Service Date:Tol 6/30/2023
City Secretary Contract #: 51009
P.O. Number: FW020-0000004361
Hours Rate ($/h
0.0
Nonlabor Expense Subtotal
Total Expenses (Subcontract Services+Markup+Non labor Expenses)
TOTAL DUE THIS INVOICE
Amount
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
Professional Services Invoice Project Manager: Bereket Birhane, P.E.
Project: Golden Triangle Blvd (Misty Redwood to 1-35V\
City Project #: 101013
Work Type Desc: JArterial Streets_Deslgn Supplier Instructions:
FID: ITO #1: 34018-0200431-5330500-101013-
City Sec Number: 51009 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the
Consultant folder within Project's folder.
Name: Wier & Associates, Inc.
Supplier's PM:
Philip Graham, P.E.
email: philipg@wierassociates.com
Supplier Invoice #:
Philip Graham, P.E.
Office Address 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Payment Request #:
50
Telephone: 817-467-7700
Service Date:From
5/27/2023
Fax: 817-467-7713
Service Date:To
6/30/2023
Invoice Date:
7/20/2023
Remit Address: 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Pay Items
Agreement
LTD
Agreement Amendment Amendment
Amount to
Completed
Percent
($) Invoiced
Current
Description
Amount Number Amount
Date
Amount
Spent
Previously
Invoice
30 - Design
Task Order 1 $159,347.20
$159,347.20
$159,347.20
100.00000000 %
$159,347.20
Totals This Unit:
$159,347.20
$159,347.20
$159,347.20
$159,347.20
Overall Percentage Spent:
1oo.00000000r
Remaining
Balance
Golden Triangle Boulevard - Misty Redwood Tri
CPN 101013
Professional Services Invoice Project Manager: Bereket Birhane, RE
Project: Golden Triangle Blvd (Misty Redwood to 1-35W)
City Project #: 101013
Work Type Desc: (Arterial Streets_Design Supplier Instructions:
FID: ITO#2: 34018-0200431-5330500-101013-0
City Sec Number: 51009 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000001482 I When your Invoice is complete, save and close, start Bu=saw and Add your invoice to the
Consultant folder within Project's folder.
Company Name: Wier& Associates, Inc.
Supplier's PM:
Philip Graham, P.E.
Supplier Invoice #:
22810
Payment Request #:
50
Service Date:From
5/27/2023
Service Date:To
6/30/2023
Invoice Date:
7/20/2023
Pay Items
130 - Desiqn
130 - Desiqn
I
I
I
I
I
I
I
I
I
I
Description
email: philipg@wierassociates.com
Office Address: 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Telephone: 817-467-7700
Fax: 817-467-7713
Remit Address: 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Task Order #1
Task Order #2
Totals This Unit:
Agreement LTD
Agreement Amendment
Amendment Amount to Complete
Percent
($) Invoiced
Amount Number
Amount Date Amount
Spent
Previously
$2.80
$2.80 $2.80
100.00000000 %
$2.80
$36,748.72
$36,748.72 $36,748.72
100.00000000%
$36,748.72
$36,751.52
$36,751.52 $36,751.52
$36,751.52
Overall Percentage Spent:
1oo.00000000%
Current Remaining
Invoice Balance
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
Professional Services Invoice Project Manager: Bereket Birhane, RE
Project: Golden Triangle Blvd (Misty Redwood to 1-35W)
City Project #: 101013
Work Type Desc: (Arterial Streets —Design Supplier Instructions:
FID: ITO#2: 39008-0060-101013-002330
City Sec Number: 51009 Fill in green cells including Percent Complete and Invoiced Previously Quanities
Purchase Order: I FW020-0000004361 I When your Invoice is complete, save and close, start Bu=saw and Add your invoice to the
Consultant folder within Project's folder.
Company Name: Wier& Associates, Inc
Supplier's PM:
Philip Graham, P.E.
Supplier Invoice #:
22810
Payment Request #:
50
Service Date:From
5/27/2023
Service Date:To
6/30/2023
Invoice Date:
7/20/2023
Pay Items
130 - Desiqn
130 - Desiqn
I
I
I
I
I
I
I
I
I
I
Description
email: philipg@wierassociates.com
Office Address: 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Telephone: 817-467-7700
Fax: 817-467-7713
Remit Address: 2201 E. Lamar Blvd., Suite 200E, Arlington, Texas 76006
Task Order #2
Totals This Unit:
Agreement
Agreement Amendment Amendment Amount to
Amount Number
Amount
Date
$28,901.28 Amendment#1
$574,237.00
$603,138.28
Amendment#2
$62,482.00
$62,482.00
Amendment#3
$7,263.00
$7,263.00
Amendment#4
$33,502.00
$33,502.00
Amendment#5
$80,941.00
$80,941.00
LTD
Completed Percent ($) Invoiced Current Remaining
Amount Spent Previously Invoice Balance
$440,013.25 72.95395842% $440,013.25 $163,125.03
$57,082.83 91.35883935% $50,919.93 $6,162.90 $5,399.17
$7,263.00
$8,217.00 24.52689392% $8,217.00 $25,285.00
$80,941.00
$28,901.28 $758,425.00 $787,326.28 $505,313.08 $499,150.18 $6,162.90 $282,013.20
Overall Percentage Spent: 64.18089842%
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
Task No.
11.1.6
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Golden Triangle Boulevard (Misty Redwood to Golden Heights Road)
City Project No. 101013
Task Description
Principal
Sr. Project
Manager
Proj. Manager
PE/RPLS
Team Leader
PE/RPLS
Labor (hours)
EIT/SIT
Sr. CADD
To
CADD
Tech
Jr. CADD
Tech
1-Man
Crew
2-Man
Crew
Admin.
Total Labor
Cost
EX ense
Subconsultant Travel
MWBE Non-MWBE
Reproduction
Total Expense
Cost
Task Sub Total
Rate $285
Project ManagQement 0
$243
$226
$205
$159
$150
$130
$111
$130
$183
$89
7
0
0
0
0
0
0
0
10
$2,591
$0 $0 $0
$0
$0
$2,591
Managing the Team
Internal Team Meetings
QA/QC
Communications and Reporting
Prepare Monthly Progress Reports with
Schedule
Prepare Monthly MBE/SBE Reports
Invoicin
1 41
3
5
5
20 0 0 0 0 0 0 0 0
$972
$0
$972
$0
$0
$0
$729
$0
$729
$445
$445
$0
$445
$0
$445
Util��Relocation / Clearance Services
0
$4,860
$69,990 $0 $0 $0
$69,990
$74,850
Utilit{yy coordination
Pro''ect Communication / Review
Utility Conflict Matrix Updates (90 % Design
& Final)
Progress Coordination Meetings (1 Group /
9 Individual)
Review Alternative to Relocations
Status Reports/ Utility Schedules
Review Utility Adjustment Plans / Assist
with Permits / Agreements /
Reimbursements (6 Plan Reviews / 1
Reimbursement Agreement)
Totals
41
21
1
41
21
8
$972
$8,669
$9,945
$9,160
$13,740
$10,570
$17,910
$8,665
$9,637
$486
$9,945
$10,431
$0
$9,160
$9,160
$972
$486
$13,740
$14,712
$10,570
$11,056
$1,944
$17,910
$19,854
0
27
01 01 01 01 01 01 01 01 101
69990 0 0 0
$69,990
$77,441
Project Summary
Total Hours
37
Total Labor
$7,451
Total Expense
$69,990
MBE/SBE Subconsultant
$69,990
Non-MBE/SBE Subconsultant
$0
5% Sub Markup
$3,500
MBE/SBE Participation
86.5%
Total Project Cosfl
$80,941
Golden Triangle Boulevard - Misty Redwood Tri
City of Fort Worth, Texas CPN 101013
Attachment B - Level of Effort Supplement 1 Off
FORT WORTH
ATTACHMENT "D"
PROJECT SCHEDULE
A. ENGINEER Project Schedule Development
ENGINEER shall prepare a project schedule for the services to be provided in fulfilling the
requirements of the Agreement and encompassing the Scope of Work defined in
Attachment A to the Agreement.
ENGINEER shall prepare and maintain project schedule throughout the life of the project
as defined in the Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule.
ENGINEER's project schedule will follow the Critical Path Methodology (CPM) for planned
sequencing of the work activity and timing of the work.
B. Schedule "Tier" Selection
City has identified three "Tier" levels for project schedules as defined in City's Specification
00 31 15, to align with the size and complexity of the project as a basis for schedule
development. City's Project Manager will determine the "Tier' level for the ENGINEER's
project schedule as part of the negotiation of the Agreement.
C. Project Baseline Schedule
ENGINEER will produce an initial project schedule and submit as a "baseline" for review
and acceptance by City's Project Manager as defined in City's Specification 00 31 15
which will be referred to as the Project Baseline Schedule. Updates to the baseline
schedule follow the requirements of City's Specification 00 31 15.
D. Project Progress Schedule
ENGINEER will provide to the City, monthly updates to their project schedule indicating
progress of the Work in compliance with the requirements of City's Specification 00 31 15
and said schedule will be referred to as the Project Progress Schedule.
E. Master Project Schedule
City will develop and maintain a master project schedule for the overall project.
ENGINEER's project baseline and progress schedule submittals will be an integral part of
the development and updating process of City's Master Project Schedule.
City of Fort Worth, Texas
Attachment D
Revision Date: 07.20.2018
Page 1 of 1
Golden Triangle Boulevard - Misty Redwood Trl
CPN 101013
i itila�olsa� ons11 H�eloweI�A�dl nl r nn.�lrone�l ��n � I aIswn o.ailluoelowe��9� W iei�1w.r n � �nmi�a�Itj000el1�lGa lwso=.�l-11-J11-- oe1N�IeJ..IF.nlm9�.IIA.Isw�oaN.o�. nl x9rnl�f Jwnw. alaDow
Pm 101013Golden Tdengle BNE EM.1 Mileabne 0 Dura0.—!, ......... I...... slerlonly ExternalMlles—
Em h—ly �� vrogreaa Golden Triangle Boulevard - Mlsty Redwood Tri
D,Weppro.4UO'NE o1 Mwry Redvootl TreAW 135WI Sptit Pre�eci Bummery �� Inactive Task Inaclrve Summary �...... ......... Manual summeryRollup♦ CPN 101013
DaleThu glldn3 Ez�emal Tasks Inactive Milestone Manuel Task O Milestone ♦ Manual eummary ♦ Exdemal casks O Deadline 8
Page 1
ID a fFxk Name Duran Plrysmal%
ky(f Lnmdate
54 survey 128Ttl ^
Ssa FinaM1
Fri 52L4 Fri M30 2$,I
55 Pnllmirery Surrey
SD d-
0%
N522/20
Mon BIL20
ss ' IdBal FieMSurvey(SUE)
SO days
0%
Fd E22/20
Mon 51320
57 ToM,pkk IFisltl) Survey
25 days
0%
Fn 522/20
Fn F12620
58 ConskvFtlon SMking
1. drys
0%
Fr10MWN
Thu 5122/25
—he
t80 days
0%
Fn 9I1312A
Tbu SIL/25
so Public MaNemanl
]07 days
0%
Tue.1.1
1.0..
61 PublicmwM
62 HOM Publm M—e PreLonstruction
]S]arys
0% Tue.1.1
0% Tue 8110/24
Tue 811024
t day
Tue 4&10I1A
wid P—m—he-Desgn
Idry
0%
Tue.1.1
Tue S13121
fi4 UtllMes
.1 drys
0%
Wed B%L31
Mon 411IN
65 Pin— wity Reloxtlon Cosh
602 drys
0%
Tue lo/2W21
Mon 41IN
UM1ldy Relocmmn(CaoNinmion S Design)1'mcludes Qty PM Time pd
Amedlmad 5 a Cexubanl rma
90 days
J%
Tue tQ2&2t
Thu &t423
6] Approval of PmeMmentS-ConaulMnt CaoNinekon NTP
lday
0%
Mon 1023123
M1bn 102323
68 Co 1—Gomtlinmpn mM F—h-ULlity Companies
115.,
0%
Tue 102423
Mon bn24
Re—Plaxxd Specs-Uolbee
20 days
0%
Tue 102N23
M1bn 112023
70 Uliliy CoordinMioNLlxnree
661 days
0%
Wad 116121
Mon 1111
]i Wa .1-
es days
0%
Tua 1121123
Mon 41124
rb mq' mn— — p— axya u, man»/raw more ma/4»
]3 Lonebuctlon 5xdrya 0% Mon.1.1 Thu1115138
74 Pniee Maregamerd 255 d- 0% Tue 3PJ24 Mon 4T125
151 Consbuubon Prged Maxg— 255 tlays 0% Tue 315/24 Mon M25
B Caretructlon AdvealsemeM t08 Gaye 0% Men-4 Fr1 e224
Msvl Jrcun 4N DueMre 1sIDueMre 2M Qu derr 3ND re 4M Due r 1s1 uei arc an Cu..,r 3k Dueller 4N DueMre 1st Duert�re 2ntl Dui err 3rtll Duei era 416q ,ISx Del IN=L..—I�M1l Mear Mr Mavre�Jurn 4mIMo 1 O,nQu. Dxhe'c JxntloM1 Mnr Arc Mxv Jeun 4m Auoo S. OrtlNwtlDx Je r Mo se o<1IN De Jee Fen uu M. Meg Je Je Del uw De J n�Fen M Mr Me. Jim JaI A Dn Nrc.II Jee Fen Me Mr ww» Je JeI Jd
I
q—"
�N1
b123
Pm 101013 Golden Triangle 8Ntl E-1 Ml—
(DaM'TM1UBlidMO' NE g Msty Redsvotl Trail W—) Spbt ............... Proleg SummaryInecg+e Task
Mlleatone ♦ Exlarnal Tasks Ina—MiI-.. °
Ireceve M1— 0 Durabonanty Sta Iy E-1 Mileslona
Inactive Summery ............... Manuel Summery ROlbp♦ FProgress
ManxlTxk O Manual Summary ♦ _—I Tasks O Deadline 8
Page 2
Golden Triangle Boulevard - Misty Redwood Tri
CPN 101013
ID ask Name
107 a Cloeepui
Ourarisn Plryama1 %
30 tlay4 CwndaIM
ssa F hel
Fri BflaL¢ Th. 1I
103
......I Rep.a aM Review
Ssda 0%
NWl— Th. 1013W25
10e'W
Ckieeaul Ranew
30 aeya 0%
Fri W1 W23 Th. 10130123
110
-
PrgeclC Phme
o., 0%
TM1u-2s TM1u 1013025
111
AwapbnFe
sd- 0%
Tau WPpWC Th. 0"
t12 Prq.n Aw<plarrw
0arye D%
TAU W2W20 Th. —F.
113 Pr --ph.—
OOays 0%
TM1u 1W11120 TM1u 1211
AnrIMrwalJnn� J iNlAuolsnn —I—ID.atenI JanalF nlW An.IMnvl Jun J.I� oIsnn O.3-1 ail1-11)nnjJan F nl Mann AplMaYel J,n J I�IAnnlsnn� onrtlhmrl oerr: Jnnal �a�l Mean AnralMaYel Jurn J.1 Nl,w s�a,1 o-i INmrlor.:�—ll near —IMr jrn J.I,wol— 01IN—lone.�Jantll1nl Mar Ar.IMa�Ii�rn Jul�l�lsnn� 0e IN. onrr: J,
♦'loreo
'.' 91
Pm1erA 101013Golden Triangle BNE Exremal Milestone ♦ Inactive Milesisne 0 Durakonanty ......... I...... st—ly External Milestone
(From app— — NEE .1-ty Redwood TreAW 135WI spot Prate -I Scmmary �1 Inacave Task Irracrive summary Manuel summery -p♦ FI-lh—ly �� Progress Golden Triangle Boulevard - Misty Redwood Tri
Date Th, 9nan3 """""""" """"""""' CPN 101013
WI—♦ External Tasks Inactive Milestone Manuel Task O Manual summary ♦ .—I Tasks ♦ Deadline 8
Page 3
Attachment E
Golden Triangle Boulevard
City Project No. 101013
Fclicv�,. Hay'
Easle �"�
Mwnteln
Golleyvilk
3])
Saginaw
WalsugB
Br.,d
Huret
Lake Wnnh .,eneom Rark
�/
Hnitum Qtv
White Westwtlrth
- se,uemem wua,
Fort Worth
_
_.
O
0
BenhlOOk -
®
Fo25t Hill
Edgac�i!'
village
Project Location
Golden Triangle Boulevard
City Project No. 10 10 13
MAPSCO 21 K, N, P
FORT WORTH..
V// A WIER & ASSOCIATES, INC.
Civil Engineering • Land Surveying • Land Planning
Page 1 of 1
101013-EPAM-Golden Triangle Boulevard -
Misty Redwood Trl - Amendment No. 5
Interim Agreement Report 2023-10-13
Created: 2023-10-12
By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status: Out for Filling
Transaction ID: CBJCHBCAABAA_-jFnc7GepUc9_fd6g8vUHGG814vAJOz
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"101013-EPAM-Golden Triangle Boulevard - Misty Redwood Trl
- Amendment No. 5" History
Document created by Andrea Munoz (Andrea. Munoz@fortworthtexas.gov)
2023-10-12 - 1:31:11 AM GMT- IP address: 204.10.90.100
Document emailed to Alexiz.Ramirez@fortworthtexas.gov for filling
2023-10-12 - 2:13:23 PM GMT
Document emailed to Carlo Silvestri (carlos@wierassociates.com) for signature
2023-10-12 - 2:13:23 PM GMT
Document emailed to bereket.birhane@fortworthtexas.gov for signature
2023-10-12 - 2:13:23 PM GMT
Email viewed by Carlo Silvestri (carlos@wierassociates.com)
2023-10-12 - 2:24:44 PM GMT- IP address: 71.42.128.198
Document e-signed by Carlo Silvestri (carlos@wierassociates.com)
Signature Date: 2023-10-12 - 2:25:23 PM GMT - Time Source: server- IP address: 71.42.128.198
Email viewed by Alexiz.Ramirez@fortworthtexas.gov
2023-10-12 - 2:43:52 PM GMT- IP address: 204.10.90.100
-;� Signer Alexiz.Ramirez@fortworthtexas.gov entered name at signing as Alexiz Ramirez
2023-10-12 - 2:47:51 PM GMT- IP address: 204.10.90.100
FoRTW❑RTHg I Paw m"Y
Adobe
Acrobat Sign
-- Form filled by Alexiz Ramirez (Alexiz. Ram i rez@fortworthtexas.gov)
Form filling Date: 2023-10-12 - 2:47:53 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by bereket.birhane@fortworthtexas.gov
2023-10-12 - 4:12:31 PM GMT- IP address: 104.47.64.254
Signer bereket.birhane@fortworthtexas.gov entered name at signing as Bereket Birhane
2023-10-12 - 4:20:45 PM GMT- IP address: 204.10.90.100
Document e-signed by Bereket Birhane (bereket.birhane@fortworthtexas.gov)
Signature Date: 2023-10-12 - 4:20:47 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for filling
2023-10-12 - 4:20:49 PM GMT
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2023-10-13 - 9:23:42 PM GMT- IP address: 204.10.90.100
FORTW❑RTHg I Paw m"Y
Adobe
Acrobat Sign
101013-EPAM-Golden Triangle Boulevard -
Misty Redwood Trl - Amendment No. 5
Interim Agreement Report 2023-10-25
Created: 2023-10-13
By: Andrea Munoz (Andrea. Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAA6u5rEpd_sVNgnFtYS8QzBUchHCm6YEM_
Agreement History
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"101013-EPAM-Golden Triangle Boulevard - Misty Redwood Trl
- Amendment No. 5" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2023-10-13 - 10:03:18 PM GMT- IP address: 204.10.90.100
Document emailed to Raul.LopezRoura@fortworthtexas.gov for filling
2023-10-13 - 10:14:41 PM GMT
Email viewed by Raul.LopezRoura@fortworthtexas.gov
2023-10-16 - 1:39:36 PM GMT- IP address: 166.205.54.63
Signer Raul.LopezRoura@fortworthtexas.gov entered name at signing as Raul E Lopez
2023-10-16 - 1:40:51 PM GMT- IP address: 166.205.54.63
Form filled by Raul E Lopez (Raul.LopezRoura@fortworthtexas.gov)
Form filling Date: 2023-10-16 - 1:40:53 PM GMT - Time Source: server- IP address: 166.205.54.63
Document emailed to Lissette.Acevedo@fortworthtexas.gov for filling
2023-10-16 - 1:40:56 PM GMT
Email viewed by Lissette.Acevedo@fortworthtexas.gov
2023-10-18 - 1:22:57 AM GMT- IP address: 204.10.90.100
Signer Lissette.Acevedo@fortworthtexas.gov entered name at signing as Lissette Acevedo, P.E
2023-10-18 - 1:23:45 AM GMT- IP address: 204.10.90.100
FORT WORTHS I Powered hY
Adobe
Acrobat Sign
Form filled by Lissette Acevedo, P.E (Lissette.Acevedo@fortworthtexas.gov)
Form filling Date: 2023-10-18 - 1:23:47 AM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to patricia.wadsack@fortworthtexas.gov for filling
2023-10-18 - 1:23:50 AM GMT
Email viewed by patricia.wadsack@fortworthtexas.gov
2023-10-19 - 12:51:59 PM GMT- IP address: 71.15.98.20
Signer patricia.wadsack@fortworthtexas.gov entered name at signing as Patricia L. Wadsack
2023-10-19 - 1:00:33 PM GMT- IP address: 71.15.98.20
bo Form filled by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Form filling Date: 2023-10-19 - 1:00:35 PM GMT - Time Source: server- IP address: 71.15.98.20
Document emailed to Lauren.Prieur@fortworthtexas.gov for signature
2023-10-19 - 1:00:38 PM GMT
Email viewed by Lauren.Prieur@fortworthtexas.gov
2023-10-19 - 1:47:05 PM GMT- IP address: 204.10.90.100
Signer Lauren.Prieur@fortworthtexas.gov entered name at signing as Lauren Prieur
2023-10-19 - 1:47:26 PM GMT- IP address: 204.10.90.100
Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2023-10-19 - 1:47:28 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Priscilla.Ramirez@fortworthtexas.gov for approval
2023-10-19 - 1:47:31 PM GMT
Email viewed by Priscilla.Ramirez@fortworthtexas.gov
2023-10-19 - 3:47:34 PM GMT- IP address: 204.10.90.100
Signer Priscilla.Ramirez@fortworthtexas.gov entered name at signing as Priscilla Ramirez
2023-10-19 - 3:48:51 PM GMT- IP address: 204.10.90.100
Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)
Approval Date: 2023-10-19 - 3:48:53 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Douglas.Black@fortworthtexas.gov for signature
2023-10-19 - 3:48:56 PM GMT
Email viewed by Douglas.Black@fortworthtexas.gov
2023-10-20 - 9:29:38 PM GMT- IP address: 204.10.90.100
Signer Douglas.Black@fortworthtexas.gov entered name at signing as DBlack
2023-10-20 - 9:31:14 PM GMT- IP address: 204.10.90.100
FORTWORTH. 1 Powered 'y
Adobe
Acrobat Sign
Document e-signed by DBlack (Douglas.Black@fortworthtexas.gov)
Signature Date: 2023-10-20 - 9:31:16 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to William.Johnson@fortworthtexas.gov for signature
2023-10-20 - 9:31:18 PM GMT
Email viewed by William.Johnson@fortworthtexas.gov
2023-10-24 - 7:14:59 PM GMT- IP address: 166.205.54.38
Signer William.Johnson@fortworthtexas.gov entered name at signing as William Johnson
2023-10-24 - 7:15:29 PM GMT- IP address: 166.205.54.38
Document e-signed by William Johnson (William.Johnson@fortworthtexas.gov)
Signature Date: 2023-10-24 - 7:15:31 PM GMT - Time Source: server- IP address: 166.205.54.38
FORTWORTH. 1 Powered 'y
Adobe
Acrobat Sign
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Golden Triangle Boulevard - Misty Redwood Trl -
Professional Services Agreement Amendment No. 5
M&C: N/A
Date: 09/28/2023
CPN: 101013
To:
Name
Department
1.
Alexiz Ramirez
TPW - initial
2.
Carlo Silvestri
Wier - Signature
3.
Bereket Birhane
TPW - Signature
4.
Raul Lopez
TPW -initial
5.
Lissette Acevedo
TPW -initial
6.
Patricia Wadsack
TPW - initial
7.
Lauren Prieur
TPW - signature
8.
Doug Black
Legal - signature
9.
William Johnson
CMO - signature
10.
Jannette Goodall
CSO - signature
11.
TPW Contracts
TPW
CSO: 51009 DOC#:
Initials Date Out
Oct 12, 2023
CS a
Oct 12, 2023
BB 25�
Oct 12, 2023
_e,f-Z
Oct 16, 2023
Oct 17, 2023
LW
�LW
Oct 19, 2023
W_ Oct 19, 2023
- wb Oct 20, 2023
,,_ Oct 24, 2023
,SG L7 Oct 26, 2023
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and
take the next steps
NEEDS TO BE NOTARIZED: ❑ Yes X No
RUSH: ❑ Yes X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No
ROUTING TO CSO: X Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
X Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(c,fortworthtexas.aov at ext. 7233 for pick up when completed.
CPN:
Project Name:
Consultant:
JUSTIFICATION OF CONTRACT CHANGES
101013
Golden Triangle Blvd
Wier & Associates
Contract
Contract Change
Initial Contract CSN 51009 M&C C-
28764 06/26/2018
$
225,000.00 $
Amendment No. 1 CSN 51009-A1
M&C 20-0232 4/07/2020
$
574,237.00 $
Amendment No. 2 CSN 51009-A2
M&C N/A 03/24/2021
$
62,482.00 $
Amendment No. 3 CSN 51009-A3
M&C N/A 12/27/2021
$
7,263.00 $
Amendment No. 4 CSN 51009-A4
M&C 22-1049 12/13/2022
$
33,502.00 $
Amendment No. 5 CSN 51009-A5
M&C N/A
$
80,941.00 $
Total to Date Justification
Design of Golden Triangle and Harmon Road
225,000.00 roundabout intersection
Update design to remove roundabout and alter
799,237.00 alignment.
861,719.00 Revise 30% street sections to comply with MTP
Traffic signal warrant study for Golden Triangle Blvd &
868,982.00 Golden Heights Road.
Design of a signalized intersection at Golden Heights
902,484.00 Road
983,425.00 Franchise utility relocation coordination services