HomeMy WebLinkAboutContract 57193-FP1FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
Normandale Street and
-FP1
City Secretary No: 57193
Date Received: 10/27/2023
City Project NQ: 101591
57193 Las Vegas Trail Improvements
Regarding contract _ _ for as required by the TRANSPORTATION AND
PUBLIC WORKS DEPARTMENT as approved by City Council on 11 /9/2021 through M&C 21-0850 the director of
the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant
Director of the Transportation & Public Works Department has accepted the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
$ 2,322,913.00
$ 61,843.18 N9 4
$ 2,384,756.18
$ 2,329,366.17
Days @ $ 1,250 / Day
$ 2,329,366.17
Less Previous Payments: $ 2,212,897.86
Final Payment Due $116,468.31
�at�icia L. wadsack oct 27 2023
Patricia L. Wad sack IDct 27. 2023 14:53 CDTI 7
Recommended for Acceptance Date
Asst. Director, TPW - Capital Delivery
PZ—
Oct 27 2023
Lauren Prieur (Oct 27, 2U2315:26 CDT)
Accepted Date
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Wilh,J hn-n(0 t27,202315:40CDT) _ _ _ _ �OCt 27, 2023
Asst. City Manager Date
Comments:
C-620 Signature Page
Contractor's Application
for Payment Invoice No.
17
To (Owner) City of Fort Worth
Invoicing Period (Ftour - To)
Invoice Date
9/1/2023-9/30/2023
10/12/2023 Retain *e
P O Fj W020-007498
From (Contractor)
Rcmrl to ( If Not Automatic Deposit )
Number
Rebcon Inc
Project 101591
Contractor's CFW Vendor No
0000033196
City Secretary Contract
57193
Contract
and Las Vegas Intersection Improvements
Nun„ber
Name-Normandale
Application For Payment
( h-- f 1-1— Cnmm—
Approved Change Orders
Number
Additions
Deletions
1
$166,947.24
$166,666 00
2
$7,673 00
3
$93,910.66
$39,819.91
4
$82,721 64
$82,923 45
5
6
7
8
TOTALS
NET CHANGE BY
CHANGE ORDERS
$351,25254
$289,409 36
S61,843.18
Contractor's Certification
The Contractor certifies with the submittal of thus document and associated Payment Request
Submittal on the City ofFort Worth Buzzsaw system that to the best of their knowledge (I ) all
previous progress payments received from Owner on account of Work done under the Contract have
been applied on account to discharge Contractor's legitimate obligations incurred in connection with
Work covered by prior Applications for Pavment, (2) title of all Work, materials and equipment
incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass
to Owner at time of payment free and clear of al I Liens, security interests and encumbrances (except
such as are covered by a Bond acceptable to Owner indemnifying Owner against any such Liens,
secunry interest or encumbrances), and (3) all Work covered by this Application for Payment is in
accordance with the Contract Documents and is not defective
Liquidated Damages $1,250.00 x day
�IGhL �JCO LhtCLKIL
1. ORIGINAL CONTRACT PRICE ........................................................ $ $2,322,913.00
1. Net change by Change Orders............................................................... $ $64,843.18
1. Current Contract Price (Line 1 t 2)...................................................... $ $2,384,756.18
t. TOTAL COMPLETED ,AND STORED TO DATE
(Progress Estimate, Construction Allowance and Change Orders)..... $ $2,329,366.17
i. RETAINAGE:
a. X $2,329,366 17 'Work Completed......... $
b. X Not Used $
c. Total Retainage (Line 5a + Line 5b).............................. $
S. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c)........................... $ $2,329,366.17
7. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)....... $ $2,212,897.86
3. AMOUNT DUE THIS APPLICATION ............................................... $ $116,468.31
d. BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate+ CA + Cos + Line 5 above) ............. $ $55,390.00
10. CONTRACT TIME:
a, Days Awarded
b, Days Added by CO
C. Total Days
d, Days Charged
C. Days Remaining
Affidavit of Bills Paid
300
186
486
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Progress Esti..te
Appli,.ti..
c-ez0 a,an02 order
Progress Estimate Construction Allowance Usage Contractor's Application
ADDITIONS
pm �.,m,ea.�7 Nmmmdaln and Lae Vegas ]ntersectlun lmpru�ewente arya. r.,mry
t Ot i91 Convau num i7193
_ygawm�o�r
17
>pp6.an„n e.,n„J 9/1/2023-9/30/2023
ap°I'"au-D- 10/12/2023 Retainage
e
c
D
❑an.
(Junn�LyN Aril
Ilnirihi�
,{Il1iL„n l'alw
l:t�mat..11 anhty
Inswll.d
�alw
Yr.rn,�e.h
li�slall.rl Cale.
\'alu. TL.
P.i iad
Atatsials Yi...ntlY
�loi.d (ncLin C)
T�rlalGwryl{al
and CNrvd �. IJaL
(�
nl.,n.,.; o, mnrlr
(R-F�
Ir��Vumlui
Il_.cii�ri„n
_V
Ilmr.�f al_nvui:.
1'�Wa
c-ez0 GI-02 oH2,
Progress Estimate Construction Allowance Usage
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
Contractor's Application
101591
17
9/l/2023-9/30/2023
'lipheR"oi
10/12/2023 Rerninn
li=n
i. � I]eli
I��i.l1i�.
R:d.�ttio�. �'al.�_
ToLl�.u.1
Vo. real
�a.l�.u.1
ToL1��1
Vo.l'e_�
TaL1��1
�oL1��1
Vut Lee.l
S�i�:,ili-�.io��
C-6 0 Change Orde1
Progress Estimate Change Order Number I Contractor's Application
ADDITIONS
F„r l.,,,nva�17 �0�59� Nmmmdaln and Lae Vegas ]ntersectlun lmpru�eluen[e -.rc=1v� 57193
1 V�u
�ppl,.al,o��una,,.r 17
npph.�mm P.mue 911I2023-9/30/2023
ahoi 0ifi I0/12/2023 Rdainagc
1
B
I
F,
R
F
16m
CO lllrvrlilyN �11
Ihu1R1-..,
41�i�w
vt;.; D�1.�
L1�m.u.;l �luenlay
I-Al"t
Calu�
Pr.ror.u.l�
In"Al"tIA.,
C.lu. Ti-
Y.r�.it
�l.uar.Jv R...n11y
"."t".I rn t;)
Tool Ccnnplil
vrl iW�l to l)s1„
CF7
Lt�lni.,.;R Ihn1:16
CB-FJ
Cb.u�s.11il.,�llan
Il:�vlFhiv
dp-t li..u��n
Ihut.rl f•I:,ulu-
1
11111 i1O R-- Cow Gv1�3, [hIILi
124111111 1--1s rdt Pa--nt
TI"A'
II'
4801O10'JOU
$4l0
$11110
480'JOIOIOI
$111'JO
$I 1I 10
0'J O%.
TI'\T
Cl
140
$2"ol
Ill, IJ'IJ'I.I'I.I
SI I'm to
$,w'ol
lflh
12
112111/1 Fags--
T11'
CY
1112
111
$1,1,12111
119]JU119U..
V"02UlU
,121O1
$fil,l]0lU
IUI U'N.
I
1211111131-ClI,11,1 1,11-1., I1-FI—
i-
SV
141111111111111111
-
SI�11lI
52,10ll fill
14J 011l11111lI1
52,111lI JO
$211J 011
52111111lI
Ill 11°o
I3
1r,
3213 J11T184 C.--[a P--u—t
1211, 91015 C,in. Curb yid-1.,1
TP'A'
S4
14U O10101OU
$11211
$151,801)0
14901NIF)J01
$15,s80 UO
515181 O1
$15,581W
LOII"."
ill
LF
411 110l10l10111
$200
19611lI
411lIIIlIf10f1lIIl
ll611lI
$,I, lQ
llE 1!I
1111111%
ISI
I I 1111 1.11a A lidt-11
C1u�r.;l L�mvl�n. l5'�L, Ihl �xlh lil1a f61L
T1111'
It
14J 0J0J0J01
S
S414111111
141111t111rv1111111
1411111111
$41411'111
1iL1111
11111
TY'A'
T111'
IF
11
2401)000OOOVO
'd201)
$1 )11
S4 d0001)
$111111
24111)00000000
11110110rv111011
14310 J0
$110111
$480101
i11111
SlF,3111
101101
57
fib
H9H 1010 To :orlR tuff eras
$—
IF"
�F
1100J0J0000
$1 J0
$110 J0
111,0101-01
$1 LO JO
S11J 01
$119 J0
1010"o
'1]
711
3341 111r121; Rtct—d111,x
11495012 15' Curb Inl.t
111 cm,m_1=Sa�omu
iIlIIIII- 3.-w.r Ns32w ka..inn.;.,e in
I]�ill_1 Slutlolmlalo�r
T11'
L 1
1 J0000111111
$11 S18111
$11 SSl11
1 00111r10111
$11 S18111
Sl1 Sift 11)
$11 S18111
00%
T-
F,
$11,45811)
$1211, 10
$12Y 1520
$12112 _u
$1 <•n9na
- I"
Ill1%
D-
-
$1 Si191
79
TPs
cr
$a<5<2
$L1n7na
21Y
$1 <•n9na
319]u4
,11
TPR'
F4
-
S$12728
16182
10J0J0111
-iYl
Sit 91
31
1,
LF
Il UJUJ09UU
�LI1, 18
ILU9U11JU1
�>_I1U 98
$'1 ill 11
S),IJO 18
LUl0%
l otale
$Ififi,94'24
SIfi3,41333
$1fi3,413.33
SIfi3,41333
19$1,333.91
G 0 Change Order
Progress Estimate Change Order Number I Contractor's Application
DELETIONS
I—b-) 101591 Noru...nd.l. eud Lae Vcg-1,t.—<d—Iu.pnnuu—
;y��II-.,00���lo„1'a 17
Appl"'bmF P.ai 911I2023-9/30/2023
"lpph'a"""D"` I0/12/2023 Rdainagc
❑
D
F.
F
R_v�
Cu lZuinury ti
Dela.-
Ilmr i4iw-
D.Li1on
Clwn�u�d.i
Valu.;
Tor ll.;,1
V,,ri'.ed
To111.;,1
Nol ll.;,1
Vuri'-.I
Tor ll.;,1
Tnl ll.;,1
_Vut Uoed
CM1a�0i.ly il.-ni
Vo
0.smpbin
ICI.-.,iti�an�n
- on Vo
Unit of M_amre
77
I'll I5--d lnl,i
TF T
M 1
I UlIUlIUlIUlI
$IU 291, 111I
$IU 2J5 UlI
71'
1111511U21;—h TI zII
TI'"R'
I
2 U11U11U11U11
'FI52J4 U11
$iO4F2 Ull
5X
9991 111I I IIII.L— bh,L 1I'S If, A-�-Il�U 21)1)ll
TP-
TV
S1JI511 U11
$41) 1)11
-
11.t'1I'll YLmcty--11—, ut lnta bvu3'x.4x5 iU0%Fg9
ll'U
TV
IT 11'1119111111
xL3511'J11
$22-11
511
JJJJ lIUI 6Lv1a1ufor IIII I.,1-11(41
4
S�-1(I U!I
$1'If,"UII
IFtlM-G.1-, 121. 11,1"1 xF"\Vl
TP`h'
F4
Irl, 00000
STfl 00
$, III"0
' VlJ llma m.nlnl I—, I —1�
TP-
L1
IV OVOVOVOU
$451)UI)
S4 '11)
FH Uf1Ufl O,vvnn6vla y>T uabwFM1ndn
MT
F_4
5211)Uf1Uf1Uf1U
Ill 11
S1, 114 Ill
iH UlJUO PIVFIus; uux �u b.d v.�F
'IPA'
eU
1424 VOVOVOVO
b1 V0
Sl 424 T)
2U11IMI
T—
TI'A'
CF
$I UII
$Illl Ull
21
U1I I—L—Pz 1111-121 aI LD lImj-l-'
TYR'
L4
Sl451I)'I
$29.11U11 U11
c-ez0 GI-02 order
Progress Estimate Change Order Number 1 2 1 Contractor's Application
ADDITIONS
F„r l.,,,nva�r7 01 $9I NI —d,], and Lae Vegas Int-... d n Imp--te 57193
rn
�ppli�rion �und�.. 17
npph.�mm P.mue 9I1I2023-9/30/2023
'I'I'�"'hoi n'� 10/12/2023 Rd inagc
P
C
D
F,
F
Imm
'tl lJrrvn�i}�kl:lCl�.vr-"�Irr.,
L I
'U.1„\'slru�
F,er,,,�a ur�yrLa�
Fh�lalbl
r,7�or�y
Fh�lalbl\'alru
cmr�_'rn�d
Pe�ad
rich o-seamy
SI—d(-I CJ
i°w c.,n�Fl.,�.a
(D L
B
R�hn.am IhnmM1
CFy6-_lLd�1Wu
Va
➢.P�npo�ir
Si.,,,ili.aLio�r
t_«o�r Va
Uu�[�f �f.��rua
�=
<3�11 illlill I1dCTl'iru ia��w
TI"h'
I I
y,A d'1
'F2541 Ilil
3�111 illlilllillliill
k2541 Ilil
6? 541 �lil
�SJI i)1)
-
it I1M.
83
-OIOi %'I—r 1,P,irn—p—
T-
LF
1- —119
21,
11'10
lflh
tOW'
�7,n7a.no
�"I,fi"I3L0
�1,61a.ao
f7,0—
A0 lllh
c-ez0 GI-02 oH2,
Progress Estimate Change Order Number 1 2 1 Contractor's Application
DELETIONS
101591
17
9/l/2023-9/30/2023
°�'��"'"O1 O'er 10/12/2023a.W—
It
n
F
F
�ir�
FIIL anh Y..
I�m.11iu-
AI' hin C6wyt
iI.,i Calu.
Vo. i'dal
ToLI'1
ToLl�.u.1
TOL1�1
Vo. i'e_�
ToL1�1
TUL1�1
Vut Leed
-
UyS�ll da llau
5�.-.,ili-�.io��
1'a�ile
C-6 0 Change order
Progress Estimate Change Order Number 1 3 Contractor's Application
ADDITIONS
F„r l.,,,nva�l7 �� $9 Nmmmduln and Lae Veins ]ntersectlun Impru�ewents Cary s�s_1sn 57193
nppb:z6„n nemb.,1 17
npph.�eml Ps.,m 9/1/2023-9/30/2023
IPPIL.6i"' D"' 10/12/2023 RI W..gc
H
D
F
F
1Lvn
'11lJu.un�IJ I� WJ
l)nll P1�.,
ndd111,in
Ctwn�., U1d,�
\'alu.;
Fd1�n�a1d C>t1ar11Ly
111a1s11_d
C.du�
11_v1o11e1}
111a1311_.I Csb1�
Val1v. T11ii
F.a�a.1
-riald l'�aarll}
AIm...1 (�Yit iYll
To51 Camp1�1.;J
enJ $b�i�J l�llel�
(Di L)
° �
(L1
P
Bxlv.� 1,1 F1n�h
(B-F)
CFyr� Ud„llau
VO
D.,c.,lrpf.n
Sp«,Ji�atio�r
:�tio�r VO
()nll ..I M�evm.;
1121'SI D P—T.11111)
VO Gvd—I Lm.,1-11" Doplh)— fills 5b-
34711101111 TIaf' C-1
3441177111,mu,,IIT, 511111F141)%.111. 11v.; M1f.taal P.Ma[nl
TI"h'
II
1111 � 1
31 1 I I III III III
]61111
$p,11F,111111
111111113111311111111
5�613111111
_
$2 F,011013
3�i"�
S5,4F,111111
TI'\C
6F
T'169u9J9J9J
$111
—
]'16uouououo
$L11 TI
$221111111.
$15211
1,,-
74
T11'
M11
J1VI00011111
55,5001)I)
$2'1111101
4001101101111
$22JIM111111
10011°n
34
TP'd'
F>
11VI00011111
S]21)111)11
$]7110111
1001101101111
S]71)111111
S770111)11
$1544890
$1 111)111)
11)111),
81
76
114nftl1'1111JT21n1_1
1111 T.mp�1r�Y4'1,pIIAIPCMT W111 Iz,B.. it,L11
1131 91114" Saxes Pipe. pl,. R_
331121029 CIPY
TI'R'
M1
12U'l0'l'J90
$15,—')0
$15,44ft')0
121J90'l0'l0
$15,44SA
11544ft 0')
I'I0 T,.,
TP
9y
111%111101YI11011
555I'll
$1,` 11111
111X 1111111111111111
S5y411110
S5J�4111YI
_ 161 ]0
$514,1111)
111011,
A4
TI"A'
I 1
I IOJOJ'l'JO
J1,Iftl ]0
31,Ift1 ]0
1 —01010
S1,Iftl ]0
$11 Al 79
1901°u
TYR'
IF
12H 111101YI11011
$17412
$3 1,112111
1711 011011011011
$31,02111
$3 L02S YR
5311)21111
11101)"a
2 °1'I°
$93,91U 66
*SS,4aU 66
*SS,45066
f ,45Q 1
142Ia
f_,41—
c-ez0 GI-02 oH2,
Progress Estimate Change Order Number 1 3 Contractor's Application
DELETIONS
101591
17
>pp1"'b,„, rend 9/1/2023-9/30/2023
°j�I11Ot"'n"` 10/12/2023 Ref ...
C
n
F
F
llcn
n.l.-bsm
53514115 yyDI2-2b P�'C Pry.;
TPR`o
11
13A90009000
$14100
51X2i400
41
<3J�51111 L11'Clnl�lnl_1
1PU
FA
1.11.1u.1u1u
tiH 4111111
tiN,4su 1u
-
144117721�rn�th 1n 112411-4SU Colt SLM.— M.t,,
1PN
L1
S]'11)111111
$]'lull ull
1111111 !)lndn Ord �e..a./natis�.lindi.
TI'%
L14
]2r; 1111111�1111111
S11111
$249111
YY ",Al)
TPR'
111
_1119111
$111
S,1111)
8'J
;11 31114'Sax_i Sin iw R>.ulmaliw
TI'\l'
F_I
111H111H1
$1 ;3; 11
l o1We
$;Y,HIH Yl
C-6 0 Change Orde1
Progress Estimate Change Order Number d Contractor's Application
ADDITIONS
F„r l.,,,nva�17 10,59, Nmm4ndeln end Las Veges Intnree.d-Imprucenmte 17193
17
npph.�mm P.mue 9/l/2023-9/30/2023
'wl'"xhai D'�` 10/12/2023 R;hvnagc
L
C
D
R
F
Ib-n�
CD lTlvrhly to Add
IIn1III—
cnaG=O�d„
1a1n_
LshmaLd VeanLe,
Hn1o11.,3
callw
Pr.,vou<ly
Hn1o11.,3 Collw
Cnle�llns
P,ame
Vlnl.,nnls Pl�s�n�y
Stage (holm C)
r
Total Cmnpldd
vrdaw_dmllare
(D III
^..
(F)
0
LAhn.a In PnmM1
1
�- l
Clmug�ILdw 1Lm
�,
n,a,rcgmw
SP..wfaeon
...nw no
Iinlol Sn.,vlua
ill
zix14115 ft"CDR--I4 ii
11110o011 I1Llll1U 111T11TI-1
TT\V
Tl
$1411111
$22;11111
$2_5011
$22;1110
,1111
TPW
LA
, J i65 oV
$10 7.5 o0
Slo ib� 00
Slo ia5 00
W1,16500
1 J00"o
YD
1i04011" COTCRFTF SIII— ILK DRIVFW_1V
TT\V
SV
]i 00000000
$15000
$i45Vo0
]i 09000000
$i,450 o0
$145110
S145o 00
1lJOOM.
14
<211111014 CONCRLTLPJCLVIDI\T
TPW
4Y
143133111111011
$Y511n
$141)1114
149333111)111)11
i141) 15-1
i14 (�154
$14,11A �4
II II
17
91925"COTCRFTF SII—V_llK
YHYH 0111 1114T �USIII\LVf 6IGN 1TYPL{
1141 '14921o"RCI`, CL19S Ill
011 TLItl LNMLDI 1Nd,OTSD SOD
999090 TIl— IN TI'RF F,11
YH1-1II—P-VRY 4"H1-1111H1P IL11L III I-
11901) RFVDLILDs1TIDN
Tii
AF
111 o9090909
$1909
$1G 21111
I1,21 U9o9o909
S e,21909
S l,21909
$IF,,21090
1119 oM.
31
TPW
CA
1110110110110
$6441111
56441111
L 110110110110
11441111
S644110
$544011
L111 111h
44
TT\V
I.11
3To; 09
$i 9i')o9
$i,')i9 o9
$i"1 o9
11 f,
1 119 oM.
TPW
SF
711110111111110110
$70110110
711110
$70110110
S7110111111
111A
111
TPW
SF
79U9 U9U9U9U9
Sl 19
$7111U9
711111111111111
167,1111111
$791-Ul10
S7,1919
'N.
I111)
71
1I1W
V5110
$1151111111)
111,500110
SI5>1
$16,$01U1
11
3X
TPW
LA
1I--
S177501J
1177501)
$1,77501)
$1775111
S1,77500
T.W.
182,71-4
A2,72-4
542,721-
W,7—,I
01Jh
G-ez0 GI-02 oH2,
Progress Estimate Change Order Number 4 Contractor's Application
DELETIONS
101591 Nor,—d.].: dLae Vcg., Int--d—I,.pmvu—,
17
4pp1"'e,„, r�1oa 9/l/2023-9/30/2023
°1'P"eR°Oi O" 10/12/2023R.W-,-e
L'
I
F
F
IIr1
C JunnOti^
D.,LI.,
i-nILP1�C.-
D.,1�11un
C6ans-Ur.l.,r
\.il
Voii'e_d
1a111,d
Ta111y;AI
N.ITT;AI
Vnii'e_.1
TaL1i-
�.:.I
TaLU,u1
V
ut Ueed
UyS�U da llau
V2
D.,s..n1N.n
C�ificauw
�1r
11v1 ��fAl.,azw.
11111 11_4D11,T%"11_1111CN.R: CIlc
TP\VL
I'.A
$5220U
$104400
33050111441—ST 2"lV 4TFR MFTFR
IPW
RA
-
$144x, 0.1
ti'1 ]i0110
NN
111221103 ALI UC41L 1"PRIG 4ILW%ILR i—ICL
IP\V
LA
10l10
$1 I�OWI
$4W1
1i0501'37 M MULEL ADILITMLT M.UIJR
TPW
RA
wwww
$244300
$4%2400
Jll
1292()4'1 TRFTCH_YDRI 6ACKFILL
TP\V
LF
I18 �0�0'IOlO
$1 i501
$151i10I)
JH
'J204 $EEDNC. HYllA1 WI ICH
TP\V
5X 110
5Xl10l10
10
112414i02 kFMU1'F t' AA 4TF IVT.FT
TPN
EA
l 110110110110
$11101111
$1110110
1<4
011 TItllCR 4PI1Ul\P4CInG
TPW
T11
1X4011011011011
V7110
$3-110
IH
3232'110U CUl\"CRLILRLIAlNINGUALLU1111 i1DLU ALA
11'\V
SF
151F'J000OU
$31 U0
FSX]4,
�' 1]"CU1CRI'.11IRI CI: IPRIIV CARP
IP\V
Ili
$55llfl
--
' J11'J024",TSIkCMTIrLlltEII\GHALIWI
TPN
LIB
mlowu
2411101,1011
$2600
$�41110
r,
J24141JI REMOCE 10'CI IRD IVLFT
TPW
FA
$11,,1705
$s 41, 1'A
3%
'32413014--L21"T-MLII\l:
TPN
I.11
$4300
$23b]00
0241 31115 RFMUVF 24" STDRM T,ITF
TPN
T.F
51111111111011011
§4J 110
§2 2110110
'JlJ00 Trucks ron'�mt ofs L.dwliran e1 b,1nh
TPN
61'
1X400000000
IF
11
,la E-1-CoK-11121,,11 It a 4"d`1, 11
TPN
T.F
'1411011011011011
$1X W,
$11 120 110
2<
011l vrdd.n .,A1ti1 .Ut w.—'a,2
TP\V
l:A
5115.01111
$115i0110
1'o�ild
gX2,Y23.4+
Citv of Fort Worth Summary of Charaes
Ctty Scmctary Contract Num
57193
Normandale and Las Vegas Intersection Improvements
P o FR'020-007498
Ptoj-t Numbct
101591
Appbcaoon Penod
9/1/2023-9/30/2023
Application
17
A licatinn Date
PP
lU/12/2U23 Retaittage
Numbci
Funding Identification (FID)
Total Completed
Amt Remaining
Gross
Retainage
Net
Original Contract
$1,985,107.55
$337,805.45
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
D
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
D
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
D
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Change Order
$165,413.33
($165,132.09)
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$O.DD
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
1 $0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Change Order
$7,673.00
$0.00
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
1 $0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Citv of Fort Worth Summary of Charaes
Ctty Scmctary Contract Num
57193
Normandale and Las Vegas Intersection Improvements
P 0 FR'020-007498
Ptoj-t Numbct
101591
Appbcaion Penod
9/1/2023-9/30/2023
Application
17
A lication Date
PP
lU/12/2U23 Retaittage
Numbci
Funding Identification (FID)
Total Completed
Amt Remaining
Gross
Retainage
Net
Change Order
$88,450.66
($34,359.91)
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Change Order
$82,721.64
($82,923.45)
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003930-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
1
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
Change Orders
$0.00
$0.00
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Citv of Fort Worth Summary of Charaes
Ctty Scmctary Contract Num
57193
Normandale and Las Vegas Intersection Improvements
P 0 FR'020-007498
Ptoj-t Numbct
101591
Appbcaion Penod
9/1/2023-9/30/2023
Application
17
A lication Date
PP
lU/12/2U23 Retaittage
Numbci
Funding Identification (FID)
Total Completed
Amt Remaining
Gross
Retainage
Net
Change Order
$0.00
$0.00
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Change Order
$0.00
$0.00
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003930-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
1
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
1 $0.00
$0.00
Change Order
$0.00
$0.00
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Citv of Fort Worth Summary of Charaes
Ctty Scmctary Contract Num
57193
Normandale and Las Vegas Intersection Improvements
P 0 FR'020-007498
Ptoj-t Numbct
101591
Appbcaion Penod
9/1/2023-9/30/2023
Application
17
A lication Date
PP
lU/12/2U23 Retaittage
Numbci
Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net
Totals
$2,329,366.17
$55,390.00
$0.00
$0.00
$0.00
34018-0200431-5740010-101591-003980-9999-18010203
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
D
$0.00
$0.00
$D.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
0
$0.00
$0.00
$0.00
$0.00
$0.00
Grand Total 1 1 $2,329,366.17 1 1 $55,390.00 1 1 $0.00 1 1 ($116,468.31) $116,468.31
FORTWORTHQ
Routing and Transmittal Slip
Transportation &Public Works_
Department
DOCUMENT TITLE: Normandale Street and Las Vegas Trail
-Improvements Change Order Ol
M&C:
CPN: �105191� CSO: ,57193 DOC#: 1
Date:
To:
Name
Department
Initials
Date Out
1.
Misty Monique -Davila — BSP
TPW - initial
Dec 14, 2022
2.
Danny Krieg -Contractor
Rebcon - signature
k
Dec 14, 2022
3.
Habte Taezaz — Inspector
TPW - signature
Dec 17, 2022
4.
Brendan McInnes —Project Manager
TPW -signature
LM
Dec 14, 2022
5.
Chad Allen — Interim Program Mngr
TPW - signature
Dec 19, 2022
6.
Lissette Acevedo - Interim Stir CPO
TPW - signature
Dec 20, 2022
7.
Michael Owen — Interim Asst. Director
TPW - signature
Dec 20, 2022
8.
Lauren Prieur — Interim Director
TPW - signature
P
Dec 20, 2022
9.
Jeremy Anato— Mensah
Legal - signature
Jan 6, 2023
10.
William Johnson
CMO - signature
.,1.
Jan 9, 2023
11.
Jannette Goodall
CSO - signature
TSG_
Jan 9, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAUtK'N MUINA 1 uttr.: till uucuiii�u�� l���l��� 1,.,,.. —1.7
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ®No
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsPforlworthtexas.4ov, for pick up when completed; list "Please call Brendan
ext # 2817 for questions. Thank you. "
Updaled 08-22.2022, indhin
57193-COI
F(wi- [i 'rR, City of Fort Worth
Change Order Request
Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Project #(s) 101591
Project Description Improvements include a multi -lane roundabout, minor storm drain improvements and pedestrain facilites such as sidewalks and American Disability (ADA)
ramps.
Contractor Rebcon, Inc. Change Order# 1 Date 1215/2D22
City Project Mgr. Brendan McInnes City Inspector Habte Taezaz, Ariel Durate
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW Contract Time
Totals (CD)
$2,322,913.00 1 1 1 1 $2.322,913.00 300
3.00 1 1 1 1 $2.322,913.00 1 300
.30
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.01 %
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2.903,641.25
FOR CHANGE ORDER
302
The existing storm drain was found further north than the design ancipated and the connection of the new storm sewer would leave a patch i n the existing roadway.
Recommended extending the pavement an additional 48ft along Normandale to replace the pavement over the limits of the storm drain connection to the existing system. 15'
inlet revisions are being made to accomodate the current standrd of having 3 rings for these inlets. Details in the current plans only indicated having 2 rings being required.
Additional sidewalk wall is being added to minimize grading behind the sidealk and impacting an existing fence in the ROW. Sewer plans did not account for existing sewer
connections being needed, and 2 lines needed to be connected to maintain severices. During the design phase the FOR switched to a flexible base section, but the unclassified
excavation was not added to the plans as required to the specification. The Contractor and FOR have both reviewed and agreed to the missing quantites. Additionally, during
the design phase a CFW Arts project was being coordingated for art in the middle of the roundabout. With further coordiantion with the art department and thier artist, the
landscaping was requested to be removed and a concrete seperator and rock design proposed by the artist. Cost - City of Fort Worth has compared the unit prices which are
being proposed by the contractor to other similar items and accepts the unit costs. The difference in pricing can be justified by the current market pricing which is fluctuating on
a monthly basis due to price escalation and inflation. The City finds that the prices that are being proposed by the contractor are fair and reasonable. The average pricing was
compiled from similar items from CFW Unit Cost Average including IPRC Data, and the Texas Department of Transportation Average Low Bid Unit Prices effective September
2022. Time - Additional contract time has been reviewed and the amount of days being granted is deemed reasonable for the work scope when reviewed in relation to the
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ontractor's Company NameS ontractor Name ntract Sifin;
Rebcon Inc. Danny KriegDK
Date
Dec 14, 2022
tor/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
_
Dec 17, 2022
,.a o „
Dec 14, 2022
Manager
Date
Dec 19, 2022"
8 ital Project Officer
Ile_ �n
Date
Dec 20, 2022
irec or Dept)
Date
111111iffDepartment (Dept)
Date
Dec 20, 2022
Dec 20, 2022
Assistant City Attorney
Date
Assistant City Manager
Date
.
Jan 6, 2023
Jan 9, 2023
9
Council Action (if required)
M&C Number IM&C Date Approved
ATTEST:
Jannette Goodall, City Secretary
City of Fort Worth
Change Order Additions
Protect Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Protect # 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # F-7--� Date 121512022
AUDITIONS
ITEM
DESCRIPTION
UEP I
City
Unit
Unit Cost
Total
0241.1300 REMOVE CONL;&
7.00000900
.00
92.00
2
0241.1000 REMOVE ASPHALT PAVEMENT
TPW
140.00000000
SY
$20.06
12
3123.0101 UNCLASSIFIED ECAVATION
TPW
1,102.00000000
CY
60.00
.0
3
3211.00113 8 CRUSHED CONCRETE FLEX BASE
o.00000000
5
.00
2,
15
3213.0103 8" CONCRETE PAVEMENT
TPW
140.00000000
SY
112.00
0.00
16
3216.0101 6" CONC CURB AND GUTTER
TPW
48.00000000
LF
$2.06
96.00
18
3232.0100 CONCRETE RETAINING WALL WITH SIDEWALK
TPW
140.00000000
SF
$31.00
$4,340.00
63
9999.0000 Crushed Limestone (5" depth) with filter fabric
TPW
2,400.00000000
SF
2.00
57
9999.0000 Turf in medians solid sod
TPW
110.00000000
SF
1.00
0.00
68
9999.0000 Top soil in turf areas
TPW
110.00000000
SIF
1.00
0.00
77
3349.6002 15'RECESSED INLET
TPW
1.00000000
E
11,518.10
, 8. 0
78
3349.500215' CURB INLET
TPW
2.00000000
EA
16,468.10
32,936.20
79
9999.0000 Concrete Seperators
TPW
22.00000000
CY
635.32
3,9 .0
80
3331.3311 4"Sewer Service, Reconnection
TPW
2.09000000
EA
$1,533.911
$3,067.82
81
36" Drilled Shaft Foundation
TPW
11.00000000
LF
$827.28
9, 00. 88
TPW
$166,947.24
Sub Total Additions
166'947.24
Change Order Additions Page 2 of 4
City of Fort Worth
Change Order Deletions
Project Name Normandale Street and Las Vegas Trail Intersection Improvements CitySec # 57193
Client Project # 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # Date 121512022
DELETIONS
DESCRIPTIONITEM
Oty
Unit
Unit Cost
Total
77
3349.600215' RECESSED INLET
TPW
1.DOOO0000
EA
10,296.00
1D,296.00
78
3349.5002 15'CURB INLET
TPW
2.00000000
EA
$15,246.0
30, 92.Oo
58
9999.0000 Limestone blocks (1681f X 2'h X1.5w) x 150I 2000
TPW
39.00000000
TN
$1,050.05
0,950.O0
59
0099.0000 4-1-imestone verticals at intersections (3' x Tx 6) x 150 12000
TPW
17.00000000
TN
17350.00
22,950.00
60
9999.0000 Structural foundation for Limestone verticals (4)
TPW
4.D0000000
EA
2,500.00
0,000.00
61
9999.0000 Concrete Edger -Colored (1260 If X 4"d X 6'W)
TPW
560.00000000
EA
si8.00
77585.10
65
9999.0000 Ornamental trees (Y cal
TPW
10.00000000
EA
$450.00
$4,500.00
66
9999.0000 Ornamental grasses I native shrubs
TPW
624.00000000
EA
$11.05
6,86 .00
69
9999.0000 Planting mix in bed areas
TPW
1,424.00000000
SF
$1.05
1,424.00
70
9999.0000 Tree much
TPW
110.00000000
SF
1.00
71
9999.0000 Landscape Lighting ( 20 Saratoga LEDFights)-
TPW
20.00000000
EA
$1,450.05
29,000.00
TPW
166,666.00
Sub Total Deletions
1 P66,666.00
Change Order Deletions Page 3 of 4
FORTWORTH,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Normandale Street and Las Vegas Trail
Improvements Change Order 02
M&C:
CPN: 105191 CSO: 57193 DOC#: 1
Date:
To:
Name
Department
Initials
Date Out
1.
Misty Monique -Davila — BSP
TPW - initial
tip
Jan 31, 2023
2.
Danny Krieg - Contractor
Rebcon - signature
aK
Jan 31, 2023
3.
Habte Taezaz — Inspector
TPW - signature
„r
Jan 31, 2023
4.
Brendan McInnes — Project Manager
TPW - signature
eLM
Feb 1, 2023
5.
Chad Allen — Interim Program Mngr
TPW - signature
-,
Feb 2, 2023
6.
Lissette Acevedo - Interim Stir CPO
TPW - signature
Feb 3, 2023
7.
Michael Owen — Interim Asst. Director
TPW - signature
zo
Feb 4, 2023
8.
Lauren Prieur — Interim Director
TPW - signature
LLP
Feb 4, 2023
9.
Doug Black
Legal -signature
16111
d,•,b
Feb 6, 2023
10.
William Johnson
CMO - signature
;,,1.
Feb 7, 2023
11.
Jannette Goodall
CSO - signature
,j
Feb 7, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ®No
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts0fortworthtexas._i7ov, for pick up when completed; list "Please call Brendan
ext # 2817 for questions. Thank you. "
Updated 08.22.2022, mdhm
CSC No. 57193-CO2
Firwil- ORTI I. City of Fort Worth
" "' — Change Order Request
Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 1 57193
Client Protect #(s) 1101591
Project Description Improvements include a multi -lane roundabout, minor storm drain improvements and pedestrian facilities such as sidewalks and American Disability (ADA)
ramps.
Contractor Rebcon, Inc. Change Order# 2 Date 1/4/2023
City Project Mgr. Brendan McInnes City Inspector Habte Taezaz, Ariel Durate
Dept. I TPW
Original Contract Amount $2,322,913.00
Extras to Date $166,947.24
Credits to Date $166,666.00
Pending Change Orders (in M&C Process) $0.00
Contract Cost to Date k"$2,323,194.24
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
FOR CHANGE ORDER
Totals
Contract Time
(CD)
$2.322,913.00
300
$166,947.24
2
$166,666.00
$2.323,194.24
302
$7,673.00
0
$2.330,867.24
$232,291.30
$232,010.06
0.34%
$2.903,641.25
A sanitary sewer line called out in the plans to be replaced is in conflict with a franchise utility line as well as an existing waterline where a sanitary sewer manhole is proposed to
be installed. The engineer has reviewed the conflicts and provided two alternatives to resolve the conflicts. One alternative is to use cast -in -place pipe (CIPP) to line the existing
pipe in place to remove the need for the added manhole and the other option is to completely move the proposed sewer line to the other side of the road. Currently 190 LF of the
300 LF of the new line has been installed per plan before the conflict was identified. Use of CIPP is least impactful to the project schedule and budget but requires a CCTV video
of the existing pipe conditions to verify adequacy of the existing line that will remain and a point repair to be conducted at the temporary intersection of the existing clay pipe and
the new pvc pipe. Contractor has submitted prices for the added work of cleaning the line, performing a permanent point repair and videoing the line for existing conditions.
Typical methods for comparing unit costs were not available and were not considered adequate for this work. Instead, the Contractor has submitted invoices and breakdowns of
the time and materials for the added work. The breakdown has been reviewed and deemed to be fair and reasonable for the work being conducted. The documentation has
been attached to this change order. After the CCTV video is conducted it will be reviewed to determine if CIPP is an option. If it is, CIPP will be change ordered into the contract,
otherwise the relocation option will be used.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Narne ontractor Name ntract Sianatur
Rebcon Inc. Danny Krieg �K e
Date
Jan 31, 2023
prTspector/Inspection Supervisor
Date
Project and Contract Com fiance Manager
Date
Jan 31, 2023
7717
Feb 1, 2023
ram Manager
Date
Senior Ca ital Project Officer
Date
Q
Feb 2, 2023
„ ,
Feb 3, 2023
irec t_
Date
Feb 4, 2023
Director, Department (Dept)
1 A Iil'.,
Date
Feb 4, 2023
Assistant Cit Attorney
Date
Assistant City Manager
D
Feb 6, 2023
Feb 7, 2023
Council Action if require
�p M&C Number M&C Date Approved
ATTEST: 'd `�� � �"
Jannette Goodall, City Secretary
City of Fort Worth
Change Order Additions
Protect Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Protect # 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # F—T—� Date 11412023
AUDITIONS
City of Fort Worth
Change Order Deletions
Project Name Normandale Street and Las Vegas Trail Intersection Improvements CitySec # 57193
Client Project # 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # Date 11412023
Change Order Deletions Page 3 of 4
FORT WORTHO,.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Normandale Street and Las Vegas Trail
Improvements Change Order 03
M&C: 21-0850 CPN: 101591 CSO: 57193 DOC#: 1
Date:
To:
Name
Department
Initials
Date Out
1.
Alexiz Ramirez — BSP
TPW - initial
aF
May 22, 2023
2.
Danny Krieg - Contractor
Rebcon - signature
May 23, 2023
3.
Habte Taezaz — Inspector
TPW - signature
b
May 18, 2023
4.
Brendan McInnes — Project Manager
TPW - signature
M
May 18, 2023
5.
Chad Allen — Program Manager
TPW - signature
May 23, 2023
6.
Lissette Acevedo - Stir CPO
TPW - signature
May 24, 2023
7.
Michael Owen — Interim Asst. Director
TPW - signature
o
May 24, 2023
8.
Lauren Prieur — Director
TPW - signature
May 24, 2023
9.
Doug Black
Legal - signature
1�14
May 26, 2023
10.
William Johnson
CMO - signature
k
May 27, 2023
11.
Jannette Goodall
CSO - signature
May 30, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ®No
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsOfortworthtexas. aov, for pick up when completed; list "Please call Brendan C�
ext # 2817 for questions. Thank you. "
Updated 08.22.2022, mdhm
CSC No. 57193-CO3
Ry'(ili'fhXt City of Fort Worth
Change Order Request
Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Project #(s) 1101591
Project Description Improvements include a multi -lane roundabout, minor storm drain improvements and pedestrian facilities such as sidewalks and American Disability (ADA)
ramps.
Contractor Rebcon, Inc. Change Order# 3 Date 1/4/2023
City Project Mgr. Brendan McInnes City Inspector Habte Taezaz, Ariel Durate
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Ti
$2,322,9'
$174,6:
$166,61
$2,330,81
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Totals
.30 1 1 1 1 $232.291.30
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.67%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,903,641.25
Contract Time
302
When installing the 10' inlet it was realized that it conflicted with the existing storm sewer line. The FOR revised the location and type of the inlet to allow the drain to be installed.
The Contractor priced reworking the pavement to allow the new inlet to be installed as well as the new inlet not currently in the plans. 24" Stripe was incorrectly quantified in the
plans, and the additional quantity is being added to the project as needed for the striping layout. The Contractor and FOR have both reviewed and agreed to the missing
quantities. Oncor and Contractor met to discuss the power supply for the project. During the meeting Oncor noted that 240/480 could not be provided but 120/240 could be.
Traffic Management approved the substitution, and the bid items are being switched out for the same cost. With further coordination with the PAR department the remaining
landscaping scrubs are being removed and swapped out for limestone rocks. A sanitary sewer line called out in the plans to be replaced conflicts with a franchise utility line as
well as an existing waterline where a sanitary sewer manhole is proposed to be installed. The engineer has reviewed the conflicts and provided revised sheets to use cast -in -
place pipe (CIPP) to line the existing pipe and relocate the manhole. Contractor has submitted prices for the added work of cleaning the line, connecting a service, and placing
the CIPP liner. Cost - Typical methods for comparing unit costs were not available and were not considered adequate for this work. Instead, the Contractor has submitted
invoices and breakdowns of the time and materials for the added work. The breakdown has been reviewed and deemed to be fair and reasonable for the work being conducted.
The documentation has been attached to this change order. Time - Additional contract time has been reviewed and the amount of days being granted is deemed reasonable for
the work scope when reviewed in relation to the critical path of the work activities.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
OEMontractor's Company Name ontractor Name Contract Si n,
Rebcon Inc. Danny KriegK
D
May z3, zoz3
Su ervisor
Date
Project and Contract Com fiance Manager
Date
May 18, 2023
oSenior
May 18, 2023
Date
Capital Project Officer
Date
May 23, 2023
,
May 24, 2023
tAssist.ntCit
Date
Director, ContractingDepartment (Dept)
Date
May 24, 2023—�
May 24, 2023
e
Date
A Manager
Date
May 27, 2023
May 26, 2023
Council Action if require
M&C Number I M&C Date Approved
.r,
ATTEST: A `-�
Jannette Goodall, City Secretary
City of Fort Worth
Change Order Additions
Protect Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Protect # 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # O3 Date 1I412023
ADDITIONS
ITEM
DESCRIPTION
DEPT
Oty
Unit
Unit Cost
Total
2
0.00000000
26.00
$8,060.00
53
9999.0000 Crushed Limestonedepth) with ter fabric
TPW
776.00000000
SF
2.00
2.D0
74
3471.0000 C CONTROL
TPW
4.00000000
MO
$5,556.65
22,000.00
84
3441.1771 Furnish/install20-2 D Volt Single Phase Metered PedestalTPW
1.O0000000
EA
7770000
TO
85
33 9.8001 10' ype 2 net
TPW
1.O0000000
EA
$15,448.00
S.DO
76
9999.0000 TEMPORARY 4" ASPHALT PVMT W TH FLEX BASE NSTALLAT
TPW
108.00000000
SY
55.00
9 O.DO
84
3331.0101 4" Sewer Pipe, Point Repair
TPW
1.ODDDD000
EA
27181.70
2, 8 . 0
85
3331.2102 8" C PP
TPW
178.O0000000
Li-
174.32
3 ,028.96
TPW $93,910.66
Sub Total Additions 93,910.66
Change Order Additions Page 2 of 4
r4014 I'Wox i a City of Fort Worth
Change Order Deletions
Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Project# 101591
Contractor Redden, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # Date 11412023
DELETIONS
ITEM
I DESCRIPTION
DEPT
Qty
Unit
I Unit Cost
Total
9
333 . 58 S -26 C PE
TPW
134.00000000
.00
$18,894.00
40
3349.5001 10' CURB INLET
TPW
1.00000000
EA
$8,430.00
8,430.00
52
3441.1772 Furnish/install 240-480 Volt Single Phase Transocket Metered PedE
TPW
1.00
EA
$7,7DO.00
7,7 00.90
66
9999.0000 Ornaments grasses I native shrubs
TPW
226.00
EA
11.00
2, 86. 00
69
9999.0000 Planting mix in bed areas
TPW
776.00000000
SF
$1.06
776.00
80
3331.3311 Sewer Service, Reconnection
.00
,533.9
,533.9
TPW $39,819.91
Sub Total Deletions 39,819.91
Change Order Deletions Page 3 of 4
FORTWORTH,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Normandale Street and Las Vegas Trail
Improvements Change Order 04
M&C: 21-0850 CPN: 101591 CSO: 57193 DOC#: 1
Date:
To:
Name
Department
Initials
Date Out
1.
Bus. Support Partner — Amtra
TPW - initial
Ask
Sep 12, 2023
2.
Danny Krieg - Contractor
Rebcon - signature
-
Sep 13, 2023
3.
Ariel Duarte — Senior Inspector
TPW - signature
Al40
Sep 12, 2023
4.
Brendan McInnes — Project Manager
TPW - signature
6L `
Sep 13, 2023
5.
Chad Allen — Program Manager
TPW - signature
-
CA
Sep 15, 2023
6.
Lissette Acevedo — Senior CPO
TPW - signature
Sep 18, 2023
7.
Patricia Wadsack — Asst. Director
TPW - signature
Sep 20, 2023
8.
Lauren Prieur — Director
TPW - signature
WO4 (
Sep 20, 2023
9.
Doug Black
Legal - signature
d b
Sep 21, 2023
10.
William Johnson
CMO - signature
L
MO
Sep 21, 2023
11.
Jannette Goodall
CSO - signature
RPg
Sep 21, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
NEXT DAY: ❑YES ®No
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsOfortworthtexas. aov, for pick up when completed; list "Please call Brendan C�
ext # 2817 for questions. Thank you. "
Updated 08.22.2022, mdhm
CSC No. 57193-CO4
Ry'(ili'fhXt City of Fort Worth
Change Order Request
Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Project #(s) 1101591
Project Description Improvements include a multi -lane roundabout, minor storm drain improvements and pedestrian facilities such as sidewalks and American Disability (ADA)
ramps.
Contractor Rebcon, Inc. Change Order# 4 Date 6/29/2023
City Project Mgr. Brendan McInnes City Inspector Habte Taezaz, Ariel Durate
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Ti
$2,322,9'
$174,6;
$166,61
$2,330,81
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
Contract Time
Totals
(CD)
322,913.00
300
174,620.24
112
166,666.00
330,867.24
412
.30 1 1 1 1 $232.291.30
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS Y. OF ORIGINAL CONTRACT 0.33%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,903,641.25
Additional mobilization of sign company was needed to install an additional sign added after all work was completed. Also, additional mobilization of the striping company was
needed due to direction provided in the field which did not allow work to be completed until conflicts were resolved. A single new mobilization items is being created to capture
the invoice cost of both these mobilizations. Existing sewer manhole was replaced as directed by sewer department due to the current conditions of the asset that would not
allow a major adjustment to be made to bring it to proposed elevations. Pavement and sidewalk items are being adjusted to match the installed and measured quantity in the
field. Additional sod being added to disturbed areas, along sidewalks, and in utility relocation areas to establish proper vegetation. Items are also being removed that were not
used in the project to offset cost of the overrun items. Additional days are being added as the time granted in Change Order 03 was not enough time to finish all the outstanding
work after the impact was completed. Time charges were also incurred during the period from when the preliminary punchlist was conducted until the City was able to schedule
and get a TDLR inspection conducted (7/19/23) and receive the report (8/28/23). Time was ceased on 8/9/23 which is the last day work was done adding a roundabout speed
advisory sign that was not shown in the original contract plans but added due to safety. Final inspection still needs to be performed after sewer department reviews the
contractors submitted videos. All line items except remobilization were part of the original contract and will not result in additional cost due to new pricing. Price for remobilization
reviewed and determined to be fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ntractor's Company Name -tractor Name Contract Si natur
Rebcon Inc. Danny Kriega K 8
D
Sep 13, 2023
Inspector/inspection Supervisor
Date
Project and Contract Compliance Manager
Date
n„ova
Sep 12, 2023
�on
Sep 13, 2023
Pro ram Mana er
Date
Senior Capital Project Officer
Date
Sep 15, 2023
Sep 18, 2023
t
Date
Director, Contracting Department (Dept)
Date
L��
Sep 20, 2023
lv—�
Sep 20, 2023
Assi
Assistant City Manager
Date
9f8/�•
S�212023
Sep 21, 2023
11111VC—ouncil
Action if required)
M&C Number I M&C Date Approved
ATTEST:
A"`" C",
Jannette Goodall, City Secretary
City of Fort Worth
Change Order Additions
Protect Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Protect # 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # ® Date 612912023
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
9
3331.4115 8 -26
6.00000000
.00
2,2 6.D0
9B
3339.0001 4" MANHOLE WITH LINER
TPW
1.00000000
EA
10,765.00
0, 6 .DO
9G
3213.0401 6" CONCRETE SIDEWALK/ DRIVEWAY
TPW
23.00000000
SY
150.00
3, O.DO
14
3211.0101 4" CONCRETE PAVEMENT
TPW
148.33300000
SY
$95.00
,09 .6
17
3213.0302 5" CONCRETE SIDEWALK
TPW
1,621.00
SF
10.00
6,2 O.DO
36
9999.0000 ALUMINUM SIGN (TYPE A)
TPW
1.00
EA
644.00
6 .GO
44
3341.0402 30" RCP, CLASS III
TPW
10.00
LF
$303.00
$3,030.00
67
9999.0000 TURF IN MEDIANS (SOLID SOD)
TPW
7,000.00
SF
1.00
DOOAO
68
9999.0000 TOPSOIL IN TURF AREAS
OOD.00
S
00
DOO.DO
76
9999.0000 TEMPORARY 4" ASPHALT PVMT WITH FLEX BASE INSTALLATI
TPW
300.00000000
SY
55.00
6, 0D.D0
88
9999.000 REMOB L ZAT ON
TPW
1.00000000
EA
$1,775.00
TPW
$82,721.64
Change Order Additions Page 2 of 6
Sub Total Additions 82,721.64
Change Order Additions Page 3 of 6
r401e riiri;lx i a City of Fort Worth
Change Order Deletions
Project Name Nonnandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193
Client Project 101591
Contractor Rebcon, Inc. PM Brendan McInnes Inspector®
Change Order Submittal # ® Date 6/2912023
DELETIONS
ITEM
UESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
7
3305.0111 ADJUST 8" WATER VALVE BOX
TPW
2.00000000
EA
522.00
1,044.00
8
3305.0014 ADJUST2
5.00000000
6.00
2
8
33 2.2003 RELOCATE 1"PRIVAIE VVAIEKSEKVICE3.00000000
3 0.00
9
3331.4117 TRENCH,C
8.00000000
35.00
9H
3292.04 SEEDING, HYDROMULCH
TPW
100.00000000
SY
$8.00
$800.00
0
0241.4302 REMOVE SGRATE INLET00000000
0.00
3
9999.0000 TRUCK APRONG
8.00000000
7.00
8
3232.0 00 CONCRETE G WALL WITH S
8.95
S
3 .00
20
9999.0000 2 x CONCRETE CK APRON C
9.00000000
6 .00
7 8 .00
29
9999.0000 24"SLD PVMT MARKING HAE (W)
TPW
210.00
LF
26.00
570.00
37
0241.4001 REMOVE 10' CURB INLET
TPW
4.00000000
EA
1,617.00
6, 68.00
38
0241.3014 REMOVE 21"STORM LINE
TPW
69.00000000
LF
$43.00
$2,967.00
39
10241.3015 REMOVE 24" STORM LINE
TPW
50.00000000
LF
$44.00
2,200.00
56
9999.0000 Truck apron (cost of applied color on paving only)
TPW
T8-T.-O-0
S
5.00
920.00
57
9999.0000 Decorative Paving (colored -stamped concrete)
TPW
115.00
SF
$6.00
690.00
61
9999.0000 Concrete Edger -Colored (1260 If X 4"d X 6"w)
TPW
740.00000000
LF
18.00
3,32D.OD
73
9999.0000 Landscape & Irrigation maintenance budget (2 years)
TPW
1.00
EA
11,5 00.00
,550.00
Change Order Deletions Page 4 of 6
Change Order Deletions Page 5 of 6
Previous Change Orders
CO#
DATE
AMOUNT
1
12/5/2022
$281.24
2
2/7/2023
$7,673.00
3
5/30/2023
$57,278.75
Total
$65,232.99
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Normandale and Las Vegas Trail Intersection Improvements
CITY PROJECT NUMBER: 101591
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS:
VALVES (16" OR LARGER)
PIPE ABANDONED
SIZE
TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID
SIZE
TYPE OF PIPE LF
8"
PVC SDR26 202
8"
CIPP 178
PIPE ABANDONED
SIZE
TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
FORT W0RTH,,.-.
TRANSPORTATION AND PUBLIC WORKS
October 18, 2023
REBCON LLC
1868 W Northwest Hwy
Dallas, TX 75220
RE: Acceptance Letter
Project Name: Normandle Street and Las Vegas Trail Improvments
Project Type: 02, 03, 04, 06
City Project No.: 101591
To Whom It May Concern:
On September 21, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on October 18, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on October 18, 2023, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817 392
2817.
Sincerely,
" 111 sv AkII-1sL 11
Brendan McInnes (Oct 26, 2023 13:33 CDT)
Brendan McInnes, Project Manager
Cc: Habte Taezaz, Inspector
Wade Miller, Inspection Supervisor
Ariel Duarte, Senior Inspector
Raul Lopez, Program Manager
Hayden , Consultant
REBCON LLC, Contractor
N/A, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev.8/20/19
CONSENT OF OWNER ❑
SURETY COMPANY ARCIIITECr ❑
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑
AIA DOCUMENT G707 OTHER
Bond No. PRF9382598
PROJECT: Normandale Street and Las Vegas Trail Improvements, City Project No. 101591
(name, address)
TO (Owner) [ City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
CONTRACTOR: Rebcon, LLC
400 109th Street
Arlington, TX 76011
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
CONTRACT DATE: November 9, 2021
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
Colonial American Casualty and Surety Company
Fidelity and Deposit Company of Maryland , SURETY COMPANY,
On bond of (here insert name and address or Contractor)
Rebcon, LLC
400 109th Street
Arlington, TX 76011 , CONTRACTOR,
hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 24th
Attest:
l
(Seal):
,OWNER,
day of October 2Q23
Colonial American Casualty and Surety Company
Eidelity and_Deposit Company of Maryland
Surety Company
Q03, Lf�j—
C/J-')f'A
Signature of Authorized Representative
Andrea Dose Crawford Attorney -In -Fact
Title
NOTH. This form is to he used as a companion document to AIA DOCUMEN'r G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS.
Curren) Edition
AIA DOCUMENT G707 CONSE'N1' OF SURETY COMPANY TO, FINAL PAY,MENE' • APRIL 1970 EDITION • AIAO ONE PAGE
eD 1970 •'I'Ill: AMI'.RICAN INS'r]'I'U'1'1: 01' ARCIIITI:C7'S, 1735.Ns %v fork Ave.. NW, WASIIING'I'ON, D.C. 20006
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of
New York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by Robert
D. Murray, Vice PmsWenk in pursuance of authority granted by Article V, Section 9, of the By -Laws of said Companion, which arc set forth
on the reverse side hereof and are hereby certified to be in full force and eff;ct on the date hereof, do hemby nominate, constitute, and appoint
John William NEWBY, Troy Russell KEY, Debra Lee MOON, Andrea Rose CRAWFORD, Sandra Lee RONEY, Linda Michelle
STALDER, Suzanne Elizabeth NIEDZWIEDZ, Sherie Michelle GREENOUGH, Cheri Lynn IRBY and Joshua D. TRITf, all of
Addison, Texas, its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalfas surety, and as its act
and deed: any and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding
upon said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly
elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of
the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland, and the regularly elected
officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland, in their own proper persons,
The said Vice President does hereby certify that the extract set forth on the reverse side hereof is a true copy of Article V, Section 9, of
the By -Laws of said Companies and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, ■nd
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 5th day of Mara, A.D. 2020.
04
88AI.
ATTEST:
ZURIC11 AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
By., Robert D. Murray
Vice President
By: Dawn E Brown
Secretory
State of Maryland
County of Baltimore
On this SO, day of Manly A.D. 2020, before the subscriber, a Notary Public of the State of Maryland, duly commissioned and qualified, RoberiD. Murray,
Vice President and Dawo E. Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and who executed
the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that he/she is the said officer of the Company
aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and that the said Corporate Seals and the signature
as such officer were duly affixed and subseribed to the said instrument by the authority and direction orthe said Corporatiora.
IN TESTIMONY WHEREOF, I have hereunto sot my hand and affixed my 0111cial Seal the day and year first above written.
Constance A. Dunn, Notary Public
My Commission Expires: July 9, 2023
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section $, Attomcys-In-The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies,
recognixances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attorncy-in-fact to affix the corporate seat thereto; and may with or without cause modify of revoke any such appointment or authority at any
tmx:."
CERTIFICATE
1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that
the foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section
8, of the By- Laws of the Companies is still in force,
This Power of Attorney and Certificate may be sighed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duty called and held on the 15th day of December 1998.
RESOLVED: "fhat the signature of the President or a Vice President and the attesting signature of a Secretary or an Assistant Secretary
and die Scat of the Company may be affixed by facsimile on any Power of Attorney ... Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on theCompany."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held on the 5th day of
May, 1"4, and the following resolution of the Board of Directors of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the 1 Oth day o f May,1990,
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature of
any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this ! day of oc'*- , �
c� BXAL
000 +-
a
By: Brian M. Hodges
Vice President
-TO RkPO94 A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION
r a T-hZ CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND VOURCONTACT
If ORM&116N TO -
Zurich Surety Claims
12" Zurich Way
Schaumburg, IL 60196.1056
www.reoortsfcl ims(a ndchna,com
800-626-4577
Texas Important Notice
IMPORTANT NOTICE
To obtain information or matte a complaint:
You may call Zurich North America's toll -free telephone
number for information or to make a complaint at;
1-800-382-2150
You may contact the Texas Department of Insurance to
obtain information on companies, coverages, rights, or
complaints at:
1-800-252-3439
You may write the Texas Department of
Insurance:
P.O. Box 149104
Austin, TX 78714-9104
Fax (512) 490-1007
Web: www.tdi.texas.gov
E-mail: ConsumerProtection@tdi.texas.gov
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or
about a claim, you should contact the company first. If
the dispute is not resolved, you may contact the Texas
Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice Is for information only and does not become
a part or condition of the attached document.
ZURICH
"ISO IMPORTANTE
Para obtener informaci6n o para presentar una queja:
Usted puede Ilemar al numero de teldifono gratuito de
Zurich North America's Para obtener informaci6n o para
presenter una queja al:
1-800-U2-2160
Usted puede comunicarse con el Departamento de Se-
guros de Texas pare obtener informaci6n sobre com-
pefilas, coberturas, derechos, o quejas al:
1-800-252-3439
Usted puede escribir al Departamento
de Seguros de Texas m
P.O. Box 149104
Austin, TX 78714-91 D4
Fax: (512) 490-1007
Sitio web: www.tdi.texas.gov
E-mail: Consume rProtection@tdi.texas.gov
DISPUTAS POR PRIMAS DE SEGUROS O
RECLAMACIONES:
Si tiene una dispute relacionada con su prima de seguro
o con una reclamacion, usted debe comunicarse con la
compafila primero. Si la dispute no es resuelta, usted
puede comunicarse con el Departamento de Seguros de
Texas.
ADJUNTE ESTE AVISO A SU PbLIZA: Este aviso es
solamente para propdsitos informativos y no se con-
vierte an parte a en condicibn del documento adjunto.
U-CU 29&E (=16)
Page 1 of 1
(Form 22)
CONTRACTOR'S AFFIDAVIT OF FINAL PAYMENT AND RELEASE
THE STATE OF TEXAS
COUNTY OF Tarrant
BEFORE ME, the undersigned authority, on this day personally appeared.
Jim Schumann ("Affiant"), who, after being by me duly sworn, deposes and says that he is
Rebcon. LLC. , a corporation (corporation, partnership, trade name) of Tarrant County, State of
Texas (the "Contractor"), which said Contractor was awarded the contract dated the 11`h day of
March , 2022, for the construction of Las Vegas Trail at Normandale (the "Work"), for a total
consideration of $2,329,366.17 dollars to be paid to the said Contractor (the "Contract"), and that
Affiant has full power of authority to make this affidavit.
That City of Fort Worth (the "Owner") has approved the final estimate on said Work, and that
the said Contractor has fully satisfied and paid any and all claims that may be covered by Chapter 53
of the Texas Property Code, and Article 5160 of the Revised Civil Statutes of the State of Texas, or any
other applicable statutes or charter provisions, and that all just bills for labor and materials have been
paid and discharged by said Contractor insofar as they pertain to the Work in question.
That in addition to any funds which may have been previously paid by the Owner, the
Contractor hereby accepts the amount of $116,468.31 Dollars as FULL AND FINAL PAYMENT under
the aforementioned Contract, and hereby waives and releases any right Affiant and/or the Contractor
may have to pursue claims of any nature against the Owner arising out of or in any manner connected
with the performance of the Work and/or the Contract, including but not limited to claims of third
parties that supplied material and/or labor for the Work for or through the Contractor
("Subcontractors"), as well as claims for delay, additional compensation orfor recovery of liquidated
damages which may have been withheld by the Owner. The Contractor shall defend, hold harmless
and indemnify the Owner from any such claims from such Subcontractors. The Contractor further
releases the Owner from any claim or liability arising from any act or neglect of the Owner related to
or connected with the Contract. This affidavit is given pursuant to the final payment provisions of the
Contract, and shall not be deemed to alter or modify the terms and provisions of said Contract.
Rebcon, LLC.
BY Jim Schumann
(Affiant)
(Printed Name)
SUBSCRIBED AND SWORN TO BEFORE ME, this 20th day of October ,2023 _.
p A ,
RY pie, tiQ (Notary ublic in and for the State of Texas)
{Notary Seal} - : 'o ram'•. p f� ` j " U : z � n . r� = run-�'Y►n a �'C ILL ('� IGi 2Z
Ln9 +4 ; (Printed Name of Notary)
OF
M commission expires ON \7zZSs
rarri2b%o�\`\`\ Y P