NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Hulen Trails Phase 4
City Project No.:103489
Improvement Type(s): Water 0 Sewer 0
Original Contract Price:
$1,187,663.00
Amount of Approved Change Order(s):
$319,510.00
Revised Contract Amount:
$1,507,173.00
Total Cost of Work Complete:
$1,507,173.00
RvaMRanrurez(Oct27. 20 055 CDT
Contractor
Project Manager
Title
Moss Utilities
Company Name
Ala 4,
Joseph manry ( ct 27, 2023 12 In CDT
Project Inspector
,4 vadt, CmAwc,,� SZe�a P4, A , P, 6,
Arash Emami Saleh, Ph.D., P.E. (Oct 27, 202313:28 CDT)
Project Manager
91L.,I,n
Rebecca Diane Ovien IOct 27, 2023 13:29 CDT)
CFA Manager
_Z�
Lauren Prieur (Oct 27, 202313:37 CDT)
TPW Director
W;IQI
Asst. City Manager
Oct 27, 2023
Date
Oct 27, 2023
Date
Oct 27, 2023
Date
Oct 27, 2023
Date
Oct 27, 2023
Date
Oct 27, 2023
Date
Page 1 of 2
Notice of Project Completion
Project Name: Hulen Trails Phase 4
City Project No.: 103489
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 264 WD Days Charged: 302
Work Start Date: 6/13/2022 Work Complete Date: 10/20/2023
Completed number of Soil Lab Test: 807
Completed number of Water Test: 19
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name HULEN TRAILS PHASE 4
Contract Limits
Project Type Water/Sewer
City Project Numbers 103489
DOE Number 3489
Estimate Number 1 Payment Number 1 For Period Ending 10/20/2023
WD
City Secretary Contract Number Contract Time 12WD
Contract Date 4/8/2022 Days Charged to Date 302
Project Manager NA Contract is 100.00 Complete
Contractor MOSS UTILITIES, LLC
18631 REMBRANDT TERRACE
DALLAS , TX 75287
Inspectors Glover / Cisneros
Monday, October 23, 2023 Page 1 of 5
City Project Numbers 103489
Contract Name HULEN TRAILS PHASE 4
Contract Limits
Project Type Water/Sewer
Project Funding
UNIT I WATER
DOE Number
3489
Estimate Number
1
Payment Number
1
For Period Ending
10/20/2023
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
---------------------------------------
1
4"-12" Pressure Plug
3 EA
$610.00
$1,830.00
3
$1,830.00
2
Trench Safety
3544 LF
$1.00
$3,544.00
3544
$3,544.00
3
Ductile Iron Water Fittings w/Restraint
0.3 TN
$138,900.00
$41,670.00
0.3
$41,670.00
4
8" PVC Water Pipe
3392 LF
$52.00
$176,384.00
3392
$176,384.00
5
8" PVC Water Pipe, CSS Backtll
40 LF
$77.00
$3,080.00
40
$3,080.00
6
12" PVC Water Pipe
112 LF
$106.00
$11,872.00
112
$11,872.00
7
Std. Fire Hydrant Assembly w/6" Gate Valve &
2 EA
$9,100.00
$18,200.00
2
$18,200.00
Valve Box
8
Connect to Existing 8" W.L. Stub -Out
3 EA
$2,320.00
$6,960.00
3
$6,960.00
9
Connection to Existing 4%12" Water Main
1 EA
$3,070.00
$3,070.00
1
$3,070.00
10
1" Domestic Water Services
154 EA
$1,300.00
$200,200.00
154
$200,200.00
11
8"Gate Valve & Valve Box
8 EA
$2,120.00
$16,960.00
8
$16,960.00
Sub -Total of Previous Unit $483,770.00 $483,770.00
UNIT H SEWER
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
12
Post -CCTV Inspection (CO#1)
5686 LF
$3.00
$17,058.00
5686
$17,058.00
13
Vacuum Test Manholes (CO#1)
19 EA
$200.00
$3,800.00
19
$3,800.00
14
Trench Safety (CO#1)
5686 LF
$1.00
$5,686.00
5686
$5,686.00
15
Tench Water Stops
10 EA
$2,350.00
$23,500.00
10
$23,500.00
16
SDR-26 4" Sewer Services
153 EA
$1,430.00
$218,790.00
153
$218,790.00
17
8" SDR-26 PVC Sewer Pipe (CO#1)
4837 LF
$54.00
$261,198.00
4837
$261,198.00
18
8" PVC Sanitary Sewer Pipe w/CSS Backfill
290 LF
$99.50
$28,855.00
290
$28,855.00
19
Epoxy Manhole Liner (CO#1)
59 VF
$370.00
$21,830.00
59
$21,830.00
20
4" Std. Dia. Manhole (CO#1)
19 EA
$6,300.00
$119,700.00
19
$119,700.00
21
4' Extra Depth Manhole (CO#1)
105 VF
$390.00
$40,950.00
105
$40,950.00
22
Connect to Exisiting 8" Sewer (CO#1)
0 EA
$3,070.00
$0.00
0
$0.00
23
15"Pressure Plug (CO#1)
1 EA
$10,856.00
$10,856.00
1
$10,856.00
24
Cut;Plug, & Abandon 8" Sewer (CO#1)
1 EA
$14,465.00
$14,465.00
1
$14,465.00
25
15" SDR-26 PVC Sanitatary Sewer Pipe (CO#1)
75 LF
$265.00
$19,875.00
75
$19,875.00
Monday, October 23, 2023 Page 2 of 5
City Project Numbers 103489
Contract Name HULEN TRAILS PHASE 4
Contract Limits
Project Type Water/Sewer
Project Funding
DOE Number
3489
Estimate Number
1
Payment Number
1
For Period Ending
10/20/2023
26 18" SDR-26 PVC Sanitatary Sewer Pipe (CO#1) 484 LF $335.00 $162,140.00
27 Connect to Existing36" Sewerw/CIP 5' Manhole 1 EA $74,700.00 $74,700.00
(CO #1)
Sub -Total of Previous Unit $1,023,403.00
484 $162,140.00
1 $74,700.00
$1,023,403.00
Monday, October 23, 2023 Page 3 of 5
City Project Numbers 103489
Contract Name HULEN TRAILS PHASE 4
Contract Limits
Project Type Water/Sewer
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number #1
DOE Number
3489
Estimate Number
1
Payment Number
1
For Period Ending
10/20/2023
$1,187,663.00
$319,510.00
Total Contract Price $1,507,173.00
Total Cost of Work Completed $1,507,173.00
Less % Retained $0.00
Net Earned $1,507,173.00
Earned This Period $1,507,173.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$1,507,173.00
Monday, October 23, 2023 Page 4 of 5
City Project Numbers 103489
Contract Name HULEN TRAILS PHASE 4
Contract Limits
Project Type Water/Sewer
Project Funding
Project Manager NA
Inspectors Glover / Cisneros
Contractor MOSS UTILITIES, LLC
18631 REMBRANDT TERRACE
DALLAS, TX 75287
DOE Number
3489
Estimate Number
1
Payment Number
1
For Period Ending
10/20/2023
City Secretary Contract Number
Contract Date
4/8/2022
Contract Time
129 WD
Days Charged to Date
302 WD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,507,173.00
Less % Retained
$0.00
Net Earned
$1,507,173.00
Earned This Period $1,507,173.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$1,507,173.00
Monday, October 23, 2023 Page 5 of 5
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME:
Hulen Trails - Phase 4
CHANGE
CONTRACT:
A Water/Sewer/Storm Drain, B Paving, C Street Lights
ORDER No:
CFA #
22-0034 CITY PARTICIPATION: 0
CITY PROJECT #
103489
1
FID #
30114-0200431-103489-EO7685
FILE #
W-2787, X-27011
INSPECTOR: Steve Cisneros Phone No: 817-996-5855
PROJECT MANAGER: Yogesh Patel Phone No: 817-392-2373
APPROVED
By Yogesh Patel, P.E. at 9:27 am, Sep 12, 2022
CONTRACT UNIT
WATER
SEWER
PAVING
DRAINAGE
GRADING
STREETLIGHTS
CONTRACT
Devolopor
Cost
City Cost
Dovolo or Cost
City Cost
Dovelopor
Cost
CI Cost
Developer Cost
City Cost
Dovelopor
Cost
CitY Cost
Dovelopor
Cost
CItY Cost
DAYS
ORIGINAL CONTRACT
$493,770.00
$0.00
$703,893.00
$0.00
S2,494,687.65
$0.00
$1.445,835.00
$0.00
S0.00
$0.00
$270,089.23
$0.00
264
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
$483,770.00
$0.00
$703,893.00
$0.00
$2,494,687.65
$0.00
$1,445,835.00
$0.00
$0.00
S0.00
$270,089.23
$0.00
264
AMOUNT OF PROP. CHANGE ORDER
$0.00
$319,510.00
$0.00
$0.00
$0.00
$0.00
35
REVISED CONTRACT AMOUNT
$483.770.00
$0.00
$1,023,403.00
$0.00
$2,494,687.65
$0.00
$1,445,835.00
50.00
$0.00
$0.00
$270,089.23
$0.00
299
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$483,770.00
$1,023,403.00
S2,494,687.65
S1,445,835.00
$270.089.23
REVISED COST SHARE
Dev. Cost: $5,717,784.88
City Cost: $0.00
TOTAL REVISED CONTRACT
$5,717,784.86
PAY REM #
CITY BID ITEM
#
V
QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
TOTAL
0241.1118
NEW
1
EA
15" Pressure Plug
$10,856.00
$10.856.00
02412103
NEW
1
EA
Cut, Plug, & Abandon 8" Sewer
S14,465.00
$14,465.00
3301.0002
12
565
LF
Post -CCTV Inspection
$3.00
$1,695.00
3301.0101
13
2
EA
Vacuum Test Manholes
$200.00
$400.00
3305.0109
14
565
LF
Trench Safety
$1.00
$565.00
3331.4115
17
6
LF
8" SDR-26 PVC Sanitary Sewer Pie
$54.00
$324.00
3331.4215
NEW
75
LF
15" SDR-26 PVC Sanitary Sewer Pie
$265.00
$19,875.00
3331A225
NEW
484
LF
18" SDR-26 PVC Sanitary Sewer Pie
$335.00
$162,140.00
3339.0001
19
39
VF
Epoxy Manhole Liner
$370.00
$14,430.0
3339.1001
20
2
EA
4' Std. Dia. Manhole
$6,300.00
$12,600.0
3339.1003
21
27
VF
4' Extra Depth Manhole
$390.00
$10.530.0
9999.0003
22
(1)
EA
Connect to Existing 8" Sewer
$3,070.00
$3,070.00)
9999.0004
NEW
1
EA
Connect to Existing 36" Sewer w/CIP 5' Manhole w/coatin , trench water stop, & CBS incesement
$74,700.00
$74 700.00
TOTAL
1 $319 510,00
REASONS FOR CHANGE ORDER
1. Revised Sanitary Sewer Design to Include portion of Sewell Tract S.S. Line through S Hulen Street.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED: APPROVED:
Gmcivil Bloomfield Homes, LP D.R. Horton Moss Utilities, LLC
_
Name: Matt Baacke, P.E. Name: t('ri' r G rf'o-: c 0. Justin Bosworth Name: Name: Ken Moore
Title: Project Engineer Title: De-4e\,.D?1-keV* &'A4x eC Title: Director of Land Title: Project Manager
Revised: 10-12-2011 Page 1
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
October 20, 2023
Moss Utilities
3300 Rock Island Rd.
Irving, Tx 75060
RE: Acceptance Letter
Project Name: Hulen Trails Phase 4
Project Type: Water & Sanitary Sewer
City Project No.: 103489
To Whom It May Concern:
On October 3, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on October 20, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on October 20, 2023, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2373.
Sincerely,
.4ra;57k C-mAwu La"
Amsh Emami Saleh, Ph.D., P.E. (Oct 27, 202313:28 CDT)
Arash Emami Saleh, Project Manager
Cc: Joseph Manry, Inspector
Mike Glover, Inspection Supervisor
Randy Horton, Senior Inspector
Andrew Goodman, Program Manager
Goodwin & Marshall, Consultant
Moss Utilities, Contractor
Bloomfield Homes, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state and
county aforesaid, on this day personally appeared Garrett Moss/President of
Moss Utilities, LLC known tome to be a credible person, who being
by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort
Worth has been paid in full; That there are no claims pending for personal injury
and/or property damages; On Contract de r' ed as;
City Project No: 103489 ; CFA No: 21-0082
:•
Subscribed and sworn before me on this date,
JFSSIGA OCANx UAVYS
'wx<:
�,_N JFS PuAlic. Saxe c1 i.�E1a
_ Camin. Hmins 72-0&?at6
",h__••. knterv14T23s$Po41 11
President
10/23/2023
y% Notary Public
Dallas, Texas
Title
CONSENT OF SURETY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
Bond No: GSB5900055
OWNER
ARCHITECT
CONTRACTOR
SURETY
0
OTHER
11
TO OWNER: ARCHITECTS PROJECT NO.:
(Name and address)
Bloomfield Homes, LP
1050 E Hwy 114, Suite 210 CONTRACT FOR: OCP: $2,672,139.00
Southlake, TX 76092 FCP: $3,097,894.00
PROJECT: CONTRACT DATED:
(Name and address)
Hulen Trails Phase 4 - install 36" wastewater lines, 16" waterlines using open cut method
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert name and address of Surety)
The Gray Insurance Company
P.O. BOX 6202
Metairie, LA 70009
,SURETY,
on bond of
(Insert name and address of Contractor)
Moss Utilities, LLC
11050 Ables Lane
Dallas, TX 75229 CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of any
of its obligations to
(Insert name and address of Owner)
Bloomfield Homes, LP
1050 E Hwy 114, Suite 210
Southlake, TX 76092 OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: October 24, 2023
(Insert in writing the month followed by the numeric date and year.)
Attest:�imck—
Ashlyn Simchik, itness
The Gray Insurance Company
(Surely)
�i 0?
(Signature of authorized represenxtive)
Sean McCauley; Jr; Attorney -in -Fact
(Printed name amid tithe)
3-21341GE 10(01 -
XDP
McCauley Bond Agency
10/24/2023 09:58 4188108018099
THE GRAY INSURANCE COMPANY
THE GRAY CASUALTY & SURETY COMPANY
GENERAL POWER OF ATTORNEY
Bond Number: GSB5900055 Principal: Moss Utilities
Project: Hulen Trails Ph 4
KNOW ALL BY THESE PRESENTS, THAT The Gray Insurance Company and The Gray Casualty & Surety Company, corporations duly
organized and existing under the laws of Louisiana, and having their principal offices in Metairie, Louisiana, do hereby make, constitute, and
appoint: Sean McCauley, Jarrod Yost, Sarah Timmons Claudia Nunez, Ashlyn Simehik, and Bridget Truxillo of Dallas, Texas jointly and
severally on behalf of each of the Companies named above its true and lawful Attorney(s)-in-Fact, to make, execute, seal and deliver, for and on its
behalf and as its deed, bonds, or other writings obligatory in the nature of a bond, as surety, contracts of suretyship as are or may be required or
permitted by law, regulation, contract or otherwise, provided that no bond or undertaking or contract of suretyship executed under this authority
shall exceed the amount of
$25,000,000.00.
This Power of Attorney is granted and is signed by facsimile under and by the authority of the following Resolutions adopted by the Boards of
Directors of both The Gray Insurance Company and The Gray Casualty & Surety Company at meetings duly called and held on the 261 day of
June, 2003.
"RESOLVED, that the President, Executive Vice President, any Vice President, or the Secretary be and each or any of them hereby is authorized to
execute a power of Attorney qualifying the attorney named in the given Power of Attorney to execute on behalf of the Company bonds,
undertakings, and all contracts of surety, and that each or any of them is hereby authorized to attest to the execution of such Power of Attorney, and
to attach the seal of the Company; and it is
FURTHER RESOLVED, that the signature of such officers and the seal of the Company may be affixed to any such Power of Attorney or to any
certificate relating thereto by facsimile, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be
binding upon the Company now and in the future when so affixed with regard to any bond, undertaking or contract of surety to which it is attached.
IN WITNESS WHEREOF, The Gray Insurance Company and The Gray Casualty & Surety Company have caused their official seals to be hereinto
affixed, and these presents to be signed by their authorized officers this 4th day of November, 2022.
o= S EAL By: Michael T. Gray Cullen S. Piske `= SEAL j;
President President
The Gray Insurance Company The Gray Casualty & Surety Company
State of Louisiana
ss:
Parish of Jefferson
On this 4ffi day of November, 2022, before me, a Notary Public, personally appeared Michael T. Gray, President of The Gray Insurance
Company, and Cullen S. Piske, President of The Gray Casualty & Surety Company, personally known to me, being duly sworn, acknowledged
that they signed the above Power of Attorney and affixed the seals of the companies as officers of, and acknowledged said instrument to be the
voluntary act and deed, of their companies.
Leigh Anne Henican
a Notary Public
Notary ID N0.92653 Leigh Anne Henican
Notary Public, Parish of Orleans State of Louisiana
' Orleans Parish, Louisiana My Commission is for Life
I, Mark S. Manguno, Secretary of The Gray Insurance Company, do hereby certify that the above and forgoing is a true and correct copy of a
Power of Attorney given by the companies, which is still in full force and effect. IN WITNESS WHEREOF, I have set my hand and
affixed the seals of/the Company this 24th day of October 2023
�r���iM'• �� �''IVianb
I, Leigh Anne Henican, Secretary of The Gray Casualty & Surety Company , do hereby certify that the above and forgoing is a true and correct
copy of a Power of Attorney given by the companies, which is still in fvill force and effect. IN WITNESS WHEREOF, I have set my hand
and affixed the seals of the Company this 24th day of October _ . ,. 2023
So «.Ny
i10
SEAL
d S
t �,t
STATE OF TEXAS
STATE BOARD OF INSURANCE
..,
P an Com No.
Certificate U 7006
i Company
THIS IS TO CERTIFY THAT
CERTIFICATE OF AUTHORITY
THE GRAY INSURANCE COMPANY
METAIRIE, LOUISIANA
08-93774
has complied with the laws of the State of Texas applicable thereto and is hereby authorized to trans-
act the business of
Fire; Allied Coverages; Hail, growing crops only; Rain; Inland Marine; Ocean
Marine; Aircraft --Liability & Physical Damage; Accident; Health; Workers'
Compensation & Employers' Liability; Employers' Liability; Automobile --
Liability & Physical Damage; Liability other than Automobile; Fidelity &
Surety; Glass; Burglary & Theft; Forgery; Boiler & Machinery; and Reinsurance
on all lines authorized to be written on a direct basis
insurance within the State of Texas. This Certificate of Authority shall be in full force and effect until
it is revoked, canceled or suspended according to law.
IN TESTIMONY WHEREOF, witness my
hand and seal of office at Austin, Texas, this
• D.
* � -
Deputy Commissioner