HomeMy WebLinkAboutContract 59066-CO1FO RI' WORT 13 Project Name: Project No,(s): Project Description: Contractor: City of Fort Worth Change Order Request Sanitary Sewer Rehabilitation, Contract 113, Part 3 City Sec No.: 56002-0600430/0700430-102785-001780 M&C: 22-0 124 City Proj. No.: CSC No. 59066-CO1 59066 1027 85 Replacement of Existing Sanitary Sewer Mains and Water Main on Tierney Rd, South Hampshire Blvd & various easements William J. Schultz, Inc. dba Circle C Construction f City Project Mgr. Dena Johnson Phone Number: 817-392-7866 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Change Order # City Inspector: Phone Number: Water Date: 10/10/2023 Paul Gi eg er 817-223-2258 Sewer Paving $591,810.15 $2,102,226.65 $604,600.00 $591,810.15 $2,102,226.65 $604,600.00 $0.00 $52,375.00 $0.00 Totals $3,298,636.80 $591,810.15 $2,154,601.65 $604,600.00 $52,375.00 $3,351,011.80 Contract Time (Calender days) 300 300 $59,181.00 $105,111.00 $30,230.00 $194,522.00 $59,181.00 $105,111.00 $30,230.00 $194,522.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1.59% $4,123,296.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 1 provides for the following: •Open cut installation to repair sags in a sewer main segment that was originally proposed to be pipe enlarged •By other than open cut to repair sags in a sewer main segment that was originally proposed to be pipe enlarged •By other than open cut service re-route on lateral L-1026 •Investigation to locate a previously unknown service line •The deletions of pay item quantity for 475 feet of a project sewer main that had been previously rehabilitated by pipe enlargement via another project along with related service lines that had been previously reconnected to the indicated lateral. It is understood and agreed That the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date %Ya mJ.Schultz,IN.dbaCirdeCConsIcudonCo. Teri Skelly /�'<_5-Ze- /D -/ 9-l. 4 Ins�ctor , Date Project Man. per U Date �✓au� l{,��1�%;T�� =�ivt�erL 10/19/23 Director (Water Dept) Date Cor tructi./Supervisor Date T, S. Oct 23, 2023 `0/ 17; j ` nnsmpner Hai e.locza, mzaosss coil Senior Assistant City Attorney Date Assistant City Manager Date Wm t Oct 27, 2023 Oct 27, 2023 H. ab A ? Council Action If Required) MC Number N/A M&C Date Approved N/A� OFFIC AL RECORD CITY SECRETARY FT. WORTH, TX FORT WWORTH Project Name Project No.(s): Project Description Contractor City Project Mgr. City of Fort Worth Change Order Additions Sanitary Sewer Rehabilitation, Contract 113, Part 3 56002-060043010700430-102785-001780 City Sec No.: DOE No, 22-0124j City Proj. No.: 59066 102785 Replacement of Existing Sanitary Sewer Mains and Water Main on Tiemey Rd, South Hampshire Blvd & various easements William J. Schultz, Inc. dba Circle C Construction Co. Dena Johnson ADDITIONS Change Order: City Inspector 1 Date: 10110/2023 Paul Gieger ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 52 53 54 55 Pipe Enlargement, Open Cut Point Repair Pipe Enlargement BOTOC Point Repair Service Reroute Investigation BOTOC Service Reroute L-1026* Sewer Sewer Sewer Sewer 250.00 65.00 1.00 25.00 LF LF LS LF $145,00 $1,500.00 $5,000.00 $1,500.00 $36,250.00 $97,500.00 $5,000,00 $37,500.00 Page 2 of 4 Water Sewer $176,250.00 Paving Additions Sub Total $176,250.00 FORT WORTJJ Project Name Project No.(s): Project Description Contractor City Project Mgr. City of Fort Worth Change Order Deletions Sanitary Sewer Rehabilitation, Contract 113, Part 3 56002-060043010700430-102785-001780 DOE No. City Sec No.: City Proj. No.: 59066 102785 Replacement of Existing Sanitary Sewer Mains and Water Main on Tierney Rd, South Hampshire Blvd & various easements William J. Schultz, Inc. dba Circle C Construction Co. Dena Johnson Change Order: City Inspector: DELETIONS 1 Date 10/1012023 Paul Gieger ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 2 11 51 8" Pipe Enlargement Service Reinstatment, Pipe Enlargement Sanitary Sewer Construction Allowance Sewer 475.0 LF $145.00 $68,875.00 Sewer 10.0 EA $1,500.00 $15,000.00 Sewer 0.8 LS $50,000.00 $40,000.00 Page 3 of 4 Water Sewer $123,875,00 Paving Deletions Sub Total $123,875.00 MWBE Sub MIWBE Breakdown for this Change Order Type of Service Amount for this CO Previous Change Orders co # DATE AMOUNT Total $0.00 Page 4 of 4 Zavala / Davis >1 > U Time Schedule O d E F N LL 12 Hours Type of Work Tcs 4) Mapsco Page m Size of Pipe W ozs ZN Work Order # Location of Project I Keller Haslet Rd. & Wat Rd. II will need this valve crew, for Friday the 20th of October 2023. Thanks' Paul L. Gieger it Z LL 0 I 102994 Inspector IGieger, Paul (817)223-2258 10/10/2023 Sanitary Sewer Rehabilitation, Contract 113, Part 3 CPN 102785 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Delia Johtison Signature Dena Johnson Name of Employee Project Manager Title ATTEST: FORT q�d p' �oo o009d Apo 0.oC daa aEao 54o Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX