Loading...
HomeMy WebLinkAboutContract 31158 AMEND,blENT NO. 4 STATE OF TEXAS CITY SECRETARY CONTRACT NO., (M&C Needed) COUNTY OF TARRANT WHEREAS, the City Of Fort Worth (City) and Lockwood, Andrews & Newman, Inc. , (Engineer) made and entered into City Secretary Contract No. 28790, (the Contract) which was authorized by the City Council by M&C C-19585 on the 13th day of May, 2003 and; subsequently revised by three Previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Sanitary Sewer Rehabilitation Contract 1XVII (67) WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through' their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the addition- al engineering services specified in M&C C-20452, adopted by the City Council on the 21st day of December, 20041 and further amplified in a proposal letter dated October 11, 2004, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be Performed by Engineer total $80,710.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $399,076.00. ZP Mc V 15 R IKI 'uf I Gir AL 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this th e day of. 2005, in Fort Worth, Tarrant County, Texas. ATTEST: L C rlt-racc- A utt.orilzatioa Marty Hendri-4 City Secretary APPROVAL RECOMMENDED: U Tcf A. Douglas Rademaker, P.E. 7IM-1a A 'Ott Director, Department of Assistant City Manager Engineering LOCKWOOD, ANDREWS & NEWMAN, INC. Engine By: Name: Patrick fEZJolly, P.E. , Business Grour) Director Sinclair Building, 512 Main St. , Suite 1001 Fort- Worth, TX 76109 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney -2- 7u, m N ., i*awVV 111Ni.�4L1.J411t✓Y 41!YY rage ! of 7 FORTWORTIJ wr w- -,,wt-,,C'F K. -4� Home cou"AcK Agenda I m&c 1 Employee Directory i morning Report P Ads i pRs I rT otdine I Departments I Site Map Print 7 &I- COUNCIL ACTION: Approved on 1212112004-Ordinance No. 16247 DATE: 12/2112004 REFERENCE NO.: **C-20452 LOG NAME: 30LOCKWOOD A4 CODE: C TYPE: CONSENT PUBLIC HEARING: NO SUBJECT: Authorize Execution of Amendment No, 4 to Engineering Agreement with Lockwood, Andrews & Newnam, Inc., for Sanitary Sewer Rehabilitation Contract LXVII and Adopt Appropriation Ordinance RECOM MENDATION: It is recommended that the City Council authorize the City Manager to: 1. Authorize Execution of Amendment No. 4 to Engineering Agreement with Lockwood, Andrews & Nenam, Inc. for Sanitary Sewer Rehabilitation Contract LXVII (67); 2. Authorize the transfer of$80,710.00 from the Water& Sewer Operating Fund to the Sewer Capital Project Fund; and 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Project Fund in the amount of$80,710.00 from the available funds. DISCUSSION: On May 13, 2003 (M&C C-19575), the City Council authorized the City Manager to execute an engineering agreement with Lockwood, Andrews & Newnam, Inc. in the amount of$260,706.00 for the design of sanitary sewer rehabilitation contract LXVII (67). The contract was subsequently revised by three previous amendments totaling $61,350.00 that are further described as follows: • Amendment No. 1 in the amount of$22,350.00 provided survey and engineering design services for the replacement of additional sanitary sewer mains as requested by the Water Department; • Amendment No. 2 in the amount of$20,410.00 provided for the rerouting of sewer main M-132 currently located on private property into public right-of-way, and • Amendment No. 3 in the amount of$14,900.00 allowed for the preparation of an alignment study that provided several alternate routes for a sewer main to covey wastewater from the redevelopment of the Montgomery Ward property and the surrounding area. • Amendment No. 4 will rwovide for the followin • The survey and design of the selected route from the alignment study conducted in Amendment No. 3; • The rerouting of a segment of a sanitary sewer main in conflict with the proposed Trinity Vision Improvements; r z • Additional efforts in construction phase services and reproduction costs; and http://www.cfwnet.org/council _packet/me_revie ,a p?]]D=30 councildate=12/'21/ 004 Z/ )` i C4 J o The preparation of additional temporary and permanent construction easements. Lockwood, Andrews & Newnam, Inc. proposes to perform these additional services for a lump sum fee of $80,710.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. Lockwood, Andrews & Newnam, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 15% M/WBE participation on this Amendment No. 4. This project is located in COUNCIL DISTRICT 9, Mapsco 62X and 62Y. FISCAL INFORMATIONI—CERTIFICATION: The Finance Director certifies that upon approval and completion of recommendation 1, and the adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fumd/AccountICenters 1&2) PS58 472045 020§80175790 $84,710.04 4,PS58 531200 _470580175790 $80 710,00 2) PS54 531200 070584175790 $84,71 0.00 PE51 538070 0709020 SK-710.40 Submitted for City Marc Oft (8476) Originating Department Head: A. Douglas Rademaker(6157) Additional Information Contact: A. Douglas Rademaker(6157) ATTACHMENTS 30LOCKWOOD A4 ord afttL Aff IN. WL? %7 '5 http-//'www,cA-vnet.org/council_packet/me—review.asp"ID---'1053&councildate=12/21/2 In I<ai 44iLl� 4 LanLockwood, Andrews & Newnan , Inc. ,7E- , C A L Y u-C,,y October 11, 2004 Mr. Liam Conlon City of Fort Worth Water Department—Engineering Services 900 Monroe Street, Suite 201 Fort Worth, Texas 76102 Re: Revised Amendment No. 4 Survey and Engineering Design Services for White Settlement Sewer Main Sanitary Sewer Rehabilitation Contract LXV11 (67) DOE#4144 Dear Mr. Conlon: As discussed, we have revised this Amendment No. 4 for the above referenced project. The amendment corresponds to the performance of survey and engineering design services for the redesign of the White Settlement Road sewer main that is to be constructed to serve the north portion of the Montgomery Ward property and areas to the west including the Linwood Addition. Based upon the results of the alternative alignment study as prepared under the requirements of Amendment No. 3 to our contract, the preferred design (Alternate C) will direct sewage flow from the area, to the north on Foch Street and connect with the M-248 trunk sewer main located on the south bank of the West Fork of the Trinity River. This new alignment will require permitting through the Tarrant Regional Water District for approval to cross under the river levee and construction of a junction box for connection to the M-248 trunk sewer main. The alternative alignment for the sewer main is needed in order to avoid conflict with the Trinity River Vision (TRV) project that will be located in the area to the cast of the Fort Worth and Western Railroad right-of-way. The selected alternative will require the survey and engineering design of approximately 5,200 linear feet of sewer main ranging is size from 8 to 24-inches in diameter. This is in addition to the survey and design work previously completed under the original contract scope. A revised preliminary opinion of construction costs for the new sewer main portions to be designed is $921,696. Based upon the work to be performed as described above, a lump sum fee addition of$80,710 is hereby requested. This fee has been adjusted in recognition of the previously performed data collection and design document preparation that can be used in support of the additional sewer line design. A summary of the contract values affected by the amendments Including Amendment No. 4 as proposed herein follows at the bottom of this letter, Tl' 'J K' H. 307 West 7th Street,Suite 1250 Fort Worth,Texas 76102 817-820,0420 Fax:817.820.0441 Mr. Liam Conlon October 11, 2004 Page Two $11,748 that will be performed by our M/WBE sub-consultant, This amount translates to 14.56% of the amendment. Thank you for your consideration. Please contact me should you require any additional information. We look forward to continuing our work with you on this project. Sincerely, LOCKWOOD,ANDREWS, & NEWNANI,INC. aig P. Schellbach, P.E. Civil T ivil Team Manager Original Contract Amount: $260,706.00 Amendment No. I Amount: $22,350.00 Amendment No. 2 Amount: $20,410.00 Amendment No. 3 Amount: $14,900.00 Amendment No. 4 Amount: $80,710.00 Total Revised Contract: $399,076.00 '�a- ke-�'ar" k1J, I EXHIBIT "13-313" FEE SUMMARY CAPITAL IMPROVEMENT PROJECTS FOCH STREET/WHITE SETTLEMENT ROAD/ADOLPH STREET ALIGNMENT (Fee Based on Percentage Of Construction Cost) Description -T- Total — Opinion of Probable Construction Cost $921,696 Curve A x 0.85 6.6% Engineerinq Desi n Engin aering Design (sub)* $60,832 Survey Design (sub) $2,200 $7,080 Reproduction (prime) $2 960 Reproduction (sub)-- , Additional Services (Permits) $0 Additional Services (PR) $3,500 ROW Ma s, Esmts. $2,750 Additional Services ROW Maps.Esmts, -sub} smt 0 _� pr $1 Services (Esmt& ROE-prime}Additional S LLE & R ime $1,1201 Sewer Fee 10%for Sub $1 068 TOTAL FEE Sub engineering is included with prime's $ deli n fee, but subject to 10°10 ockwoW.Andrews Newnam,inc, 155-00935-007 z", September 24,2004 P mgmtkAmend 4 B-3 Fee Est R LOCKWOOD, ANDREWS & NEWNAm , INC. OPINION OF PROBABLE CONSTRUCTION COST PART 2 -FOCH/WHITE SETTLEMENT ROAD ALIGNMENT BASED UPON CONCEPTUAL PLAN DESIGN PROJECT: CONTRACT 67 SANITARY SEWER REHABILITATION FORT WORTH WATER DEPARTMENT PROJECT NO. PS58-070580175790 FORT WORTH DEPARTMENT OF ENGINEERING NO. 4144 DATE- September 24,2004 Item No. Description Unit Foch/White Settlement-Street Alignment Quantit Unit Price Amount 1 24- All Depths LF 1,800 $90 $162,000 2 24"Sanitary(ze-w by Bore/42"Steel Casing LF 200 $350 $70,000 3 12"Sanita Sewer,All Depths LF 3,100 4 $50 $155,00n 10"Sanita Sewer,- the LF 2 $48 $960 5 8"Sanita Sewer,An nisqnthe LF 80 $4 $3,600 6 Post Construct-b-TI, Ins ection LF 5,200 $2 $10,400 7 Trench Safety zy-q- LF 5,000 $2 $10,000 8 Junction Box EA 1 $25,000 $25,000 9 5'Sanita Sewer M__qhnj,3 w�F___ EA 2 $2,900 10 5'Dro Sewer RA-k-1- A,Des EA 4 $3,600 $14,400 11 Additional De-11,for 55'r'"--ater Manhole VF 40 $150 $6,000 12 4'Sanita Sewer Manhole,A— ep EA 9 $2,000 $18,000 13 4'Dro Sewer hAp-h-1- r,'Deep EA - 4 $3,000 $12,000 14 Additional Dept for --Diameter Manhole VF 16 $120 $1,920 15 Interior Protective Manhole Coverin SF 1,850 $13 $24,050 16 Concrete Manhole Collar EA 19 $130 $2,470 17 Waterti ht Manhole Inserts EA 19 $100 $1,900 18 Vacuum Test Manholes EA 19 $145 $2,755 19 Remove Sanita-,Sewer­"p-hole EA 9 $600 $5,400 20 Cut, Plug,Grout&Abandon Existing Sanitary Sewer LF 2,200 $22 $48,400 21 Cut, Plu &Abandon,Existing Sanitary Sewer EA 14 22 $225 $3,150 Remove and Rq-1--- 1""RCP Storm Drain LF 100 $80 $8,000 23 Permanent HMAC Pavement Repair LF 3,200 $45 $144,000 24 Permanent Concrete Pavement Repair LF 1,550 $60 $93,000 25 Si nal Detector Loo Rs air LS 1 $3,500 $3,500 26 Utili RepairsAdjustments LS 0 $25,000 $0 27 Traffic Control Mtn 0 $2,500 $0 28 Remove and Replace Concrete Sidewalk SF 400 $8 $3,200 29 SW3P LS 1 $3,000 $3,000 30 Type'B'Concrete CY 0 1 $85 $0 1 31 pe'E'Concrete CY 0 $75 $0 32 Crushed Limeston-e for Misc. Placement 0 $10 $0 33 Wash y Sub-Total $837,905 Contingena 10% $83,791 TOTAL Lockw-jod,Andrews,Nawnam, Inc, 155-00935-007 September 24,2004 docs\estimateskArnend 4 New Design_R Page 1 of 1