Loading...
HomeMy WebLinkAboutContract 31161 AMENDMENT NO. 1 STATE OF TEXAS $ CITY SECRETARY CONTRACT NO. (No M&C Needed) COUNTY OF TARRANI' $ WHEREAS, the City ,of Fort Worth (City) and Wade & Associates, Inc. , (Engineer) made and entered into City Secretary Contract No. 28404, (the Contract) which was authorized by the City Council by M&C C-19437 on the 21st day of January 2003; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Sanitary Sewer Rehabilitation Contract LVI (56) . WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE; City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 13, 2004, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $22, 916.50 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that- tho total fee paid by the City for all work and services shall not exceed the sum of $312, 042 .50. ORIGINAL F1 o1 r 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full. force and effect. bl EXECUTED on this the day of 1 200I ', in Fort Worth, Tarrant County, Texas. ATTEST: ont ` Contract Authorization Marty Hendrix, City Secretary Date APPROVAL RECOMMENDED: AP VED: G A. Douglas Rademaker, P.E. Mar A. O t Director, Department of Assistant City Manager Engineering Wade & Associates, Inc. ENGINEE By: Name: Mark G. _Wade, P.E. President_ 6701 Brentwood Stair Road Fort Worth. TX 76112 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney CITY ' WHOE ®Q•`9JLB'�Sg 08Yt°.;i 13 December,2004 ATTN: Mr.Mike Domenech,P.E. Department of Engineering City of Fort Worth 900 Monroe Street, Suite 200 Fort Worth,Texas 76102 RE: Submission of REVISED Contract Amendment No. 1, Contract LVI(56)Rehabilitation and Improvements Project No:PS58-070580175110,DOE No. 3765 WADE File No. 0211 Mr.Domenech: Per your instructions, we have revised our Contract Amendment No. 1 request to reflect the appropriate changes. The revised amendment request for this agreement addresses additional engineering services that were previously authorized by the Fort Worth Water Department on the above referenced project for sanitary sewer improvements in the Henderson and W. Belknap Streetarea. The original scope of world required the re-route L-39 from its present location in an easement between Belknap and Weatherford Streets. Our conceptual plan for L-39 intended to locate the new sewer alignment in Belknap St. During the formal review meeting, we were asked to modify this plan to move the proposed sewer line into Weatherford St. Once preliminary plans were produced for this location, a field visit was conducted to examine other area sewer improvements being designed to serve a new development project. Based on the field visit, we were instructed to move the proposed L-39 realignment back to our original Belknap location. The overall design revisions for this location resulted in the collection of additional topographic survey data for Weatherford alignment and,it.required us to address the downstream portion of L-39 from Sta. 5+04 to the M-15 R improvements, east of the Weatherford Traffic Circle. As a result, the overall design footage for L-39 increased from 466 LF to 1,084 LF. Therefore, the design footage was increased by 618 LF for L-39 and approximately 274 LF of 6-inch sewer service relocations were also designed at three locations. Additionally, we were also instructed to address the rehabilitation design of L-44 in Henderson St. from Sta. 10+95E to 1+73 at this time. Sewer line L-44 was not included in the original scope of work,but it was added to facilitate there-route of L-39 and complete the sewer system improvements in this area. The addition of L-44 increased the design footage by 490 LF for this project: This location also required the design of 17 LF for a 6-inch sewer service-relocation: Therefore, the Henderson/Belknap St. area sewer improvements have resulted in a total~sewer design footage increase of 1,109 LF for this project location. A total of 291 LF of 6-inch service Consulting Engineers 6701 Brentwood Stair Road RECORXIC S u i t e 1 0 0 W Vu 4� Fort Worth, Texas 76112 , RRY 8 1 7 . 4 5 1 2 8 2 0 f�e Ro FAX 817.451 .2208 Page 2 of 2 Mr.Mike Domenech,P.E. December 13,2004 laterals were designed,at 4 locations. This project also included the design of four extensive 4- inch service lateral relocations totaling approximately 478 LF. Finally, the design changes associated with this area resulted in the collection of 845 LF of additional survey footage in Weatherford and Henderson Streets. Please note that we may seek additional funding in the future to cover the labor costs associated with processing the additional topographic survey data that was collected for the alignment change(Weatherford St.) and the portion of L-44 that was abandoned in Henderson St. A summary table of all of the amendment items and costs are as follows: Amendment Item Description Quantities Unit Prices Total Costs Additional Design Footage 1,108 LF $16.00 $ 17,728.00 6-inch Service Re-route Design Locations 4 Ea $300.00 $ 1,200.00 4-inch Service Re-route Design Locations 4 Ea $300.00 $ 1,200.00 Additional Design Survey 845 LF $3.30 $ 2,788.50 Total Amendment No. 1 Fee: $22,916.50 Therefore, we are requesting Contract Amendment No. 1 to the Contract LVI(56)Rehabilitation and Improvements Agreement in the amount of $22,916.50. This amendment represents approximately an eight percent (7.93%) increase in the total contract value. For your convenience, a summary of the total project fees are as follows: Contract Item Fee Original Contract Amount $ 289,126.00 Amendment No. 1 $ 22,916.50 Revised Contract Value $ 312,042.50 Please do not hesitate to contact me should you have questions or need any background information concerning this matter. Thank you for your time and consideration. W &ASSOCT A.TES,INC. oks,P. ., Project er CC: Peter Fu,P.E.,FWWD, City of Fort Worth Marls Wade,P.E.,President,Wade&Associates Tf C..I CRY A�°Rj O�f;�( /n\ Wade &Associates, Inc. Consulting Engineers