AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 54569
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 54569,
(the CONTRACT) which was authorized by M&C 20-0673 on the 15th day of
September, 2020 in the amount of $1,117,000.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $394,134.00 authorized by M&C 21-0476 on June 22, 2021; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Village Creek Water Reclamation Facility (VCWRF) Grit Facility
and South Influent Lift Station;
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $98,400.00.
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $1,609,534.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
Prof Services Agreement Amendment Template [VCWRF Grit Facility & South Influent LS]
Revision Date: November 23, 2021 [CPN 100075-21
Page
1 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Dana Burghdoff (Oct , 2023 1444 4 CDT)
Dana Burghdoff
Assistant City Manager
DATE: OCt 31, 2023
APPROVAL RECOMMENDED:
ChristOCher #ardO v
Christopher Harder (Oct 30, 2023 07:23 CDT)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Freese and Nichols, Inc.
i �;'C� �
Nicholas Lester, P.E.
Vice President
DATE: 10/25/2023
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring
all performance and reporting requirements.
10/26/2023
Farida Goderya, P.E.
Senior Project Manager
M&C:
Date:
N/A
N/A
APPROVED AS TO FORM AND LEGALITY:
Form 1295:
DB[ack (Oct 31, 2023 17:46 CDT)
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
Jannette S. Goodall
City Secretary
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page
2
dpg4 �Il°n
FORt�C9dd
op
a�°s °=o
Pdd'f `e ate' �`o
adpa�TLeXpSooa
N/A
[VCWRF Grit Facility & South Influent LS]
[CPN 100075-21
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
801 Cherry Street, Suite 2800 + Fort Worth, Texas 76102 + 817-735-7300 + FAX 817-735-7491
October 4, 2023
Farida Goderya
Project Manager, Fort Worth Water Department
200 Texas Street
Fort Worth, Texas 76102
www.freese.com
Re: Amendment No. 2 - Village Creek WRF Lift Station — City Project No. 100075-2
Dear Mrs. Goderya:
Freese and Nichols is providing this contract amendment for additional part-time services related to the
Construction Management and Resident Project Representative services required on the Village Creek
WRF Lift Station project. These changes reflect the additional level of effort required to continue our
services through the current CPM scheduled completion date of June 17, 2024.
Lift Station Facility (No. 100075-2):
0 35 weeks remaining in construction.
0 20 hrs/wk for 35 weeks — resident project representative (reduced rate of $120/hr for
inspection services).
0 20 hrs/wk for 6 weeks — resident project representative contingency effort (as approved
by City)
The following is a summary of the amendment costs proposed:
City Project No. 100075-2
Item Fee
Additional RPR Services- 10/5/23 to completion (700 hours) $84,000
RPR Contingency Services (120 hours) $14,400
Amendment No. 2 Total $98,400
Freese and Nichols appreciates this opportunity, and we are available to meet with you, if requested, to
discuss these reduced/additional services.
Original Contract Amount $1,117,000
Amendment No. 1 $ 394,134
Amendment No. 2 $ 98,400
Contract Amount to Date $1,609,534
Sincerely,
Freese and Nichols, Inc.
Chris Jones, P.E, CCM
Vice President/Principal
Attachments: Amended Scope of Work (Attachment A)
Level of Effort (LOE)
ATTACHMENT A
CONSTRUCTION PHASE SERVICES FOR
VILLAGE CREEK WWTP IMPROVEMENTS
CITY PROJECT NO.: 100075 & CO2647 &100075.2
ATTACHMENT A
for Construction Phase Services Related Services for the Villaae Creek WWTP
Improvements
CONSTRUCTION PHASE SERVICES FOR THE VILLAGE CREEK WWTP
IMPROVEMENTS
CITY PROJECT NO.: 100075-2
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
WORK TO BE PERFORMED
TASK 6. CONSTRUCTION PHASE SERVICES.
Task 6. Construction Phase Services
Freese and Nichols, Inc. will support the construction phase as follows.
• For the construction of the Village Creek Lift Station, Freese and Nichols
proposes the following:
o Based on current contractor CPM schedule of 35 weeks remaining
with a completion date of 6/17/2024:
■ Construction Manager Services as described below (effort
covered by budget already under contract).
■ Add Part -Time RPR budget (Alan Cossabone) for construction
inspection at $120/hr for 20 hrs/wk for 35 weeks ($84,000
increase)
■ Contingency hours to be used as approved by the City.
$120/hr for 6 weeks at 20 hrs/wk ($14,400 increase)
Construction Management (CM)
For the construction phase of the Village Creek WWTP Lift Station, FNI proposes to
provide an FNI CM. The CM efforts consist of providing the follow services and are
covered under the existing budget under contract:
Assist in the review of contractor(s) baseline schedule(s), schedule of
values and submittal schedule and consult with Engineer concerning
acceptability.
Confirm that shop drawings/submittals are submitted/approved before any
work requiring shop drawing approval progresses.
Before Substantial Completion, submit to the contractor a list of observed
items requiring completion or correction.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 09.15.2020
Page 1 of 3
ATTACHMENT A
DESIGN SERVICES FOR
VILLAGE CREEK WWTP IMPROVEMENTS
CITY PROJECT NO.: 100075 & CO2647 &100075.2
Resident Project Representative (RPR)
For the construction phase of the Village Creek WWTP Lift Station, FNI proposes to
provide an FNI RPR on a full-time basis. The RPR hours consist of providing the
follow services:
• RPR will act as the Client/Engineer agent at the site and be supervised by
the CM.
• Attend regularly scheduled construction progress meetings.
• Report to CM immediately the occurrence of any accidents at the site.
• Conduct on -site investigations of the Work in progress to determine if the
Work is in general conformance with the Contract Documents (CD)
o Report to the CM any Work that the RPR believes does not
comply with the CDs or any test reports that indicate materials do
not meet the specified requirements.
o Accompany visiting inspectors representing the Owner or other
agencies having jurisdiction over the project and record the results
of these inspections.
• Conferences and Meetings: Attend meetings with Contractor, such as
progress meetings, job conferences and other project -related meetings.
• Furnish daily construction reports (for hours spent on -site observing on-
going Work by the contractor) of the progress of the Work and upload these
reports in the City of Fort Worth Autodesk BIM 360 system.
• Payments Requests: Review Applications for Payment with Contractor
noting particularly the relationship of the payment requested to the
schedule of values, Work completed and materials and equipment at the
Site but not incorporated in the Work.
• Limitations of the RPR
o Shall not authorize any deviation from the Contract Documents or
substitution of materials or equipment (including "or -equal" items),
unless authorized by Engineer.
o Shall not exceed limitations of Engineer's authority as set forth in
Agreement or the Contract Documents.
o Shall not undertake any of the responsibilities of Contractor,
Subcontractor, Suppliers, or Contractor's superintendent.
o Shall not advise on, issue directions relative to or assume control over
any aspect of the means, methods, techniques, sequences or
procedures of construction unless such advice or directions are
specifically required by the Contract Documents.
o Shall not advise on, issue directions regarding or assume control over
safety precautions and programs in connection with the Work or any
activities or operations of Client or Contractor.
o Shall not accept shop drawing or sample submittals from anyone other
than the Contractor.
o Shall not participate in specialized field or laboratory tests or
inspections conducted by others, except as specifically authorized by
Engineer.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 09.15.2020
Page 2 of 3
ATTACHMENT A
DESIGN SERVICES FOR
VILLAGE CREEK WWTP IMPROVEMENTS
CITY PROJECT NO.:100075 & CO2647 &100075.2
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and FNI agree
that the following services are beyond the Scope of Services described in the tasks above.
However, FNI can provide these services, if needed, upon the CITY's written request. Any
additional amounts paid to the FNI because of any material change to the Scope of the Project
shall be agreed upon in writing by both parties before the services are performed. These
additional services include the following:
• Services beyond the durations of the assumed construction schedules noted within.
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final
completion.
• Services related to Survey Construction Staking
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 09.15.2020
Page 3 of 3
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Village Creek Lift Station Facility Amendment No. 2
Citv Proiect No. 100075-2
Task No.
Task Description
Labor(hours)
Total Labor
Cost
Expense
Total Expense
Cost
Task Sub Total
Project
Mana er
Resident
Eno
n ineer
CM
RPR
Travel
Reproduction
Rate
$236.00
$220.00
$131.00
$120.00
SBE
Non-MWBE
1.0
Project Management
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
1.1
Managing the Team
$0
1.1.1
Internal Team Meetings
$0
$0
$0
1.1.2
QA/QC
1 $0
$0
$0
2.0
Conceptual Design (30-Percent)
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
3.0
Preliminary Design (60 Percent)
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
4.0
Final Design
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
5.0
Bid Phase
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
6.0
Construction Phase Services
0
0
0
820
$98,400
$0
$0.00
$0
$0
$0
$98,400
6.1
Construction Support
6.1.1
Attend Preconstruction Conference
$0
$0
$0
6.1.2
Attend Public Meeting
$0
$0
$0
6.1.3
Project Site Visits
700
$84,000
$0
$84,000
6.1.4
RPR Contingency
120
$14,400
$0
$14,400
6.3.1
Speciatly Electrical Inspection
$0
$0
$0
6.3.2
Lift Station Startup Assistance
$0
$0
$0
$0
$0
$0
7.0
ROW/Easement Services
1 01
0
0
0
$0
$0
$0
$0
$0
$0.00
$0.00
8.0
Survey
1 01
0
0
0
$0
$0
$0
$0
$0
$0.00
$0.00
9.0
Permitting
0
0
0
0
$0
$0
$0
$0
$0
$0.00
$0.00
Totaisl
01
0
0
820
$98,400
$0
$0.00
$0
$0
$0
$98,400
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date 8.09.2012
Project Summary
Total Hours
820
Total Labor
$98,400
Total Expense
$0
Total Project Cost
$98,400
1of1