HomeMy WebLinkAboutContract 55432-FP1AC Coded 10.30.23
Vendor Name: Mountain Cascade of Texas LLC
VendorlD:0000043238
Invoice No. 55432 - FP1
Invoice Date: 10/23/23
PO#: FW060-20440
Earned: $112,223.82
Release Retainage
FID:56019-2060000-CO1960-CRETAN
$80,403.74
FORTWORTH
-WIV
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
NOTICE OF PROJECT COMPLETION
CSC No. 55432-FP1
56019-CO1960
CS 55432
Regarding contract 55432 for Little Fossil Creek Interceptor (M-292) Improvement Part 2A Location 2 as required
by the Water Department as approved by City Council on 2-16-2021 through M&C 21-0130 the Director of the Water
Department, upon the recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery, Water Department,
has accepted the project as complete.
Original Contract Prices:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Other Deductions(see comments):
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
6 11 ( v v
Recommended for Accep
nce
Assistant Director, Water Department
christoogher Harder
Christopher Harder (Oct 31, 2023 14:02 CDT)
Accepted
Director, Water Department
Burghdoff (Oct 31, 2023 CDT)
City Manager
$1,559,450.00
$160,848.64 Ns 2
$1,720,298.64
$1,720,298.64
0 Days @ $630.001 Day
$0.00
$1,720,298.64
$1,527,671.08
$192,627.56
/(' Z&12�
Date
Date
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Project Name: DOE. Ns:
Little Fossil Creek Interceptor (M-292) Improvement Part 2A Location 2
Comments:
56019-CO1960
CS 55432
City Project Numbers 01960-2A2 DOE Number 0045
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- Part 2A - Location 2 Estimate Number 17
Contract Limits Council District 4 Payment Number 17
Project Type Sewer For Period Ending 1/15/2023
Project Funding
Project Manager UNKNOWN
Inspectors Johnson / Behn
Contractor Mountain Cascade of Texas
11729 E FM 917
Alvarado, TX 76009
City Secretary Contract Number 55432
Contract Date
2/16/2021
Contract Time
614 CD
Days Charged to Date
614 CD
Contract is .000000
Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $1,720,298.64
Less 0 % Retained
$0.00
Net Earned
$1,720,298.64
Earned This Period $192,627.56
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$1,527,671.08
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$192,627.56
Friday, October 20, 2023 Page 6 of 6
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name
Little Fossil Creek Interceptor (M-292) Improvement- Part 2A - Location 2
Contract Limits
Council District 4
Project Type
Sewer
City Project Numbers 01960-2A2
DOE Number
0045
Estimate Number 17 Payment Number 17
City Secretary Contract Number 55432
Contract Date 2/16/2021
Project Manager UNKNOWN
Contractor Mountain Cascade of Texas
11729EFM917
For Period Ending 1/15/2023
CD
Alvarado, TX 76009
Inspectors Johnson / Behn
Contract Time 61CD
Days Charged to Date 614
Contract is 100.00 Complete
Friday, October 20, 2023 Page 1 of 6
City Project Numbers 01960-2A2 DOE Number 0045
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- Part 2A - Location 2 Estimate Number 17
Contract Limits Council District 4 Payment Number 17
Project Type Sewer For Period Ending 1/15/2023
Project Funding
Sewer
Item Description of Items
Estimated Unit
Unit Cost
Estimated
Completed Completed
No.
Quanity
Total
Quanity
Total
-
Ia.
- - - - - - - - - - - - - - -
3331.4416 3 6" Sewer Pipe (PVC ASTM
- - - - - -
2400 LF
-
$204.00
- - - -
$489,600.00
- - - -
2400
-
$489,600.00
lb.
3331.4416 36" Sewer Pipe (FRP*)
2400 LF
2
3331.4217 15" Sewer Pipe (PVC)
25 LF
$190.00
$4,750.00
25
$4,750.00
3
3339.1001 4' Manhole (CO#1)
2 EA
$9,000.00
$18,000.00
2
$18,000.00
4
3339.1003 4' Extra Depth Manhole (CO#1)
14 VF
$180.00
$2,520.00
14
$2,520.00
5
3339.1101 5' Manhole (CO#I) (CO#2)
1 EA
$11,000.00
$11,000.00
1
$11,000.00
6
3339.1102 5' Drop Manhole (CO#1)
0 EA
$18,000.00
$0.00
0
$0.00
7
3339.1103 5' Extra Depth Manhole (CO#1)
0 VF
$230.00
$0.00
0
$0.00
8
3303.0001 Bypass Pumping
1 LS
$50,000.00
$50,000.00
1
$50,000.00
9
0171.0101 Construction Staking
1 LS
$14,000.00
$14,000.00
1
$14,000.00
10
0171.0101 Construction Survey (As-Bu
1 LS
$1,100.00
$1,100.00
1
$1,100.00
11
0241.1000 Remove Conc Pvmt
2000 SY
$34.00
$68,000.00
2000
$68,000.00
12
0241.1100 Remove Asphalt Pvmt
1400 SY
$30.00
$42,000.00
1400
$42,000.00
13
0241.1300 Remove Conc Curb&Gutter
20 LF
$50.00
$1,000.00
20
$1,000.00
14
0241.2105 12" Sewer Abandonment Plu
1 EA
$1,000.00
$1,000.00
1
$1,000.00
15
0241.2113 3 0" Sewer Abandonment Plu
I EA
$3,000.00
$3,000.00
1
$3,000.00
16
0241.2120 33 " Sewer Abandonment Plu
5 EA
$3,100.00
$15,500.00
5
$15,500.00
17
0241.2201 Abandon 4' Sewer Manhole
3 EA
$2,000.00
$6,000.00
3
$6,000.00
18
3201.0400 Temp Asphalt Repair (6" fl
1700 LF
$35.00
$59,500.00
1700
$59,500.00
19
3211.0212 4" Asphalt (Type B)
1440 SY
$37.00
$53,280.00
1440
$53,280.00
20
3212.0302 2" HMAC (Type D)
1440 SY
$25.00
$36,000.00
1440
$36,000.00
21
3211.0123 8" Flexible Base, Type A, (CO#2)
520 SY
$60.00
$31,200.00
520
$31,200.00
22
3211.0600 Lime
52 TO
$240.00
$12,480.00
52
$12,480.00
23
3211.0703 6" Lime Stabilized Subgrad
1440 SY
$8.00
$11,520.00
1440
$11,520.00
24
3211.0703 8" Lime Stabilized Subgrad (CO#2)
1970 SY
$9.00
$17,730.00
1970
$17,730.00
25
3213.0104 7" Conc Pvmt (CO#1) (CO#2)
125 SY
$103.00
$12,875.00
125
$12,875.00
26
3213.0104 7.5" Conc Pvmt
1800 SY
$106.00
$190,800.00
1800
$190,800.00
27
3213.0401 6" Concrete Driveway
120 SF
$30.00
$3,600.00
120
$3,600.00
28
3213.0501 Barrier Free Ramp, Type R (CO#2)
7 EA
$2,900.00
$20,300.00
7
$20,300.00
29
3216.0101 6" Conc Curb and Gutter (CO#2)
136 LF
$45.00
$6,120.00
136
$6,120.00
30
3231.0121 4' Chain Link, Aluminum
150 LF
$25.00
$3,750.00
150
$3,750.00
Friday, October 20, 2023 Page 2 of 6
City Project Numbers 01960-2A2 DOE Number 0045
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- Part 2A - Location 2 Estimate Number 17
Contract Limits Council District 4 Payment Number 17
Project Type Sewer For Period Ending 1/15/2023
Project Funding
31
3231.0211 Barbed Wire Fence, Metal
650 LF
$10.00
$6,500.00
650
$6,500.00
32
3231.0305 12' Gate, Steel
2 EA
$1,200.00
$2,400.00
2
$2,400.00
33
3291.0100 Topsoil
50 CY
$85.00
$4,250.00
50
$4,250.00
34
3292.0101 Utility Service Surface R
400 SY
$30.00
$12,000.00
400
$12,000.00
35
3301.0002 Post -CCTV Inspection
2400 LF
$2.00
$4,800.00
2400
$4,800.00
36
3301.0101 Manhole Vacuum Testing
9 EA
$225.00
$2,025.00
9
$2,025.00
37
3305.0109 Trench Safety
2400 LF
$1.00
$2,400.00
2400
$2,400.00
38
3305.0112 Concrete Collar
3 EA
$1,150.00
$3,450.00
3
$3,450.00
39
3305.0113 Trench Water Stops
1 EA
$1,700.00
$1,700.00
1
$1,700.00
40
3339.0001 Epoxy Manhole Liner (4' M) (CO# 1)
10 VF
$290.00
$2,900.00
10
$2,900.00
(CO#2)
41
3339.0001 Epoxy Manhole Liner (5' M) (CO#1)
77 VF
$300.00
$23,100.00
77
$23,100.00
(CO#2)
42
Remote Vertical Vent Station (CO#1)
0 EA
$2,500.00
$0.00
0
$0.00
43
CCTV for Abandonment (33"&30")
2400 LF
$6.00
$14,400.00
2400
$14,400.00
44
Grout & Abandon Existing. 33" & 30" (CO#2)
425 CY
$142.00
$60,350.00
425
$60,350.00
45
Sewer Abandonment Test Hole
2 EA
$700.00
$1,400.00
2
$1,400.00
46
Exploratory Excavation (Deholes0
2 EA
$2,500.00
$5,000.00
2
$5,000.00
47
Construction Allowance (CO#1)
0 LS
$100,000.00
$0.00
48
4'Polymer Manhole (CO# 1)
1 EA
$10,740.00
$10,740.00
1
$10,740.00
49
4' Extra Depth polymer Manhole (CO#1)
4 VF
$470.00
$1,880.00
4
$1,880.00
50
5' Polymer Manhole (CO#1)
8 EA
$12,800.00
$102,400.00
8
$102,400.00
51
5'Drop Polymer Manhole (CO# 1)
1 EA
$18,000.00
$18,000.00
1
$18,000.00
52
5' Extra Depth polymer Manhole (CO#1)
55 VF
$530.00
$29,150.00
55
$29,150.00
53
7" HES Concrete Pavement (CO#1)
475 SY
$124.20
$58,995.00
475
$58,995.00
54
Remove 8' Gate install 12' Gate (CO#1)
2 EA
$2,500.00
$5,000.00
2
$5,000.00
55
8" Sewer (Haltom City) (CO#1)
350 LF
$257.00
$89,950.00
350
$89,950.00
56
Odor Control Vent (CO#1)
1 EA
$15,969.82
$15,969.82
1
$15,969.82
57
Additional Work ro Cross Fiber Optic Cable (CO#2)
1 LS
$33,613.22
$33,613.22
1
$33,613.22
58
Straub Coupling for 48" Sewer Pipe (CO#2)
2 EA
$2,012.50
$4,025.00
2
$4,025.00
59
Crushed Stone Temporary Backfill (CO#2)
20 TN
$27.31
$546.20
20
$546.20
60
18 inch Dia. RCP Storm Drain (CO#2)
12 LF
$43.70
$524.40
12
$524.40
61
Traffic Control (CO#2)
2 MO
$1,288.00
$2,576.00
2
$2,576.00
62
Electronic Messafge Board (CO#2)
236 EA
$57.75
$13,629.00
236
$13,629.00
Friday, October 20, 2023 Page 3 of 6
City Project Numbers 01960-2A2 DOE Number 0045
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- Part 2A - Location 2 Estimate Number 17
Contract Limits Council District 4 Payment Number 17
Project Type Sewer For Period Ending 1/15/2023
Project Funding
--------------------------------------
Sub-Total of Previous Unit $1,720,298.64 $1,720,298.64
--------------------------------------
Friday, October 20, 2023 Page 4 of 6
City Project Numbers 01960-2A2 DOE Number 0045
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- Part 2A - Location 2 EsUntnte Number 17
Contract Limits Council District 4 Payment Number 17
Project Type Sewer For Period Ending 1/15/2023
Project Funding
Contract Information Si n inary
Original Couh•nct Amount $1,559,450.00
Change Orders
Chnnge Order Number 1 $48,794.82
Chnnge Order Ntunber 2 $112,053.82
Date ZZa • 23
onUnclor
Date/d'iC
Iuspection Supervisor
W fir Date 1 az0-z3
Project Manager
Date /o /L-
AssL Director��
Chns-jl--o er Oarder
(hri,tn.,hcr Harder tart 31. M314:G2 CDTI Date
Director / Conlracling Department
Total Contract Price $1,720,298.64
Total Cost of Work Completed $1,720,298.64
Less 0 % Retained
$0.00
Net Earned
$1,720,298.64
Earned This Period $192,627.56
Retninage This Period $0.00
Less Liquidated Damages
Days @ / Day
$0.00
LessPaventent Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$1,527,671.08
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$192,627.56
Friday, October 20, 2023 Page 5 of 6
FORTWORTH rev 03/05/07
WATER ENGINEERING & FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:4-&/ 7
NAME OF PROJECT: Little Fossil Creek Interceptor (M-292) Improvements Part 2A Location 2
PROJECT NO.:
CO 1960-2A2
CONTRACTOR: Mountain Cascade
CITY PROJECT CO 1960-2A2
PERIOD FROM:12/31/22
TO: 10/18/23 FINAL INSPECTION DATE: 3/30/2023
WORT{ ORDER EFFECTIVE:5/10/2021
CONTRACT TIME: 614 O WDO CD
DAY OF DAYS
CHARGED
REASON FOR DAYS
DAY OF DAYS REASON FOR DAYS
MONTH
CREDITED
MONTH CHARGED CREDITED
DURING
DURING
1.
16.
2.
17.
3.
18.
4.
19.
5.
20.
6.
21.
7.
22.
8.
23.
9.
24.
10.
25.
11.
26.
12.
27.
13.
28.
14.
29.
15.
30.
31.
SAT, SUN,
RAIN, TOO WET,
UTILITIES
DAYS
TOTAL
& HOLIDAYS
& TOO COLD
RELOCATIONS
OTHERS*
CHARGED
DAYS
THIS
PERIOD
291
291
PREVIOUS
PERIOD
322
322
TOTALS
TO DATE
G 14
614
^ 11C1111VIAlf ltJ:
C-TOR C_ DATE INSPECTOR DATE
Capital Projects Delivery, Water Department
The Ciq, of Fort Worth • 200 Texas Street • Fort \X/orth, TZ 76012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
AFFIDAVIT
STATE OF TEXAS
COUNTY OF JOHNSON
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Andrew L.
McCulloch, Vice President Of Mountain Cascade of Texas, LLC, known
to me to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations Runishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Little Fossil Creek Interceptor (M-292) Improvement Part 2A - Locaf n 2
BY
An L. McCulloch, Vice President
Subscribed and sworn before me on this date 13th of October, 2023.
� SONIA GONZALES
Notary Public =-���` Notary ID #134431925
Johnson County, Texas ��yiC�'� My Commission Expires
c^c�` June 29, 2027
CONSENT OF SURETY OWNrR ❑
TO FINAL PAYMENT ARCHITrCT D
/VA DOCun?ew G707 CONTRACTOR ❑
SURM K
Rnnd Nn 070214 i'3f1 OTHER ❑
TO OWNER: ARCHITECT'S PROJECT NO.:
(A'ame and addmN)
City of Fort Worth Little Fossil Creek Interceptor (M-292) Improvement
200 Texas Street CONTRACT FOR: Po�rtr�o M8 tXi8gA Ity Project No. 01960, Client
Fort Worth, TX 76102
PROJECT: CONTRACT DATED: March 7, 2021
(Nome and addro-iq
Little Fossil Creek Interceptor (M-292) Improvement Part 2A - Location 2, City Project No. 01960, Client Job No.
MCTX 88057
In accordance vMb the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Jnsa,i rmnrrand addrt:n of vmrp9
Liberty Mutual Insurance Company
175 Berkeley Street
Boston, MA 02116
, SURETY,
on bond of
(Jrtcrrr name and address ofCo,: rraaw)
Mountain Cascade of Texas LLC
11729 East FM 917
Alvarado, TX 76009
, CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relleve the Surety of
any of its obligations to
(1,),'rl Yzame emd addmc• ofOrener)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
as set forth in said Surety s bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: October 12, 2023
(Jruari (n R1)Vhkq dx u,anrb jaliourd l{t tlx nnnrcric dateand to ar.)
FLP
1912
Attest: -�
(Seal):
R iss r
Liberty Mutual Insurance Company
(.Vorr19
(S(vuatrnrofarU�r/.�•d,rpn�•muri,cJ � — -- —
Michelle Anne McMahon, Attorney -in -Fact
(Ainrcrhrmec• uud rirlrl
, OC( Nr:R,
G707-1994
� co
a_
C U)
O N
j_ This Pourer of Attorney limits the acts of those named herein, and they have no authority to
Libe
17 bind the Company except in the manner and to the extent herein stated.
J
Mutual Liberty Mutual Insurance Company
SURETY The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duty organized under the lays of the Stale of New Hampshire. that
Liberty Mutual Insurance Company is a corporation duty organized under the lay.s of the Slate of Massachusetts, and West American Insurance Company is a corporation duly
organized under the lav,s of the Stale of Indiana (herein collectively called the 'Companies-), pursuant to and by authority herein set forth. does hereby name, constitute and appoint
Michelle_Ano_e_acMahon_ all of the oily of San Francisco . slate of CA its true and IavAul atlorney-in-fact, m1h full pourer and authonty, hereby conferred to sign, execute and
acknowledge the follov.Ong surety bond.
Principal Name: Mountain Cascade of Texas LLC
Obligee Name: City of Fort Worth
Surety Bond Number: 070214330 Bond Amount: See Bond Fomi
IN WITNESS WHEREOF, this Pov.erof Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
therelo this 12th day of October 2023
%NSUR -1( INSU 1NsUR
P�°pPOR,J04'Ym QJPcoPvoq,a/oRq� GP' oµroq'Lfn
o rn
Y �1912 0 o 1919 i 1991
y O B
d� S4 C110s� dD 0 II4 r.1 PS By:
S pjptl d
STATE OF PENNSYLVANIA ss
COUNTY OFMONTGOMERY
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
.i
David M. Carey. Assistant Secretary
On this 12th day of October . 2023, before me personalty appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual
Insurance Company, The Ohio Casualty Company, and West Amencan Insurance Company, and that he. as such, being authorized so to do, execute the foregoing instrument for the
purposes [herein contained by signing on behalf of the corporations by himself as a duly authorized officer.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above millen.
PA&,
Cumrrcr:.cuVi °r Pcnn;yhonia • Notary Scat
c�
Teresa Pastena, N ; e
'.:onig°mcry Counounty
My commis cn r_vpues Mard, 28. 2025 By:
��•^cr' .o Ccfnmsscnnurrbor1126044 Teresa Pastella, Notary Public
�.lemtar. Pennsylvania Assmatmn otNoLanef
This Power of Allomey is made and executed pursuant to and by authority of the following By-laws and Authonzations of The Ohio Casually Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company v.hich resolutions are now in full force and effect reading as follows,
ARTICLE IV — OFFICERS: Section 12. Pourer of Attorney
Any officer or other official of the Corporation authorized for [hat purpose in venting by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in [heir respecIrve pov.ers of attomey,
shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any pourer or authority granted to any representative or attomey-in-fact under the
provisions of this artide may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such po„er or authority
ARTICLE XIII — Execution of Contracts: Section 5. Surety Bonds and Undertakings
Any officer of the Company authorized for that purpose in venting by the chairman or the president. and subject to such limitations as me chairman or the president may prescribe,
shall appoint such attorneys -in -fact. as may be necessary to act in behalf of the Company to make, execute, seal, acknoededge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective pourers of attorney, shall have full power to bind
the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding
as if signed by the president and attested by the secretary_
Certificate of Designation —The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M Carey, Assistant Secretary to appoint such attomeys-
infact as may be necessary to act on behalf of the Company to make, execute, seal, acknu.aedge and deliver as surety any and all undertakings, bonds, recognizances and other
surety obligations
Authorization — By unanimous consent of the Companys Board of Directors, the Company consenls that facsimile or mechanically reproduced signature of any assistant secretary
of the Company, wherever appearing upon a certified copy of any power of attomey issued by the Company in connection with surely bonds, shall be valid and binding upon the
Company vrith the same force and effect as though manually affixed
I. Renee C. Llewellyn, the undersigned, Assistant Secretary, of Liberty I.lutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company
do hereby cerhty [hat this poser of attorney executed by said Companies is in full force and effect and has not been revoked
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 12th day of October 2023
I
LNIC, OCIC. V AIC - TSM-09202,
%,SUR �t'I INSG %NsbR
j P`Og0R4/COym Q P°oavo�loRgy
� 4P; onPOR,
yL1912 0 0\1919 i 1991
_ � o a o By:
Ydos�s�4aHos`~~aD ° f`',,avr`,: as rs /DIANP daS enee C. Llewellyn. Assistant Secretary -----
0
7 �
17 �
C
c E
o >,
�)
U Q)
�L2_
a� tJ
Q�
0_O
a—
C
E
o �
Q O
00
a
�N
3 O0
0C14
aOP
00
C �
cv —
a rD
U
o cn
m
m
LL CL
FORTWORTH
Capital Projects Delivery, Water Department
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR & PROJECT DATA
REV: 02/20/07
Name of Contractor"
Project Nanre
Mountain Cascade of Texas LLC
Little Fossil Creek Interceptor (M292) Improvements
Water Engineering brspector
DOB Number
Shane Behn
45
Muter Engineering brspector
Project Manager
❑ Water R] Waste Water ❑ Storm Drainage ❑ Pavement
Walter Norwood
Initial Contract Amount
Project Dtffrcully
$1,559,450.00
Q simple Q Routine Q Complex
Final Cont•ael Amount
Date
$1,720,298.64
10/19/2023
II) PERFORMANCE EVALUATION
0 - Inadequate I - Deficient 2 - Standard ,3 - Good 4 - Excellent
ELEMENT
WEIGHT (x)
APPLICABLE (Y / N)
RATING (0 - 4)
MAX SCORE
SCORE
1 Submission of Documents
2
Y
3
8
6
2 Public Notifications
5
Y
3
20
15
3 Plans on Site
5
Y
3
20
15
4 Field Supervision
15
Y
3
60
45
5 Work Performed
15
Y
3
60
45
6 Finished Product
15
Y
3
60
45
7 Job Site Safety
15
Y
3
60
45
8 Traffic Control Maintenance
15
Y
3
60
45
9 Daily Clean Up
5
Y
4
20
20
10 Citizen's Complaint Resolution
5
Y 1
4
20
20
11 Property Restoration
5
Y
3
20
15
12 After Hours Response
5
Y
3
20
15
13 Project Completion
5
Y
3
20
15
TOTAL ELEMENT SCORE (A) 346
BONUS POINTS (25 Maximum) (B)
TOTAL SCORE (TS) 346
III) CONTRACTOR'S RATING
Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448
Rating ( [TS / MS] * 100%) 346 / 448 = 77%
Performance Category Good
<20% = Inadequate 20% to <40% = Deficient 40% to <60% = Standard 60% to <80% = Good >_80% = Excellent
Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector Signature Contractor
Signature Inspector's Supervisor fi
CONTRACTOR'S COMMENTS
Capital Projects Delivery, Water Department
The Cite of Fort Worth • 1000 Throckmorton Street • Fort Worth, T176012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
FORT WORTH
Capital Projects Delivery, Water Department
CONTRACTOR'S EVALUATION OF CITY
IN AT?nTTrT rWrn12MAT1nN Date: 19-0ct-23
REV: 02/22/07
Name ofCon(raclor
Project Name
Mountain Cascade of Texas LLC
Little Fossil Creek Interceptor (M292) bnprovements
f later Engineering Inspector
Projeci kfanager
Shane Behn
Walter Norwood
DOE Number
45
Project Difficillfy
10 Simple OQ Routine 0 Complex
Type of Contract
❑ Water 0 Waste Water ❑ Storm Drainage ❑ Pavement
Mifial Contract Amowa
Final Contract Amount
$1,559,450.00
$1,720,298.64
II) PERFORMANCE EVALUATION
0 - In de gate I - Deficient 2 -Standard 3 - Good 4 - Excellent
a 'i
ELEMENT
RATING
(0-4)
ELEMENT
RATING
(0-4)
INSPECTION EVALUATION
PLANS & SPECIFICATIONS
1 Availability of Inspector
I Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector
2 Clarity & Sufficiency of Details
3 Accuracy of Measured Quantities
3 Applicability of Specifications
4 Display Of Professionalism
4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution
PROJECT MANAGER EVALUATION
6 Performance - Setting up Valve Crews, Labs
I Knowledge And/Or Problem Resolution
ADMINISTRATION
2 Availability of Project Manager
I Change Order Processing Time
3 Communication
2 Timliness of Contractor Payments
4 Resolution of Utility Conflicts
3 Bid Opening to Pre -Con Meeting Timeframe
III) COMMENTS & SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Capital Projects Delivery, Water Department
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
FORTWORTH
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: Little Fossil Creek Interceptor (M292) Improvements
PROJECT NUMBER: 045 c01960
DOE NUMBER: 45
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS: VALVES (16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
PIPE LAID
2400 LF
25 LF
PIPE ABANDONED
1400 LF
600 LF
DENSITIES:
NEW SERVICES:
SEWER
SIZE
TYPE OF PIPE
36"
PVC
15"
PVC
SIZE
TYPE OF PIPE
30"
Concrete
33"
Concrete
WATER ENGINEERING & FISCAL SERVICES
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 4477 • Fax: (817) 392 - 8460
LF
2400
25
LF
1400
600
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01960-2A2
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- DOE Number 0045
Contract Limits: Council District 4 Estimate Number 18
Project Type Sewer Payment Number 18
Control Number 004501
For Period Ending
Contract: 55432
Contract Date: 2/16/2021
Contract Time 614 CD
Inspectors Johnson / Behn
Days Charged to Date CD
Date Prepared by Inspector I ,( 8 / :) --,a,
Contract is 1, oc:> % Complete
Construction ID: 13942
Item
Description of Items
Estimated Uni
Unit Cost
Previous Quanity Completed Total Cost
No.
Quanity
-----------------------
Quanity for Month Quanity
Sewer
1a.
3331.4416 36" Sewer Pipe (PVC
2400 LF
$204.00
2400-'
ASTM
1 b.
3331.4416 36" Sewer Pipe (FRP*)
2400 LF
2
3331.4217 15" Sewer Pipe (PVC)
25 LF
$190.00
251
3
3339.1001 4' Manhole (CO#1)
2 EA
$9,000.00
2 e-
4
3339.1003 4' Extra Depth
14 VF
$180.00
14'
Manhole (CO#1)
5
3339.1101 5' Manhole (CO#1)
1 EA
$11,000.00
1
(CO#2)
6
3339.1102 5' Drop Manhole
0 EA
$18,000.00
0
(CO#1)
7
3339.1103 5' Extra Depth
0 VF
$230.00
0
Manhole (CO#1)
8
3303.0001 Bypass Pumping
1 LS
$50,000.00
1
9
0171.0101 Construction Staking
1 LS
$14,000.00
1
10
0171.0101 Construction Survey
1 LS
$1,100.00
1
(As-Bu
11
0241.1000 Remove Conc Pvmt
2000 SY
$34.00
2000
12
0241.1100 Remove Asphalt Pvmt
1400 SY
$30.00
1400
13
0241.1300 Remove Conc
20 LF
$50.00
20
Curb&Gutter
14
0241.2105 12" Sewer
1 EA
$1,000.00
1
Abandonment Plu
Tuesday, October 17, 2023 Page 1 O ` G
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01960-2A2
Contract Name Little Fossil Creek Interceptor
(M-292) Improvement-
DOE Number 0045
Contract Limits: Council District 4
Estimate Number 18
Project Type Sewer
Payment Number 18
15
0241.2113 30" Sewer
1 EA
$3,000.00
1
Abandonment Plu
16
0241,2120 33" Sewer
5 EA
$3,100.00
5
Abandonment Plu
17
0241.2201 Abandon 4' Sewer
3 EA
$2,000.00
3
Manhole
18
3201.0400 Temp Asphalt Repair
1700 LF
$35.00
1700
(6" fl
19
3211.0212 4" Asphalt (Type B)
1440 SY
$37.00
1440
20
3212.0302 2" HMAC (Type D)
1440 SY
$25.00
1440
21
3211.0123 8" Flexible Base, Type
520 SY
$60.00
520
A, (CO#2)
22
3211.0600 Lime
52 TO
$240.00
52
23
3211.0703 6" Lime Stabilized
1440 SY
$8.00
1440
Subgrad
24
3211.0703 8" Lime Stabilized
1970 SY
$9.00
1970
Subgrad (CO#2)
25
3213.0104 7" Conc Pvmt (CO#1)
125 SY
$103.00
105
26
3213.0104 7.5" Conc Pvmt
1800 SY
$106.00
1800
27
3213.0401 6" Concrete Driveway
120 SF
$30.00
120
28
3213.0501 Barrier Free Ramp,
7 EA
$2,900.00
7
Type R (CO#2)
29
3216.0101 6" Conc Curb and
136 LF
$45.00
136
Gutter (CO#2)
30
3231.0121 4' Chain Link,
150 LF
$25.00
150
Aluminum
31
3231.0211 Barbed Wire Fence,
650 LF
$10.00
650
Metal
32
3231.0305 12' Gate, Steel
2 EA
$1,200.00
2
33
3291.0100 Topsoil
50 CY
$85.00
50
34
3292.0101 Utility Service Surface
400 SY
$30.00
100
00
R
Soo bO 9. ono
35
3301.0002 Post -CCTV Inspection
2400 LF
$2.00
2400
Tuesday, October 17, 2023 Page 2
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01960-2A2
Contract
Name Little Fossil Creek Interceptor
(M-292) Improvement-
DOE Number 0045
Contract
Limits: Council District 4
Estimate Number 18
Project Type Sewer
Payment Number 18
36
3301.0101 Manhole Vacuum
9 EA
$225.00
9
Testing
37
3305.0109 Trench Safety
2400 LF
$1.00
2400
38
3305.0112 Concrete Collar
3 EA
$1,150.00
3
39
3305.0113 Trench Water Stops
1 EA
$1,700.00
1
40
3339.0001 Epoxy Manhole Liner
10 VF
$290.00
10
(4' M) (CO#1) (CO#2)
41
3339.0001 Epoxy Manhole Liner
77 VF
$300.00
77
(5' M) (CO#1) (CO#2)
42
Remote Vertical Vent Station
0 EA
$2,500.00
1
(CO#1)-
43
CCTV for Abandonment (33%30")
2400 LF
$6.00
2400
44
Grout & Abandon Existing. 33" &
425 CY
$142.00
425
30" (CO#2)
45
Sewer Abandonment Test Hole
2 EA
$700.00
2
46
Exploratory Excavation (Deholes0
2 EA
$2,500.00
2
47
Construction Allowance (CO#1)
0 LS
100,000.00
48
4' Polymer Manhole (CO#1)
1 EA
$10,740.00
1
49
4' Extra Depth polymer Manhole
4 VF
$470.00
4
(CO#1)
50
5' Polymer Manhole (CO#1)
8 EA
$12,800.00
8
51
5' Drop Polymer Manhole (CO#1)
1 EA
$18,000.00
1
52
5' Extra Depth polymer Manhole
55 VF
$530.00
55
(CO#1)
53
7" HES Concrete Pavement
475 SY
$124.20
475
(CO#1)
54
Remove 8' Gate install 12' Gate
2 EA
$2,500.00
2
(CO#1)
55
8" Sewer (Haltom City) (CO#1)
350 LF
$257.00
350
56
Odor Control Vent (CO#1)
1 EA
$15,969.82
1
57
Additional Work ro Cross Fiber
1 LS
$33,613.22
Optic Cable (CO#2)
Tuesday, October 17, 2023
Page 3
City of Fort Worth
Inspector's Estimate Worksheet
City Project Numbers 01960-2A2
Contract Name Little Fossil Creek Interceptor (M-292) Improvement- DOE Number 0045
Contract Limits: Council District 4 Estimate Number 18
Project Type Sewer Payment Number 18
58 Straub Coupling for 48" Sewer
Pipe (CO#2)
59 Crushed Stone Temporary Backfill
(CO#2)
60 18 inch Dia. RCP Storm Drain
(CO#2)
61 Traffic Control (CO#2)
62 Electronic Messafge Board (CO#2)
2 EA $2,012.50
°°
20 TN $27.31
12 LF $43.70
I t D
2 MO $1,288.00
OC
236 EA $57.75
r�3,`�13�sa
:stimated Total This Unit $1,720,298.64 Completed Total This Unit $1,656,824.82 i
--------------------------------------
Total Itemized Amount (Including Change Order $1,720,298.64
i����DATE !�-% Total Cost of Work Completed
pect' �
I or ' z
Less 0 % Retained J
Net Earned i
Previous Payment v'61�3 983-58
/ C Material on Hand 15% �� ��- -17
r•
Balance Due This Payment i
27,
Tuesday, October 17, 2023 Page 4
FORT VVC)RTH City of Fort Worth City Secretary Copy55432-CO1
Change Order Request
Project Name Lillie Fossil Creek Interceptor (M-292) Improvements - Pafl 2A-Location 2 City Sec No. 55432
Project No.(s)[ 5601907004305740010 CO1960 CO1780 DOE No. N/A City Proj. No. r 1960
Project Description:
Replacement Main-292, in Haltom City, beginning from a point 310 feel west and 730 feet north of the Fossil Creek/Field
Sheet intersection, then southerly 730 feel to Fossil Drive and then easterly 1,500 feel to Kerry Lane.
Conlraclor,l Mountain Cascade of Texas, LLC
Change Order: Date: 1 1119/2022
City Project Mgr. Waller Norwood
City Inspector: I Sh ane B ehn
Phone Number: 817-392-5026
Phone Number.[ (817) 392-2190
Dept. Sewer
Totals Contract Time
(Calenderdays)
Original C on tract Amount $1,559,450.00
$1,559,450.00 320
Extras to Dale
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Dale $1,559,450.00
$1,559,450.00 1320
Amount of Proposed Change Order
$48,794.82
1
1
$48,794.82
1120
Revised Contract Amount $1,608,244.82
$1,608,244.82
1440
Original Funds Available for Change Orders $77,973.00
$77,973.00
$77,973.00
Remaining Funds Available for this CO $77,973.00
Additional Funding (if necessary)
3.13%
CHANGE ORDERS to DATE (INCLUDING THIS ONE)
AS % OF ORIGINAL CONTRACT
$1,949,312.50
MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRA CT COST + 25%)
JUSTIFICATION.(REASONS) FOR.CHANGE ORDER
Change Order,No. 1 provides for the following:
• The replacement of epoxy lined concrete manholes with polymer concrete manholes.
• The replacement of an 8 foot gate with a 12 foot gate to provide maintenance access for the Field
Operations crew.
• The replacement of an existing sanitary sewer line on Fossil Drive that was undermined during
installation of the projectsewer main.
• The installation of an ordor control vent at a project manhole.
Staff recommends the approval of an additional 120 calendar days to complete work.
It is understood and aareed that the acceptance of this Chanae Order by the con tractor constitutes an accord and satisfaction and represents oavment
in full (both lime and money) for all costs arising out of, or incidental to, the above Change Order.
Con lractor's.0omp an 'Name I
ContractorName I
-Con l aotor,Sl nature
Igate i
Mountain Cascade of Texas, LLC
Jason Williford
.. _
/(MIzz—
Insoector „ _ Date I ;Prolect+Manaaer 1 - IRa e -
ll�rector :Wa er Dept) Date ConstructlowSu `ervlsor Water Dept) iDate
hrycto2hzrNa'der - Nov 16, 2022
Senior City Attorney Date Assistant City Manager Date
- - - - - Nov n, zo2z a o Nov 17, 2022
M&C Number
N/A
M&C Dale Appi =N1AOFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Change Order Additions
Project Name Little Fossil Creek Interceplor (M-292) Improvements -Part 2A-Localion 2 City Sec No. 55432
Project No.(s) 56019 0700430 574OD10 CO1960 CO1780 DOE No.E= City Proj. No. 1960
Project
Description
Replacement Main-292, in Haltom City, beginning from a point 310 feet west and 730 feet north of [fie Fossil Creek/Field
Street intersection, then southerly 730 feel to Fossil Drive and (lien easterly 1,500 feet to Kerry Lane.
Contractor Mountain Cascade of Texas, LLC Change Order: = Dale: 111912022
City Project Mgr, Walter Norwood City Inspector r Shane Behn
ADDITIONS
DESCRIPTION
DEPT
QtX ` :
Unit
Unit Cost
Total
3 7
4' Manhole
Sewer
1.00
EA
$9,000.00
$9,000.00
4 J
4' Extra Depth Manhole
Sewer
10.00
VF
$180.00
$1,800.00
48 /
4' Polymer Manhole
Sewer
1.00
EA
$10,740.00
$10,740.00
49
4' Extra Depth Polymer Manhole
Sewer
4.00
VF
$470.00
$1,880.00
50 s
5' Polymer Manhole
Sewer
8.00
EA
$12,800.00
1$102,400.00
51
5' Drop Polymer Manhole
Sewer
1.00
EA
$18,000.00
$18,000.00
52
Extra Depth Polymer Manhole
Sewer
55.00
VF
$530.00
$29,150.00
53
7" HES Concrete Pavement
Sewer
475.00
Sy
$124.20
$58,995.00
54
Remove 8' gale Install 12' gate
Sewer
2.00
EA
$2,500.00
$5,000.00
55 `
8" Sewer (Haltom City)
Sewer
350.00
LF
$257.00
$89,950.00
56 f
Odor Control Vent
Sewer
1.00
EA
$15,969.82
$15,969.82
Page 2 of 4 JAdditions
Sewer
$342,884.82
Sub Total
$342,884,82
F(Oa-r Wo1p,-Fi£-3[ City of Fort Worth
Change Order Deletions
Project Name Little Fossil Creek Interceptor (M-292) Improvements - Part 2A-Location 2 City Sec No. 55432
Project No.(s) 56019 0700430 5740010 C01960 C01780 DOE No. NIA City Proj. No. 1960
Project Description Replacement Main-292, in Haltom Cily, beginning from a point 310 feet west and 730 feet north of the Fossil
Creek/Field Street intersection, then southerly 730 feel to Fossil Drive and then easterly 1,500 feel to Kerry Lane.
Contractor Mountain Cascade of Texas, LLC Change Order; FFI Date 11/9/2022
City Project Mgr. Walter Norwood City Inspector Shane Behn
DELETIONS
ITEM
DESCRIPTION
1. DEFT
Qty
Unit
Unit Cost
Total
5 /
5' Manhole
Sewer
8.00
EA
$11,000.00
$88,000.00
6
5' Drop Manhole
Sewer
1.00
EA
$18,000.00
$18,000.00
7 J
5' Extra Depth Manhole
Sewer
55.00
VF
$230.00
$12,650.00
25/
7" Concrete Pavement
Sewer
380.00
SY
$103.00
$39,140.00
40
Epoxy MH Liner (4' Manhole)
Sewer
10.00
VF
$290.00
$2,900.00
41
Epoxy MH Liner (5' Manhole)
Sewer
103,00
VF
$300.00
$30,900.00
42/
Remote Vertical Vent Station
Sewer
1.00
LS
$2,500.00
$2,500.00
47 l
Construction Allowance
Sewer
1.00
LS
$100,000.00
$100,000.00
i
Page 3 of 4
Sewer
$294,090.00
Deletions Sub Total
$294,090.00
MIWBE Breakdown for this Change Order
Page 4 of 4
11/9/2022
CPN 1960
Little Fossil Creek Interceptor (M-292) Improvements - Part 2A-Location 2
Change Order 1 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Project Manager
Title
ATTEST:
�o�dfJ�G
Janne[te 5. Goodall {Nov 19, 2022 08:19 CST)
Jannette Goodall
City Secretary
FORT'Woiwrm City of Fort Worth CSC NO. 55432-CO2
Change Order Request
Project Namel Little Fossil Creek Interceptor (M-292) Improvements -.Part 2A-Location 2 City Sec No. 55432
Project No.(s)[ 56019 0700430 5740010 C01960 C01780 DOE No. NIA City Proj. No. 1960 II
ProjectDescriptlon: Replacement Main-292, in Haltom City, beginning from a point 310 feet west and 730 feet north of the Fossil CreeklField
Street intersection, then southerly 730 feet to Fossil Drive and then easterly 1,500 feet to Kerry Lane.
Contractor: Mountain Cascade of Texas, LLC Change Order: Date: 9/1312023
City Project Mgr. Walter Norwood City Inspector: [ Shane Behn
Phone Number: 817-392-5026 Phone Number: (817) 392-2190
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Sewer
Totals
Contract Time
(Calender days)
$1,559,450.00
$1,559,450.00
1320
$48,794.82
1 $48,794.82
1120
$1,608,244.82
$1,608,244.82
440
Amount of Proposed Change Order
$112,053.82
$112,053.82
173
1613
Revised Contract Amount $1,720298.64
Original Funds Available for Change Orders $77,973.00
Remaining Funds Available for this CO j $29,178.18
Additional Funding (If necessary) $82,875.64
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRA CTAMOUNT (ORIGINAL CONTRACT COST+ 25%)
$1,720298.64
$77,973.00
j
$29,178.18
$821875.64
10.31 %
$1,949,312.50
JUST IFICATION.'(REASONS)IFOR CHANGE'.ORDER
Change Order No. 2 provides compensation for the following additional and increased pay items
necessary to complete the project:
• Additional expense, effort and time expended to avoid an existing conflicting fiber optic cable
that was encountered during construction.
• Epoxy lining of project manholes.
• The installation of a 5-foot diameter manhole
• Concrete pavement replacement
• Electronic message board to inform motorists of the construction work
The additional 173 days requested will provide for additional time to complete the work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or Incidental to, the above Change Order.
Contractor !
ContractorNarre !
Contractor Signature
Date
Mountain Cascade of Texas, LLC
Jason Williford
I ector „ '
Date I
Pro a t;M na er I
Pate
s/4 j
4.14
Director Water;De t l
Dale I
Co strucllon SU ervisor: WaterDe t
Date
_ 1lav7er _. T S,
Sep 20, 2023
Senior Assl§taht;Clty Attorney
Date i
Asslstant Cll Manager
iDate
i-a(N'",2,22::..- i --
I Sep 21, 2023
.�_�„
Sep 22, 2023
M&C Number 23-0774 M&C Date Approved CT � OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
For, P T WO R'Y' 7H[
City of Fort Worth
Change Order Additions
Project Name Little Fossil Creek Inlerceplor (M-292) Improvements -Part 2A-Localion 2 City Sec No. 55432
Project No.(s) 56019 0700430 5740010 CO1960 CO1780 I DOE No.= City Proj. No. 1960
Project
Description
Replacement Main-292, in Haltom City, beginning from a point 310 feet west and 730 feet north of the Fossil Creek/Field
Street intersection, then southerly 730 feet to Fossil Drive and then easterly 1,500 feet to Kerry Lane.
Contractor Mountain Cascade of Texas, LLC Change Order: 0 Dale: 9/1312023
City Project Mgr. Walter Norwood City Inspector Shane Behn
ADDITIONS
_117W
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
5
5' Manhole
Sewer
1.00
EA
$11,000.00
$11,000.00
1
8" Flexible Base, Type A, GR-2
Sewer
60.00
$60.00
$3,600.00
24
8" Lime Stabilized Subgrade (36 Ib/SY)
Sewer
170.00
$9.00
$1,530.00
--'-25 .
7" Conc Pvmt
Sewer
60.00
$103.00
$6,180.00
W 28
Barrier Free Ramp, Type R-1
Sewer
1.00
$2,900.00
$2,900.00
-/29
6" Conc Curb and Gutter
Sewer
116.00
J$45.00
$5,220.00
✓40
Epoxy Manhole Liner (4' Manhole)
Sewer
10.00
VF
$290.00
$2,900.00
41 -',
Epoxy Manhole Liner (5' Manhole)
Sewer
77.00
VF
$300.00
$23,100.00
44 J
Grout & Abandon Existing. 33" & 30" Sewer Mains
Sewer
5.00
$142.00
$710.00
57
Addilional Work to cross Fiber Optic Cable
Sewer
1.00
LS
$33,613.22
$33,613.22
58
Straub Coupling for 48" Sewer Pipe
Sewer
2.00
EA
$2,012.50
$4,025.00
59 '
Crushed Stone Temporary Backfill
Sewer
20.00
TN 1$27.31
$546.20
60 J
18 Inch Dia. RCP Storm Drain
Sewer
12.00
LF 1$43.70
$524.40
611
Traffic Control
Sewer
2.00
$1,288.00
$2,576.00
62
Eleclronic Message Board
Sewer
236.00
$57.75
$13,629.00
Page 2 of 4
Sewer
$112,053.82
JAdditions Sub Total
$112,053.82
Fc>R- WoP_-FM City of Fort Worth
Change Order Deletions
Project Name Little Fossil Creek Interceptor (M-292) Improvements -Part 2A-Location 2 City Sec No, 1 55432
Project No.(s) 56019 0700430 5740010 CO1960 CO1780 DOE No. NIA City Proj, No. 1960
Project Description
Replacement Main-292, in Haltom City, beginning from a point 310 feet west and 730 feet north of the Fossil
Creek/Field Street intersection, then southerly 730 feet to Fossil Drive and then easterly 1,500 feet to Kerry Lane.
Contractor Mountain Cascade of Texas, LLC Change Order: 0 Date F 9/13/2023
City Project Mgr. Walter Norwood City Inspector Shane Behn
DELETIONS
Previous Change Orders
Page 4 of 4
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, September 12, 2023 REFERENCE NO.: **M&C 23-0774
LOG NAME: 60LFSIIM292P2AL2CO2-MOUNTAINC
SUBJECT:
(CD 4) Authorize Execution of Change Order No. 2 in the Amount of $112,053.82 and the Addition of 173
Calendar Days to a Contract with Mountain Cascade of Texas, LLC, for the Little Fossil Creek Interceptor
(M-292) Improvements, Location 2 and Adopt Appropriation Ordinance to Effect a Portion of Water's
Contribution to the Fiscal Years 2023-2027 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
Authorize execution of Change Order No. 2 in the amount of $112,053.82 and the addition of 173
additional calendar days to City Secretary Contract No. 55432 with Mountain Cascade of Texas,
LLC, for the Little Fossil Creek Interceptor (M-292) Improvements, Location 2, for a revised contract
cost of $1,720,298.64; and
Adopt the attached appropriation ordinance adjusting appropriations in the Water & Sewer Rev
Bonds Series 2021 by increasing estimated receipts and appropriations in the Little Fossil Creek
Interceptor (M-292) Improvements, Location 2, (City Project No. C01960) in the amount of
$112,054.00 and decreasing estimated receipts and appropriations in the UNSPECIFIED- ALL
FUNDS project (City Project No. UNSPEC) by the same amount to effect a portion of Water's
contribution to the Fiscal Years 2023-2027 Capital Improvement Program.
DISCUSSION:
On February 16, 2012, Mayor and Council Communication (M&C) 21-0130, authorized a contract with
Mountain Cascade of Texas, LLC, in the amount of $1,559,450.00 (City Secretary Contract No. 55432) for
the Little Fossil Creek Interceptor (M-292) Improvements, Location 2 project. The contract was
subsequently revised by Change Order No. 1 in the amount of $48,794.82, administratively authorized on
November 17, 2022, that provided for the installation of concrete polymer manholes in lieu of concrete
manholes and the replacement of a sewer service line that was undermined during the installation of the
new sewer main.
Change Order No. 2 provides compensation for the following additional and increased pay items
necessary to complete the project:
• Additional expense, effort and time expended to avoid an existing conflicting fiber optic cable that
was encountered during construction.
• Epoxy lining of project manholes.
• The installation of a 5-foot diameter manhole
• Concrete pavement replacement
• Electronic message board to inform motorists of the construction work
The additional 173 days requested will provide for additional time to complete the work.
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of
within the annual budget ordinance, as projects commence, additional funding needs are identified, and to
comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's
portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows:
60 LFSI IM292P2AL2C O2-MOUNTAIN C
Budget
Capital
Fund
Project
FY2023 CIP
Authority
Change
Revised
Name
Name
Appropriations
(Increase/
Budget
Budget
Decrease)
�56019 —
W&S
C01960 -
Little Fossil
I
$0.00
This M&C
$112,054.00
n
$112,054.00
ev ilinterceptor(
Creek
onds
Funding is currently available in the Unspecified- All Funds project within the Water & Sewer Rev Bonds
Series 2021 Fund for the purpose of funding the Little Fossil Creek Interceptor (M-292) Improvements,
Location 2. Appropriations for the Little Fossil Creek Interceptor (M-292) Improvements, Location 2 are as
depicted in the table below:
Fund
Existing
Additional
Project Total*
Appropriations
Appropriations
Water and
Sewer Capital -
$499,963.00
$0.00
$499,963.00
Fund 56002
Water Capital
Fund 59601
$14,200.00
$0.00
$14,200.00
Sewer Capital
Legacy - Fund
$3,874,193.00
$0.00
$3,874,193.00
59607
W&S Rev
Bonds Series
2021- Fund
$1,837,913.00
$112,054.00
$1,949,967.00
56019
Project Total
$6,226,269.00
$112,054.00
$6,338,323.00
*Numbers rounded for presentation purposes.
Business Equity: Mountain Cascade of Texas is in compliance with the City's Business Equity Ordinance
by committing to nine percent MWBE participation on this project. The City's MWBE goal on this project is
six percent.
The project is located In COUNCIL DISTRICT 4.
FISCAL INFORMATION 1 CERTIFICATION.
The Director of Finance certifies that funds are available in the Unspecified -All Funds project within the
W&S Rev Bonds Series 2021 Fund and upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the W&S Rev Bonds Series 2021 Fund for the
Little Fossil Creek Interceptor project to support the above recommendations and execution of the change
order. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the
availability of funds.
FUND IDENTIFIERS (FIDs):
TO
Fund
Department
ccount
Project
Program
ctivity
Budget
Reference #
moun
I
ID
ID
I Year
Chartfield 2)
r
CERTIFICATIONS:
Submitted for City Manager's Office by, Dana Burghdoff (8018)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Walter Norwood (5026)
ATTACHMENTS
1. 60LFSIIM292P2A2L2CO2-MOUNTAINC Compliance Memo.pdf (CFW Internal)
2.60LFSIIM292P2A2L2CO2-MOUNTAINC Form 1295.pdf (CFW Internal)
3.60LFSIIM292P2A2L2CO2-MOUNTAINC MAP.pdf (Public)
4. 60LFS I I M292P2A2L2CO2-MO U NTAINC SAM.pdf (CFW Internal)
5.60LFSIIM292P2AL2CO2-MOUNTAINC FID Table (WCF 06.29.23).xlSx (CFW Internal)
6.60LFSIIM292P2AL2CO2-MOUNTAINC funds availabilitypdf (CFW Internal)
7.ORD.APP 60LFSIIM292P2AL2CO2-MOUNTAINC 56019 AO23(r2)_(1).docx (Public)
8. PBS CPN C01960.pdf (CFW Internal)
60LFSIIW92P2AL2CO2-MOUNTAhNC FM Table
FIDs
Rec# (Fund (Dept# (Account (Project ID Activity Budget
l Year
Bud et
CF2 Program Amount Purpose �Xfer
FIDs Actual
Rec# Fund Dept# Account Project ID Activity (Budget CF2 Program Amount Purpose (Xfer
Year
FIDs REVENUE or EXPENSE - No KK or GL Entries Needed
(Fund Dept# (Account IProjectID Activity Budget (CF2 JProgram Amount I Purpose (Xfer
Year
Rec#
Contract Compliance Manaeer
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Walter Norwood
Name of Employee
Project Manager
Title
ATTEST:
�"
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH.
October 19, 2023
Mountain Cascade of Texas
11729 E. FM 917
Alvarado, TX 76009
Re: Acceptance Letter
Project Name: Little Fossil Creek Interceptor (M-292) Improvement Part 2A Location 2
Project Type: Sewer
Project Ns: 01960-2A2
DOE. No: 0045
Contract Ns: 55432
Gentleman:
Dated: 10/19/2023
On March 30, 2023 a final inspection was made on the subject project. There were punch list items identified at
the time. The punch list items were completed on March 30, 2023. The final inspection and the corrected
punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by
the City. The warranty period will start on March 30, 2025, which is the date of punch list completion and will
extend for (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-6054
Yours Truly,
�011y
Tony Sholola, P.E., Assistant Director, Water Department
TS /
cc: Chris Harder, P.E., Director, Water Department
Laura Wilson, P.E., Deputy Director, Water Department
Captain Michael Skains, Fire Department
Luke Coffman, Sanitary Sewer Systems Superintendent, Water Department
Cesar Zavala, Water Systems Superintendent, Water Department
Walter Norwood PE, Project Manager, Water Department Capital Projects Delivery
David R Johnson, Inspection Supervisor, Water Department Capital Projects Delivery
Shane Behn, Inspector, Water Department Capital Projects Delivery
Parsons, Consultant
Jamie Voris, Contractor
File