HomeMy WebLinkAboutContract 41090-A1CSC No. 41090-Al
FIRST AMENDMENT TO
CITY SECRETARY CONTRACT NO. 41090
BETHESDA WATER SUPPLY CORPORATION WHOLESALE WATER
CONTRACT
WHEREAS, the City of Fort Worth ("Fort Worth") and Bethesda Water Supply
Corporation ("Customer") entered into that certain Water Services Agreement, with term
of January 1, 2011 through September 30, 2031 (Fort Worth City Secretary Contract No.
41090) (the "Contract"); and
WHEREAS, the cities of Crowley and Burleson and the Bethesda Water Supply
Corporation each have individual contracts for water supply with the City of Fort Worth
but may share certain connection points or other facilities; and
WHEREAS, the Contract provides for Customer to purchase from Fort Worth and
for Fort Worth to supply, at reasonable rates, treated water for Customer's use; and
WHEREAS, the Contract, at Section 3.2 (Points of Delivery) and 3.3 (Costs ofNew
or Additional Connections), anticipates future expansion by the Customer as its needs
dictate; and
WHEREAS, Customer has a current capacity of 4 million gallons per day (MGD)
at Meter#l and desires to increase its capacity by an additional 6 MGD at existing Meter#l
for a total increased capacity of 10 MGD; and
WHEREAS, Customer is required to share in the cost of design, construction and
easement acquisition for the project, which will make certain system improvements to Fort
Worth's Southside II water system; and
WHEREAS, to support the increased water take, construction of new 36" and 42"
water mains, the upsizing of existing 16" and 20" mains to 24" as well as new meter points
is required; and
WHEREAS, Exhibit "A-1" reiterates the existing meter points and identifies the
Customer's new meter locations; and
WHEREAS, Exhibit "F-1" Additional Terms, recites additional terms for the
necessary increased capacity and related design and construction obligations;
NOW, THEREFORE, in consideration of the above-stated recitals, the contract is
hereby amended as follows:
'.
1.
The Contract is hereby amended by inserting Exhibit A-1, attached hereto and
incorporated herein for all purposes, which shall supplement Exhibit A.
2.
The Contract is hereby amended by inserting Exhibit F-1, attached hereto and
incorporated herein for all purposes, which sets forth the details, including the engineering
cost estimate and anticipated location(s) of the new or improved infrastructure to serve the
Customer within the Southside II system to serve Customer's additional water take.
3.
All other exhibits, terms and conditions to the Agreement not specifically amended
hereby shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by Fort Worth's designated
Assistant City Manager.
CITY OF FORT WORTH
Z?41U?3:� Dana Burghdoff(No�T)
Dana Burghdoff
Assistant City Manager
DATE: -----------
ATTEST
�A�
Jannette S. Goodall
City Secretary
Recommended By:
Christ oober Harder Christopher HarMr (Oct 31, 2023 14:02 CDT)
Chris Harder, Director
Water Department
Bethesda WSC First Amendment to FWCS 41090
DATE: -----------
ATTEST
&1�.4
Gra�
Board Secretary/Treasurer
Steve ievers
General Manager
2 of3
Approved As To Form And Legality �I
D�lack (Nov 2, 202310:22 CDT)
Douglas W Black
Sr. Assistant City Attorney
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the. monitori.ng and administration of this contract, including ensuring all pcifonnancc and reporting requirements.
Matt Kusnir. Engineering Manager
Bethesda WSC First Amendment to FWCS 41090
Approved As To Form And Legality
City Attorney
3 of3
EXHIBI'T A-1
SERViCE AREA AND POIlVT3 OF CONNEC'I'�ON
FQRTVVURTH Wholesale Customer Meters For
WA,� Bethesda
�
�
�
O
GJ
�
'o
�'
n
5
a
a
�
o'
v
n
ti
Q �5� 30fl 4�J� s�a NA�_79B3_StatePlana_Texas_Norih_Central_F1P5_4292 Feel linchequals300feef
r'"BEl —
FoRTWoRTx Wholesale Customer Meters For
WA�'J Be#hesda
0 150 306 450 600 Na.D_issa_StatePlane_Texas_North�Ceniral_FIPS G202 Feet t inch equals 300 feet
Feet � -
Exhibii F-1
TERM� OF �OUTH�IDE II TRANSMISSION MAIN EXTEN�SION FOR WHOLESALE
CAPACITY INCREASE TQ CROWLEY, BURLESON, AND BETHESDA
Project: South �ide II Water Main Improvement and Extension Project
PUBLIC-WHOLE�AL PARTNERSHIP IN PUBLIC INFRA�TRUCTURE PR4JECTS
A. Description of ProjectBenet'its to City and Water Wbolesale Customcrs
The project wil( bring additional capacity to support development in southern Fort Worth along I-
35 in additio� to extra capacity for Crowley, Burleson, and Bethesda. This shown i� this E�ibit
"F" (Crowley), "F-1" (Bethesda, Burleson) Terms, Scape of Work and Cost Share engineers
estimate, to the I`` amendments of their Contracts depicts the pxoposed main oversizing for all 3
Cities and proposed ne4v water main extension with new co�nection point for the City of Crowley.
The Project Managernent will be conducted by City o£ Fort Worth.
Exhibit "F" "F-1" outlines the fir1l extent of Terms and all phase,s oi the project to be completed.
The fall project scape includes the following. 'I'he segtnents matching the e�chibit "F", "F-1" are in
parenthesis:
. 11,000 feet of parallel 42" water maiu (A}
+ 4,500 feet of paralle136" water main (B)
• 5,000 feet o€ 24" water main extension {C)
• 25,p00 feet of 24" water main extensions to replace existin� 16" mttins (D, E, F)
• One (1) new wholesale meter connection
The cities' proportional responsibilities for this projecf is outlined in other sections of these terms
and the $56,960,401 engineers estimated cost share breakdor�cm is outlined in exhibit "engineers
estimate".
B. Eaisting and Future Cgpacity
The table below shows existing and future capacify, in million galfons per day (MGD) at �ach meter
as well as the proposed projects that need to be completed before the capaoity is available:
City 1 Entity Current Capacity Future Totai Projects required ta
Capacity increase Capacity increase capacity
Crowley Meter #1 1.1 MGD 4.4 MGD 5.S MGD Segments A, B, D
Crowley future Segments A, C, and
meter #3 0 MGD 7.9 MGD 7,9 MGD new meter install
Bethesda #1 4 MGD 6 MGD lb MGD Segments A, B, �
Burleson (combined 2 MGD 1 f MGD 13 MGD Segments A, B, F
metex # 1 and #2j
Draft Terrn �heet Page 1 of 4
[Crowley, Bethesda, Burleson] [SSII Maia Exteasions]
C. Cost SharinglAllocated Capacity/Percent Share of Line Segment/Distance x Capacify
The tables below shows khe cast-sharing for each segment:
Alloca�ed Capacity (MGD)
Whalesale
Current future
City / Entity Demand Totaf A B C D E F
Crowfey 1,1 13.4 12.3 4.4 7.9 5.5
Burleson 2 13 1� 11 12J6
Bethesda 4 20 fi 6 6
fort Worth 12J6 9.16 4.85 7.26 6.76 0
Proposed Line
Size 42" 3fi" 24" 24" 24" 24"
Cine Capacity.
Iper WMCC
ordinance} 42A6 30.Sfi 12J6 12Jb �2.76 22.76
Total Aflocated
Capacity 42.06 3fl,56 12.76 12Jf 12J6 12J6
Estimated
Length {ftj 11,000 4,50Q 5,�00 5,500 11,50Q 5,000
Percent Share of Line Segment
City /
Entity A B C � E F
Crowlay 29%fl 14.4% 61.9% 43.1% 0.0% 0,0%
BU�leson 26% 36.0% 0.0'� 0.0% 0.0% 100,0%
Bethesda 14% 19.6% O,Q% O.fl% 47.0% O,Cf%
Fort
Worth 30% 30.0% 38,1% 56,9% 53.0% Q.0%
Distance x Capacity
9� af
A B C D E F share
G#'owley 135,300 19,800 39,500 30,250 Q 0 22.9%
Burfeson 121,000 49,500 0 0 0 102,080 27J9�o
Bethesda 66,Q00 27,000 0 0 fi9,000 0 16.5%
�ort
INorth 140,360 4],;220 24,30U 39,930 ` 77,74U o 32.9%
• The general formula fox cost-sharing used to derive the table above is as foliowing:
% paid by entity = reque,sted capacity in t�e propos�d sagxzzent ! capacity of the segment as
de�ned by the Fort Worth Water Main Capacity ordinance
The additional wholesale meter to be iustalled for Crowle� is 140% Crowley cost
responsibility,
Draft Term Sheet Page 2 of 4
[Crowley, Bethesda, Burleson] [S�II Main Extensions]
•�or the alignment siudy and GO% design praject that encompasses alI segments, the following
table represents the aost-sharing responsibility;
Ci� / Entit % of share
Czowle 22.9%
Burleson 27.7%
Bethesda 16.5%
Fort Worth 32.9%
The formuia to calculate the cost-sharing for multiple segments is based on the weighted
average (length x capacity o£segment),
Unle�s explicitly listed as an exceptioa, a11 project costs are to be shared between fhe entities /
cities, inoludsng: consultant costs related to design, land acquisition, and constzuction,
easement acquisition including legal and attorney fees related to easement acquisition,
franchise utility fees or relocatios�, public noti�cations, outside entity penmits such as TxDOi'
or railroad, material testing and iztspectzon, puhlic bidding and advertisement costs
The following costs are NOT ta be shared: citylentity staff time
D. Payments
The following outlines houT the project cosEs �11 be collected:
1- Fort Worth is under contract for a 60% design and alignment study thai will cover the entire
scope (all segments) as shown in Exhibit "F", "F-1". The maney for the contract is being
fronted by For� Worth with the expectation of partial reimburse�nent:
a. Upon execution of the wholesale agreement amendments co�ering the terms outlined
in this document, each party agrees to pay fheir propartional share as outlined in
Section C, with engineers estimated amounts in exhibit "F-1" within 30 days.
2- Upon completion of the 60% design and alignment study, Fort Worth will engage the design
engineer to provide a cost to finalize design as well as cost for construction services and ihe
construction inspeciion cost estimate.
3- Fort Wort�s will begin to obtain easements for the respective iine segments. As easaments are
obtained, Fort Worth wi11 track the costs and present a� in�oice to each city/entity consistent
with the cost sharing outlined in Section C, Each citylentity is responsible for paying the
invoices presented within 30 days,
a. After design is complete, constructian will NOT start until all easement cos# invoices
are paid to Fort Worth
4- After design is complete and easement invoices paid by all, ihe project will be advertised for
bid
a. Once bids are received, each citylentity will receive ar► invoice, based on the low bid,
from Fort Worth for their propartionaE casts of construction
h. The invoice received will include proportional cosis related to the estimate for
construction services and inspection
5- Upon completion of cons�ruction, Fort Worth will issue an invoice to each city!entity to settle
up changes in difference be�veen construction, construction ser�ices, and inspeciion costs
actualiy accrued versus the estirnate paid. The invoice (ar credit} will be paid to (or by) Fort
Worth within 30 days.
E. Pxoject Management and Administration
Draft Term Sheet Page 3 of 4
[Crowley, Bethesda, Burlesan] [S�II Main Extensions]
The City of Fort Worth will manage all phases oi ihe project, including engineer selection, design, land
acquisition, biddingladvertise�nent, and construction admiqistration. Dasign and cons�ruction standards will
be as determined by the City of Port Worth. Depending on the size and estimafed costs of entire project,
Fort Worth may choose to break down the project into smatler segments and ufilize multiple contractors or
a phased constxuctioz� approach. However, if For� Worth chooses to phase construction, then Fort Worth
will continue between multiple phases without any unreasonable / controllable delays in between phases.
In other words, upon comgletion o£ one phase, Fort Worth will move as quickly as feasibly possible in
canstruction of another phase.
Unless mutualiy agreed upon by Fort Wor�h and the affecied entity(ies), no segment will be delayed �as far
as it can be controtled) from the desig�n or construction prooess.
F. Miscellaneous
1- The City of �'ort Worth wi11 work with each individual entity in modifying the v��holesale water
agreement to accurately reflect tlie additiona[ capacity enabled due to this project
Dr�ft Term Sheet Page 4 01'4
[Crowley, Bethesda, Burleson] [SSII Main Extensions]
�vzozz
_ SSII Transmission Main Fox�rWpx�x �
- - �xtension for Wholesale
Capacity Increase � _ "��� N
Exhibit F-1 - "`
ENGINEERS ESTIMATE
CITY COUNCIL AGENDA
Create New From This M$C
DATE: 6/27/2023 REFERENCE **M&C 23-
N O.: 0522
CODE: C TYPE: CONSENT
LOG NAME:
PUBLIC
HEARING:
FU RT �4'�`U RT H
-�-
60UNIFORM WATER
CONTRACTAMENDMENT
WITH VARIOUS CITY, TX
NO
SUBJECT: (CD 6 and CD 8) Authorize Execution of an Amendment to each of the Wholesale Water
Contracts with the City of Burleson, the City of Crowley and the Bethesda Water Supply
Corporation to Provide for Increased Capacity from the Southside II Water System;
Provide for Fort Worth's Cost Participation in an Amount Not to Exceed $663,084.00 for
Design Costs; Authorize Acceptance of Funds from The City of Burleson, The City of
Crowley, and The Bethesda Water Supply Corporation for Design Costs, and Adopt
Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years
2023-2027 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Amendment No. 1 to the wholesale water contract with the City of Burleson,
City Secretary Contract No. 41091, to provide for_increased capacity and an additional future
connection point to the City of Crowley to the Southside II water system with new 42', 36"
transmission mains and oversizing of existing 16", 20", to 24" water line to existing wholesale water
take points;
2. Authorize execution of Amendment No. 1 to the wholesale water contract with the City of Crowley,
City Secretary Contract No. 41092, to provide for increased capacity and an additional future
connection point to the City of Crowley to the Southside II water system with new 42', 36"
transmission mains and oversizing of existing 16', 20', to 24" water line to existing wholesale water
take points and new 24" water line to proposed new take point 3;
3. Authorize execution of Amendment No. 1 to the wholesale water contract with the Bethesda Water
Supply Corporation, City Secretary Contract No. 41090 to provide for increased capacity and an
additional future connection point to the City of Crowley to the Southside II water system with new
42", 36" transmission mains and oversizing of existing 16", 20", to 24" water line to existing
wholesale water take points;
4. Authorize the acceptance of funds for design in the amount up to $537,181.00 from the City of
Crowley, $651,211.00 from the City of Burleson, and $496,925.00 from the Bethesda Water Supply
Corporation for their participation in the 0-60\% design for the South Side II Water Main Align Study
project (City Project No. 103649); and
5. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water & Sewer Capital Projects Fund in the amount up to $1,685,317.00, from future receipts for
the wholesale customers' participation in the South Side II Water Main Align Study project (City
Project No. 103649) to effect a portion of Water's contribution to the Fiscal years 2023-2027 Capital
Improvement Program.
DISCUSSION:
The City of Burleson (Burleson), The City of Crowley (Crowley), and Bethesda Water Supply Cooperation
(Bethesda) are wholesale water customers (City Secretary Nos. 41091, 41092, 41090, respectively) and are
experiencing increased growth and demand for additional water. Pursuant to their respective contracts,
Burleson, Crowley and Bethesda may request additional connection points and water supplies. The contract
also provides that each city shall bear certain costs for such expansion. These Amendments will provide for
design and construction of new 42" and 36" water segments and the upsizing of existing 16" and 20" mains to
24" to upgrade the Southside II water main system to provide such additional capacity at existing South Side II
take points (Project). In addition, Crowley desires a new take point for its increased capacity.
The Project includes design, survey and construction cost participation by the cities as well as by Fort Worth.
When the Project is complete, Fort Worth will deliver an additional 11 million gallons per day (MGD) to
Burleson for a total of 13 MGD. Crowley will receive an additional 4.4 MGD at existing meter #1 for a total of
5.5 MGD and an additional 7.9 MGD at the future meter, when completed, for a total of 13.4 MGD. Bethesda
will be taking an additional 6MGD for a total of 10MGD. When design is completed, Fort Worth will publicly
procure the construction project. Under the wholesale contracts, Fort Worth will also participate in the
construction costs. Fort Worth's financial participation is currently estimated to be $16,533,560.00 just under
30\% of the total costs to design, survey, acquire easement and construct the improvements. An M&C for
funding and to let the construction contract will be brought forward at the appropriate time.
The City of Fort Worth entered into an Engineering Agreement with Kimley —Horn and Associates, Inc. (City
Secretary Contract No. 58057, M&C 22-0652) in August, 2023 in the amount of $2,348,401.00 for the 0-60\%
total design costs. The M&C authorized an additional $1,266,688.00 to be used towards the real property
acquisition, project management and material testing. This M&C is appropriating funds from each wholesale
customer to be applied to the 0-60\% design contract which makes the City of Fort Worth's share the amount
of $663,084.00. The resulting increased balance of the City of Fort Worth's original appropriation
($2,952,005.00) will be used to cover the City's participation in a future amendment to achieve 60-100\%
design and easement acquisitions phases of this project with the appropriate contributions from the wholesale
customers.
The table 1 below describes the anticipated capacity increases and Table 2 describes the associated design,
easements, and construction proportional share of costs for future line segments.
Table 1:
City / Entity
Crowley Meter #1
Crowley future
meter #3
Bethesda #1
Burleson
(combined meter #1
and #2)
Table 2
Current
Capacity
1.1 MGD
Future
Capacity
5.5 MGD
7.9 MGD
Projects required
to increase
capacity
Segments A, B, D
Segments A, C,
and new meter
install
Segments A, B, E
City / Entity
Crowley
Burleson
Bethesda
Fort Worth
4 MGD � 10 MGD
2 MGD
_ :
13 MGD
Segments A, B, F
C D E F
29\% 14.4\% 61.9\% 43.1 \% 0.0\% 0.0\%
26\% 36.0\% 0.0\% 0.0\% 0.0\% 100.0\%
14\% 19.6\% 0.0\% 0.0\% 78.4\% 0.0\%
30\% 30.0\% 38.1 \% 56.9\% 21.6\% 0.0\%
*Numbers rounded for presentation purposes.
It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of
within the annual budget ordinance, as projects commence, additional funding needs are identified, and to
comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of
the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows:
60UNIFORM WATER CONTRACTAMENDMENT WITH VARIOUS CITY, TX
Capital Fund FY2023 CIP Budget Change Revised FY2023
Name Project Name Appropriations Authority �Increase/Decrease) Budget
Water & 103649 — SS
Sewer Capital 11 W Main $0.00 This M&C $1,685,317.00 $1,685,317.00
Projects — Align Study
Fund 56002
Funding for this project will be collected from The City of Crowley, The City of Burleson, and the Bethesda
Water Supply Corporation per the terms of their respective City Secretary Contracts, as amended.
Appropriations for the SS II W Main Align Study project are as depicted below:
Fund Existing Additional project Total*
Appropriations Appropriations
Fund 56021 — W&S
Rev Bonds Series $3,615,089.00 $0.00 $3,615,089.00
2023
Fund 56002 — Water & $0.00 $1,685,317.00 $1,685,317.00
Sewer Capital Projects
Project Total $3,615,089.00 $1,685,317.00 $5,300,406.00
This contract will be with a governmental entity, state agency or public institution of higher education: (the City
of Burleson, City of Crowley and Bethesda Water Supply Corporation).
This development is located in Council Districts 6 and 8.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies funds are available in the current capital budget, as previously appropriated,
of the W&S Rev Bonds Series 2023 Fund, and that upon approval of the above recommendations, execution
of the amendments, and adoption of the attached appropriation ordinance, funds will be deposited into the
W&S Capital Projects Fund as appropriated. The Water Department (and Financial Management Services) is
responsible for the collection and deposit of funds due to the City. Prior to any expense being incurred, the
Water Department has the responsibility to validate the availability of funds.
TO
Fund Department
ID
FROM
Fund Department
ID
Account
Account
Project Program Activity Budget Reference # Amount
ID Year (Chartfield 2)
Project
ID
Submitted for City Manager's Office by_
Originating Department Head:
Program Activity Budget Reference # Amount
Year (Chartfield 2)
Dana Burghdoff (8018)
Chris Harder (5020)
Additional Information Contact: Chris Harder (5020)
ATTACHMENTS
80BURLESON CROWLEY BETHESDA Funds Available 56021.docx (CFW Internal)
80Burleson Crowley Bethesda FID table (WCF 03.27.23).xlsx (CFW Internal)
Engineers Estimate 05 17 2023.pdf (Public)
ORD.APP 60UNIFORM WATER CONTRACTAMENDMENT WITH VARIOUS CITY, TX 56002 A023(r5).docx
(Public)
Water Exhibit.pdf (Public)
i — � ���
�.,������� �
�1 ' I, , ����m .� � �����11� =
� ' �������
. � -= -
:'�-.
�ni{ m�{�19i{� � - __ __ , ye .� ' ``,., �r,
��u������������� ='== �,� .''�..����um ` � ��'
- mm = _' �_ -�. _ ,�i��, ♦ o` � � .��oo•rr/ �` `
wm
�.: d � � �iuuuunn ;:o;:a .
-�� ������ 35W 11 ■ 3 3_ mmmnnuui iwnwu muu\6n �i a� ��um���� �� �.' `�•
� � ��� ►� 1► _ _ _ _ nii i :.?. ii i
��IIIIIIn ����� 111►\.� II, �� e = 1111111111� 11►\i �\,�nmmllllln iii�
�� ��11 = �i i i uumnu' � � ����mll
� n i m• - _ � _ _= _ __ =
n�lu nW 11111 / = � 111111111 ? _ = I - ee =' _ _ iiullllllulll� E-
IIIIIIIIIIIIII
11111111� - � - -- -- =1��1= - � IIIII111111111
� 111111// _ ■- � - -- -11� _ _ = 11111111111111
11111� � 11jI// , - -- � III/I IIII i '�� _ _
li������ � - - - IC�P�7I���� �_
nw� '- ____ '%'a"lu�.. ' = uwninii ii�=.
� : __ .... ■�.■■■ . _ ��������� _
uumiu um ���� ��11���'�� i„ui�unu�uannn i
I
� %I111111111111111 11111\ � � � �
� 111111111111111111 _
� 11111111111111 �� � � • '�
i � 1\ i = : �' • � � � � . � �.,�
- .,, .,,, ,,,,,,,,. = _ -- � �'� �iiiil�lllr �_ �-
_ ,,,,,,,,,,,,,,,, : _ -- ==
.,,. --- .. '�. �`�.
�su� =� �
� �ii',� - .
� �-,� ;,,,��� _ _ - _ ��!
1 1 '�� uu u�nn,n■ ;../
_ � u �i
�,,,,,,,,,,,,,,,�,�,,,,,, . ,��,,,,�,,,,,,,, ���,,,,,�„�,,, ,,,,,�,,..�,,,,,,,.,,,,,,,,,,, „
,�, .,,�,,,,,, ,,, ,,,,,,� � ■�.c� ' � �
,,. ,,.�.�,�,�,�,� „��,,,,� ������������,���, ���,�,,,,,,,,�,�, ,,,�����.,.,��,������������� ���
„�.,,.�,�,�,�,�,..,�,�,,,, ��� �
n� numunm mumn - I� � �� . ,
in nnnmum =mi ' • unmuwnw uuuuuu u ,``
u umumm� = I�i
Il luuuuum' � unn �� 4._ uunmm m �mm�umn nn mw i mw �nu ,
11 �unum�
111111111111 ♦ _ In�nnn
��1��1 l�/l�llllllllllll f_ IIIIIIIIIIIIII 11111111
,� _ _ mmm� 35W '' e _ = oe e
e � i � ��� `I�� _ umn __
= mui E muu � unn � _ - _
/:,..'u1;`= _ � : �wuu -_== '
�:.ii = nnn ? �nu►► � � nn
• '_'lllll/,
•,,,,i:== 111111 ; 111111� � 11111111� ��
������ �,:111::111111111 � �111111 � 111111\ =-1 ��`\���1111%%
``,`Q� : � � =I1111\�' �iuw�\� _ ��J�-.=� _liiiiri
� � - Inllnn\ = 11111n� , • 1= � I �
• ' � - _ I ��1
I'�- �� __ = �1111� �� 111111111111 � � ` .. �_ �� � -\ �i
II �. �C �� �II�� � '.. � . . � .� 11��
�� .- --_ - wuuu .mni
■ i mm� nm �: J
-�'- - � mn.�- un � i ■
ii :? ee = e ' • uumumC � __ •nuuun
.a' '_ :_ _
� -�
" nni�i � = �
�i � p
�� �'�' .� _ „ =
, • r�
1 `' _ _ ��������� � �
, , �� � ��a'
;, - _ ��.
; ,,.,,,,,�,,,,_ � � ' � =�■
emnu U/luummwu�i��i=
�o ;a�o�v:/iiiiitli n�n��:��', iiiini 11 iiiiii.�;
o�� \% ♦ wunri, - �
p�N"`NQ„p11111���111110\�:����:������.�uuwp�. � � �
���� �►a� � nn�n/� _pI/ _ :� �: �� = : �. ! � r � ��i
pA eI�Q% �nIIIqC _��p � p: � � . ��� , / ' �
��P.71�lll�iiiiiiihi:►����� ������0:%:�i�.��.�i.�0uunnri
■■
i�� �1111111 un � �ONpO p�J�� ��i��i. ���� �' = ' ����������� 11'��1'1���� ��
I�1� 4111� I \ ♦ • � - 2
�iTi ���uw �� i��,���p0 y�0 � •� �= = �.�. ���I
�� ..m�n �►A?•''•.:: e=cee_ __ _ ������ �����u 11�11
=I►Ilun - . ,' - - _ ■ ■ ���
(i � �1111111 . i i 4�_ �' l' :� 7_ �' _' _ ��'111'��"��� ����
♦ i N""'�.�"�c=�
!_3%tlllw �•� ♦ � � ■■ ���
U�nnmuunum� mmu= � �■�
n� ��q1P�� ��i V�mmm�uuu�. � - �������
�n�%.i►►n�. ' :%.�.���������.._ � w � �����■■■■■■■�����
��� .n��o.� ��.�� �.o�°�°a o�!���::: e?? � ,���������
;..,,,,.,.,, ,,.,.;,..,,;;.. ...,.:,.� � ����::�.� �►
,�:...-..;::...:..•;.....•...::.�.:.�;...�:•�� ��������i.� -........�
;;�,,.,.;,;;;;.,;,;;,:.;;:;,,,.,,...�;• �,. _........�
:. : ;:.-..�: �.:,: .:...:.�:: � .. = _ ........�
.:� �-•.:,;:.,-::.,�::::::•::•::.•:� ��II��� �.��������
, .� . _
,,. .,:..-.,......:..:...:.�: -
�� ��IIIII\ �i�,���,Q Q�►�.j` ��,i. ��,,��' . ' , • , �
�111111� � ♦ C� I 1 O
(I i nm�n .�..''�.`-���0;4�'.� ,� uuu�i ..u� � i ►
■ � nnmuu. • 4a. Ji . - � ■
��umuu.■' ,,,���. `. i.,
�auumuup ► ��� �' W � ��
��� nunlun . i����O����i.. ��P. � —�: - ��
---------��� - - ���I� _'
�.
_ ' -_ ' � ' ' 1 , �
- - - :�-
�
' -•
:11 --
• �- •'
• �
� �
Phases Estimated Cost Start End Crowley Burleson Bethesda Fort Worth Crowley Burleson Bethesda Fort Worth060% Design $2,348,401 8/22/22 3/4/24 23% 28% 21% 28% $537,181 $651,211 $496,925 $663,08460100% Design (and constructionservices)$3,000,000 3/4/24 3/4/25 23% 28% 21% 28% $686,230 $831,899 $634,804 $847,067Easement Acquisition $4,912,000 10/1/24 2/1/26 23% 28% 21% 28% $1,123,587 $1,362,096 $1,039,386 $1,386,931Advertise, Bid, AwardConstruction: SegmentA$13,500,000 Stage 1 Stage 1 29% 26% 14% 30% $3,947,932 $3,530,670 $1,925,820 $4,095,578Construction: Segment B $7,100,000 Stage 1 Stage 1 14% 36% 20% 30% $1,022,251 $2,555,628 $1,393,979 $2,128,141Construction: SegmentC$5,800,000 Stage 2 Stage 2 62% 0% 0% 38% $3,590,909 $0 $0 $2,209,091Construction: Segment D $6,900,000 Stage 2 Stage 2 43% 0% 0% 57% $2,974,138 $0 $0 $3,925,862Construction: Segment E $6,000,000 deferred deferred 0% 0% 78% 22% $0 $0 $4,702,194 $1,297,806Construction: Segment F $7,400,000 Stage 2 Stage 2 0% 100% 0% 0% $0 $7,400,000 $0 $0Construction: Stage 1 8/5/25 8/5/27Construction: Stage 2 7/31/26 1/29/28Total $56,960,401 $13,882,227 $16,331,504$10,193,109 $16,553,560