Loading...
HomeMy WebLinkAboutContract 31298 AMENDMENT NO. 1 STATE OF TEXAS CITY SECRETARY CONTRACT NO.'�, (No M&C Needed) COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and Huitt-Zollars, Inc. , (Engineer) made and entered into City Secretary Contract No. 27727, (the Contract) which was authorized by the City Council by M&C C-19079 on the 14th day of May 2002; and WHEREAS, the Contract involves engineering services for the following project: Engineering contract for the design of Berry Street Surface Transportation Enhancement Project From Evans Avenue To 6th Avenue. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 10, 2005, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $3, 700 . 00. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $170,310. 00. I U I I � L 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this 2005 the ,q L,- day o f -JA 1 , in Fort Worth, Tarrant County, Texas. ATTEST: f u Marty Hend x, City Secretary APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Marc A. I Ott Director, Department of Assistaxitt City Manager Engineering Huitt-Zollars, Inc. ENGINE,Eqi"-" By:—.j # 116 Name:—Aubrjdv Adcock, P.E. Senior Vice President 3131 McKinney Avenue, Ste. 600 Dallas, TX 75204 APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney r 'J -2- 0111012005 16:36 FAX 2149710757 liUIT-T-ZOLLARS DALLAS Q002/002 AMENDMENT No. I SUMMARY OF DESIGN FEE January 10, 2005 Mike Domenech Transportation and Public Works City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Berry Street Streetscape, Change in Scope- STORM WATER POLLUTION PREVENTION PLAN DOCUMENT. Dear Mr. Domenech, To expand the scope of the project, we are requesting an additional fee of $3,700.00 dollars. The additional work is outlined below: • Prepare Storm Water Pollution Prevention Plan Document(SW3P) • Scope includes one set of review comment revisions This amendment does not include any meetings. Original Contract Fee $166,610.00 Proposed Amendment No. 1 1-3,700.00 TOTAL $170,310.00 If you have any questions or require additional information, please give me a call. Sincerely, Huitt-Zollars, Inc. AubrejAdcock, P.E. Senior Vice President