HomeMy WebLinkAboutContract 28433AMENDIVIENT NO. 2
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.��I'�
(No. M&C Needed)
C�UNTY OF TARRANT §
WHERAS, the City of Fort Worth (City) and Biack & Veatch Corporation
(Engineer) made and entered into City Seeretary Contract No. 24676 (the Contxact)
which was authorized by the City Cauncil by M&C G17264 on the 2nd day of February,
1999. This Contract was previausly revised by Amendment No. 1 far $C,230.00; and
WHERAS, the Contract involves engineering ser�ices far the fallowing project:
Engineering Contract for the Pavement Reconstruction and Water
Replacements on Foard Street (East 5eminary to Dead End), Brookline A��nue
(Trentman to Algerita) and Algerita Street (Trentrnan to Miller).
WI�REAS, it has b�come necessary ta execute Amendment No. 2 to said
Contract to include an �ncreased scope of work and revised maxunum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized x�presentativ�s, enter inta tk�e foIlawing agreement which amends the
Contract:
1.
Artic�e I of the Contract is amended to include the additional engineering services
specified in a groposal letter dated February Z0, 2003, a copy of which xs attached hereto
and incorporated herein. The cost to City for �he additiot�a] services to be performed by
Engineer total $ 6,958.00.
2.
Article II of the Contract is amended to provide for an increase in the ma�i�nunn
fee to be paid to Engineer for all work and services performed und.er the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of $ 72,066.00.
�
Atl other provisions of the cantz-act, which are not expressly amended herein, shall
rernain in full force and effect.
1-r - '
_ . . � ,
EXECUTED on this tha
� �
Warth, Tarrant Caunty, Texas.
I: • • : �li/:l-�i.�K�]��l�t�u�7�i�
�!
A. Douglas Rademaker, P,E.
Direcior, Department of
Engineering
Black & Veatch Corporation
ENGINEER
By: ����. I 1 G� ,� ��� -,�
�
Name: Randv McIntvre, P.E.
Proiect Mana�er
B1ack & V�atch Corp.
APPROVED AS TO FORM AND LEGALITY:
��
Gaxy Steinbexger
Assi�tant City Attorney
AP VED:
M�� �r � J
Assistant City Manager
ATTEST:
��
�-�-'.'s -t"�.� � t. �� ='- —
C�loria Pearsd�n;�ty Secsetary
���� _,�� ����' .
Qtill�i���i� �.�L.��k��'�.������ �
�___ � ;;�.��
n���` _-�---
r;� �
,
day of ��11�-C-� . 2003, in Fort
�
�L�4C�C & 1/��►�'�H
816 Cangress Avenue
Sulte 11DD
Ausiin, Texas 78701 USA
Tel: (512) A85-4596
Fax:(512)473-3680
City of Fort Worth, Texas
1998 CiP prnject; Reconstructian
1) Foard 5t. 2) Brookline Ave. 3} Algerita 5t.
Mr. Gopal Sahu, P.E., Project Manager
Fort Worth Department ofi Engineering
i 000 Throckmorton Street
�ork Worth, Texas 76102
Bleak & Veatch Garporation
B&V Praject 58937
B&V File B-1.01
February 1 d, 2003
Subject: City Contract #24676, Amendment No. 2
Dear Mr. Sahu:
In response to various meetings and the requested additions to the 90% plan
documents submitt�d December 1999, we are submitting this request far contract
amendment. This amendm�nt is for the additfonal engineering and sur�ey ser�ices
necessary to design the following.
D Asphalt and Concrete Paving alternatives and de�ails.
o Sanifary sewer replacements and extensions in Foard and Algerita.
o Additional field survey for sanitary sewer designs.
o Additionaf printing costs far plar�s, cietails and sections.
o Prepare 27 additional Right-of-Entry Requests.
Th� initia! contract amount was $58,878 and Amenelment No. 1 was for $6,230.
This amendment is requesting $6,958 to pro�ide engineering services necessary for
the additional desi�n efforts, givir�g a new contract amount of $72,46fi.
Sincerely,
BLACK & VEATCH
�M`�".�•w �, '�—
Randy Mclntyre, P.�.
Prnject Manager
edad�nq a wnrld oi d�x�.eR�. ,
�9�� CIP R�oje��; �e����tra�cti�� - 1) �o��c� ��. �,) ��ooklir�� A��. 3) a4�g���#a St.
Design Staff Lead Drctfting
TA5K5 Project Engineer Engirteers Technician GraPhics TOTAL SACARY
Manager Civil �VIANHOURS COSTS �XPPNSES SUBTOTAL
S11D S95 575 S75 $50
Ur�it I Sani�•ory Sewer I�p�ovenr�e�ts
5anitary Sewer Line Desl�7n C2et�lacement Foard & Alaerits 2
Additoinal Fiefd Survev ofi 5anitary Sewer;
Revise sp�cifications & Bid Document� 2
Additlonal Printin�a
Suf�tofal - d2not I� Sewer Irr�IpPavervsenPs 4
Unit [I Pavin� � Rrair�age Ir�p�ravee�enis
Incfusion of Street Sections in Plans
�gns, 5pecification, Deiails and AlternatiVe BiddEn�l of Concrete Pavin� i
?repare Add9tional Ri�1ht of Eniry Aclreements & Exhibits f27 Additional: 1
Additional Printin�
S�bfota� - Clnif fIC t�ving & Dnc�ima�e lnr��proveve�,ee�hs 2
Ame�dau�e�t No. 2 ��4AL b
12
2 2
2 4
16 6
4
4
20
�
4
8
13
19
4 ] 6 34 $2,460 $272 $2,732
4 $340 $32 $372
s S��a S64 s��a
0 $0 $300 $300
4 76 Qfi $3,510 $391 $3,878
Fa
�
�
4 5
17
4 13
0
8 29
24 7�
$275 $40 $315
$940 $88 $1,028
$970 $�04 $1,D14
$0 $7Q0 $7q0
$2,125 $932 $3,057
$5,535 $1,323 $b,958
n