COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
COUNTY OF TARRANT §
City Secretary
Contract No._�� �
WHEREAS, Mooreland Development Companv, inc.., hereinafter called
"Developer", desires to make certain improvements in South Oak Grove Estates
Phase 2& 3, an addition to the City of Fort Worth, Texas on north I-35; and
WHEREAS, the said Developer has requested the City of Fort Worth, a
municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called
"City", to do certain work in connection with said improvements;
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Michael Beatv, its duly
authorized President and the City, acting herein by and through Marc A. Ott, its
duly authorized Assistant City Manager, for and in consideration of the covenants
and conditions contained herein, do hereby agree as follows:
���� ��i�,r�;� c; 0�°,,;; ���;,;�� �;� �6i;,�i��,�W� �
`�''� �1�.?��Y��l�i�ll���i�'���i��hdli���lk� ��
�� r� ������I ! �'�I I� 'I ' �/
��'V,�`I, ��I I�h,��,
k.�.-.� ___
. � / • � 1 , I
SECTION ONE
COMMUNITY FACILITIES AGREEMENT
to install
WATER AND SEWER SERVICES
for
SOUTH OAK GROVE ESTATES SECTION II & III, PHASE 1
A. The City agrees to permit the Developer to let a contract for, in accordance
with its accepted practices, ordinances, regulations, and the provisions of
the City Charter, and subject to the requirements of the City's Charter, and
subject to the requirements of the City's Policies and Regulations for
fnstallation of Community Facilities, all as current at the time of installation:
WATER FACILITIES serve the lots as shown on the attached Exhibit A,
and SANITARY SEWER FACILITIES to serve the lots as shown on the
attached Exhibit A-1 all in accordance with plans and specifications to
be prepared by private engineers employed by the Developer and
approved by the Water Department. The water and sewer facilities were
partially installed by a previous Developer and will be replaced by the
new Developer. Thorough testing and field investigation reveal any
rehabilitation or replacement indicated.
B. The City agrees to allow the Developer to install, at his expense, at the
time all other water mains in this addition are installed, a service line for
each lot as shown on the attached Exhibit A. The estimated cost of
these service lines is $ 34,745*. The City agrees to record the location of
each said service line in respect to the corner of the lot served, and to
retain said records in its possession. Water mains, valves, and fire
hydrants will be paid on a 50/50% basis between Developer and City.
Cost is estimated to be One Hundred Nine.Thousand, Eiqht Hundred
and One Dollars ($109,801) .
C. The City agrees to allow the Developer to install, at his expense, at the
time all other sanitary sewer mains in this addition are installed, a service
line for each lot as shown on the attached Exhibit A-1 . The estimated
cost of these service lines is $ 58,065*. The Developer shall be
responsible for approach and onsite sewer mains and service lines. The
City shall be responsible for the sewer manholes only. The City agrees to
record the location of each said service line in respect to the corner of the
lot serveci, and to retain said records in its possession.
D. The construction cost of the sanitary sewer facilities to be installed
hereunder, exclusive of service lines and engineering, is estimated to be
One Hundred Sixtv-Seven Thousand, Two Hundred Seventv-Three
Dollars ($167,273 ).
I-1
PROJECT NAME: SOUTH OAK GROVE ESTATES SECTION II & III, PHASE 1
E. Prior to allowance of the construction contract by Developer, the Developer
agrees to provide acceptable financial guarantee to the city for 100 percent
of the construction costs along with payment of any Ordinance costs and
fees that are applicable. Prior to the award of the construction contract by
the City or the commencing of any work by the City or its contractors, the
Developer agrees to pay to the City:
(1) An additional ten percent (10%) of the total of the Developers cost
of these water and sanitary sewer facilities, exclusive of cost of service
lines, is required for design engineering if such engineering is performed
by the City at the Developer's request.
(2) One hundred percent (100%) of the Developer's cost of all water
and sewer service lines, estimated under 1-B and 1-C above, in
accordance with the provisions of the current Fort Worth City Code.
(3) A construction Inspection Fee equal to two (2%) of the Developer's
actual cost share of the construction cost (including all services) of the
water and/or sanitary sewer facilities.
(4) No water and sewer impact fees shall be assessed for the service
lines for the previously platted lots. However, impact fees will be
assessed to the additional 24 lots within this phase. Total cost for the
impact fees shall be paid in cash prior to the construction.
G. The distribution of estimated construction cost between the City and the
Developer, as per paragraph 1-F above, for all water and sanitary sewer
facilities to be constructed hereunder is estimated as follows:
I-2
PROJECT NAME: SOUTH OAK GROVE ESTATES SECTION II & III, PHASE 1
(1) WATER FACILITIES :
Estimated **
Developer Estimated Total
Cost City Cost Cost
(a) Mains, Within
Development $ 54,901 $ 54,900 $ 109,801
Approach $ -0- $ -0- $ -0-
(b) Impact Fees $ -0- $ -0- $ -0-
(c) Services*
See page I-4* $ 22,443
(d)Park Participation $ -0-
Sub-Totals, Water $ 77,344
(2) SANITARY SEWER FACILITIES:
(a) Development $ 120,856
Approach $ 25,617
(b) Easements $ -0-
(c) Services ( 147 -4") $ 58,065
(d)Park Participation $ -0-
Sub-Totals, Sewer $ 204,538
(3) TOTAL
CONSTRUCTION COST: $ 281,882
(4) CONSTRUCTION
INSPECTION FEE : $ 5,638
$ 12,302 $ 34,745
$ -0- $ -0-
$ 67,202 $ 144,546
$ 18,200 $ 139,056
$ 2,600 $ 28,217
$ -0- $ -0-
$ -0- $ 58,065
$ -0- $ -0-
$ 20,800 $ 225,338
$ 88,002 $ 369,884
$ 1,760 $ 7,398
*Developer pays 50% of bullhead double water services on old replacements, in
addition to 9 new long double, 2 short double and 14 single services.
** see Page I-4 for City Cost
I-3
** CITY PARTICIPATION BREAK-DOWN FOR:
PROJECT NAME: SOUTH OAK GROVE ESTATES SECTION II & III PHASE 1
WATER:
Water will be paid on a 50/50% basis between Developer and City water
pipe, valves, fire hydrants and old services. Water Impact Fees for
the new lots will be $8,929.20, paid entirely by the developer prior to
the construction.
8" water pipe ($18 per L.F.)
4,000 L.F. x$18 x.50 = $ 36,000
8" water gate vaive ($600 Each)
11 EA x$600 x.50 = $ 3,300 �
Connect to existing 8" water pipe ($200 LS)
2 LS. x$200 x.50 = $ 200
Standard Fire Hydrant ($1,850 Each)
8 EA. x$1,850 x.50 = $ 7,400
Water fittings ($3,000 per Ton)
2 Ton. x$3,000 x.50 = $ 3,000
Water services- long, bullhead ($460 Each)
38 EA. x$460 x.50 = $ 8,740
Water services- short, bullhead ($375 Each)
19 EA.. x$375 x.50 = $ 3,563
Water line testing ($2.50 per L.F.)
4,000 x $2.50 x .50 = $ 5,000
Subtotal: $ 67,203
*Developer pays 50% of bullhead double water services on old replacements, in
addition to nine new long double, two short double and 14,single services.
SEWER:
Sewer will be paid in agreement that the Developer does pipe, fiftings and
services. The Cify will pay for the manholes. Sewer lmpact Fees for
the new lots will be $10,886.40, paid entirely by the developer prior to
the consfruction.
Replace manholes
14 x $1,200 EA.= $ 16,800
Test new manholes ($100 Each)
14 x $100 EA = $ 1,400
Subtotal $ 18,200
OFFSITE SEWER:
Replace manholes
2 x $1,200 EA.= $ 2,400
Test new manholes ($100 Each)
2 x $100 EA = $ 200
Subtotal $ 2,600
The cost difference is based on estimate only.
TOTAL CITY PARTICIPATION FOR WATER DEPARTMENT
_ $ 67,203 + $ 18,200 + $ 2,600 = $ 88,003
I-4
PROJECT NAME: SOUTH OAK GROVE ESTATES SECTION II & III, PHASE 1
H. The above charges do not include any front foot charges for connection to
existing or proposed water and/or sanitary sewer mains constructed or to
be constructed under the provisions of the "APPROACH MAIN OPTION"
as described in Section III of the Policy for the "INSTALLATION OF
COMMUNITY FACILITIES" adopted in April 2001. These additional
charges are as follows:
Applicable to this Coritract in the amount of $ N/A.
by Contract No. N/A dated N/A
Applicable CFA Name N/A
Date: N/A Number N/A
When water facilities are installed by contract, installation of water
services will be included as part of the contract. Installation of ineter
boxes on those services may be done by the City, after completion of
construction of all relative curb and gutter work on the water facilities
project site, at a cost of $70/$135 per contract-installed charge to be due
and payable prior to issuance of a Work Order on the water facilities
installation contract. The above charges do not apply if the Developer
elects to include meter box installation as part of the contract. However,
meter boxes must conform City standards.
J. Within a reasonable time after completion of the above referenced
facilities to be constructed by contract awarded by the Developer,
provided all conditions for City participation have been met, the City
agrees to pay the Developer the "Estimated City Cost" set out in 1-G
above; provided, however, that said payment shall be calculated using the
actual construction costs and actual service costs under the provisions of
the current Fort Worth City Code, (said payment to be calculated as in 1-
G above), based on actual quantities as reflected in the final estimate paid
to the Contractor by the Developer and on the actual records of cost kept
by the City as a part of its customary procedures. In the event the
difference in the deposit and the actual costs exceeds $25, Developer
agrees to pay to the City and underpayment which said adjustment might
indicate as being due, and the City agrees to pay to Developer any
overpayment.
I-5
PROJECT NAME: SOUTH OAK GROVE ESTATES SECTION II & III. PHASE
1
K. Work hereunder shall be completed within two (2) years from date hereof,
and it is understood that any obligation on the part of the City to make any
refunds with respect to water and/or sanitary sewer facilities shall cease
upon the expiration of two (2) years from date hereof, except for refunds
due from "front foot charges" on water and sanitary sewer mains, which
refunds may continue to be made for a period of ten (10) years
commencing on the date that approach mains are accepted by the
Director. If less than 70°/a of the eligible collections due to the developer
has been collected, the Developer may request in writing an extension of
up to an additional 10 years for collection of front charges. In the event
water and/or sanitary sewer facilities work is not completed within the (2)
year period, City may, at its election, complete such work af Developer's
expense.
L. It is further agreed and understood that any additional payment required
of Developer is to cover only such additional work and/or materials as may
be made necessary by conditions encountered during construction, and
shall not include any change in scope of the project.
RECOMMENDED:
�. ' �
Dale A. Fissel r, R:E.
Water Director
i �� �a
Date
I-6
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to
be executed in quadruplicate in its name and on its behalf by its City
Manager, attested by its City Secretary, with the corporate seal of the City
affixed, and said Developer has executed this instrument in quadruplicate,
at Fort Worth, Texas this the �O�' day of , 20 4� .
APPROVED AS TO FORM AND
LEGALITY:
l�
����
Gary J. Steinberger
Assistant rity Attorney
RECOMMENDED:
Dale A. Fisseler, P.E.
Director, Water Department
ATT, ST:
�
Gloria Pe rson
City Secretary
G- �� �-��
t�3ontract Authorization
� I ���-�l � �
Date
CITY OF FORT WO
:
���i.:L
Marc A.�Ott �/
Assista t City Manager
Developer:
�_ _, �
gy: � ��
/�cC�� �ry9'%Y
� �",�-
��� ��-
�ov n-��-R� (� c.�''�-sz� r�.�., ; �N�.
��Y�`�'Gap� ,. _ ,;, �,�(��J�
� �r, ��`�i �° � ��C�`�'��
„ �i ,.
' U'�1� �!''' � 'll'I���� ��. =
. . � • N ' .-
�P' E
. �OCATI 0�1 M AP s
W
0
GARDEN �
ACRES �
0
MCPHERSON ROAD
�
/
� � ,
SUBJECT
PROPERT Y
OAK GRO VE EAST ROAD
I
A
tio
�a
�
W�
ow
ww
�
S �UTH OAK GR4VE E STATE S �
�
M
SECTI�NS II 8c III �
,
PHASE 1� �
�
� .
�
, �.
0
0
0
. • N '
: .. . ... . . . . � , . .
�
X
X
X
��. G ORD ON S. SWIFT ,w
� CONSULTING ENGINEER INC. •
— -- -- ��-- --t--; �
_ _ _ _ —i� � � �OSE _ _ _ _ _ _ _ _' _ I
��, -Idt P •
ns�sg � _ i\ . � - � - I � /
� �B� ' � /2B I 9A � \ BO 5.1 / � �D IA Ir' , 1
r
�s� I � a�B � I— - �aa � sa � 1 an sa ` � �+ ra II� � �
� �oa ^
90H III 69B 60A -�7 I1B ' t0A g� I' 7B �/ BA II 90 YA II � I
IB9A 60B r R r08 �+ �1 /
71A I � I -I $a I �A �a' m u+e' &� I 7.c eg I 9A Zg I �
� 7rB 6EB ' B!A �I � —�^-- ----
I 7YA I I BPJi ' 19 6JB -I � _ _ _ —�� _ — _ _ — � — _ _� ' l 1
�7PB I I I 878 6?A -I I �— ---- � AflOCAN NB I i� I� I
I � I � I
��d I I fi7A I 6ZB � IA ! I / �/
I !B �}A PB 3.7 JB IA �B � SA SB 6A BH �A 78 8A, 8B 9A 9B I{' � -
�JO � I �
I , I 66B ' i9A � I I I � I I O I � I
� 7 B � I I 66A � 69B �� I � ' !�
I
�SA III B3B 6M � /8B IBd 17B f7A !6H !6A l5B ISA ��B !<A�19B '� 128� 121 fIB IfAIIOB 70A/ r I I I
75� I 65A 6 1 B I i I / ' I
� � � � � _ _ � � srai r. ,ur �ene I � . .� I
--�_---- — _--_ — --- --- J--T�I
I,. �rn rrf�a � —�9— — "i'� �
�
� 77A ,
ne �
` 78A �
78B
��ga JI
� 79B -{
� �
e� i-�
BIA
��-•— BrB
� 9�,�
�B
a�
�
� 8M
B�B
BSA
� ase
� ese
87A
i 8�8
' d8A
aeg
B9A
' aae
' l9
. ooa /
� 95A
95B
� 96A
s 96B
� 87A
- �B
_ �
_ aBe
- 98A
- 99B
,o�
,�g
_ rOIA
E lOTB
a
, � - �. �oz�
� �ase
�' /0�A
—' i
I - rose
IOM
IO�B
_ ' IOSA
,�58
� /06A
'I � �068
/18B �II I IA � � GSlCl�OYE E A I I� �\ II
I v. ae[e�F M�ea. I
Ir� _� � � !B � 2B �5/ 9B I�A SB 6A SB I6A 6E 7A 7B BA 8/l 8Ir
I7�H � I I
lr7A �l � I nut�� ra�rnr �o � � I -
116B -�I � 18H 18A t7B f7A 16B /61 �I i5B 75A �IB ICA f3B 18d IEB I2A IIB trA/ f08 I0� II
,I � �' lI 5/L ER . R C£ V£� / / / I
„5a � —1-- —�-L—
„� � �_--_=—�_�--===-=i—y-==
,,.8 -� I� 1 i i 1 I �� � � I, i� I�
n v!G!-�0.t P. I I I I
O//� �� I�1A IB � 121 YB 3A 3b I�A I4B �'I'ul SH I�6A 6B �7A �B 8A �, �A �B— i
„� �� _. JL � � �il _ JL �— i Z�_ �
„ZB i - � �I �l � � � „
/I� - I I I 8B 1BAIIITB l7A l6B lBAI'lSB 15A ICB /IA�I/3B f31 1.B I� f/B f1A fOB TOA II
i I I I II
n �e
I � I �� TSAlC NF I I
l7/A -� T � � �
� //OB � � � �= = � �=�_ — � � �_ ��` — — �. .
r�oe �� I }II n•� .�„'llt' l! i \ II
I 9B
1098 � I� �d 1 B I � � g J A 3 B I k d f B S A S B I I W 6 B 7 A ?8I I I 8 A 8B 9A ¢ I I
I09A � I �c - I �� I / I — .i��� � 6
IOBB I J ' a ^ ,
� ��� , ! e i �
,� � � I
107B � � i Y� YOE Y�A IIE ZZA YSt Y Z� SA 6A BB Y7A 7B Y8L9A Y9BI / 90.1 90L 7�A �6 32A 92 i I�
,o�� ! , ' , ��
�oac rnc���. �. �' --�-- �-- I��= � .�. � .. � -� �-�- �.-��-�_� �--�
i.TT'.I I�.��I�-`f �`T.I�'I ,I TT'—Ie.lsf .i Jl �� i I,I I'I I,
� � m m n OI m� m o m i W m �oy I. I �0 � b o o � m /Gee��
i 92A 2B 9SA BM BtBI I85A y� `ei m o 0 0 0 0 o IOIA � o o _ � o o f0@A \
0 0 O 0 � O! O T O � � � � I I
•i i ��i �� a ��� � ��
I ►
I I
� i ----- - -----
GORDON S. SW/FT
� CONSULTING ENGINEER, INC.
•oo � sr. s� +o+� wKr woRm, iou►s. �e,o2-�2
(e�� �s—e�e+
90B
�
FI6L
V.
i� //\
\I, �
ff /)
1',X1111�11- 1�
1PATER LAYOUT
' FOR
i
'SOUTH OAK GROVE ESTATES
SECTIONS 2 & 3
PBASE 1
�
�
.
�
�
:
�
/6B � V �
O IBA
......_._Lv!!.'"_�..._,._ f� mmrro
, .......IOB
70A I ( A08 �
�oe I � o�
71A I I
r�g I ooe
72A I I e�
vze � I a;a
�9A ! I 47A
��g I � 0H8
��" � eae
__ �as .._._�
�M lA4N
.............._._._�_
as� asa
�
�
- "�77B
7gA i'
98B
_�9A
�88 ;
BOA
19 B09
_8fJ
BiB
B2A
B2B i
83A-1
83B
BIA
81B /
_/1
BSA
H5B
88A
8BB
87A_ J
97H
ee�
8ga
88A
89B
, 13
90A
80B
/
, �
riii�.�
� �
—BOA� 1
60B
— "'_�
6IA
19 61B
ez,�
eze�
B3A
B9B�
J
B/A '
61B �
.
'� �i �
�/�qq � ,
_ " 2 J-�.�:f � _
� �f
� , /
_ �. /1�.
�,
,"'�, 1,'��
wn L
.- b1A N(JGl NY J,,�,� _
(TYP,
IA 1N 2,{ 211 �A 90
�g({ l6A 17N 17A 1B� 1NA
� .�:LL_ �'1� QAC,._.1..9�Y.4'�
i . ,
� g6���e� SUU7N OAAf C/ OV£ £:7'.IT69
31C17oN T1�
Y. 90A•tB3, F I
p�86H � IIBA I l6 1H PA 2� :tA 90
8BA II7B
9B�f l7�
87A fi68 ��p tEA 170 1?A lBA 18�
----;� p
878 71BA
se� iise - SIL /EIl SfHiUG % LAiVu'
98B I J5�
�
~ as� ) n.e � '
899 If1A ,
y ��.-� r IA 10 2A YB :IA �tl
f00A � I13B ?
j� l00�_113A � '
7
IOIA IfEB � -
�+ 101B ��,y� , IOB 1BA 17B I7A IOB 19n
' i IOY,/ IIIB �
`f02B I11A � �
�r �a�d..Y,� —
rose ,roe ,
1038 !!OA
�" -'
IOIA �aag I
IA 1B 2A 2H OA 99
IOIB 109A
fOSA 108H � � �� ��� � � �„�„��� ,�. �
,;oSB ,o� I I I I I I 1 I I I I I I I I� �` /� I I I I I
� f07B i YO 20 2fA� I
fOBA q Q 2 A22A�22�21A�PIE�2bA�5�E6A�2B627A�7B�8A�29B29A� !� � 90A i80��fA;31B'�.42Ai92B
\ ,aBB ,o,�—j L.LL.J�LI_111--�--�-�--�--J__� ��_(��/�'--1-1.--
� P/A/G'� dlIJF' I I
� j'�"�"� ��j'' j j �j' � �'-��.,. �.�.�
�Iy9B� I � � I I�I I I I �'�109 �' 1f01A 06 OB 07 ,�
81A 91q9�1921� I 8�A'9/B I 95Aig5�8BAI8BB�87A�97B�8B,�8BB�99A`89Bf00 �O�IOL,Q� OP`�Z��� r/ �0�06 �OB �07H���
ii�iii i iiiiiiiiii�� � i�il� iiiiii
/' \�
�i \I/
EXHIBIT "A"— I
S�PER LAYOUT
FOR
SOUTH OAK GROVE ESTATES
�ECTIONS 2 & 3
PHASE 1
��J
G OR� ON S. SWIFT
CONSULTING ENGINEER INC.
�
N
O
O
N
I
�
�
�
0
�
�
�
�
�
0
0
0
�
N
N
O
\
�
W
City of FoYt Worth, Texas
Mayor and Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
1/14/03 C_�9428 60GROVE 1 of 2
SUBJECT APPROVAL OF COMMUNITY FACILITIES AGREEMENT WITH MOORELAND
DEVELOPMENT COMPANY, INC. FOR CONSTRUCTION OF WATER AND SEWER
SERVICES TO SERVE A PORTION OF SOUTH OAK GROVE ESTATES, PHASE II
AND III OF BLOCKS 7, 8, 12 AND 13, A DEVELOPMENT ON MCPHERSON ROAD
EAST OF HIGHWAY 135 IN FAR SOUTHEAST FORT WORTH
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute a Community Facilities
Agreement with Mooreland Development Company, Inc. (the developer) for the rehabilitation of existing
facilities and installation of water and sewer services to serve a portion of South Oak Grove Estates,
Phase II and III of Blocks 7, 8; 12 and 13, on McPherson Road east of Highway 135 in far southeast
Fort Worth.
DISCUSSION:
The developer of a portion of South Oak Grove Estates, Phase II and III of Blocks 7, 8, 12 and 13, has
executed a proposed contract for community facilities to serve a town home development located in far
southeast Fort Worth on McPherson Road, east of Highway 135.
The total cost for water and sewer improvements for this development is $377,282. There will be City
participation in water and sewer pipe. The estimated costs for water and sewer improvements are
subject to construction inspection fees.
Proiect Cost
Water
Sewer
Easements
Inspection
Developer
$ 77,344
$204,538
-0-
$ 5,638
TOTAL $287,520
C�
$67,202
$20,800
-0-
$ 1,760
$89,762
Total
$144, 546
$225,338
-0-
$ 7.398
$377,282
This development is located in COUNCIL DISTRICT 8.
City of FoNt Wo�th, Texas
Mayor and Council Communication
DATE REFERENCE NUMBER LOG NAME PAGE
1/14/03 C-19428 60GROVE 2 of 2
SUBJECT APPROVAL OF COMMUNITY FACILITIES AGREEM NT WITH MOORELAND
DEVELOPMENT COMPANY, INC. FOR CONSTRUCTION OF WATER AND SEWER
SERVICES TO SERVE A PORTION OF SOUTH OAK GROVE ESTATES, PHASE II
AND III OF BLOCKS 7, 8, 12 AND 13, A DEVELOPMENT ON MCPHERSON ROAD
EAST OF HIGHWAY 135 IN FAR SOUTHEAST FORT WORTH
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that funds are available in the current capital budget, as appropriated, of
the Water and Sewer Capital Projects Funds. .
MO:k
Submitted for City Manager's
Oftice by:
Ntar� otc
Originating Department Head:
Dale Fisseler
Additional Information Contact:
I FUND I ACCOUNT I CENTER I AMOUNT
� (to)
I �
8476
8207 � (from)
IP162 539140 060162151260 $67,202.00
P172 539140 070172131250 $20,800.00
CITY SECRETARY
�
� APPROVED O1/14/03
Dale Fisseler 8207