HomeMy WebLinkAboutContract 60443City of Fort Worth, Texas Page 1 of 27
Standard Community Facilities Agreement
Rev. 9/21
Received Date: _______________
Received Time: _______________
Developer and Project Information Cover Sheet:
Developer Company Name: FG Aledo Development, LLC
Address, State, Zip Code: 3045 Lackland, Fort Worth TX 76116
Phone & Email: kgill@sableholdings.com; 817-732-2291
Authorized Signatory, Title: Kim Gill, President
Project Name: Morningstar - Westpoint Parkway
Brief Description: Water, Sewer and Storm Drain
Project Location: Westpoint Blvd. and N Indigo Sky Dr.
Plat Case Number: None provided Plat Name: None provided
Mapsco: 710 Z Council District: 3
CFA Number: 23-0126 City Project Number: CPN 104118 | IPRC22-0221
City of Fort Worth, Texas Page 2 of 27
Standard Community Facilities Agreement
Rev. 9/21
City Contract Number: _______________________
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT (“Agreement”) is made and entered into by
and between the City of Fort Worth (“City”), a home-rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and FG Aledo Development, LLC
(“Developer”), acting by and through its duly authorized representative. City and Developer are referred to
herein individually as a “party” and collectively as the “parties.”
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Morningstar
- Westpoint Parkway (“Project”); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement (“Community Facilities” or “Improvements”); and
WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement; and
WHEREAS, the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance (“CFA Ordinance”), as amended, is incorporated
into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer’s duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
City of Fort Worth, Texas Page 3 of 27
Standard Community Facilities Agreement
Rev. 9/21
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City (“Engineering
Plans”) are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
Exhibit A: Water
Exhibit A-1: Sewer
Exhibit B: Paving
Exhibit B-1: Storm Drain
Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 –
Changes to Standard Community Facilities Agreement, Attachment 2 – Phased CFA Provisions, and
Attachment 3 – Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer’s contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements (“Financial Guarantee”).
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth, Texas Page 4 of 27
Standard Community Facilities Agreement
Rev. 9/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City’s Assistant
City Manager (“Effective Date”). Developer shall complete construction of the Improvements and
obtain the City’s acceptance of the Improvements within two (2) years of the Effective Date (“Term”).
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time (“Extension Period”). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a)The City may utilize the Developer’s Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b)The City may utilize the Developer’s Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement, becomes insolvent, or fails to pay costs of construction.
(c)If the Financial Guarantee is a Completion Agreement and the Developer’s contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d)Nothing contained herein is intended to limit the Developer’s obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer’s agreements with Developer’s
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer’s contractors begin
constructing the Improvements, Developer agrees to the following:
(a)that Developer and City must execute a termination of this Agreement in writing;
(b)that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c)to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City’s inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth, Texas Page 5 of 27
Standard Community Facilities Agreement
Rev. 9/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b)Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
(c)Developer will require Developer’s contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer’s contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City’s
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d)Developer will require Developer’s contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor’s
insurance provider, which shall be made a part of the Project Manual.
(e)Developer will require the Developer’s contractors to give forty-eight (48) hours’ advance notice
of their intent to commence construction of the Improvements to the City’s Construction Services
Division so that City inspection personnel will be available. Developer will require Developer’s
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City’s inspectors. Developer will require Developer’s contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f)Developer will not allow Developer’s contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g)Developer will not allow Developer’s contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth, Texas Page 6 of 27
Standard Community Facilities Agreement
Rev. 9/21
11.
Easements and Rights-of-Way
Developer agrees to provide, at its expense, all necessary rights-of-way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a)DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b)THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT
OF ANY INJURIES OR DAMAGES SUSTAINED BY ANY PERSONS, INCLUDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERLY SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
(c)DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS’ FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE,
AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
City of Fort Worth, Texas Page 7 of 27
Standard Community Facilities Agreement
Rev. 9/21
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre-approved material testing laboratories. The Developer must
contract with material testing laboratories on the City’s list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand-
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY: DEVELOPER:
Development Coordination Office FG Aledo Development, LLC
City of Fort Worth 3045 Lackland Road
200 Texas Street Fort Worth, TX 76116
Fort Worth, Texas 76102
With copies to:
City of Fort Worth, Texas Page 8 of 27
Standard Community Facilities Agreement
Rev. 9/21
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager’s Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer’s contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor’s facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer’s contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
City of Fort Worth, Texas Page 9 of 27
Standard Community Facilities Agreement
Rev. 9/21
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co-employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non-Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City’s right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
City of Fort Worth, Texas Page 10 of 27
Standard Community Facilities Agreement
Rev. 9/21
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms “boycott Israel”
and “company” have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer’s signature provides written verification to the City that
Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement.
26.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds
of the City with a company with 10 or more full-time employees unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of the contract. The terms “boycott energy company” and “company”
have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Developer certifies that Developer’s signature
provides written verification to the City that Developer: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of this Agreement.
27.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly
from public funds of the City with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate
during the term of the contract against a firearm entity or firearm trade association. The terms
“discriminate,” “firearm entity” and “firearm trade association” have the meaning ascribed to those terms
by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer’s signature provides written verification to the City that
Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm
entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
City of Fort Worth, Texas Page 11 of 27
Standard Community Facilities Agreement
Rev. 9/21
28.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER’S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
29.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City’s prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third-Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
32.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
City of Fort Worth, Texas Page 12 of 27
Standard Community Facilities Agreement
Rev. 9/21
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
35.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 13 of 27
Standard Community Facilities Agreement
Rev. 9/21
36.
Cost Summary Sheet
Project Name: Morningstar - Westpoint Parkway
CFA No.: 23-0126 City Project No.: 104118 IPRC No.: 22-0221
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction 1,677,382.00$
2. Sewer Construction 2,605,963.00$
Water and Sewer Construction Total 4,283,345.00$
B. TPW Construction
1. Street 3,477,671.95$
2. Storm Drain 4,662,513.00$
3. Street Lights Installed by Developer 252,823.50$
4. Signals -$
TPW Construction Cost Total 8,393,008.45$
Total Construction Cost (excluding the fees):12,676,353.45$
Estimated Construction Fees:
C. Construction Inspection Service Fee $92,250.00
D. Administrative Material Testing Service Fee $19,502.00
E. Water Testing Lab Fee $1,980.00
Total Estimated Construction Fees:113,732.00$
Financial Guarantee Options, choose one Amount
Choice
(Mark one)
Bond = 100%12,676,353.45$
Completion Agreement = 100% / Holds Plat 12,676,353.45$
Cash Escrow Water/Sanitary Sewer= 125%5,354,181.25$
Cash Escrow Paving/Storm Drain = 125%10,491,260.56$
Letter of Credit = 125% 15,845,441.81$
Escrow Pledge Agreement = 125% 15,845,441.81$ X
City of Fort Worth, Texas Page 14 of 27
Standard Community Facilities Agreement
Rev. 9/21
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City’s Assistant City Manager.
CITY OF FORT WORTH
Dana Burghdoff
Assistant City Manager
Date: __________________
Recommended by:
Dwayne Hollars/Bichson Nguyen
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Richard A. McCracken
Sr. Assistant City Attorney
M&C No. N/A
Date:
Form 1295: N/A
ATTEST:
Jannette S. Goodall
City Secretary
DEVELOPER
FG ALEDO DEVELOPMENT, LLC
By: KTFW INVESTMENTS, INC.,
A Texas corporation, its manager
Kim Gill
President
Date:
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Rebecca Diane Owen
Development Manager
City of Fort Worth, Texas Page 15 of 27
Standard Community Facilities Agreement
Rev. 9/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Attachment 2 – Phased CFA Provisions
Attachment 3 – Concurrent CFA Provisions
Location Map
Exhibit A: Water Improvements
Exhibit A-1: Sewer Improvements
Exhibit B: Paving Improvements
Exhibit B-1: Storm Drain Improvements
Exhibit C: Street Lights and Signs Improvements
Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 16 of 27
Standard Community Facilities Agreement
Rev. 9/21
ATTACHMENT “1”
Changes to Standard Community Facilities Agreement
City Project No. 104118
None
City of Fort Worth, Texas Page 17 of 27
Standard Community Facilities Agreement
Rev. 9/21
ATTACHMENT “2”
Phased CFA Provision
City Project No. 104118
Developer intends to construct a public sanitary sewer main pursuant to a separate community
facilities agreement (City Project Number 105124, IPRC23-0151) that will run underneath portions of the
paving Improvements being constructed pursuant to this Agreement. Therefore, this Agreement shall be
considered a “Phased CFA” and the provisions contained in this section shall apply to this Agreement.
The improvements being constructed by Developer under the separate Community Facilities
Agreement shall be defined as the “Parent Project.” The improvements being constructed by Developer
under this Agreement shall be defined as the “Child Project.”
Developer acknowledges and agrees that due to Developer’s election to construct a Phased CFA,
the potential exists for technical, delivery, acceptance or performance problems (hereinafter “Construction
Problems”). Construction Problems may include, but are not limited to: failure of the improvements to
comply with the approved plans or City Specifications; failure of the improvements in the Parent Project
and the Child Project to properly connect to each other; changes to the design or construction of the
improvements in the Parent Project that impact the design and construction of the improvements in the
Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the
Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of
some or all of the improvements and Developer having to remove and reconstruct the improvements at
Developer’s expense. In addition, Developer understands and agrees that disputes may arise between
Developer’s contractors or their subcontractors relating to responsibility for the Construction Problems.
Developer shall be solely responsible for resolving disputes between contractors or disputes between
contractors and subcontractors.
Developer further acknowledges and agrees that Developer has notified all of Developer’s
contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this
section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for
Developer’s decision to proceed with a Phased CFA.
Developer shall not make the final connection of the improvements in the Child Project to the
improvements in the Parent Project until the improvements in the Parent Project have been constructed and
accepted by the City and the City has consented to Developer making the connection.
Developer agrees that if this Agreement is for improvements relating to the construction, renovation
or modification of one or more single family residential homes or structures, the City will not record the
plat related to the Project until the Improvements are constructed and accepted by the City. Developer
agrees that if this Agreement is for Improvements relating to the construction, renovation or modification
of one or more commercial buildings or structures, the Developer shall not receive a Certificate of
Occupancy from the City for the building(s) related to the Project until the improvements in this Agreement
are constructed and accepted by the City. Developer further understands and agrees that the City will not
approve a final plat of the property that the Improvements in this Agreement are intended to serve until the
Parent Project has been constructed and accepted by the City. Completion of the Improvements under this
Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of
City of Fort Worth, Texas Page 18 of 27
Standard Community Facilities Agreement
Rev. 9/21
Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by
Developer.
BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES ALL RISKS
AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES,
INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMIC DAMAGES PROPERTY LOSS,
PROPERTY DAMAGES AND PERSONAL INJURY, (INCLUDING DEATH), OF ANY KIND OR
CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBY EXPRESSLY
RELEASES AND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES,
INCLUDING, BUT NOT LIMITED TO ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS,
PROPERTY DAMAGE AND PERSONAL INJURY (INCLUDING DEATH) ARISING OUT OF OR
IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE
IMPROVEMENTS OR DEVELOPER’S DECISION TO CONSTRUCT A PHASED CFA.
DEVELOPER, AT ITS SOLE COST AND EXPENSE, AGREES TO AND DOES HEREBY
INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY’S OFFICERS,
REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR, FROM AND AGAINST
ANY AND ALL CLAIMS (WHETHER AT LAW OR IN EQUITY), LIABILITIES, DAMAGES
(INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGES
AND PERSONAL INJURIES INCLUDING DEATH), LOSSES, LIENS, CAUSES OF ACTION,
SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS,
ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR
DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WAY RELATED TO
CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER’S CHOICE TO CONSTRUCT A
PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON
OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE
CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER’S CHOICE TO CONSTRUCT A
PHASED CFA WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN
WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
DEVELOPER
FG ALEDO DEVELOPMENT, LLC
By: KTFW INVESTMENTS, INC.,
A Texas corporation, its manager
______________________________
Kim Gill, President
�
A
U
�
�
.-.
l!")
�
l!")
(LJ
M
(LJ
0
(LJ
M
(LJ
\
�0
LOCATION MAP
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 301 1 4-0200431-1 041 1 8-E07685
STREET/STORM DRAIN N0. K-3046
X- 27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
MAPSCO N0. 710-Z
i i� n
� �ii'i i �
-- 11��.— -----------------------------------1L-----
I �° —�LI—���I�—� I�I �I
, — — — — — — \
\ I SUPREME STREET I I I I
I � � i i i L i
�
❑
Q
0
�
�
�
w
�
�
Q
�I
_ EX
I o �—Z � � � � � � � �
I �_Q � � � � � � � �
I �o� _ �_ �—�+�—�+�—�
I } I I I I I I I I
— J
L L
I '� � I-
� / I I LYFT LANE I I
� / � I I I I I I I I�
II I I I I _��
— -------� _.a�
� �
i—�
W.L. N0. 1 L—.�
PROP 16"W � [�
_ wESTPO�nn- �. L--
,-. ,
� W.L. N0. :
I PROP 8°W
I II
IIYEX 76"W
� r�
- II
J �I
;
� il�i
�
' ���I
J
� � ', ` � �, \I
VD W.L. N0. 1 I �
PROP 16"W I/ �
i
...PROPL$ W I
�� ��
� � ��r
�\U
,�
I I I I I I I I
I SUPREME STREET I
I—I—I i i I I—I_
--�--
�
--T--
r--+—�� I
�-----��—
-- p �
---��'
-- —'Q-
---I--'H
_
-----'C.9
r--+— m I
�--�-- �
— T--
--+--�
--�--
N�2"W�
_i �
\�� � \7 i i � ��`� (�,
� � '-' -�f l,- � � i �� \
--� � -� �� �
i i � i � ,�L� �`
� , � I �
SCALE: 1 "=300'
� I
-- � -- I
--t---
�--�-- r
— � --wa �-
� � > i
--t--�� �
--�--Y I_
-- i --Q- i
--t--=
� --�--z I-
— � --�a �-
I I
-- fi--Oa !-
--�-- !
-- i -- i-
----r-- �
R'�MI��� �
% W.L.. NO.. 4� (t
PROP 12'W% %��
� � \� �
' ' � / � � � ;
�
� ���
�,,.
,c� e<UFF ' ! �:
� oR. ' �
Q� �
�
�
LEGEND
100� DEVELOPER'S COST
*__ 8", 12" AND 16" WATER LINES, FIRE HYDRANTS,
GATE VALVES AND ASSOCIATED
APPURTENANCES
�
>
�
n
S
s
>
EXHIBIT "A"
WATER IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 1 OF 3
—�--�-� ir--T—�Q= i ; � � � � --
� I I I I I I w i
-- �-- --fi-�� � --�--- � I I I I I I I I I I I� � �---_
- -�-- ---r-- -� L+�-L�-I-L��I�J._�-�-
_fi-- --T-- --+--� � Q_J �� I ��� I---Y� I __ �
qM�J,� --t-- _—�-- � � W —�\ �� � / � --"' -� ----'.
� L� + I o
�� /�-- I J—� � � ,
w � ��}..--Q I-_—_i
L I
� �� \ / (�—��� ((/ —_ - '
\� \ � � _
a R � � �� � Z ---
� ;
;,�y%� \ �C � �� �� � \� U � �—_'Z�
�l � � � � � K \�T \� ����\_� ��� X \\�' �� �
� � /
� l / j % � '� �Ri�F � �\��� z�� � �� � ��� y / ��� I
�� U � % \ �
\ ��
� � � � � /� T � ���� ��� �� � � \�� I
. i ����p / � � � � � / \\ ��� ��v
�R � � �� � � � � � � � /� T � � a
/ �
�
�` � �'FS�A � I I j �,y /�� �
j� r r� �% �/ ��NT e � ��'oc ��� � i
'� / I / � I �� W.L. N0. 7 �j- /�\�
�� � � � � � � � � PR9P 72"W �� �
�\�-��� ��� � � � � / // / //� � ��� �
�� % / ��/� /� ��� I,
`/ / �
. .__ .-- \�( / � W.L. N0. 8 I I � ,
� � � � Q� ROP 8"W � I � _ -
� `� / / -
� �C � / �"J� W.L. N0. 7 --
� . _� � �� . . . C� \ �! � �� PROP 12"W
�'�I \ \�C�O� W.L. N0. 5 W.L. N0. 8
� � � \ �O��v/ PROP 12"W PROP 8"W
\ L. N0. 8
PROP 8"W
(LJ � T C�,A� �� __�__�==�==J
� I � � ;'�j � ��
� �— T �D T�,� �
� � _� \ � ��
N �' � � � W.L. N0. 5 � \�.
� �., � � �PROP 12"W . �
M ` �
/ / �
N J�- �O � � \
� , � ? yy,L. N0. 7 .�
� V ROP 12"W , :�
x i2"w �<u � / � Ex �2"w ��_
3 -_� nTi�i�T�n�rT�r� _
� --
—_ , �
o .....__� _- PRO� 8"W �
= I / � � �� Ex�a"w _ GLAD�TONE DRI � E �
� �\ �
—_— \
3 -�- _- , ,I —I' l' f ;1��4 � � �.
i
� LEGEND
U
X 100� DEVELOPER'S COST
W *__ 8", 12" AND 16" WATER LINES, FIRE HYDRANTS,
� GATE VALVES AND ASSOCIATED
M APPURTENANCES
� EXHIBIT "A" SCALE: 1°°=300°
N IPRC N0. 22-0221
`� WATER IMPROVEMENTS CITY PROJECT N0. 104118
o FID N0. 30114-0200431-104118-E07685
� M ORN I N GSTAR STREET/STORM DRAIN N0. K-3046
g WESTPOINT BOULEVARD AND X-27609
� N. INDIGO SKY DRIVE
�
� OWNER f DEVELOPER: ENGINEER:
� FG ALEDO DEVELOPMENT, LLC � WELCH ENGINEERING, INC.
+� 3045 LACKLAND BOULEVARD 1308 NORWOOD DRIVE, SUITE 200
d FORT WORTH, TEXAS 76116 BEDFORD, TEXAS 76022
% SHEET 2 OF 3
\
� \
/�A
/ \ \
.� ��
��
�
\ N- �
\ �, �\ /
� X
� � /
� �
\ � "Ex�"w
�� /
\ Ex a��v�
]
)
J
•
7
7
�\ ��
\
��
� �\
��� �
�� � Y%
�%y /
LEGEND
�111,` \ /\\ \
� / � \�
✓ \\ �
� \
� \
�
� � \ .
� \
� \�
10a� DEVELOPER'S COST
+� 4", 8", 12" AND 16" WATER LINES, FIRE
HYDRANTS, GATE VALVES AND
ASSOCIATED APPURTENANCES
EXHIBIT "A"
WATER IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
�
>
�
n
S
s
>
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
f� -
I I I
���
i
I
�II�
I—_—
�I �
�
�
�
B"W
� W.L. N0. 10
PROP 12"W
9"W
PROP 4"W
' 8"W
-�
�
s"w
i
i
W.L. N0. 10
PROP 12"W
/ I
I
SCALE: 1 "=300'
I
I
W.L. N0. 10
PROP 12"W
_��\
� �fX 72"W I
�
_ � � EX 16 "W� _ �EX 76 "W _ -
\ �-�
X \ I
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 301 1 4-0200431-1 041 1 8—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 3 OF 3
I I I I I �II I I
�-���-�T�-�
� � � � � � � �
iiiiiiii
L L
�-
r-
�-
�
I__
�_
/ � /
�
�
��
�� �� i � i
\ _i � i
\ �
� \\7 % j\
�� /
__ �� ��� % � �
� � 1�
1 �
� � � �% -`
� P��KETT, CREEK ri /
�
A
U
�
a
v
0
�
�
0�
/ � � � � � � ��\
--L�_L�i��� �
— — — —� — —
M
(LJ
0
(LJ
\
l!")
\
�
---------------�
i
� PROP 24"SS - - - � I
1 \
�, �, i
�Ivl^ATCH LI N E- SH EET 2 OF 2
�
PROP 24"SS
�\
\ \
I I
I I �
I I PROP 10"SI
I L--------�
I �
�------ --� I
PROP 24"SS I I
I I
I I
I I
I �PROP 24"S$
I I �
PROP 8"SS I � I
��
��
��
��
��
I I
�^ (
/ `
� /� \
X�S�
� N ��
<.� �
� `��.�
� � ��L /
�� ��
� EX 72 SS
�� � �
\ � �\
�� \
\ . � Y
�
�
E�2 ss
� ��
r
v,�
��'� ��
q
��•�
\� ��" �
�� \ �\
��
��
\ \ � � �
� �
t �
� �
� �
� `
� �
� �
\ �
,,
/, �,
i
i� /
� � � \
SS /
� \,�EX 21 ".SS
\ ��
\ �
.��
�PROP 24"SS
I �
i �
i
i i
i J
•PROP 8"SS
' 24"SS
I
24"SS I
�
� .
LEGEND
100� DEVELOPER'S COST
8", 10��, 12��, 18" AND 24�� SANITARY
SEWER LINES AND ASSOCIATED APPURTENANCES
EXHIBIT "A-1 "
SANITARY SEWER IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
SCALE: 1 "=300'
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118-E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 1 OF 2
\ /'��\ ���. U
��
T �� �� i ���
� �_ ?�� � �
\
�
i
� i
�
�
PROP 1
. \
PROP 18"SS
H
�l
U
�
a
v
0
�
�
�
n�ITI-f T�I-I�T
M
(LJ
0
(LJ
\
l!")
\
�
��\ I
�� �
_ ��i
/ j �
/\/ ��
\� -�� ,.,���
LEGEND
100� DEVELOPER'S COST
8", 10��, 12��, 18" AND 24�� SANITARY
SEWER LINES AND ASSOCIATED APPURTENANCES
EXHIBIT "A-1 "
SANITARY SEWER IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
rPROP 8"SS
L---------------
I
r PROP 24"SS - - - � I
\
\ �
� �
.��� PROP 24"SS � \�
SCALE: 1 "=300'
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118-E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 2 OF 2
i i� n
� �ii'i i
I — 11��.= --
I �o
�
I
�I m
Q �
�
�
, m
� �I m
N
�
A
U
�
�
0
M
M
�
0
(LJ
\
M
(LJ
�
�
� , 1
LEGEND
100� DEVELOPER'S COST
� 9" PAVEMENT W/29� CROSS SLOPE
ON 8" UME SUBGRADE
:� p � ���'�\
�K, Q
r � ��U� ` � \ �,'�.�
� � \
�� � /
� U �� ;
� � �\�'� �� �
'�Q�� � 7 / � ����z`/ GRFF � �� ..
—� � � � � l � m�? �.�� e���FF O ••
-- —� r�� `I/ l R a
I j � � " `� / � � °
I I I � I I / /� /'�. i �� C
�100� DEVELOPER'S COST
7.5" PAVEMENT W/2% CROSS SLOPE
ON 8" LIME SUBGRADE
�100� DEVELOPER'S COST
7.5" STAMPED/STAINED CONCRETE TRUCK
APRON ON 8�� LIME SUBGRADE
EXHIBIT "B"
PAVING IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
� ��� �
IT i I I—I_
IL�
--��.
I--IN
--�.
_ I=
I
--�N.
I I�
'qM i
�
�
�
�
�
------ SIDEWALK BY DEVELOPER
� SIDEWALK BY BUILDER
Q ADA RAMPS BY DEVELOPER
\
r
V
SCALE: 1 "=300'
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 1 OF 2
--------------- -----------_i�— -----
— — �--��-- � --
�\ i � � � � � � � � � � � � �
i i � � i i i I I i i i i
�� SUPREME STREET i SUPREME STI
— T T
� � Q I I I I I I I I �
� �--�- -I-�+�-�+�-� --T--
--`� I I I I I I I I r--+--w-
--J I I I I I I I I �_—�__� i
� � � � o
'I / I I LYFT LANE I I w --+--�
/ � I I I I I I I I� --�--_
�-� '--�--�!—�- —�o — c�
�',L --Q� r--+--m I
�---_� �--�---
m � I
m� � --� --T--
wESTPp�NT m L— °o --+--
�"�' R.o.wB�V�. m � — --�--
� � � �
I
�� �--sL_ , �
�__
M �. �\\\ ��_� M
N m \\ ♦� � �
� F¢_— �—_� � � i i i i i i i � � � �
--T-- --fi-- = T Q � __1_ I I I I I I I I I I I w __
--+-- --�-- c�--fi--�- � Q I I I I I I I I I I I�
--�-- - I -- �--�--Q --*--� --L��-L�-I-L���L�-p� L--
� —_.+— o--T--� --+--Q� I__� �� � �i I----Y1 I--
� J�� �-- fi--� --�--� I I I �� I � L---�'
� R� w �� I o —
�, AM% , }--- --rt--w --� � — c� �
, � � --�----_ _�
� , N �, ��, ,\ 1---� --�'��,�, \ I---Z --
�� \ noC� � �\� �\ �_ �\�`� \\ � �---z _
O� / ���! �� ��,� �, U� , �x �, I _
� l , m OR� �� �� / �� _ � ���C ��� � � ��
�, �
� �N � �\F ��� � ��� �`\��� �� y � ����
,� � � �� U � � ��
riJ L � / � r � OQ". � � � \ � �
�
A
U
�
�
(LJ
0
�
0
�
M
(LJ
0
(LJ
�
M
(LJ
\
�0
. h,F, `,w ,
j > � e� UFF ! w �� � / % m'
/ ���'.,= m � � ti �
/ � / N � m� �''►
M�
��% L ��� I r,� / , � j / �
�� � �
/ \ \� \Z �/ � / / / � �ry�,�
� J J 't\` / � / � /
— �_ ���� � � /
�( / /
U � / /
= � �Q �ij.�, ��C /� /
�
�� � � �9 � � `� �r';
� � �r � 3,e �
� ��� � � ��� c����
�
�\ 11 �
y`
���\��I i T � �
LEGEND
100% DEVELOPER'S COST
� 9" PAVEMENT W/2� CROSS SLOPE
ON 8" LIME SUBGRADE
�100% DEVELOPER'S COST
7.5" PAVEMENT W/29� CROSS SLOPE
ON 8" UME SUBGRADE
�100% DEVELOPER'S COST
7.5" STAMPED/STAINED CONCRETE TRUCK
APRON ON 8" LIME SUBGRADE
EXHIBIT "B"
PAVING IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
i . 'I
, ��j�� .
i����' �
i��
� �'%�i�` �•
.� ��� �
:� -'
��, �
.
� �•
r�i � �`��� `���, _ • ` _
��� �
� �1
O'
�_ _ _ � _ _ � _ _
� . I \
I
\ � �
------ SIDEWALK BY DEVELOPER
� SIDEWALK BY BUILDER
Q ADA RAMPS BY DEVELOPER
SCALE: 1 "=300'
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118-E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 2 OF 2
�
A
U
�
a
�
v
0
(LJ
0�
M
(LJ
0
(LJ
l!")
�
�
i i� n
� � ii �,i �
II '
1
STORM DRAIN IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
;
�
�
- �. � ,• - �
_ FF ; � �
�� I I I I ���`�K �R. j o� ��
i i� i � I I I I I � \��,, �. ��� ,\
LEGEND
10', 15, OR 20' INLET�
� 1009� DEVELOPER'S COST
STORM DRAIN AND INLET
AND ASSOCIATED APPURTENANCES
100� DEVELOPER'S COST
STORM DRAIN AND HEADWALL
EXHIBIT "B-1" SCALE: 1°°=300°
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TAS 76116
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TAS 76022
SHEET 1 OF 2
i�
; �_��_ � _ � _��_ � _
�I
I� I� I I I I I
I I I I SUPREME STR ET I
I-I. I i i I I-I_
--�-- N �
--T-- --�0 -
r--+—�� I I --� ,-
�-----��- — � w� �-
o I I IN � I !-
---I--�Q- — �� �{ '-
---�—�_ -- �w �!
a�
----- c� _
r--+- m- --�i/i Z� �-
�--�-- � � -- � QI �-
�-- �-- I I I � oi �-
--t--�I �--T— � I
--�-- -- fi- -
� --�--
-_�N --T--
, )� --t--
qM~ �� i---
\� �� ���
�
/ W � �� R�cK \
�'w � / �
P '_ � / � /
� N � �
i
--1--
I
---r--
--�--�
--�--�
--*--
� �--
� ��
��� ��
��T �� /
\`��F
4 RCP � i �
� . � so'gcP �
�.�q . I 72°RCP 24"RCP� �
� � �
� 4"RCP
F �� w � ��u,� .
\Z / �� ��
!J � � /
`� = rr � � j /
� Hl � j � � �
Q �� ` � � �
� \ � �'� � %
— � �C
<�j,�.� �
F
-- —` ,�q�ys � �
c�,�
�T F�
� I I / �� � \
�
A
U
�
a
�
�
0
�
o�
M
(LJ
O
ii.i
\
ll�
\
�
,
I� ��
� �
>�
� � � � � � � � � � � �
I I I I I I I I I I I W I
Q I I I I I I I I I I I� __
_�.L�� L�—I—L��I�L�_❑ � L--
� J-� �� I /� I---Y
��_� �\ � � �__�7 I--
I o
W -� ��� _-�----� -1
v -J`�� � I---z -
h � �� I - --
� ��� � J�--z
, � V�' �� �� —�
� �
� � X ���
�\ � �,� � ��� ��\ � � ��
'�� ��� ������ �� y � ���
� �� �
� �� ��� � \ � \�� �
\ �
� � \
\ \
\ \\
�
�
/� I I I i� T\��
ST'OpN� � I I j,�, �'-9� i��
'� . 4.,RCP e��/O 24°RCP �% ��/ /T � I
.�
� \���— ;s' �, � Ri� ��'S' �^J
��CP 10' / � / /
�p•r. /
% _10a 24"RCP � -
i l� �s•x�• Rce ,� ��\
� �\�
.� � � ��`e
� / �/ /
/
/ i
��
/ /
���� i� ti
��TxDOT PW-
HEADWAL�
�I�'�� ��\ � . _
.-S -
FTxDOT PW-1
HEADWALL
MULTI BOX CULVERT
1-9'x8'RCB
5-9'X6'RCB's
TxDOT PW-1 ��� E
HEADWALL � T�Q•
%=� -L=r �`'
�
-� 24"RCP 36"RCP
�7p' � Y- 21"RCp� 4"RCP
�' - - ,�� 4�,-R�P
�2 •' p
24"RCP
\�-10_Y_�_ p� � 8'X7' RCB
rxoar"Pw ,
HEADWALL
I
I
I
/
� \� \
SCALE: 1 "=300'
LEGEND
10', 15, OR 20' INLET�
� 1009� DEVELOPER'S COST
STORM DRAIN AND INLET
AND ASSOCIATED APPURTENANCES
100� DEVELOPER'S COST
STORM DRAIN AND HEADWALL
EXHIBIT "B-1"
STORM DRAIN IMPROVEMENTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TAS 76116
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TAS 76022
SHEET 2 OF 2
I' j i i I I li
„
�- ���------------------------
I �°' ��� �— � � � � �
\ I SUPREME STREET I
�� L L
� o �—Z � � � � � � � �
� �~ a � � � � � � � �
o _� �—�+�—�+�—�
} I I I I I I I I
— J
L L
// / I I LYFT L NE I I
/ � I I I I I I I I�
I I I I I .L_L-
wFsTpo/�T e< �
��, O
�
A
U
�
�
�
�
�
�
�
M
(LJ
0
(LJ
\
M
(LJ
�0
�
�
�� <
r � ��
�\U�.
���
�
��
� U
Q�
-- �
� ' �..
�
—.��
_.�J
—_
�
_.�
m
--�
, �
/
n
� � � � � � � � � � �
i SUPREME STREET � � I—I_
�—_�
I
---T--
r---�--� I
�---�---�-
� �I
---T--�
---�--�
--�--�
_
— — _I- — _:�
�--T—_m I
�--- � -- �
---T--
--+--
\----� --
/ � /
�� /
/ � /�
����/ % � %
�'\�,i;
,�
�`'7 � ' � �J c,
�, i i � m �
_� � � � � / � ' �
-- 1 fi �r��� / �
I � I � � ��� ;�
\
r
V
�'
LEGEND
�o -- PROPOSED STREET LIGHT (10a% DEVELOPER'S COST)
� -- PROPOSED STREET SIGN (100� DEVELOPER'S COST)
■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST)
� -- EXISTING STREET LIGHT
EXHIBIT "C1"
STREET NAME SIGNS AND STREET LIGHTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
SCALE: 1 "=300'
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 1 OF 2
_ �
LL �
--�0 w
� ---��N ol
— �� ��
-- �w =
--�='u^' Z
—_�- " �
I a�
I I� �
--� �
---IW
__ IZ
IJ
--�
R'�M i�= �
� , � -�
, � / ' ��
r � /
��:". ,
�� .
:FN �,
6� UF
\` F �R �
O�. ;
h �
---�-- ' --t--�
--+-- --�--
--�-- --! --
�� -- fi--
�
��
�
�,
� '
�
W
— — �Z.
, �J
—� _�.
�
A
U
�
�
�
�
�
�
�
I �
� ��
��� � I�
��
� . � � ` �i�
M
(LJ
0
(LJ
\
M
�
�
�
�---�---
--t---
--�---
--T---
— i
_- i ---
--+---
�
1 k--
I L__
7 I __
----�
----1
� ��
j ��
��
���
�� � � I
�
�
�� �\
�
, �
i T ��
����� .� ��
.\`C���� ���. I
� � � �\� � ,
� �� � � �_
-���, � I � I i
��
LEGEND
�o -- PROPOSED STREET LIGHT (10a% DEVELOPER'S COST)
� -- PROPOSED STREET SIGN (100� DEVELOPER'S COST)
■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST)
� -- EXISTING STREET LIGHT
EXHIBIT "C1"
STREET NAME SIGNS AND STREET LIGHTS
MORNINGSTAR
WESTPOINT BOULEVARD AND
N. INDIGO SKY DRIVE
OWNER f DEVELOPER:
FG ALEDO DEVELOPMENT, LLC
3045 LACKLAND BOULEVARD
FORT WORTH, TEXAS 76116
I /
-�_
SCALE: 1 "=300'
IPRC N0. 22-0221
CITY PROJECT N0. 104118
FID N0. 30114-0200431-104118—E07685
STREET/STORM DRAIN N0. K-3046
X-27609
ENGINEER:
� WELCH ENGINEERING, INC.
1308 NORWOOD DRIVE, SUITE 200
BEDFORD, TEXAS 76022
SHEET 2 OF 2
� � � � � � � � � � �
iiiiiiiiiiiW
Qi�iiiiiiii��
_�.L�� L�-I-L���L�_❑
i a—� \�. � �� �---Y
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNIIYGSTAR - WCSTPOINT PARI{WAY
UNIT PRICE BID
004243
DAP - 6ID PROPOSAL
Page I of 8
CONTRACT: 8/30/2023
CPN: 104118 I PRC22-0221
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Description Specification Unit of Bid Unit Price Bid Value
Item No. Section No. Measure Quantity
UNIT I: WATER IMPROVEMENTS
1-I 3311.0161 6" PVC WaterPipe 33 11 10 LF 180 $43.00 $7,740.00
I-2 3311.0261 8" PVC Water Pipe 33 11 10 LF 974 $65.00 $63,310.00
I-3 3311.0261 8" PVC Water Pipe, �v/CSS 33 I I 10 LF 20 $I 15.00 $2,300.00
I-4 3311.0251 8" DIP Water 33 1 I 10 LP 12 $65.00 $780.00
I-5 3311.0461 12" DR-14 PVC Water Pipe 33 1 I 10 LF 2,500 $95.00 $237,500.00
1-6 3311.0442 12" DR-14 PVC Water pipe, w/CSS 33 11 10 LP 40 $IZ5.00 $5,000.00
I-7 9999.0100 ]2" DR-14 PVC Water Pipe w/Concrete Casing 33 1 I 10 LF 38 $125.00 $4,750.00
1-8 9999.0101 12" DR-14 PVC Water Pipe w/24" Steel Casing 33 11 10 LP 155 $310.00 $48,050.00
IA 3311.0454 ]2"DIPWater(Restraint.ioints) 331110 LF 446 $110.00 $49,060.00
1-10 9999.0102 12" DIP Water (Restraint Joints), 24" Steel Casing 33 I I 10 LI� 147 $340.00 $49,980.00
1-I 1 3311.0454 12" DIP Wa[er (Restraint Joints), w/CSS 33 11 10 LP 120 $125.00 $15,000.00
1-12 3311.0541 16" DR-14 PVC Water Pipe 33 1 I 10 I.F 905 $165.00 $149,325.00
1-13 3311.0554 16" DIP Water(Restrained.loints) 33 1I 10 LP 30 $165.00 $4,950.00
t-14 9999.0103 16" DR-14 PVC Water Pipe w/30" Steel Casing 33 I 1 10 LF 20 $375.00 $7,500.00
I-14 0241.1 I 18 4"-12" Pressure Plugs 02 41 14 EA 10 $500.00 $5,000.00
I-15 3305.0109 Trench Safcty 33 OS 10 LF 5,587 $1.00 $5,587.00
I-16 3312.3002 6" Gate Valve 33 12 20 GA 9 $1,250.00 $11,250.00
I-17 3312.3003 8" Gate Valve 33 12 20 GA 6 $2,100.00 $12,600.00
1-18 3312.3005 12" Gate Valve 33 12 20 EA 16 $4,250.00 $68,000.00
1-19 9999.0104 12" Gate Valve and Box (Pressure Plane) 33 12 20 EA 1 $4,250.00 $4,250.00
1-20 3312.3006 16" Gate Valve wNault 33 12 20 EA 2 $25,000.00 $50,000.00
1-21 3312.0117 Connect. to Exis[ing 4"-12" Water Main 33 12 25 EA 7 $1,500.00 $10,500.00
I-22 3312.0001 Fire Hydran[ 33 12 40 F,A 7 $5,600.00 $39,200.00
1-23 3312.6002 6" Blow Off Valve (Detail D105) 33 12 60 CA 1 $25,000.00 $25,000.00
� �4 9) 99.0105 d�djust existing 12" Valve box w/Concrete collar (Sheet 02 41 14 EA 1 $500.00 $500.00
� �5 3305.01 I I Adjust Lx. Valve Box Adjustment to finished grade 33 OS 14 FiA ? $500.00 $1,000.00
(Sht 9)
1-26 3305.0106 Manhole Adjustment, Valve Vault (Sheet 9) 33 OS 14 EA 1 $1,500.00 $1,500.00
1-27 3305.0108 MiscelL Structure Adjustment, Air Release (Sheet 9) 33 OS 14 EA 1 $2,500.00 $2,500.00
� �8 9999.0106 Remove & Replace 7.5" Pavement/Lime Stabiliza[ion 02 41 14 S[' 296 $26.00 $7,696.00
Pressure Plugs (Sheets 12 & 13)
��9 9999.0107 Remove & Replace 6.0" Pavement/Lime Stabilization 02 41 14 SF 260 $24.00 $6,240.00
Pressure Plugs (Sheets 16)
9999.0016 Remove & Replace Barrier �ree I2amp - Type P-1
1-30 �Modified) (Sheets 12 & 13) 02 41 14 EA 2 $4,200.00 $8,400.00
� 31 9999.0108 Remove & Replace existing Concrete Driveway (4" 02 41 14 SP 245 $26.00 $6,370.00
Thick) (Sheet I?)
� 3� 9999.0109 Remove & Replace existing residential sidewalk (4" 02 41 14 SP �,570 $26.00 $66,820.00
Thick) (Sheets 13 & 13) -
1-33 9999.0110 Cut, Backfill Grout, Plug and Abandon in Place 12" 02 41 14 LP 50 $95.00 $4,750.00
Water Line (Sheet 13)
1-34 3311.0001 Ductile Iron Water Pittings w/Restraint 33 11 11 7'ON 16 $12,000.00 $192,000.00
1-35 3137.0105 Medium Stone, Riprap, dry 31 37 00 SY 500 $125.00 $62,500.00
1-36 0241.1118 4" - 12" Pressure Plugs OZ 41 14 EA 11 $500.00 $5,500.00
1-37 33122003 1" Irrigation Service (Medians or POS) 33 12 10 EA 4 $1,250.00 $5,000.00
CITY Of �ORT WORTH
STANDARD CONSTRUCTION SPECIFICA770N DOCUMENTS - DGVGLOPER AWARDLD PROJGCTS
Form Version April 2, 2014 00 42 43 - BIDDING CONTRACT - MORNINGSTAR - WESTPOINT PARKWAY - 0830-23.x1s
004243
DAP - BID PROPOSAL
Page 2 of 8
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - W GSTPOIN7' PARICVVAY
. `► ' : a=�=�l��
CONTRACT: 8/30/2023
CPN : 104118 IPRC22-0221
Bidder's Application
Project Item Infonnation Bidder's Proposal
Bidlist Specification Unit of Bid
Item No. Description Section No. Measure Quantity Unit Price Bid Value
I-38 33122203 2" Irrigation Service (Medians or POS) 33 12 10 EA 6 $3,400.00 $2Q400.00
1-39 3311.0261 8" DR-14 PVC Water Pipe (Items 1-39 to 1-57, Shts. 33 I 1]0 LP 10 $65.00 $650.00
16A to 1GC
1-40 3311.0461 12" DR-14 PVC Water Pipe 33 1 I 10 LF 2,155 $95.00 $204,725.00
1-41 9999.0110 12" Water Pipe w/Concrete Casing 33 11 10 LP 5 $I25.00 $625.00
1-42 9999.0111 12" DIP Water Pipe 33 I l 10 LF 25 $125.00 �3,125.00
I-43 9999.0112 12" DIP Water Pipe w/24" Steel Casing 33 11 ]0 LP' 6 $310.00 $1,860.00
1-44 9999.0113 12" DIP Water Pipe w/24" Steel Casing on Conc. 33 11 10 LF 35 $150.00 $5,250.00
Cradle
1-45 3305.0109 Trencli Safety 33 OS 10 LF 2,170 $1.00 $2,170.00
1-46 3312.3003 8" Gate Valve 33 12 20 EA 1 $2,100.00 $2,100.00
1-47 3312.3005 13" Gate Valve 33 12 20 GA 4 $4,250.00 $17,000.00
I-48 0241.] 118 4"-12" Pressure Plugs 0? 41 ]4 GA 2 $500.00 $1,000.00
1-49 3312.0117 Connect. to Existing 4"-12" Water Main 33 12 25 EA 1 $1,500.00 $1,500.00
I-50 33122203 2" [rrigation Service (Medians or POS) 33 12 10 EA 2 $3,400.00 $6,800.00
� 5� 33122802 4"-Combination Turbine Metter Vault installation with 33 12 11 LS 1 $65,000.00 $65,000.00
bypass per D-I 19 with 27 L.F. of 4" PVC water line an 4" plug
1-52 3137.0105 Medium Stone, Riprap, dry 31 37 00 SY 334 $125.00 $41,750.00
1-53 9999.01 14 Remove & Replace 7.5" Pavement/Lime Stabilization 02 41 14 SY 19 $261.00 $4,959.00
Pressure Plugs
i-54 9999.0115 Remove & Replace existing residential sidewalk (4" 02 41 14 SF 860 $26.00 $22,360.00
Thick)
1-55 3213.0501 Remove & Replace existing R-I ADA Ramp 32 13 20 �A 1 $4,200.00 $4,200.00
9999.0116 Remove existing 167 L.F. of an existing 8" waterline ,
1-56 remove and salvage an existing 8" gate valve an box, remove 8"x8" 02 41 14 LS 1 $9,500.00 $9,500.00
anchor tee and install 12" anchor tee with 2-12" a8" reducers.
� 5� 9999.0117 Slavage and Reinstall existing Washington Styte Street 34 41 20 EA 1 $15,000.00 $15,000.00
Light witli Type 7 founda[ion.
UNIT L• WATER IMPROVEMENTS TO"CAL $1,677,382.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECI�ICATION DOCUMLNTS - DEVELOPLR AWARDLD PROJBCTS
Form Version April 2, 2014 00 42 43 - 61DDING CONTRACT - MORNINGSTAR - WESTPOINT PARKWAY - 08-30-23.x1s
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
M02NINGSTAR - WESTPOINT PARKWAY
UNIT PRICE BID
004243
DM - BID PROPOSAL
Page 3 of 8
CONTRACT: 9/27/2023
CPN: 104118 I PRC22-0221
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Description Specification Unit of Q�d Unit Price Bid Value
Item No. Section No. Measure Quantity
UNIT II: SANITARY SEWER IMPROVEMENTS
2-I 3331.4108 6" Sewer Pipe SDR-26 (Sheet 22) 33 I 1 10 LP 84 $50.00 $4,20Q00
2-2 3331.41 I S 8" Sewer Pipe SDR-26 33 I 1 10 LP 594 $65.00 $38,610.00
2-3 3331.4116 8" Sewer Pipe SDR-26 w/CSS 33 11 10 Ll� 40 $i25.00 $5,000.00
2-4 9999.0200 8" Sewer Pipe SDR-26 w/Concrete Encasement 33 I 1 10, 33 OS 10 LP 42 $125.00 $5,250.00
2-5 9999.0201 8" DIP Sewer, w/Gpoxy Coating 33 11 10 LP 4 $ I 10.00 $440.00
2-6 9999.0202 8" DIP Sewer w/20" Steel Casing, w/�poxy Coating 33 1 1 10 LP 189 $225.00 $43,525.00
2-7 3331.4201 10" Sewer Pipe SDR-26 33 11 10 LP' 30 $74.00 $2,220.00
2-8 3331.4115 IZ" Sewer Pipe SDR-26 33 I 1 10 LP' 356 $85.00 $30,260.00
2-9 3331.41 16 l2" Sewer Pipe SDR-26 w/CSS 33 1 I 10 LP SO $145.00 $7,250.00
2-10 9999.0203 12" D[P Sewer w/Gpoxy Coating 33 1 I 10 LP 283 $185.00 $52,355.00
2-11 9999.0204 12" DIP w/34" Steel Casing,w/Gpoxy Coa[ing 33 1 I 10 I.F 130 $375.00 $48,750.00
2-12 9999.0205 12" DIP, w/CSS 33 11 10 LP 50 $235.00 $11,750.00
2-13 3331.4235 18" DR-14 Sewer 33 11 10 LF 20 $118.00 $2,360.00
2-14 3331.4309 24" HDPG DR-17 DIPS Pipe 33 41 10, 33 31 13 LP 3,664 $350.00 $1,282,400.00
33 OS 10
2-15 3305.0202 Imported GmbedmenU[3ackfill, CSS 33 OS 10 CY 50 $25.00 $1,250.00
2-16 3305.0203 Imported F,mbedmenUl3ackfill, CLSM (D201B01) 33 OS 10 CY 2,400 $35.00 $84,000.00
2-16A 3305.0116 Concrete Gncasement for Utility Pipes 33 OS 10 CY 56 $75.00 $4,200.00
2-17 3331.4323 24" DIP Sewer Pipe, w/Gpoxy Coating 33 I 1 10 33 OS 10 LP 249 $400.00 $99,600.00
2-18 9999.0207 24" HDPL-' DR-17 DIPS Pipe with Epoxy Coating 33 I I 10, 33 OS 10 L� 155 $573.00 $88,815.00
2-18A 3305.1007 42" Casing by Open Cut 33 OS 22 LP I55 $425.00 $65,875.00
2-19 3305.0109 Trench Safety 33 OS 10 LF 2,354 $1.50 $3,531.00
2-20 9999.0210 Wagner No. 3050-200 Order Control (See Sheet 33A) 33 39 60 EA 1 $18,000.00 $18,000.00
2-21 9999.0211 Wagner No. 2050-450 Order Control (See Sheet 33A) 33 39 60 EA 4 $31,250.00 $125,000.00
2-22 3301.0002 Post-CCTV Inspection 33 O1 31 LF 2,354 $4?0 $9,886.80
2-33 3339.1001 4' Manhole (0-6' Depth) 33 39 20 �A 1 I $6,400.00 $70,400.00
2-24 3339.1002 4' Drop Manhole (0-6' Depth) 33 39 20 EA 2 $7,200.00 $14,400.00
Z-25 3339.1003 4' Extra Depth Manhole 33 39 20 VP 152 $200.00 $30,400.00
2-26 3339.1 101 5' Manhole (0-6 Depth) 33 39 20 �A I S $7,500.00 $ I 12,500.00
2-27 3339.1102 5' Drop Manhole (0-G Depth) 33 39 20 EA 3 $8,600.00 $25,800.00
2-28 3339.1 ]03 5' Extra DepUi Manhole 33 39 20 VF 312 $300.00 $93,600.00
2-29 3339.0001 Epoxy Manhole Coating (24" Manholes Only) 33 39 60 V[' 475 $3 ] 0.00 $147,250.00
2-29A 3339.000] �poxy Manhole Coating 33 39 60 VF 32 $310.00 $9,920.00
2-30 3301.0101 Manhole Vacuum Testing 33 01 30 EA 29 $150.00 $4,350.00
2-31 0241.11 1 S 4" - 12" Pressure Plug 02 41 14 EA 8 $500.00 $4,000.00
2-32 0241.1107 18" Pressure Plug 02 41 14 EA 1 $I,500.00 $1,500.00
3-33 9999.0212 Co��nect to Existing Sanitary Sewer Main (8-21 ") 33 I I 10 EA 1 $2,41520 $2,41520
2-34 3305.0113 Trench Water Stops 33 11 10 GA 12 $950.00 $I 1,400.00
CITY O� FORT WOR'I�H
STANDARD CONSTRUCTION SPECIPICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
�orm Version April 2, 2014 00 42 43 - SEWGR IN NHW C�A - 09-28-23.x1s
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - W�STPOINT PARKWAY
_- - �
-
004243
DAP - BID PROPOSAL
Page 4 of 8
CONTRACT: 9/27/2023
C PN: 104118 IP RC22-0221
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item No. Description Section No. Measure Quantity Unit Price Bid Value
2-35 3137.0105 Mediwn Stone, Riprap, dry 31 37 00 SY 356 $125.00 $44,500.00
UNIT [L• SANITARY SEWER IMPROVEMGNTS 'I'OTAL $2,605,963.00
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS
CITY OF FORT WOR7'H
STANDARD CONSTRUCTION SPGCIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
FonnVersionApri12,2014 004243- SEWERINNEWCFA-09-28-23.xis
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - WESTPOiNT PARKWAY
UNIT PRICE BID
ooazas
DAP-Bm PROPOSAL
Page 5 of B
coN�rRncr: siaonoz3
CPN: 104118 IPRC22-02Z 1
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist p�ription Specification Unit of B�d Unit Price Bid Value
[tem No. Section No. Measure Quantity
UNIT III: DRAINAGE IMPROVEMENTS
3-I 3341.0205 ?4" RCP, Class Ill 33 41 10 LF 1,511 $105.00 5158,655.00
3-2 3341.0302 30" RCP, Class III 33 41 10 LF 304 $128.00 538,912.00
3-3 3341.0309 36" RCP, Class III 33 41 10 LF 545 5160.00 $87,200.00
3-4 3341.0402 42" RCP, Class lI[ 33 41 10 LF S 16 $201.00 $103,716.00
3-5 3341.0409 48" RCP, Class III 33 41 10 LF 575 $275.00 $158,125.00
3-6 334I .050? 54" RCP, Class llt 33 41 I O LF 48 $325.00 S 15,600.00
3-7 3341.060? 60" RCP, Class Il1 33 41 10 LF 290 $405.00 SI 17,450.00
3-8 3341.0701 72" RCP, Class ll[ 33 41 10 LF 325 $550.00 $178,750.00
3-9 3341.1102 4' x 3' Box Culvert (Multi-Box Structure, Sheet 53 ) 33 41 10 LF 373 5500.00 $186,000.00
3-IO 3341.1305 6' x 6' Box Culvert 33 41 10 LF 492 $675 00 $332,100.00
3-1 I 3341.1605 8' x 6' Box Culvert 33 41 10 LF 310 S758.00 $234,980.00
3-12 3341.1504 8' x T Box Culvert 33 41 10 LF 1,124 $875.00 $983,500.00
3-13 3341. t 603 9' x 6' Box Culvert (Multi-Box Structure, Sheet 50) 33 41 10 LF 376 $1,150.00 $432,400.00
3-14 3341.1605 9' x 8' Box Culvert (Multi-Box Structure, Sheet 50) 33 41 10 LF 75 $ I,250.00 $93,750.00
3-I S 3305.0109 Trench Safety 33 05 10 LF 6,863 $I.00 $6,863.00
3-16 3349.0001 4' Stortn Junction Box 33 49 20 EA 3 $5,500.00 516,500.00
3-i 7 3349.0002 5' Stortn Junction Box 33 49 ?0 EA I $6,000.00 $6,000.00
3-I 8 3349.0003 6' Stocm Junction Box 33 49 ?0 EA I $6,500.00 $6,500.00
3- I 9 3349.0004 7' Stortn Junction Box 33 49 ?0 EA I $8,000.00 $8,000.00
3-20 3349.7001 4' Drop Inlet 33 49 20 EA I 57,500.00 $7,500.00
3-21 3349.700? 5' Drop Inlet 33 49 ?0 EA 3 $7,500.00 $ I 5,000.00
3-33 9999.0301 7' Drop Inlet 33 49 20 EA I SI 1,250.00 $I 1,?50.0�
3-?3 3349.0102 4' Manhole Riser 33 49 10 EA 7 $1?50.00 $8,750.00
3-24 3349.5001 10' Curb Inlet 33 49 20 EA 2 57,500 00 $I5,000.00
3-25 3349 5003 20' Curb Inlet 33 49 30 EA 2 S I 5,000 00 $30,000.00
3-26 3349.6001 10' Recessed Curb Inlet 33 49 20 EA 22 58,500.00 $187,000.00
3-27 3349.6002 15' Recessed Curb Inlet 33 49 20 EA 2 I13,250.00 $26,500.00
3-28 024130?I Remove42"RCP 024114 LF 38 550.00 $I,900.00
3-29 3341.0402 - Install 4?" RCP, Class 111 33 41 10 LF 12 $201.00 $2,412.00
3-30 9999.0303 TxDOT 4:1 Type PW-1 Headwafl w!1'xDOT Type 33 49 40 EA 2 SI05,000.00 $210,000.00
PRI I Handrail, Multi-Box (1) 9x8, (5) 9x6, refer to Sheet 50
3-31 9999.0303 TxDOT 4:1 Type CH-PW-S Headwall, (1) 36" 33 49 40 EA 1 515,000.00 $I5,000.00
3-32 9999•0304 TxDOT 4:1 Type PW-1 Headwall wlTxDOT Type 33 49 40 EA I 526,000.00 $26,000.00
PRI 1 Handrail, Multi-Box (2) 4x3, refer w Sheet 53
3-33 3137.0110 Rock Chute Discharge - Main "B" (Sheet 38 & 51) 31 37 00 SY 135 $175.00 $23,625.00
3-34 3137.0110 Rock Chute Discharge - Main "C" (Sheet 38 & 52) 31 37 00 SY 574 $175.00 $100,450.00
3-35 3137.0105 Medium Stone, Riprap, dry (See individua) Drainage 31 37 00 SY 6,5?5 $125 00 $815,625.00
Structure Graduation Charts)
3-36 9999.0305 Connect to Existing Storm Sewer Main 33 1 I 10 EA I $1,500 00 $1,500.0
UNIT lll: DRAINACE IMPROVEMEN75 TOTAL $4,662.513.00
CITY OF FOAT WORTH
STANDARD CONSTRUCTION SPECffICAT10N DOCIJMENTS - DEVEC,OPER AWARDED PROIECTS
Fortn Version April 2, 2014 00 42 43 - BIDD(NG CONTRACT - MORNiNGSTAR - WESTPOMT PARKWAY - OS•30•23 xls
SECTION 00 42 43
Developer Awarded ProJects - PROPOSAL FORM
MORNINGSTAR - WESTPOINT PARKWAV
UNIT PRICE BID
004243
DAP - Bm PROPOSAL
Page 8 of 8
CONTRACT: 8l30l2023
CPN: 104118 IPRC22-0221
Bidder's Application
Project Item Information Bidder's Proposal
Bidiist Description Specification Unit of B�d Unit Price Bid Value
Item No. Section No. Measure Quantity
Bid Summary
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT 111: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
Cootractor agrees to complete WORK for F1NAL ACCEPTANCE within
CONTRAC'I' commences to run as provided in the Geoeral Cooditions.
WATERIMPROVEMENTS
SANITARY SEWER IMPROVEMENTS
DRAINAGEIMPROVEMENTS
PAVING IMPROVEMENTS
STREET tIGHT IMPROVEMENTS
Total Construction Bid
�80 working days after the date when the
40 working days.
80 working days.
60 wo�lcing days.
working days.
working days.
END OF SECTION
Cli'Y OP FORT WORTH
STANDARD CONSTRUCTION SPECffICATtON DOClftv�NTS - DEVELOPER AWARDED PROJECTS
Form Yeroion April 2, 2014 00 42 43 - B1DD[NG CON7'RACT - MORNiNGSTAR - WESIPOINT PARKWAY • 08•30•23.xis
_ . _._ __ .. .
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - WESTPOINT PARKWAY
UNIT PRICE BID
004243
DAP - BID PROPOSAL
Page G of 8
CONTRACT: S/14/2023
CPN: 104118 [PRC22-0221
Bidder's Application
Project Item Infonnation Bidder's Proposal
Bidlist Description Specification Unit of B�d Unit Price Qid Value
Item No. Section No. Measure Quantity
UNIT IV: PAVING IMPROVEMENTS
4 � 9999.0401 7.5" Conc. Pvmt (Indigo Sky Drive) - 4,000 psi 32 13 13 SY 3,968 $61.95 $245,817.60
(#3�18)
4-2 321 1.0502 8" Lime 1'reatment 32 1 I 29 SY 4,226 $4.50 $19,017.00
4-3 3211.0400 Hydrate Lime 32 11 29 TN 64 $288.60 $18,470.40
4-4 9999.0402 7.5" "Stamped" Conc. Pvmt (1 I-foot width-diameter) 32 13 13 SY 323 $255.55 $83,542.65
Central Island, (WestpoinQ - 4,000 psi (#3@18) T�vck Apron
4-5 3211.0502 8" Lime Treatment 32 11 29 SY 344 $4.50 $1,548.00
4-6 3211.0400 Hydrate Lime 32 I 1 29 1'N 5 $288.60 $1,443.00
4-7 3216.0102 7" Concrete Curb (Central Island Curb) 32 16 13 LP 230 $35.95 $8,268.50
4-8 3213.0104 9.0" Conc. Pvmt (Westpoint) - 4,000 psi (#4 cr 18) 32 13 13 SY 25,650 $73.05 $1,873,732.50
4-9 3211.0502 8" Lime Treatment 32 1 I 29 SY 27,317 $4.50 $122,926.50
4-10 3211.0400 Hydrate Lime 32 1 I 29 TN 547 $288.60 $157,86420
4-11 9999.0403 4" or 6" Splitter Island (Round-about) 32 13 20 SF 1,189 $30.30 $36,026.70
4-12 9999.0404 10' Stamped Colored Concrete Cross-walks 32 13 20 SP 1,761 $30.30 $53,358.30
4-13 3213.0302 5-foot, 4" Concrete Sidewalk 32 13 20 SP 250 $6.00 $I,500.00
4-14 3213.0302 G-foot, 4" Concrete Sidewalk 32 ]3 20 SP 4,828 $6.00 $28,968.00
4-15 9999.0405 Transition Areas G to 10' width 32 16 13 SF 1,780 $6.00 $10,680.00
4-16 9999.0406 10-foot, 4" Concrete Sidewalk 32 13 20 SP 79,004 $6.00 $474,024.00
4-17 3213.0506 Barrier Free Ramp - Type P-1 (Modified) 32 13 20 EA ]4 $2,950.00 $41,300.00
4-18 3213.0504 [3arrier Free Ramp - Type M-2 32 13 20 EA 8 $3,O60A0 $24,480.00
4-19 3213.0509 Barrier Pree Ramp - Type C-2 32 13 20 EA 4 $1,300.00 $5,200.00
4-20 3217.0501 White Stop Qar 32 17 23 LF 22 $16.80 $369.60
4-21 3217.0102 6" Yellow Solid (Double) 32 17 23 LF 430 $4.35 $1,870.50
4-22 3217.0101 6" Wliite Solid 32 17 23 LF 2,958 $2.20 $6,507.60
4-23 9999.0407 6" White Dash w/Type II CR 4" RPM's 32 17 23 LP 6,590 $2.90 $19,1 I 1.00
4-24 3217.0201 8" White Solid - Round-aboirt 32 17 23 L� 770 $2.70 $2,079.00
4-25 3217.0201 8" White Solid - 2" Dash - Round-about 32 17 23 LF 220 $2.70 $594.00
4-26 3217.0201 8" White Solid - 3" Dash - Roimd-about 32 17 23 LF 41 $2.70 $ I 10.70
4-27 3217.0302 12" White Solid Crosswalk Strip 32 17 23 LP 324 $8.55 $2,77020
4-28 3217.040218"WhiteSolid 321723 LP 1,514 $13.05 $18,243.70
4-29 3217.0403 18" Yellow Solid 32 17 23 LP 31 $12.05 $373.55
4-30 3217.1009 Words and Arrow 32 17 23 GA 28 $788.25 $22,071.00
4-31 3217.0502 24" White Contrast Crosswalk 32 17 23 LP 89 $26.75 $2,380.75
4-32 9999.0408 Street [3arricade Type ll[ (street dead ends) 31 36 00 LF 176 $50.00 $8,800.00
4-33 3124.0101 Gmbanktnent Plan (Parkway/Median Acceptable 31 34 00 CY 1,933 $52.00 $100,516.00
Backfill)
4-34 3292.0100 Block Sod Placemen[ (Central Island in Round-aUout) 32 92 13 SY 4,075 $5.92 $24,124.00
4-35 3292.0400 Seed Hydromulch (Parkways and Medians) 32 92 14 SY 11,600 $1.53 $17,748.00
3441.4003 �urnish & Install Ground Mount Post, unless at the
4-36 intersection, mount to Street Light corner w/Stop & Directive Signs 34 41 30 GA 1? $350.00 $4,200.00
(Rl-1).
4-37 9999.0409 Street Name Plates for Street Intersection (D3-1) 34 41 30 GA 12 $695.00 $8,340.00
4-38 9999.0410 Miscell Sign with Steel Posts (See Sheet 86) 34 41 30 EA 73 $415.00 $30,295.00
UNIT IV: PAVING IMPROVEMENTS TOTAL $3,477,671.95
CIl'Y OP FORT WORTH
STANDARD CONSTRUCTION SPBCI�ICATION DOCUMBNTS - DEVLLOPER AWARDED PROIGCTS
Form Version April 2, 2014 00 42 43 - 6IDDING - MORNINGSTAR - WBSTPOINT PARKWAY - 08-14-23x1s
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - W ESTPOI[YT PARKWAY
UNIT PRICE BID
004243
DM - BID PROPOSAL
Page 8 of 8
CONTRACT: 8/14/2023
CPN: 104118 IPRC22-0221
Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Specification Unit of Bid
Item No. Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I: WATER IMPROVEMENTS
UNIT II: SANITARY SEWER IMPROVEMENTS
UNIT tll: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
Total Construction Bid
Contractor agrees to complete WORK for FINAL ACCEPTANCE withm $5�s j�p�y`�:fvorking days after the date when thc
CONTRACT commences to run as provided in the General Conditions. ,� ^
WATERIMPROVEMENTS
SANITARY SEWER IMPROVEMENTS
DRAINAGEIMPROVEMENTS
PAVING IMPROVEMENTS
STREET LIGHT IMPROVEMENTS
working days.
working days.
working days.
85 working days.
working days.
ENA OF SECTION
671.95
.95
CITY OF FORT WORTfi
STANDARD CONSTRUCTfON SPECIFICATION DOCUIvIENTS - DEVELOPER AWARDED PROIEC'CS
Form Version April 2, 2014 00 42 43 - BIDDING - MORNINGSTAR - WESTPOIN'C PARKWAY - 08-I4-23 xls
secTio�v oo aa as
004243
DAP-Bm PROPOSAL
Page 7 ofe
Developer Awarded Projects - PROPOSAL FORM CONTRnCT: 7/3orzo2a
MORIVINGSTAR - WESTpOIIVT PARKWAY CPN: 104118 iPRC22-0221
C[TY OF FORT WORTH
STANDARD CONS7RUCTYON SPECffICAflON DOCUMEN7S - DEVELOPER AWqRDED PROJECTS
FormYusionApri12,2014 004243- BIDDlPSG•MORNMGSTAIt-WFS7pplNfpqR1(�yAY-07-30•23.xts
M � � ,
�
;� ,� .,• .�. .• � � ' : : � .. ��. ..
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
MORNINGSTAR - WESTPOINT PARKWAY
UNIT PRICE BID
Project Item InformaUon
Bidlist
Item No.
004243
DAP-HIDPROPOSAL
Pega 8 of 8
CONTRAC'f: 7/30f1023
CPN: 104118 IPRC22-0221
Bidder's Application
Description Specification Unit of Bid
Section No. Measure Quantity
Bid Summary
Bidders Proposal
Unit Price � Bid Value
UNIT i: WATER IMPROVEMENTS
UNIT ti: SANITARY SEWER IMPROVEMENTS
U1VIT lII: DRAINAGE IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS �
Total Construction Bid g
Contractor agrees to complete WORK for FINAL ACCEPTANCE within :,' `: �. '='Taworkin da s after the date �vhen the
:60.Taay,B. g y
CONTRACT commences to run as provided io the Generai Conditious.
WATER IMPROVEMENTS
SANITARY SEWER IMPROVEMENTS
DRAINAGE lMPROVEMENTS
PAVING IMPROVEMENTS
STREET LIGHT IMPROVEMENTS
working days.
working days.
working days.
working days.
60 working days.
END OF SECT[ON
CiTY OF FORT WORT}i
STANDARD CONSTRUCTION SPECIF7CATION DOCUMENTS - DEVELOPER AWARDED PROlECTS
FormVersionApri12,2014 004243- BmDMG-MORNINGSTAR-MFS'[POIN1'pqRE�1yAY-OZ30-23.x1s
City of Fort Worth, Texas Page 19 of 27
Standard Community Facilities Agreement
Rev. 9/21
ESCROW AGREEMENT
THIS ESCROW AGREEMENT (the “Agreement”), is made and entered into by and
between FG ALEDO DEVELOPMENT, LLC., (“Developer”), the City of Fort Worth, a Texas
home-rule municipal corporation (“Fort Worth”) and PLAINS CAPITAL BANK, a Texas State
Bank, (“Escrow Agent”) is to witness the following:
WHEREAS, Developer and Fort Worth have entered into a Community Facilities
Agreement for Morningstar - Westpoint Parkway, CFA Number CFA23-0126, City Project
Number 104118, IPRC Number 22-0221 (the “CFA”); and
WHEREAS, the CFA provides that Developer shall submit to Fort Worth performance
bonds, cash deposits or other financial security acceptable to Fort Worth (collectively, the
“Financial Security”) for the purpose of guaranteeing satisfactory compliance by Developer with
all requirements, terms, and conditions of the CFA (the “CFA Obligations”); and
WHEREAS, Developer and Fort Worth desire and agree that Developer be allowed to
escrow and pledge cash deposits to Fort Worth, to be held by Escrow Agent, as an escrow agent,
in complete satisfaction of the obligation to submit the Financial Security to secure the
performance of the CFA Obligations.
NOW THEREFORE, for and in consideration of these recitals, ten dollars ($10.00) and
other good and valuable consideration, the receipt, sufficiency and adequacy of which are hereby
acknowledged, the parties hereto hereby agree as follows:
SECTION 1. DEFINED TERMS.
For the purposes of this Agreement, unless the context otherwise clearly requires, the
following terms shall have the following meanings:
“Security Funds” shall mean the cash deposit of FIFTEEN MILLION EIGHT
HUNDRED FORTY FIVE THOUSAND FOUR HUNDRED FORTY ONE
DOLLARS AND EIGHTY ONE CENTS, ($15,845,441.81), which sum represents one
hundred twenty-five percent (125%) of the estimated Developer’s cost of constructing the
CFA Obligations (the “Estimated Developer’s Cost”).
“Lien” shall mean any lien, security interest, charge, tax lien, pledge or encumbrance
designed to secure the repayment of indebtedness or the satisfaction of any other obligation
to a third party not a party of this Agreement.
SECTION 2. SECURITY FUNDS.
As financial security for the full and punctual performance of the CFA Obligations,
Developer hereby pledges, assigns, and transfers to Fort Worth, and hereby grants to Fort Worth
a security interest in the Security Funds and all rights and privileges pertaining thereto with the
City of Fort Worth, Texas Page 20 of 27
Standard Community Facilities Agreement
Rev. 9/21
exception of the interest income to be derived therefrom (which interest income shall remain the
property of Developer and shall be distributed by Escrow Agent in accordance with Developer’s
periodic instructions) subject, however, to the terms, covenants, and conditions hereinafter set
forth. The security interest granted and the assignments made hereunder are made as security only
and shall not subject the City of Fort Worth or Escrow Agent to, or transfer or in any way affect
or modify, any obligation of Developer with respect to the CFA Obligations or any transaction
involving or giving rise therefrom.
SECTION 3. PHYSICAL POSSESSION OF SECURITY FUNDS.
Concurrently with the execution of this Agreement, Developer shall have delivered to and
deposited with Escrow Agent the Security Funds. The parties acknowledge and agree that Escrow
Agent shall be required to segregate the Security Funds from other funds held by Escrow Agent
for Developer in accordance with the normal practices of Escrow Agent acting as an escrow agent.
Escrow Agent shall return all funds on deposit representing or evidencing the Security Funds
remaining in its possession to Developer (or take such other action as Developer may request or
direct) immediately after receipt of written notice from Fort Worth that the CFA Obligations have
been fully performed. During such time as Escrow Agent has possession of the Security Funds,
Escrow Agent shall furnish to the City of Fort Worth (when requested by Fort Worth) written
acknowledgments signed by an officer of Escrow Agent detailing the amount of the Security
Funds. Fort Worth’s rights in the Security Funds shall be superior to those of Escrow Agent’s
notwithstanding any terms or understandings (written or otherwise) between Developer and
Escrow Agent.
SECTION 4. COVENANTS.
(a) Affirmative Covenants. So long as any of the CFA Obligations remain unperformed,
Developer covenants and agrees that Developer will:
(i) from time to time execute and deliver to Fort Worth all such assignments,
certificates, supplemental writings, and other items and do all other acts or
things as Fort Worth may reasonably request in order to evidence and perfect
the security interest of Fort Worth in the Security Funds;
(ii) furnish Fort Worth with information which Fort Worth may reasonably request
concerning the Security Funds;
(iii) notify Fort Worth of any claim, action, or proceeding affecting title to the
Security Funds or Fort Worth’s security interest(s) therein; and
(iv) adjust the Security Funds to an amount equal to the actual contract price,
including revisions thereto, if the original Security Funds were based on an
engineer’s estimate of costs.
City of Fort Worth, Texas Page 21 of 27
Standard Community Facilities Agreement
Rev. 9/21
(b) Negative Covenants. So long as any of the CFA Obligations remain unperformed,
Developer covenants and agrees that Developer will not:
(i) assign or transfer any rights of Developer in the Security Funds; or
(ii) create any Lien in the Security Funds, or any part thereof, or permit the same to
be or become subject to any Lien except the security interest herein created in
favor of Fort Worth.
SECTION 5. EVENTS OF DEFAULT.
Developer shall be in default under this Agreement only upon the happening of any of the
following events (a “Default”):
(a) default in the timely payment for or performance of the CFA Obligations after written
notice thereof has been given to Developer and Escrow Agent and such default is not
cured within seven (7) days after such notice;
(b) any affirmative or negative covenant is breached by Developer.
SECTION 6. RIGHTS AND REMEDIES OF FORT WORTH UPON AND AFTER
DEFAULT.
(a) Remedy. Upon the occurrence of a Default, Fort Worth shall have the right to direct
Escrow Agent to transfer to Fort Worth all of the Security Funds. Escrow Agent is
hereby authorized to transfer the Security Funds immediately upon the receipt of a
written statement purporting to be executed by an authorized representative of Fort
Worth stating that:
(i) a Default by Developer has occurred related to the CFA Obligations;
(ii) written notice of such Default has been given by Fort Worth to Developer and
Escrow Agent and such Default was not cured within seven (7) days after
delivery of such notice; and
(iii) Fort Worth is entitled to have the Security Funds transferred in accordance with
the Agreement.
(b) Notices. Any notice required or permitted to be given to any party hereto shall be given
in writing, shall be personally delivered or mailed by prepaid certified or registered
City of Fort Worth, Texas Page 22 of 27
Standard Community Facilities Agreement
Rev. 9/21
mail to such party at the address set forth below, and shall be effective when actually
received.
To Developer:
FG ALEDO DEVELOPMENT, LLC, KIMBERLY GILL
3045 LACKLAND ROAD
FORT WORTH, TEXAS 76116
To: Escrow Agent:
PLAINSCAPITAL BANK, a Texas State Bank, DAKOTA
RAWLS
3707 CAMP BOWIE BLVD. SUITE 100
FORT WORTH, TEXAS 76107
To: City of Fort Worth
City of Fort Worth
Attn: City Treasurer
200 Texas Street
Fort Worth, TX 76102
With a copy to:
City of Fort Worth
Attn: Contract Management Office
200 Texas Street
Fort Worth, TX 76102
Any party may change its address for notice by giving all other parties hereto notice to such
change in the manner set forth in this Section no later than ten (10) days before the effective date
of such new address.
SECTION 7. EXCLUSIVE RIGHTS AND REMEDIES.
City of Fort Worth, Texas Page 23 of 27
Standard Community Facilities Agreement
Rev. 9/21
If the Developer fails to perform its obligations under the CFA, Fort Worth’s sole and
exclusive remedy shall be to complete the obligations of Developer at Developer’s expense. In
furtherance of such sole and exclusive remedy, Fort Worth is entitled to exercise its rights as set
forth in Section 6 hereof.
SECTION 8. SUBSTITUTION OF COLLATERAL.
Notwithstanding any contrary provision in this Agreement, Developer shall have the right,
at any time and from time to time, to obtain releases of all or any part of the Security Funds
(hereinafter called the “Released Collateral”) upon satisfaction of the following conditions:
(a) Developer shall provide Fort Worth and Escrow Agent written notice (the “Substitution
Notice”) that the Developer desires to obtain Released Collateral in exchange for a
contemporaneous substitution of an alternate Financial Security acceptable to Fort
Worth (as specified and described in the Substitution Notice); and
(b) Developer shall pledge to, or obtain for the benefit of Fort Worth, and deliver to Fort
Worth the alternate Financial Security acceptable to Fort Worth (the “Substituted
Collateral”) which Substituted Collateral shall in the aggregate be at least equal to the
Estimated Developer’s Cost; and
(c) Said Substituted Collateral shall be of sufficient amount(s) to cover all work which has
occurred prior to the substitution of collateral provided for in this Section.
Upon satisfaction of the above-specified conditions, Escrow Agent shall be authorized
(without the further consent of Fort Worth) to return to Developer the original Security Funds in
Escrow Agent’s possession that represent or evidence the Released Collateral or take such other
action with respect to the Released Collateral as Developer may request or direct. Developer shall
pay the expenses incurred by Escrow Agent In connection with obtaining each such release and
substitution.
SECTION 9 REDUCTIONS IN SECURITY FUNDS.
(a) Notwithstanding any contrary provision in this Agreement, Developer shall have
the right to reductions in the Security Funds (hereinafter called a “Reduction in the
Security Funds”), in accordance with this Section 9.
(b) Every thirty (30) days, Developer may request a reduction in the Security Funds
in accordance with Section 9-310-1 of the CFA Ordinance.
City of Fort Worth, Texas Page 24 of 27
Standard Community Facilities Agreement
Rev. 9/21
(c) Developer shall provide the City of Fort Worth and Escrow Agent with written
notice (the “Withdrawal Notice”) that Developer desires to obtain a Reduction in the
Security Funds in any amount less than or equal to the then-completed CFA Obligations
as inspected or accepted by Fort Worth.
(d) A Reduction in the Security Funds may only be made after:
i. Fort Worth 's inspectors have verified the amount of the Community
Facilities that have been constructed in accordance with the engineering plans;
and
ii. Fort Worth has received an affidavit and release of lien executed by the
contractor indicating that the contractor has been paid by Developer and the
contractor has paid all subcontractors and material suppliers for the Community
Facilities that have been constructed pursuant to the CFA.
(e) After Fort Worth has confirmed the amount of the Community Facilities that have
been constructed in accordance with the engineering plans and Fort Worth has received
an affidavit and release of lien from the contractor for the Community Facilities that have
been constructed, then the Security Funds may be reduced to an amount that is no less
than one hundred twenty-five percent (125%) of the value of the Community Facilities
that are remaining to be constructed.
SECTION 10. NON-ASSIGNABILITY OF FORT WORTH’S RIGHTS.
The rights, powers, and interests held by Fort Worth hereunder in and to the Security Funds
may not be transferred or assigned by Fort Worth in whole or in part. Any attempted transfer or
assignment shall be absolutely void and shall entitle Developer to a release of all Security Funds.
SECTION 11. NO WAIVER.
No waiver by Fort Worth of any Default shall be deemed to be a waiver of any other
subsequent Default. No delay or omission by Fort Worth in exercising any right or power
hereunder shall impair any such right or power or be construed as a waiver thereof, nor shall any
single or partial exercise of any such right or power preclude other or further exercise thereof.
SECTION 12.BINDING EFFECT.
This Agreement shall be binding on the parties, their successors and assigns. No provision
of this Agreement may be amended, waived, or modified except pursuant to a written instrument
executed by Fort Worth, Escrow Agent and Developer.
City of Fort Worth, Texas Page 25 of 27
Standard Community Facilities Agreement
Rev. 9/21
SECTION 13. CHOICE OF LAW; VENUE
This Agreement is to be construed and interpreted in accordance with the laws of the State
of Texas. Venue shall be in the state courts located in Tarrant County, Texas or the United States
District Court for the Northern District of Texas, Fort Worth Division.
SECTION 14. COUNTERPARTS.
This Agreement may be executed in any number of multiple counterparts and by different
parties on separate counterparts, all of which when taken together shall constitute one and the same
agreement.
SECTION 15. INDEMNITY.
DEVELOPER HEREBY AGREES TO RELEASE, HOLD HARMLESS, AND
INDEMNIFY ESCROW AGENT (AND ITS DIRECTORS, OFFICERS, EMPLOYEES,
AGENTS AND REPRESENTATIVES) FROM AND AGAINST ALL CLAIMS,
DAMAGES, EXPENSES, COSTS, SUITS AND OTHER LIABILITY OF ANY KIND
WHATSOEVER THAT ARISE OUT OF OR ARE DIRECTLY OR INDIRECTLY
RELATED TO THE PERFORMANCE BY ESCROW AGENT OF ITS DUTIES
HEREUNDER EXCEPT FOR THE GROSS NEGLIGENCE OR WILLFUL
MISCONDUCT OF ESCROW AGENT OR ITS DIRECTORS, OFFICERS, EMPLOYEES,
AGENTS OR REPRESENTATIVES AND DEVELOPER HEREBY AGREES TO
RELEASE, HOLD HARMLESS, AND INDEMNIFY FORT WORTH (AND ITS
RESPECTIVE DIRECTORS, OFFICERS, EMPLOYEES, AGENTS AND
REPRESENTATIVES) FROM AND AGAINST ALL CLAIMS, DAMAGES, EXPENSES,
COSTS, SUITS AND OTHER LIABILITY OF ANY KIND WHATSOEVER THAT ARISE
OUT OF OR ARE DIRECTLY OR INDIRECTLY RELATED TO ANY ACTIONS OR
INACTION BY FORT WORTH WITH RESPECT TO THIS AGREEMENT.
SECTION 16. PAYMENT OF ESCROW FEES
Developer will be responsible for the payment of all fees to Escrow Agent associated with
this Agreement.
ACCORDINGLY, the City of Fort Worth, Developer and Escrow Agent have each caused this
instrument to be executed in each entity’s respective name by its duly authorized signatories
effective as of the date executed by the City Manager or his/her designee.
City of Fort Worth, Texas Page 1 of 27
Standard Community Facilities Agreement
Rev. 9/21
CITY OF FORT WORTH
Dana Burghdoff
Assistant City Manager
Date:
Approved at to Form & Legality:
Richard A. McCracken
Assistant City Attorney
M&C No. N/A
Date:
ATTEST:
Jannette Goodall
City Secretary
DEVELOPER
FG Aledo Development, LLC
By: KTFW INVESTMENTS, INC.,
A Texas corporation, its manager
Name: Kim Gill
Title: President
Date: _________________
ESCROW AGENT
PLAINS CAPITAL BANK
Name: Dakota Rawls
Title: Vice President
Date: _________________
Contract Compliance Manager
By signing I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Rebecca Diane Owen
Development Manager
City of Fort Worth, Texas
Standard Completion Agreement – Lender-Funded Revised 01.30.23 BN
CFA Official Release Date: 07.01.2015
Page 2 of 27
ATTACHMENT “1”
Changes to Standard Agreement