Loading...
HomeMy WebLinkAboutContract 60443City of Fort Worth, Texas Page 1 of 27 Standard Community Facilities Agreement Rev. 9/21 Received Date: _______________ Received Time: _______________ Developer and Project Information Cover Sheet: Developer Company Name: FG Aledo Development, LLC Address, State, Zip Code: 3045 Lackland, Fort Worth TX 76116 Phone & Email: kgill@sableholdings.com; 817-732-2291 Authorized Signatory, Title: Kim Gill, President Project Name: Morningstar - Westpoint Parkway Brief Description: Water, Sewer and Storm Drain Project Location: Westpoint Blvd. and N Indigo Sky Dr. Plat Case Number: None provided Plat Name: None provided Mapsco: 710 Z Council District: 3 CFA Number: 23-0126 City Project Number: CPN 104118 | IPRC22-0221 City of Fort Worth, Texas Page 2 of 27 Standard Community Facilities Agreement Rev. 9/21 City Contract Number: _______________________ STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT (“Agreement”) is made and entered into by and between the City of Fort Worth (“City”), a home-rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and FG Aledo Development, LLC (“Developer”), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a “party” and collectively as the “parties.” WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Morningstar - Westpoint Parkway (“Project”); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement (“Community Facilities” or “Improvements”); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance (“CFA Ordinance”), as amended, is incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer’s duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exists between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. City of Fort Worth, Texas Page 3 of 27 Standard Community Facilities Agreement Rev. 9/21 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City (“Engineering Plans”) are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: Exhibit A: Water Exhibit A-1: Sewer Exhibit B: Paving Exhibit B-1: Storm Drain Exhibit C: Street Lights & Signs The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 – Changes to Standard Community Facilities Agreement, Attachment 2 – Phased CFA Provisions, and Attachment 3 – Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer’s contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements (“Financial Guarantee”). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. City of Fort Worth, Texas Page 4 of 27 Standard Community Facilities Agreement Rev. 9/21 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City’s Assistant City Manager (“Effective Date”). Developer shall complete construction of the Improvements and obtain the City’s acceptance of the Improvements within two (2) years of the Effective Date (“Term”). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time (“Extension Period”). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a)The City may utilize the Developer’s Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b)The City may utilize the Developer’s Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c)If the Financial Guarantee is a Completion Agreement and the Developer’s contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d)Nothing contained herein is intended to limit the Developer’s obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer’s agreements with Developer’s contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer’s contractors begin constructing the Improvements, Developer agrees to the following: (a)that Developer and City must execute a termination of this Agreement in writing; (b)that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c)to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City’s inspectors at preconstruction meetings. 9. Award of Construction Contracts City of Fort Worth, Texas Page 5 of 27 Standard Community Facilities Agreement Rev. 9/21 (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b)Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c)Developer will require Developer’s contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer’s contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City’s Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d)Developer will require Developer’s contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor’s insurance provider, which shall be made a part of the Project Manual. (e)Developer will require the Developer’s contractors to give forty-eight (48) hours’ advance notice of their intent to commence construction of the Improvements to the City’s Construction Services Division so that City inspection personnel will be available. Developer will require Developer’s contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City’s inspectors. Developer will require Developer’s contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f)Developer will not allow Developer’s contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g)Developer will not allow Developer’s contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. City of Fort Worth, Texas Page 6 of 27 Standard Community Facilities Agreement Rev. 9/21 11. Easements and Rights-of-Way Developer agrees to provide, at its expense, all necessary rights-of-way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a)DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b)THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES SUSTAINED BY ANY PERSONS, INCLUDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ON ACCOUNT OF ANY ACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB-CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c)DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR IN ANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS’ FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts City of Fort Worth, Texas Page 7 of 27 Standard Community Facilities Agreement Rev. 9/21 Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre-approved material testing laboratories. The Developer must contract with material testing laboratories on the City’s list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand- delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: DEVELOPER: Development Coordination Office FG Aledo Development, LLC City of Fort Worth 3045 Lackland Road 200 Texas Street Fort Worth, TX 76116 Fort Worth, Texas 76102 With copies to: City of Fort Worth, Texas Page 8 of 27 Standard Community Facilities Agreement Rev. 9/21 City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager’s Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer’s contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor’s facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer’s contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the City of Fort Worth, Texas Page 9 of 27 Standard Community Facilities Agreement Rev. 9/21 creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co-employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non-Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City’s right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would City of Fort Worth, Texas Page 10 of 27 Standard Community Facilities Agreement Rev. 9/21 normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms “boycott Israel” and “company” have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer’s signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms “boycott energy company” and “company” have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer’s signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms “discriminate,” “firearm entity” and “firearm trade association” have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer’s signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. City of Fort Worth, Texas Page 11 of 27 Standard Community Facilities Agreement Rev. 9/21 28. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER’S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 29. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 30. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City’s prior written approval shall be void and constitute a breach of this Agreement. 31. No Third-Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 32. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 33. Signature Authority The person signing this Agreement on behalf of Developer warrants that he or she has the legal City of Fort Worth, Texas Page 12 of 27 Standard Community Facilities Agreement Rev. 9/21 authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 34. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 35. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 13 of 27 Standard Community Facilities Agreement Rev. 9/21 36. Cost Summary Sheet Project Name: Morningstar - Westpoint Parkway CFA No.: 23-0126 City Project No.: 104118 IPRC No.: 22-0221 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 1,677,382.00$ 2. Sewer Construction 2,605,963.00$ Water and Sewer Construction Total 4,283,345.00$ B. TPW Construction 1. Street 3,477,671.95$ 2. Storm Drain 4,662,513.00$ 3. Street Lights Installed by Developer 252,823.50$ 4. Signals -$ TPW Construction Cost Total 8,393,008.45$ Total Construction Cost (excluding the fees):12,676,353.45$ Estimated Construction Fees: C. Construction Inspection Service Fee $92,250.00 D. Administrative Material Testing Service Fee $19,502.00 E. Water Testing Lab Fee $1,980.00 Total Estimated Construction Fees:113,732.00$ Financial Guarantee Options, choose one Amount Choice (Mark one) Bond = 100%12,676,353.45$ Completion Agreement = 100% / Holds Plat 12,676,353.45$ Cash Escrow Water/Sanitary Sewer= 125%5,354,181.25$ Cash Escrow Paving/Storm Drain = 125%10,491,260.56$ Letter of Credit = 125% 15,845,441.81$ Escrow Pledge Agreement = 125% 15,845,441.81$ X City of Fort Worth, Texas Page 14 of 27 Standard Community Facilities Agreement Rev. 9/21 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City’s Assistant City Manager. CITY OF FORT WORTH Dana Burghdoff Assistant City Manager Date: __________________ Recommended by: Dwayne Hollars/Bichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: Richard A. McCracken Sr. Assistant City Attorney M&C No. N/A Date: Form 1295: N/A ATTEST: Jannette S. Goodall City Secretary DEVELOPER FG ALEDO DEVELOPMENT, LLC By: KTFW INVESTMENTS, INC., A Texas corporation, its manager Kim Gill President Date: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Rebecca Diane Owen Development Manager City of Fort Worth, Texas Page 15 of 27 Standard Community Facilities Agreement Rev. 9/21 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Attachment 2 – Phased CFA Provisions Attachment 3 – Concurrent CFA Provisions Location Map Exhibit A: Water Improvements Exhibit A-1: Sewer Improvements Exhibit B: Paving Improvements Exhibit B-1: Storm Drain Improvements Exhibit C: Street Lights and Signs Improvements Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 16 of 27 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT “1” Changes to Standard Community Facilities Agreement City Project No. 104118 None City of Fort Worth, Texas Page 17 of 27 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT “2” Phased CFA Provision City Project No. 104118 Developer intends to construct a public sanitary sewer main pursuant to a separate community facilities agreement (City Project Number 105124, IPRC23-0151) that will run underneath portions of the paving Improvements being constructed pursuant to this Agreement. Therefore, this Agreement shall be considered a “Phased CFA” and the provisions contained in this section shall apply to this Agreement. The improvements being constructed by Developer under the separate Community Facilities Agreement shall be defined as the “Parent Project.” The improvements being constructed by Developer under this Agreement shall be defined as the “Child Project.” Developer acknowledges and agrees that due to Developer’s election to construct a Phased CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter “Construction Problems”). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Parent Project and the Child Project to properly connect to each other; changes to the design or construction of the improvements in the Parent Project that impact the design and construction of the improvements in the Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer having to remove and reconstruct the improvements at Developer’s expense. In addition, Developer understands and agrees that disputes may arise between Developer’s contractors or their subcontractors relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors or disputes between contractors and subcontractors. Developer further acknowledges and agrees that Developer has notified all of Developer’s contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for Developer’s decision to proceed with a Phased CFA. Developer shall not make the final connection of the improvements in the Child Project to the improvements in the Parent Project until the improvements in the Parent Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the Improvements are constructed and accepted by the City. Developer agrees that if this Agreement is for Improvements relating to the construction, renovation or modification of one or more commercial buildings or structures, the Developer shall not receive a Certificate of Occupancy from the City for the building(s) related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that the City will not approve a final plat of the property that the Improvements in this Agreement are intended to serve until the Parent Project has been constructed and accepted by the City. Completion of the Improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of City of Fort Worth, Texas Page 18 of 27 Standard Community Facilities Agreement Rev. 9/21 Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMIC DAMAGES PROPERTY LOSS, PROPERTY DAMAGES AND PERSONAL INJURY, (INCLUDING DEATH), OF ANY KIND OR CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBY EXPRESSLY RELEASES AND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TO ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGE AND PERSONAL INJURY (INCLUDING DEATH) ARISING OUT OF OR IN CONNECTION WITH, DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER’S DECISION TO CONSTRUCT A PHASED CFA. DEVELOPER, AT ITS SOLE COST AND EXPENSE, AGREES TO AND DOES HEREBY INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY’S OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR, FROM AND AGAINST ANY AND ALL CLAIMS (WHETHER AT LAW OR IN EQUITY), LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGES AND PERSONAL INJURIES INCLUDING DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WAY RELATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER’S CHOICE TO CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER’S CHOICE TO CONSTRUCT A PHASED CFA WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. DEVELOPER FG ALEDO DEVELOPMENT, LLC By: KTFW INVESTMENTS, INC., A Texas corporation, its manager ______________________________ Kim Gill, President � A U � � .-. l!") � l!") (LJ M (LJ 0 (LJ M (LJ \ �0 LOCATION MAP MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 301 1 4-0200431-1 041 1 8-E07685 STREET/STORM DRAIN N0. K-3046 X- 27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 MAPSCO N0. 710-Z i i� n � �ii'i i � -- 11��.— -----------------------------------1L----- I �° —�LI—���I�—� I�I �I , — — — — — — \ \ I SUPREME STREET I I I I I � � i i i L i � ❑ Q 0 � � � w � � Q �I _ EX I o �—Z � � � � � � � � I �_Q � � � � � � � � I �o� _ �_ �—�+�—�+�—� I } I I I I I I I I — J L L I '� � I- � / I I LYFT LANE I I � / � I I I I I I I I� II I I I I _�� — -------� _.a� � � i—� W.L. N0. 1 L—.� PROP 16"W � [� _ wESTPO�nn- �. L-- ,-. , � W.L. N0. : I PROP 8°W I II IIYEX 76"W � r� - II J �I ; � il�i � ' ���I J � � ', ` � �, \I VD W.L. N0. 1 I � PROP 16"W I/ � i ...PROPL$ W I �� �� � � ��r �\U ,� I I I I I I I I I SUPREME STREET I I—I—I i i I I—I_ --�-- � --T-- r--+—�� I �-----��— -- p � ---��' -- —'Q- ---I--'H _ -----'C.9 r--+— m I �--�-- � — T-- --+--� --�-- N�2"W� _i � \�� � \7 i i � ��`� (�, � � '-' -�f l,- � � i �� \ --� � -� �� � i i � i � ,�L� �` � , � I � SCALE: 1 "=300' � I -- � -- I --t--- �--�-- r — � --wa �- � � > i --t--�� � --�--Y I_ -- i --Q- i --t--= � --�--z I- — � --�a �- I I -- fi--Oa !- --�-- ! -- i -- i- ----r-- � R'�MI��� � % W.L.. NO.. 4� (t PROP 12'W% %�� � � \� � ' ' � / � � � ; � � ��� �,,. ,c� e<UFF ' ! �: � oR. ' � Q� � � � LEGEND 100� DEVELOPER'S COST *__ 8", 12" AND 16" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES � > � n S s > EXHIBIT "A" WATER IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 1 OF 3 —�--�-� ir--T—�Q= i ; � � � � -- � I I I I I I w i -- �-- --fi-�� � --�--- � I I I I I I I I I I I� � �---_ - -�-- ---r-- -� L+�-L�-I-L��I�J._�-�- _fi-- --T-- --+--� � Q_J �� I ��� I---Y� I __ � qM�J,� --t-- _—�-- � � W —�\ �� � / � --"' -� ----'. � L� + I o �� /�-- I J—� � � , w � ��}..--Q I-_—_i L I � �� \ / (�—��� ((/ —_ - ' \� \ � � _ a R � � �� � Z --- � ; ;,�y%� \ �C � �� �� � \� U � �—_'Z� �l � � � � � K \�T \� ����\_� ��� X \\�' �� � � � / � l / j % � '� �Ri�F � �\��� z�� � �� � ��� y / ��� I �� U � % \ � \ �� � � � � � /� T � ���� ��� �� � � \�� I . i ����p / � � � � � / \\ ��� ��v �R � � �� � � � � � � � /� T � � a / � � �` � �'FS�A � I I j �,y /�� � j� r r� �% �/ ��NT e � ��'oc ��� � i '� / I / � I �� W.L. N0. 7 �j- /�\� �� � � � � � � � � PR9P 72"W �� � �\�-��� ��� � � � � / // / //� � ��� � �� % / ��/� /� ��� I, `/ / � . .__ .-- \�( / � W.L. N0. 8 I I � , � � � � Q� ROP 8"W � I � _ - � `� / / - � �C � / �"J� W.L. N0. 7 -- � . _� � �� . . . C� \ �! � �� PROP 12"W �'�I \ \�C�O� W.L. N0. 5 W.L. N0. 8 � � � \ �O��v/ PROP 12"W PROP 8"W \ L. N0. 8 PROP 8"W (LJ � T C�,A� �� __�__�==�==J � I � � ;'�j � �� � �— T �D T�,� � � � _� \ � �� N �' � � � W.L. N0. 5 � \�. � �., � � �PROP 12"W . � M ` � / / � N J�- �O � � \ � , � ? yy,L. N0. 7 .� � V ROP 12"W , :� x i2"w �<u � / � Ex �2"w ��_ 3 -_� nTi�i�T�n�rT�r� _ � -- —_ , � o .....__� _- PRO� 8"W � = I / � � �� Ex�a"w _ GLAD�TONE DRI � E � � �\ � —_— \ 3 -�- _- , ,I —I' l' f ;1��4 � � �. i � LEGEND U X 100� DEVELOPER'S COST W *__ 8", 12" AND 16" WATER LINES, FIRE HYDRANTS, � GATE VALVES AND ASSOCIATED M APPURTENANCES � EXHIBIT "A" SCALE: 1°°=300° N IPRC N0. 22-0221 `� WATER IMPROVEMENTS CITY PROJECT N0. 104118 o FID N0. 30114-0200431-104118-E07685 � M ORN I N GSTAR STREET/STORM DRAIN N0. K-3046 g WESTPOINT BOULEVARD AND X-27609 � N. INDIGO SKY DRIVE � � OWNER f DEVELOPER: ENGINEER: � FG ALEDO DEVELOPMENT, LLC � WELCH ENGINEERING, INC. +� 3045 LACKLAND BOULEVARD 1308 NORWOOD DRIVE, SUITE 200 d FORT WORTH, TEXAS 76116 BEDFORD, TEXAS 76022 % SHEET 2 OF 3 \ � \ /�A / \ \ .� �� �� � \ N- � \ �, �\ / � X � � / � � \ � "Ex�"w �� / \ Ex a��v� ] ) J • 7 7 �\ �� \ �� � �\ ��� � �� � Y% �%y / LEGEND �111,` \ /\\ \ � / � \� ✓ \\ � � \ � \ � � � \ . � \ � \� 10a� DEVELOPER'S COST +� 4", 8", 12" AND 16" WATER LINES, FIRE HYDRANTS, GATE VALVES AND ASSOCIATED APPURTENANCES EXHIBIT "A" WATER IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE � > � n S s > OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 f� - I I I ��� i I �II� I—_— �I � � � � B"W � W.L. N0. 10 PROP 12"W 9"W PROP 4"W ' 8"W -� � s"w i i W.L. N0. 10 PROP 12"W / I I SCALE: 1 "=300' I I W.L. N0. 10 PROP 12"W _��\ � �fX 72"W I � _ � � EX 16 "W� _ �EX 76 "W _ - \ �-� X \ I IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 301 1 4-0200431-1 041 1 8—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 3 OF 3 I I I I I �II I I �-���-�T�-� � � � � � � � � iiiiiiii L L �- r- �- � I__ �_ / � / � � �� �� �� i � i \ _i � i \ � � \\7 % j\ �� / __ �� ��� % � � � � 1� 1 � � � � �% -` � P��KETT, CREEK ri / � A U � a v 0 � � 0� / � � � � � � ��\ --L�_L�i��� � — — — —� — — M (LJ 0 (LJ \ l!") \ � ---------------� i � PROP 24"SS - - - � I 1 \ �, �, i �Ivl^ATCH LI N E- SH EET 2 OF 2 � PROP 24"SS �\ \ \ I I I I � I I PROP 10"SI I L--------� I � �------ --� I PROP 24"SS I I I I I I I I I �PROP 24"S$ I I � PROP 8"SS I � I �� �� �� �� �� I I �^ ( / ` � /� \ X�S� � N �� <.� � � `��.� � � ��L / �� �� � EX 72 SS �� � � \ � �\ �� \ \ . � Y � � E�2 ss � �� r v,� ��'� �� q ��•� \� ��" � �� \ �\ �� �� \ \ � � � � � t � � � � � � ` � � � � \ � ,, /, �, i i� / � � � \ SS / � \,�EX 21 ".SS \ �� \ � .�� �PROP 24"SS I � i � i i i i J •PROP 8"SS ' 24"SS I 24"SS I � � . LEGEND 100� DEVELOPER'S COST 8", 10��, 12��, 18" AND 24�� SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES EXHIBIT "A-1 " SANITARY SEWER IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 SCALE: 1 "=300' IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118-E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 1 OF 2 \ /'��\ ���. U �� T �� �� i ��� � �_ ?�� � � \ � i � i � � PROP 1 . \ PROP 18"SS H �l U � a v 0 � � � n�ITI-f T�I-I�T M (LJ 0 (LJ \ l!") \ � ��\ I �� � _ ��i / j � /\/ �� \� -�� ,.,��� LEGEND 100� DEVELOPER'S COST 8", 10��, 12��, 18" AND 24�� SANITARY SEWER LINES AND ASSOCIATED APPURTENANCES EXHIBIT "A-1 " SANITARY SEWER IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 rPROP 8"SS L--------------- I r PROP 24"SS - - - � I \ \ � � � .��� PROP 24"SS � \� SCALE: 1 "=300' IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118-E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 2 OF 2 i i� n � �ii'i i I — 11��.= -- I �o � I �I m Q � � � , m � �I m N � A U � � 0 M M � 0 (LJ \ M (LJ � � � , 1 LEGEND 100� DEVELOPER'S COST � 9" PAVEMENT W/29� CROSS SLOPE ON 8" UME SUBGRADE :� p � ���'�\ �K, Q r � ��U� ` � \ �,'�.� � � \ �� � / � U �� ; � � �\�'� �� � '�Q�� � 7 / � ����z`/ GRFF � �� .. —� � � � � l � m�? �.�� e���FF O •• -- —� r�� `I/ l R a I j � � " `� / � � ° I I I � I I / /� /'�. i �� C �100� DEVELOPER'S COST 7.5" PAVEMENT W/2% CROSS SLOPE ON 8" LIME SUBGRADE �100� DEVELOPER'S COST 7.5" STAMPED/STAINED CONCRETE TRUCK APRON ON 8�� LIME SUBGRADE EXHIBIT "B" PAVING IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 � ��� � IT i I I—I_ IL� --��. I--IN --�. _ I= I --�N. I I� 'qM i � � � � � ------ SIDEWALK BY DEVELOPER � SIDEWALK BY BUILDER Q ADA RAMPS BY DEVELOPER \ r V SCALE: 1 "=300' IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 1 OF 2 --------------- -----------_i�— ----- — — �--��-- � -- �\ i � � � � � � � � � � � � � i i � � i i i I I i i i i �� SUPREME STREET i SUPREME STI — T T � � Q I I I I I I I I � � �--�- -I-�+�-�+�-� --T-- --`� I I I I I I I I r--+--w- --J I I I I I I I I �_—�__� i � � � � o 'I / I I LYFT LANE I I w --+--� / � I I I I I I I I� --�--_ �-� '--�--�!—�- —�o — c� �',L --Q� r--+--m I �---_� �--�--- m � I m� � --� --T-- wESTPp�NT m L— °o --+-- �"�' R.o.wB�V�. m � — --�-- � � � � I �� �--sL_ , � �__ M �. �\\\ ��_� M N m \\ ♦� � � � F¢_— �—_� � � i i i i i i i � � � � --T-- --fi-- = T Q � __1_ I I I I I I I I I I I w __ --+-- --�-- c�--fi--�- � Q I I I I I I I I I I I� --�-- - I -- �--�--Q --*--� --L��-L�-I-L���L�-p� L-- � —_.+— o--T--� --+--Q� I__� �� � �i I----Y1 I-- � J�� �-- fi--� --�--� I I I �� I � L---�' � R� w �� I o — �, AM% , }--- --rt--w --� � — c� � , � � --�----_ _� � , N �, ��, ,\ 1---� --�'��,�, \ I---Z -- �� \ noC� � �\� �\ �_ �\�`� \\ � �---z _ O� / ���! �� ��,� �, U� , �x �, I _ � l , m OR� �� �� / �� _ � ���C ��� � � �� �, � � �N � �\F ��� � ��� �`\��� �� y � ���� ,� � � �� U � � �� riJ L � / � r � OQ". � � � \ � � � A U � � (LJ 0 � 0 � M (LJ 0 (LJ � M (LJ \ �0 . h,F, `,w , j > � e� UFF ! w �� � / % m' / ���'.,= m � � ti � / � / N � m� �''► M� ��% L ��� I r,� / , � j / � �� � � / \ \� \Z �/ � / / / � �ry�,� � J J 't\` / � / � / — �_ ���� � � / �( / / U � / / = � �Q �ij.�, ��C /� / � �� � � �9 � � `� �r'; � � �r � 3,e � � ��� � � ��� c���� � �\ 11 � y` ���\��I i T � � LEGEND 100% DEVELOPER'S COST � 9" PAVEMENT W/2� CROSS SLOPE ON 8" LIME SUBGRADE �100% DEVELOPER'S COST 7.5" PAVEMENT W/29� CROSS SLOPE ON 8" UME SUBGRADE �100% DEVELOPER'S COST 7.5" STAMPED/STAINED CONCRETE TRUCK APRON ON 8" LIME SUBGRADE EXHIBIT "B" PAVING IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 i . 'I , ��j�� . i����' � i�� � �'%�i�` �• .� ��� � :� -' ��, � . � �• r�i � �`��� `���, _ • ` _ ��� � � �1 O' �_ _ _ � _ _ � _ _ � . I \ I \ � � ------ SIDEWALK BY DEVELOPER � SIDEWALK BY BUILDER Q ADA RAMPS BY DEVELOPER SCALE: 1 "=300' IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118-E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 2 OF 2 � A U � a � v 0 (LJ 0� M (LJ 0 (LJ l!") � � i i� n � � ii �,i � II ' 1 STORM DRAIN IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE ; � � - �. � ,• - � _ FF ; � � �� I I I I ���`�K �R. j o� �� i i� i � I I I I I � \��,, �. ��� ,\ LEGEND 10', 15, OR 20' INLET� � 1009� DEVELOPER'S COST STORM DRAIN AND INLET AND ASSOCIATED APPURTENANCES 100� DEVELOPER'S COST STORM DRAIN AND HEADWALL EXHIBIT "B-1" SCALE: 1°°=300° OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TAS 76116 IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TAS 76022 SHEET 1 OF 2 i� ; �_��_ � _ � _��_ � _ �I I� I� I I I I I I I I I SUPREME STR ET I I-I. I i i I I-I_ --�-- N � --T-- --�0 - r--+—�� I I --� ,- �-----��- — � w� �- o I I IN � I !- ---I--�Q- — �� �{ '- ---�—�_ -- �w �! a� ----- c� _ r--+- m- --�i/i Z� �- �--�-- � � -- � QI �- �-- �-- I I I � oi �- --t--�I �--T— � I --�-- -- fi- - � --�-- -_�N --T-- , )� --t-- qM~ �� i--- \� �� ��� � / W � �� R�cK \ �'w � / � P '_ � / � / � N � � i --1-- I ---r-- --�--� --�--� --*-- � �-- � �� ��� �� ��T �� / \`��F 4 RCP � i � � . � so'gcP � �.�q . I 72°RCP 24"RCP� � � � � � 4"RCP F �� w � ��u,� . \Z / �� �� !J � � / `� = rr � � j / � Hl � j � � � Q �� ` � � � � \ � �'� � % — � �C <�j,�.� � F -- —` ,�q�ys � � c�,� �T F� � I I / �� � \ � A U � a � � 0 � o� M (LJ O ii.i \ ll� \ � , I� �� � � >� � � � � � � � � � � � � I I I I I I I I I I I W I Q I I I I I I I I I I I� __ _�.L�� L�—I—L��I�L�_❑ � L-- � J-� �� I /� I---Y ��_� �\ � � �__�7 I-- I o W -� ��� _-�----� -1 v -J`�� � I---z - h � �� I - -- � ��� � J�--z , � V�' �� �� —� � � � � X ��� �\ � �,� � ��� ��\ � � �� '�� ��� ������ �� y � ��� � �� � � �� ��� � \ � \�� � \ � � � \ \ \ \ \\ � � /� I I I i� T\�� ST'OpN� � I I j,�, �'-9� i�� '� . 4.,RCP e��/O 24°RCP �% ��/ /T � I .� � \���— ;s' �, � Ri� ��'S' �^J ��CP 10' / � / / �p•r. / % _10a 24"RCP � - i l� �s•x�• Rce ,� ��\ � �\� .� � � ��`e � / �/ / / / i �� / / ���� i� ti ��TxDOT PW- HEADWAL� �I�'�� ��\ � . _ .-S - FTxDOT PW-1 HEADWALL MULTI BOX CULVERT 1-9'x8'RCB 5-9'X6'RCB's TxDOT PW-1 ��� E HEADWALL � T�Q• %=� -L=r �`' � -� 24"RCP 36"RCP �7p' � Y- 21"RCp� 4"RCP �' - - ,�� 4�,-R�P �2 •' p 24"RCP \�-10_Y_�_ p� � 8'X7' RCB rxoar"Pw , HEADWALL I I I / � \� \ SCALE: 1 "=300' LEGEND 10', 15, OR 20' INLET� � 1009� DEVELOPER'S COST STORM DRAIN AND INLET AND ASSOCIATED APPURTENANCES 100� DEVELOPER'S COST STORM DRAIN AND HEADWALL EXHIBIT "B-1" STORM DRAIN IMPROVEMENTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TAS 76116 IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TAS 76022 SHEET 2 OF 2 I' j i i I I li „ �- ���------------------------ I �°' ��� �— � � � � � \ I SUPREME STREET I �� L L � o �—Z � � � � � � � � � �~ a � � � � � � � � o _� �—�+�—�+�—� } I I I I I I I I — J L L // / I I LYFT L NE I I / � I I I I I I I I� I I I I I .L_L- wFsTpo/�T e< � ��, O � A U � � � � � � � M (LJ 0 (LJ \ M (LJ �0 � � �� < r � �� �\U�. ��� � �� � U Q� -- � � ' �.. � —.�� _.�J —_ � _.� m --� , � / n � � � � � � � � � � � i SUPREME STREET � � I—I_ �—_� I ---T-- r---�--� I �---�---�- � �I ---T--� ---�--� --�--� _ — — _I- — _:� �--T—_m I �--- � -- � ---T-- --+-- \----� -- / � / �� / / � /� ����/ % � % �'\�,i; ,� �`'7 � ' � �J c, �, i i � m � _� � � � � / � ' � -- 1 fi �r��� / � I � I � � ��� ;� \ r V �' LEGEND �o -- PROPOSED STREET LIGHT (10a% DEVELOPER'S COST) � -- PROPOSED STREET SIGN (100� DEVELOPER'S COST) ■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST) � -- EXISTING STREET LIGHT EXHIBIT "C1" STREET NAME SIGNS AND STREET LIGHTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 SCALE: 1 "=300' IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 1 OF 2 _ � LL � --�0 w � ---��N ol — �� �� -- �w = --�='u^' Z —_�- " � I a� I I� � --� � ---IW __ IZ IJ --� R'�M i�= � � , � -� , � / ' �� r � / ��:". , �� . :FN �, 6� UF \` F �R � O�. ; h � ---�-- ' --t--� --+-- --�-- --�-- --! -- �� -- fi-- � �� � �, � ' � W — — �Z. , �J —� _�. � A U � � � � � � � I � � �� ��� � I� �� � . � � ` �i� M (LJ 0 (LJ \ M � � � �---�--- --t--- --�--- --T--- — i _- i --- --+--- � 1 k-- I L__ 7 I __ ----� ----1 � �� j �� �� ��� �� � � I � � �� �\ � , � i T �� ����� .� �� .\`C���� ���. I � � � �\� � , � �� � � �_ -���, � I � I i �� LEGEND �o -- PROPOSED STREET LIGHT (10a% DEVELOPER'S COST) � -- PROPOSED STREET SIGN (100� DEVELOPER'S COST) ■ -- PROPOSED GROUND BOX (100% DEVELOPER'S COST) � -- EXISTING STREET LIGHT EXHIBIT "C1" STREET NAME SIGNS AND STREET LIGHTS MORNINGSTAR WESTPOINT BOULEVARD AND N. INDIGO SKY DRIVE OWNER f DEVELOPER: FG ALEDO DEVELOPMENT, LLC 3045 LACKLAND BOULEVARD FORT WORTH, TEXAS 76116 I / -�_ SCALE: 1 "=300' IPRC N0. 22-0221 CITY PROJECT N0. 104118 FID N0. 30114-0200431-104118—E07685 STREET/STORM DRAIN N0. K-3046 X-27609 ENGINEER: � WELCH ENGINEERING, INC. 1308 NORWOOD DRIVE, SUITE 200 BEDFORD, TEXAS 76022 SHEET 2 OF 2 � � � � � � � � � � � iiiiiiiiiiiW Qi�iiiiiiii�� _�.L�� L�-I-L���L�_❑ i a—� \�. � �� �---Y SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNIIYGSTAR - WCSTPOINT PARI{WAY UNIT PRICE BID 004243 DAP - 6ID PROPOSAL Page I of 8 CONTRACT: 8/30/2023 CPN: 104118 I PRC22-0221 Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Bid Unit Price Bid Value Item No. Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 1-I 3311.0161 6" PVC WaterPipe 33 11 10 LF 180 $43.00 $7,740.00 I-2 3311.0261 8" PVC Water Pipe 33 11 10 LF 974 $65.00 $63,310.00 I-3 3311.0261 8" PVC Water Pipe, �v/CSS 33 I I 10 LF 20 $I 15.00 $2,300.00 I-4 3311.0251 8" DIP Water 33 1 I 10 LP 12 $65.00 $780.00 I-5 3311.0461 12" DR-14 PVC Water Pipe 33 1 I 10 LF 2,500 $95.00 $237,500.00 1-6 3311.0442 12" DR-14 PVC Water pipe, w/CSS 33 11 10 LP 40 $IZ5.00 $5,000.00 I-7 9999.0100 ]2" DR-14 PVC Water Pipe w/Concrete Casing 33 1 I 10 LF 38 $125.00 $4,750.00 1-8 9999.0101 12" DR-14 PVC Water Pipe w/24" Steel Casing 33 11 10 LP 155 $310.00 $48,050.00 IA 3311.0454 ]2"DIPWater(Restraint.ioints) 331110 LF 446 $110.00 $49,060.00 1-10 9999.0102 12" DIP Water (Restraint Joints), 24" Steel Casing 33 I I 10 LI� 147 $340.00 $49,980.00 1-I 1 3311.0454 12" DIP Wa[er (Restraint Joints), w/CSS 33 11 10 LP 120 $125.00 $15,000.00 1-12 3311.0541 16" DR-14 PVC Water Pipe 33 1 I 10 I.F 905 $165.00 $149,325.00 1-13 3311.0554 16" DIP Water(Restrained.loints) 33 1I 10 LP 30 $165.00 $4,950.00 t-14 9999.0103 16" DR-14 PVC Water Pipe w/30" Steel Casing 33 I 1 10 LF 20 $375.00 $7,500.00 I-14 0241.1 I 18 4"-12" Pressure Plugs 02 41 14 EA 10 $500.00 $5,000.00 I-15 3305.0109 Trench Safcty 33 OS 10 LF 5,587 $1.00 $5,587.00 I-16 3312.3002 6" Gate Valve 33 12 20 GA 9 $1,250.00 $11,250.00 I-17 3312.3003 8" Gate Valve 33 12 20 GA 6 $2,100.00 $12,600.00 1-18 3312.3005 12" Gate Valve 33 12 20 EA 16 $4,250.00 $68,000.00 1-19 9999.0104 12" Gate Valve and Box (Pressure Plane) 33 12 20 EA 1 $4,250.00 $4,250.00 1-20 3312.3006 16" Gate Valve wNault 33 12 20 EA 2 $25,000.00 $50,000.00 1-21 3312.0117 Connect. to Exis[ing 4"-12" Water Main 33 12 25 EA 7 $1,500.00 $10,500.00 I-22 3312.0001 Fire Hydran[ 33 12 40 F,A 7 $5,600.00 $39,200.00 1-23 3312.6002 6" Blow Off Valve (Detail D105) 33 12 60 CA 1 $25,000.00 $25,000.00 � �4 9) 99.0105 d�djust existing 12" Valve box w/Concrete collar (Sheet 02 41 14 EA 1 $500.00 $500.00 � �5 3305.01 I I Adjust Lx. Valve Box Adjustment to finished grade 33 OS 14 FiA ? $500.00 $1,000.00 (Sht 9) 1-26 3305.0106 Manhole Adjustment, Valve Vault (Sheet 9) 33 OS 14 EA 1 $1,500.00 $1,500.00 1-27 3305.0108 MiscelL Structure Adjustment, Air Release (Sheet 9) 33 OS 14 EA 1 $2,500.00 $2,500.00 � �8 9999.0106 Remove & Replace 7.5" Pavement/Lime Stabiliza[ion 02 41 14 S[' 296 $26.00 $7,696.00 Pressure Plugs (Sheets 12 & 13) ��9 9999.0107 Remove & Replace 6.0" Pavement/Lime Stabilization 02 41 14 SF 260 $24.00 $6,240.00 Pressure Plugs (Sheets 16) 9999.0016 Remove & Replace Barrier �ree I2amp - Type P-1 1-30 �Modified) (Sheets 12 & 13) 02 41 14 EA 2 $4,200.00 $8,400.00 � 31 9999.0108 Remove & Replace existing Concrete Driveway (4" 02 41 14 SP 245 $26.00 $6,370.00 Thick) (Sheet I?) � 3� 9999.0109 Remove & Replace existing residential sidewalk (4" 02 41 14 SP �,570 $26.00 $66,820.00 Thick) (Sheets 13 & 13) - 1-33 9999.0110 Cut, Backfill Grout, Plug and Abandon in Place 12" 02 41 14 LP 50 $95.00 $4,750.00 Water Line (Sheet 13) 1-34 3311.0001 Ductile Iron Water Pittings w/Restraint 33 11 11 7'ON 16 $12,000.00 $192,000.00 1-35 3137.0105 Medium Stone, Riprap, dry 31 37 00 SY 500 $125.00 $62,500.00 1-36 0241.1118 4" - 12" Pressure Plugs OZ 41 14 EA 11 $500.00 $5,500.00 1-37 33122003 1" Irrigation Service (Medians or POS) 33 12 10 EA 4 $1,250.00 $5,000.00 CITY Of �ORT WORTH STANDARD CONSTRUCTION SPECIFICA770N DOCUMENTS - DGVGLOPER AWARDLD PROJGCTS Form Version April 2, 2014 00 42 43 - BIDDING CONTRACT - MORNINGSTAR - WESTPOINT PARKWAY - 0830-23.x1s 004243 DAP - BID PROPOSAL Page 2 of 8 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - W GSTPOIN7' PARICVVAY . `► ' : a=�=�l�� CONTRACT: 8/30/2023 CPN : 104118 IPRC22-0221 Bidder's Application Project Item Infonnation Bidder's Proposal Bidlist Specification Unit of Bid Item No. Description Section No. Measure Quantity Unit Price Bid Value I-38 33122203 2" Irrigation Service (Medians or POS) 33 12 10 EA 6 $3,400.00 $2Q400.00 1-39 3311.0261 8" DR-14 PVC Water Pipe (Items 1-39 to 1-57, Shts. 33 I 1]0 LP 10 $65.00 $650.00 16A to 1GC 1-40 3311.0461 12" DR-14 PVC Water Pipe 33 1 I 10 LF 2,155 $95.00 $204,725.00 1-41 9999.0110 12" Water Pipe w/Concrete Casing 33 11 10 LP 5 $I25.00 $625.00 1-42 9999.0111 12" DIP Water Pipe 33 I l 10 LF 25 $125.00 �3,125.00 I-43 9999.0112 12" DIP Water Pipe w/24" Steel Casing 33 11 ]0 LP' 6 $310.00 $1,860.00 1-44 9999.0113 12" DIP Water Pipe w/24" Steel Casing on Conc. 33 11 10 LF 35 $150.00 $5,250.00 Cradle 1-45 3305.0109 Trencli Safety 33 OS 10 LF 2,170 $1.00 $2,170.00 1-46 3312.3003 8" Gate Valve 33 12 20 EA 1 $2,100.00 $2,100.00 1-47 3312.3005 13" Gate Valve 33 12 20 GA 4 $4,250.00 $17,000.00 I-48 0241.] 118 4"-12" Pressure Plugs 0? 41 ]4 GA 2 $500.00 $1,000.00 1-49 3312.0117 Connect. to Existing 4"-12" Water Main 33 12 25 EA 1 $1,500.00 $1,500.00 I-50 33122203 2" [rrigation Service (Medians or POS) 33 12 10 EA 2 $3,400.00 $6,800.00 � 5� 33122802 4"-Combination Turbine Metter Vault installation with 33 12 11 LS 1 $65,000.00 $65,000.00 bypass per D-I 19 with 27 L.F. of 4" PVC water line an 4" plug 1-52 3137.0105 Medium Stone, Riprap, dry 31 37 00 SY 334 $125.00 $41,750.00 1-53 9999.01 14 Remove & Replace 7.5" Pavement/Lime Stabilization 02 41 14 SY 19 $261.00 $4,959.00 Pressure Plugs i-54 9999.0115 Remove & Replace existing residential sidewalk (4" 02 41 14 SF 860 $26.00 $22,360.00 Thick) 1-55 3213.0501 Remove & Replace existing R-I ADA Ramp 32 13 20 �A 1 $4,200.00 $4,200.00 9999.0116 Remove existing 167 L.F. of an existing 8" waterline , 1-56 remove and salvage an existing 8" gate valve an box, remove 8"x8" 02 41 14 LS 1 $9,500.00 $9,500.00 anchor tee and install 12" anchor tee with 2-12" a8" reducers. � 5� 9999.0117 Slavage and Reinstall existing Washington Styte Street 34 41 20 EA 1 $15,000.00 $15,000.00 Light witli Type 7 founda[ion. UNIT L• WATER IMPROVEMENTS TO"CAL $1,677,382.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECI�ICATION DOCUMLNTS - DEVELOPLR AWARDLD PROJBCTS Form Version April 2, 2014 00 42 43 - 61DDING CONTRACT - MORNINGSTAR - WESTPOINT PARKWAY - 08-30-23.x1s SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM M02NINGSTAR - WESTPOINT PARKWAY UNIT PRICE BID 004243 DM - BID PROPOSAL Page 3 of 8 CONTRACT: 9/27/2023 CPN: 104118 I PRC22-0221 Bidder's Application Project Item Information Bidder's Proposal Bidlist Description Specification Unit of Q�d Unit Price Bid Value Item No. Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENTS 2-I 3331.4108 6" Sewer Pipe SDR-26 (Sheet 22) 33 I 1 10 LP 84 $50.00 $4,20Q00 2-2 3331.41 I S 8" Sewer Pipe SDR-26 33 I 1 10 LP 594 $65.00 $38,610.00 2-3 3331.4116 8" Sewer Pipe SDR-26 w/CSS 33 11 10 Ll� 40 $i25.00 $5,000.00 2-4 9999.0200 8" Sewer Pipe SDR-26 w/Concrete Encasement 33 I 1 10, 33 OS 10 LP 42 $125.00 $5,250.00 2-5 9999.0201 8" DIP Sewer, w/Gpoxy Coating 33 11 10 LP 4 $ I 10.00 $440.00 2-6 9999.0202 8" DIP Sewer w/20" Steel Casing, w/�poxy Coating 33 1 1 10 LP 189 $225.00 $43,525.00 2-7 3331.4201 10" Sewer Pipe SDR-26 33 11 10 LP' 30 $74.00 $2,220.00 2-8 3331.4115 IZ" Sewer Pipe SDR-26 33 I 1 10 LP' 356 $85.00 $30,260.00 2-9 3331.41 16 l2" Sewer Pipe SDR-26 w/CSS 33 1 I 10 LP SO $145.00 $7,250.00 2-10 9999.0203 12" D[P Sewer w/Gpoxy Coating 33 1 I 10 LP 283 $185.00 $52,355.00 2-11 9999.0204 12" DIP w/34" Steel Casing,w/Gpoxy Coa[ing 33 1 I 10 I.F 130 $375.00 $48,750.00 2-12 9999.0205 12" DIP, w/CSS 33 11 10 LP 50 $235.00 $11,750.00 2-13 3331.4235 18" DR-14 Sewer 33 11 10 LF 20 $118.00 $2,360.00 2-14 3331.4309 24" HDPG DR-17 DIPS Pipe 33 41 10, 33 31 13 LP 3,664 $350.00 $1,282,400.00 33 OS 10 2-15 3305.0202 Imported GmbedmenU[3ackfill, CSS 33 OS 10 CY 50 $25.00 $1,250.00 2-16 3305.0203 Imported F,mbedmenUl3ackfill, CLSM (D201B01) 33 OS 10 CY 2,400 $35.00 $84,000.00 2-16A 3305.0116 Concrete Gncasement for Utility Pipes 33 OS 10 CY 56 $75.00 $4,200.00 2-17 3331.4323 24" DIP Sewer Pipe, w/Gpoxy Coating 33 I 1 10 33 OS 10 LP 249 $400.00 $99,600.00 2-18 9999.0207 24" HDPL-' DR-17 DIPS Pipe with Epoxy Coating 33 I I 10, 33 OS 10 L� 155 $573.00 $88,815.00 2-18A 3305.1007 42" Casing by Open Cut 33 OS 22 LP I55 $425.00 $65,875.00 2-19 3305.0109 Trench Safety 33 OS 10 LF 2,354 $1.50 $3,531.00 2-20 9999.0210 Wagner No. 3050-200 Order Control (See Sheet 33A) 33 39 60 EA 1 $18,000.00 $18,000.00 2-21 9999.0211 Wagner No. 2050-450 Order Control (See Sheet 33A) 33 39 60 EA 4 $31,250.00 $125,000.00 2-22 3301.0002 Post-CCTV Inspection 33 O1 31 LF 2,354 $4?0 $9,886.80 2-33 3339.1001 4' Manhole (0-6' Depth) 33 39 20 �A 1 I $6,400.00 $70,400.00 2-24 3339.1002 4' Drop Manhole (0-6' Depth) 33 39 20 EA 2 $7,200.00 $14,400.00 Z-25 3339.1003 4' Extra Depth Manhole 33 39 20 VP 152 $200.00 $30,400.00 2-26 3339.1 101 5' Manhole (0-6 Depth) 33 39 20 �A I S $7,500.00 $ I 12,500.00 2-27 3339.1102 5' Drop Manhole (0-G Depth) 33 39 20 EA 3 $8,600.00 $25,800.00 2-28 3339.1 ]03 5' Extra DepUi Manhole 33 39 20 VF 312 $300.00 $93,600.00 2-29 3339.0001 Epoxy Manhole Coating (24" Manholes Only) 33 39 60 V[' 475 $3 ] 0.00 $147,250.00 2-29A 3339.000] �poxy Manhole Coating 33 39 60 VF 32 $310.00 $9,920.00 2-30 3301.0101 Manhole Vacuum Testing 33 01 30 EA 29 $150.00 $4,350.00 2-31 0241.11 1 S 4" - 12" Pressure Plug 02 41 14 EA 8 $500.00 $4,000.00 2-32 0241.1107 18" Pressure Plug 02 41 14 EA 1 $I,500.00 $1,500.00 3-33 9999.0212 Co��nect to Existing Sanitary Sewer Main (8-21 ") 33 I I 10 EA 1 $2,41520 $2,41520 2-34 3305.0113 Trench Water Stops 33 11 10 GA 12 $950.00 $I 1,400.00 CITY O� FORT WOR'I�H STANDARD CONSTRUCTION SPECIPICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS �orm Version April 2, 2014 00 42 43 - SEWGR IN NHW C�A - 09-28-23.x1s SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - W�STPOINT PARKWAY _- - � - 004243 DAP - BID PROPOSAL Page 4 of 8 CONTRACT: 9/27/2023 C PN: 104118 IP RC22-0221 Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item No. Description Section No. Measure Quantity Unit Price Bid Value 2-35 3137.0105 Mediwn Stone, Riprap, dry 31 37 00 SY 356 $125.00 $44,500.00 UNIT [L• SANITARY SEWER IMPROVEMGNTS 'I'OTAL $2,605,963.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FORT WOR7'H STANDARD CONSTRUCTION SPGCIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS FonnVersionApri12,2014 004243- SEWERINNEWCFA-09-28-23.xis SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - WESTPOiNT PARKWAY UNIT PRICE BID ooazas DAP-Bm PROPOSAL Page 5 of B coN�rRncr: siaonoz3 CPN: 104118 IPRC22-02Z 1 Bidder's Application Project Item Information Bidder's Proposal Bidlist p�ription Specification Unit of B�d Unit Price Bid Value [tem No. Section No. Measure Quantity UNIT III: DRAINAGE IMPROVEMENTS 3-I 3341.0205 ?4" RCP, Class Ill 33 41 10 LF 1,511 $105.00 5158,655.00 3-2 3341.0302 30" RCP, Class III 33 41 10 LF 304 $128.00 538,912.00 3-3 3341.0309 36" RCP, Class III 33 41 10 LF 545 5160.00 $87,200.00 3-4 3341.0402 42" RCP, Class lI[ 33 41 10 LF S 16 $201.00 $103,716.00 3-5 3341.0409 48" RCP, Class III 33 41 10 LF 575 $275.00 $158,125.00 3-6 334I .050? 54" RCP, Class llt 33 41 I O LF 48 $325.00 S 15,600.00 3-7 3341.060? 60" RCP, Class Il1 33 41 10 LF 290 $405.00 SI 17,450.00 3-8 3341.0701 72" RCP, Class ll[ 33 41 10 LF 325 $550.00 $178,750.00 3-9 3341.1102 4' x 3' Box Culvert (Multi-Box Structure, Sheet 53 ) 33 41 10 LF 373 5500.00 $186,000.00 3-IO 3341.1305 6' x 6' Box Culvert 33 41 10 LF 492 $675 00 $332,100.00 3-1 I 3341.1605 8' x 6' Box Culvert 33 41 10 LF 310 S758.00 $234,980.00 3-12 3341.1504 8' x T Box Culvert 33 41 10 LF 1,124 $875.00 $983,500.00 3-13 3341. t 603 9' x 6' Box Culvert (Multi-Box Structure, Sheet 50) 33 41 10 LF 376 $1,150.00 $432,400.00 3-14 3341.1605 9' x 8' Box Culvert (Multi-Box Structure, Sheet 50) 33 41 10 LF 75 $ I,250.00 $93,750.00 3-I S 3305.0109 Trench Safety 33 05 10 LF 6,863 $I.00 $6,863.00 3-16 3349.0001 4' Stortn Junction Box 33 49 20 EA 3 $5,500.00 516,500.00 3-i 7 3349.0002 5' Stortn Junction Box 33 49 ?0 EA I $6,000.00 $6,000.00 3-I 8 3349.0003 6' Stocm Junction Box 33 49 ?0 EA I $6,500.00 $6,500.00 3- I 9 3349.0004 7' Stortn Junction Box 33 49 ?0 EA I $8,000.00 $8,000.00 3-20 3349.7001 4' Drop Inlet 33 49 20 EA I 57,500.00 $7,500.00 3-21 3349.700? 5' Drop Inlet 33 49 ?0 EA 3 $7,500.00 $ I 5,000.00 3-33 9999.0301 7' Drop Inlet 33 49 20 EA I SI 1,250.00 $I 1,?50.0� 3-?3 3349.0102 4' Manhole Riser 33 49 10 EA 7 $1?50.00 $8,750.00 3-24 3349.5001 10' Curb Inlet 33 49 20 EA 2 57,500 00 $I5,000.00 3-25 3349 5003 20' Curb Inlet 33 49 30 EA 2 S I 5,000 00 $30,000.00 3-26 3349.6001 10' Recessed Curb Inlet 33 49 20 EA 22 58,500.00 $187,000.00 3-27 3349.6002 15' Recessed Curb Inlet 33 49 20 EA 2 I13,250.00 $26,500.00 3-28 024130?I Remove42"RCP 024114 LF 38 550.00 $I,900.00 3-29 3341.0402 - Install 4?" RCP, Class 111 33 41 10 LF 12 $201.00 $2,412.00 3-30 9999.0303 TxDOT 4:1 Type PW-1 Headwafl w!1'xDOT Type 33 49 40 EA 2 SI05,000.00 $210,000.00 PRI I Handrail, Multi-Box (1) 9x8, (5) 9x6, refer to Sheet 50 3-31 9999.0303 TxDOT 4:1 Type CH-PW-S Headwall, (1) 36" 33 49 40 EA 1 515,000.00 $I5,000.00 3-32 9999•0304 TxDOT 4:1 Type PW-1 Headwall wlTxDOT Type 33 49 40 EA I 526,000.00 $26,000.00 PRI 1 Handrail, Multi-Box (2) 4x3, refer w Sheet 53 3-33 3137.0110 Rock Chute Discharge - Main "B" (Sheet 38 & 51) 31 37 00 SY 135 $175.00 $23,625.00 3-34 3137.0110 Rock Chute Discharge - Main "C" (Sheet 38 & 52) 31 37 00 SY 574 $175.00 $100,450.00 3-35 3137.0105 Medium Stone, Riprap, dry (See individua) Drainage 31 37 00 SY 6,5?5 $125 00 $815,625.00 Structure Graduation Charts) 3-36 9999.0305 Connect to Existing Storm Sewer Main 33 1 I 10 EA I $1,500 00 $1,500.0 UNIT lll: DRAINACE IMPROVEMEN75 TOTAL $4,662.513.00 CITY OF FOAT WORTH STANDARD CONSTRUCTION SPECffICAT10N DOCIJMENTS - DEVEC,OPER AWARDED PROIECTS Fortn Version April 2, 2014 00 42 43 - BIDD(NG CONTRACT - MORNiNGSTAR - WESTPOMT PARKWAY - OS•30•23 xls SECTION 00 42 43 Developer Awarded ProJects - PROPOSAL FORM MORNINGSTAR - WESTPOINT PARKWAV UNIT PRICE BID 004243 DAP - Bm PROPOSAL Page 8 of 8 CONTRACT: 8l30l2023 CPN: 104118 IPRC22-0221 Bidder's Application Project Item Information Bidder's Proposal Bidiist Description Specification Unit of B�d Unit Price Bid Value Item No. Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT 111: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS Cootractor agrees to complete WORK for F1NAL ACCEPTANCE within CONTRAC'I' commences to run as provided in the Geoeral Cooditions. WATERIMPROVEMENTS SANITARY SEWER IMPROVEMENTS DRAINAGEIMPROVEMENTS PAVING IMPROVEMENTS STREET tIGHT IMPROVEMENTS Total Construction Bid �80 working days after the date when the 40 working days. 80 working days. 60 wo�lcing days. working days. working days. END OF SECTION Cli'Y OP FORT WORTH STANDARD CONSTRUCTION SPECffICATtON DOClftv�NTS - DEVELOPER AWARDED PROJECTS Form Yeroion April 2, 2014 00 42 43 - B1DD[NG CON7'RACT - MORNiNGSTAR - WESIPOINT PARKWAY • 08•30•23.xis _ . _._ __ .. . SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - WESTPOINT PARKWAY UNIT PRICE BID 004243 DAP - BID PROPOSAL Page G of 8 CONTRACT: S/14/2023 CPN: 104118 [PRC22-0221 Bidder's Application Project Item Infonnation Bidder's Proposal Bidlist Description Specification Unit of B�d Unit Price Qid Value Item No. Section No. Measure Quantity UNIT IV: PAVING IMPROVEMENTS 4 � 9999.0401 7.5" Conc. Pvmt (Indigo Sky Drive) - 4,000 psi 32 13 13 SY 3,968 $61.95 $245,817.60 (#3�18) 4-2 321 1.0502 8" Lime 1'reatment 32 1 I 29 SY 4,226 $4.50 $19,017.00 4-3 3211.0400 Hydrate Lime 32 11 29 TN 64 $288.60 $18,470.40 4-4 9999.0402 7.5" "Stamped" Conc. Pvmt (1 I-foot width-diameter) 32 13 13 SY 323 $255.55 $83,542.65 Central Island, (WestpoinQ - 4,000 psi (#3@18) T�vck Apron 4-5 3211.0502 8" Lime Treatment 32 11 29 SY 344 $4.50 $1,548.00 4-6 3211.0400 Hydrate Lime 32 I 1 29 1'N 5 $288.60 $1,443.00 4-7 3216.0102 7" Concrete Curb (Central Island Curb) 32 16 13 LP 230 $35.95 $8,268.50 4-8 3213.0104 9.0" Conc. Pvmt (Westpoint) - 4,000 psi (#4 cr 18) 32 13 13 SY 25,650 $73.05 $1,873,732.50 4-9 3211.0502 8" Lime Treatment 32 1 I 29 SY 27,317 $4.50 $122,926.50 4-10 3211.0400 Hydrate Lime 32 1 I 29 TN 547 $288.60 $157,86420 4-11 9999.0403 4" or 6" Splitter Island (Round-about) 32 13 20 SF 1,189 $30.30 $36,026.70 4-12 9999.0404 10' Stamped Colored Concrete Cross-walks 32 13 20 SP 1,761 $30.30 $53,358.30 4-13 3213.0302 5-foot, 4" Concrete Sidewalk 32 13 20 SP 250 $6.00 $I,500.00 4-14 3213.0302 G-foot, 4" Concrete Sidewalk 32 ]3 20 SP 4,828 $6.00 $28,968.00 4-15 9999.0405 Transition Areas G to 10' width 32 16 13 SF 1,780 $6.00 $10,680.00 4-16 9999.0406 10-foot, 4" Concrete Sidewalk 32 13 20 SP 79,004 $6.00 $474,024.00 4-17 3213.0506 Barrier Free Ramp - Type P-1 (Modified) 32 13 20 EA ]4 $2,950.00 $41,300.00 4-18 3213.0504 [3arrier Free Ramp - Type M-2 32 13 20 EA 8 $3,O60A0 $24,480.00 4-19 3213.0509 Barrier Pree Ramp - Type C-2 32 13 20 EA 4 $1,300.00 $5,200.00 4-20 3217.0501 White Stop Qar 32 17 23 LF 22 $16.80 $369.60 4-21 3217.0102 6" Yellow Solid (Double) 32 17 23 LF 430 $4.35 $1,870.50 4-22 3217.0101 6" Wliite Solid 32 17 23 LF 2,958 $2.20 $6,507.60 4-23 9999.0407 6" White Dash w/Type II CR 4" RPM's 32 17 23 LP 6,590 $2.90 $19,1 I 1.00 4-24 3217.0201 8" White Solid - Round-aboirt 32 17 23 L� 770 $2.70 $2,079.00 4-25 3217.0201 8" White Solid - 2" Dash - Round-about 32 17 23 LF 220 $2.70 $594.00 4-26 3217.0201 8" White Solid - 3" Dash - Roimd-about 32 17 23 LF 41 $2.70 $ I 10.70 4-27 3217.0302 12" White Solid Crosswalk Strip 32 17 23 LP 324 $8.55 $2,77020 4-28 3217.040218"WhiteSolid 321723 LP 1,514 $13.05 $18,243.70 4-29 3217.0403 18" Yellow Solid 32 17 23 LP 31 $12.05 $373.55 4-30 3217.1009 Words and Arrow 32 17 23 GA 28 $788.25 $22,071.00 4-31 3217.0502 24" White Contrast Crosswalk 32 17 23 LP 89 $26.75 $2,380.75 4-32 9999.0408 Street [3arricade Type ll[ (street dead ends) 31 36 00 LF 176 $50.00 $8,800.00 4-33 3124.0101 Gmbanktnent Plan (Parkway/Median Acceptable 31 34 00 CY 1,933 $52.00 $100,516.00 Backfill) 4-34 3292.0100 Block Sod Placemen[ (Central Island in Round-aUout) 32 92 13 SY 4,075 $5.92 $24,124.00 4-35 3292.0400 Seed Hydromulch (Parkways and Medians) 32 92 14 SY 11,600 $1.53 $17,748.00 3441.4003 �urnish & Install Ground Mount Post, unless at the 4-36 intersection, mount to Street Light corner w/Stop & Directive Signs 34 41 30 GA 1? $350.00 $4,200.00 (Rl-1). 4-37 9999.0409 Street Name Plates for Street Intersection (D3-1) 34 41 30 GA 12 $695.00 $8,340.00 4-38 9999.0410 Miscell Sign with Steel Posts (See Sheet 86) 34 41 30 EA 73 $415.00 $30,295.00 UNIT IV: PAVING IMPROVEMENTS TOTAL $3,477,671.95 CIl'Y OP FORT WORTH STANDARD CONSTRUCTION SPBCI�ICATION DOCUMBNTS - DEVLLOPER AWARDED PROIGCTS Form Version April 2, 2014 00 42 43 - 6IDDING - MORNINGSTAR - WBSTPOINT PARKWAY - 08-14-23x1s SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - W ESTPOI[YT PARKWAY UNIT PRICE BID 004243 DM - BID PROPOSAL Page 8 of 8 CONTRACT: 8/14/2023 CPN: 104118 IPRC22-0221 Bidder's Application Project Item Information Bidder's Proposal Bidlist Specification Unit of Bid Item No. Description Section No. Measure Quantity Unit Price Bid Value Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT tll: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS Total Construction Bid Contractor agrees to complete WORK for FINAL ACCEPTANCE withm $5�s j�p�y`�:fvorking days after the date when thc CONTRACT commences to run as provided in the General Conditions. ,� ^ WATERIMPROVEMENTS SANITARY SEWER IMPROVEMENTS DRAINAGEIMPROVEMENTS PAVING IMPROVEMENTS STREET LIGHT IMPROVEMENTS working days. working days. working days. 85 working days. working days. ENA OF SECTION 671.95 .95 CITY OF FORT WORTfi STANDARD CONSTRUCTfON SPECIFICATION DOCUIvIENTS - DEVELOPER AWARDED PROIEC'CS Form Version April 2, 2014 00 42 43 - BIDDING - MORNINGSTAR - WESTPOIN'C PARKWAY - 08-I4-23 xls secTio�v oo aa as 004243 DAP-Bm PROPOSAL Page 7 ofe Developer Awarded Projects - PROPOSAL FORM CONTRnCT: 7/3orzo2a MORIVINGSTAR - WESTpOIIVT PARKWAY CPN: 104118 iPRC22-0221 C[TY OF FORT WORTH STANDARD CONS7RUCTYON SPECffICAflON DOCUMEN7S - DEVELOPER AWqRDED PROJECTS FormYusionApri12,2014 004243- BIDDlPSG•MORNMGSTAIt-WFS7pplNfpqR1(�yAY-07-30•23.xts M � � , � ;� ,� .,• .�. .• � � ' : : � .. ��. .. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM MORNINGSTAR - WESTPOINT PARKWAY UNIT PRICE BID Project Item InformaUon Bidlist Item No. 004243 DAP-HIDPROPOSAL Pega 8 of 8 CONTRAC'f: 7/30f1023 CPN: 104118 IPRC22-0221 Bidder's Application Description Specification Unit of Bid Section No. Measure Quantity Bid Summary Bidders Proposal Unit Price � Bid Value UNIT i: WATER IMPROVEMENTS UNIT ti: SANITARY SEWER IMPROVEMENTS U1VIT lII: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS � Total Construction Bid g Contractor agrees to complete WORK for FINAL ACCEPTANCE within :,' `: �. '='Taworkin da s after the date �vhen the :60.Taay,B. g y CONTRACT commences to run as provided io the Generai Conditious. WATER IMPROVEMENTS SANITARY SEWER IMPROVEMENTS DRAINAGE lMPROVEMENTS PAVING IMPROVEMENTS STREET LIGHT IMPROVEMENTS working days. working days. working days. working days. 60 working days. END OF SECT[ON CiTY OF FORT WORT}i STANDARD CONSTRUCTION SPECIF7CATION DOCUMENTS - DEVELOPER AWARDED PROlECTS FormVersionApri12,2014 004243- BmDMG-MORNINGSTAR-MFS'[POIN1'pqRE�1yAY-OZ30-23.x1s City of Fort Worth, Texas Page 19 of 27 Standard Community Facilities Agreement Rev. 9/21 ESCROW AGREEMENT THIS ESCROW AGREEMENT (the “Agreement”), is made and entered into by and between FG ALEDO DEVELOPMENT, LLC., (“Developer”), the City of Fort Worth, a Texas home-rule municipal corporation (“Fort Worth”) and PLAINS CAPITAL BANK, a Texas State Bank, (“Escrow Agent”) is to witness the following: WHEREAS, Developer and Fort Worth have entered into a Community Facilities Agreement for Morningstar - Westpoint Parkway, CFA Number CFA23-0126, City Project Number 104118, IPRC Number 22-0221 (the “CFA”); and WHEREAS, the CFA provides that Developer shall submit to Fort Worth performance bonds, cash deposits or other financial security acceptable to Fort Worth (collectively, the “Financial Security”) for the purpose of guaranteeing satisfactory compliance by Developer with all requirements, terms, and conditions of the CFA (the “CFA Obligations”); and WHEREAS, Developer and Fort Worth desire and agree that Developer be allowed to escrow and pledge cash deposits to Fort Worth, to be held by Escrow Agent, as an escrow agent, in complete satisfaction of the obligation to submit the Financial Security to secure the performance of the CFA Obligations. NOW THEREFORE, for and in consideration of these recitals, ten dollars ($10.00) and other good and valuable consideration, the receipt, sufficiency and adequacy of which are hereby acknowledged, the parties hereto hereby agree as follows: SECTION 1. DEFINED TERMS. For the purposes of this Agreement, unless the context otherwise clearly requires, the following terms shall have the following meanings: “Security Funds” shall mean the cash deposit of FIFTEEN MILLION EIGHT HUNDRED FORTY FIVE THOUSAND FOUR HUNDRED FORTY ONE DOLLARS AND EIGHTY ONE CENTS, ($15,845,441.81), which sum represents one hundred twenty-five percent (125%) of the estimated Developer’s cost of constructing the CFA Obligations (the “Estimated Developer’s Cost”). “Lien” shall mean any lien, security interest, charge, tax lien, pledge or encumbrance designed to secure the repayment of indebtedness or the satisfaction of any other obligation to a third party not a party of this Agreement. SECTION 2. SECURITY FUNDS. As financial security for the full and punctual performance of the CFA Obligations, Developer hereby pledges, assigns, and transfers to Fort Worth, and hereby grants to Fort Worth a security interest in the Security Funds and all rights and privileges pertaining thereto with the City of Fort Worth, Texas Page 20 of 27 Standard Community Facilities Agreement Rev. 9/21 exception of the interest income to be derived therefrom (which interest income shall remain the property of Developer and shall be distributed by Escrow Agent in accordance with Developer’s periodic instructions) subject, however, to the terms, covenants, and conditions hereinafter set forth. The security interest granted and the assignments made hereunder are made as security only and shall not subject the City of Fort Worth or Escrow Agent to, or transfer or in any way affect or modify, any obligation of Developer with respect to the CFA Obligations or any transaction involving or giving rise therefrom. SECTION 3. PHYSICAL POSSESSION OF SECURITY FUNDS. Concurrently with the execution of this Agreement, Developer shall have delivered to and deposited with Escrow Agent the Security Funds. The parties acknowledge and agree that Escrow Agent shall be required to segregate the Security Funds from other funds held by Escrow Agent for Developer in accordance with the normal practices of Escrow Agent acting as an escrow agent. Escrow Agent shall return all funds on deposit representing or evidencing the Security Funds remaining in its possession to Developer (or take such other action as Developer may request or direct) immediately after receipt of written notice from Fort Worth that the CFA Obligations have been fully performed. During such time as Escrow Agent has possession of the Security Funds, Escrow Agent shall furnish to the City of Fort Worth (when requested by Fort Worth) written acknowledgments signed by an officer of Escrow Agent detailing the amount of the Security Funds. Fort Worth’s rights in the Security Funds shall be superior to those of Escrow Agent’s notwithstanding any terms or understandings (written or otherwise) between Developer and Escrow Agent. SECTION 4. COVENANTS. (a) Affirmative Covenants. So long as any of the CFA Obligations remain unperformed, Developer covenants and agrees that Developer will: (i) from time to time execute and deliver to Fort Worth all such assignments, certificates, supplemental writings, and other items and do all other acts or things as Fort Worth may reasonably request in order to evidence and perfect the security interest of Fort Worth in the Security Funds; (ii) furnish Fort Worth with information which Fort Worth may reasonably request concerning the Security Funds; (iii) notify Fort Worth of any claim, action, or proceeding affecting title to the Security Funds or Fort Worth’s security interest(s) therein; and (iv) adjust the Security Funds to an amount equal to the actual contract price, including revisions thereto, if the original Security Funds were based on an engineer’s estimate of costs. City of Fort Worth, Texas Page 21 of 27 Standard Community Facilities Agreement Rev. 9/21 (b) Negative Covenants. So long as any of the CFA Obligations remain unperformed, Developer covenants and agrees that Developer will not: (i) assign or transfer any rights of Developer in the Security Funds; or (ii) create any Lien in the Security Funds, or any part thereof, or permit the same to be or become subject to any Lien except the security interest herein created in favor of Fort Worth. SECTION 5. EVENTS OF DEFAULT. Developer shall be in default under this Agreement only upon the happening of any of the following events (a “Default”): (a) default in the timely payment for or performance of the CFA Obligations after written notice thereof has been given to Developer and Escrow Agent and such default is not cured within seven (7) days after such notice; (b) any affirmative or negative covenant is breached by Developer. SECTION 6. RIGHTS AND REMEDIES OF FORT WORTH UPON AND AFTER DEFAULT. (a) Remedy. Upon the occurrence of a Default, Fort Worth shall have the right to direct Escrow Agent to transfer to Fort Worth all of the Security Funds. Escrow Agent is hereby authorized to transfer the Security Funds immediately upon the receipt of a written statement purporting to be executed by an authorized representative of Fort Worth stating that: (i) a Default by Developer has occurred related to the CFA Obligations; (ii) written notice of such Default has been given by Fort Worth to Developer and Escrow Agent and such Default was not cured within seven (7) days after delivery of such notice; and (iii) Fort Worth is entitled to have the Security Funds transferred in accordance with the Agreement. (b) Notices. Any notice required or permitted to be given to any party hereto shall be given in writing, shall be personally delivered or mailed by prepaid certified or registered City of Fort Worth, Texas Page 22 of 27 Standard Community Facilities Agreement Rev. 9/21 mail to such party at the address set forth below, and shall be effective when actually received. To Developer: FG ALEDO DEVELOPMENT, LLC, KIMBERLY GILL 3045 LACKLAND ROAD FORT WORTH, TEXAS 76116 To: Escrow Agent: PLAINSCAPITAL BANK, a Texas State Bank, DAKOTA RAWLS 3707 CAMP BOWIE BLVD. SUITE 100 FORT WORTH, TEXAS 76107 To: City of Fort Worth City of Fort Worth Attn: City Treasurer 200 Texas Street Fort Worth, TX 76102 With a copy to: City of Fort Worth Attn: Contract Management Office 200 Texas Street Fort Worth, TX 76102 Any party may change its address for notice by giving all other parties hereto notice to such change in the manner set forth in this Section no later than ten (10) days before the effective date of such new address. SECTION 7. EXCLUSIVE RIGHTS AND REMEDIES. City of Fort Worth, Texas Page 23 of 27 Standard Community Facilities Agreement Rev. 9/21 If the Developer fails to perform its obligations under the CFA, Fort Worth’s sole and exclusive remedy shall be to complete the obligations of Developer at Developer’s expense. In furtherance of such sole and exclusive remedy, Fort Worth is entitled to exercise its rights as set forth in Section 6 hereof. SECTION 8. SUBSTITUTION OF COLLATERAL. Notwithstanding any contrary provision in this Agreement, Developer shall have the right, at any time and from time to time, to obtain releases of all or any part of the Security Funds (hereinafter called the “Released Collateral”) upon satisfaction of the following conditions: (a) Developer shall provide Fort Worth and Escrow Agent written notice (the “Substitution Notice”) that the Developer desires to obtain Released Collateral in exchange for a contemporaneous substitution of an alternate Financial Security acceptable to Fort Worth (as specified and described in the Substitution Notice); and (b) Developer shall pledge to, or obtain for the benefit of Fort Worth, and deliver to Fort Worth the alternate Financial Security acceptable to Fort Worth (the “Substituted Collateral”) which Substituted Collateral shall in the aggregate be at least equal to the Estimated Developer’s Cost; and (c) Said Substituted Collateral shall be of sufficient amount(s) to cover all work which has occurred prior to the substitution of collateral provided for in this Section. Upon satisfaction of the above-specified conditions, Escrow Agent shall be authorized (without the further consent of Fort Worth) to return to Developer the original Security Funds in Escrow Agent’s possession that represent or evidence the Released Collateral or take such other action with respect to the Released Collateral as Developer may request or direct. Developer shall pay the expenses incurred by Escrow Agent In connection with obtaining each such release and substitution. SECTION 9 REDUCTIONS IN SECURITY FUNDS. (a) Notwithstanding any contrary provision in this Agreement, Developer shall have the right to reductions in the Security Funds (hereinafter called a “Reduction in the Security Funds”), in accordance with this Section 9. (b) Every thirty (30) days, Developer may request a reduction in the Security Funds in accordance with Section 9-310-1 of the CFA Ordinance. City of Fort Worth, Texas Page 24 of 27 Standard Community Facilities Agreement Rev. 9/21 (c) Developer shall provide the City of Fort Worth and Escrow Agent with written notice (the “Withdrawal Notice”) that Developer desires to obtain a Reduction in the Security Funds in any amount less than or equal to the then-completed CFA Obligations as inspected or accepted by Fort Worth. (d) A Reduction in the Security Funds may only be made after: i. Fort Worth 's inspectors have verified the amount of the Community Facilities that have been constructed in accordance with the engineering plans; and ii. Fort Worth has received an affidavit and release of lien executed by the contractor indicating that the contractor has been paid by Developer and the contractor has paid all subcontractors and material suppliers for the Community Facilities that have been constructed pursuant to the CFA. (e) After Fort Worth has confirmed the amount of the Community Facilities that have been constructed in accordance with the engineering plans and Fort Worth has received an affidavit and release of lien from the contractor for the Community Facilities that have been constructed, then the Security Funds may be reduced to an amount that is no less than one hundred twenty-five percent (125%) of the value of the Community Facilities that are remaining to be constructed. SECTION 10. NON-ASSIGNABILITY OF FORT WORTH’S RIGHTS. The rights, powers, and interests held by Fort Worth hereunder in and to the Security Funds may not be transferred or assigned by Fort Worth in whole or in part. Any attempted transfer or assignment shall be absolutely void and shall entitle Developer to a release of all Security Funds. SECTION 11. NO WAIVER. No waiver by Fort Worth of any Default shall be deemed to be a waiver of any other subsequent Default. No delay or omission by Fort Worth in exercising any right or power hereunder shall impair any such right or power or be construed as a waiver thereof, nor shall any single or partial exercise of any such right or power preclude other or further exercise thereof. SECTION 12.BINDING EFFECT. This Agreement shall be binding on the parties, their successors and assigns. No provision of this Agreement may be amended, waived, or modified except pursuant to a written instrument executed by Fort Worth, Escrow Agent and Developer. City of Fort Worth, Texas Page 25 of 27 Standard Community Facilities Agreement Rev. 9/21 SECTION 13. CHOICE OF LAW; VENUE This Agreement is to be construed and interpreted in accordance with the laws of the State of Texas. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. SECTION 14. COUNTERPARTS. This Agreement may be executed in any number of multiple counterparts and by different parties on separate counterparts, all of which when taken together shall constitute one and the same agreement. SECTION 15. INDEMNITY. DEVELOPER HEREBY AGREES TO RELEASE, HOLD HARMLESS, AND INDEMNIFY ESCROW AGENT (AND ITS DIRECTORS, OFFICERS, EMPLOYEES, AGENTS AND REPRESENTATIVES) FROM AND AGAINST ALL CLAIMS, DAMAGES, EXPENSES, COSTS, SUITS AND OTHER LIABILITY OF ANY KIND WHATSOEVER THAT ARISE OUT OF OR ARE DIRECTLY OR INDIRECTLY RELATED TO THE PERFORMANCE BY ESCROW AGENT OF ITS DUTIES HEREUNDER EXCEPT FOR THE GROSS NEGLIGENCE OR WILLFUL MISCONDUCT OF ESCROW AGENT OR ITS DIRECTORS, OFFICERS, EMPLOYEES, AGENTS OR REPRESENTATIVES AND DEVELOPER HEREBY AGREES TO RELEASE, HOLD HARMLESS, AND INDEMNIFY FORT WORTH (AND ITS RESPECTIVE DIRECTORS, OFFICERS, EMPLOYEES, AGENTS AND REPRESENTATIVES) FROM AND AGAINST ALL CLAIMS, DAMAGES, EXPENSES, COSTS, SUITS AND OTHER LIABILITY OF ANY KIND WHATSOEVER THAT ARISE OUT OF OR ARE DIRECTLY OR INDIRECTLY RELATED TO ANY ACTIONS OR INACTION BY FORT WORTH WITH RESPECT TO THIS AGREEMENT. SECTION 16. PAYMENT OF ESCROW FEES Developer will be responsible for the payment of all fees to Escrow Agent associated with this Agreement. ACCORDINGLY, the City of Fort Worth, Developer and Escrow Agent have each caused this instrument to be executed in each entity’s respective name by its duly authorized signatories effective as of the date executed by the City Manager or his/her designee. City of Fort Worth, Texas Page 1 of 27 Standard Community Facilities Agreement Rev. 9/21 CITY OF FORT WORTH Dana Burghdoff Assistant City Manager Date: Approved at to Form & Legality: Richard A. McCracken Assistant City Attorney M&C No. N/A Date: ATTEST: Jannette Goodall City Secretary DEVELOPER FG Aledo Development, LLC By: KTFW INVESTMENTS, INC., A Texas corporation, its manager Name: Kim Gill Title: President Date: _________________ ESCROW AGENT PLAINS CAPITAL BANK Name: Dakota Rawls Title: Vice President Date: _________________ Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Rebecca Diane Owen Development Manager City of Fort Worth, Texas Standard Completion Agreement – Lender-Funded Revised 01.30.23 BN CFA Official Release Date: 07.01.2015 Page 2 of 27 ATTACHMENT “1” Changes to Standard Agreement None