Change Order Request
CSC No. 59073-COI
Facility and Project Forest Park Pool
City Sec No. 59073
Description:
34027 0800450 5740010103326 004980 9999 22020801
Funding (FID) No.(s) 30100 0800450 5740010103326 004980 9999
�33002
City Proj. No. 103326
0800450 5740010103326 004980 9999
Contractor: I Steele & Freeman I Change Order#
Date: 1
11/2/2023
City Project Mgr. IRonnie Clements 1 City Inspector:
1John Fowler
I
Phone Number:1(817) 392- 8014 1 Phone Number:
1(682) 201-1918
1
Contract
Time
(CD)
Original Contract Amount--------------------------------------------------------------------------------------------------------------------------------I $9,497,625.00
282
Extras to Date------ -------------------------------------
0.00
0
Creditsto Date---------------------------------------------------------------------------------------------------------------------------------------------1 0.00
0
Pending Change Orders (in M&C Process)-----------------------------------------'0.00
0
Contract Cost to Date------------------------------------------------------------------------------------------------------------------------------------� 9,497,6 5.00
282
Amount of Proposed Change Order -------------------------------------------------{ J3,537,203.00
0
Revised Contract Amount-------------------------------------------------------------------------------------------------------------------------------� 3,034,828.00
282
Original Funds Available for Change Orders
0.00
Remaining Funds Available for this CO-------------------------------------------------------------------------------------------------------------1 0.00
Additional Funding (if necessary)---------------------------------------------------------------------------------------------------------------------1 0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
1 3 .2
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
1 $11,872,031.25
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The purpose of Change Order #1 is to add funds to the Guaranteed Maximum Price (GMP) of the construction contract for the Forest Park Pool. Steele &
Freeman was selected as Construction Manager at Risk (CMAR) in March 2023. Change Order No. 1 ($3,537,209.00) increases the original contract amount
($9,497,625.00) for a revised contract amount of $13,034,834.00, a 37.2% increase to the original contract, approved by M&C 23-0815. No additional contract
time is approved in this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both
time and money) for all costs arising out of, or incindental to the above Change Order.
Contractor's Company Name I Contractor Name I Contractor Signature Date
Steele & Freeman Reilly R. Freeman Nov 5, 2023
PMD Inspector
Date
Architecural Services Manager
Date
%� C-n. A
Nov 6, 2023
;�
Nov 7, 2023
PMD Superintendent
Date
Director/Property Management Department
Date
Nov 6 2023
e �
Nov 7, 2023
r e�ct Manager
2y""
Date
Nov 6, 2023
ey
S"2
Date
Nov 9, 2023
Date
ana er
Darte
hen snrinas
.e-4-9;4 '244
ov 6, 2023
° „�°
a ,e °s7�
Nov9 2023
,
M&C Number 123-0815
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and adminstration of this contract, including
ensuring all performance and reporting requirements.
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
9/26/2023
Nikita Watts
Architectural Services Manager
11/1/23, 10:14AM
M&C Review
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 9/26/2023 REFERENCE
NO..
CODE: C TYPE
M&C 23-0815 LOG NAME:
NON- PUBLIC
CONSENT HEARING:
Official site of the City of Fort Worth, Texas
FoRTWORni
21 FOREST PARK
POOLS CHANGE
ORDER 1
NO
SUBJECT: (CD 9) Authorize Execution of a Change Order for Construction Manager at Risk Contract
with Steel & Freeman, Inc., in the Amount Not to Exceed $3,537,209.00, Including an
Owner's Construction Contingency Allowance, for a Total Project Budget of
$13,034,828.00, for the Forest Park Pool, Adopt Appropriation Ordinances, and Amend
the Fiscal 2023 Adopted Budget and Fiscal Years 2023-2027 Capital Improvement
Program
RECOMMENDATION:
It is recommended that the City Council
1. Authorize the execution of a Change Order for Construction Manager at Risk Contract with
Steel & Freeman, Inc., in the amount not to exceed $3,537,209.00, including an Owner's
Construction Contingency Allowance, for a total project budget of $13,034,828.00, for the
Forest Park ENFAC (City Project No. 103326);
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations
Park and Recreation Department of the General Fund in an amount not to exceed
$1,958,492.00, from available fund balance, for the purpose of transferring to the General
Capital Projects Fund for the Forest Park ENFAC project (City Project No. 103326);
3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the General Capital Projects Fund, in the amount of $1,958,492.00 transferred from the General
Fund, for the purpose of funding the Forest Park ENFAC project (City Project No. 103326);
4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the PARD Gas Lease Capital Project Fund, in the amount of $1,000,000.00, from available
funds, for the purpose of funding the Forest Park ENFAC Project (City Project No. 103326) ; and
5. Amend the Fiscal Year 2023 Adopted Budget and Fiscal Years 2023-2027 Capital Improvement
Program.
DISCUSSION:
The Forest Park Pool project has completed the Construction Document stage and Steele & Freeman
provided a final Guaranteed Maximum Price (GMP) price of $13,034,828.00. A change order is
requested in the amount of $3,537,209.00 for the shortfall amount. On March 21, 2023, the City
Manager's Office approved the use of Fiscal Year (FY) 2022 General Fund Surplus Mayor & Council
Communication (M&C) (23-0095, February 14, 2023) in the amount of $1,958,492.00. Additional
funding has also been committed from the Park and Recreation Department (PARD) Gas Lease
Capital Project Fund in the amount of $1,000,000.00.
Forest Park Pool Replacement Budget TOTALS
Architectural Design Fees (Including Amendment No. 1) $979,520.00
Anticipated CMAR Construction Cost (Including Owner's $9,497,625.00
Construction Allowance)
Change Order 1 $3,537,209.00
apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31441 &counci ddate=9/26/2023 1 /3
11/1/23, 10:14AM M&C Review
Project Administration Cost (Site Utilities, IT, Security, Project $1,029,638.00
Management, Contingency, FIFE, Etc.)
PROJECT TOTAL $15,043,992.00
Funding for this project was included in the FY2023-2027 Capital Improvement Program in the
amount of $11,000,000.00. Additional funding in the amount of $2,958,492.00 is needed due to the
increase in cost can be attributed to the inflation/escalation in construction materials and labor. The
action in this M&C will amend the FY2023-2027 Capital Improvement Program as approved in
connection with Ordinance 25773-09-2022.
This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP)
(M&C 22-0607; Ordinance 25765-08-2022) provides liquidity to support the appropriation. Available
resources will be used to actually make any interim progress payments until debt is issued. Once
debt associated with a project is sold, debt proceeds will reimburse the interim financing source in
accordance with the statement expressing official Intent to Reimburse that was adopted as part of the
ordinance canvassing the bond election (Ordinance 25515-05-2022).
On 2/14/23, the City Council approved M&C 23-0095, assigning $9,458,492 for Capital Project
Shortfalls as a part of the Fiscal Year 2022 year-end process. To date, the City Council has
authorized M&C 23-0567 of $4,000,000 for the Fire Station 43 - Walsh Ranch on 6/27/23, M&C 23-
0272 of $1,500,000 for the Intermodal Parkway Improvements project on 4/11/2023. Approval of this
M&C will appropriate $1,958,492 and leave a remaining balance of $2,000,000 for Capital Project
Shortfalls.
Waiver of Building Permits - In accordance with the City Code of Ordinances, Part II, Chapter 7-1
Fort Worth Building Administrative Code, Section 109.2.1, Exception 2; "Work by non -City personnel
on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the
work is for action under a contract that will be or has been approved by City Council with notes in the
contract packages stating the fee is waived.
Business Equity - Steele & Freeman, Inc agrees to maintain its initial M/WBE commitment of 25\%
that it made on the original contract and extend and maintain that same M/WBE commitment of 25\%
to all prior change orders up to and inclusive of this Change Order No. 1. Therefore Steele &
Freeman, Inc remains in compliance with the City's M/WBE Ordinance and attests to its commitment
by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized
representative of its company.
Forest Park Pool is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the General Fund and the PARD Gas
Lease Capital Project Fund and that upon approval of the above recommendations and adoption of
the attached appropriation ordinances, funds will be available in the General Capital Projects Fund
and the PARD Gas Lease Capital Project Fund for the Forest Park ENFAC project to support the
approval of the above recommendations and execution of a contract. Prior to any expenditure being
incurred, the Property Management Department and the Park & Recreation Department has the
responsibility of verifying the availability of funds.
TO
Fund Department Account Project Program Activity ' Budget
ID ID Year
FROM
Fund Department Account Project
ID ID
Submitted for City Manager's Office by.,
Program Activity Budget
Year
Dana Burghdoff (8018)
Reference # Amount
(Chartfield 2)
Reference # Amount
(Chartfield 2)
apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31441 &counci (date=9/26/2023 2/3
11/1/23, 10:14AM
M&C Review
Originating Department Head: Ricky Salazar (5134)
Additional Information Contact:
ATTACHMENTS
2023-7-28 1295 form.pdf (CFW Internal)
2023-8-29 Completed Acceptance of Previous MWBE Committment Form (APCF) 2021 rev.pdf (CFW Internal)
21 FOREST PARK POOLS CHANGE ORDER 1.docx (CFW Internal)
21 FOREST PARK POOLS CHANGE ORDER 1.xlsx (CFW Internal)
Forest Park Pool Construction C01 map.pdf (CFW Internal)
ORD.APP 21 FOREST PARK POOLS CHANGE ORDER 1 A023(r2).docx (Public)
ORD.APP 21 FOREST PARK POOLS CHANGE ORDER 1 A023(r3).docx (Public)
ORD.APP 21 FOREST PARK POOLS CHANGE ORDER 1 A023(r4).docx (Public)
Sianed APCF CPN103326 SteeleFreeman 9.11.23 GV.pdf (CFW Internal)
apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31441 &counci ddate=9/26/2023 3/3
W1
=_ Document G701"' - 2017
Change Order
PROJECT: (Name and address)
Fort Worth Forest Park Pool
2850 Park Place
Fort Worth, Texas
PMD2021-03
City Project #103326
OWNER: (Name and address)
City of Fort Worth
Ronald Clements
401 W. 13th Street
Fort Worth, Texas 76102
CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
Contract For: Forest Park AquaticCenter Change Order Number: 001
Date: March 20, 2023 Date: June 21, 2023
ARCHITECT: (Name and address)
Brinkley Sargent Wiginton
5000 Quorum Drive, Suite 600
Dallas, Texas 75254
CONTRACTOR: (Name and address)
Steele & Freeman, Inc.
1301 Lawson Rd.
Fort Worth, TX 76131
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon,adjustments
attributable to executed Construction Change Directives)
Reference Exhibit'B" Project Manual Drawings Pages 1-8 Dated June 21, 2023
Reference Exhibit "C" Allowances, 1 Page, Dated June 21, 2023
Reference Exhibit "D" Clarifications, Pages 1-4 Dated June 21, 2023
Reference Exhibit "E" Schedule — 1 Page Dated June 21, 2023
Reference Exhibit "F" Alternates — 1 Page Dated June 21, 2023
Reference Exhibit "G" Unit Prices — I Page Dated June 21, 2023
Reference Exhibit "H" Guaranteed Maximum Price (GMP) - 1 Pages Dated June 21, 2023
The original Guaranteed Maximum Price was $ 9,497,625.00
The net change by previously authorized Change Orders $ 0.00
The Guaranteed Maximum Price prior to this Change Order was $ 9,497,625.00
The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 3,537,203.00
The new Guaranteed Maximum Price including this Change Order will be $ 13,034,828.00
The Contract Time will be increased by Zero (0) days.
The new date of Substantial Completion will be
NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract
Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR ANPWNER.
Brinkle Sargent Wi�rinton Steele & F eman, c
ARCHITCT (Firm name) CONTRACT' /afime)
SIGNATURE
Stephen Springs, Senior Principal, AIA„
LEED AP
PRINTED NAME AND TITLE
DATE
SITATURE
Micha i .Freeman, President
PRINTED NAME AND TITLE
06/21/23
DATE
City of Fort Worth
OWNER (Firm name)
SIGNATURE
PRINTED NAME AND TITLE
DATE
AIA Document G701 — 2017. Copyright @ 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of
Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 11:02:03
ET on 11/03/2023 under Order No.4104245847 which expires on 10/04/2024, is not for resale, is licensed for one-time use only, and may only be used in
accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes: (3139ADA36)
*CVR
CVR COVER SHEET April 21, 2023 ADD No .1
CIVIL
C00.01
GENERAL NOTES
April 17, 2023
C00.02
GENERAL NOTES
April 17, 2023
C1.00
EXISTING CONDITIONS
April 17, 2023
C2.00
DEMO PLAN
April 17, 2023
C3.00
SITE PLAN
April 17, 2023
C4.00
DIMENSIONAL CONTROL PLAN
April 17, 2023
C5.00
FIRE PROTECTION PLAN
April 17, 2023
C6.00
PAVING PLAN
April 17, 2023
C7.00
GRADING PLAN
April 17, 2023
C8.00
PRE -DEVELOPMENT DAM
April 17, 2023
C9.00
POST -DEVELOPMENT DAM
April 17, 2023
C10.00
UTILITY PLAN
April 17, 2023
C11.00
DRAINAGE PLAN
April 17, 2023
C14.00
EROSION CONTROL PLAN
April 17, 2023
C15.00
CIVIL DETAILS
April 17, 2023
C15.01
CIVIL DETAILS
April 17, 2023
C15.02
CIVIL DETAILS
April 17, 2023
C15.03
CIVIL DETAILS
April 17, 2023
C15.04
CIVIL DETAILS
April 17, 2023
C15.05
CIVIL DETAILS
April 17, 2023
C15.06
CIVIL DETAILS
April 17, 2023
C15.07
CIVIL DETAILS
April 17, 2023
STRUCTURAL
S001
GENERAL NOTES
April 17, 2023
S002
STATEMENT OF SPECIAL INSPECTIONS
April 17, 2023
S003
STRUCTURAL DESIGN DIAGRAMS
April 17, 2023
S211
LEVEL 1- FLOOR PLAN - OVERALL
April 17, 2023
S212
LEVEL 1 FLOOR PLANS
April 17, 2023
S213
POOL PLANS
April 17, 2023
S214
ROOF PLANS
April 17, 2023
S215
BATH HOUSE OPENING PLAN
April 17, 2023
S301
TYPICAL CONCRETE DETAILS
April 17, 2023
S302
TYPICAL CONCRETE DETAILS
April 17, 2023
S303
CONCRETE DETAILS
April 17, 2023
S309
MISC CONCRETE DETAILS
April 17, 2023
S310
TYPICAL CONCRETE POOL DETAILS
April 17, 2023
S311
POOL DETAILS
April 17, 2023
S312
POOL DETAILS
April 17, 2023
S313
LEISURE POOL DETAILS
April 17, 2023
S401
TYPICAL MASONRY DETAILS
April 17, 2023
S410
BATH HOUSE EXTERIOR MASONRY WALL ELEVATIONS
April 17, 2023
S411
BATH HOUSE INTERIOR MASONRY WALL ELEVATIONS
April 17, 2023
S412
PUMP HOUSE MASONRY WALL ELEVATIONS
April 17, 2023
S501
TYPICAL STEEL DETAILS
April 17, 2023
S502
STEEL DETAILS
April 17, 2023
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 1
ARCHITECTURAL
A000
TEXAS ACCESSIBILITY STANDARDS (TAS)
April 17, 2023
A021
CODE
April 17, 2023
A101
SITE PLAN
April 17, 2023
A102
SITE DETAILS
April 17, 2023
A201
BATH HOUSE FLOOR PLANS
April 21, 2023
ADD No .1
A202
PUMP HOUSE FLOOR PLANS
April 21, 2023
ADD No .1
A210
PLAN DETAIL
April 21, 2023
ADD No .1
A301
ROOF PLANS AND DETAILS
April 21, 2023
ADD No .1
A302
REFLECTED CEILING PLAN
April 21, 2023
ADD No .1
A401
BATH HOUSE ELEVATIONS
April 21, 2023
ADD No .1
A402
PUMP HOUSE ELEVATIONS
April 21, 2023
ADD No .1
A501
BUILDING SECTIONS
April 21, 2023
ADD No .1
A511
WALL SECTIONS
April 21, 2023
ADD No .1
A521
SECTION DETAILS
April 21, 2023
ADD No .1
A522
SECTION DETAILS
April 21, 2023
ADD No .1
A701
PARTITION TYPES
April 17, 2023
A702
DOOR SCHEDULE, DOOR TYPES, AND DOOR DETAILS April 21, 2023
ADD No .1
A801
FINISH PLAN
April 21, 2023
ADD No .1
A901
INTERIOR ELEVATIONS & MILLWORK SECTIONS
April 21, 2023
ADD No .1
MECHANICAL
M001
MECHANICAL GENERAL NOTES AND LEGENDS
April 17, 2023
M101
MECHANICAL PLANS
April 17, 2023
M201
MECHANICAL SCHEDULES
April 17, 2023
M301
MECHANICAL DETAILS
April 17, 2023
M401
MECHANICAL CONTROLS
April 17, 2023
ELECTRICAL
E001
ELECTRICAL GENERAL NOTES AND LEGEND
April 17, 2023
E201
ELECTRICAL SITE PLAN
April 17, 2023
E401
ELECTRICAL SECTIONS AND ENLARGED PLANS -
FLOOR PLAN April 17, 2023
E402
ELECTRICAL SECTIONS AND ENLARGED PLANS -
REFLECTED CEILING I April 17, 2023
E501
ELECTRICAL SCHEDULES
April 17, 2023
E502
ELECTRICAL PANEL SCHEDULES
April 17, 2023
E601
ELECTRICAL DETAILS
April 17, 2023
E602
ELECTRICAL DETAILS
April 17, 2023
E701
ELECTRICAL ONE -LINE DIAGRAMS
April 17, 2023
PLUMBING
P001
PLUMBING GENERAL NOTES AND LEGEND
April 17, 2023
P101
PLUMBING ANNOTATION PLAN
April 17, 2023
P201
PLUMBING UNDERSLAB PLAN
April 17, 2023
P301
PLUMBING WASTE & VENT PLAN
April 17, 2023
P401
PLUMBING SUPPLY PLAN
April 17, 2023
P501
PLUMBING SITE PLAN
April 17, 2023
P601
PLUMBING SCHEDULES
April 17, 2023
P701
PLUMBING DETAILS
April 17, 2023
AQUATICS
AQO.0
POOL REFERENCE PLAN
April 17, 2023
AQ1.0
COMPETITION POOL PLAN
April 17, 2023
AQ1.1
COMPETITION POOL SECTIONS
April 17, 2023
AQ1.2
COMPETITION POOL COURSE LAYOUT
April 17, 2023
AQ1.3
COMPETITION POOL COURSE LAYOUT
April 17, 2023
AQ1.4
COMPETITION POOL DETAILS
April 17, 2023
AQ1.5
COMPETITION POOL DETAILS
April 17, 2023
AQ1.6
COMPETITION POOL DETAILS
April 17, 2023
AQ1.7
WATERSLIDE PLAN, ELEVATION, & DETAILS
April 17, 2023
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 2
AQ2.0
AQ2.1
AQ2.2
AQ3.0
AQ3.1
AQ4.0
AQ4.1
AQ4.2
AQ4.3
AQ5.0
AQ5.1
AQ5.2
AQ5.3
AQ5.4
AQ5.5
AQ5.6
AQ5.7
AQ6.0
AQ6.1
LEISURE POOL PLAN, ELEVATION, & DETAILS
LEISURE POOL DETAILS
LEISURE POOL DETAILS
POOL LOCATION POINT PLAN
POOL LOCATION POINT PLAN SCHEDULE
POOL PIPING NOTES & SCHEDULES
POOL SUCTION PIPING PLAN
POOL RETURN PIPING PLAN
POOL FEATURE PIPING PLAN
POOL MECHANICAL ROOM NOTES & SCHEDULES
POOL MECHANICAL ROOM PLAN & SECTIONS
SURGE TANK PLAN & SECTIONS
POOL MECHANICAL DETAILS
POOL MECHANICAL DETAILS
POOL MECHANICAL DETAILS
POOL MECHANICAL DETAILS
POOL MECHANICAL DETAILS
COMPETITION POOL SYSTEMS SCHEMATIC
LEISURE POOL SYSTEMS SCHEMATIC
LANDSCAPE
L1.01
TREE PRESERVATION AND REMOVAL PLAN
L1.02
EXISTING TREE LISTING AND CITY OF FORT WORTH NOTES
L2.01
SITE PLAN
L2.02
DETAILS
L2.03
DETAILS
L3.01
LANDSCAPE PLAN
L3.02
LANDSCAPE PLANT LIST AND DETAILS
L4.01
IRRIGATION PLAN
L4.02
IRRIGATION NOTES AND DETAILS
OFOI SECURITY SYSTEM DRAWINGS FOR ROUGH -IN
PROPERTY OVERIEW
TICKET OFFICE / RESTROOMS - 1 OF 2
TICKET OFFICE / RESTROOMS - 2 OF 2
PUMP HOUSE - 10F 2
PUMP HOUSE - 2 OF 2
DRAWINGS BY GOODWIN AND MARSHAL. INC FOR ALTERNATE NO. 1
10
PARK PLACE AVENUE
- EROSION CONTROL PLAN
11
PARK PLACE AVENUE
- DEMOLITION PLAN
23
PARK PLACE AVENUE
- CURB & GUTTER AND TRAIL
31
PARK PLACE AVENUE
-STRIPING PLAN
32
CITY OF FORT WORTH
- PAVING DETAILS
33
CITY OF FORT WORTH
- PAVING DETAILS
34
CITY OF FORT WORTH
- PAVING DETAILS
35
CITY OF FORT WORTH
- PAVING DETAILS
38
CITY OF FORT WORTH
- STORM DETAILS
39
CITY OF FORT WORTH
- STORM DETAILS
40
CITY OF FORT WORTH
- STORM DETAILS
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
May 2, 2023
May 2, 2023
May 2, 2023
May 2, 2023
May 2, 2023
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
March 4, 2015
ADD No .2
ADD No .2
ADD No .2
ADD No .2
ADD No .2
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 3
SPECIFICATION SECTION, NUMBER & TITLE DATED
DIVISION 00 - PROCUREMENT AND CONTRACTING REOUIREMENTS
00 0110 Table of Contents April 21, 2023
00 3132 GEOTECHNICAL DATA April 17, 2023
AIA 201 Draft General Conditions of Contract
SFI Front End Documents and Proposal Package Manual April 21, 2023
DIVISION 01-GENERAL REOUIREMENTS
011100 SUMMARY
April 17, 2023
012100 ALLOWANCES
April 17, 2023
0123 00 ALTERNATES
April 17, 2023
0125 00 SUBSTITUTION PROCEDURES - REQUEST FOR SUBSTITUTION FORM
April 17, 2023
0126 00 CONTRACT MODIFICATION PROCEDURES
April 17, 2023
0126 10 REQUESTS FOR INTERPRETATION
April 17, 2023
0129 00 PAYMENT PROCEDURES
April 17, 2023
013100 PROJECT MANAGEMENT AND COORDINATION
April 17, 2023
0132 00 CONSTRUCTION PROGRESS DOCUMENTATION
April 17, 2023
0133 00 SUBMITTAL PROCEDURES
April 17, 2023
0140 00 QUALITY REQUIREMENTS
April 17, 2023
0142 00 REFERENCES
April 17, 2023
0143 39 MOCK-UPS
April 17, 2023
0145 33 CODE -REQUIRED SPECIAL INSPECTIONS AND PROCEDURES
April 17, 2023
0150 00 TEMPORARY FACILITIES AND CONTROLS
April 17, 2023
0156 39 TREE AND PLANT PROTECTION
April 17, 2023
0160 00 PRODUCT REQUIREMENTS
April 17, 2023
0173 00 EXECUTION
April 17, 2023
0177 00 CLOSEOUT PROCEDURES
April 17, 2023
0178 23 OPERATION AND MAINTENANCE DATA
April 17, 2023
0178 39 PROJECT RECORD DOCUMENTS
April 17, 2023
0179 00 DEMONSTRATION AND TRAINING
April 17, 2023
DIVISION 03 - CONCRETE
03 1113 STRUCTURAL CONCRETE FORMING
April 17, 2023
03 15 00 CAST -IN ANCHORS AND EMBEDS
April 17, 2023
03 20 00 CONCRETE REINFORCING
April 17, 2023
03 3100 STRUCTURAL CONCRETE
April 17, 2023
03 62 14 GROUTING STEEL BASE PLATES
April 17, 2023
DIVISION 04 - MASONRY
04 05 26 - CLEANING NEW MASONRY
April 17, 2023
04 2113 BRICK MASONRY VENEER
April 17, 2023
04 22 00 CONCRETE UNIT MASONRY
April 17, 2023
04 4100 STONE BENCH
April 17, 2023
04 72 00 CAST STONE MASONRY
April 17, 2023
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL FRAMING
April 17, 2023
05 2100 STEEL JOISTS
April 17, 2023
05 3123 STEEL ROOF DECKING
April 17, 2023
05 50 00 METAL FABRICATIONS
April 17, 2023
05 5133 ALUMINUM LADDER
April 17, 2023
05 52 16 ALUMINUM PIPE RAILINGS
April 17, 2023
ADD No. 1
ADD No. 1
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 4
DIVISION 06 - WOOD. PLASTICS AND COMPOSITES
06 10 53 MISCELLANEOUS ROUGH CARPENTRY
06 20 13 EXTERIOR FINISH CARPENTRY
06 20 23 INTERIOR FINISH CARPENTRY
06 4116 PLASTIC -LAMINATE -FACED ARCHITECTURAL CABINETS
DIVISION 07 -THERMAL AND MOISTURE PROTECTION
07 13 26 VERTICAL SHEET WATERPROOFING
07 2100 THERMAL INSULATION
07 26 17 BELOW SLAB VAPOR BARRIERS
07 27 26 FLUID -APPLIED MEMBRANE AIR BARRIERS
07 52 16 SBS MODIFIED BITUMINOUS MEMBRANE ROOFING
07 62 00 SHEET METAL FLASHING
07 62 19 FABRICATED SHEET METAL FASCIA
07 84 13 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION JOINT ASSEMBLIES
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES
08 16 13 FIBERGLASS DOORS AND FRAMES
08 3113 ACCESS DOORS
08 33 13 COILING COUNTER DOORS
08 33 23 OVERHEAD COILING DOORS
08 42 13 ALUMINUM -FRAMED ENTRANCES
08 43 13 ALUMINUM FRAMED STOREFRONT
08 7100 FINISH HARDWARE
08 80 00 GLAZING
FINISHES 09 - FINISHES
09 30 00 TILING
09 6139 SEALING CONCRETE FLOORS
09 9100 PAINTING
09 97 13 EXTERIOR STEEL COATINGS
DIVISION 10 - SPECIALTIES
10 00 00 MISCELLANEOUS SPECIALTIES
10 14 16 PLAQUES
10 14 23 SIGNAGE
PARK STANDARD MONUMENT SIGN
10 14 25 PHENOLIC SIGNS
10 16 00 TOILET COMPARTMENTS
10 22 53 CHAIN LINK PARTITIONS
10 35 10 FLAGPOLES
10 44 16 FIRE EXTINGUISHERS
10 5129 PHENOLIC LOCKERS
10 80 00 TOILET ACCESSORIES
April 21, 2023
April 21, 2023
April 21, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 21, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
April 17, 2023
ADD No. 1
ADD No. 1
ADD No. 1
ADD No. 1
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 5
DIVISION 11- EOUIPMENT
1145 00 APPLIANCES
April 17, 2023
DIVISION 12 - FURNISHINGS
12 3133 STAINLESS STEEL FABRICATIONS
April 17, 2023
12 36 61 ENGINEERED STONE COUNTERTOPS
April 17, 2023
DIVISION 13 - SPECIAL CONSTRUCTION
13 1100 SWIMMING POOLS
April 17, 2023
13 1103 SWIMMING POOLTILE
April 17, 2023
13 1104 SWIMMING POOL CEMENTITIOUS FINISH
April 17, 2023
13 14 13 WATERSLIDES
April 17, 2023
DIVISION 22 - PLUMBING
22 05 19 METERS AND GAUGES FPR PLUMBING PIPING
April 17, 2023
22 05 23 GENERAL -DUN VALVES FOR PLUMBING PIPING
April 17, 2023
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
April 17, 2023
22 05 33 HEAT TRACING FOR PLUMBING PIPING
April 17, 2023
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
April 17, 2023
22 07 00 PLUMBING INSULATION
April 17, 2023
22 1116 DOMESTIC WATER PIPING
April 17, 2023
22 1119 DOMESTIC WATER PIPING SPECIALTIES
April 17, 2023
22 13 16 SANITARY WASTE AND VENT PIPING
April 17, 2023
22 13 19 SANITARY WASTE PIPING SPECIALTIES
April 17, 2023
22 14 13 FACILITY STORM DRAINAGE PIPING
April 17, 2023
22 14 23 STORM DRAINAGE PIPING SPECIALTIES
April 17, 2023
22 33 00 ELECTRIC DOMESTIC WATER HEATERS
April 17, 2023
22 40 00 PLUMBING FIXTURES
April 17, 2023
DIVISION 23 - HEATING. VENTILATING AND AIR CONDITIONING
23 05 00 COMMON WORK RESULTS FOR HVAC
April 17, 2023
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
April 17, 2023
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
April 17, 2023
23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC
April 17, 2023
23 07 00 HVAC INSULATION
April 17, 2023
23 09 00 INSTRUMENTATION AND CONTROLS FOR HVAC
April 17, 2023
23 09 25 VARIABLE FREQUENCY DRIVES
April 17, 2023
23 3113 METAL DUCTS
April 17, 2023
23 33 00 AIR DUCT ACCESSORIES
April 17, 2023
23 34 23 HVAC POWER VENTILATORS
April 17, 2023
23 37 13 DIFFUSERS, REGISTERS AND GRILLES
April 17, 2023
23 8113 PACKAGED TERMINAL AIR -CONDITIONERS, THROUGH -WALL UNITS
April 17, 2023
DIVISION 26 - ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
April 17, 2023
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS
April 17, 2023
26 05 29 HANGERS AND SUPPORTS
April 17, 2023
26 05 33 RACEWAY AND BOXES
April 17, 2023
26 05 43 UNDERGROUND DUCTS AND RACEWAYS
April 17, 2023
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
April 17, 2023
26 05 73.13 SHORT-CIRCUIT STUDIES
April 17, 2023
26 05 73.16 COORDINATION STUDIES
April 17, 2023
26 05 73.19 ARC -FLASH HAZARD ANALYSIS
April 17, 2023
26 09 23 LIGHTING CONTROL DEVICES
April 17, 2023
26 22 00 LOW VOLTAGE TRANSFORMERS
April 17, 2023
26 24 16 PANELBOARDS
April 17, 2023
26 27 26 WIRING DEVICES
April 17, 2023
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
April 17, 2023
26 5100 INTERIOR LIGHTING
April 17, 2023
26 56 00 EXTERIOR LIGHTING
April 17, 2023
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 6
DIVISION 31- EARTHWORK
3110 00 SITE PREPARATION AND DEMOLITION
April 17, 2023
3122 00 EARTHWORK
April 17, 2023
3123 33 TRENCH EXCAVATION
April 17, 2023
3123 34 TRENCH BACKFILL
April 17, 2023
3123 35 TRENCH SAFETY SYSTEM
April 17, 2023
3125 00 EROSION CONTROL
April 17, 2023
313116 TERMITE CONTROL
April 17, 2023
3163 29 DRILLED CONCRETE PIERS
April 17, 2023
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 ASPHALT PAVING
April 17, 2023
32 13 13 CONCRETE PAVING
April 17, 2023
32 15 10 SANDBLAST CONCRETE FINISHES
April 17, 2023
32 15 11 STAINED CONCRETE FINISH
32 95 2 COLORED CONCRETE RAVING
May 12, 2023
A 97 202-
32 17 23 PAVEMENT MARKINGS
ffii
April 17, 2023
32 3113 CHAIN LINK FENCES AND GATES
April 17, 2023
32 3119 ORNAMENTAL FENCES AND GATES
April 17, 2023
32 80 01 LANDSCAPE IRRIGATION SYSTEM
April 17, 2023
32 80 11 IRRIGATION RECORD DOCUMENT
April 17, 2023
32 80 21 DRIP IRRIGATION
April 17, 2023
32 84 01 IRRIGATION SLEEVES
April 17, 2023
32 9100 GENERAL PLANTING
April 17, 2023
32 9105 PLANT SELECTION
April 17, 2023
32 9119 TOPSOIL AND FINISHED GRADING
April 17, 2023
32 92 23 SOLID SOD
April 17, 2023
32 93 33 SHRUB AND GROUNDCOVER PLANTING
April 17, 2023
32 93 43 TREE PLANTING
April 17, 2023
DIVISION 33 - UTILITIES
33 3100 WATER UTILITIES
April 17, 2023
33 30 00 SANITARY SEWERAGE UTILITIES
April 17, 2023
33 40 00 STORM DRAINAGE UTILITIES
April 17, 2023
OTHER DOCUMENTS
B000520.015 Forest Park Final Plat 2022 23-0131(1) Prepared July 2022
COMcheck Electrical signed April 13, 2023
COMcheck Mech Signed April 13, 2023
EAB registration April 17, 2023
Issued in Pre -Bid RFI #07
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 7
PRE -BID RFI No. & TYPE
DATED
RETURNED
Pre -BID RFI No. 1
April 27, 2023
May 2, 2023
Pre -BID RFI No. 2
May 1, 2023
May 2, 2023
Pre -BID RFI No. 3
May 1, 2023
May 2, 2023
Pre -BID RFI No. 4
May 4, 2023
May 4, 2023
Pre -BID RFI No. 5
May 9, 2023
May 9, 2023
Pre -BID RFI No. 6
May 9, 2023
May 9, 2023
Pre -Bid RFI No. 7
May 11, 2023
May 12, 2023
ADDENDUM No. DATED
ADDENDUM No. 1 April 21, 2023
ADDENDUM No. 2 May 2, 2023
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 8
1 Contractor's Contingency
2 Owners Contingency
3 Salvage and reuse/recover the six (6) Round and two (2)
Rectangular existing umbrella shades
4 Ingress/Egress ADA Turnstyles (Detail 1/A102)
5 Landscape an Irrigation Associated with Alt. 1 street widening (2015
Drawings)
6 Utility Revisions Associated with Alt 1 Street widening (2015
Drawin,vs)
7 Repairs to the 1920 Sacred Concrete Circle per Pre -Bid RFI #2
ALLOWANCES INCLUDED IN GMP
$275,961
$596,543
$35,000
$15, 500
$20,000
$15,000
$8,943
$966,947
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 1
COVID-19 or Pandemics issues may delay delivery of equipment and/or labor. Any and all delays related to COVID-19 or unforeseen
circumstances outside the Construction Managers control shall be claimed on a day for day basis.
Construction Management Fee and General Condition Expense are a fixed lump sum cost.
Force Majeure /Pandemic/Supply Chain Matters. Construction Manager shall not be liable for delays in performance or for nonperformance
due to Acts of God; actions or inactions of Contractor or Owner or Owner's Design Team; war (including impacts from the Russia/Ukrainian
War); epidemic/pandemic; fire; flood; hurricane; tornado; extreme weather; sabotage; terrorism (domestic or foreign); labor shortages, labor
strikes or labor disputes; riots and civil disturbances; governmental requests, demands, restrictions and/or allocations; newly-
passed/imposed laws, regulations and/or tariffs; governmental and/orjudicial orders or actions; unavailability of or delays in transportation
due to any of the aforementioned activities or occurrences; default of suppliers due to any of the aforementioned activities or occurrences
(including materials, supply shortages, labor shortages or discontinuations and/or spikes in supplier prices greater than 10% as of date the
bid was submitted); or, other unforeseen circumstances, events or causes beyond Contractor's reasonable control. Subject to the survival of
viable communication systems, Construction Manager will timely notify Owner if and when one or more of the above identified matters have
occurred and whether and to what extent the same may result in delay of performance or in a specified non-performance.
Div 01 General Reauirements
1 We have excluded state sales tax on INCORPORATED materials.
2 We have excluded tap, impact & meter fees.
3 The Building Permit cost has been excluded.
4 Plat and easements by others.
5 Bids are based on Construction Documents as noted in Exhibit'B' and Alternates as noted in Exhibit'F'.
6 We have excluded materials testing and special inspections.
7 It is assumed that the contract documents have been thoroughly reviewed to meet Federal, state and local codes.
8 We exclude all seismic requirements referenced in the specifications due to the Project's location in Fort Worth does not require any Seismic
consideration.
9 Schedule does account for weather delays; any weather events, will have a day -for -day impact on the schedule.
10 Submittal schedule is excluded, priority submittals will be identified as they are transmitted to the architect.
11 Recovery schedules are excluded.
12 All telephone, paging, low voltage, computer, server, switching, network, cable TV, radio and DAS equipment and testing is excluded.
Deposits required in advance to procure materials will be included on the pay application within the same pay period in which payment is due
13 for deposit to the subcontractors / suppliers, when approved by City of Fort Worth.
Materials that are stored onsite or stored at subcontractor's warehouse will be included on pay applications. Invoices and photos of stored
14 materials will be provided upon request.
The contract contingency is for the Construction Managers exclusive use to cover those costs considered reimbursable as the Cost of the
15 Work but not included in a Change Order. All construction contingency expenditures will be documented monthly with each application for
payment.
All unforeseen scope not clearly identified , not quantified and/or not properly referenced in the contract will be presented to the Owner as a
16 Proposed Change (PC).
This project is not a LEED project, therefor VOC Content Restriction (greater than federal or state requirements) and Commissioning is
17 excluded.
18 Video of recorded training, if any, will be provided on a thumb drive.
19 Temporary Environmental Controls, Flush Out & Air contaminant testing is not included in this scope of work.
20 Materials Testing Laboratory Services shall be provided by the Owner and is excluded from this scope of work.
21 TDLR/TAS review and inspections are excluded. To be provided by Owner.
22 SFI will provide access to the ProjectSight project management software for project documentation, if requested.
SFI will notify City of Fort Worth of any priority submittals requiring Owner's approval to ensure project stays on schedule. If additional time is
23 required for approval, then delay to material fabrication and delivery could affect the construction schedule.
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 1
Perspective drawings and/or architectural renderings are for visualization concepts only. Details, dimensions, and materials shall not be
25 inferred from perspectives and architectural renderings.
26 Franchise utility service charges have been excluded for communication lines, electrical power, Atmos gas, etc.
Delegated Design submittals are recognized for the following sections: 05 12 00 Structural Steel Framing, 05 52 16 Aluminum Pipe Railings,
27 13 1100 Swimming Pools, 13 14 13 Waterslides, 26 05 29 Hangers and Supports, 26 0 73.13 Short -Circuit Studies, 26 05 73.19 Arc Flash
Hazard Analysis, 26 56 00 Exterior Lighting. No other Delegated Design requirements are recognized.
28 Unforeseen material delivery and availability issues beyond Steele & Freeman's control shall be a day -for -day schedule delay.
29 All utilities, including but not limited to, domestic water, irrigation water, electricity, gas and communications shall be transferred into the
Owner's name at Substantial Completion. All utilities from this date shall not be funded thru the GMP Estimate.
Due to the current market with shortages of material, we reserve the right to provide substitutions for approval if the shortage or material
30 causes an increase in material pricing, color, or finish limitations or affects the construction schedule or availability of those materials during
construction.
Div 02 Existing Conditions
1 Hazardous materials identification, testing, abatement, removal, demolition, and/or disposal is excluded.
2 Removal of underground storage tanks, contaminated soils and related remediation is excluded.
3 Items not detailed in the contract documents to be removed or demolished are excluded from this work.
Div 03 Concrete
1 All belled piers have been bid as dry, with bearing elevation at 15' below finished grade, per the structural general notes. No Unit pricing for
added, deducted length, or casing is included.
All exposed slab finishes to be Class B and per the specifications for unshored suspended slabs have a minimum FF of 25
2 (which translates to 1/4" vertical variance in 10')
3 All concrete is bid as hand -finished. Mechanical screed, vibratory screed and paving machines is excluded.
5 Any underground obstructions discovered to the new foundation will be handled as a change order to contract contingency on an individual
basis.
6 Hot or cold weather cooling or heating of concrete. Proposal may be requested if conditions fall within hot or cold weather parameters.
7 Rock coring or rock drilling are excluded.
8 Monument sign foundation is included as shown, and was added per the Alternate No. 3.
9 We have included an allowance for repairs to the 1920 Sacred Concrete Circle per Pre -Bid RFI #2. See Exhibit C - Allowances.
The stained concrete "bubbles" that are shown on L201 and Detail 1/L2.02 will be a stained concrete finish per the answer on Pre -Bid RFI #7
10 and the Specification Section 32 15 11 issued with the RFI. Color to be from Manufacturer standard colors. Specification 32 15 12 Colored
Concrete Paving is no longer applicable for this project and is excluded.
Div 04 Masonry
1 Mortar shall be grey in color.
2 Galvanized wire brick ties are included per Pre -Bid RFI #3.
Div 05 Metals
1 We have excluded all AESS steel finishes. None shown.
2 Upsizing of steel beyond what is clearly shown, sized and located in the contract documents is excluded.
3 Any finishes on galvanized metals are excluded.
Div 06 Woods. Plastics. and Composites
1 All millwork has been bid to be built to AWI Standards per the specs. AWI Labels are excluded.
2 Wood blocking shall be untreated or treated dimensional lumber as specified for the locations indicated.
3 Artwork handling and installation is excluded.
Div 07 Thermal & Moisture Protection
1 Fireproofing is excluded as none is shown.
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 2
Div 08 Openings
1 Conduit and back box to door frame is included per the Addendum #2 Security drawings. Access controls, wiring, and programming by Owner.
2 Automatic door openers excluded, none are shown.
3 Door hardware finish will be provided as brushed chrome/satin chrome, 26D / 626, 626AM, 628, 630, 630AM as specified.
Div 11 Eauioment
The following appliances are Owner Furnished Owner Installed: Side -by -Side Refrigerator, Microwave. Contractor Furnished Contractor
1 Installed includes one under counter ice machine as specified. All other appliances are excluded.
Div 12 Furnishings
1 We have excluded all furniture, except as noted as millwork in Div 6
Div 21 Fire Suppression
1 The fire suppression system is not required, and is excluded.
Div 22 Plumbing
1 Gas lines are excluded, none for this project.
2 Trench drains are as noted on Pre -Bid RFI #05, and are the Daldorado Product.
Div 23 Mechanical
1 Gas equipment is excluded, none shown for this project.
2 We have excluded indoor air quality control inspections.
3 Fire dampers that are not specifically shown on the drawings are excluded.
4 Screening of roof mounted equipment is excluded (none shown).
Div 26 Electrical
1 Oncor or electrical provider charges for primary conductors and transformer scope is excluded.
2 Secondary conduits and feeders from the pole mounted transformer is included.
4 Lightning protection is excluded.
Empty conduits and back box for low voltage cabling in building to nearest plenum space for are supplied as shown on Addendum #2
5 Documents. All wiring and devices are by the Owner.
Div 27 Communications
1 Low Voltage structured cabling is by the Owner.
2 AV Systems is by the Owner.
3 Communications Systems is by the Owner.
4 VOIP phone/paging system is by the Owner.
5 Sound Reinforcing is by the Owner.
Div 28 Electronic Safetv and Security
1 Access control is by the Owner.
2 Video Surveillance is by the Owner.
3 Intrusion Detection is by the Owner.
4 Public Safety Radio Enhancement System (ERRS) is excluded. A proposal for testing can be provided upon Owner request once the building
envelope is complete.
5 Fire alarm is not required for this project and is excluded.
Div 31 Earthwork
1 We have excluded the disposal of any contaminated soils.
2 Moisture conditioning of the areas shown on Sheet 5211 is per the response in Pre -Bid RFI #5.
3 Identification of geological stratas including bearing strata are to be identified by the Owner's Testing Laboratory Service.
4 Earthwork is to grade (within 0.2')
Scarified, water added and recompacted subgrade under the areas of 4" sidewalks and 5" flatwork noted on C6.0. Lime stabilized
5 subgrade(6" with 7% hydrated lime) is included as noted on Detail 04/C15, under the 6" and 7" concrete paving is included.
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 3
Div 32 Exterior Improvements
Landscape and irrigation scopes are included as shown for the Pool Drawings. For the Alternate No. 1 Street Widening areas, we have
1 included an Allowance to repair disturbed areas included in that work. See Exhibit C - Allowances.
Ip•mport of topsoil is excluded. It is assumed the existing topsoil that will be stripped and stockpiled is suitable material for the planting and
2 landsca in
g•
3 We have excluded the removing of rock that is smaller than 2" from landscape area.
4 Monument sign, foundation and lighting are included as the accepted Alternate No. 3.
We have included the ornamental fencing where located on the documents. Fencing is included as 7' tall TCF7-Eagle 7' Tall iron Fence,
5 galvanized inside and out, with 3/4" 14" ga. pickets, 11/2" 14 ga. Rails (3 rail system), and 3" 14 ga. Posts, and a 15 year paint warranty,
and 5 year labor warranty. This product is a better than or equal to the specified Ameristar fence.
We have included an Allowance to recover, re -set, and re -use the existing six (6) existing round umbrellas, and the two (2) rectangular shade
6 structures. Foundations are as noted per the documents and are not included in this allowance. See Exhibit C - Allowances.
Div 33 Utilities
1 Underground utilities not shown by the contract documents (unknown conditions) are specially excluded.
2 We have included an Allowance for Utility Revisions Associated with Alt 1 Street widening (2015 Drawings) - See Exhibit C - Allowances
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 4
�jr
STEELE & FREEMAN, INC.
CONSTRUCTION MANAGERS
PROJECT:
Fort Worth Forest Park Aquatics Center
2850 Park Place, Fort Worth TX 76110
SFI JOB No.:
5509
COMPLETION SCHEDULE GENERAL CONSTRUCTION
Change Order 001 1 AIA G701- 201
Exhibit'E' - Schedu
Date: 06/21/20:
ARCHITECT:
Brinkley Sargent Wiginton Architects
5000 Quorum Drive, Suite 600
Dallas, Texas 75254
No. 1 Add on -street parking to Park Place Ave.
No. 2 Add terracing between pool deck and upper deck.
No. 3 Add Monument Sign at parking lot entrance.
No. 4 Add Monument Sign at parking lot without LED.
None
$ 421,937.00 Approved and Included
$ 113,723.00 Rejected
$ 85,501.00 Approved and Included
$ 62,658.00 Rejected
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 1
Piers are included as dry, 15' below the finished floor - adjustments to
1.
depth as noted below:
BP1-
24" DIAMETER SHAFT
54" DIAMETER BELL
$73.25 /LF
$27.05 /LF
BP2 -
24" DIAMETER SHAFT
60" DIAMETER BELL
$73.25 /LF
$27.05 /LF
BP3 -
24" DIAMETER SHAFT
68" DIAMETER BELL
$73.65 /LF
$27.05 /LF
BP4 -
24" DIAMETER SHAFT
76" DIAMETER BELL
$99.25 /LF
$42.15 /LF
BP5 -
24" DIAMETER SHAFT
82" DIAMETER BELL
$99.25 /LF
$42.15 /LF
If water is encountered it would require a new straight shaft pier design
2. with additional geo technical information / design and BP4 and BP5 would
require 30" shaft diameter due to the size requireed for the bell.
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 1
DIVISION
BID PACKAGE DESCRIPTION
TOTAL COST
01
GENERAL REQUIREMENTS
$317,267
02
EXISTING CONDITIONS
$15,000
03
CONCRETE
$1,371,207
04
MASONRY
$395,500
05
METALS
$353, 784
06
WOODS, PLASTICS and COMPOSITES
$35,871
07
THERMAL and MOISTURE PROTECTION
$316,062
08
OPENINGS
$167,007
09
FINISHES
$150,164
10
SPECIALTIES
$169,083
11
EQUIPMENT
$0
12
FURNISHINGS
$999
13
SPECIAL CONSTRUCTION
$5,040,000
21
FIRE SUPPRESSION
$0
22
PLUMBING
$485,000
23
MECHANICAL
$182,850
26
ELECTRICAL
$650,288
27
COMMUNICATION
$0
28
ELECTRONIC SAFETY AND SECURITY
$0
31
EARTHWORK
$639,068
32
EXTERIOR IMPROVEMENTS
$442,501
33
UTILITIES
$258,887
COST OF WORK - SUBTOTAL
$10,990,538
00
LABOR BURDEN
$47,901
00
SUBCONTRACTOR DEFAULT INSURANCE FEE
$157,518
00
CONTRACTOR CONTINGENCY
$275,961
00
CONSTRUCTION MANAGER FEE
$391,146
00
PAYMENT and PERFORMANCE BONDS
$105,725
00
BUILDERS RISK
$12,438
00
GENERAL/ EXCESS LIABILITY
$29,852
00
PROFESSIONAL LIABILITY/ POLLUTION INSURANCE
$7,463
01
GENERAL CONDITION EXPENSE
$419,743
00 OWNERS CONSTRUCTION CONTINGENCY $596,543
INTIAL PROPOSAL AMOUNT $8,835,000
INITIAL OWNERS CONSTRUCTION CONTINGENCY $662,625
Forest Park Aquatics Center - Change Order 001,
06/21/23
Page 1