Loading...
HomeMy WebLinkAboutContract 59073-CO14 9 nnn �a PV8 0=0 � �sg Qan� nE4p4aa Attest: FORT WORTH, City Of Fort Worth Change Order Request CSC No. 59073-COI Facility and Project Forest Park Pool City Sec No. 59073 Description: 34027 0800450 5740010103326 004980 9999 22020801 Funding (FID) No.(s) 30100 0800450 5740010103326 004980 9999 �33002 City Proj. No. 103326 0800450 5740010103326 004980 9999 Contractor: I Steele & Freeman I Change Order# Date: 1 11/2/2023 City Project Mgr. IRonnie Clements 1 City Inspector: 1John Fowler I Phone Number:1(817) 392- 8014 1 Phone Number: 1(682) 201-1918 1 Contract Time (CD) Original Contract Amount--------------------------------------------------------------------------------------------------------------------------------I $9,497,625.00 282 Extras to Date------ ------------------------------------- 0.00 0 Creditsto Date---------------------------------------------------------------------------------------------------------------------------------------------1 0.00 0 Pending Change Orders (in M&C Process)-----------------------------------------'0.00 0 Contract Cost to Date------------------------------------------------------------------------------------------------------------------------------------� 9,497,6 5.00 282 Amount of Proposed Change Order -------------------------------------------------{ J3,537,203.00 0 Revised Contract Amount-------------------------------------------------------------------------------------------------------------------------------� 3,034,828.00 282 Original Funds Available for Change Orders 0.00 Remaining Funds Available for this CO-------------------------------------------------------------------------------------------------------------1 0.00 Additional Funding (if necessary)---------------------------------------------------------------------------------------------------------------------1 0.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 3 .2 MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $11,872,031.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER The purpose of Change Order #1 is to add funds to the Guaranteed Maximum Price (GMP) of the construction contract for the Forest Park Pool. Steele & Freeman was selected as Construction Manager at Risk (CMAR) in March 2023. Change Order No. 1 ($3,537,209.00) increases the original contract amount ($9,497,625.00) for a revised contract amount of $13,034,834.00, a 37.2% increase to the original contract, approved by M&C 23-0815. No additional contract time is approved in this change order. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incindental to the above Change Order. Contractor's Company Name I Contractor Name I Contractor Signature Date Steele & Freeman Reilly R. Freeman Nov 5, 2023 PMD Inspector Date Architecural Services Manager Date %� C-n. A Nov 6, 2023 ;� Nov 7, 2023 PMD Superintendent Date Director/Property Management Department Date Nov 6 2023 e � Nov 7, 2023 r e�ct Manager 2y"" Date Nov 6, 2023 ey S"2 Date Nov 9, 2023 Date ana er Darte hen snrinas .e-4-9;4 '244 ov 6, 2023 ° „�° a ,e °s7� Nov9 2023 , M&C Number 123-0815 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and adminstration of this contract, including ensuring all performance and reporting requirements. M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 9/26/2023 Nikita Watts Architectural Services Manager 11/1/23, 10:14AM M&C Review CITY COUNCIL AGENDA Create New From This M&C DATE: 9/26/2023 REFERENCE NO.. CODE: C TYPE M&C 23-0815 LOG NAME: NON- PUBLIC CONSENT HEARING: Official site of the City of Fort Worth, Texas FoRTWORni 21 FOREST PARK POOLS CHANGE ORDER 1 NO SUBJECT: (CD 9) Authorize Execution of a Change Order for Construction Manager at Risk Contract with Steel & Freeman, Inc., in the Amount Not to Exceed $3,537,209.00, Including an Owner's Construction Contingency Allowance, for a Total Project Budget of $13,034,828.00, for the Forest Park Pool, Adopt Appropriation Ordinances, and Amend the Fiscal 2023 Adopted Budget and Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council 1. Authorize the execution of a Change Order for Construction Manager at Risk Contract with Steel & Freeman, Inc., in the amount not to exceed $3,537,209.00, including an Owner's Construction Contingency Allowance, for a total project budget of $13,034,828.00, for the Forest Park ENFAC (City Project No. 103326); 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations Park and Recreation Department of the General Fund in an amount not to exceed $1,958,492.00, from available fund balance, for the purpose of transferring to the General Capital Projects Fund for the Forest Park ENFAC project (City Project No. 103326); 3. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the General Capital Projects Fund, in the amount of $1,958,492.00 transferred from the General Fund, for the purpose of funding the Forest Park ENFAC project (City Project No. 103326); 4. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the PARD Gas Lease Capital Project Fund, in the amount of $1,000,000.00, from available funds, for the purpose of funding the Forest Park ENFAC Project (City Project No. 103326) ; and 5. Amend the Fiscal Year 2023 Adopted Budget and Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: The Forest Park Pool project has completed the Construction Document stage and Steele & Freeman provided a final Guaranteed Maximum Price (GMP) price of $13,034,828.00. A change order is requested in the amount of $3,537,209.00 for the shortfall amount. On March 21, 2023, the City Manager's Office approved the use of Fiscal Year (FY) 2022 General Fund Surplus Mayor & Council Communication (M&C) (23-0095, February 14, 2023) in the amount of $1,958,492.00. Additional funding has also been committed from the Park and Recreation Department (PARD) Gas Lease Capital Project Fund in the amount of $1,000,000.00. Forest Park Pool Replacement Budget TOTALS Architectural Design Fees (Including Amendment No. 1) $979,520.00 Anticipated CMAR Construction Cost (Including Owner's $9,497,625.00 Construction Allowance) Change Order 1 $3,537,209.00 apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31441 &counci ddate=9/26/2023 1 /3 11/1/23, 10:14AM M&C Review Project Administration Cost (Site Utilities, IT, Security, Project $1,029,638.00 Management, Contingency, FIFE, Etc.) PROJECT TOTAL $15,043,992.00 Funding for this project was included in the FY2023-2027 Capital Improvement Program in the amount of $11,000,000.00. Additional funding in the amount of $2,958,492.00 is needed due to the increase in cost can be attributed to the inflation/escalation in construction materials and labor. The action in this M&C will amend the FY2023-2027 Capital Improvement Program as approved in connection with Ordinance 25773-09-2022. This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25765-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). On 2/14/23, the City Council approved M&C 23-0095, assigning $9,458,492 for Capital Project Shortfalls as a part of the Fiscal Year 2022 year-end process. To date, the City Council has authorized M&C 23-0567 of $4,000,000 for the Fire Station 43 - Walsh Ranch on 6/27/23, M&C 23- 0272 of $1,500,000 for the Intermodal Parkway Improvements project on 4/11/2023. Approval of this M&C will appropriate $1,958,492 and leave a remaining balance of $2,000,000 for Capital Project Shortfalls. Waiver of Building Permits - In accordance with the City Code of Ordinances, Part II, Chapter 7-1 Fort Worth Building Administrative Code, Section 109.2.1, Exception 2; "Work by non -City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived. Business Equity - Steele & Freeman, Inc agrees to maintain its initial M/WBE commitment of 25\% that it made on the original contract and extend and maintain that same M/WBE commitment of 25\% to all prior change orders up to and inclusive of this Change Order No. 1. Therefore Steele & Freeman, Inc remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. Forest Park Pool is located in COUNCIL DISTRICT 9. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the General Fund and the PARD Gas Lease Capital Project Fund and that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the General Capital Projects Fund and the PARD Gas Lease Capital Project Fund for the Forest Park ENFAC project to support the approval of the above recommendations and execution of a contract. Prior to any expenditure being incurred, the Property Management Department and the Park & Recreation Department has the responsibility of verifying the availability of funds. TO Fund Department Account Project Program Activity ' Budget ID ID Year FROM Fund Department Account Project ID ID Submitted for City Manager's Office by., Program Activity Budget Year Dana Burghdoff (8018) Reference # Amount (Chartfield 2) Reference # Amount (Chartfield 2) apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31441 &counci (date=9/26/2023 2/3 11/1/23, 10:14AM M&C Review Originating Department Head: Ricky Salazar (5134) Additional Information Contact: ATTACHMENTS 2023-7-28 1295 form.pdf (CFW Internal) 2023-8-29 Completed Acceptance of Previous MWBE Committment Form (APCF) 2021 rev.pdf (CFW Internal) 21 FOREST PARK POOLS CHANGE ORDER 1.docx (CFW Internal) 21 FOREST PARK POOLS CHANGE ORDER 1.xlsx (CFW Internal) Forest Park Pool Construction C01 map.pdf (CFW Internal) ORD.APP 21 FOREST PARK POOLS CHANGE ORDER 1 A023(r2).docx (Public) ORD.APP 21 FOREST PARK POOLS CHANGE ORDER 1 A023(r3).docx (Public) ORD.APP 21 FOREST PARK POOLS CHANGE ORDER 1 A023(r4).docx (Public) Sianed APCF CPN103326 SteeleFreeman 9.11.23 GV.pdf (CFW Internal) apps.cfwnet.org/counci I_packet/mc_review.asp? I D=31441 &counci ddate=9/26/2023 3/3 W1 =_ Document G701"' - 2017 Change Order PROJECT: (Name and address) Fort Worth Forest Park Pool 2850 Park Place Fort Worth, Texas PMD2021-03 City Project #103326 OWNER: (Name and address) City of Fort Worth Ronald Clements 401 W. 13th Street Fort Worth, Texas 76102 CONTRACT INFORMATION: CHANGE ORDER INFORMATION: Contract For: Forest Park AquaticCenter Change Order Number: 001 Date: March 20, 2023 Date: June 21, 2023 ARCHITECT: (Name and address) Brinkley Sargent Wiginton 5000 Quorum Drive, Suite 600 Dallas, Texas 75254 CONTRACTOR: (Name and address) Steele & Freeman, Inc. 1301 Lawson Rd. Fort Worth, TX 76131 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable, attach or reference specific exhibits. Also include agreed upon,adjustments attributable to executed Construction Change Directives) Reference Exhibit'B" Project Manual Drawings Pages 1-8 Dated June 21, 2023 Reference Exhibit "C" Allowances, 1 Page, Dated June 21, 2023 Reference Exhibit "D" Clarifications, Pages 1-4 Dated June 21, 2023 Reference Exhibit "E" Schedule — 1 Page Dated June 21, 2023 Reference Exhibit "F" Alternates — 1 Page Dated June 21, 2023 Reference Exhibit "G" Unit Prices — I Page Dated June 21, 2023 Reference Exhibit "H" Guaranteed Maximum Price (GMP) - 1 Pages Dated June 21, 2023 The original Guaranteed Maximum Price was $ 9,497,625.00 The net change by previously authorized Change Orders $ 0.00 The Guaranteed Maximum Price prior to this Change Order was $ 9,497,625.00 The Guaranteed Maximum Price will be increased by this Change Order in the amount of $ 3,537,203.00 The new Guaranteed Maximum Price including this Change Order will be $ 13,034,828.00 The Contract Time will be increased by Zero (0) days. The new date of Substantial Completion will be NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price, or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR ANPWNER. Brinkle Sargent Wi�rinton Steele & F eman, c ARCHITCT (Firm name) CONTRACT' /afime) SIGNATURE Stephen Springs, Senior Principal, AIA„ LEED AP PRINTED NAME AND TITLE DATE SITATURE Micha i .Freeman, President PRINTED NAME AND TITLE 06/21/23 DATE City of Fort Worth OWNER (Firm name) SIGNATURE PRINTED NAME AND TITLE DATE AIA Document G701 — 2017. Copyright @ 1979, 1987, 2000 , 2001 and 2017. All rights reserved. "The American Institute of Architects," "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents" are trademarks of The American Institute of Architects. This document was produced at 11:02:03 ET on 11/03/2023 under Order No.4104245847 which expires on 10/04/2024, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com. User Notes: (3139ADA36) *CVR CVR COVER SHEET April 21, 2023 ADD No .1 CIVIL C00.01 GENERAL NOTES April 17, 2023 C00.02 GENERAL NOTES April 17, 2023 C1.00 EXISTING CONDITIONS April 17, 2023 C2.00 DEMO PLAN April 17, 2023 C3.00 SITE PLAN April 17, 2023 C4.00 DIMENSIONAL CONTROL PLAN April 17, 2023 C5.00 FIRE PROTECTION PLAN April 17, 2023 C6.00 PAVING PLAN April 17, 2023 C7.00 GRADING PLAN April 17, 2023 C8.00 PRE -DEVELOPMENT DAM April 17, 2023 C9.00 POST -DEVELOPMENT DAM April 17, 2023 C10.00 UTILITY PLAN April 17, 2023 C11.00 DRAINAGE PLAN April 17, 2023 C14.00 EROSION CONTROL PLAN April 17, 2023 C15.00 CIVIL DETAILS April 17, 2023 C15.01 CIVIL DETAILS April 17, 2023 C15.02 CIVIL DETAILS April 17, 2023 C15.03 CIVIL DETAILS April 17, 2023 C15.04 CIVIL DETAILS April 17, 2023 C15.05 CIVIL DETAILS April 17, 2023 C15.06 CIVIL DETAILS April 17, 2023 C15.07 CIVIL DETAILS April 17, 2023 STRUCTURAL S001 GENERAL NOTES April 17, 2023 S002 STATEMENT OF SPECIAL INSPECTIONS April 17, 2023 S003 STRUCTURAL DESIGN DIAGRAMS April 17, 2023 S211 LEVEL 1- FLOOR PLAN - OVERALL April 17, 2023 S212 LEVEL 1 FLOOR PLANS April 17, 2023 S213 POOL PLANS April 17, 2023 S214 ROOF PLANS April 17, 2023 S215 BATH HOUSE OPENING PLAN April 17, 2023 S301 TYPICAL CONCRETE DETAILS April 17, 2023 S302 TYPICAL CONCRETE DETAILS April 17, 2023 S303 CONCRETE DETAILS April 17, 2023 S309 MISC CONCRETE DETAILS April 17, 2023 S310 TYPICAL CONCRETE POOL DETAILS April 17, 2023 S311 POOL DETAILS April 17, 2023 S312 POOL DETAILS April 17, 2023 S313 LEISURE POOL DETAILS April 17, 2023 S401 TYPICAL MASONRY DETAILS April 17, 2023 S410 BATH HOUSE EXTERIOR MASONRY WALL ELEVATIONS April 17, 2023 S411 BATH HOUSE INTERIOR MASONRY WALL ELEVATIONS April 17, 2023 S412 PUMP HOUSE MASONRY WALL ELEVATIONS April 17, 2023 S501 TYPICAL STEEL DETAILS April 17, 2023 S502 STEEL DETAILS April 17, 2023 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 1 ARCHITECTURAL A000 TEXAS ACCESSIBILITY STANDARDS (TAS) April 17, 2023 A021 CODE April 17, 2023 A101 SITE PLAN April 17, 2023 A102 SITE DETAILS April 17, 2023 A201 BATH HOUSE FLOOR PLANS April 21, 2023 ADD No .1 A202 PUMP HOUSE FLOOR PLANS April 21, 2023 ADD No .1 A210 PLAN DETAIL April 21, 2023 ADD No .1 A301 ROOF PLANS AND DETAILS April 21, 2023 ADD No .1 A302 REFLECTED CEILING PLAN April 21, 2023 ADD No .1 A401 BATH HOUSE ELEVATIONS April 21, 2023 ADD No .1 A402 PUMP HOUSE ELEVATIONS April 21, 2023 ADD No .1 A501 BUILDING SECTIONS April 21, 2023 ADD No .1 A511 WALL SECTIONS April 21, 2023 ADD No .1 A521 SECTION DETAILS April 21, 2023 ADD No .1 A522 SECTION DETAILS April 21, 2023 ADD No .1 A701 PARTITION TYPES April 17, 2023 A702 DOOR SCHEDULE, DOOR TYPES, AND DOOR DETAILS April 21, 2023 ADD No .1 A801 FINISH PLAN April 21, 2023 ADD No .1 A901 INTERIOR ELEVATIONS & MILLWORK SECTIONS April 21, 2023 ADD No .1 MECHANICAL M001 MECHANICAL GENERAL NOTES AND LEGENDS April 17, 2023 M101 MECHANICAL PLANS April 17, 2023 M201 MECHANICAL SCHEDULES April 17, 2023 M301 MECHANICAL DETAILS April 17, 2023 M401 MECHANICAL CONTROLS April 17, 2023 ELECTRICAL E001 ELECTRICAL GENERAL NOTES AND LEGEND April 17, 2023 E201 ELECTRICAL SITE PLAN April 17, 2023 E401 ELECTRICAL SECTIONS AND ENLARGED PLANS - FLOOR PLAN April 17, 2023 E402 ELECTRICAL SECTIONS AND ENLARGED PLANS - REFLECTED CEILING I April 17, 2023 E501 ELECTRICAL SCHEDULES April 17, 2023 E502 ELECTRICAL PANEL SCHEDULES April 17, 2023 E601 ELECTRICAL DETAILS April 17, 2023 E602 ELECTRICAL DETAILS April 17, 2023 E701 ELECTRICAL ONE -LINE DIAGRAMS April 17, 2023 PLUMBING P001 PLUMBING GENERAL NOTES AND LEGEND April 17, 2023 P101 PLUMBING ANNOTATION PLAN April 17, 2023 P201 PLUMBING UNDERSLAB PLAN April 17, 2023 P301 PLUMBING WASTE & VENT PLAN April 17, 2023 P401 PLUMBING SUPPLY PLAN April 17, 2023 P501 PLUMBING SITE PLAN April 17, 2023 P601 PLUMBING SCHEDULES April 17, 2023 P701 PLUMBING DETAILS April 17, 2023 AQUATICS AQO.0 POOL REFERENCE PLAN April 17, 2023 AQ1.0 COMPETITION POOL PLAN April 17, 2023 AQ1.1 COMPETITION POOL SECTIONS April 17, 2023 AQ1.2 COMPETITION POOL COURSE LAYOUT April 17, 2023 AQ1.3 COMPETITION POOL COURSE LAYOUT April 17, 2023 AQ1.4 COMPETITION POOL DETAILS April 17, 2023 AQ1.5 COMPETITION POOL DETAILS April 17, 2023 AQ1.6 COMPETITION POOL DETAILS April 17, 2023 AQ1.7 WATERSLIDE PLAN, ELEVATION, & DETAILS April 17, 2023 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 2 AQ2.0 AQ2.1 AQ2.2 AQ3.0 AQ3.1 AQ4.0 AQ4.1 AQ4.2 AQ4.3 AQ5.0 AQ5.1 AQ5.2 AQ5.3 AQ5.4 AQ5.5 AQ5.6 AQ5.7 AQ6.0 AQ6.1 LEISURE POOL PLAN, ELEVATION, & DETAILS LEISURE POOL DETAILS LEISURE POOL DETAILS POOL LOCATION POINT PLAN POOL LOCATION POINT PLAN SCHEDULE POOL PIPING NOTES & SCHEDULES POOL SUCTION PIPING PLAN POOL RETURN PIPING PLAN POOL FEATURE PIPING PLAN POOL MECHANICAL ROOM NOTES & SCHEDULES POOL MECHANICAL ROOM PLAN & SECTIONS SURGE TANK PLAN & SECTIONS POOL MECHANICAL DETAILS POOL MECHANICAL DETAILS POOL MECHANICAL DETAILS POOL MECHANICAL DETAILS POOL MECHANICAL DETAILS COMPETITION POOL SYSTEMS SCHEMATIC LEISURE POOL SYSTEMS SCHEMATIC LANDSCAPE L1.01 TREE PRESERVATION AND REMOVAL PLAN L1.02 EXISTING TREE LISTING AND CITY OF FORT WORTH NOTES L2.01 SITE PLAN L2.02 DETAILS L2.03 DETAILS L3.01 LANDSCAPE PLAN L3.02 LANDSCAPE PLANT LIST AND DETAILS L4.01 IRRIGATION PLAN L4.02 IRRIGATION NOTES AND DETAILS OFOI SECURITY SYSTEM DRAWINGS FOR ROUGH -IN PROPERTY OVERIEW TICKET OFFICE / RESTROOMS - 1 OF 2 TICKET OFFICE / RESTROOMS - 2 OF 2 PUMP HOUSE - 10F 2 PUMP HOUSE - 2 OF 2 DRAWINGS BY GOODWIN AND MARSHAL. INC FOR ALTERNATE NO. 1 10 PARK PLACE AVENUE - EROSION CONTROL PLAN 11 PARK PLACE AVENUE - DEMOLITION PLAN 23 PARK PLACE AVENUE - CURB & GUTTER AND TRAIL 31 PARK PLACE AVENUE -STRIPING PLAN 32 CITY OF FORT WORTH - PAVING DETAILS 33 CITY OF FORT WORTH - PAVING DETAILS 34 CITY OF FORT WORTH - PAVING DETAILS 35 CITY OF FORT WORTH - PAVING DETAILS 38 CITY OF FORT WORTH - STORM DETAILS 39 CITY OF FORT WORTH - STORM DETAILS 40 CITY OF FORT WORTH - STORM DETAILS April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 May 2, 2023 May 2, 2023 May 2, 2023 May 2, 2023 May 2, 2023 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 March 4, 2015 ADD No .2 ADD No .2 ADD No .2 ADD No .2 ADD No .2 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 3 SPECIFICATION SECTION, NUMBER & TITLE DATED DIVISION 00 - PROCUREMENT AND CONTRACTING REOUIREMENTS 00 0110 Table of Contents April 21, 2023 00 3132 GEOTECHNICAL DATA April 17, 2023 AIA 201 Draft General Conditions of Contract SFI Front End Documents and Proposal Package Manual April 21, 2023 DIVISION 01-GENERAL REOUIREMENTS 011100 SUMMARY April 17, 2023 012100 ALLOWANCES April 17, 2023 0123 00 ALTERNATES April 17, 2023 0125 00 SUBSTITUTION PROCEDURES - REQUEST FOR SUBSTITUTION FORM April 17, 2023 0126 00 CONTRACT MODIFICATION PROCEDURES April 17, 2023 0126 10 REQUESTS FOR INTERPRETATION April 17, 2023 0129 00 PAYMENT PROCEDURES April 17, 2023 013100 PROJECT MANAGEMENT AND COORDINATION April 17, 2023 0132 00 CONSTRUCTION PROGRESS DOCUMENTATION April 17, 2023 0133 00 SUBMITTAL PROCEDURES April 17, 2023 0140 00 QUALITY REQUIREMENTS April 17, 2023 0142 00 REFERENCES April 17, 2023 0143 39 MOCK-UPS April 17, 2023 0145 33 CODE -REQUIRED SPECIAL INSPECTIONS AND PROCEDURES April 17, 2023 0150 00 TEMPORARY FACILITIES AND CONTROLS April 17, 2023 0156 39 TREE AND PLANT PROTECTION April 17, 2023 0160 00 PRODUCT REQUIREMENTS April 17, 2023 0173 00 EXECUTION April 17, 2023 0177 00 CLOSEOUT PROCEDURES April 17, 2023 0178 23 OPERATION AND MAINTENANCE DATA April 17, 2023 0178 39 PROJECT RECORD DOCUMENTS April 17, 2023 0179 00 DEMONSTRATION AND TRAINING April 17, 2023 DIVISION 03 - CONCRETE 03 1113 STRUCTURAL CONCRETE FORMING April 17, 2023 03 15 00 CAST -IN ANCHORS AND EMBEDS April 17, 2023 03 20 00 CONCRETE REINFORCING April 17, 2023 03 3100 STRUCTURAL CONCRETE April 17, 2023 03 62 14 GROUTING STEEL BASE PLATES April 17, 2023 DIVISION 04 - MASONRY 04 05 26 - CLEANING NEW MASONRY April 17, 2023 04 2113 BRICK MASONRY VENEER April 17, 2023 04 22 00 CONCRETE UNIT MASONRY April 17, 2023 04 4100 STONE BENCH April 17, 2023 04 72 00 CAST STONE MASONRY April 17, 2023 DIVISION 05 - METALS 05 12 00 STRUCTURAL STEEL FRAMING April 17, 2023 05 2100 STEEL JOISTS April 17, 2023 05 3123 STEEL ROOF DECKING April 17, 2023 05 50 00 METAL FABRICATIONS April 17, 2023 05 5133 ALUMINUM LADDER April 17, 2023 05 52 16 ALUMINUM PIPE RAILINGS April 17, 2023 ADD No. 1 ADD No. 1 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 4 DIVISION 06 - WOOD. PLASTICS AND COMPOSITES 06 10 53 MISCELLANEOUS ROUGH CARPENTRY 06 20 13 EXTERIOR FINISH CARPENTRY 06 20 23 INTERIOR FINISH CARPENTRY 06 4116 PLASTIC -LAMINATE -FACED ARCHITECTURAL CABINETS DIVISION 07 -THERMAL AND MOISTURE PROTECTION 07 13 26 VERTICAL SHEET WATERPROOFING 07 2100 THERMAL INSULATION 07 26 17 BELOW SLAB VAPOR BARRIERS 07 27 26 FLUID -APPLIED MEMBRANE AIR BARRIERS 07 52 16 SBS MODIFIED BITUMINOUS MEMBRANE ROOFING 07 62 00 SHEET METAL FLASHING 07 62 19 FABRICATED SHEET METAL FASCIA 07 84 13 FIRESTOPPING 07 92 00 JOINT SEALANTS 07 95 00 EXPANSION JOINT ASSEMBLIES DIVISION 08 - OPENINGS 08 1113 HOLLOW METAL DOORS AND FRAMES 08 16 13 FIBERGLASS DOORS AND FRAMES 08 3113 ACCESS DOORS 08 33 13 COILING COUNTER DOORS 08 33 23 OVERHEAD COILING DOORS 08 42 13 ALUMINUM -FRAMED ENTRANCES 08 43 13 ALUMINUM FRAMED STOREFRONT 08 7100 FINISH HARDWARE 08 80 00 GLAZING FINISHES 09 - FINISHES 09 30 00 TILING 09 6139 SEALING CONCRETE FLOORS 09 9100 PAINTING 09 97 13 EXTERIOR STEEL COATINGS DIVISION 10 - SPECIALTIES 10 00 00 MISCELLANEOUS SPECIALTIES 10 14 16 PLAQUES 10 14 23 SIGNAGE PARK STANDARD MONUMENT SIGN 10 14 25 PHENOLIC SIGNS 10 16 00 TOILET COMPARTMENTS 10 22 53 CHAIN LINK PARTITIONS 10 35 10 FLAGPOLES 10 44 16 FIRE EXTINGUISHERS 10 5129 PHENOLIC LOCKERS 10 80 00 TOILET ACCESSORIES April 21, 2023 April 21, 2023 April 21, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 21, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 April 17, 2023 ADD No. 1 ADD No. 1 ADD No. 1 ADD No. 1 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 5 DIVISION 11- EOUIPMENT 1145 00 APPLIANCES April 17, 2023 DIVISION 12 - FURNISHINGS 12 3133 STAINLESS STEEL FABRICATIONS April 17, 2023 12 36 61 ENGINEERED STONE COUNTERTOPS April 17, 2023 DIVISION 13 - SPECIAL CONSTRUCTION 13 1100 SWIMMING POOLS April 17, 2023 13 1103 SWIMMING POOLTILE April 17, 2023 13 1104 SWIMMING POOL CEMENTITIOUS FINISH April 17, 2023 13 14 13 WATERSLIDES April 17, 2023 DIVISION 22 - PLUMBING 22 05 19 METERS AND GAUGES FPR PLUMBING PIPING April 17, 2023 22 05 23 GENERAL -DUN VALVES FOR PLUMBING PIPING April 17, 2023 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT April 17, 2023 22 05 33 HEAT TRACING FOR PLUMBING PIPING April 17, 2023 22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT April 17, 2023 22 07 00 PLUMBING INSULATION April 17, 2023 22 1116 DOMESTIC WATER PIPING April 17, 2023 22 1119 DOMESTIC WATER PIPING SPECIALTIES April 17, 2023 22 13 16 SANITARY WASTE AND VENT PIPING April 17, 2023 22 13 19 SANITARY WASTE PIPING SPECIALTIES April 17, 2023 22 14 13 FACILITY STORM DRAINAGE PIPING April 17, 2023 22 14 23 STORM DRAINAGE PIPING SPECIALTIES April 17, 2023 22 33 00 ELECTRIC DOMESTIC WATER HEATERS April 17, 2023 22 40 00 PLUMBING FIXTURES April 17, 2023 DIVISION 23 - HEATING. VENTILATING AND AIR CONDITIONING 23 05 00 COMMON WORK RESULTS FOR HVAC April 17, 2023 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT April 17, 2023 23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT April 17, 2023 23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC April 17, 2023 23 07 00 HVAC INSULATION April 17, 2023 23 09 00 INSTRUMENTATION AND CONTROLS FOR HVAC April 17, 2023 23 09 25 VARIABLE FREQUENCY DRIVES April 17, 2023 23 3113 METAL DUCTS April 17, 2023 23 33 00 AIR DUCT ACCESSORIES April 17, 2023 23 34 23 HVAC POWER VENTILATORS April 17, 2023 23 37 13 DIFFUSERS, REGISTERS AND GRILLES April 17, 2023 23 8113 PACKAGED TERMINAL AIR -CONDITIONERS, THROUGH -WALL UNITS April 17, 2023 DIVISION 26 - ELECTRICAL 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL April 17, 2023 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS April 17, 2023 26 05 29 HANGERS AND SUPPORTS April 17, 2023 26 05 33 RACEWAY AND BOXES April 17, 2023 26 05 43 UNDERGROUND DUCTS AND RACEWAYS April 17, 2023 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS April 17, 2023 26 05 73.13 SHORT-CIRCUIT STUDIES April 17, 2023 26 05 73.16 COORDINATION STUDIES April 17, 2023 26 05 73.19 ARC -FLASH HAZARD ANALYSIS April 17, 2023 26 09 23 LIGHTING CONTROL DEVICES April 17, 2023 26 22 00 LOW VOLTAGE TRANSFORMERS April 17, 2023 26 24 16 PANELBOARDS April 17, 2023 26 27 26 WIRING DEVICES April 17, 2023 26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS April 17, 2023 26 5100 INTERIOR LIGHTING April 17, 2023 26 56 00 EXTERIOR LIGHTING April 17, 2023 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 6 DIVISION 31- EARTHWORK 3110 00 SITE PREPARATION AND DEMOLITION April 17, 2023 3122 00 EARTHWORK April 17, 2023 3123 33 TRENCH EXCAVATION April 17, 2023 3123 34 TRENCH BACKFILL April 17, 2023 3123 35 TRENCH SAFETY SYSTEM April 17, 2023 3125 00 EROSION CONTROL April 17, 2023 313116 TERMITE CONTROL April 17, 2023 3163 29 DRILLED CONCRETE PIERS April 17, 2023 DIVISION 32 - EXTERIOR IMPROVEMENTS 32 12 16 ASPHALT PAVING April 17, 2023 32 13 13 CONCRETE PAVING April 17, 2023 32 15 10 SANDBLAST CONCRETE FINISHES April 17, 2023 32 15 11 STAINED CONCRETE FINISH 32 95 2 COLORED CONCRETE RAVING May 12, 2023 A 97 202- 32 17 23 PAVEMENT MARKINGS ffii April 17, 2023 32 3113 CHAIN LINK FENCES AND GATES April 17, 2023 32 3119 ORNAMENTAL FENCES AND GATES April 17, 2023 32 80 01 LANDSCAPE IRRIGATION SYSTEM April 17, 2023 32 80 11 IRRIGATION RECORD DOCUMENT April 17, 2023 32 80 21 DRIP IRRIGATION April 17, 2023 32 84 01 IRRIGATION SLEEVES April 17, 2023 32 9100 GENERAL PLANTING April 17, 2023 32 9105 PLANT SELECTION April 17, 2023 32 9119 TOPSOIL AND FINISHED GRADING April 17, 2023 32 92 23 SOLID SOD April 17, 2023 32 93 33 SHRUB AND GROUNDCOVER PLANTING April 17, 2023 32 93 43 TREE PLANTING April 17, 2023 DIVISION 33 - UTILITIES 33 3100 WATER UTILITIES April 17, 2023 33 30 00 SANITARY SEWERAGE UTILITIES April 17, 2023 33 40 00 STORM DRAINAGE UTILITIES April 17, 2023 OTHER DOCUMENTS B000520.015 Forest Park Final Plat 2022 23-0131(1) Prepared July 2022 COMcheck Electrical signed April 13, 2023 COMcheck Mech Signed April 13, 2023 EAB registration April 17, 2023 Issued in Pre -Bid RFI #07 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 7 PRE -BID RFI No. & TYPE DATED RETURNED Pre -BID RFI No. 1 April 27, 2023 May 2, 2023 Pre -BID RFI No. 2 May 1, 2023 May 2, 2023 Pre -BID RFI No. 3 May 1, 2023 May 2, 2023 Pre -BID RFI No. 4 May 4, 2023 May 4, 2023 Pre -BID RFI No. 5 May 9, 2023 May 9, 2023 Pre -BID RFI No. 6 May 9, 2023 May 9, 2023 Pre -Bid RFI No. 7 May 11, 2023 May 12, 2023 ADDENDUM No. DATED ADDENDUM No. 1 April 21, 2023 ADDENDUM No. 2 May 2, 2023 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 8 1 Contractor's Contingency 2 Owners Contingency 3 Salvage and reuse/recover the six (6) Round and two (2) Rectangular existing umbrella shades 4 Ingress/Egress ADA Turnstyles (Detail 1/A102) 5 Landscape an Irrigation Associated with Alt. 1 street widening (2015 Drawings) 6 Utility Revisions Associated with Alt 1 Street widening (2015 Drawin,vs) 7 Repairs to the 1920 Sacred Concrete Circle per Pre -Bid RFI #2 ALLOWANCES INCLUDED IN GMP $275,961 $596,543 $35,000 $15, 500 $20,000 $15,000 $8,943 $966,947 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 1 COVID-19 or Pandemics issues may delay delivery of equipment and/or labor. Any and all delays related to COVID-19 or unforeseen circumstances outside the Construction Managers control shall be claimed on a day for day basis. Construction Management Fee and General Condition Expense are a fixed lump sum cost. Force Majeure /Pandemic/Supply Chain Matters. Construction Manager shall not be liable for delays in performance or for nonperformance due to Acts of God; actions or inactions of Contractor or Owner or Owner's Design Team; war (including impacts from the Russia/Ukrainian War); epidemic/pandemic; fire; flood; hurricane; tornado; extreme weather; sabotage; terrorism (domestic or foreign); labor shortages, labor strikes or labor disputes; riots and civil disturbances; governmental requests, demands, restrictions and/or allocations; newly- passed/imposed laws, regulations and/or tariffs; governmental and/orjudicial orders or actions; unavailability of or delays in transportation due to any of the aforementioned activities or occurrences; default of suppliers due to any of the aforementioned activities or occurrences (including materials, supply shortages, labor shortages or discontinuations and/or spikes in supplier prices greater than 10% as of date the bid was submitted); or, other unforeseen circumstances, events or causes beyond Contractor's reasonable control. Subject to the survival of viable communication systems, Construction Manager will timely notify Owner if and when one or more of the above identified matters have occurred and whether and to what extent the same may result in delay of performance or in a specified non-performance. Div 01 General Reauirements 1 We have excluded state sales tax on INCORPORATED materials. 2 We have excluded tap, impact & meter fees. 3 The Building Permit cost has been excluded. 4 Plat and easements by others. 5 Bids are based on Construction Documents as noted in Exhibit'B' and Alternates as noted in Exhibit'F'. 6 We have excluded materials testing and special inspections. 7 It is assumed that the contract documents have been thoroughly reviewed to meet Federal, state and local codes. 8 We exclude all seismic requirements referenced in the specifications due to the Project's location in Fort Worth does not require any Seismic consideration. 9 Schedule does account for weather delays; any weather events, will have a day -for -day impact on the schedule. 10 Submittal schedule is excluded, priority submittals will be identified as they are transmitted to the architect. 11 Recovery schedules are excluded. 12 All telephone, paging, low voltage, computer, server, switching, network, cable TV, radio and DAS equipment and testing is excluded. Deposits required in advance to procure materials will be included on the pay application within the same pay period in which payment is due 13 for deposit to the subcontractors / suppliers, when approved by City of Fort Worth. Materials that are stored onsite or stored at subcontractor's warehouse will be included on pay applications. Invoices and photos of stored 14 materials will be provided upon request. The contract contingency is for the Construction Managers exclusive use to cover those costs considered reimbursable as the Cost of the 15 Work but not included in a Change Order. All construction contingency expenditures will be documented monthly with each application for payment. All unforeseen scope not clearly identified , not quantified and/or not properly referenced in the contract will be presented to the Owner as a 16 Proposed Change (PC). This project is not a LEED project, therefor VOC Content Restriction (greater than federal or state requirements) and Commissioning is 17 excluded. 18 Video of recorded training, if any, will be provided on a thumb drive. 19 Temporary Environmental Controls, Flush Out & Air contaminant testing is not included in this scope of work. 20 Materials Testing Laboratory Services shall be provided by the Owner and is excluded from this scope of work. 21 TDLR/TAS review and inspections are excluded. To be provided by Owner. 22 SFI will provide access to the ProjectSight project management software for project documentation, if requested. SFI will notify City of Fort Worth of any priority submittals requiring Owner's approval to ensure project stays on schedule. If additional time is 23 required for approval, then delay to material fabrication and delivery could affect the construction schedule. Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 1 Perspective drawings and/or architectural renderings are for visualization concepts only. Details, dimensions, and materials shall not be 25 inferred from perspectives and architectural renderings. 26 Franchise utility service charges have been excluded for communication lines, electrical power, Atmos gas, etc. Delegated Design submittals are recognized for the following sections: 05 12 00 Structural Steel Framing, 05 52 16 Aluminum Pipe Railings, 27 13 1100 Swimming Pools, 13 14 13 Waterslides, 26 05 29 Hangers and Supports, 26 0 73.13 Short -Circuit Studies, 26 05 73.19 Arc Flash Hazard Analysis, 26 56 00 Exterior Lighting. No other Delegated Design requirements are recognized. 28 Unforeseen material delivery and availability issues beyond Steele & Freeman's control shall be a day -for -day schedule delay. 29 All utilities, including but not limited to, domestic water, irrigation water, electricity, gas and communications shall be transferred into the Owner's name at Substantial Completion. All utilities from this date shall not be funded thru the GMP Estimate. Due to the current market with shortages of material, we reserve the right to provide substitutions for approval if the shortage or material 30 causes an increase in material pricing, color, or finish limitations or affects the construction schedule or availability of those materials during construction. Div 02 Existing Conditions 1 Hazardous materials identification, testing, abatement, removal, demolition, and/or disposal is excluded. 2 Removal of underground storage tanks, contaminated soils and related remediation is excluded. 3 Items not detailed in the contract documents to be removed or demolished are excluded from this work. Div 03 Concrete 1 All belled piers have been bid as dry, with bearing elevation at 15' below finished grade, per the structural general notes. No Unit pricing for added, deducted length, or casing is included. All exposed slab finishes to be Class B and per the specifications for unshored suspended slabs have a minimum FF of 25 2 (which translates to 1/4" vertical variance in 10') 3 All concrete is bid as hand -finished. Mechanical screed, vibratory screed and paving machines is excluded. 5 Any underground obstructions discovered to the new foundation will be handled as a change order to contract contingency on an individual basis. 6 Hot or cold weather cooling or heating of concrete. Proposal may be requested if conditions fall within hot or cold weather parameters. 7 Rock coring or rock drilling are excluded. 8 Monument sign foundation is included as shown, and was added per the Alternate No. 3. 9 We have included an allowance for repairs to the 1920 Sacred Concrete Circle per Pre -Bid RFI #2. See Exhibit C - Allowances. The stained concrete "bubbles" that are shown on L201 and Detail 1/L2.02 will be a stained concrete finish per the answer on Pre -Bid RFI #7 10 and the Specification Section 32 15 11 issued with the RFI. Color to be from Manufacturer standard colors. Specification 32 15 12 Colored Concrete Paving is no longer applicable for this project and is excluded. Div 04 Masonry 1 Mortar shall be grey in color. 2 Galvanized wire brick ties are included per Pre -Bid RFI #3. Div 05 Metals 1 We have excluded all AESS steel finishes. None shown. 2 Upsizing of steel beyond what is clearly shown, sized and located in the contract documents is excluded. 3 Any finishes on galvanized metals are excluded. Div 06 Woods. Plastics. and Composites 1 All millwork has been bid to be built to AWI Standards per the specs. AWI Labels are excluded. 2 Wood blocking shall be untreated or treated dimensional lumber as specified for the locations indicated. 3 Artwork handling and installation is excluded. Div 07 Thermal & Moisture Protection 1 Fireproofing is excluded as none is shown. Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 2 Div 08 Openings 1 Conduit and back box to door frame is included per the Addendum #2 Security drawings. Access controls, wiring, and programming by Owner. 2 Automatic door openers excluded, none are shown. 3 Door hardware finish will be provided as brushed chrome/satin chrome, 26D / 626, 626AM, 628, 630, 630AM as specified. Div 11 Eauioment The following appliances are Owner Furnished Owner Installed: Side -by -Side Refrigerator, Microwave. Contractor Furnished Contractor 1 Installed includes one under counter ice machine as specified. All other appliances are excluded. Div 12 Furnishings 1 We have excluded all furniture, except as noted as millwork in Div 6 Div 21 Fire Suppression 1 The fire suppression system is not required, and is excluded. Div 22 Plumbing 1 Gas lines are excluded, none for this project. 2 Trench drains are as noted on Pre -Bid RFI #05, and are the Daldorado Product. Div 23 Mechanical 1 Gas equipment is excluded, none shown for this project. 2 We have excluded indoor air quality control inspections. 3 Fire dampers that are not specifically shown on the drawings are excluded. 4 Screening of roof mounted equipment is excluded (none shown). Div 26 Electrical 1 Oncor or electrical provider charges for primary conductors and transformer scope is excluded. 2 Secondary conduits and feeders from the pole mounted transformer is included. 4 Lightning protection is excluded. Empty conduits and back box for low voltage cabling in building to nearest plenum space for are supplied as shown on Addendum #2 5 Documents. All wiring and devices are by the Owner. Div 27 Communications 1 Low Voltage structured cabling is by the Owner. 2 AV Systems is by the Owner. 3 Communications Systems is by the Owner. 4 VOIP phone/paging system is by the Owner. 5 Sound Reinforcing is by the Owner. Div 28 Electronic Safetv and Security 1 Access control is by the Owner. 2 Video Surveillance is by the Owner. 3 Intrusion Detection is by the Owner. 4 Public Safety Radio Enhancement System (ERRS) is excluded. A proposal for testing can be provided upon Owner request once the building envelope is complete. 5 Fire alarm is not required for this project and is excluded. Div 31 Earthwork 1 We have excluded the disposal of any contaminated soils. 2 Moisture conditioning of the areas shown on Sheet 5211 is per the response in Pre -Bid RFI #5. 3 Identification of geological stratas including bearing strata are to be identified by the Owner's Testing Laboratory Service. 4 Earthwork is to grade (within 0.2') Scarified, water added and recompacted subgrade under the areas of 4" sidewalks and 5" flatwork noted on C6.0. Lime stabilized 5 subgrade(6" with 7% hydrated lime) is included as noted on Detail 04/C15, under the 6" and 7" concrete paving is included. Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 3 Div 32 Exterior Improvements Landscape and irrigation scopes are included as shown for the Pool Drawings. For the Alternate No. 1 Street Widening areas, we have 1 included an Allowance to repair disturbed areas included in that work. See Exhibit C - Allowances. Ip•mport of topsoil is excluded. It is assumed the existing topsoil that will be stripped and stockpiled is suitable material for the planting and 2 landsca in g• 3 We have excluded the removing of rock that is smaller than 2" from landscape area. 4 Monument sign, foundation and lighting are included as the accepted Alternate No. 3. We have included the ornamental fencing where located on the documents. Fencing is included as 7' tall TCF7-Eagle 7' Tall iron Fence, 5 galvanized inside and out, with 3/4" 14" ga. pickets, 11/2" 14 ga. Rails (3 rail system), and 3" 14 ga. Posts, and a 15 year paint warranty, and 5 year labor warranty. This product is a better than or equal to the specified Ameristar fence. We have included an Allowance to recover, re -set, and re -use the existing six (6) existing round umbrellas, and the two (2) rectangular shade 6 structures. Foundations are as noted per the documents and are not included in this allowance. See Exhibit C - Allowances. Div 33 Utilities 1 Underground utilities not shown by the contract documents (unknown conditions) are specially excluded. 2 We have included an Allowance for Utility Revisions Associated with Alt 1 Street widening (2015 Drawings) - See Exhibit C - Allowances Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 4 �jr STEELE & FREEMAN, INC. CONSTRUCTION MANAGERS PROJECT: Fort Worth Forest Park Aquatics Center 2850 Park Place, Fort Worth TX 76110 SFI JOB No.: 5509 COMPLETION SCHEDULE GENERAL CONSTRUCTION Change Order 001 1 AIA G701- 201 Exhibit'E' - Schedu Date: 06/21/20: ARCHITECT: Brinkley Sargent Wiginton Architects 5000 Quorum Drive, Suite 600 Dallas, Texas 75254 No. 1 Add on -street parking to Park Place Ave. No. 2 Add terracing between pool deck and upper deck. No. 3 Add Monument Sign at parking lot entrance. No. 4 Add Monument Sign at parking lot without LED. None $ 421,937.00 Approved and Included $ 113,723.00 Rejected $ 85,501.00 Approved and Included $ 62,658.00 Rejected Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 1 Piers are included as dry, 15' below the finished floor - adjustments to 1. depth as noted below: BP1- 24" DIAMETER SHAFT 54" DIAMETER BELL $73.25 /LF $27.05 /LF BP2 - 24" DIAMETER SHAFT 60" DIAMETER BELL $73.25 /LF $27.05 /LF BP3 - 24" DIAMETER SHAFT 68" DIAMETER BELL $73.65 /LF $27.05 /LF BP4 - 24" DIAMETER SHAFT 76" DIAMETER BELL $99.25 /LF $42.15 /LF BP5 - 24" DIAMETER SHAFT 82" DIAMETER BELL $99.25 /LF $42.15 /LF If water is encountered it would require a new straight shaft pier design 2. with additional geo technical information / design and BP4 and BP5 would require 30" shaft diameter due to the size requireed for the bell. Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 1 DIVISION BID PACKAGE DESCRIPTION TOTAL COST 01 GENERAL REQUIREMENTS $317,267 02 EXISTING CONDITIONS $15,000 03 CONCRETE $1,371,207 04 MASONRY $395,500 05 METALS $353, 784 06 WOODS, PLASTICS and COMPOSITES $35,871 07 THERMAL and MOISTURE PROTECTION $316,062 08 OPENINGS $167,007 09 FINISHES $150,164 10 SPECIALTIES $169,083 11 EQUIPMENT $0 12 FURNISHINGS $999 13 SPECIAL CONSTRUCTION $5,040,000 21 FIRE SUPPRESSION $0 22 PLUMBING $485,000 23 MECHANICAL $182,850 26 ELECTRICAL $650,288 27 COMMUNICATION $0 28 ELECTRONIC SAFETY AND SECURITY $0 31 EARTHWORK $639,068 32 EXTERIOR IMPROVEMENTS $442,501 33 UTILITIES $258,887 COST OF WORK - SUBTOTAL $10,990,538 00 LABOR BURDEN $47,901 00 SUBCONTRACTOR DEFAULT INSURANCE FEE $157,518 00 CONTRACTOR CONTINGENCY $275,961 00 CONSTRUCTION MANAGER FEE $391,146 00 PAYMENT and PERFORMANCE BONDS $105,725 00 BUILDERS RISK $12,438 00 GENERAL/ EXCESS LIABILITY $29,852 00 PROFESSIONAL LIABILITY/ POLLUTION INSURANCE $7,463 01 GENERAL CONDITION EXPENSE $419,743 00 OWNERS CONSTRUCTION CONTINGENCY $596,543 INTIAL PROPOSAL AMOUNT $8,835,000 INITIAL OWNERS CONSTRUCTION CONTINGENCY $662,625 Forest Park Aquatics Center - Change Order 001, 06/21/23 Page 1