HomeMy WebLinkAboutContract 28530i
�
' ���`'� ��{:������ ������1 �
SECOND AMENDMENT TO CCJNTRAC� i� ..� -"_._ .— .._...._
CITY SECRETARY CQNT`RACT NO. 19352
BETHESDA WATER SUPPLY CORPOR.ATION
WHOLESALE WATER CONTRACT
WHEREAS, on the 22"d day of September, 1992, the City of Fort Worth and the
Bethesda Water Supply Corporation entered into City of Fart Worth City Secretary
Contracfi No. 19352, providing for the sale of treated water by the City of Fort Worth to
the Bethesda Water Supply Corporation; and
WHEREAS, on the 30th day of March, 20Q1, the City of Fort Worth and the
Bethesda Water �upply Cotporation entered into City of Fort Worth Ci�y Secretary
Contract No. 26644, amen.ding City of Fort Worth City Secratary Cantract No. 19352;
and
WHEREAS, the Bethe�da Water Supply Carporation desires to abtain an additional
point of connection fo the Fort Warth System, as well as contribute to the cost of a water
main that Fort Worth is canstructing that will enable the Bethesda Water Suppiy
Corporation to obtain additiona� water �rom the Fort Worth Syste�n, such main being known
as the 36" Southside Water Main; and
WHEREAS, City of Fart Worth City �ecretary Contract No. 19352 provides that
for the cost of each additional eonn�ctian to the Fort V�orth System, Bethesda Water �upp�y
Cozporation will pay an amount not Iess than that which would be paid by a developex to
Fort Worth under Fart VVorth's tben exisking connection and line extension policy, ar an
amow�t agxeed upon mutually by Fort Worth, Bethesda Water �upply Corporation, and the
Water �ystem Advisory Committee; and
WHEREAS, on the 20�' day of February, 2�01, ihe City of Fort Worth and Bet�esda
Water �upply Corporation entered into an amendna,ent to City of Fort Warth City Secretary
Contract 19352, such amendment bcing City of Fort Worth City Secretary Con�ract Na.
26644, wherein Bethesda Water Supply Corporataon agreed to cons1;ruct certain
improvements to f,he Faxt Warth System.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
�'�I�I�Q��WI� k���v�iL�
� '^�M1' '— _,.�, a�
(� s
,� �I�-,fNv
1.
Ciiy of Fart Worth City Secre�ary Contract No. 19352 is amended by addang a new
paragrapb 24, which shall be and read as follows:
24.
Additional Point of Connection
24.1 The meter to be installed at such connection shall be a su�teen-inch (16"} meter. In
consideration of Custornar's agreement Yo make the payments described in paragraph 24,4
below, Customer is granted a third point of connection to the Fart Wa:ril� System at the
appraximate location as shown on Exhibit "A" attached hereta and made a parE hereof for a11
purposes. The meter to be installed at such cormecnon shall be a sixteen-inch (16") meter.
Customer's failure to make the payments described in paragrapb 24.4 belaw shall entitle
Fort Worth to suspend water service through this fihird point of connection until paytMents
are brougt�.t curreni.
24.2 Custamer, at its sole cost and expense, shall be responsible far the design and
construction of the meter vault and the installat�on of all metering equipment, which shall be
subj ect to the review and approval of Fort Worth. The metering equipmenC sb.all be in
compliance with paragraph 3.1 of City of Fort Worth Gity Secretary Contract No. 19352.
Ail construction shall be inspected by and acceptable to Fort Worth. Upon comp�etion and
acceptance of the meter vault and metering equipment, th� operation and maintenance of
same shall be the r�sponsibility of Fort Worth, the cost thereofbeing a System Cost.
24.3 Customer, at its sole cost and expense, sha11 design and construct install a hac�flow
prevention device, tog�ther with any necessary housing ther�fore, which shall be subj ect to
the review and approval of Fort Worth. Customer, ai its sole cost and expensc:, shall be
responsible for the operation and maintenance of such backflow prevention det+ice and
housing. In lieu of the installation of a backflow prevention device, Customer may in5tall an
air gap, such air gap to be approved in writing by Fort WartS� prior to installation, on
Custamer's ground storage tank immediately ai�er the rneter; provided, however, that no
sez-vice Iine or main line connec�ions w�ill be installed between the rneter and the ground
storage tank.
24.4 Fort Worth and C�xstomer further ag�ree that Cusiomer's cost associated with the
construction of the 36" Southside III Water Main is $2,482,940, such cost being based upon
Customer's estimated capacity/demand demand in 2Q20, and es�unated cost for the
construction, engiineering and acquisition af rights-of-way, and after the credit far
Custnmer's cos� incurred under City of Fort Warth Ciiy Secretary Contract No. 26644.
Upon completion af construcfion, G�istamer's costs shall be xecalculated using the actua.l
costs incurred for engineering, construction, and acquisition of rights-of-way, Such
recalculated amount shall be payable over a period of sixty (60) months and shall accrue
interest at the rate of six percent (6%) per annum from the date of campietion and final
acceptance by the City. The Customer sha11 be notified in writing of the date of final
acceptance. Notwithstanding, C�istomer may rnake add.rtianal and/or ea,rly payments
without penalty. The monthly payment sha11 b� billed by Fort Worth witl� t�i�:�ronth'1��. --
I SV
L �� U�L����� I�� tYr°uU���
„ �% lYr'if1!l���i��(�9 Il�o
issued far wholesale water sexvice. Late payments shall accrcte interest at the rate of 1% per
month or at ihe highest rate perrnitted by law.
2�L.5 In ihe event Customer desires to have a Iarger meter installed at a time vvhen the
sixteen-inch (16'� meter is not otherwise in need of replacement, Customer shall make
written request to Fort Worth for its consideraiion. If Fort Worth, in its sale discreiion,
approves th� installatian of the larger meter, Customer, at its sole cost and expense, will be
responsihle %r the design of the im�rovements, such design being subject io Fort Worth's
written approval. The instaliation of tli,e larger meter will be at Customer's sole cost au.d
expense. In addition, the Custom�r's cost as stated in pa�ragxaph 24.4 abave will be
recalculated to include the additional capacityldemand allowed by the meter.
24.6 Fort Worth agrees to charge any wholesale custom�r who in the fixture connects
directly io t;ie 36" �outhside III Water Main based upon the methodology contained in
paragraph 24.4.
Z.
All vther tenns, conditions, and covenants contained in City af Fort Worth City
Secretary Contract 19352 nat amended herein continue in full �arce and effect.
(Rernainder ofpage intentionally left blank)
a'U a, ��{L1
�. ,,
rIl�
41� •'L'
i
Executed this the
AT'�ST:
� .r : , .
day of
� -'�' - ' � �x,
' �, - .
Glaa-ia Pearso{�City Secri tary � 1 Y � fr
Cantxac� Au�horiz��ion
APPROVED AS TO FORM � �_ ..___..�� �2 ._ �
AND LEGALITYoate- ----- — ---- --
�
Assistant ity Attorney
ATTEST:
r
Corporate Sacretary
APPROVED AS TO FORM AND
LEGALITY
�
Att rney for Bethesda ater 5upply
Corporation
, 2041.
CTT�
:
Assistant City Manager
- - ".PPROVAL RECOMMENDED
c� , ��X��/.i�7 �lrL/
�
� Dale Fisseler, P. E., Director
Fort Worth Water Department
BETHESDA WATER SUPPLY
CORPORATION
By: �„
Steve Sievers
General Manager
J�'�U���� �'�����nf�
+r.ncrr. �,ra,��, .�i 6liiln:
�
�:�,'.: r� � 1
City a�'Fort Wo�th, Texas
� �r ��� ��n�( �r���r�������n
� �. �
DAT� R�F�RE'NCE I�UMBER LOG NAM� PAG�
1114103 **�_����'� � 30LOlJIS � 1 of 3
sue�Ec� AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT
T� S.J. L�U15 C�NSTR�CTION OF TEXAS, LTD., �.LP FOR 50UTHSIDE III, 35-lNCH
iNATER TRANSMlSS10N MAIN EXTENSION FROM C�.EBURNE CROWLEY ROAD
TO THE CITY OF BUR�ESON AT SHANNON CREEK
RECOMMENDATION:
It is recommer�ded that tne City Cauncil:
1, Aufhoriz� the City Manager to execute amendments io w�olesale water contracts with the City o�
Burieson, City of Crawley, and Bethesda Water Supply Corporation pr.oviding far cvst participatian
by these entitias in the proposed water transmissio� main extension to meet each customer's
estimated capacityldemand in 2020; and
2, Au#ho�ize the City Manager to execute a cantract with S.J. Louis Constructior� of Texas, Ltd., LLP,
in tY�e amount of $2,7$1,80� for the 5outhside Ill, 36-Inch Wa#er Transmission Ma�n Extension from
Cle��rne Crowley Road to the City of Burleson at Shannon CreeEc.
D15CUSSi4N:
On August 8, 2001 (M&C C-18713), the City Counci� authorized the City Manager to execut� an
engineering contract with Freese & Nichols, Inc. to pr�pare pfans and specifications for the Southside lll
water transmissian main from Cleburne Crowiey Road to the City ofi Burleson� at 5hannon Creek. TY�is
project wiq accommodate new growfih in the Fo�t Worth extrater�'itoria� jurisdiction, as well as areas
currently served i�y wholesale water customers (Befhesda Vllater Supply Corporation and the Cities of
Burlesor� and Crowley}.
In or�er to shar� in the costs of the overall �roject, wholesal� wafer cantracts must be amended. The
wholesale customers agree to participate in th� engineering and consfiructian bas�d on capacity of
�ach customer's need as stated in t�e car�tract amendments,
ll�der the terms ofi the contract amendment, the fallowing cost participation e�fimates w�ll ap�ly to this
fina{ phase af the project:
City of Burleson
City of Crowley
Betfi�esda Water Supply Gorporation
City o� Fart Workh
$1,099,084
$ 31,81 T
$1,099,084
` $�'` 551,815 . .
I otai $2,'�81,800
�ity of 1�'ort T�i�o��h, T'exas
���� �n� ���r��il �ar�m�n�cat��n
DATE REFERENCE NUMSER LOG NAM� PAGE
�1'f4103 **�_���1� 30LOU15 2 of 3
SUBJEC7 AMENDMENT OF WHOLESALE WATER CONTRACTS AND AWARD OF CONTRACT
TO 5.,7. LOUIS C4NSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE III, 36-INCH
WATER TRANSM{SS[ON MAIN EXTEN510N FROM CLEBIJRNE CROWLEY ROAD
TO THE CITY OF BURLESON AT SHANNON CREEK
,�he who[esale customers agree to repay Fort Worth, over a per�od of sixty (60} months, interes# at a
' rate of six �ercent (6%} per annum from the dafe of completian and acc�ptance af #he construction by
the Vllater Department.
T�� project cor�sists af t�e installat�on of approximatefy 24,270 linear feet of 36-inch water line.
BID �C�VERTISEMENT - This project was advertised �or bid on Sept�mber 2E and October 3, 2002.
On October 31, 2002, the following bids were received:
: �� �
AMOUNT
TIME OF COMPLETION
S.J. Louis �onstruction of Texas. Ltd., LLP
Oscar Renda Contracting, inc.
BRB Contractor's, Inc.
Jacksan Canstruction, Ltd.
Texas Electric Uti[ity
Wil�iam J. 5chultz, Inc. dlbla Circle "C"
Construction Company
$2,781,800.Q0
$3,158,344.OQ
$3, 9 73,36fi.00
�3,28�1,7�D.5�
$3,521,310.64
$3,990,830.Q0
� 75 Cal�ndar Days
In addition to the contract cost, $194,72fi.00 is r�quired for inspection and survey, and $$3,454.00 is
required for project continger�cy to co��r change arders.
MIWBE - S. J. �au�s �r�nstruction �f Texas, Ltd., LLP is in compliance with the Ci#y's MIWBE
Ordinance by committing to 22% MIWBE participa#ian. T�e City's goal on this projecf is 21 %.
This project is located in COUNCIL D15TRICT 6, Mapsco 117 and 118.
City of �'ort Wor�h, T'exas
���� �n� ������.1 ��mm�r��c�t���
DA7E R�FERENCE NLJMBER LOG NAME PAGE
'f114103 �`�`��� 941 �. 30LOU1S I 3 of 3
SUBJECT AMENDMENT OF VIIHOLESAL� WATER CONTRAGTS AND AWARD OF CONTRACT
TrJ S.J. LOU{S GDNSTRUCTION OF TEXAS, LTD., LLP FOR SOUTHSIDE IIE, 36-INCH
'�',lATER TRANSMISSION MA�N EXTENSION �ROM CLEBURNE CROWL.EY ROAD
TO THE CITY OF BURLE50N AT SHANNON CREEK
FISCAL �NFORMATIONICERTIFICATION:
T�e Finance Directflr cert9fiies tl�at fur�ds are available in the current capital budget, as apprapriated, of
the Water Capital Projects �und.
MO:k �
5ubmitted for City Manager's
Oft'iee by:
Marc Ott
Origivating Department Iiead:
Douglas Radema[cer
Additional Infarmation Contact:
Douglas Rademaker
FU1VD I ACCDUNT I CENTEIt
(ta)
3476
6157 � {from)
I P162
6157
r ,..
aMOUNT CTTY SECRETARY
541200 060162'i 414 �0 $2,781,SOQ.00 �
1
�
�