HomeMy WebLinkAboutContract 28421A117ENDMEl�IT NO. 2
�TATE OF TEXAS § CITY SECRETARY CONTRACT NO.���� �
(Na M&C needed)
COUNTY OF TARRANT §
WHEREAS, th� City of Fort Worth (City} and TranSystems Corparation,
{En.g�eer) made and entered into City Secretary Cantr�ct No. 26807 (the Contract}
which was authorized hy the City Council bq M&C G18571 on the 26th day of April,
2�01; and
WHEREAS, the Cantract involves enginaering services for the following project:
Engincering Coniract for S�ni�ary Sewer Main� 244A Parallel Re�ief Study
and Design
WHER.EA�, it has becorne necessary to execute Amendment No. 2 to said
Contract to include an�increased scope of work and revised maximurz� fee;
NOW THEREFORE, Ciry and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I of the Contract is axnended io include the additiQnal engineering services
specified in a proposal Ietter dated February 4, 2003, a copy of which is attached hereto
and incorporated herein. Tha cost to City for the a�ditional services to be performed by
Engineer total $18,897.00
2.
Article II of ihe Cantract is amended to provide for an increase in �he maximum
fee to be paid to Engineer far all work and services performed iander the Contract, as
amended, so that the totai fee paid by the City for all work and services shall not exc�ed
the sum of $925,79$.48.
3.
All other pravisions of the contraci, which are nat expressly amended herein, shall
remain in full force and effect.
. �
EXECUTED on this the �)� day of
Fort Worth, Tarrant County, Texas.
APPROVAL RECOIVINIENDED:
��ir �
A.Douglas Rademaker, P.E.
Director, Department of
Engineering
TranSvstems Comoration
ENGINEER
/
�
f
By: � —
Name: Raul Pena III, P.E.
Re�ional Vice President
APPR0�7ED AS T� FORM AND LEGALITY:
�
�
Gary Steinberger
Assistant City Attorney
��� C�^-� , 20Q3_, in
APP VED:
�
Marc 4tt �
Assistaxzt City Manager
ATTEST:
�� � —
'� , ,v
�?�.
loria Pear n, City Secretary
�o rn�� � ,
���.���� �uthox���t��x� ..�
�,. , ,�.� ,� „.. .
��1��
�"X'i�l�ulr',i�- u�_t �.- �� ���i�'
�, f _` " _ _ . . .. y, !'Y �R �1`rf
� , ql'111u1 �
�i �j��t,�.
� ����� /. �'���°����,
PC�/?�T/C�/�11�',��
February 4, 2003
Gapal Sahu, P.E.
Deparhne�►t of En�ineering
City af �t. Worth
ID00 Thro�kmorton Street
Fort Warih, Texas 7b1Q2
Referez�ce ta: Scope of Services
Sanitary Sewer Main 244-A P�allel Relief Colleeior
Amendment No. 2
Dear Mr. Gopal,
We at TranSystems appreciate the opportunity to subn�it this amendment for you.r
consideration. Based on our meeting �tve have prepared the belaw Scope oi Sezvices and
fees.
Geotechnical Investigatian �ump Surn $1�,$97.OQ
1. Eva�uate subsuzface coz�d'ztions along the M-244A relief rouie alig�ment;
provide recoxnmendations regarding pipe embedment and design of the
structures; and evaluate sandstone (where found} to be encauntexed above
the shale.
2. Pzavide 16 bori�gs wiih a range of 2Q-55' deep.
3. The results af the field and labarat4ry investigation will be presen#ed in a
geQtechnical engineering repprt which will include a pl�n of the borings, Iogs
of the exploratory borings, and the resr�Its of the la�boratory iesti�tg program.
4. Sub-consultant manageme�.t o� Terra Mar, Inc.
Please feel free to contact me if you should have any questions.
Sin.cerely,
Tra�y�t �qrparation Consul�ants
.; . � f �/
f...., .
R�ul Pen I ,T�T.E.
Principal
G:\200\01884\ProjectMgmt\Conlracts\City Fort Worth\Addihicmal Work�Axzlend 2\amendment 2r�vised02042i)03.doc
' -� ����} /vp�� � � �xhibit /� -� Scope or Ser�ice�'�'�
Cansulttng Engineers• G�otecttnical- Environmetltal ^ Construction Materials Testinc
� ,� �� � oALLA3•FI3RTWORiH•H0115T4iV•AUSTIN•LQNGYIEW
� � _.
october 18, 20[�2
TMI Na: � P�2-22�1 FE
TranSystems Corporatior� Gonsultants
�OQ West Se�entt� 5t., Suite 6�0
�ort Wvrt�, Texas 76102
Attn: Mr. Kant A. l�unski, P.E.
Re: Geat�chnicai InVestigaiion
5anitary 5ewer Allain 244 Refief
Forf Warth, Texas
Dear Mr. E.unski,
Terra-Mar Inc. (TMl) is pleased to submlt thls cost estimaie and scope of services to pra�ide
Geatec�nical Engineeri�g Services for f�e proposed project, The faElowing describes aur
undErstanding af the project and ti�e proposed scape af services ta be provided and is based on
our meeting o� C�ctober 1B, 2002.
Pro'ect Desc�iption and Purpase, .
iF�e pro�ect consists of the inskal�ation of 72-inch and 9p-inc� diarneter, 23,OQ0 foat long sanitary
sewet' plpeEine. The sanitary sewer main alignment is generafly Iocated from the Village Creek
1NWTP sout� ko I-iighway 80. The project Enc�udes abovt 33 maC�hole structures and �6 ta 20
ot�er major structures including siphons and special �oxes. Five lo�g sewer bores are
presentEy planned at tF�e tolfowing lacatiot�s: Along Meadowbroak Bkyd and across Vilfage
CraeK, I-30, Dotkie Lynn Parkway a�c# Highway 180.
Ti�e purposa vt the �roposed investigation will be to evaluate su�surface canditions alo�g the
alignmer�t; pro�ide recommendations regarding pipe embedment and destgn of the structures;
and evaluate tne carras�on pot�ntial on cone�'ete strt�ctures and pipes.
Geot�chnica! Fie1d Envestiqatio�,
Based on TM1's site vicinity experience th� sit�: is lacaked 1n the 1Noadbine Farmatian. Thas
farmation is highly variable with soi! materi�ls varying from sands ta clays. Tk�e rock forrr�ation
consists of cemented sands and shale typicaify at de,�ths of 20 feek or more. Very hard
sandstvne can be encountered a�ove the shale.
In accardance �viti� y�ur �equest, a iotal af �6 �orings are planned. Roring depths rar�ge from
about 2a tv 55 feet below existing grade. The general boring locations and depths have bee��
selected �y TranSystems. The bvring depihs have been sefected ta provide a depth of
exploratian to a m�nimum depth of 5 iest be�aw t�e bottom of tt�e pipe andlor structure.
2400 Gr9v$t Drlva, Bldg. 25� �ort Worth� Texaa 7611 B phone: B97-Z8d-9383 I�ax: 817-284.9430
, �.
���.�.�-��� �.
iMl Proposal Na. P02-2201F�. pctoher 1 S, 2fl02
�age 2 at d
�1
Afl sotis wi11 be Sampled using 5t�e�by tube sam�lers in ciays and split s�aon samplers ln
pr�daminateZy �ranular salls. W�ere ,encou�iered at sefected barin� locations, wnere bor�s or
tun�els a�e anticipated, #�e under�ying shale formation wiil be eored using a dou�ie tube, N/X —
size core barrel €itted uvith a carblde cutt�ng bit.
Grour�dwater meastirement� 3rvi11 be taken at the com}�I�tion of drilling operatians and the
borings w[il trien be backfilled aE campletior�. TMl w!I! per€orm t�e sta�Cln� of the borings and
clearance of underground �tilities, an� wi�E provi�e app�'optlate traffic control meas�res. lf
required, the ground sur�ace e2evation at each bar�hole locatian will be determiried by othars, or
estEmated based on tapogra�Y�ic maps provided by ihe design team.
l.aboratory [r�vesligation
The a6�ecti�e of t�e lat�oratory-�est�r�g pTogram will be to evaluate englnee�ing properties anti
parameters req�ired far tYte deslgn and constr�tcEion af the proposed praject eternents. Pt�ysica[
properties of the soil as well as data necessary €or CIa55�Cati�11 by tha Unlfed So91
Classi�ication System (USCS) will b� determir�ed by cEassi�cation fests. These tests will includ�
the determin2tior� of natural molst�rE cantents, unit dry density, [�ercent passing No. 2�0 5ieve
and Atterberg limits.
llndrainEd s�ear 5tren[�Ihs of clayey soils will be evalt�ated by hand pen�trometer tests, and
confirmed by uncar�fined campressive �trength testing. Unconfined compressive str�ngth
tesEing will also be perfarmed on seleCted rack core samples. The results of al! oi ihese tests
wi1G be included at tY�e appropriate depths or� ihe baring logs and figures.
Resis#ivity and corrosian tes#s (��cluding sulfde, sulf�te,
b� performed on se�ecled soil sarnpl�s to eval�ate tt�eir
metal.
Geatechnica� Engineering AnalySes �nd Report
pH tests a�d oxidatian/�eduction} will
�otential far carrosion af cancrete and
Tt�e results of the field and iaboratary inv�sligation wi11 be pr�senked i� a geatechnical
eng�ne�ring report w�ich will Inciude a plar� of ti�e bori�gs, logs of the eXplor.atory borings, and
the results o� the labora�ory tesfi�g prograrn. The report wilE address the folloi+vir�g topics:
e A detailed description of subsurfac� and groundwater conditions at th� boring Iocativns,
and thelr effect on design an� construetion, �ncEuding a descrf�tivn of the s�il
skratigraphy, underly�ng rock farmakion, anci any notewarthy geologic candikions;
q 7he effecks aF groundwater on the design and insta�latlon of tne proJect ele�ents;
o Recommencfat+ans resarding pfpe embedment and trench construction;
� Recommer�dat+ons for 4aundation types, depths and design pa�'ameters (1.E. Allawable
Bearing Cap�city) for tf�e below grad� structures;
b Estimatior� of modulus of subgrade reaction of enveloping eattf� (Inct�dir�g Ka and Kp};
. Laterat eanh pressures fo� th�: design of ihe beEow grade walEs;
� Maximum �xcavation slopes; ar�d
� Corr�sion poter�tfal of subgrade materials.
/r, ..
���� ��� �
7MI I�roposal t�o. POx-2209FE, Oqot>er �e, 2002
Paya 9 of 4
�
TM! will remain available for c�nsuftation as #he project pragresses.
Project Sch�cl�I� and Comp��5�tfon
We proposE to initiate tne study within four io fi�e days foifowing client pe�m4ssion to proceed,
Fie1d aperations wil! requir� approximately tour ta �ve days. depe�din� on weather condit}ons
and �ccess limftatians. The Faboratary.-testing pragram wifl req�9re a�proxim�t�ly seven working
days, arld the en�ineerin� report should be �inaliz�d approxirrrately four weeks after �roject
initiation. Prelimir�ary results may b� �resented during the caurse of the in�estigation.
Compe�sation #ar f�is work shail be a lump sum fee far $17,'i95.0o. A deta�led 6udget and
schedule estimate faT this work is attached. This �udget wEll not be exceeded, for th� described
scops of wor�, wiihout priar �pArov��.
TMI assumes you have tfi�e righE of entry to the property and thaE the bor}ng locations are
accessible ta tivck rnounted d�iHing equipmetlt during worki�g days and buslness hours. This
co5t estimate assumes r�o ciearing of tr�es andlor bT�sh wiEl b� req�tiEed to access boring
Ineatians.
TMl's experienced engineers �re cammitted to meeting yQur schedt�le. We a�preciate the
opportunity to pt'ovi�e ydu witi� this cast esfimate, al�d look fanrvard t� serving your rteeds or�
this p�-o�ect. If any questians arise, please da not hesitai� to call.
Respectfully,
TE'RRi�-1v1Af�, 1111C.
��"'�'' �
Leone! Ruiz. E.I.T.
Graduai� Engineer
� �r
arrett E. Williams, P.E.
Forf Worth Office Mar�ager
;
i'
i
���� �.�� �_�
TA4} Froposai Na. P�2-220'[ F6, OUober 18, 2002
Pag� g of a
� �,
SCHEDUL� �ND BU�G�T ESTIAAATES
�E4TEGHNICAL IN!lESTia�rT�ON
SANlT�1RY SEW�R W9AlN 244 R�L-1EF
F�RT WORTH, T�XAS
Task
�escriotfor�
Ge�technic�l �ield lnvestlqation
DrilEing Rig Mob.IDer�ab.
}r�termittent Sofl 5ampling
Rock Coring
7raffic Control
Field Coordination
lJtiiity Clearance
SUBTOTAL -- FI�LD IIVVESTIGATIQN
Lahor�tory lnvestiAation
Liqutd and Plastic Lirni�s
Moistura Can;ent
Unconfined Compression, Soil
�7nconfined Cartlpression, Rack
Gra�n Siz� Analysis
Soil llnit We9ght
Resistivity Testing
Carrasion T�sting
SU87�TAL — �.A60RATORY TEST�NG
EStll'CiBtP,('t
tVum�er Ut�its
� trip
42b foot
i 20 foot
2 days
16 ha�rs
� 6 hours
24
2Q
Z4
8
15
15
3
3
Geotechnica� Enair,eerinq and Repo�t �reparakion
each
each
eac�
eaCh
each
each
each
each
Graduate Engineer, Labof�tory Gl�ssifcation 5 hours
Graduato ��gineer, FZepori • 24 hours
Senior' �ngineer, Report 18 Ilours
d�afting 3 hoU�s
S11B7�TAL — ENG�NEERiNG
TOTAL
Cost Per
Unit
$'f 75.QC1
$12.00
$17.00
��zo,ao
$65.OQ
$65.OQ
�Qaao
$�4.50
$3S.Qa
$35.QD
�3�Aa
$15.40
$25,OQ
$160.00
�70.00
$70.00
$95.00
$35.UU
m
EstimaEed
Cost
0
S 175.�Q
�5,# i2.0�
$2,040.00
�s4o.ofl
�1,U40.00
$� .040.00
�w10,047.OD
�950.00
$108.00
�&44.00
5�80.00
$525.60
�2zs.ao
� �75.00
$480.04
$3.493.QQ
�350.00
�� ,sso.oa
�1,520.04
$105.40
$3,655A0
$17,195.00
. � f� ��' `�
/
�xF�ibi� � d �ehedufe of �ees and Rafies
Taslc
Description
CREW & �QLJIPM�MT TRANSP�RTATIQN FE�S
DrilHng Rig Mobilfzatlon, within Metraplex
GEOTECHNtCAL DRiLttf�G & SAMP�.iNG FEES
Drilling wif�out Svif Sampiing
Dri[ling and lntermittent Soil Sampling with Hollnw 5fem
Casfng of Boring Through Overb�rden far Sarrfpling
Rock Cori�g, Carbide Bit - NIX Size
Minimum Orilling Fee
GEO7ECHNICAL LABORATORY TESTING F�ES
Liquid ar�d Plastic Limits
Percentage Passir�g #200 Sieve
Sieve Anafysis
Mnisture Content
Soi{ Dry llnit Weig�t
Unconfined Compressfon, Soil
Llnconfined Compression, Rock Core
�re� 5we�! Test
Sail Resisfivity Test
CorroSion Testing Group
Cost Per
llnits Ur�it
mile $175.00
foot
foat
faoi
faot
c��y
�a.oa
$12.00
$5.5Q
$17.0(}
$60Q.Op
each
each
each
each
each
each
eact�
�ach
each
each
GEOT�CHMfCAL ENGINEERING AND R�R�RT PREPARATION
Graduate Engineer, Laborafary Classification hour
Graduat� �ngineer, Report hour
Senior Engineer hvUr
Drafting hour
Cl�rical hour
$44.Q0
$25.OQ
$35.00
��.sa
$� s.oa
$35.00
$35A0
$8�.Q0
$25.00
$160.OQ
$i0.00
$70.00
$95.OQ
$35.U0
$35,00