Loading...
HomeMy WebLinkAboutContract 27890, 1 � AN�NDMEN I NO . 1 � � ��!1T��1' p��J����E"ip�AR�° '�..�. ElQIv 1 �i� I IV� a�.—.- � STATE 4F TEXA,S $ C�TY SECRETAR% CONTRACT NO. 26686 M&C C--�9�.40 covrrT� oF T�T � Wf3EREAS, the Ca.ty o� Fart Worth (CZTY) and Huitt-Zollars, Ine .(�NGaNEER) made and en�exed inta City Secxetary Contract Na . 26686, (the COL�T�`RAC'b') v,rhich rnras autho�ized b�r the City Cauncil by M&C C�18525 on the 27� da�r of March, 2Q01; and WH�REAS, the CONT'RACT involv�s engi�neering services for the follornring projea�: Evans Avenue Urban Design fxozn East Rasedale Street to Ter�ell A�renue ; and WHEREAS, it has become necessary to execute Amendment Na. I to sa�d C�NTRACT to include axa, increased scope of work and revised maximum fee; NOW THEREFORE, C�TY and ENGINEER, acting hexeyn by and th�ough their duly autharized representa�ives, enter into th� £allowinq agreement, whieh amen,ds the CONTRACT: 1. � Article I, af the Cantract is amended to include the additional enga.neering services specified in M&C C-1.9140, adopted by the City Council an �.he 2�'d day of July, 2d02 and further ampl�.fied in a proposa], letter dated May 16, 2002, copies of which are both a.ttached hereto and incorpora�ed herein, Th� cost to CITY for the add�.tional services ta be performed by ENGINEER tatal $100,062.50. 2. Artiale I�I, of the CONTRACT is amended ta p�ovide far an incr�ase in the max�mum �ee ta be paid to ENGINEER for all v�rork and services performed under the CONTRACT, as amended, so that the total fae paid hy the CITY for a�.1 work and services sha�,l not exceed the sum af $336,626.50. 1 i' ������ ��� .� �� � �, � ����� �_ � ��, i� � , � � 3. A�1 ather prav�s�ons o� the CaNTRACT, which are not expressly amended herein, shall rema�n in £ul� force and effect. EXECU�ED on �hi.s the ��� day o� �tn�y�, 2002, in Fort Warth, Tarrant County, Texas. ATTEST: APPROVED: �� .� � ��- Glo za Pearso�n � c Ott City Secretary Assi tant City Max�agex �,�� l�t I� �� ��r.tr��� �,uthorixa�.ion APPROVAI� RECOI+��NDED : r-�` � � 1 ! � ���'.��'�- � ���� \ George Behmanes , P.E. Interim Director, Transportation/ Puhlia Works Departmen� HUITT-ZOLLAEtS, INC. 1'v� ..► � �� �� Senior Vice Pres�,dent APPRO D AS TO FORM AND LEGALITY / �f Gary Stei erger Assistant City Attorney 2 •- �: ����°���aa�� �� ����� � � ��r�� �� � 3' �����! ���� i HIJITT-ZOLLAR�, INC. � Suite 390 � 500 Wsst 7Yh St. Moil Unii 23 � Ff. Wor1h,TX 76102 4773 � 817.335.30D0 phone � 817.424.1291 melro � 817.335,1025 Fpx � huiR-zol[urs.cam May 16, 20D2 M�•. 7oe Ternus, P.E. Assistant Director of PubIie Works 1000 Throckmortazi Street Forf Wortl�, Texas 76102 RE: Evans Averuue City Secretary Contract No. 266$6 HZ Project 03-07G8.p2 Dear Mr. Tec•nus: Huiti-Zollars, I�ac, p�-esents t�is p�oposal of addiiional services for the Evans Avenue Urban Design prnject, The �xopasal incluc�es fees for setvices that we�•e performed du�•itig tixe design �has� af tl�e �roject wl�ich are defuied as "Additional Services" ar ide�lti�ed under "ASSLLl17�l�Ip1.75" in tEle origi�lal Co��firact awa�ded Marc1127, 20Q1. Also included is a p��oposal %r Construction AdEninistration Ser�ices. ADD�TIDNAL SERV�CES PR:CVIOUSLY PERFORM�D D�NG THE D�SIGN P�AS� The purpose of tl�is �ortion of the praposal is to adj�st tlae fees associated '�vitli the Evans Avenue pz�oject iza z•esponse to several additions of worfc requested by the City tiiafi are either ide�ltified as "additioiaal services" xn tl�e original scope or a.re not ide�ltifed as services to 6e provided. The ser�vices in question include: A. Seven additional value a]teri�ative� to respond to the requ�st by the City SYa�f for the vaiue engineering of the projecY following �l�e public m�etin�, B. Seven additiQnal apinions of probable construction costs associated witl� tl�e s�veii value alternatives to xaspond to the request by the City Staff for value engineering of the project. � G. The original Scoge for the Stor� Telling aspect of ihe project included ih� in�erviews and firanscription of four designated citizens. Tlie designaied Worki�g G�•oup Co�ninittee {WGC} expanded the approaclz wl�ich required �weekly attendance of Sto�y Telling Meetin�s {�0 stary-telIing meetings). The Engineer's invalvement fncluded the additinnal interviews beyond scope lirt�itatian af A{30 [11�0TVLBW3 and assoczated transcription). T: proj103D768U"lladminlletter af agreement 4 5-1 �-D2,dnc Mr. Joe 'I�ernus, P.B. Assistant Director of Public Works May 15, 20�2 Pa�e 2 ���� ���� D. The Con�-act identifies the �eld staking of praposed improvements under "III C, Additional Services". The Engiz�eer painted the proposed plaza irnpi•ovements an 3une 19, 2401 at Pulaslci Street up�n tl�.e existing te;rz•ain af the request of the WGC and a.pproval of the City. �. The Cantract 5cape does not identify the Engineer as providing 6 sets af 3 orzginal (J.8 total) fu�l size reproductions of the final canceptual design e�iibits far the project. Tl�e Etagineer pravided these 18 reproductia�zs at tk�e renuest af the WGC ai�d City appro�ai for public infarination p�rposes. They were distributed by tlle E��ginee;r azad displayEd throughout locations as seIacted by tl�.e WGC. F. The Contract Scape does not identify African American Symbai reseaz•cI� or an associated African Ainerican Syrnbol bookle� (deliverahle). TI�e WGC requested this informatzan. Tl�.e Engiueer provided research and a booklet depzcii�tg nur findings of tlie African Amexican symbolagy and associated art as requested by tlie WGC. G. The Scope foz the project does not include the study, recatnxttettdatiota, a� desigz� of interiln intersectiot� in.�prove►�aents for the intersection of Rosedale aild Evans Avenue. Tl�e City lias been asked by tl�e WGC to study potential fen�porary design alteniativ�s and incorporate a select�d alternative into canstructioii docuinents. Tlie Engineer requests campensation for t1�e deszgi� of t}�is item as an additional service. IT. Tl�e Contract Scope for tIae project does not identify prope�-ty owner �uoxdii-�ation £or the acquisitioz� of teinpora�-y and perinailent constri.ictiorl easemez�ts. Tlxe ��giz�eer requests compensatiaii for tIais �•equest by the City %r tiiis �oordination with tllree church properties and 3 privately lield properties �ar off p�-oject ROW construction. T�uitt-Zol�ars, Inc. inade va�'�ous z�aadifications and cl�ange orders to the coilstructioEi docu�nez�ts p�r TDLR caminents aild �rojecf 6udgetary constraitxts. Tlze revisians included the incorparatio�� of 3 liaudicap spaces, planting urn iiiaterial znadi�catao:ns, remova� of bollards, iempora�-� entry monuznents at Rosedale, fountain copuig modifications, vehicular ADA striping, uplight fixture substitutia�i, and tl�e relocation of park bench on Sheet F-1. CONSTRUCTYON ADMINI�TRATIQN S�RVICE� T� BE PERFORMED The Contract Scope far the project does not ineluda Cozistruction Administration sez�vices. The En�ineer reques�s cQmpensation for the scope of services detaiied in attachment `A'. I:1projId307b8021adminlletter of agreement 4 5-15-02.dac nar.loe ���z�nus, P.E. Assistant Director of T'ublic Works May 15, 20Q2 Page 3 �����CJL� COMPENSATION SCJMMARY The fee for performing the additional scope af seivices as described abave is based upon a�ump st�m (with �he exception of,Construction Ac�ministration seivices) and is as fallaws: ADDITIONAL SERV�CES PREVIOUSLY 1'ERFOIiMED TASK HZI IVIIWBE TQTAL REMARKS TASK A. $ 3,705.00 $3,705.00 TASKB. $ 2,415,00 $ 2,4�S.Q0 TASK C. $15,660.00 $15,660.00 TA.�K D. $840.QQ $840.00 TASK E. $962.31 $ 2,i27.69 $3,�90.00 Traviz-�a & Assac. �nc. TASK F. $ 6,465.0� $6,465.OQ TASK G. $ �},125.00 $4,125.00 TASK H. $ 1,30�.00 $1,300.00 TASK I. $ 5,30Q.00 $5,300.00 SUBTOTAL $4D,772.31 $2,127.69 ��2,9Qa.00 TASK J`. $45,765.Q� $11,I47.54 $56,7I7.50 LTS, Iz�c. $250.04 Trevino & Assoc. Inc. SUBTOTAL $45,765.00 �11,397.50 $57,1G2.5(1 T(}TAL ADDITIONAL SERVICES �$G,537.31 $13,�25.19 $i00,Q62.50 I:Iproj1a30758021adminlietter oF 1,�eement 4 S-IS-02.doc Mr. .1ae Ternus, P.E. Assistant Directar of Public Woi•ks May 15., 2Q�2 Page 4 ���� ���� I� this pxoposaI is acceptable, please incorporate into a standard City af Fort Worth contract, and return for au�• signature. If you have any questions concerning fihe above request, please contact me at (S 17) 335-3000. Sincerely, H�TITT-ZOLLARS, TNC. . s h W. Atwood,l'.E. Praject Manag;er I;1proj103 0 76 8 021adr�iiuUetter of agreemeiYt 4 5-15-Q2.dac I�'Ir. Joe `T'ernus, P.E. Assistant Director of Public Works May I5, 2002 1'age 5 ���� ����� ATTACHMENT `A' CONSTRUCTION ADMINISTRATTON SCOPE �F SERVICES The following propasal detai�s a proposed scope of services for Constructioi� Adzxiinistx•aiian for the E�van's Avenue Reconstruction project. This Proposal is hoLirly, with not to exceed rates as follows: CHANGE ORDER PREPARATION: Huitt-Zallars, Inc, will prepare aIl necessacy change orders for the p�'oject. It is assumed �l�at change orders will be �ssued axaly if an unfor�seen cofidition arises that requires a co��st�ructi.on nnodi�catinn or if it is in tlie City's best f�iancial iilterest to do so. It is assu�ed tliafi the scope of the project will not vary from �e bid docLimei�ts due to additional public input. TASK Change Q�•dez•s wl Accompanying Drawings Hourly, Not to Exceed Fee: $9,120 Direct Expeiise — Rep�•oduction Hugo Trevino & Associates $ 250 $9,4Q0 RESPDND TO CQNTR.ACT�R REQUE�TS FOR TNFORMATION: QTY HOURS EA T�TAL HRS 12 96 MIWBE The Er�gineez• will respond to written requests for informat�o�l £i'otn ��a co�ltt'actor throu�hout t[ie construction process. A City representative will always be copied on all docuinentation. TAST� QTY HOURS �A TOTAL HIt� R�I Response (11wIc ave. by Leonard Technical Setviees, Ii�c.) - 30 2 60 M/WBE RFI R�sponse o�ersight 30 0.5 15 Haurly, Not to ��ceed �ee: $5,700 MIWBE $1,425 $7,i25 SHOP DRAWING/SUBMITTAL REVTEW: Huitt-Zollars, Ine. wil� reviaw and p�'ocess aIl contractor desigu subinittals, The Engineer will subzxzit a Iist of required shop drawzngs/submittaIs to �he conh�actor. This review will include layout, font and text I:lproj10307b8Q21adrtinlletter of agrecment 4 �-15-02.doc , Mr. Joe Ternus, P.E. ' Assistant Direetor of Public Works May I5, 2002 Page 6 q � � � � � 0 m � 0 � � � m 0 ���� �L��� for each of the storytelling elerr►ents. The follo�ving list details the anticipated submittals: ElectrzcaI cabinefs and panel boaj-ds Light fixtures and conirollers Bric�C pavers of each type Building brick atid tnortars Granite samples �ith text (34) Liinestone samples with text (2) Bronze plaques of each type and text Cast stane of each type and text (A7 witii text) Custozn metal pieces of each type (rings, poles, etc.) Irrigation equipt�aez�t Landscape compost and mulc�les Tree grates New signage 5tt•eet furnit�.ire Concrete mix desigii TASI� QTY HOURS EA T�T.t�L HRS S1aop DiawinglSLibmittals wl Re-subinittals 12 1 12 Submittals for Storytelling Elez��ents and Text 83 1.5 124 HaurIy, Not ta Exceed I�ee: CONTRACTOR PAY REQUEST REV�E'4V AND PROC�SS: $12,920 Huitt Zollars, Ine, will x•e�view contractor pay requests for accuracy. This servzce �will inchtde calculatio�i and verifica�ion of finished quantities. The proposal assumes approximate constrt�ction time of I50 vvorking days (per contract), beginning on or about May 1, 2002 and ending on or about December 1, 2402. TASK QTY HO�URS EA TOTAL HRS Pay Request w/ on-site quantity veri�cation 7 8 56 (Leonard Tech�iical Services, Inc.) Hourly, Not to Exceed �ee; $5,320 1VI/WBE T:lpraj103fl7fi$021adminlletter of agreement 4 5-15-02.doc Czty of .�'o�t Worth9 T'e�cas ���� ��� �������. ����t����,����� DATE REFERENCE NUMBER L.OG NAME PAG� 7�2�a2 **C-'�9��0 � 20HUITT 1 of 2 SUB.IECT ENGINEERING SERVICES SUPPI.EMEN�'AL AGR�EMENT NO. 1 TO CITY SECRETARY CONTRACT. NO. 26686 WITH HUITT-ZQI�[.ARS, INC. FOR EVANS AVENUE URBAN DESIGN FROM EAST ROSEDALE STREET TO TERRELf� AVENUE RECOMMENDATION: It is recommended thaf the City Council authorize tY�e Cify Manager to execute Su�plemenfaf Agreement No. 1 ta CEty Secre�ary Contracf No. 26686 with Huitt-Zollars, Inc. far the preparation af construction plans, specifications, and construction administration services for Evans Av�nue urban �esign from East Rosedale 5treet to Terrell A�enue for a total fee ot $1 �0,062.50. D15CUSSlON: �n January 1 �, 20�0 (M&C G�12784), the City Council authorized the City Manager to apply for a grant in t�e amount of $1,2Qa,000.00 fram th� Ecanomic Develapment Administration far Heritage Center. T�e City"s participafion for the grant is in the amaunt of $8�3,0OO,OD. The total funding of $2,013,000.40 will be used to reeonstruct Evans Avenue trom East Rosedale Street to Terrell Avenue with urban design elements including p[aza, fauntain, trees, landscaping, irrfgatior�, benches, monuments, ar�, signage, enhanced �aving, and lighting. �n March 27, 200'f (M&C C-� 852�), tF�e City Council authorized the City Manager .to execute an engineering services agreement with Huitt-Zof[ars, Inc. to �re�ar� construction plans and specificatians for Evar�s Avenue Urban Design from East Rosedale Street to Terrell Avenue in the amo�nt of $236,564.a0. During the design process, tF�e Citizen's Ad�isory Committee requested additional engineering design in order to be�ter evaluate alternatives, prov9de ad�rtional community involvement, and incorporate additional bid items in the construction documents. City staff agreed with t�eir req�ests. The additiona{ fee of $1 a0,062.50 for 5upplemental Agr�ement No. 1 is for the fallowing additional design an� construcfion administration services: m Design of seven additional alternatives; and � Construction cost estimafes for the seven alternatives; and � Additional inferviews for the historic storytelling aspect of the projecf; and o�ield staking the location of �he proposed p[aza; and � Reproductions of �he final concep� design �xhibits for p�blic review; and � African-American symbol and art research; and • Interim monuments at East Rosedale Stre�t and Evans Avenue; and C'ity of '�F'o�t yVo�th, 7'exas ���� ��� �,������ �„��r������t��� DATE REFERENCE NUMBER L.OG NAME F'AG� 712IO2 **�o� �'��0 20HUlTT 2 of 2 SUBJECT ENGINEERfNG SERVICES SUPPLEMENTAL AGREEMENT NO. 1 TO CITY SECRETARY CONTRACT. NO. 2�686 WITH HUITT�ZOLLARS, INC. �UR EVANS AVENUE URBAN DE51GN F'ROM �AST ROSEDALE STREET TO TERRELL AVENUE o Property owner caordination for the acquisition of three permanent and two temparary construction easemenfs; and � Construction dacument modifications for Change Order No. 9 to the construction co�tract with 5R0 General Cantrac�ors; and m Review of shup drawin�s, contractor pay requests, site inspection and co�structian meetings for the street and plaza. Staff considers this fee to be fasr and reasonable for fihe additional scope ofi services. The additional project funding of $100,062.50 will come from New D�velopment funds pr�viously a�fhoriz�d in fhe $45M Criticai Capital Projecfis �unding Strategy in December 2000, wifih Certificaies o� Obliga#ion. Huitt-Zollars, Inc. is in camp{iance with the City's MIWBE Ordinance by cammift�ng to an addit�ona� 14% MNUBE par�icipation on this amendmenf. This projec� is located in COUNCI� DISTRICT 8, Mapsco 77K. F15CAL 1NFORMATIONICERTIFICATION: Tha �inance Director certifies thafi funds are available in the current capital budget, as apprapriated, �f the Critical Capital f'rojects Fund of the $45M Certificates of Obligafion program. BG:k Submitted for City Manager's �#fice by: BridgetEe GarrettlAeting Originxting Department Head: G. Behmanesh/Acting Additional Informatlou Contact: G. Behmanesh/Acting FUND I ACCOUNT I CENT�R I AMOUNT I CTTY S�CRE'rARY (ta) 6140 79I4 � (&om) C'116 � 7914 I 54'�2Q0 020146136368 $100,062.50 �''ity of Fo�t b�oYth, Texas Mayor �r�d Cour�cil �omn����c��t�or� � DA7E REFERENCE NUMBER LOG NAME PAGE ���a� **Co1 ��i4o � 2oHuirr � of z sU���cr �NGINEERCNG SERVICES S�PPLEMENTA� AGREEMENT NO. 1 TO CITY SECRETARY CONTRACT. NQ. 26686 WITFi i�Lll�f'-�LlAI��, INC. FOR EVANS AVENUE URBAN DESIGN FROM EAST ROSEDALE STREET TO TERRE�L AVENUE RECOMMENDATiON: It is recommended thai the City Councif authorize the City Manager to execute 5upplemental Agreement No. � to City Secretary C�r�traci Na. 26886 with Huitt-Zallars, Ine. far the preparation of constructio� plans, specifications, and canstruction administration services for Evans Aven�e urban design from East Rosedale 5treet to T�rrell Avenue far a iotal fee of $1 p0,062.50. � DISCUSSfON: 4n January 11, 20a0 (M&C G-12784), the City Council authorized the City Manager to apply far a grant in the amount of $1,20Q,O��.QO fram tt�e Economic Deveiopment Administratian for Heritage Center. The City's participa#ion for tf�� grant is in the amount �f $813,oaa.00. Th� t�tal funding of $2,013,DODAO will be used to reconstruct Evans Avenue from East Rosedafe Street to Terrelf Avenue wit� urban design elements including plaza, fountain, trees, �andscaping, irrigation, benches, monuments, art, signage, enhanced paving, ar�d fignting. �n Ma�ch 27, 2009 (M&C C-18525), th� City Council autharized the City Manager to execute an engineering s�rvices agreement with Huitt-Zollars, lnc, to prepare canstruction pians and specifications for Evans Avenue Ur6an Design from East Rosedale Street to TerreCl Av�nue in the amount of �2��,5sa.aa. . During the design process, the Citizen's Ad�isory Committee re�ues#�d additional engine�ring design fi order ta bet#er evaluate alt�rnatives, pro�ide additional community in�olvement, and incarporate additional bid items in the constructian dncuments. City staff agreed with their re�uests. The addi�ional �ee of $� OO,a62.50 for 5upplemental Agreem�nt No. 1 is for the fo[lowing additional design and . canstruction admi�istratian services: • Design af seven a�ditional alternativ�s; and . � Canstruction cost estimates for the s�ven alteTnatives; and • Additional ir�terviews far the histo�ic stor�telling aspect af the project; and � Field staking the location of the �roposed pfaza; and o Reproductions of the final concept design exhibits for publi� r�wiew; and � African-American symbal and art research; and � lni�rim manuments at East Rosedal� Street and Evans Avenue; and City o��'ort Wo�th9 T'exas ivl�yor and Cou�nc�l Commun�ca��o� DATE REFERENCE NUMB�R LQG NAME PAGE 7/2102 **�A19��,p 2flHUITT 2 of 2 SUBJECT ENG[NEERING SERVICES SUPPLEMENTAL AGREEMENT NO. 1 TO C�TY SECRETARY CONTRACT. NO. 26fi86 WITH HUITT�ZOLLARS, INC. FOR �VANS AVENUE URBAN DESIGN FROM EAST ROSEDALE STREET T4 TERRE�L AVENUE • Prope�y owner coordination for the ac�uisition of three permane�t and two temporary construc#ion easements; and . • Canstruction docurnent modifications for Char�ge Order No. 1 to the construction contract with SR� General Contractors; and � ReWiew of shop drawings, coniractar pay r�quests, sifie inspectior� and construction meetings for the street and plaza. Staff consid�rs tF�is fee to be fair and reaso�able for the additional scope of s�rvices. The additi�na! project funding of $100,062,5D wifl come from New Development funds previously authorized in the $45M Critical Ca�ital Projects Funding Strategy in December 2000, with Certi�icates of Obligation. � Huitt-Zallars, Inc. is in complianc� with the City's MIWBE Ordinance �y committing to an ad�it�onal �4% M/WBE participation on this amendment. - TF�is project is located in COUNCIL DISTRICT 8, Mapsco 77K. �ISCAL INFORMATIONICERTIFICATION: The �inance Direc#or certifies that #unds are available in the current capital budget, as appropria�ed, afi the Critica! Capital Projects Fund of the $45M Certificates af Obligation program. BG:k Suhtr�itted for City Manager's Office by: Bridgette Garrett/Aoting Originating pepartment Head: G. Behmanesh/Acting AddiNonai Informatian Contact: 6440 7914 FUND I�CCDUNT I CENTER AMO�lNT (ta) � I {from) I C116 541200 024116136368 $100,Q62.50 CITY S�CRETARY APPROVED 071021q2 � G. BehmaneshlActing 7914 I