Loading...
HomeMy WebLinkAboutContract 27903� �..� � <<.. � . i ��'� AMI�NDM�NT NO. I STAT� OF' T�XAS $ CTTY SECR�TARY CONTRAiCT NQ, p����� covN�r o� ����rT s WHER�AS, the City of Fort Worth (Cityj and A.N.A. Consultants, L.L.C., (�ngin��x) made and entered into City Secretary Contract No. 27555, (the Contract) which was authorized hy the Ci�y Council, by M�C C-189B4 on the 5�h day of March, 20Q2; and WH�R�AS, the Contract involves engineera.ng se�vices for the following project: Engineering design of Sanitary Sewer Rehabi�itation Contract LIX (59) . AH�REAS, it has become nec�ssary to execute Amenc�Cent No. 1 to said Cantract to include ar� i.nc�eased scop� of work and re�rised maximurn f�e; NOW i'E�R�FOR�, Cit�,r and Engineer, acti.ng herein b�r ancl through their duly authorized .represezztatives, enter into �he fol3.owing agreement which amends the Contract: le A�ticle I, of the Cantract is amended to inc�r,xde the addition- a� engineering services sg�cified in M&C C--19�73, adopted by the Citx Council on 30th day of July, 2002� and fu�ther amplified in a propasal letter dated June 6, 2002, copies of which are laoth attaclied hereto and incorp�rated herein. The cos� to Ci�y for the additional services to � performed by Engineer total $29,000.00. 2. Article II, of the Contract a.s amended to provide fo� an a.ncreas� �.n the ma.�ci,m� fee to be pa�d to Engineer for all work and ser�vices performed under the Con�rac�, as arrrended, so �ha� the tota�. fee paid bS,i the City for all work and sexva.ces shall nat e�ceer� the suzn of $�.34 ,16� . OQ . � 4���9Yt"'11i �"1��'i_���� � � � �����l�A� �' � �. "� I �1�� � � All o�her p�ovisians af the Contract wh�.ch are not exgress].y amended herein shail remain in ful]. force and effect. � �XECU'I'�D on this the da.y of , 2002, in Fort Worth, Tarrant County, Te�tas. AT� : ` F � � � . c ;' J ^� � . � / ' Gloria Pea�z'son, Ci.ty Secretary Ci ty Secre�r.a:.ry APPROVAL R]�C�:�I]�D : ��� -� A. Doug�.as Rademaker, P.Eo Director, Department of �ng�.neering A.N.A. CON5ULTANT5, L.�.C. �ngxneer By : ,� r'!.'��-y- , �, . %�� Na�ne_Assaad N. Assaad, P.�. Presiden� 1i01 River Run, Suite 610 Fort Worth. TX 76107 APPROVED A� TO FO�! A�1D I�GALZTY: r � ry Steinberger Assistant City Attorney 27555 l �r I� � � ,�.1 Contract Au�Gho�i���$�ri ^ '� f �a � �:;,�..___--�_ Date A. VLL �}cant Ci�y Manager -2- �' �- � ���II i�� `;i'.��JL.��' ���� �� ��� � � �� Y �a��_ �_ , �,��`y�i�� ��-�� �����,�r�r�, �.�a�o ' ��' E1VC�iVEER�, SUC2VEY�tS, PLANNFRS& ARCHfTpCiS � 1701 �tiver Run, Suite 61� �"oact Worth, Taxas 9610'� (817} 33�-99QD Fax�(81'� 33�-9955 ~ June 6, 2002 John Boyer, Project Manager - Gity of FQrt Worth -�epartment of Engineering 81 � Lamar 5treet, Suite 310 �ort worth, TX 76102 Re: �4mendmen� Pd�. 7 "Revised„ 5aniia�r �ewer Reh�bif�tation Con�r�c4 LIX (59) �ewer Project P�o. P�S��Oi0�8Dii�'P90 l�.�.�. No. 357� Dear Mr. Bflyer: During ihe Cor�ceptual Design Plan review meeting on Tuesdayf AprEl 9, 2002, and follow-up meetings an Tuesday, April 30, 2402 and Tuesday, May 29, 2002 for the above referenced praject, City st�fF rec�uested additional er�gir�eering and surveyEng serv�ces be �rovided far the .replacement of the tollowing, sanitary sewers: Sanitary 5ewers Not Existing Parf of Oriainal Contracf Line 1. L-6580, Sta.12+55 to Sia. 20+6DE 8D5 LF 2. �-1143, S#a. Q�-00 tn Sta. 2+35 235 LF 3. L-990, 5ta. 0+00 to Sta. 9+�D5 90v LF 4. L-5172, S#a. Of�O in 5#a. 9+00 904 LF 5. M-95, Sta. 10+69AF) to Sta. 41�90� 121 LF 6. �.-34Q9, Sia. O+Q� #o S#a. 3+�� 30Q LF Subtatal 2�}68 LF Proposed New �ine 805 LF 35 LF 10$1 LF �00 LF 121 LF 300 LF 2442 LF Survey Required 805 �F 2�a LF 1346 �F 144 LF 121 LF 300 LF 29�2 �.F Additlonal Plan 5heets Required 2 Add ta L-99U Sheet 3 Add to L�301S Sf�eet Add fo 1.-34Q1 Sheet i 6 5ee �xhibits A, B, C& D�For location maps and r�habilitation recommehdafians. ihe above referenced sanitary sewers have been ider�tified by the Cii7+ of Fort Warth INater Departm�n#, �iefd �perations sta�f ta have sEgnificant defects, resuliing in nurneraus customer complaints. The request for additional services is not partAf our existing contract and wifl exceed our current scope of work fio� this project. A.N.A. Consultants, L.L.C. is recomm�nding that our current contract be amended to include t�tese additianal services and correspor�ding fee adjustment, The following summa+-� for these Amendmer�t �Eo. 7 addiiional engir�eering and surveyir�g services are being presenfe� far yaut review: BA51C SERVlCES S�rveying {Approx. 2,902 LF @ $3.25/LF) En�ir�eerinq (Aaorax. 2.442 LF (c� $7,841LF Subtotai $ 8,706.00 $'! 7.094.00, $25,80D.00 Uti/e have rnet with TKDOT - Fort Worth District #2, Right of Way and IJtility Permit Section to ensure that Qur recommendations comply with their requirements for the re- alignment of L-990 crossing U.S. Highway 287 at Vaughn Blvd. G:W081d943601contraatlAmend Na 115-29-02.doc 06106120d2 Enginaering Exoellenae C`�ty ��'�or°i �or°th, �e�as �y�r �r�d ������� �,��m���c�t��� DATE R��'�R�NCE NUMBER � LOG NAME 3QL1K_�9 I PAGE � Of Z 71301Q2 ��o� �� �� sue.��eT APP�OPRIATION ORDINANCE AND AIIRENDMENT NQ. 'I 7Q �NGINEERING AGREEMENT WIT}�i P,.N.A. CQNSIJLTANTS, L..L.C. FOR SAN�TARY SEW�R R�HABILIiATION CONTRACY LIX �59) RECQMM�NDATIQN: It is reeommended t�at the City Councii: 1. A�thorize the trar�sfer of $29,00� from the Wa#er and Sewer Fund ta the Sewer Capiial �roject Fund; ar�d 2. Adopt the attached appropr�ation ordir�ance increasing estimated receipts and appropriatians in the Sew�r Capi#al Projeci Fund in the amount of $29,OD0 from a�ailable funds; and 3. Authori�e the City Manager to execute ame�dment No. 1#o City S�cr�tary Contract No. �7���, an engineering agreeme�t with A.N.A. Consultants, L.L.C. in the amo�nt o# $29,000 to pro�ide �or addiiiona� de5ign and surv�y s�rvic�s, thereby incr�asing the contract amount to $134,160. DISCUSSION: . On March 5, ��Q2 {M&C C-189�4), the City Cauncil authorized the City Manage� to execute a contract with A.N.A. Co�su[tants= L.L.C. in fi�e amount of $'[05,16� for Sa�nitary Sewer�Rehabili�atiort Contract LIX (59). In order to address wastewater overflows to residents an �'arrant Raad (facaied in cfose proximiiy to this project}, it is necessary to repiace approximately 2,500 fee� of severely deteriorafied sewer pipe. �he poor condition ofi the iden��ied pipe segment was unknawn prior to appro�ral of #he contract. The engin�er will prepare the plans and specifications necessary for the replacement of th�s section of pipe. City stafF cor�siders the proposed fee ofi $29,OOQ to be �air and reasonable for the additional services to be pro�ided. M1WBE - A.N.A. Consul#ants, L.L.C., is in compfiance with the Ci#y's �IIWBE Ordinance by commif�ing to 15°lo MIW�E participation. The City's goal an tr�is project is � 5%. � . C'ity o�`�'o� �'o�°th, �'�cas ��a� ��� ��c��tc�l ������t���t��� DATE REFERENCE NUMBER �.OG NAME PAGE 713D102 �"�d°��°�'�� 3DLIX-59 � 2af2 susJ�c`r ApPROPRIATIQN OR�INANCE AND AMENQMENT NO. 1 TO ENGlNEERING AfaRI��M�N� VIIITFi A.N.A. CONSULTANTS, L.L,C. FUR SANITaRY S�WER REHABILITATI�N CONYRRCT LIX {59} _ FISCAL iN�'ORMAYI4NIG�FtilFICAilON: The Firtartce Direutor certifes that upon appro�a! and completion of recommendation No, 1, and adoptian of t�e attached appro�riation ordinance, funds w�l! be available in the current capital budget, as appropriated, of the Sew�r Capital Praject Fund. Mi�:k SuhmiEted �'or City Manager's Offiee bp: M�c Ott Originatin� Department Head: I]auglas Rademaker Addi�tlon�l �nf�rm�tian Caatact: Dauglas Rademaic�' TLJI�TD ��o� , t&2) �SSs 6122 2) PS5$ 6I57 (from) 3) P558 1) PL�45 6157 I ACCOIINT I CENTER � AMOIINT CITY S�CRETARY 472D45 070580175190 $29,Q00.00 53120f} 07D580175190 $29,OQ0.00 631200 �7aS8017519E1 $29,000.ao 53807[] ai09020 $29,U00.00 APPROi7�D 07/30/02 ORD.# 15174 C`iiy of �o�t bVo�th, Texas �' �� � l I � I �' I �����1���'���� DATE REFER�NCE NUMBER l LOG N,4ME 7130102 �`*C�191l3 I 3QLIX-59 sug��cT APPR�PRIATION ORDINANCE AND AMENDMENT AGREEMENT WITH A.N.A. GONSULTANTS, L.L.C. REHABILITATION CONTRACT LfX (59� RECOMMENDATION: It is recammended that the City Council: PAGE 1 af 2 N�. 1 TO ENGINEER[NG FOR SANITARY SEWER Authorize fhe trans#er af $29,000 from the Water and Sewer Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ardinance increasing estimated receipts and appropria�ions in the 5ewer Capital Project Fund in the amount of $29,OOQ from availa�le funds; and 3. Authflrize the City Manager to ex�cu#e amendment No. 1 to City S�cr�tary Cantract Na. 27555, an engineering agreemen# with A.N.A. Consultants, L.L.C. in the amount of $29,000 to provide for additional design and survey ser�ices, th�reby incr�asing the contract amaunt ta $134,960. DlSCUSSION: 4n March �, 2002 (M&C C-18984), the City Cauncil authorized the City Manager to execute a contract wifh A.N.A. Consuftants, L.L.C. in the amount of $105,160 for Sanitary Sewer Rehabilita#ion Contract LIX (59). In order to address wastewat�r a�erflows to residents on Tarrant Road (located in close proximity to this project), it is necessary to repiace approximately 2,5D� fieet of seuerely deteriorated sewer pipe. The poor condition of the identified pipe segment was unknown prior to approval of the contract. The engineer will prepare the plans and sp�cifications n�cessary far the replacam�nt of this sectian of pipe. City staff considers the propased fee of $29,000 to be fair and reasonable for the additiona[ services ta be provided. MIWBE - A.N.A. Co�sultants, L.L.C., is in campliance with the City's MIWBE Ordinance by committing to 15% MIVIIBE par#icipation. The City's goal on this project is 15%. C'i�y of 1�'0� YB�oring 7'eacas I�i�.�or a�� C�v����� �� un������� QAT� REFERENC� NUMBER LOG NAME PAGE 7130102 **�.� g�'�� � 30L.IX-59 2 af 2 suB�ECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 TO ENGWEERING ' AGREEMENT WITH A.N.A. CON5l1LTANTS, L.L.C. FOR SAN�TARY SEWER REHABILITATION CONTRACT L.IX (59} FISCAL INF�RMATIONICERTIFICATION: The Finance Directar certifies that upon app�-o�al and completion of recommendation No. 1, and adoption of the attached appropriation ordinance, funds wi{I be available in the current capital budget, as appropriated, of the Sewer Capital Project Fund. ►fT[��17 Su6mitted for City Manager's O�ce by: I FUND � (to) 1 &2) PS58 G 122 2) PS5$ ACCOUNT I CENTER I AMOUNT CITY SECRETAAY Marc Ott Origiaating Department Head: Douglas Radamaker Additional Information Contact: Douglas Rademaker � G 157 I (fram) 3} PS58 1) PE45 � 6157 I 472045 070580175990 $29,OpQ,00 5312D0 �70580175190 $29,Q00.40 531200 07Q584175190 $28,DD0.0� 53$Oi0 0709020 $29,000.00 APPROVED 07/30/02 ORD.# 15174