Loading...
HomeMy WebLinkAboutContract 27916����° �V���� . �- _ TO: A. Dnuglas Rade�akex, �.E. FROM: Fred Ehia, P.E. DATE: Augns# 14, 24Q2 RE: DESIGH OF WATER AND SAI+TiTARY SEWER LINE ADNST1V.iENTS Il� ROSEDALE STREET, T+OREST PARK TO S. NiAIN STREE'T, DOE#3140 AMENDMENT � As requested by the public Works and Transpartation Deparhneni, LOl'EZGARCIA GROYTP, IPTC. bas submitted a proposal to design additio:nal water line Teplacemem in Rose�ale Slreet LOPEZ�-ARCTA GROUP, INC. requested ta perform these addi�tional services for a fee not to exceetl $1�,076.00 increasing the contract fce to 5540,459.00 Staff considers ihis fae to be fair and :reasonable for the scope of services proposed. Ptease authorize this additional design by your signature on the attaci�ed Contract Axnendment form. Xc: Rick Trice EIi1GINEE�IIYG DEPARTMEIYT THE CITY OF FORT WORTH * lOOO THROCK�U[ORTON STREET *�'ORT WOR'I'Fi, TEXAS '7G1OZ-�311 (817} 871-7941 * Fax {$1'� 871-7854 � Pdnted on recycled paper F' � STATE OF TEXAS 3 COLTNTY OF TARRANT 3 AMENDMENT NO. 8 ���Y ��C+�C�AR� ������ � . C�TY SECRETARY CONTRACT fNo M&C Needed) WHEREAS, �he Ci�y of Fort Worth (City) and LOPEZGARCIA GROUP,�NC.(The "Engineer"} made and entered into Ci�y Secre�a�`y Contxac� No. 24883, �the Contract} which was authorized by the City Couneil by M&C C-17334 an the 23 day of March, 1999, and WHEREAS, the Con:tract involves engincering services for �he following pxoject: Water azid sanitary s�wez line replacemen� �.n Rosedal.e Street, Cantrac� no. 2, Fo�est Park Blvd. To �. Main street WHEREAS, it has becomc necessaxy ta execu�e Amendmen� No.B to sazd Contract to includ� an incr�ased scope Qf work and re�cris�d maximr�m fee; Separa�ion of �onfracfi {Vo. � into ihree separa�e consfruc4ion unifis. C�equired modifiicaiions to p[ans and specifiica�ivns. NOW THEREFORE, City and Engineer, acting hexezn by and through their duly authorized �ep�-esen�atives, enter into the fol.lowing agreement which an�ends the Contract : 1. A�ticle I of �he Contract is amez�ded to include �he additional ez�.ga.z�eexing serv-ices speci�ied in a propo�al le�ter da�cd July 8, 2002 a copy o� which is a��ached hereto aarzd ineorgorated herein. The cQst to City for �he additional services to }�e performed by Engineer total $12,076.00 �� ArtiCle x� of the Contxact is am�nd�d �o provide for arz irzcrease in �Yie maximurr� fee ta be paid ta Enginc��r for all work a�n.d sexv�ices perfarmed under the Contract, as amended, so that the total �ee pa�.d by �he City for all work and ser�ric�s shall not exceed the sum a� $540,459.00 � �9Q� ���"� '. � ��{��� � � ����, �� �. � i-� � � � � .� � � l .�. � �! �� �l P July 8, 2002 Mr. Fred Ehia, P.E. Project Manager Ci4y of �o�t Wc�rih - ��pariment of �ngineering C�nsulfian� Serr►ices Di�isi�n 1000 Throckmorton Street �art Warth, Texas 76102 RE: Reques# �or Supplemen�al Agreement (Amendmen� No. 8) Rosedaie Street Improvements Forest Park Boulevard to U.S. Highway Na. 287 Water and Sanitary 5ewer R�placements Water Project No. PW77-a60770153580 Sewer Praject No. PS46-Q7D4601334A�0 D.O.E. No. 3140 G&� Project IVo. 99�00��01�'W Dear Mr. Ehia: This letter is in response ta the City of For� Wor�h's rEquest to s�parate th� abo�e mentEoned project into three (3) separate construction units. These three units are generally described as follows: UNIT I-- For�st Park Bl�d. ta 9'h A�e. UNIT II -- 9T" Ave, to Alstan Ave. UNIT III — Alston Ave. to 5. Mai� St. The limits afi eaeh unit were establish�d as the result of several meetings/discussions held among City staff. A description of the additional services necessary to camp{ete the abo�e mentioned separation is as follows: � Modify 1 s�t af construction plans inta three separate canstruction plan sets. � Modify 1 set of specifieatians and contract documents into three separate sets. � Mo�ify design as necessary for construction, Ir� particular, at least trrvo design modifications will be required: 1. Tt�e design of sanitary sewer lateral 1.-449 will be changed to accommodate the s#orm sewer construction in Unit I. 4£� � � 5r �. n-.�'-F,; � — '� 2. The design of the pr�posed 16" water main in Rosedale St. at Alstan A�e. will be modified to include a temporary connection to ihe existing 20" water main. lopezgarciagroup,Goi7i b850 Manlzattan Blvd., 5�iite 300 Fort Worth,Texas 761Z0 (817) 446-180d {8�7j 446-1113 Fax , 4i �� � � � � C-� Q � �; � Q Mr. Fred Ehia, P.E. City of Fort Worth July 8, 2002 Page 2 � r��r, � L� � The additiona! fee to provide the above men#ianed additional s�rvices is $12,076.00 (See Attachment — S�pplemental F'ee Schedule). If you ha�e any questions or need additional infarmation concerning this request, please feel free ta call me at ($17} 44E-18D0. Sincerely, LOPEZGARCIA GROUP , , i i . � ,� _ : = H. INay Bartbn, P.E. �ort V�h Operations Manager HWB:bI