ATVIENDMEI�T WITH M&C
AMENDMENT NO. 1
STATE QF TEXAS
COUNTY OF TARRANT
CITY SECRETARY C�NTRA.CT NO. �
WI�REAS, th►� City of Fort Worth (City} and Kimley-Hom and Associates, rnc.,
(Engineer) made and entereci into City Secretary Contract No. 276'75, (the contract)
which wa.s authorized by the City Counci.I and by M&C C-19071 on the 30th day of
April, 2002; and
WHER�AS, the Confract involves engineexiz�g services for the following project:
Water Distriburion System Itnprovements in the Med.ical District
WHEREAS, ii has become necessary to execute Amenc�nent No. 1 to said
Contract ta include an increased scope o�work and revi�ed maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Con�ract:
1.
Article I of the Contract xs amended fo include the additional engineering services
specified. in a proposalletter dated August 19, 2002, a copy af which is attached hereto
and incorporated herein.
2.
Article II af the Contract is amended to provide �or an additional $14,000.00 to the
contract amou�t of $474,6�0.00. The m�imum fee to be paid to the Engineer %X a11
wark and services performed under the Contraci. The tota.� fee paid by the Czty for all
work and services shall not exceed the sum of $48$,600.00.
3.
All other provisians of the Contract, which are not expr�ssl� amended herein, shall
remain in fu11 force and effect.
il ��l�Utl�i�W,W��'
� �9 � '�l�
i. � �" ' _ �
' �- � � '1.'11�. �
EXECUTED on this ���
Tarrant County, Texas.
AT �T:
e� .���
ity Secr y
day of SY�n �, 20Q2, in Fort Woz-kk�,
� �b �'� � � ��-�� ��
Contract Authorization
APPRQV REC�MMENDED:
�
Dale A. Fisseler, P.E.
Director, Water Dep ent
Date: � c!" ��
i� �
KIlViLEY-HORN AND ASSOCIATES, INC.
'.-�- -.��- �
^, .�
!/' _ �=/`r � _ �
,� -
G1enn A. Gary, P.E.
Vice President
801 Cherry Street, Suite 1 T00
Fart Worth, TX 76102
APPROVED AS TO FORM 1�ND LEGALITY:
` .
,;
Assistant City Attorney
P:106I018.017hppp5AT4HNDbAEN T I . dae
Date
�ptt " /
Assistant City M ager
Date: � `�'
Date:
�
�
�� ���U�u,
i� „�li'�.
I
i �
?� II ;���[`I�
U�i7�_, MXI.`�
IL'f�pm�
i� �s�
U
, _��
F�
�I� Kimley-Horn
I��� and Associates, Inc.
August 19, 2002
Mr. Peter Fu, P.E.
Engineer
City oF Fort Worth Water Department
1600 Throckznortan 5�reet
Fort Worth, TX 76102
Re: City of Fort Worth Water Disiributian Improvements in the Medical District
Addi�ional Services -- Field Ianvestigation and Mapping
KHANo. Qb1Q18017
Dear Peter:
As we have discussed with you, while conducting the field investigation portion
of the proj ect, we becarne aware khat it would be beneficial to perform additional
field investigation for a few of the major iransmission lines that extend beyond
the siudy area. The transmissian lines include the 30-inch, 36-inch, and 42-inch
lines frorn Holly to tlae 8"' Avenue Pump Station (abandoned) and the 12-inch
and 1 b-inch transmissian lines irom South Side II ta the 7PS Health Network
area.
On� of the z�.aajor goals of tliis project is to identiiy operational procedures to
isolate major transmission lines. Tl� 36-inch line fram the South Holly Pump
Statior� crosses Interstate 30 and reduces ta a 3Q-inch line at Vickery Boulevard.
The 30-inch and 42-inch (alsa from Holly) lines cnntinue through tlae Sfi.�dy Area
and appear to tie together south af the Study Area near the 8'h Avenue Pump
Station, vvhich is also the pressure plane bour�dary between Holly and South Side
IL 5ince these transmission lines, located flutside of the Study Area, have not
been verified, we recomtnend performing additional field investiga�ion and
mapping sexvices. These lines are gex�erally located between Ho�.y Pump Station
and Viekery Boulevard and between A11en Avenue and Jessamine Street. Further
investigation and mappi�r�:g of these lines will assist the City to develop "transfer
plans" to follow during emergencies in the e�ent that one of the lines becomes
out of service.
We also recommend further investigation and r�apping of the 12-inch and 1 b-
inch water lines from JPS Healtl� Network south to Capps Street. Our initial
analysis indieates that tne JP� area lacks redundancy and it appears #hat the
t�ansmission lines leading to this area are limited to a single 16-inch water line.
Additional investigation will assist us in determining how to provide mare
reliable water service to this area.
�
5ulte 11 p0
801 Cherry 5�ree1, Uni1 i 1
Forf WortM, Texas
76102•6893
a�
T�1. 817 335 6511
MET 817 854 4266
FAX 817 335 5010
� �� � � Kimley-Horn
�' � antl Assaciates, Inc.
More specifically, the areas that we are recommending addztianal field
investigation and mapping services include:
• Easement outside Tarantula RailroadROW from (Park Place to 8th Ave)
• $°i A�enue (Richmond St. to Jessamine St.)
� 6�' Avenue (Allen Ave. to Jessaznine St.)
� Jennings Avenue (Alle�. Ave. ta Mulkey �t.)
� Main Street {Allen Ave. to Jessamine St.)
� May Street (Mulkey St. to Capps St.)
� St. Louis Street {Capps to Cantey St.}
� Mitchell Avenue (8`h Ave. to 6`h Ave)
o Jefferson Avenue (Jennings Ave. io Main Si.)
� ressamine Street {8� Ave. to Main St.)
• Mulkey Sireet (Jennings St. to May St.}
o Capps Street (7ennings to St. Louis St.)
* South HoIly H.S. Pump Station to Vickery Boulevard (crossing I30}
This area encompasses approximately 24,SOO linear feet of additional street far
field investigafion, which includes three additional City water maps (#2042-3$0,
#2042-392 and #2048-380). Several of the above mentiozaed s�eets contain two
or more r�vater lines. Tlae approximate length of water line ihat we are proposing
ko investigate is 35,500 iinear �eet, revising ihe total amount of Transmission
Line to be inves�igated from approximately 60,OOa to 95,SQ0 Iinear feet.
The Scope of Services to be performeci for this additional area will be the sxrne
as those included in our current cont�ract for FieId Investigation axad Mapping
under Task 1-Data Callection and Field Tnvestigation Section GI.c and Task 2-
Mapping.
Mr. Peter Fa, Augusf 19, 20p2, Page 2
We recommend that the City increase the rnaximum fee not to exceed budget by
$14,000 for the Fzeld Investigati�n and Mappin� of this additianal area. We
recommend increasing the budget for Task 1- Data Collection and Field
Invastigati�on by $6,500 and inereasing the budget for Task 2- Mapping by
$7,500. The following table summarizes our recomznended budget revisions:
Task Description
1 Data Collection and Field
Original Fee
Revised Fee
Investigation
2 Mapping
3 Analysis and Evaluation
� Repart and Communica�ion
5 Standard Operation Pxocedures
6 Water Line Desigta and Bidding
Total Pxaject
$ 89,150
$ 28,60�
$ 77,700
� sa,�so
$ 24,4Q0
$204,600
$4i4,600
$95,650
$36,100
No Changes
No Changes
No Changes
No Changes
$488,600
� �� � � Kimley-Horn
I�► ��l and Associates, lnc.
Mr. Peter Fu, August 19, 2D02, Page 3
Kimley-Horn will subcantract a portion of these services ta Paxagon Pro�ect
Resources, Inc., a M/WBE subconsultant. The amount we wzll be subcontracting
is $5,400. This represents a MIWBE participation percentage of 36.0%. With
these Addztional. Services, our revised eontract amount will he $488, 600. This
will revise our tatal contract M/WBE participa�ion percentage to be J 9.5%. Our
M/WBE goaI %r this projact is 19.0%.
We appreciate the opportunity to be oi continued service to the City. Please
contaet us if we need to provide any further inforrnation.
Very iruly yours,
KIMLEY HORN 11ND ASSOCIATES, INC.
��
Glenn A. Gary, P.E.
Vzce Fresident
GAGIJRT:h.vh