Loading...
HomeMy WebLinkAboutContract 57011-AR11CSC No. 57011-AR11 FORT WORTH�, City of Fort Worth `��� Construction Allowance Request Project Name Trinity Boulevard Phase 1- IH 820 to Salado Trail City Sec # 57011 Client Project #(s) 102101 Project Trinity Boulevard Phase 1- Roadway, Drainage, Illumination, Landscape and Traffic Improvements Description Contractor SJ Louis Construction of Texas LTD. CA # 11 Date 10/31/2023 City Project Mgr. Mitch Aiton City Inspector Steve Johnson Original Contract Amount Extras to Date Credits to Date UNIT or DEPT � Unit I, IV & V � Unit II � Unit III � - � Totals Allowance Funds Previously Allocated Revisetl Allowance Balance IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Furnish all labor antl material as per attached proposed Construction Allowance Request (with attachments): This construction allowance is to atld item 27B Energy Transfer Gas Vent Extension for 1 LS at $11,233.20. There is an existing gas vent for Energy Transfer in their easement that needs to be extended to proposed grade. The gas vent is located in existing easement owned by Energy Transfer antl is to be compensatetl for any relocation The 2" gas line extension and testing will be tlone by an Energy Transfer approved subcontractor. Price is considered fair and justified, TxDOT average prices provided for reference. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. SJ Louis Construction of Texas LTD. Adam Lunsford A, �� F�� � Nov 7, ;:. ATTEST: "e,�,.9 �... . � _�x. w ',o;�;;os Jannette Goodall, City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 1 FORT WORTH, City of Fort Worth ��,��" Construction Allowance Additions T Project Name Trinit Boulevard Phase 1- IH 820 to Salado Trail ity Sec #� Client Project # 102101 Contractor SJ Louis Construction of Texas LTD. PM Mitch Aiton Inspector Steve Johnson Construction Allowance Submittal # 0 ate � ADDITIONS Construction Allowance Additions Page 2 of 4 FORT WORTH.� City of Fort Worth ��—� Construction Allowance Value Project Name Trinit Boulevard Phase 1- IH 820 to Salado Trail City Sec #� Client Project # 102101 Contractor SJ Louis Construction of Texas LTD. PM Mitch Aiton Inspector Steve Johnson Construction Allowance Submittal # 0 Date � CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Unit 1 Item 84 9999.0025 Construction Allowance 0.022466 LS $500,000.00 $11,233.20 Construction Allowance Value 3of4 Previous Construction Allowance Requests CAR # DATE AMOUNT Total $0.00 Construction Allowance MSBE Data Page 4 of 4 MISBE for this Construction Allowance Request Trinity Boulevard Phase 1- IH 820 to Salado Trail Ronald Etter Project Manager Energy Transfer Vent Extension •• • NO CHANGE INCREASE IN COST $ 11,233.20 DECREASE IN COST 11 11 • • •• 5701 1 SJ Louis Construction of Texas LTD. SJ Louis NO CHANGE INCREASE IN TIME DECREASE IN TIME # of Days = # of Days = Energy Transfer has a vent on their line in their easement that needs to be extended to the proposed grade. Existing easement states relocations to be compensated for. SJ Louis to use Energy Transfers approved contractor LLR Construction. Mitch Aiton Sr Professional Engineer 682-715-9424 O8/30/23 LLR Construction can do it for $9,768.00 before SJ Louis Overhead. The proposed price for the gas companie's contractor to extend the vent is 2" pipe, wire and test equipment is fair and justified. TxDOT Average Prices for 2" gas line is $100/LF and Testing is $4000/LS, please see attached for reference. 940-399-6757 08/30/23 No Schedule Impact Mitch Aiton, Sr Professional Engineer ��� �� 09/13/23 10/31/23 � _I I \� 0 v I � I �� 6� a �,s .z� .� I I I I� I � I �r - I -=J � rl I ' I I I I I 6 I - I z" II �`p\ I - `( I� C I �II I � � I - �I / a ol � ` ��, I � \ Ip �� _ �o w!�\ �d = -�'�y o _ � �� 0 z w c� � � m � _ c �1�� -_ -_ _ : � : � p � � _ _ � .! \i�n,� yy O o � � F C � _ _ ,�;���Y l��/� � C[ ( a �.`� �" � _ � 3 � _ - _ :b's� o;M�°�. � /\ - t- ' '= 4�i••.. :� - -� � � ce Y m s - ,/���ii�\ i� � ;' p F _ _ -_ _ W N� O < - o - - � - - � C �3 � _� _� � -a�-a�,w3aQo��_ � U c -- — — — i m F kl� oz� � ol � Q� �- > I � mi �,' z' �, I � IIo � I p � �I I I 1NIOd I � H�JiH ol oll 03 �_ �,% � � � � c p� � c X �� � W .X c N � O @ � � C p7� N N _ 'O N i � � � � � _ � � O O � � I � II � � p - �I �w� I 30 � I�G - � _ III �j //////~/// /j 2�_ li 2�� 30 I✓ _ 'I= �a�� o '�, � - � � � p °id i �I �� � _m� �'s � ,_ , � � _ — oo.o � � � � � , � � oo.� tic�y '�''��� � � � � Q i i� � Gyc�� 9 � i � \ pc,+9Z� tl1S 1.11N1i�13NIlH�1VN1 0 i z � v ) � m ,� W v� F� ¢ .�1. � � o�� p P �.' N ) Q j G O P�-� � ,�. � >, �,>o � � x �o¢ ai N . w �a¢ z c : a m�o a � � W �' �F- W + F � Q z3� z¢ w N ; F F¢x > � — � � �^ Q ? � a o � o� 0 0 + � 0 + omp�l - IJ o g u I i oa�saeays�pvo��p� noq n�iuua ma�-{g£810190\�ompo rm�3� �.v� w (OO+6Zl tl15 O1 OS+SZI tl15 LO £J) LS'�L0-81 OZ-LO-£ZOZ ��PanoS �T�� aryo� `arydaoa '99'�50=84 OZ-CO-£ZOZ R9 'Pa��old Request for Proposal roject Name C.M.R. - Proposal No. Date Trinity Blvd., Phase I(I.H. 820 to Salado Trail) City of Fort Worth, Texas 19 October 26, 2023 esponse Required By Transmitted By Mr. Mitch Aiton, P.E., PMP Ronald Etter 200 Texas Street Proj ect Manager Fort Worth, Texas 76102 signature Via Email Ro��.al,ol. Etfe,�- cc: Mr. Trenton Tidwell- Kimley Horn, Via Email escription of Work This CMR is for the extension of the Energy Transfer Gas Vent near Gifford Hill Road to bring up to proposed grade. reakdown of Proposal Trinit Blvd., Phase I(I.H. 820 to Salado Trail) Gas Vent Extension Item Description Quantity Unit Price Extension New Ener Transfer Gas Vent Extension 1 LS $11,233.20 $11,23320 $0.00 $0.00 $0.00 $0.00 $0.00 Net Change: $11,233.20 Additional Calendar Days: 0 If acceptable, please provide an authorization signature below and return one (1) copy to our office. .J. Louis Construction Action xc: S. J. Louis Pro�ectNo. 22111 S.J. Louis Construction of Texas Ltd. 520 S. 6th Avenue Mansfceld, Texas 76063 (817) 477-0320 Office (817) 477-0552 Fax C O .y � � K W W � `d / N ,�^ V � + � U o + O m � Q a N O s o y o > � O N y O N O C m � N � � O 2 O � O r � O F O N O S m O F O y � O O O O � m O O O O O O O O O O O O � m O p p p p O �j H M O O O O + O O O O O O O O O O O O } M a a a a a C') � M ��� O F Q O O O O O O O O O O O O F Q N � � � � � N �() N y3 fA fA fA fA fA fA fA fA fA fA fA H3 � EA EA EA EA EA ' l0 fR � (:i � O O O O O N O O O O O O O O O O O O G�i � O O O O O N 0 0 0 o m� t o 0 0 0 0 0 0 0 0 0 0 o m N s � o 0 0 0 0 � 0 0 0 0 �`y o 0 0 0 0 0 0 0 0 0 0 0 `m v o 0 0 0 o y F» e» F» f» > F» F» F» F» F» F» F» F» e» F» F» fn > F» e» e» e» e» O O u� y� . . . . . . . . . . . — O O O O O O O O O O OI O fA M fA �y O O O O 0 0 o O O O O O fA fA fA y) O O O o O 0 0 v3 y� O O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ����ri�cov�� ������I�I�I� ry Q � � N N � O Q N @ @ i 2 � �0��� a� a� a�i m o�`�' a p.o. m m �m�gai-,a,��� O O 0 Vi O LL y N A O �� U m � .. � O F �I m m � N 7 d C R d V N � 0 � O O O O O � O O O O O � O O O O O � �s �s �s �s �s �s J O N � X O n m o_ Q C > N N C � N N > � O > � N 9 N U 0 � m u� J J C O U O U K J O W N � GG,12 LLR Construction, LLC PO Box 4332 Longview, TX 75606 Phone: 903-522-2036 Email: � :,rQ;�:ac�,��'< Estimate Number: 151 Date:8/29/2023 Bid Prepared For: North Side of Trinity Blvd Vent Pipe Chad Hensley Email: Chad.Hensley@energytransfer.com Phone: ($17) 915-2263 DeSCrlptiOn Unit Estimated Price Price LLR Construction LLC to provide test lead, wire, 2" pipe and 2" 90's for the repair of existing vent pipe. LABOR/EQUIPMENT $7,568.00 MATERIAL $2,200.00 Total $9,768.00 Bid is good for 30 days Detail Exclusion: If hydro-vac is required there will be an additional charge Estimate does not include sales and/or use tax if applicable. � o o � o o a o � o 0 0 0 0 ��I �C 4 4 O 4 O �'7 O 4 4 O ��� � V � � ri O � lu] � u O M i,H i i a a w w � w � <<I � .f ti I - � iL O v U � i O U � m m � QC C � � m Y 0 O � >O > G a 0 � � M N M O '� � a c� a �i p o 0 0 0 0 0 0 � o e� �r� ,y o � I'� � � � ua ir� +x 0 0 0 0 U [] G] 4 O - o 0 0 0 d O O N O o �n N o m i_ '�' m � u� e�. u. z y o 0 0 0 c� c� o 0 - o 0 0 0 a' - - r.i o �n N o - m r= '}' m � lS] L�] iF} � a n n O n � .I .I N .I v O � � T m � � c� n O n E .i .i ni .i 0 in p Y m O � � � Q � H � Q m z w ..[ .'.[ ��.[ - � z ��� ��� � ��� >. a m o � z 0 0 -Y � G Z v "�' "�' n i i i � � •=C �S U � W O � � � `,1 � W W � � m j� � III III III @ a > > > � C fi � � in [n N N a a a �.s � lJ V V � O � _ _ � •T N C N � C W - H •Y •Y -Y •�[ v r r r r � o m . . . � i v N � n � - � O O O O w � � � � H � � � m m m m � o m � ti ti ti ¢ � 0 0 � n o 0 i . n n �� N �� o a o CJ 4 V �n o 0 r. �n tr u� N �� V] o a o c� o c] iri o 0 i.... in n �� N �� US c] U U G] V O [7� �D n U fn c� Cs G vi v o cni a n m � u' iii W Q �•1 V •C � w LLI _ �n ` [l ui � n •{ N L7 � - `A w �1f O � N O n ri� :J � � � r O rl N 'i rl ti � � � mm m nr� n � � v � � � � � � o m � 0 m � - a' � _ v _ � Y � X d � r+ S' W N O l6 U O � E J E � N .. Y _ m � T +' O a� NC N'-� -'-� ] _O o .� C.� N.� a N.� _ �oQ aQ �, a �Q oQ �aQ v�Q - cn � m" a m o" �" a > �" CJ � w H U �.i V �•i U %• i tJ ri i i) I �o ,i i 1 �f1 F�RT��RTH� Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Trinitv Boulevard CA #11 M&C: N/A Date: 10/31/2023 � � � � � � � � : � � � � Name Mitch Aiton Jessica Rodriquez Adam Lunsford Steve Johnson Raul Lopez Lissette Acevedo Patricia Wadsack Lauren Prieur Doug Black William Johnson Jannette Goodall TPW Contracts CPN: 102101 CSO: 57011 Department TPW - Signature TPW - Review SJ Louis - Signatur TPW - Signature TPW - Signature TPW — Signature TPW — Signature TPW — Signature Legal — Signature CMO — Signature CSO - Signature Initials �� pL1N' DOC#: N/A Date Out Nov 6, 2023 Nov 6, 2023 N ov 7, 2023 Nov 6, 2023 Nov 7, 2023 Nov 7, 2023 Nov 10, 2023 N ov 10, 2023 N ov 10, 2023 N ov 13, 2023 Nov 13, 2023 CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CiTY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑YES �No SAME DAY: ❑YES �No ROUTING TO CSO: �YES ❑No NEXT DAY: ❑YES �No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested � For Your Information � Signature/Routing and or Recording � Comment ❑ File Return To: Please notify TPWContracts(a�fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!