Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 59298-A2
CSC No. 59298-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 59298 WHEREAS, the City of Fort Worth (CITY) and Halff Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 59298, (the CONTRACT) which was authorized by M&C 23-0269 on the 111:h day of April, 2023 in the amount of $ 170,380.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $9,680.00 which was administratively authorized on September 12, 2023;and WHEREAS, the CONTRACT involves engineering services for the following project: S. Hulen Street and South Drive Highway Safety Improvement Project (HSIP) , CPN 104095; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $56,295.00. (See Attached Funding Breakdown Sheet, Page OFFICIAL RECORD CITY SECRETARY 2. FT. WORTH, TX Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $236,355.00. City of Fort Worth, Texas S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Prof Services Agreement Amendment Template CPN 104095 Revision Date: November 23, 2021 Page 1 of 4 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth William Johnson (N v 17, 2023 12:36 CST) William Johnson Assistant City Manager DATE,: Nov 17, 2023 APPROVAL RECOMMENDED: of the date subscribed by the City's ENGINEER Halff Associates, Inc. t'Avar% A. 8c rkhif David A. Burkett (Oct 26, 2023 07:31 CDT) David A. Burkett Director of Transportation DATE: Oct 26, 2023 _A.. Lauren Prieur (Nov 16, 202309:23 CST) Lauren Prieur Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Fanta Kaba, P.E. Project Manager City of Fort Worth, Texas S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Prof Services Agreement Amendment Template CPN 104095 Revision Date: November 23, 2021 Page 2 of 4 APPROVED AS TO FORM AND LEGALITY: 1p i Mack (Nov 16, 202317:35 CST) Douglas W. Black Sr. Assistant City Attorney ATTEST: p OAF ...4 ad �9dd a 0e p�8 .Id dP** a r� � �p _ dd4y nEXagoO.�p Jannette Goodall City Secretary M&C: N/A Date: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 3 of 4 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FUNDING BREAKDOWN SHEET City Secretary No. 59298 Amendment No. 2 Department Fund -Account -Center Amount TPW 34027-0200431-5330500-104095-007230-9999- $56,295.00 22010207 Total: $56,295.00 City of Fort Worth, Texas S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Prof Services Agreement Amendment Template CPN 104095 Revision Date: November 23, 2021 Page 4 of 4 FORT WORTH ATTACHMENT "A" Scope for Enqineerinq Design Related Services for Intersection Improvements The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVE The objective of the S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) is project is to improve safety of the intersection by providing lane offsets for the northbound and southbound turn lanes along S. Hulen Street. Also included are improvements to the traffic signal equipment including cameras, Opticom system and controller equipment, as well as the addition of new striping to delineate dedicated left and right turn lanes on South Drive and constructing appropriate repairs to the curb ramps and crosswalk facilities as needed to comply with the Americans with Disabilities Act (ADA) requirements. WORK TO BE PERFORMED Task 1. Oes+gR Project Management Task 2. GenGoptOSI D96igR (30%) Task Z. Preliminary DeSigR (60 Task � . Finsl D96igR (Quo% and 10091 Task 5. Bid Phase Services Task 6. Construction Phase Services Tools 8. ✓ire d ✓ubourla% Utility Engineering Se WiGes Task Q. Pig City of Fort Worth, Texas S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Attachment A CPN 104095 PMO Release Date: 07.23.2012 Page 1 of 27 FORT WORTH TASK 1. PROJECT MANAGEMENT —Additional Projects. ENGINEER will manage the compilation of submittals to include plans, specifications, and estimates provided by the City of Fort Worth (CITY), through its consultant, for two additional intersection projects (ADDITIONAL PROJECTS) to be included with ENGINEER's project in order to create a single PS&E package for TxDOT letting. 1.1. Coordination with ADDITIONAL PROJECTS: • Regular coordination meetings • Coordinate project schedule and deadlines for submittals. • Coordinate with the other consultant to establish the standard details and bid items proposed in all projects. • Review submittals for completeness and compliance with established standard details and bid items, not to include QAQC of engineering and design. 1.2. Preparation of Submittal Packages: • Incorporate other consultant's plans sheets, bid items, and standard details into the submittal packages for each milestone and in the final PS&E package submitted for letting. This includes: • Produce combined summary sheets split by CSJ • Prepare summary of all project quantities (including ADDITIONAL PROJECTS). • Prepare and maintain a sheet index to include ADDITIONAL PROJECTS. • Accessing and uploading information from TxDOT Connect for ADDITIONAL PROJECTS. • Incorporating ADDITIONAL PROJECTS information into required TxDOT forms for each submittal package • Incorporate ADDITONAL PROJECT into Contract Time Determination for TxDOT. ASSUMPTIONS • Eight (8) meetings with the other consultant • ENGINEER will only be responsible for QAQC of ENGINEER's project. The other consultant will perform QAQC of their work. • ENGINEER will be responsible for compiling and incorporating sheets and information provided from the other consultant. • ENGINEER will not be responsible for attending separate design review meetings for ADDITIONAL PROJECTS. • ENGINEER is not responsible for coordination or deliverables for environmental clearance of ADDITIONAL PROJECTS. City of Fort Worth, Texas Page 2 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 2 of 27 CPN 104095 FORT WORTH. • ENGINEER will not be held responsible for adverse impacts to the project schedule or deliverables caused by the ADDITIONAL PROJECTS. DELIVERABLES A. Compilation of design plans from ADDITIONAL PROJECTS to create a single PS&E package for TxDOT letting. 0GINEER will minlwe the werk outlined in this osepe to ensure effiniont cnd effecti use of IEER' / s and resources. ENGINEER ni a ge change ��.. s s � o tim���eesr—� ��i mar,s� GommuniGate effeGtively, adre&L icu--es with the GITV's PFelect Manager and ethcNr c ac necessary to make nregre. . nn thvr, e�v"dvnk. 4.1. MaRagiRngthe Team: •--Lead, mcnoge and mires+ design team actiVi+ies + Ensu Axv-rL\"1se4QQ-QA) is p;s+c+icerd in performance of the werk Refer to Tack 10 for further details �Communisate internally among team members Tmk snd ` llenate team rese ernes 1.2. Ge- MIJRiGativns and Tepeert�g: • Attend a pre_ldesign project kickoff/charter meeting with CITY stsff tq Gonfirm and Glarofy sGGne e i R derstanld CITY ebiectiVes e i iand ensre economical anandfi mctional designo the maet-CITY cnd TxD()T ren(„irerReen+S • rd Attenand facilitate a meeting with T)(VIOT cuff to confirm !design criteria anrd goals The meeting I bo similar to the TxDOT D8Sign i`oncent Genference and rr�. �vrTccprwnr�rvT cc-crrra ENGINEER will prepare c Dc,3;.gn ✓.immary Report PsSR) ao port af this mew • C E)R di ict and ldecUment monthly project update meetings ,e,i+h C.I TY Praj -Gt Manager .dUring the !design phswafthe PFE)vJeGtTheCcse-meetings will held virtually, • Genrdi ict review meetings with the'CITY snd TvnnT at the 60 design phao&7 • i`enrdi ict and rdeci invent monthy rdesign toom meetings during the design phooe of the project y7 • GeodUc+ QC/nA reviews and rdeci iment these actiVities Refer to Task 10 for further lde+ails Prepare , 1 v ei—, i, , aGGGFclanGe with AttaGhment B to this Standard AgFeerneR and submit monthly in the fermat requested by the CITY City of Fort worth, Texas Page 3 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 3 of 27 CPN 104095 FORT WORTH. • Prepare and submit monthly Prvjeat Status Reports in the—#ormst provided respeEtivo Trsnsperta+ien and Public Werks Department • Prepare rand oubmit baseline Prele Gt Cchedi ilv ini+iully, and Project Schedule updates with a schedi ilc narra live monthly, as required in Attachment D to this Standard Agreement in ^omplianse with the City's Specification nn 21 15 entitled Engineer PFGjeet9e#edula. This PRE IF=GT- requires a Tier 4 schedule as defined in the Gitv's Cpecificatien nn 31 15 entitled Engineer Preject Schedule. • Prepare rand submit a pr9liminary Dreieat Risk Rsgister,proliminary Stakeholder Register, and pr0imincry Project Gemmi inications Plan. CITY to medify and finalize. • Gemnlete I\Aon+hly M/VVBE Report Germ and Canal Sb:mmary Payment Deport dorm at tho end of the nreieGt • Coordinate with other agencies and entities as necessary for the design of the pprnpeced st i icti ire and nre„ide and obtain informatien needed to prepare the 1�''d`"'e c i n n �9TT With respect to coerdinatien with permitting autheritiec CIS GIICCR sl-lslt comma inicate with permitting ai ithoritiso ouch that thoir regi hater,, regi ijremen+c are appropriately reflected in the deci C i` gns. ��! ��" ICC� . ohs!! work with regulatery authorities to obtain approval of the designs and make changes necessary to meet their req iiren emento, m part of the design Scope - Per: onnol and Vehicle Identifi ati�. When co�aGtiRg sitevisits to the project Iecation the ENGINEER or any of its ss:b sels► ltwnt shell sarry readily visible j nformation identifying the name of the GempaRy and the rand representative • One (1) pre -design project kickoff/chartering meeting • Zero (0) field review meetings • Ten (10) McRthly project update Meetings during design phase (GOMpletien e 40(M p!&\qG) wid up to three (3) addi+ienal project update meetings during I?(1\/\/ acquisition pha,-\). These meetings are to he heldvirtually. • The 90 C submittal required for the City and 95Q cubmittal required fer TxDQT will heq `n the cams sabmittcl and ull he labeled "9C aNbmittul" on dOGUrnentc -�n-rnier� I) plan review meetings (G 0%) + P!Sn review meetings will he coordinated by CITY staff any-undwill include TxDQT co mmuein s, • Ten (10) monthly design team meetings • All submittals to the City will he Quality checked prier +o submissisr} Project design phaoc is L\gtioipated to take ten (1 n) '"'"'ontho inGluding enyIrORmental clearance. ROW acquisition is sntisipated to take an addi+iopral twelve (12) menthe City of Fort worth, Texas Page 4 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 4 of 27 CPN 104095 FORT WORTH • PreleGt GGRGtFUGtion phaoo is cntisipa+erd +e take ten (10) men+hs n Risk • Ton (10) monthly updates of Dreieot State RepeFts 11A\A/QC formo, TPI�€ Register, rd annreiee+ G`eherdl le •CITY otsff Will he reonenoihle far all eeerrdina+ion With TxDQT anrd the ENGINEER Will supper++he r` - f���.. � .. T ao needed. DELIVERABLES 6-.-Meetm4g 3 mmSriac with ao+yen i+emc I►\ RC aline rdesigR SGherdi le E. PFeIiminar„ o �rR eieet Riolt ueter, PFOminary Stakeh lyder eg;�«a• ter d .�� nreliminal y P—Jeo+ G .+a+ienc flan ommuni� C. Men+hli Cnherdl ile updates with cnherd• !3 narrlil' a Rtidpa+erd SGherdi ile nhanees G. Men+hly Dreiecit Statuo o LJ�T hlr TDQC spreadsheet updates I Men+hly Dreier.+ Rink Register updates J. Plan SN:bmittsl gheGklists (Rae TAPk 10) K. MORthly invoioeo L. IVIGRthli MiVVQC Report Corm anrd Final ✓immar��Gymont Reper+ Cerm City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 5 of 27 Page 5 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The GORGOph.,&I D8SigR shall bo submitted to CITY and TxDQT per the approved Dreient SGheda;, rr. _ . �. _ �:r_�n:�rsr.*s�:r_��■r - .ns�errsn�n . - - A A- Tx-DOT'o approval of this oonoep+ IJ�rlll►Tly-�-�IIr' _ . �7R71:S T�Il:1�� �CITY ahsll selleot and prevido turning MOVeMon+ nog ants onrt any traffin y required for the proiert In addition to data obtained freFR the CITY, ENGINEER will rosoaroh and make eff�e-obtain p8r+inen+ inforrrma+ion +rJ Sid In GeordiFlatiOR of the pFepe imnro�ie meats with aRy planned femant-- the may infl,,enoe the proient CAI i'_I ICC� All oleo iden+ifv and cook to obtain data for evis+ipo ,I\EE.. EeFId+t+ona that may 'impaGt the nroiest inr.Iudino• utilities, aoenries (TxDQT and railreads)City Maser �Icno, and prepeFty ewrwrahiF as available fromtheTax Assessor's offino (G ,rrent and fi t uro) that havo an impaet or infli Jenne on the nroieot. sewer re_re Ming plcnc. 2.2. b`uhsurfaae Utility Gnoineerino Provide Ci bsi irfare Utility GnoiReerinry /S,!C\ perT per �Taassk 8. 2.3. Utility (Te ti WhereGonfliGtG With eXiGtiRg Litilities, and where known and possible GensideF potential Utility GORflints will begin & the-GeRGOptual Design phase O In the case of C public. Utility Genflin+ , the ENGINEER will design CITY fanilities to avoid or minimize GORf"GtS with existing utilities, and where known and possible r•onsider petenticl fv, urs Utilities in designs. In the case of a private Utility i`onflin+ , the ENGINEER \ado s MF aet$f plans with the Utility aonfliGts highlighted and a Utility GORflirts Table of these Genflints to he induded in s Jt4*C'IccrcncgLc+erccr fGF GGardination. The ENGI CCD a i need to Geerdina+ion directly with the private utility provider if that provider needs to undertake design to adjust their utility's Iona+inn City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 6 of 27 Page 6 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. The Cal (_IAI EER ohalJuploadd a PL\F file of the approved preliminary plan set fn the designated prefect folder in the City's rdeci invent mano(rement system /RIBA 360) for forwarding 0 all utility high hsve facilities within fho limb 9f the prefect Tho PDF file shniilyd he created rdirently frem the CAD files '� liesign DaGkage shall inG irde the fnllewing: Dr i ceder and �. optu`:. �.. c imin���� i nrdev of sheets innli irding prnient limits area location msp snd beginning anrd earl station limito. TxDQT Drnieot Sammsry-She cto that inol de-TxDC)T-zom nNmbers and JJEPlan ohpets sealed by a licensed prefessional engineer registered in the State of Texas 6iiisting typioal sections of the roadway to he constrl inter) along with proposed typinal sections which ei itline the prnpnserd imprevemonto. Ty�#+onL Lholl innlurde evicting and prepeserd ROW evicting and proposed lane widths and rdirectien arrews evicting and proposed ourbo, olydewalks aR d retaining walls. Gen vp�vvl 1An R+nrd profile sheets showing evicting and prepesed hnrizental reardwa y alignments, rd pexisting proposedROW,anpropnserd p sidewalks and driveways proposed lane rdimenciono and Isne r� arty "wv�-exis� drainage structures, s 't i owned avid franchise i itil't'evicting roadway y rn-an-ragc�cr ci cc'di�.s , sir rrrFrfo o, and vertical alignments (prnfiles) signal poles and moot ormo, grog inrd hover controller cabinet anrd electrical service meter. Eotimctec of prehahle nonotruotin 0 Three / 2\ sets of 9 9 "xi 7" civic p!&\qC ��I he delivered to � CITY fer "" �"� " ,-,�a�eKed�t#��rthe 3 - � tiP-r�T-T.E 70- T-T. A _ 2 I V-14,011 "11, ■_ Z. I I MWIM a 1 J\rill\IJd!:Ttt�1ll:►- J■ R�/a1:11-t1:'orm&,t and quantity DOT PFejeGt i City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 7 of 27 Page 7 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. Drelir�c�min plans, Spenifi and estimates (oo&E) paGkagv sh O.. ho submitted to CITY and TxDQT per the approved Droient Qnhed ilo ENG NEED Will develop the DCQC as fellows. 3.1. The PreliminaryDQ4.0 W.2ns s nll innlude the fnllewing as nenessary: • Title Sheet • index. of 2heQt3 S. Prniont Legend • Dreiert I ay3ut Q_ Eurvey Centre! Sheets • E)doting-Typiosl Raving c & • Proposed Typinnl Paving Cer.tl/lns • Draft General Notes (Final provided by T�EBBT) •--Prejeot ✓immary Sheets • Temporary Traffic Control and Qeg Renee of Constr, Otien Sheets • Traffic (`petrel details • Removal DlaRS -P-avirnrg Plcn and Ppefilo Cheefs • rlrniewa y Profile Sheets • Grading Dlnnc • DayiRg Retails •--Pavomont MarLiRg R_ SigRage Plans • &jmmar) • Pavement Marking and Sinn Details • T-R440nal/I ightiRg PaRG • 1=FGSO/ln Gentral Plans • Erllslon GORtrol Retails • Cr"o So^t ■- ,:1 - Pavement �n shall either mntnh existing or bo based on renommendatiorns provided by the CITY 3.3. GenstFlirtnhility Review Drier to the Rn nerrent review meeting with the C.ITY, the EN INEEP Shall snhedule and attend a preiest site visit with the CITY Droient Manager and +'on personnel to walk ent The EAIU ICED notruo.i���-r�=�rt#c-p�ej��—rTr��o,l��" . ohall oummariz>?-the City of Fort worth, Texas Page 8 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 8 of 27 CPN 104095 FORT WORTH GITV's ^^mmnnts frervm the field visit and oubmit thio inf^rma+inn +e the CITY in W i'tiRg. M. Fk�sbk MeetiRg After the nrnliminaplsno hs\,n been Feyinwed and appFeved by +ITY, th9 ENGINEER ohall n � �at he rnnirnd to prepare preieet exhibits er attend any p� �blie ��EE " meeti G W help explain the propesed p�r�ce+ to residentc�cr-ITY `Jhs.II ce�aa vuTt Ga+inn time and date, aa,rni"rd be reJPpnnc per all (,',-e^fc of fanili+a+inn the meeting. -� NCER will rde„elep the design of GITV faoilitioo to avei�or minimiza future Utilitieo in designs Where nenflinto et he a eided erdinatien of Utility onflioto Will be idep+ified at the Ge^noptual phaoq and begin ct the Dreliminani design phaos— In the ^ace of a public Utility eonfliot, tho ENGINEER w4l--�LITY fcGiliti�ec to avoid OF MiRiMiZ8 GE)Rfl!GtS with 8X!6tiRg utilities, and where kROWR and pessible nonsider ae+ential fvtwre Utilitiec in designs ate Utility GE)Rflln+ the ENGINEER will preyirde a RDF set of n tho ease-o a prig I���.. ��,,, plaRS with the utility GE)RAGts highlighted and a Utility GGRfliGtS Table ef these eonflints to he in^li &S! In a Utility Clearance Letter for eenrldinatien at each deGigR mT1�IeStOl'le he ENGI 1EER msy. need to eeerrdinatien direetl y With the pFiyate utility ��.`VFe The if that provider needs to i R der+ohe design to adjust their Utility's leea+ien The CAI (_IA`EER 9hs9-� s DDC file of the appreyed preliminapy plan set to the designated preies+ felder in the Gity's denurvwnt mcnr ^meet system /RIBA e all vtillti.yhinh have fanilities Within the limits of the prvjcot. Tho PDF file should he ^reateid ldire^thi from the G ID files a ebtain utility as_bi lilts and/er do field Visits toe is -1I��" EER . t onfirm raleeatinn� GOMplete ^aRT ths: the utility has been reloea+ed in asnnrdanne with thi plans, e ENGINEER to upload all utility as_builts in the Gity's deoumont managemeRt System (RIBA 360) e--T*4,�(3) Ito of 11 "xi 7" sire plan`.] will he delivered to the CITY fer the 600% All submitted dOGUmeRts and GheGklists will be uploaded to the desipated preient folder in the Gity's nt dnni imp istem /RIBA 2Ql1\ ..msnwgnmc\t n. ✓, - N INGEo Will provide Tx QT cwlemitta files/^npies in format and quaRtityF requested by TxDOT Droieet Manager. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 9 of 27 Page 9 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH MTV will provide pavement `4esigR(S) 4e be used for all proposed pavement arcm. Er4 In56R %,ill ne+ eenrdiint a geetenhninal in"es+igatien er pre"irde a proposed pavement ,-�ecigR TxrVIT spenifinatiens and Geperal Metes will he used and p1sno will be developed asserd'ng 4e Txrl dards Cal(`_ ICC� a mi4 c�a�l atanaa. � ��.. o a a� „ cpenifieatienc to TxDQT for approval if neede4 " t1) FUb1i^ "ti- " Rq i3 c:®vam---d-. %` ICC� C' design antiyities wither it writt •--€f��l���.. nha �ith . Insl � as spprava4 by the CITY of the Proliminary Design plsno. C. Eotimstes of preba 3notruoti9R GGSt r\ F1\ViG Meeting exhibits C. Ti<QQT-farmo snd ` GGYmentatien as re, City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 10 of 27 Page 10 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH TASK 4, CIAIAI DESIGN /AA PERCENT CITY! 95 PERCENT T-xD 1T\ AND CIAIAI /' Upon DOCUMENTS (100 PERCENT). • Upon spprn-•,al of+he orolimiRaFy plsno, ENGINEER Will pFeparo nnns+motion piano as fellews: • Final draft GGns+n,G+ion plans /°n°i 95 \ inGI ding GneGifiGations shall bo submitt s CITY and -Tx -DOT por the nnnre„ed Dreieet CGhedule • The EN Will nreyide a PDF= sot of piano With the Utility GenfliGts highlighted and n Utallty GGRfllots Table of these GGnfliG+s +G he inGl, ,ded in a Utility (;IeaFaRGe Letter fer • Cellewing resein+ Gf 900/ /950/ Gene++r,,Gtion plan rgyieW GGmmen+s frem the (CITY and T-xDQT the ENGINEER ohsll oNbmlt Final Plano /1001 ) to the -CITY snd TvnnT ner +he appFeved PFejeGt SGhedule ash plsn shaO ,Gild kS `ramped, dated end signed by +he I�CEa oh r8gisteFod in S�ata-of Tonao. •--Pr*ot ✓immary. Sheets will be edthe 60% 9004 /95 and 100% design paG The ENGINEE ahall oubmit an estimate of n ebable G ns+r,,G+ien Gest with the 601/ O 0 and ° design paGkagG. This e�.imstshall use standard T-xQQT bid ASSUMPTIONS „ „ xi to the CITY fGr the 1100/ /951 Design paGkage O 0 t m,+nRgGFRent system (BIM 360 nxl u size drawiRgs and twe (2) set of speGifiGatiGRG Will be delivered +e the MTV fer the1 DO-% nDee-sG:g paaGkaage. 0 Design will be r4e-ated- fre-M design CAD draWiRgs and will be ,,pleaded to the nrGieet folder in Gity's desumont msnsgement system /RIBA 360\ _El�GINEER will! nreyide TxD T oubmittal fllevs/Genies in format and quaRtity requested by Tv1l(1T Droieet Manager fer eaoh submittal. DELIVERABLES A.° ° on plans cn . Q. Utility . ° on plans snd . D. De � s-tima 3Nmmaries of hid items end qua Rti+ies ,,sing Tvfl(1T'o otond Grd hid i+ems gnd form, cc cppli able E—9risiinccl 11 "M 7„ eF`-e-sAver mylar fE)F sign,"v rec of a- itherized CITY offiGialo C. T>tC'9T-forms snd dose 1mentation as required by TxDOT PFOje Gt Manager City of Fort Worth, Texas Page 11 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 11 of 27 CPN 104095 FORT WORTH TASK 5. BID PHASE SERVICES. TxDOT will be letting this project. ENGINEER will RGt provide si ippert ser„ices related to the IettiRg support the letting process on an as -needed basis as follows. 5.1. Letting Process Support The ENGINEER EER Will pot proVirde letting prenv+G �NIpport for the proieet i R der this seope of weFk • Assist TxDOT with answering contractor questions during the bid period. If an addendum is necessary, the ENGINEER will assist TxDOT with preparation of necessary drawings or documents. ASSUMPTIONS • The project will be bid only once and awarded to one contractor. • The ENGINEER will not attend a pre -bid meeting. The GITV MX 11 c3Ist T)tnnT with aRSWeriRg eontraeter of iestions rdi lFino the hied pe imee. If & i dU�' b 11.'"Gess aFy e will the GITV ill r, a the ReGessaFy rdrawiRgS or rdooU rnents Sheyi d the CITY peed from the CNICQ11NICCC? fer anY bird phase se Wieesamendmenta eoptraet amendment will he req Direr•! DELIVERABLES A. None City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 12 of 27 Page 12 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH TASK 6. CONSTRUCTION PHASE SERVICES. ENG NEER Will net provide GeR6# 1nfion ph&\9oo�s or thio ^ pr, ENGINEER will support the construction phase of the project as follows. 6.1. Construction Phase Support The ENGINEER will net provide GGRMIFUGtion phmo oupport F this scope of Work. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals. • As requested by TxDOT, the ENGINEER shall provide necessary interpretations and clarifications of project plans and specifications and respond to Request for Information (RFI) from the contractor. • The ENGINEER will meet with TxDOT, the Project Delivery Team and Contractor on -site to review any field changes. • The ENGINEER shall attend the "Final' project walk through and assist with preparation of final punch list. TxDOT or CITY will prepare the final punch list. 6.2 Record Drawings • The ENGINEER shall prepare record drawings from information provided by the CITY and/or TxDOT depicting any changes made to the Final Drawings during construction. Information provided by the CITY and/or TxDOT may include, but is not limited to the following: o As -Built Survey o Red -Line Markups from the Contractor o Red -Line Markups from City/TxDOT Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: City of Fort Worth, Texas Page 13 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 13 of 27 CPN 104095 FORT WORTH These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. • The ENGINEER shall submit a set of sealed Final Drawings, modified and stamped as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or higher) and on DWF format The ENGINEER may keep copies of the information provided by the CITY and/or TxDOT for their files, but all original red - lined drawings shall be returned to the CITY with the digital files. • There shall be one (1) PDF file and eRe (1 ` DVVF= file for the TPW plan set and a separate PDF and DWF file for the Water plan set, if required. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF F files shall conform to naming conventions as follows: TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320 org5.pdf II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_orgl8.pdf Both PDF and files shall be uploaded to the project's Record Drawing folder in the City's document management system (BIM 360). For information on the proper manner to submit files and to obtain a file number for the project, the ENGINEER should coordinate with the City project manager. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The ENGINEER will not attend the pre -construction conference. • The ENGINEER will not attend project construction meetings. • The CITY will handle any public involvement or public meetings during the construction phase of this project including any exhibits. The ENGINEER will not provide assistance with a public meeting during the construction phase. • Two (2) site visits are assumed. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 14 of 27 Page 14 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH • Four (4) submittal reviews are assumed. • Two (4) RFI's are assumed. • Two (2) Change Orders are assumed. The CITY will handle any reviews of shen dfawiRSz, ou1°np and anether �� sub ittalo oNbmitt9d by the non+renter for general oonformenoe With the desigI oonoents end general ^omplianse with the requirements of the eontreet fer eenG+rl 1et!en • As requested by TxDQT the CITY will nreyi/de ReGesssaryiTrce�etC�tie nrr�i-sand elerifinetionc of nr^ieat plsno sn`'I speeifioetiono enrd respeR d to Request for Inferme+inn (RFI) fr o m to �T eentreoter Th�GINEER Will net et+enld +ho "Final" preie^t walk through and assist with nreneretien of final punoh liot. T)(DOT er GITy will a epare +"^ final punah lost. Cher ld the CITY neocl &,3 .ok.a se frem the ENGINEER fer any �+oniitruotiq} phase servioec a oentreot amendment will he required. DELIVERABLES A. Anne Response to Contractor's Request for Information B. Review of Change Orders C. Review of shop drawings D. Final Punch List items E. Record Drawings in digital format City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 15 of 27 Page 15 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. The EN II`ICCR ohall determine rights _of_way, easements needs for eonstri Gtinn eef the nreieGt. Required temporary and pormanont easements will be irden+ifierd based en available infermatien and reeeMmenrdatiens will he trade for oppr9va4 by the CITY The CAI r`It`I CCR shall prepare ldeG iments to he used to obtain right _ef_way and permanent and/or temporary easements required tG Gen6trIJGt the improvements. ■ The rdee men+a+ion oholl bg provided ' nfermanee with the eheoldicfs and templates available on the Git y's rdeGUmont management system (BIM 360 reset frees folyder. 7.Z. Temnerary Right of Cn+r.y Dreparatien and ✓.abmittal Prior to construction, the CAIGGI ICCR ohoi slid eooridinate with the Git y proiee+ manager to identify all needed Temporary Right of Entries frem landeOro. It io assurned that letters will 0RIy be required for land OWFIers adjaceRt tO ternporar eenstrl Jetien easements er whe are rdireetl y affeeteld by the preieet avid Re easement is required to enter their preperty. The r•deGI imentatinn shall he provided in eenfornmanee with the ehed lists and templates available on the Gity's yderi rnent management system (BIM 360 7P.7:S✓1.5�1��6'it'17.�9.1T.1:171:T.lIR:'T.l7�ltJf.Rt!{S'T.}1:RS1�)I'�/:1:5✓l.ELr17'�T. .1T.1�".*T.t•7.OR al DictriGt (TAD) available at parent tradl. resooroh, additional■ reGords, Fight of way takiRgS, easement vaGat'OFIs and abandonments, right of DELIVERABLES A. Up to Get it /A\ Right _of_Way vxhll-\`t L\n d meets and hey 1nrds nreVirderd on CITY forms. B. Up to Four (4) Temporary Right of Entry ooyer letters .0 Up to Four (4) Temporary Right of Entry rdoei iments City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 16 of 27 Page 16 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH 2.1. Design Survey anATIRMMevatiens ■. thpinepesed ute The s miov will onn3mpa90 the entire axis+iRg Q(1\A/ and a manimum of 20 feet eutside of the exioting ROW. Tepegrap4ic- survey will he nnmpleted and a digital Lorrain model prepared for use in Fight _ef_way and/er ease mlv Ito. Dre\Iide heri-antal and Vertical eentrel menum3nt3 a} approximately 500- font intervals along the preieet rni ite 2.2. Tomperapi Right of ERtFy orc�p-cyckiaa-and Submittal Drier to entering nrenerfis tho EN-GINEER ahall Gnerdinate with the Gity's preieet manager to irdentif y e mail and obtain Tamnerwy Right of Entry from landownerC The deeYmenta+inn shall he provided in eenfermaneey0ith the ehedklists and templates available en the Gity's dneUm + gement system resni ernes felderm 2.2. Cubourfane Utility Engineering • GRGI int apprepriate (e.g., GWReF Fe GGFddj, G9I IRtY/(`ITV reGo)rdds, personal interviews,yicuiN Incpeetiens, etc.), to help identify utility owners that magi have fonilities within the preie3t limito or thst may he affected by the preient. GGrieGtable-eGGFdS(e.g., Utility E) ReF base -rho, "m built" or record drawings permit reeerds field notes geegraphle infnrmatien sy6tem data oral e e e e utilities. hiis't+e; ^ries eta.) OR the existepne and approximate legating of evicting in�inl�ied =Develop SUE plsn ohaets-and tranofor in€ermatien-on all invel„ed „+ili+ie� +e appropriate des -n plsn oheetc0 , i i eleetrnpin filesapd/or ether dnnnvents as :1 required. ExerGisgprofessiopa ggmeRt to resnhie nnnflint�g�infermatinn. FC^ E) City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 17 of 27 Page 17 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH 0 nfeerr at�en depi Gted,ndi Gate. utility type and ewneFship; date of depin#inn' quality levels);; eRd nnintc of nnY Utility data, Ilnv 1iclvc (e.g., activn, ` bandE)Red ewut of seMGe); lino size and renon•e nNmbeF of jointly buried Gables; and ennasement Qu ality Level G (OnGYudca t dic Lx: desnrihed for Quality I ey lid • Identify surfane features, from preinnt tenegraphin dctc and em field y observat4ano, that sYre suFfaGO appsrte�Qf oaboarfane utilities. Quality Level C tCDb. • Survey si Ffane feed Tres of 9Nb3Nrfaoe utility fanilities er sys+omo, if O inah fe atures have not already been sy weyed by a prefessionsl oNrv-e yGp If preyiei isle � � srye yed � � nhenk sniey data fer annL JraG y and smmplete''n)) `ess • The swvey ce Ol .,(-n addition to oubourfase utility feat gyresvisible at the grey and surfane)• mats `rminc�i9n of irnie rt elevations of onY monheles and vriw ; `fit tchvs showing in+erier dimensions and line nennentions of sunh manhele nd auM; any surfane markings denoting su bsyrfa% utilities • Exereise prefessienal judgment to relate .data frem .different s rn00, Cnd t3 ref•nl/e GORfkting infermatinn • Update (or ppeparo) plcn oheetse elentronin files, and/or other dens iments to ref'eEt theiRtegrat+en ef„-a:;ty Level D and Quality Level G infvr`r' ati • ReGemmend follow _i in in�ie (e.g., a 3nsl ourveyS popsy iltation With Utility E)WRers oto.) w msy he needed to f irther reselve disnrepannies. • evide Quality G to identify overhead 1tilitieS on , the project and provide the overhead Utility infermatien eho C`LC ploin ohgetg Level R (innL ird33 tally- as desnribed fer Quality Level G) de'eEtand apply appropriate surfaGe g nhyss•'r0"'-cl mrTe-t4/i'rred(s) to seaFGh ffo d i detest sibs� irfane utilities ��iithin the nreioot limito, sndFsr-te�fa - iR pwtl,anr Utility line OF s\/stem Rood -on an interpretation of SIata, mark the indina+ions of utilities on the grey Rd si I:fane for si bseq i t s� �nie��ilize point or etheF ed annepta�,h�e ace-rcrvc-rvr—.raves" `-lueirva Utilize marking of lines IUnloos etheFw nse rdirented, ma* nentedine of single_ GGIRdNit lin•33, snd eutslde multi of mlti nonLkAit 3Y-Et City of Fort Worth, Texas Page 18 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 18 of 27 CPN 104095 FORT WORTH Denemmenrl additional measures to reselye rdi#erennes if they still evict. Renemmenrdationo may innl,,rde ardrli+ional or different s,,rfane geenhysinal methods, explerater, , or upgrade te Quality Level A data. i i i i As an altematve to the nhysnal markng of lnes the EN - -I��" IEER , may, CITY'o appra aI�mze-ethmeans ef data eerieEt'eR, sferage retrieval an,d reon, thst enables the norrelatien of s,,rfane geenhysinal data to the nroient°s Level pt • Expese anrd Innate ,,tiliti Q3 Ot M,enifin Innatiens. • T'e herzontal cnd- vertinal Innat'GR of , itility to s, iFyey nn• ntrnl Dreyi.de utility s ze R d nenfig,,ration •RFeviQe-paving thiGkReSs and type, where a nlinable • Drn.iirde general snit ty-PV Vrl� vltV GGR ditiens and s,,nh ether Pertinent infermatien as is ��reea/s�n�n�ohhi asnertainable from eanh test hole site c • SUFyea and I e„ol Q JJE limits a . within then ent intersentien an,d 200 feet eanh direntinn alnnn 93uth Drive ' eaGh direotion aleng S3uth Haley vtrccr • Up to fide (5) Level A test heles are innl, ,id eld • Up to one (1 ) clays of traffin nentrol for Level iel A test heles A. DraWin Of the Fdi G+t layout with ReRSiens anrd neerrlinate list. ^{ liSUE CC plan ldrawffiRgs sealed by a nrefessienal enigigiii— ld neer regiegicterein thv CtctC 3t Texas. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 19 of 27 Page 19 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. ENGINEER will nreyide nnrmi##inn s inner# for the ( ITV #n obtain any ` Rd 'III nnreemnn#c andtI�p`Jrmito normally required for o preiee+ of this size onrt tine as follows Identify onrl analyze therequirements of the Texas Arehlte Chaapter�8rexns Ardministrn+iye`�eand pecorne fnmiliar with geveramont^l authorities haVinn i, irisdi^+ien +e appFa ie the design of the Drniee+. •N :'EER io respeRSih'e f^r nr^„idinS plans that are iR GOmp;iano�-.aith Tn! R rent lire ients. ✓ab, , �+r, ,^fle�montc to the TDLR Cornple g all TAR f^rrns/appliGmiens neeessar„ 0 Obtain the ^'ref ✓jbstantial Sompliana^ frZ-rr^vrmrrtho Tni o •--RequcQt &n inap9Gtien from TSLP, or a TSLR Inn^lly appre„ed Qenis+ere Arressihility Qne ii;�Oi3t na-lator than 40 eolenrtor days offer eenstn,ntien £doh �l`ltl�I Vemnletion Advise the CITY in Writing of the results of tho insp8G ien. t �� All ens#s ossnniotert yen rlI R pan er.,e,n yii onr+ insnee#inns are to he paid by the - ENGINEER during the ee, arse of the nreieet 0.2 Cnvirnnmentol Ceniiees ItP.►_T�7.— ----- \wlrS�■L'S�T.r17rS1 _r a 1 _. R . I . . gill 1111 ProjeGt bq provided W t:��+I■Titita3T:INn. 1 ■ for the prpjcc�. !-J,,a!# will obtaiR digital envirenmeRtal inforrnatieR available from apprepFiate -[Goal, r r - and federal- er Data GelleGtedbe stered OR GeegraphiG Information System (Gig) �krrnc�. kciff shall GOMplete the W Plan Davelopment P■ tG-T*D()T. The following ill be Q �.' L City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 20 of 27 Page 20 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH e Water Resources f. P-s-srdeus nn a. Traffic Noise h. Ceetlen n/f\ R. Ceetlen 6(f) i. IZerko cnd Wild" j. \NCode, Chapter 26 Natural ,., I atural R869 gaps+ Cede Chapter 'I S2 `2 '-,ter ;a;reetcc'�cts I. GuRquiativeImpaGts m Dr rblis Involvement III. shall he prepared for resowFG-Oo that rent sire assesassessment as defined in the \n/DD EGOS sGreom. The—teEhmeal repeFts are used by TxDQT to snit;gate reso- irne/reg Iateni arroneY oeorrdinatien and to obtain feed ba Gk/appreval from agenniOM ac Cppli This pre}eot to cntiampa+end to require the follOWORe +eehnieal r ens f rr+her rdesoriberd in Taoko s thr . a. Species Analysis Form, ✓pe ' Y6,e-Spreadsheet, any Tiar I ✓ts Asse rRt h. Cr rrfaoe \AFater Analysis Cerm G. Dreior.t Georrdina+ien Request (PGR) for Historical St, adios o. Hraaa o Initial ✓te Assessment (ICA) The tenhnieal reports w 11 bo oub„ fitted to the TxDQT- For Worth R�otftt and revisor-! in ascendance with oomments reseiyerd during up to two (2) rounds of Feyie�.y a Cpeeies Analysis Form, SP86es ARalysis Spreadsheer-and Tier 'e i-'AMMM9Rt An assessment will he conrdi lcterd for Vegetation anrd nreteeterd habitat impaotc in assorrdanse with the MO I between TxDQT anrd Texas -Prrl(C cnd Wildlife Department (T-RAID). Tho analysis shall consirder Ceelervieal Mapping Systems of Texas /CIVACTI If1:TlRr: MMMWITI1/■Z7:CS7. 10 OftI■ 11 RUM _ _ _ potaotisl affeetor impca Thio took includes the following rdeliyerahles. • Species Analysis Corm • Species Analysis Spreadsheet arm Ks City of Fort Worth, Texas Page 21 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 21 of 27 CPN 104095 FORT WORTH. ... - MI.i fia Area ef Petontial EffeGtS (APE). HmsteriG Sites Atlas to identify previously reGorded historiG Sit The PGR ferm will inoli irde attachments ith mspo of the preneserd Arnh leel I Backnreunrd Study An Arnh Toni I Backer Study d��ee,� rEa ee,� rc-a��a u n d be n�aG d by a professio�arGheeIegist. The ArGheeleg'Gai—RvaaGkgrc�-eurld Study will innli irde the feIIG yinn• • Definitien of the ADC which innli ir•IoL misting new ROW easements (temperary and nermanont), and an ethe nl'elet-specific lecatien designated by tho Stoto os y"'el�l aoJ cnnsirderot ion of the likely depth of impacts rest iltiRg freFA the data,prepesed project. • Review of exiStiRg 'RdudiRg but FIE)t limited to the Texas Arnheeleginal Cites Atlas geelegio mapo, ooil mans aerial p4etsgrspha, and-h+ster+a msps. �ss�s MINOR - field investigotivrio ve recemmenderd E PJa--,&rrdei is Material Initicl aiteAssessrmeRt ualff Will nemnlete ❑ H/--zur s ,Materials ICA for not tiol hazpardvvo m&�eris!a impsota. Tha shall determine the Wential for enrei entering hazarrdoi 1s matericla in the study area incring possible eRVirenmO.1tc1 Iich.i,lity, iRGreased handling �r eq�i iir er�en�is � w. (e.g., eesemi er re nd �yater\e andpetential censtn Unties ��yerker health Lind safety afecy issues. --Detu minoti City of Fort worth, Texas Page 22 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 22 of 27 CPN 104095 FORT WORTH monies of list seareh renarto maprJ ,denie+inn leeations ph"rapho, re^nmmen,da+inns and any ether s,,vvor+ing i nferrvatien gathered to ^emnlete the ICA Should the finrdings of the ICA eonel, „de that and I rd' investigation, tionsl im-�st+gation' SpeGial eensi,-deratiens, er ether eeningitments from T1(POT er the Present snenser are required d,,ring nreieet ,de"elepmont, Pxalff shall review these findings w0th the Glien+ anrd Tv1)(1T ASSUMPTIONS t I p ormit pr9paratien will begin aftapprevalE)fthe9O 9519; Des!gn ENGINEER will pa „ T"'-R prgjeGt registr on, plan revie , Vinal inopa eeetS. Permits a net inelu ded in thio osepe of ,,,,eFk Teehnieal reverts er anvlieable rdee, imentatien far the fOIIG ,ing items are eXGkAdeTr.7m thio .Jenne of 68FViees. air quality, G—ommunity ewe Ian,d ,deelineatieR FePeFt, Sec impaGtS tuble, iRdiFec and , oamalstivwe eoto. This oGE)pe of wepk else eve' U,des an" eeer,dinatien er rdee,,meRta+ier, a a+e,d with +he n:rka and Wildlife Ge.de Ghapter 76 aR d Natural P8SeUFEe��GhapteF 183. t This 3Geve of werk rdees net seal, ir'do pro NcretcieR e a resear^h desig ; SGepepe e Wei * Pe Ff9rmi w�te�'_;iY8 661r. ,y(ire., eR the ereI'Ad er ar6huyal eea eh�T for histeFoe c.+ &�div\riat snd areheelegiGal MSG UF% e"al, cation of Alatienal Register of Historic Planes \NRHP) eligibility far non_ WGheel4oal histori , NRHP_eligible or -listed sites rde"elonmen+ of mitigation Inns rT �-rcngr�c-vr—n�c��rr��,�cv cr�pr,Tcr,r-vrrrm,�rr p , eyali ,ations s snt, pNbre Fnee+ing andiGF public hearing are des in thio o-.epe ef welrk. Effort to obtain right _Of_entr" from p.ablie or private IanrdOWRers to allow for the eemvletlen of en"ironmental sev,iees is not inel, irderd in this scene of wort The o mdt"i9R With the USFVVS URdor tho Endangered Cneeies Ae+ Prenaratlen of a Preeenstr,,etien Netifieatien /P!�` I I C .. , miti�a�+on p sn, or ..... Arm" Corps of Engineers (USAGE) Ceetlon 404 lR di"id, cal Permit Anvliration is aetiRGl1 s in thio ssspe-e#werl-. IfT),C'nT er a reg, slater" agene" requires ardrditienal infermatien ether than thst required. m,k ied in thin osepe-ef ark, thon c 3upplemental sen,ieec+ agreeen+ill be p 'equ' "ed. City of Fort Worth, Texas Page 23 of 27 Attachment A PMO Release Date: 02.06.2015 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) Page 23 of 27 CPN 104095 FORT WORTH A—Sep+oo of TRL- permit AppliGatiens City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 24 of 27 Page 24 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. IEER responsible far and shall neerdinate all s� �l sti"ity to innL ide -In�" , io r„ ,a.�ltant a., quality and oensisteno" of plans if, at antime, during i i dring the ooron of reviewing a oNbmittal of any item it hegerns Opt -.went to the -CITY that the submittal-zontaina arrnrc —miss ens, all innnncictendec, the CITY msy Gease its review and roturn the si brnittal to the CAICIIn EER Immediately for appropriate astien A submittal returned to the ENGINEER for this reason may he reieoted by the CITY Drejes+ Manager. Us � The CAI('_IAICCR'o ✓irveyor ohsll porf cNIrvns-e+} all preoedures field surveys, dutc and pFedUoto prier to delivery to the CITY. Ths / also regUmFe the CAI( KCB's CITY may II���.. Q ..ur\ ASsurraa rFlGe review of the survey nor oubourfa,.n Utility a eerinn (SUE) werl� perfermed by ether su ryeyers and JJC providers. *�- ICCR'o ✓urveyerrshall GeFl;R WlTtif�g=via-aa letterthat the survey od hao undergone a Quality ran+Col/ Quality Asswranse pFeGess. _&�ICCC'o &uhsull Utility y Gnnineerinn nrrnyidi` 3hdI certify in WFmting via a letter tl tho JJE infermatien pre"idessl hsJ` un � N INEER is to aGknowledge that each item en the Retailed CheoLliat has beer+ iRGludded by heGking "done" on the Ghenhliot. If a partioular ohanLlis+ item is no+ al , thic cl be.-iFIGIOcatCd by Ghenl "AI/A". If aR eRtiFe GheG ist� Rot l this ol he indicated by gheGl ever" item OR the list as "AIl all of?II included wmth tho oubmittd. The €N INEC0 .glop use the Detailed O A Comment Resolution al Leg muot be used +e decl Fnent nnnflintinn nnmme nts between reviewers anto highlightby nnmments made htITY thst+��e €N&f���.. ICC� io n i aof incnrnnrating into the design dnomen+s along with the aGGGGiated i1(r!ln3ti9n The CAIC_INCCR al use the Comment Reselllfien Leg previded by CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 25 of 27 :t�Jrei�1r_Me.l all M-i Page 25 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH persennnl inyel e d in the nheGkiRg nreenss Irk wpa may also be !feeUmente d i Isino the ('`nmm t D e6 1tinn I en t�"1.. ,C3a.�,m,-�� 0 F=y0depee of the QGiQ4 r� i eview will be rnniFed to nnnmmPnnA cubmitta� lieeiimentation ohall info, but is net Il miterd to the fnlln,^,iRg items. PDF= of the QGQA ehook print of the GaIGUI"t'ono, plano, op9dfiGat ens, estimates de monotrating that o review has been underta Len• e PDF of Previews riepts (W any) and the CAIf_InCCR'o r8 S m to these nnmonto in thg Gemment Deseli itien Log, "N"� �"" If aR y of the above infermatian io miooinne y is incomplete or if aR eommepts are Rot adequately addressed; the CITY may eentaet the ENGINEER and re ques thenfnrmatinn if the NCCR does not resnenrd to the ren�pest i,-rEmissing F�rnvm�ucrvrr— ^ Oth owrs) the -CITY shg. re;�ent t#o oubmittal. Na additional time granted for S roturner•d submittal, If the CAI(_INCCC h&,c net adequately addressed the eemments th.J aubmittul shall he reieeterd anrd returned to the ENGINEER immediately to address the ASSUMPTIONS All submittals to the City will he Quality eheGked prier to aubmiSsieR. A DrIC of the QGQ4 ep will he u pleaded to the prnieet felyder in DELIVERABLES A. QGQA GIGG Fnentatien City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 26 of 27 Page 26 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 FORT WORTH. Aadiffional ercrvmGes not y� nl��rlo� in the exmstinq S'nen �mn� CITY and �iJ notthe`fCfClri 1Tr—GTf��i /C .�iZTTTG'� �i A�e r.ITf�i v ENG IEER the fellewing serVioes are heyend the Qnone of Cervices rdeonriherd in th tli;�3ka aI q n Heweyere ��lCi`_INCCQ 'u,n previde these CeeFV'Ges, if needed, Upen be sure to traGk Ghanges. the CITY's written request. Any additiOFIal amounts paid to the ENGINEER as a result of any material change to the Scope of the ProjeGt shall be agreed upon -h e s' u ee tetrackchRes. ifs WFIt+Rg by —both parties � f�,e serV+eesreper#ormed. These a drlitieRal serViGes innli irde the fellewing: nleoetiatien of easemento er nrenerty anquioit;ian. Cery'Ges related to rdeyelenment of the CITY'o proient finnnning enrl/er budget. SerVieeS related t9 Meeting ony TvDQT DQ I IQ neolur.S a'aT8 RE)ciTrduded. This Genfrent ncci MCNO that the CnG4NICCQ is moefing the Cite of Cert Werth M\/t/QC bidding of the nontront for nnnstri Antien • G ORStrUGtion rnaRagemont anrd iRSpentiGR oeniinec • Derfermonre of materials tectino or speriolty toctinn seryinec • CeNires neressary due to the default of the Centrader. • Serv'Ges related to darnageS Gaused by fire, flood, earthquake or other aGtS of Godm • SeNieelte suppert, prepare, ldeni invent hrino defendor ccsisst in Iiti n U mldertaken or defended by the CITY City of Fort Worth, Texas Attachment A PMO Release Date: 02.06.2015 Page 27 of 27 Page 27 of 27 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) CPN 104095 ATTACHMENT B COMPENSATION Design Services for S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) City Project No. 104095 Time and Materials with Rate Schedule Project Compensation A. The ENGINEER shall be compensated for personnel time, non -labor expenses, and subcontract expenses in performing services enumerated in Attachment A as follows: i. Personnel Time. Personnel time shall be compensated based upon hours worked directly in performing the PROJECT multiplied by the appropriate Labor Cateqory Rate for the ENGINEER's team member performing the work. Labor Cateaory Rate as presented in the rate schedule table below is the rate for each labor category performing the work and includes all direct salaries, overhead, and profit. Labor Category 2023 Rate 2024 Rate ($/hour) ($/hour) QA Manager 265.00 278.25 Project Manager 250.00 262.50 Project Engineer 205.00 215.25 EIT 130.00 136.50 CADD 143.00 150.15 Environmental Project/QC Manager 200.00 210.00 Senior Environmental Scientist 141.00 148.05 Mid -Level Environmental Scientist 123.00 129.15 Junior Environmental Scientist 95.00 99.75 RPLS 165.00 173.25 Survey Tech 125.00 131.25 Survey Crew 2-Person 175.00 183.75 Administrative 105.00 110.25 ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct Expenses at invoice or internal office cost. Direct Expenses (non -labor) include, but are not limited to, mileage, travel and lodging expenses, mail, supplies, printing and reproduction services, other direct expenses associated with delivery of the work; plus applicable sales, use, value added, business transfer, gross receipts, or other similar taxes. iii. Subcontract Expenses. Subcontract expenses and outside services shall be reimbursed at cost to ENGINEER plus a markup of ten percent (10%). City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 1 of 4 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) LM ATTACHMENT B COMPENSATION iv. Budgets. ENGINEER will make reasonable efforts to complete the work within the budget and will keep the City informed of progress toward that end so that the budget or work effort can be adjusted if found necessary. ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be adjusted, nor is the City obligated to pay ENGINEER beyond these limits. If ENGINEER projects, in the course of providing the necessary services, that the PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether by change in scope of the project, increased costs or other conditions, the ENGINEER shall immediately report such fact to the City and, if so instructed by the City, shall suspend all work hereunder. When any budget has been increased, ENGINEER's excess costs expended prior to such increase will be allowable to the same extent as if such costs had been incurred after the approved increase. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. The ENGINEER shall be paid by the City based upon an invoice created on the basis of statements prepared from the books and records of account of the ENGINEER, based on the actual hours and costs expended by the ENGINEER in performing the work. B. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. C. ENGINEER shall prepare and submit invoices in the format and including content as presented in Exhibit B-1. D. Payment of invoices will be subject to certification by the City that such work has been performed. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 2 of 4 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) LM ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Prime Consultant Halff Project Associates, Management Inc. and Design Original Agreement Addendum No. 1 Addendum No. 2 Total (Original Agreement + Addenda Nos. 1 & 2) Proposed MBE/SBE Sub -Consultants ARS SUE, ROW/ Original Agreement Engineering, Easement Addendum No. 1 Inc. Services Addendum No. 2 Total (Original Agreement + Addenda Nos. 1 & 2) Non-MBE/SBE Consultants ARS SUE, ROW/ Engineering, Easement Inc. Services TOTAL Project Number & Name CPN104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) City MWBE Goal = 13% City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 3 of 4 Original Agreement Addendum No. 1 Addendum No. 2 Total (Original Agreement + Addenda Nos. 1 & 2) Original Agreement Addendum No. 1 Addendum No. 2 Total (Original Agreement + Addenda Nos. 1 & 2) Original Agreement Addendum No. 1 Addendum No. 2 Total (Original Agreement + Addenda Nos. 1 & 2) Fee Amount % $145,201.00 85.2% $880.00 9.1 % $56,295.00 100% $202,376.00 85.6% $23,479.00 $8,800.00 $0.00 $32,279.00 $1,700.00 $0.00 $0.00 $1,700.00 $170,380.00 $9,680.00 $56,295.00 $236,355.00 13.8% 90.9% 0% 13.7% 1.0% 0% 0% 0.7% 100% 100% 100% 100% Total Fee M/WBE Fee MWWBE $170,380.00 $23,479.00 13.8% $9,680.00 $8,800.00 90.9% $56,295.00 $0.00 0% $236,355.00 $32,279.00 13.7% Consultant Committed Goal = 13.7% CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) LM EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Insert required invoice format following this page, including negotiated total budget and allocations of budgets across desired work types and work phases. City of Fort Worth, Texas Attachment B Revised Date: 12/9/2022 Page 4 of 4 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) A Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) City Project No. 104095 Labor thours I Env. Survey Task Description CIA Project Projeet Project/ Sr Env. Mid Env. Jr. Env Survey �AdminlstralTotal Labor Subconsultant Task No. Manager Manager Engineer EIT CADID QC Scientist Scientist Scientist RPLS Tech CM n2 live Cost Manager Rate $265 5250 5205 5130 f143 $200 $141 8123 $95 $165 5125 8175 $105 I MWBE I Non-MWBE 1.0 Protect Management -Additional Protect 01 401 821 381 80 1.1 Coordination with ADDITIONAL PROJECT 1. ro Meejings 8 12 ina ion na� on on standards, bid items, 1. , schetlule 1.� Review submittals for corr��nnleteness 16 2 24 B 12 6 1.2 Prepparation of SubmiHal P" 'Is 1.. Incomoate ADDTL PROJEI,T sheets 4 8 48 Prepare TxDOT Summary Sheets split by 1 i CSJ and combined 4 8 8 24 Prepare and maintain sheet mdex to include 1., ADDTL PROJECT 4 8 Incorporate ADDTL PROJECT Info Into 1i TxDOT forms 8 16 4 Incorporate ADDTL PROJECT into TxDOT 2.1 Data Collection 2.2 Subsurface Utility Enoineenna 2. QL-D, C, B Desianatinq 2 QL-A Vacuum Excavations((5((((� .700) $j.560 ea) Traffic Contr% daj'. Clow) 2.3 Utility Clearance ISea S 5 below) 2.4 Design Drawings 2.5 Project Decision Lon 3.1 Prahmmary Design Drawin((�j 3.2 Gcotochnical Investioation%vement Desiqn 3.3 Constructabadv Review 3.4 Public Meeting 3.5 Utilit�yy Clearance 3.6 Traffic Control Plan 3.7 TxDOT Forms Preparation 3.8 Protect Decision Loq Final Draft (90%/95%) Construction Plans and 4.1e 'fications 4.2 na1jj100%) Plans and SpecBications 4.3 TxDUT Forms Preparation 4.4 Protect Decision Logs (90 % and 100%) 4.5 Conslmcton Estimates f90% and 100%1 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09 2012 Expense Data Reproduction/ Total Expense Task Sub Total Travel Collection Postage Cost CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) 1 of2 Level of Effort Spreadsheet TASKMOUR BREAKDOWN Design Services for S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) City Project No. 104095 Joel I Total Lab-1 Cost I Sub Expense Travel Date � ,iictlon Co `h' Postage R.pr.d. rul�MM 6.1 Construction Support ,.11 Final Valk) Thmuqh and Punch List 2 4 R quest for InformationlChange Order 0tm 1 �- �� ttttttttttttttttttttt� Temporary Right of Entry . _ ' SubmittalSubmittal MENEM mommommmmmm�� liEnvinonmental Services Son City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09 2012 Proleel Summary Total Hours 310 Total Labor $56 220 Total Es'q@ se 1�75 MBFISBE Subconsulianf SO Non4vffiE/SBE Subconsultant 50 10%Sub Markup so MBE/SBE Panic$��tion 0 0 Total Prolee'l '041 $56,295 CPN 104095 S. Hulen St. and South Dr. Highway Safety Improvement Project (HSIP) 2of2 CFW - Integrated Program Management � NmName 1 " I— I nr I ,rem Complete Kaba, Fanta 1251 1042 034br-72A I rin- 11 Jn27 I wanano, Preh 0 Project Development 1 03Mar-22A 1000 Project Initiation 0 0 100% 03Mar-22A 1010 Prt>ject Planing 20 0 10D% 03Mer-23A Project Funding (AFA Process) 129 129 iBJUL23 0 85 03-W-23A 448 0 1050 Begin AFA Draft 28 28 0% 18JUM 2-Arg23 0 1060 CFWAFADraftAappreval 20 20 0% 25Aug-23 22Sep23 0 1065 AFA M&Cappovdl 40 40 0% 25Sep23 174,bv-23 0 1070 T)DOTAFAappnrval 10 10 0% 20Nov-23 050eo23 0 1080 AFA Executed 21 21 0°16 06-D-23 05Jarv24 0 110D Issue TM]OT Payment 10 10 0°A 08-J -24 22J-24 0 Project Charter 112 0 01Jul-MA 2DOd-MA 124 1120 Salad Prged Manager 10 0 100°A 01Ju1-22A 15..Irp22A 90 1130 Develop Prefect Charter 10 0 100% 11-0d-22A 14Oct-22A 118 1140 Appova Protect Charter 10 0 10D% 17-0d-22A 2DOd-Oct 124 397 226 2MI-MA 3005 Seled the Demon Engneer 171 10 0 0 100% 29Jul-MA 19-AW-MA 13 3015 Perform MBC Process -Design Z. 25 0 100% 09-0d-22A 11AW-23A 405 3010 E mAe Deign 10 0 100% 11,W-23 A 28-Ap-23A .95 3020 Award DesgnAgreameNs 0 0 100% 11-Apr-23A 82 3040 Isere Nolice To Proceed- Ergeer 0 0 0°A 01-v1ay-23 0 Conceptual Design(30%) 69 69 014VW23 0 3100 Design Kid(off Meeting 1 1 0% 01-KW23 01-.1ay23 0 3110 Prepare Canseplual Design Drawings & Documents 43 43 0% 027vW23 36Jun-23 0 312D Submit Cmoeptual Plans to ROW, Tralfc, Pade, Storm Water, A 0 0 0°A 3Wun-23 0 3125 Combine Plan so and wpporbng doc by Coreuttart 5 5 0% 03Juk23 10Jul m 0 3130 Rmlow Conceptual Plan(CFW) 15 15 0% 114u123 31JuM 0 3140 Rwiew Conceptual Plan(TXDOT) 20 20 0% 11JU123 07-Arg23 0 3170 Conceptual Design Complete 0 0 0% 07-Arg23 0 Preliminary Design(60%) MIT 06Au923 22NWO 0 7 3200 Prepare Preliminary Design Dr-ige and specifications 30 30 0% 08-Aug-23 19Sep23 0 3205 Submit Preliminary Plus and Spmdfi®tionsb Utilities, ROW, Tre 0 0 0% 19Sep23 0 3207 Combine plan set and sgporhrg dcc byCcreutat 5 5 0°A 2DSep23 26Sep23 0 3210 Review Preliminary Plane and spedrsations(CRV) 15 15 0% 27SeP23 17-0d-23 0 3215 Review Preliminary Plans and Speirsations(D(DOT) 20 20 0% 27Ssp23 24-0d-23 0 3216 Conduct Conshudability Review(Wak-rhragh) 1 1 0°A 25od-23 25-Od-23 0 3218 Review Preliminary Design Meeting with TMIOT 1 1 0% 250d-23 250d-23 0 3217 Notion oropportuniryto comment 21 21 0916 25od-23 22NW23 0 3220 Peer Review Mewing (redmkal) 1 1 0% 2640d-23 260d-23 0 3260 Preliminary Deagn Compste 0 0 0°A 26-Od-23 0 p%) 40 27-0d-23 0 3300 3310 Prepare 90% Final Design Plans and Sp9ckations Submit Final Desgn to I.Alties, ROW, Trafic, Pads, Storm Wab 20 20 016 27-0d-23 27NW23 0 0 0 0% 27NW23 0 3315 Combine plan set and wppod,ng dw 5 5 0% 2814w-23 04-Deo23 0 3320 Review 90% Final Plane and Speollcations(CFW) 15 15 0% 050-23 250-23 0 3330 Review 90% Final Plansand Spealcenon(rxDOT) 15 15 0°16 05Deo23 25Deo23 0 3340 1 Final 90% Design Complete 0 0 0°A 25-D-23 0 Final Deisgn(951/6) 50 50 27-D-23 07Nlar-24 0 3400 Prepare 95%Fina1 Plans 15 15 0% 27-0eo23 18Jam24 0 34W Combine plan set and spportirg doc 5 5 0°A 19Jarv24 251an-24 0 3410 Submit 95946 Final Planato TxDOTforapp vsl 0 0 0°A 25Jan-24 0 Attachment D - Consultant Schedule Project Schedule Data Date: 01-May-23 I LULJ LUL4 LULb LULb LUL/ r M I J 1Jul i Al S Ottl NJ D Jan1 F I M lAprl MI J 1Ju11 A I S iOdi N D Jan1 F I M lAPrl MI J lJul l Al S iOdl N D Jan1 F 1 M 1Apr1 101 J 1Jul1 Al S IOct NJ D IJani F 1 M iApr1 M I J lJu11 L � Actual Work ♦ ♦ Milestone - Remaining Level of Effort ♦ ♦ Baseline Milestone � Remaining Work ♦ ♦ Critical Milestone - Actual Level of Effort 104095 - S Hulen St South Dr HSIP � Critical Remaining Work ♦ ♦ Completed Milestone Project Baseline Bar CFW - Integrated Program Management I Project Schedule I Data Date: 01-May-23 u I namry rome 3420 Approve Final Plan saM Speaficaliorrs and Rage for Signatures; I uu 15 I tai 15 I cite 0% I arert 02Feb24 I rinse 22Feb24 I Finish Qale 0 I rl M I J I Jul i A l S lOQ` N i D 3430 Fina1D p siege Com fete 0 0 M. 22Feb24 0 --- --- --------- ---- ------ 3a50 Prepare Bid Patl age 10 10 016 23Feb24 074,W.24 0 Environmental 3510 Identify Environmental Isues 189 1 189 1 0% 03May623 OUA y-23 01Feb24 03i*23 0 0 - ---- -- ----- --- ---- ------ 3520 P=antl Submit Environmental Site Assessment(ESA)Repo 5B 58 0% 04,W23 26Ju123 0 3530 Review and Approve ESA Repat/TxDOTapp—dfor Envianmi 130 130 0% 27Ju123 01Feb24 0 Per'nift 162 182 03Ju123 21-M.-24 0 Permits -Identification 75 75 03Ju123 17-0d23 0 3810 ldenbfy Required PemnRe(PM Delete permits not regd perscope) 20 20 01. 03Ju123 31JuM 0 3850 39M P6rrrlfte-Review/Appose ISWM(Integreled Sudalnable Waste Managemad)Plan (Design TDLR (7 Dep. Of Li ermng and Regulations) Permit (Design 1 20 20 0°16 01Aug-23 28Arg23 0 20 20 016 20Sep-23 17-0d-23 0 100 100 27-0d-23 214ft-24 0 5150 1 Review and Approve Permits 100 100 0% 27-0d,23 214,4w-24 0 --- ----- -�'�-----� II IIIIII 5160 All PermitsApproved 0 0 0116 214tx-24 0 ROW & Easements 179 179 OBAug-23 22-Apr-24 0 4010 Itlenhy RORequirements 10 10 V/h O8Aug23 21Aug23 0 - .. ....:..... ...... , 4020 Submit LandW AoauistionEssement Requementsto Property Mgi 5 5 0% 20Sep23 26Sep23 0 ROW Negotiatioraffiv isition t44 144 _ 27SeP23 22-Apr-24 0 LUL4 LULb LULb LUL/ I F I M JAprl M I J IJu11 A i S iOdi N D Jan1 F I M lAprl M I J lJul l A I S iOctl N D IJanl F I M lAorl M I J liul l A I S 1001 N I D IJani F I M iAprl M I J IJul ll 4030 OmerAppre'sel 30 34 0°h 27Sep-23 074Jw-23 0 4040 OdarTdfe Commitment 30 30 0% 27Sep23 074Jw-23 0 4000 RghtdWaySt ft 0 0 016 27Sep23 0 -------- - -- ---"- - "-------- 4050 Order Environmental Report (it needed) 20 20 0% 27SeP23 24-0d-23 0 4060 Send Introduction Lederw4h land Owner Bill of Fghls 1 1 0% 040d-23 04-0d-23 0 _ 4070 Appraisal Received date and Submission tOT)DOT 1 1 0°/h OBAIov-23 084Nov23 0 4080 RevavAppaisals and Prepare Initial08a 20 20 0°h 09Tbv-23 084)ac23 0 �-- - 4090 Present Initial Offerto Property Owner 1 1 0% 02Feb24 02Feb24 0 4100 Negobabort Acoeptance Penod 20 20 0% 05Feb24 014 W-24 0 4110 Present FinalOgerto Properly Owner 1 1 0% 1810ar24 184v1ar-24 0-------�', ; 4120 Conduct Final Negotiations (AosRpfan-siection Period) (If Neec 20 20 0°16 19Mar-24 15Apr-24 0 4160 SubmitDoumentstotitie Co forCieseont 5 5 0% 16AK-24 22-Apr-24 0 'B MdW Coon "-"-"--" "-"'---".................. 42R g ay plete 0 0 0% 22Apr24 0 tilityRalocation 197 D U91tyltebcation Coordlnal 197 197 03Jul-23 —I 11-Apr-24 f 0 -------- Utdiy Clearance 197 197 03Jul2n 11Apr-24 0 7000 UtiFice Start 0 0 0% 03JuF23 0 3 7040 Review 30-/.CFW Design Dnvgs and Repaid to CFW(Ulity) 0 0 0% 03JuM 03JuM 0 ------- ,___• 7045 Review 80'/o CFW Design Drvgsantl Respond to CFW (Utility) 20 20 0% 2(ISep-23 17-0d-23 0 7050 Prepare and Submit Relocation Design 0 CFW/Desgr Engineer 1 20 20 0% 180d23 1444 -23 0 7060 Review andAppmve Udiy Rebrabat Design(CFW/Design Ergii 20 20 0% 15Nov-23 14-D-23 0 7085 Review 909/6CFW Design Uwgsand Respond to CFW (Utility) 10 10 0°h 28Nov-23 11-0eo-23 0 7070 Revise Unity Design and get Approval (i Regd) 10 10 0% 1547eo23 29Deo23 0 7080 Request UIRy Relo atlon Permit from CFW (Lid" 10 10 0% 02Jem24 16Jan-2R 0 I ............:............i .......... 7090 IwJe Permttto Utlity(CFW) 0 0 0°h 16Jan-2t 0 _-_--_-� 7100 Pedam Relecation Construction (Drily) W 50 0% 02Feb-24 11Apr-24 0 7120 Utilities Cleared/complete 0 0 0% ll Apr24 0 Carstnwtian 351 351 23Apr24 10Sep25 0 80/0 Submit Certificationsto TxDOT (ROW Certfiation, Utility CaM'ica 5 0°h 23Ag24 29Ag24 0 8010 Payment to TrDOT fated math before adrerl�g 15 0% I 30Apr24 20-Wa L24 0 Bid and Award 22 *V/. 2livisy-24 ZOJun24 0 Advertisment&Bid 22 r 214,W24 20Jun-Jun 0 214v1ay-24 18Jurv24 0 8120 Advert'semonl Penal 29 — 8110 BidAdvenisementByTX4J0T 0 0 09/. I 2144ay-24 0 -------------- 8130 1 Conduct PnsBld Meeting 1 1 0% 20Jun24 ZOJu. 0 Actual Work ♦ ♦ Milestone - Remaining Level of Effort ♦ ♦ Baseline Milestone Remaining Work ♦ ♦ Critical Milestone - Actual Level of Effort 104095 - S Hulen St South Dr HSIP Cditical Remaining Work ♦ ♦ Completed Milestone Project Baseline Bar CFW - Integrated Program Management ApNay Name uu - myscal`w Complete I 8ruc id Opening By TX4]OT 0 0 Construction [ solution 309 309 Pr Connrwllon 15 1 15 8330 Conduct Conshudan Pubic KAwbw N4-Fire, 8340 Sfie Moblltlon Construction 5350 1Consinxlun Start 8360 ConsbW*n,MatenaltesW@ano Lands png 8370 Subsfadial Completion 8540 1 Canstrudnn Competion 8510 WakThrough Sutaialtid Completion 8520 8530 Complete Punch L'at Tasks 1Final WalkThrough with TA)OTfor Completed Punch LIST Tads Closean — Cortatruction Contract Closeout As43Lnft As Built Plans 9300 1 Design Engineer PiepaeAsBalt Plans xrstrucflon Contract Closeout 9110 1 Contact Rewndllation tinake Pad DwWAgreem nt Cbsecut 9400 iRedeve Final I— for Design Cr 9410 Final Design Centred I— Pad 21,1un24 21J.rvM 03JuF24 05Jut24 13JUI24 14Jut24 14JUV24 14JuQ4 14JUI24 14JUL24 21JuF25 22Jul-25 10Sep25 11Sep25 11Sep25 11Sep25 11Sep25 11SW25 18Sep-25 18Sep-25 11Sep-25 11Sep25 230d25 24feb26 3Ood-25 3O0d25 1314pv-25 Project Schedule I Data Date: 01-May-23 Rush Qale r M J Jul S Out N D Jan F M Apr M J Jul S Od N D Jan F M Apr M J Jul S Oct N D Jan F M Apr M J Jul S Oct N D J F M Apr M J J I lul I I I I I I I I I lal I I I I I I I I I lal I I I I I I I I I lal I I I I and I I I I lal' 2OJun-24 0 16Sep25 0 13JuF24 0 27Jun-Jun0 03Jul,24 0 05Juk24 0 13Jul,2t 0 0 08,lul-25 0 _• 08Jul,25 0 10Sep-Sep0 16Sep25 0 OBJUL25 0 IIIIIIII IIIi IIIIIIIIIIII II IIIIIIIIIII IIIIIIIIIIII J -� ` - -'- - 21Jul-25 0 01Sep.25 0 1OSep25 0 11-J-27 0 24Feb26 0 - > 17Sep.25 0 17Sep25 0 290d-25 0 290d-25 0 2LFeb, 6 0 ... . ........................ ------------ :........... :........... :............----------- :------------ :------ _. _ _ ------ _._.__._._ __._._._.__ ____.__._ _ ._ _ _ _._.._._._.__ _ _ _.._._._ 22-0d-25 0 - — - - ` -- 174)-25 0 02Feb-n 0 24.Feb-26 0 - ------------------ -- - - - -- - - - 24Feb26 0 25N -25 0 12Nmv-25 D _ ________ _ __________ __________ _ _ ___._ __ _ _._.__._ _ _ _._.._._._ ----------- _ _._.... _ ._.— _ ._ _._. _._._ __._._._.__ ____.__._ _ ._ _ _ _._.._._._.__ _ _ _.._._._ 2BNw25 0 _ _ __._ ?afJw-25 0 .... .' . �. . 15Oao-26 0 _.._ 2Oivlar-26 0 '� 25Sep26 0 rr• 15Oeo26 0 1O4ft-26 0 24Feb26 0 - ........................ .... ........ . , . .,. . 1OA4a-26 0 ______ _______ __ 11,An27 0 ZZ 114-27 0 9620 TROT CloseaulAutlb 132 1 132 1 0% 1 11Sep-25 9630 9640 TOOT Fina Statement of Payment 1v18C for final payments over 100k(if reguieM 132 45 132 45 0°h 0% 23MarW 28Sep26 9650 Issue final Payment to TA')OT 10 10 0% 02-0Dec Prepare I Archare Olt —it Dots 9510 Plajed Cemdete 9500 Fina Project Repott—ons Leaned Financial CloseoullAsset Capital'cation 9700 Finaxia Reolndlabon 9710 CapBaltraAsset in CFW System lu lU L4reP[l1 0 0 0% 10 10 0°h 25Feb-Feb 124 124 16Oeo-26 62 62 V/h 16-D-,% 62 62 0% 17-Mr27 Actual Work ♦ ♦ Milestone - Remaining Level of Effort ♦ ♦ Baseline Milestone Remaining Work ♦ ♦ Critical Milestone - Actual Level of Effort 104095 - S Hulen St South Dr HSIP C>lbcal Remaining Work ♦ ♦ Completed Milestone Project Baseline Bar 104095-EPAM-S Hulen St & South Dr Highway Safety Improvements Amendment #2 Final Audit Report 2023-11-06 Created: 2023-10-24 By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAA52HU1oL-cEf4Kyre2EAoMVERJvaubFJC "104095-EPAM-S Hulen St & South Dr Highway Safety Improve ments Amendment #2" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2023-10-24 - 9:54:43 PM GMT- IP address: 204.10.90.100 Document emailed to ann.estes@fortworthtexas.gov for filling 2023-10-24 - 9:59:28 PM GMT Document emailed to dburkett@halff.com for signature 2023-10-24 - 9:59:29 PM GMT Document emailed to fanta.kaba@fortworthtexas.gov for signature 2023-10-24 - 9:59:29 PM GMT Email viewed by dburkett@halff.com 2023-10-24 - 10:07:05 PM GMT- IP address: 52.206.70.14 Email viewed by ann.estes@fortworthtexas.gov 2023-10-25 - 1:02:59 PM GMT- IP address: 204.10.90.100 Go Signer ann.estes@fortworthtexas.gov entered name at signing as Ann Estes 2023-10-25 - 1:03:51 PM GMT- IP address: 204.10.90.100 &0 Form filled by Ann Estes (ann.estes@fortworthtexas.gov) Form filling Date: 2023-10-25 - 1:03:53 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by fanta.kaba@fortworthtexas.gov 2023-10-25 - 2:26:47 PM GMT- IP address: 204.10.90.100 %4 Signer fanta.kaba@fortworthtexas.gov entered name at signing as Fanta Kaba 2023-10-25 - 2:29:40 PM GMT- IP address: 204.10.90.100 FORTW❑RTHg I Paw m"Y Adobe Acrobat Sign Document e-signed by Fanta Kaba (fanta.kaba@fortworthtexas.gov) Signature Date: 2023-10-25 - 2:29:42 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by dburkett@halff.com 2023-10-26 - 3:46:13 AM GMT- IP address: 52.206.70.14 Signer dburkett@halff.com entered name at signing as David A. Burkett 2023-10-26 - 12:31:06 PM GMT- IP address: 128.92.196.202 o Document e-signed by David A. Burkett (dburkett@halff.com) Signature Date: 2023-10-26 - 12:31:08 PM GMT - Time Source: server- IP address: 128.92.196.202 Document emailed to Chad.Allen@fortworthtexas.gov for filling 2023-10-26 - 12:31:10 PM GMT Signer Chad.Allen@fortworthtexas.gov entered name at signing as Chad Allen 2023-11-06 - 5:45:09 PM GMT- IP address: 204.10.90.100 Form filled by Chad Allen (Chad.Allen@fortworthtexas.gov) Form filling Date: 2023-11-06 - 5:45:11 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lissette.Acevedo@fortworthtexas.gov for filling 2023-11-06 - 5:45:13 PM GMT Email viewed by Lissette.Acevedo@fortworthtexas.gov 2023-11-06 - 7:26:22 PM GMT- IP address: 204.10.90.100 c, Signer Lissette.Acevedo@fortworthtexas.gov entered name at signing as Lissette Acevedo, RE 2023-11-06 - 7:26:32 PM GMT- IP address: 204.10.90.100 GS© Form filled by Lissette Acevedo, RE (Lissette.Acevedo@fortworthtexas.gov) Form filling Date: 2023-11-06 - 7:26:34 PM GMT - Time Source: server- IP address: 204.10.90.100 12+ Document emailed to patricia.wadsack@fortworthtexas.gov for filling 2023-11-06 - 7:26:36 PM GMT Email viewed by patricia.wadsack@fortworthtexas.gov 2023-11-06 - 7:57:03 PM GMT- IP address: 71.15.98.20 p Document declined by patricia.wadsack@fortworthtexas.gov Decline reason: Please explain what this amendment is for.Thanks,Patricia 2023-11-06 - 11:10:54 PM GMT- IP address: 71.15.98.20 FORTW❑RTHg I P°Ner "Y Adobe Acrobat Sign DOCUMENT TITLE: M&C: 23-0269 Date: FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department S Hulen St & South Dr Highway Safety Improvements Project Engineering Contract Amendment #2 CPN: 104095 CSO: 59298 DOC#: To: Name Department Initials Date Out 1. Ann Estes TPW - initial 4� Oct 25, 2023 2. David Burkett, Consultant Consultant - Signature DB na Oct 26, 2023 3. Fanta Kaba TPW - Signature FK Oct 25, 2023 4. Chad Allen TPW -initial , Nov 6, 2023 5. Lissette Acevedo TPW -initial C Nov 6, 2023 6. TPW AD (Patricia Wadsack) TPW - initial PLW Nov 16, 2023 7. TPW Dir. (LaurenPrieur) TPW - signature Nov 16, 2023 8. Doug Black Legal -signature Mb wb Nov 16, 2023 9. William Johnson CMO - signature N Nov 17, 2023 10. Jannette Goodall CSO - signature ,Sc7,SG Nov 17, 2023 11. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: [-]YES ®No RUSH: ❑YES ®No SAME DAY: []YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts (&FortWorthTexas. 2ov at ext. 7233 or 8363, for pick up when completed. Thank you! Updated 12.07.2022, mdhm 104095: S Hulen St & South Dr: Contract Amendment # 2 Summary This amendment is for extra scope and costs for Halff Associates to perform all the TxDOT coordination for this project. This coordination includes combining three projects from multiple consultants, putting together the three sets of plans for each of the multiple TxDOT submittals and performing all the overall plan, specification, bidding and cost estimate documentation in TxDOT Connect. This Amendment also adds bidding and construction phase services to the contract that were not included in the original scope. Summary of Contracts/Amendment: • Contract for Engineering Services: Includes efforts for full PS&E • Amendment 1: This was issued as ROW was not included in the contract for PS&E. This amendment provided services for ROW descriptions and meets & bounds which were also submitted to TxDOT. In order to keep the project on schedule and not risk missing the August 2024 let date, TxDOT requested this information by the 60% design plans submittal. • Amendment 2: This project will be combined with two additional projects and be let as a single package by TxDOT. After additional funding was appropriated by M&C 23-0890, this amendment will be for additional coordination efforts with TxDOT and two other design consultants including combing all the plan sheets for each submittal. Bid phase and construction phase efforts were not included in the contract for PS&E; those efforts are included in this amendment as well. Table of Engineering Fees: 104095: S Hulen St & South Dr HSIP Contract Date Amount Engineering Services 4/28/2023 $ 170,380.00 Amendment 1: ROW 9/12/2023 $ 9,680.00 Amendment 2: TxDOT; Bid; Construction TBD $ 56,295.00 Total $ 236,355.00