HomeMy WebLinkAboutContract 58528-CO5FORTVVORTH -·City of Fort Worth
Change Order Request
CSC No. 58528-COS
Project Name:i Sanitary Sewer Rehabilitation Contract 98
Project No.(s):i 56002-0600430-0700430-0200430-5740010
I City Sec No.: I 58528 :=:::=========�M&C: I 22-0888 I City Proj. No.: I C02719
Project Description: Water, sanitary sewer, and paving Improvements in the Northside Neighborhood.
Contractor:! Woody Contractors, Inc.
City Project Mgr,I Suzy Abbe :=:::::::::::========� Phone Number:! 817-392-8209
Dept. Water
Original Contract Amount $3,043,559.00
Extras to Date $6,200.00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $3,049,759.00
!Amount of Proposed Change Order -$18,950.00
Revised Contract Amount $3,030,809.00
Original Funds Available for Change Orders $121,742.00
Remaining Funds Available for this CO $115,542.00
Addillonal Funding (if necessary)
Change Order II I 5 Date:
City Inspector: I Charles Hayes
Phone Number:! 682-213-0240
Sewer Paving Totals
$3,253,980.00 $957,884.25 $7,255,423.25
$8,431.00 $0.00 $14,631.00
$3,262,411.00 $957,884.25 $7,270,054.25
$0.00 $0.00 ·$18 950.00
$3,262,411.00 $957,884.25 $7,251,104.25
$130,159.00 $57,473.00 $309,374.00
$121,728.00 $57,473.00 $294,743.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
:o.06%
$9,069,279.06
JUS'flFICATION (REASONS),FO� CHANGE ORDER
Change Order No. 5 provides for the following:
11/13/2023
Contract Time
(Calender days)
550
650
550
•Deletion of the installation of proposed 20-inch isolation valve at NE 20lh and Commerce Street because of Insufficient space for the
Installation;
•Installation of additional temporary water service in order to maintain service to customers who would be affected by a shut-out to make a
project connection at NE 20th and Commerce Street; and
• A pay item quantity to buy the 20-inch valve and deliver it to field operations.
It is understood and agreed that the acceptance of this Change Order by the contractor consUtutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Date
11/16/2023
Date
Nov 17, 2023
Date
Nov 17 2023
Cquncli Action
M&C Number N/A M&C Date Approved NIA
FC�RT WC�RTH City of Fort Worth
Change C7rder Additions
Project Name Sanitary Sewer Rehabililation Conlracf 98 City Sec No.; 5852ft
Project No.(s): 56002-0600430-0700430-0200430-5740010 DOE No. 22-088 Cily ProJ. No.: CO2719
Project I water, sanitary sewer, and paving Improvemenfs In the Northside Nefghborhood.
Descriplion
Contractor Woody Contractors, Inc, Change Order:� Dale: 1111312023
City Projecf Mgr. Suzy Abbe City Inspector Charles Ha es
anniria�s
FORT WC]RTI-1 City of �ori UVorth
���"�'�"�'�"�— Change Ord�r Deletions
Projecf Name Sanitary Sewer Rehabilitation Contract 98 City Sec No.; 58528
Project No.(s): 56002-0600430-0700430-0200430-5740010 DOE No. 22-08 City Proj. No.: CO2719
Project Description � Water, sanitary sewer, and paving Improvements in the Northside Neighborhood,
Contractor Woody Contractors, inc, Change Order: �5 Date 1111312023
Ciry Project Mgc Suzy Abbe City Inspeclor: Charles Hayes
n�LETIONS
Page 1 of 1
■�nn�..t� w__. _.__�.. � ... ... .. .
11/10/2023
CPN CO2719
Sanitary Sewer Rehabilitation Contract 98
Chan�e Request 5 Notes
The contract included installation of a 20" valve at Commerce and NE 20'h street to maintain fire
protection and water service to businesses and homes south of 20th Street. Installation of the 20" valve
at the location needed to maintain water service south of NE 20th street was not possible due to
conflicts (bends due to line lowering, blow off valve, sanitary sewer, and storm drain). 1986 LF of
additional temporary water service were used to maintain water service to businesses and homes. The
City will pay for the valve and turn it over to field operations for future use and will be credited for the
valve vault and installation cost (see attached for the cost of the valve).
The unit price for 1986 LF additional temporary water service for $31,300 is $15.76/LF, lower than the
bid price for temporary water service for the overall project of $20/LF ($160,000 for approximately
8,000 LF). The lower price for the additional temporary water is due to the lower number of connected
services.
WOODY CONTRACTORS INC
�ou: �.�. Q�� (1�3`r"i��,�;�' 9�
Date N�av�mber 2, �0�3
�WAI'��� (�f�C1E{� 4
Item Descript(on
23 20" CUT IN G.V. / VALVE
1 20" G.V.
2 EX7RA TEMP. WATER (1986 L
G2uantity
-1 EA
'I �A
1 l.S
WOODY
CONTRACTORS
650 TOWER RD
KENNEDALE, TX 76060
PHONE- 817-4�3-4787
FAX 817-483-204f3
Unif Price
$ 77,500.00 $
$ 27,250,00 $
$ 31,300.00 �
Total for Sheet $
Total For Job $
Total Prlce
(77,500.00)
27,250.00
31,300.00
(18,950.00)
(1 a,950.00)
�
l�"����'��q�� ���
v�.�•r�r��r�►r��c�
� �O�,JC�7 �oxmpan�
� '!.''itt fQ p�lla� C'{ctnry
� l��ilas, TX 7�24�6
� I�Ayman� InquYE�l�s 70��70E�-�JQQQ
�
�
� '
��� i/ �E4��
BOLU TO
3Qh 3$P L11U L0026 107.�3 D1197liG12013 S'l P9�Aq0U7 p002;0011
�I�tl�i�i�P���l���l���iiiE��ri�irrlJlll�►�dlfil�����ui►�I���ilr�
,�.���` WOQDY CbNSTRUC71dN ING
� GGO TQWFF2 DR
f<�NN�DALE TX 7BOH0-8012
• 030 ' • 5907801 61�07Q6
e • �;
18/20 MAT�RIp,� ,cqNFnACT�a W1zo
..�, � , �
'16��� 16" C9U0 DR1D Plf'� BI..UF �
RID I,IN��� Q0�80
MhIV2075710�5GSS 20" MJ C�V OlR 7571 W/SPUf:O�At2
RI[J I.IN� �t 01830
MHY1(i757��,y,,..,. .. .. �IQ" MJ QVo/R7s71�1�1/.�CC,. _ .. .
�Ib�IN�#O�i(i0 . �
1C�1BB1.,0lC21 •IG" C�J00 QR18 DIAMOND LOK-2'1
EiID LIN� �'� OO,wi�O
4��-� 8" �IFLD l.pK CSKT
Wf3CG5 5 OAL LUgE
i_�1RkC3 CAI.I.ON LUBG
gID LiNG # 00400
�..�....��...�_�..
INVOICL=' NUMB�R; (39f307Q5
C31LL qlr LADI►Vd;
iNvo�e� dA���: �orz7r2a
I�u�' pA7�,��y1112G123
p/��tso Re►t�lf Paym�rlt �'p; �
1'4, pox 9R14fl9
Dalla�, 7oxnb 75284-1qy9
r•ociar�„�►rox iu��sr.o�no , �..
Warehouse: '�"'
�ORTlLIN� PpRT WqRTH
1'YUG CYf�R�SS ST,
HAl.1'�M CI'I'Y TX 7��117
6HIpT0 Telepliand: �0�-747•Ofl79
WOODY CONSTRUCTION INC
NORTH CQMM�RCE & N� 20TH S7
��I�T WQR7'I-I, TX 769 02
• �,. o�N�:• �^ s�s._ : .;.��u�.p � � ,.,• � .
1 �• .N1;L'�,�;i.�:�i��i�,.�5kpronTc•:,
� I: �uptyl,, I:Qap�r�q•I 51.�IppCR•. �� 4`� '`' • r�, „
� �
��� G � �� r. � ����`'� ��N��ti,P�i
� ,,,.
�A � 1 D
:�A ? . . �, . . A . ,
F1' 66 86 n
�A 1 1 U �Z2.
�A � 1 0 � 38,
�A 2 2 � 22.
. Prok2�x:GIHii� of�'a�:s an�.ine �ayman�ts anc� aptspsa �a 3.nvoiae csb�a:Lc�s �'ax yo�1x
cnnvt�niet�oe a'� itt��//l�ortiline Billtrn�t.Cofi.
, •'�R.�� ��axs�Ttt �o ncc�ss xdux vNxzrna �caou�aa� A�� �ct�: �
. _., �1L�f�LlL,IIY�,IilLLT/7U57:CbM
�� ��p,d` f1' 1e Pav�nenls Vlcw o�id Dowrrlon u/ces rn S!a w�e�,r,
NO R�1"Uf�Ns ACCEPTED WITNUUI' PRIOR hU71�10R17.J11'CON, AU7'HO(tIZED f��;TURNS AR6 SU[3J�C1' 1'q REBTqG<ING F�L-'S.
Sp�CIAL oR�F.R ITFMS ARE NO'I' IZ�TUf�NABGG, ALL OLAIMS A7UST DC f�ILCD WITH TH� CAkRI�Fi.
�nr iTRMS end CONDI1'IUNS of nut�, ploase vlail�iJtp;/hnnw� forlllh�u cwm
�22.5
1�¢.1
27,z50.p0
1if10'I,;U011 To VI6W ANp PAY GNLINLs Fodlllnc�,com US� TNI6 FNI�OI.LM�N'I"YOK�N; HHZ PKZ 7Q�
_ � Pa�� 1 of 1
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
ATTEST:
Jannette Goodall
City Secretary