HomeMy WebLinkAboutContract 32163 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.?2 b' -2� WHEREAS, FW Trail Ridge, Ltd., hereinafter called "Developer", desires to make certain improvements to Trail Ridge Estates, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant and Denton Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, is hereby incorporated into this Community Facilities Contract as if copy herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. E. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section lI, of the Policy. Trail Ridge Estates Ff. `o Ong, Tot F. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allezed ne0kence of the City of Fort Worth, its officers, servants, or employees. G. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. H. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). J. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. Trail Ridge Estates 2 CITY U L. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached. M. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1, and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $578,219.77. Trail Ridge Estates 3 SUMMARY OF COST Trail Ridge Estates Item Developer City Cost Total Cost Cost A. Construction $ - 1. Streets $357,376.90 $ 357,376.90 2. Storm Drainage $183,426.80 $ 183,426.80 3. Street Lights $6,500.00 $ 19,500.00 $ 26,000.00 4. Street Name Signs $ 600.00 $ 600.00 B. Engineering Design $ - C. Construction Engineering and Management by DOE 2% $ 10,816.07 1 1 $ 10,816.07 TOTALS $ 558,119.77 1 $ 20,100.00 $ 578,219.77 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. The developer is responsible for installation of sidewalk and a separate financial guarantee is required in the form of a bond or check for the cost of the sidewalk. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees and materials testing. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Future Improvements: Developer's cost for one-half of the width of the section of Chapin Road abutting this development is $130,843.00. Developer's cost for future construction of the culvert is $130,327.00. Trail Ridge Estates 4 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said De, eloper has executed this instrument in triplicate, at Fort Worth, Texas this the J,4 day of , 2005. Approval Recommended: Transportation and Public Works Department Robert oode, P. E. Director City of Fort Worth NO M&C REQUIRED i Marc Ott Assistant City Manager ATTEST: M AA-1� Marty Hendrix City Secretary Approve �s to Form: DEVELOPER: Assistant Cit ey FW Trail Ridge Ltd Att Arbors Development LLC ATTEST: Its General Partner By: rtefrrti Corporate Secretary Ronald Forman Managing Member RECEIVED Trail Ridge Estates 5 UK. SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS - UNIT AMOUNT ITEM ITEM QUANTITY WITH BID PRICES WRITTEN IN PRICE BID WORDS SECTION C - STORM DRAIN SYSTEM 40 1. 287 L. F.21" Class III R.C. Pipe, including 02 trench excavation and backfill, complete in place for the sum of THIRTY-SIX Dollars & ZERO Cents per Linear Foot $36.00 $10332.00 40 2. 48 L.F.27" Class III R.C. Pipe, including 02 trench excavation and backfill, complete in place for the sum of FORTY-SIX Dollars& ZERO Cents per Linear Foot $46.00 $2208.00 40 3. 145 L.F.30" Class III R.C.P. Pipe, 02 including trench excavation and backfill, complete in place for I� the sum of FIFTY-TWO Dollars& ZERO Cents per Linear Foot $52.00 $7540.00 40 4. 311 L.F.36" Class III R.C.P. Pipe, 02 including trench excavation and backfill, complete in place for the sum of SIXTY-EIGHT Dollars& ZERO Cents per Linear Foot $68.00 $21148.00 5. 140 L.F.4' Chain Link Fence Pedestrian Barrier at culvert complete in place I for the sum of TWELVE Dollars ZERO Cents per Linear Foot $12.00 $1680.00 P-7 I II I DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 440 6. 98 L. F.8'x6' Precast Box Culvert, 02 including trench excavation and backfill, complete in place for he sum of Three hundred Sixty-five Dollars & Zero Cents per Linear Foot $365.0 $35770.0 7• 4 Ea.Standard 10'Curb Inlet omplete in Place for the sum of Two Thousand Dollars & Zero Cents per Each $2000.00 $8000.0 44 8. 2 Ea.Standard 15'Curb Inlet Complete in Place for the sum of went -nine hundred Dollars & zero Cents per Eac $2900.00 $5800.0 9• 3 Ea.LManhole 4'SQ. Storm Drain for the sum of ve hundred Dollars & Zero Cents per Each $2500.00 $7500.0 10. 2 Ea.LFift ---,even ht Wing Headwalls for 8x6' ulvert for the sum of hundred Dollars & Zero Cents per Each $5700.0 $11400.0 11. 1 Ea.Headwall for 36" R.C.P. Txdot H-FW-0 3:1 complete in place Thirty-two hundred Dollars & Zero Cents per Ea. $3200.0 $3200.0 P-8 1 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH UNIT AMOUNT ITEM ITEM QUANTITY BID PRICES WRITTEN IN PRICE BID WORDS 12. 1 Ea.Headwall for 24" R.C.P. Txdot flared wing 300 CH-FW-30 4:1 SS complete in place for the sum of IEighteen hundred Dollars Zero Cents per Each $1800.00 $1800.0 13. 1945 C.Y.Unclassified Channel Excavation or the sum of . Five Dollars Zero Cents per Cubic Yard $5.0 $9725.0 14. 1000 S.Y.Rock on Filter Fabric for Channel Bank Protection and at end of 1 Stubout Streets for the sum of Fifty-three Dollars Zero Cents per Square Yard $53.0 $53000.0 525 15. 1076 L.F.Trench Safety System IZero Dollars Thirty Cents per Linear Fool $.3 $322.8 02 16. 10 C.Y.Washed Gravel for Pipe Bedding for the sum of IZero Dollars Ten Cents per Cubic Yard $.1 $1.0 I I I i DESCRIPTION OF ITEMS SPEC PAY APPROXIMATE WITH BID PRICES WRITTEN IN UNIT AMOUNT ITEM ITEM QUANTITY WORDS PRICE BID 17. 1 L.S.Traffic Control for Storm Drain Construction along Chapin Road or the sum of Twenty-five hundred Dollars Zero Cents per Lump Sum $2500-00 $2500.0 i 18. 1 L. S.Storm Water Management for he sum of Fifteen hundred Dollars Zero Cents per Lump Sum $1500.01 $1500.0 SECTION C—STORM DRAIN SYSTEM: $183,426.8 PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT I ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID SECTION D - STREET LIGHTS ETC. 1 . 1000 L. F.2" P.V.C.-Schedule 40 Conduit for Street Lights for the sum Five Dollars & Zero Cents per L. F. $5.00 $5000.00 2. 14 EA.Street Light Foundations for the sum of Three hundred eighty Dollars & Zero Cents per Ea. $380.00 $5320.00 3. 1000 L.F. Install T.U. Crossings (conduit supplied by Texas Utilities)' Seven Dollars & Zero Cents per L. F. $7.00 $7000.00 SECTION D — STREET LIGHT SYSTEM: $17,320.00 Inspection by TU Electric and Southwestern Bell Telephone Companies P-10r'j; ' U, '.''J!� UHr VEcvo i %TE EC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT M ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID f SECTION E - STREET IMPROVEMENTS 210 1 15600 S.Y. 6" Lime Stabilized Subgrade ' (includes Preparation of Subgrade), complete in place for the sum of ' ONE Dollars & TWENTY-FIVE Cents per S.Y. $1.25 $19500.00 212 2. 234 Tons Lime for Subgrade (30#/S.Y.)* Icomplete in place for the sum of EIGHTY Dollars& ' ZERO Cents per Ton $80.00 $18720.00 3. 555 S.Y. 6" H.M.A.C. Pavement Icomplete in place for the sum of TWENTY-TWO Dollars& IFIFTY Cents perTon $22.50 $14737.50 314 4. 13,784 S.Y. 6" Reinforced Concrete Pavement (IncludesJoint Sealer and 7" Standard Attached Concrete Curb) IComplete in Place for the sum of TWENTY Dollars& SIXTY Cents per S.Y. $20.60 $283950.40 I 514 5• 29 L.F.Construct Concrete Header per City IStandard for the sum of SIX Dollars& ZERO Cents per L.F. $6.00 $174.00 524 6. 30 L.F.Construct End of Road Barricade per City Standard for the sum of FORTY Dollars& ZERO Cents per Ea. $40.00 $1200.00 7. 12 Ea.Barrier Free Ramps per City Standard for the sum of FOUR HUNDRED FIFTY Dollars ZERO Cents per Each $450.00 $5400.00 P-11 SPEC PAY APPROXIMATE DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM QUANTITY PRICES WRITTEN IN WORDS PRICE BID 8. 1732 S.F. ' Sidewalk for the sum of Three Dollars & Zero Cents per L.F. $3.0 $5196.0 9. 1 Ea.Gate, Knox Box etc. for the sum of Four thousand Dollars I Zero Cents per Ea. $4000.00 $4000.0 10. 15 Ea.Adjust Manholes and vaults for ! Twenty-five Dollars & j Zero Cents per Ea. $25.00 $375.0 11. 18 Ea.Adjust Gate Valves for the sum of Twenty-five Dollars Zero Cents per Ea. $25.00 $450.0 12. 1 L. S.Traffic control along Chapin Road A _ or the sum of Three thousand one hundred seventy-four Dollars Zero Cents per L.S. $3174.00 $3174.0 Spec 13. 1 L. S.Storm Water Management for the Prov sum of Five Hundred Dollars & III Zero Cents per L.S. $500.0 $500.0 TOTAL SECTION "E" STREET IMPROVEMENTS $357,376.9 9 11 City of Fort Worth requires a minimum of 30#/s.y. The Paving Contractor will be responsible for a lime test as directed by the City of Fort Worth Construction Inspection Department. SUMMARY Section A Water System $ 157,431.50 Section B Sanitary Sewer System $ 150,580.45 f ' Section C Storm Drain System $ 183,426.80 Section D Street Lights, etc. $ 17,320.00 Section E Paving $ 357,376.90 I Total Amount Bid $ 866,135.65 I � I P-12 ti ,� PART B - PROPOSAL (Cont.) Within ten (10) days after acceptance of this Proposal, the undersigned will execute the formal contract approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful perfo mlandce of the an Contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the specific Contract Documents and appurtenant plans. The successful bidder shall be required to perform the work in accord with the following publications, both of which are incorporated herein and made a part hereof for all purposes: The General Contract Documents and General Specifications for Water Department Projects dated January 1, 1978, which may be purchased from the Water Department. The Standard Specifications for Street and Storm Drain Construction which may be purchased from the Department of Transportation & Public Works. The undersigned assures that its employees and applicants organization, subcontractors, or employment agency in eher furnishing or referringtemployee applicants to a he undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete the contract within 100 working days after beg furnished by the Owner. inning construction as set forth in the written work order to be f (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of Nonresident bidders in the State t of our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non resident bidders in the State of our principal I place of business, are not required to underbid resident bidders. X B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. I P-13 I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, GILC CONTRACTING IN Y: LE CON TH Ti e PRESIDENT Address GILCO CONTRACTING, INC. P.O. BOX 24196 FORT WORTH, TEXAS 76124 (Seal) Telephone: (817) 516-0596 Date: i i �I I P-14 E. STREET LIGHTS: 1. STREET LIGHT COST ESTIMATE QUANTITY UNIT COST TOTAL COST INTERSECTIONS 5 EA $ 2, 000 $10 . 000 . 00 MID-BLOCK RESIDENTIAL 3 EA $ 2, 000 $6, 000 . 00 CHANGE OF DIRECTION RESIDENTIAL 5 EA $ 2, 000 $10, 000 . 00 MID-BLOCK COLLECTOR 0 EA $ 2, 000 $--0-- MID-BLOCK ARTERIAL PARKWAY 0 EA $ 2, 800 $--0-- MID-BLOCK ARTERIAL MEDIAN 0 EA $ 2, 200 $__0__ RELOCATE EXISTING LIGHT 0 EA $ 1500 $--0-- Subtotal $26, 000 . 00 City' s Cost $19, 500 . 00 Developer' s Subtotal $0, 000 . 00 10% Contingencies $0, 000 . 00 Project Total $0 . 000 . 00 Adjacent Developer' s Cost $0 . 000 . 00 Developer's Cost $0, 000. 00 2% Inspection Fee $0, 00 . 00 Developer' s Responsibility See PG III-1, "Line 7" TRAIL RIDGE ESTATES March 18, 2002 Fort Worth, Texas May 9, 2002 +V�.4�I1 uL✓�(. III- 1 2 . STREET LIGHTS WORK DESCRIPTION: 1 . The Developer shall provide for the installation of streetlights at the approximate locations shown in Exhibit "C" , immediately after final acceptance of the street construction, in accordance with engineering plans and specifications approved by the Transportation and Public Works Department . 2 . Streetlights on residential and /or collector streets can be installed using overhead or underground conductors with the approval of the Director of Transportation and Public Works . 3 . Streetlights on arterial streets shall be installed with underground conduit and conductors . 4 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit at a depth not less than 30 inches and at least 18-inch behind the curb, "clear from all other utilities" . 5 . The Developer shall provide for the installation of a 2-inch schedule 40 PVC conduit between streetlights proposed for installation and the power source to become operational . 6 . A 3-inch schedule 80 PVC conduit is required when crossing streets at a depth not less than 30 inches, unless indicated otherwise on the plans concrete pull boxes shall be provided at the crossing points . 7 . Street light conduit and footings shall be installed by the developer' s contractor as part of and at the time of street construction. The city will obtain electric service and complete the street light construction in accordance with approved plans . 8 . The developer or their contractor shall contact City' s street light division 48 hours prior to starting any installation of conduit and/or streetlights at (817) 871-8100 to insure proper inspection of work. 9 .The procedure for installing conduit and footings will be with the inspector on the job site or you can request a copy by calling 817- 871-6596 . TRAIL RIDGE ESTATES March 18, 2002 III- 2 "STREET LIGHTS" INTERSECTIONS DUSTY RIDGE CT & WAKE CREST DR 1 HIGH RIDGE LN & WAKE CREST DR 1 SPUR RIDGE CT & WAKE CREST DR 1 ROY BEAN CT & WAKE CREST DR 1 ENSENEDA LN & WAKE CREST DR 1 MID - BLOCK WAKE CREST DR 3 CHANGE OF DIRECTIONS DUSTY RIDGE CT 2 SPUR RIDGE CT 1 ROY BEAN CT 1 WAKE CREST DR 1 TRAIL RIDGE ESTATES IV STREET NAME SIGNS 1 . The City will install the street name signs upon final approval of the street construction. The street name signs will remain the property of, and will be maintained by, the City. 2 . The City will pay for the street name sign installations required for this development to the extent of $100 . 00 per intersection. This unit cost will be revised annually by the Department of Transportation and Public Works to reflect prevailing costs of materials and labor. 3 . This development creates the following six (6) intersections at a cost to the City of $600 .00 : Chapin Road and Wakecrest Drive Wakecrest Drive and Dusty Ridge Court Wakecrest Drive and Spur Ridge Court Wakecrest Drive and Roy Bean Court Wakecrest Drive and Ensenada Lane Wakecrest Drive and High Ridge Lane TRAIL RIDGE ESTATES PHASE — Fort Worth, Texas March 21, 2002 IV-1 LOCATION MAP TRAIL RIDGE ESTATES , S FP R NCH p 4rq rs VEST NT ti WE T p s n OLD WEATHERFORD FORT p 1 CHAMI r SANTA C ARA r SANTA NI B > RICHLAND RIC SANTA $ PAUL r PALO PINTO M wl OD _ c �FA J } Z CHAPIN Y CHAPIN SHADY ��TM EXHIBIT "B" STREETS w 1�ar CTRAIL RIDGE ESTATES ~ PSI I >e ■ " 17 � ^ Q ,• SIG$ '• 1' • 7I0 �� s ♦ i i t „ s anc a „ 27 urns aw1a,ca n uL A.MA aM7 is V 1/ 29' B-B A D � R R " DEVELOPERTREETS a=L WW morilow CONSTRUCTION 12 WA A.KJOE RNk FATAT. 4 R1 a e , .AGa1,1a/1 A W� uL'ATA um A O x Q 14 a =ClOII DA u 12 let n x W • ■ ,• a ' • p � N I R M 7 N • Q Q . K 6 r � Q w 4 ~ " a DA=H Lux • • . s s 1 s cx"nr RoAD 1/2 BLVD S 2T 5' - r EXHIBIT 'B-1' ' 'u STORM DRAIN R ; '�-----� -----� [TRAIL RIDGE ESTATES - _ r I" 127 ' �aura Cl§lK x CAN.w INA SMT 2 "RCP ' -- BLOCK 86 R N 22 PATItt 01LOCK 86 CAL A.SM UK PJLTat R , 13 Is 10 , i Ly N EXHIBIT "C" STREET LIGHTS n ' /:TRAIL RIDGE ESTATES • R I,a ° f• - I M I' w Q in WON LAN= �. ,• p S M f t i L XNEMADA LANE * CC v A .t „ .t „ i+ �t►s „ r 27 „UKA.SLD. CFAMK 25 24 23 ACT e�A� p q 4 ! s a q W• p „• �itEE e'at R PRL4T. x u 4 R :T� m. w EN"M X p ' CAL vR�� . N 4 p get 14 �, SCTOA DR 1] a It es 4 n •L ,e a s A I 3 ! M s a s u a awC O 4 DUITT XMI CT. " r DALLAM LAN= • • + t t 1 2 a,SS� CHAPIN ROAD !t S V Ll V1,