Loading...
HomeMy WebLinkAboutContract 27256�fiE�Tlll�[EI�T� �JV][7['I� 1VI�C AMENDMENT NO. 1 STATE OF T�XAS § CITY SECRETARY CONTRACT NO. � � � �g �' COUNTY OF TARRANT � WHEREAS, the City of Forth Warth (City) and Wade & Assoeiates, Inc., (Engineer) made and entered into City Secretaxy Contract No.26426, (the Contract) which was authorized by the City Council and by M&C C�18336 on the 7th day of November, 2000; and WHEREAS, the Contract invalves engineering servicas for the following project: Engineering contract far Village Creek Drainage Area Wastewater Collection Systern Evaluation Study WHEREAS, it has beeome neces�ary to execute Amendment No. 1 to said Contract to include an increased scope of v�ark and revi�ed maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contxact: 1. Article I of �he Contract is arnended to include the additional engineering services specified in a proposalletter dated 19 September, 2001, a copy of which is attached hereto and incorporated herein. I•� Article II of �tie Contraat is amended to provide for an additional $268,S83.OQ to the cantract amount of $457,464.00. The maximum fee to be paid �o Engineer far a11 wark and services performed under tl�e Contract. The toial fee pa.id by the City for all work and ser�ices shall not exceed the sum of $726,047.00. � All other provisions of the Contract which are not expr�ssly amended herei� sha11 remain in full �arce and effect. -1- �������� ����"� �� �i ������{ �`iA �� � . EXECUTED an this the �day of �•��yry�„ �Q�-, 2Q�_, in rort Worth, Tarrant Caunty, Texas. ATTEST: I � ���� � �Ciiy ecretary T APPROV � o DED: -, / Da1e F�eler, P.E. � Director, Water Dep ent Date: �' � �/ � t Wad� & Associates, Inc. B : ��j/l' ""l/ 6 � Y Narne: Mark G. Wade, P.E., President 6701 Brentwood Stair Rd. S,iite 1OQVV Fort Worth, Texas 76112 Date: ������� ( r , P OVE AS TO ORM AND LEGAI_,ITY: Assisfan City Attorney _�_ � � � " � �� _. _ �. Contract Au�horiza:f�inn � ��� ���.- �-� __ .._ _ — , Date AP R.OVE : Mike Graomer � Assistant City Manager Date: I 2� 3� �l — . .—:� �������a ��� � C�B� �� ���� '�3 �^ r��p y�g � �� �11�,, u Fryl� u lSw�� � � I � �Pw&�9CI�TtiF.fi, 11+1C. 19 September, 2001 FORT WORTH WATER DEPARTMENT Attn: Mr. Liatn Conlan Engineering Division 100� Throckmorton Sireet k'ort �orth, TX 7b102 Re: Contract AmendmentNo. 1 Village Creek Darainage Area; Wastewater Evaluation Study P170-070170410010 WAI Agreement File: 0017 Dear Liam: G�nsuli;ng Engineer� 6701 Brentwaotl Stair Road 5 u I t e 1 b 0 W Fort Warih, Texas 76i12 817•451•2820 FAX 817�451�2208 Wade & Associates, Inc, would like to submit the followir►g revised request for a Contract .Amendment to the above refereilced Agreement per the City's rec�uest. The Amendinent shall include four {4) separate tasks defined as follows: A. Prepare Sewer Cleaning Bidding Documents, Provide Bidding Assistance, and Provide 5ewer Cleaning Pragram Management. The ENGINEER s1�ll prepare the bidder's document for the pnrpose af solicitiug bids from qualified contractor�. The bid documents sliall be a single contract that applies to cleaning, CCTV insp�ctian, and dyed-water testing work for lines previously bid by the City of Fort Worth that will not be comple#ed under the current contract due tv substantial changes in large diameter cleaning and CGTV activities north of IH-20. Generally, all lines to be cleaned and teIer�ised are within the ViIlage Creek Drainage Area and are located south of IH-20. Bid schedules shall separate tlie work hased oz1 tl�e full pipe inventory in eacn part. The bid dacuments wilI inelude the following: � Invitat�an �a Bid � Instruction to Bidders � Bid Form N General CQnditions M Special Conditions � Specifications � Certificates af Insurance N Addenda (if necessary) � Bonding Requirements The ENGINEER shall assist the CITY in reviewing bids, answering questians from bidders, attend pre-bid meeting, preparing any necessary addenda and bid tabulation, making recommendations to award the imal cantract. AiI data gathered from CCTV/c�eaning inspections shall be recorded and entered inta tIie ENGINEER's database management system. This sha�l include CCTV ii�spections, cleaning and dyed-wafer tesiing. Each �ntry shall be aceompanieci by a hard copy of the Mr. Liam Conlon Page � of 5 19 September, 2001 fieId form, digitaI photog�raphs, and attached electronic files in standard Fort Worth �SES fo�at. A representative aithe ENGINEER shall oversee the Contractar's activities, provide part time on-site inspections, review pay estimates, review change orders, review all videotapa recordings, make rec4mme��datians for emergency repairs and act as �11e CITY's representaiive during the project. The ENGINEER'S field representativ� will inainCain a detailed daily log of the contractor's activities and immed'aately report, to the CITY, unusual or emergency conditions that require follow-up activity. Tl�e ENGINEER shall also determine whera heavy cleaning is required to complete tI�e cleaning operations. Where the existing pipeline condition prevents norinal or heavy cleanin� operatians 6y the Contractor, tha ENGINEER will consult and recammend to ihe CITY to evaluate o#her methods such as manual removal of debris anci deposition. It is anticipated that CCTVlcleaning opexatians s1ia11 be ca�iducted within a 6-month period. The Engineer shall provide one (1) fulI-time inspactor to oversee all contractor activities. A CTTY's contraotor will conduct CCTV inspectian a� approximately 136,100 feet of main sanitary sewers within the Part 1 study area. The cleaning and CCTV cantrac#or will be selected through competitive l�idding process. The ENGINEER will prepare a list af line segznents selected to 6e inspected by CCTV based on f eld inspection activities, averflow re�orts, maintenanee records, and oth�r pertin�nt informatinn. Allowance of approxi�ately 49,4D0 feet of main sanitary sewers will be included in the contract for either normal or heavy cleaning. The contractor will cietermine water pressure and voIume. It is anticipated, hawever, that due to tl�e remote Locatian of the Village Creek Interceptor that mechanical means of cleaning will h� required by the confractor. Where necessary, rev�rse set-�ps shall l�e attempted where the TV ar cleaning �quzpment is unable to pass through the line segment, or where equipment set-up is not feasible. Also, wl�ere flows are high and hinder au adequate inspec�ion af the pipe, the contractor snall plug and isolate the lirte segment by pro`riding one or xnare bypass purnps. Dewatering o�tha isolated line segzment shall be required, as determined by the ENGINEER. In the unlikely event of a back-up on#o parivate property, and when such a baek-up is report�d by the property owner or resident, the cnntractor shall secure t11e services of a professional cleaning contractor to mitigate the problem with reasonable ef%rt and timeliness. As such, communication between the property o�+ner, ENGINEER., CITY, and conlractor shall follow prescribed procedures as agreed to during the project kick-off meeting. The contractor will use specialized field forms tiiat camply with the database recommended in the CITY's SSE9 Standards Manual. All inspections shall be recorded on pre-approved VHS tape me�ia with voice-o�er of all obsezvatians of the contractor's TV operatpr. If, during the course of the work, the ENGINEER determi�es that cleai�ing and inspection procedures could result in eminent danger ar result in significa.nt structural damage or deteriaratian of the pipeliiae, the CITY shall be infarme�l. �trfade � Associ��e�. l��. Cons4�#�f�� ��gineers Mr. Liam Conlon Page3of5 l.9 September, 2001 An esiimatc of main sewers to be cleaned and/ar te�evis�d is as follows: 1V[ain M-257D-1 I M-257D-2 I M-257C I M-287 I M-295 M 295A M-295B M-295C M-3Q7 M-313 � lkI-314 � M-321 M-322 � M-325 � M-326 � M-329 M 357 M-361 M-416 M-423* M�77* � M-52U* I Total Whalesale Custamer Forest Hill Everman Everman Evermaa �verman Everman Everman Forest Hill Crowley Everman Evea'man Everma�i Forast Hill Everman Crowley USMFI 137+U0 243+46E 165-�21E 17+1OS 165+LSE 6Q+37E 55+13E 74 �96E 71 r39 a6+�I 60+75E 108*33E 69-�SO 172+33 11+6U 174+89E 38+84E 9+q4 13-�Sp 39+S6E 61�-62 14�-54E DSMH O+pO 137�-OD O+DO O+DO p+p0 a+oo 0+05 U+04 D+40 a-�ao O+UO 0+00 p+p0 0+21 0+56 0+00 Q+Ob U+OD (}+OD a-�oo 0�00 4+00 Pipe DiR. 33" 36" 36" l0" 2I" 18" 1Z" LO-15" i0-12" 10" 12" I8" 12„ 18-24" l0" CIP 15-18" 10" 10" PVC 10"PVC i2-21" IO-1S"PVC 12"PVC �Q�� cc•ry roatage rootage 13,70U 11,OOD 10,60U 8,SOD 16,500 1 b,500 1,700 ],440 1b,50D 13,2(}0 6,OOD 4,800 S,SOD 4,40p 7,500 6,Oq0 7,100 5,7DD 2,700 2,200 6,100 4,906 11,Op0 8,80D 7,000 5,600 17,200 13,800 1,20D I,000 17,500 14,OU0 3,90D 3,100 9fl0 7�0 1,4fl0 1,100 a,oao 3,200 6,20Q 5,OD0 1,500 1,200 165,7D0 � 136,10U Nnrma� Clean Foatage 3,Q00 2,�no IG,500 400 3,GOD 1,300 1,200 1,700 1,6�0 6D0 1,300 2,400 1,SOU 3,800 300 3,900 90D 20D 300 gaa L,400 3U0 49,4U0 He�wy Clean Footage 1,500 1,2D4 i 6,500 Zoa 1,800 700 600 800 800 300 7�0 1,200 SDU 1,900 1QU 1,90D R00 lOD 2�0 �oo 7U0 2fl0 33,000 B. Flaw Monitorin�. Due ta the unusually large tributary area within the V illage Creek Drainage Area additional flow monitoring is reyuired to determine the time af concentration to �e used for pro�ection of peak I/I during design storm e�ents. 1'rojected UI shall be combined with existing and future growth wastewater production to determine pipe capacity requirements. Wade & Associates shall install and maintain three (3) temporary continuously recording electronic depth and velocity flow meters. The meters shall be Americau Sigma l�iodel 910 AV or approved equal. Flow monitoxs shall be installed for a period of 60 days beginning approximataly �ctober 15°', 2001 in �e lower portion of Main 503*, Main 244B and Main 261. The ENGINEER will adhere to a minirx�um ance-weekly meter maintenance program. These inspections will involve a check to determine that tl�e meter is functioning properly, a transfer of the computerized data, check the actuaS deptli and velocity against the recorded readings and assessment of the self-contained power source. During the course of the metering, calibration of the meter site will be performed o�+er �lie range of anticipated flows. Tke ENGINEER will submit weekly laydrographs for each metering site during the monitoring periad. The resultant analysis will be used to quantify peak wet-wea�►er flows for the capacity utilization report. Results of the flow monitoring will be �valuated as follows: � Base f�ow, infiltration (g�roundwater-induced} and inflow (rainfall-induced) will be determined for each monitaring site. Relationships between rainfall intensity and peak system flows for each sub-basin unc;er "non-bypassing" conditions aiYd 1d�ade � ��sc�iaies. lnc. Cans�lting ��gir�ee�� Mr. Liam Ca�lon Page4af5 19 September, �001 saturated graund conditions will be determined. This is called the "Q vs. i" method of hydrau�ic analysis and will become the primary method of ranki�ig sub-basins and calibrating the hydraulic madel. � System curves will be developed for eaeh sub-taasin by comparing maximum rainfall intensiiy "i" expressed in incheslhaar and peak systetn flow "Q" expresseci in gallons per minu�e. Separate curves will be developed for boih inflow aud raiu�all-induced infiItrafion, iuicluding projected flow hydrographs far the design starm evel�ts. d Rainfall inte��sity distribution using TP-4Q mathad will be used for sub-basins ta de�elop a model that replicates and characterizes hydraulic behavior to localized rainfall conditions. A Draft Interim Report as defined in Task C.2. of the Agreement regarding Main 244A capacity analysis shall be submitted January 15��', 2002. C. Additional R�port Preparation. Due ta additional CCTV work provided by the City's current CCTV and cleaning contraatar for Main 188, Main 503*/Contract 2, and Main 503 *IContract 3, additianal CCTV review and rehabslitation recorramendations will be required. Wade & Associates shall review approxirnately 40 additianal lines aa�d prepare prelirr�inary rehabilita#ion recommendations as necessary. Recommendations shall be included in the 1'roject Report as de�ned in Task D of our origiiia! Agreeinent. D. Rehabilitallon Design. Par the City's request Wade & Associates shall prepare construction plans and specificaiions and provide bidding assistan.ce far 10,560 lf of sewerrs within the VilIage Creek Drainage Area. Following a recent overflow Main 188 was televised and faund to be in poar structural condition. Tlie City's HydroWorks model indieates that Main 188 also has insuf�icient capacity. For this r�asan Wade & Associates has recominended ih�s line be replac�d. The City currently maintains a backlog of lines determined to be in need af structural restoration. Additianal lines �rom this lis�ing have also been included for rehabilitation design aud are generally defiiied as follows: Main 188, Sta. 0�-OQ to Sta. 65+78 VilEage Creek Miscellaneous Rehab Design a. M-'{70A, Sta. 246+83 to Sta. 277+22E b. M-17aAR, Sta. 59+00 to Sfa. 63+54 c. L-6401, Sta. 2D�-49 to Sta. 2Q*85 "Paint Repairs" Sub-Total � III. Lake Arlington Ranch Conceptual Design Report And Design a. M-503�, Sta. 340-�84 to Sta. 3�2*84 b. M-257B, Ska. 83+26 to Sta. 85+26 Sub-Total = SUMMARY Main 188 Total = Village Creek Miscellaneous Rehab Design = Lake Arlington Ranch Grand Total (design footage) _ 6,631 LF 3,039 LF 454 LF 36 LF 3,529 LF 2a0 LF 200 LF 400 LF 6,fi31 LF 3,529 LF 400 LF 10,560 LF V�ade � llss�ciates. I�c. �c�sulfin� �n�i�eers Mr. Liam Conlon Page 5 nf 5 19 September, �001 Our fee for tlie above proposed Cantract Amendment will be $268,583, increasing the total con#ract amount from $457,�b�.00 to $726,047. A rn�re detailed sutntnary of tlie proposed Contract Amendment fee is shown in Attachment A, A schedule of services defined herein is shown in Attachment B. The fallawing summary represents our �ee estimate for the scope of services subrr�itted herein. In addi�ion, we have secured cammitments from two MIWBE s�b-consultants who �vill assist Wade & Associates on this project. Letters of Commitment are attached. We propose to complete the work in accordance with the following fee schedule. Task A — CGTV/Cleaning Manageznent Task B — Flow Manitoring Task C— Additional Report Preparation Task D — Rehabilitation Desi�n Subtotal Amendment No. 1 M/WBE Sub-consultant Fees {10.0%) $ 97,265 20,SG4 3,718 147,03b $268,5 $3 $26,600 A further break down of fees to be provided by our M/WBE partners for this praject is as failows: TDO Resources d�ra CAD Resources Task D.1. Main 1 S$ Design Task D.2. Misc. Design Task D.3. Lake Arlington Ra.uch Hugo C Trevino Printing Services Total $23,000 3,600 $26,600 Shauld you have any questians or need further informa#ion please cQntact me at ($04)684- S 899. Best regards. WADE & ASSOCTATES, INC. ��.`" � �.�,.�.�(/� Dan R. Hegwald, P.E. Project Manager Attachment CC: Mark G. Wade, WAI Chris Brooks, WAI IRlade � A��acia�es. i�c. ��ns�i�in� ���i�eer$ �tfi ��;�tim�ri'� �i Amm�ncl�aex�t �io . 1 Vi�l�ge Creak Dr�in�ge Are� �astewater Collection Systiem Svalnation Study Project No. P17a-07ff1704ZD010 eile IDn �`\nroiecta\OOl7\aga�t\amdlfee5.x7x oPORR �&3 W IInit IIuit CaatQuaatity Totak Perso�el C.`.aes f catiox, f5I Vhit Casf va RS P8 ST OT SP PT C[+ Ol� A. Piald Savaat3gatiou i. 9awos Cleaaiag Prgsa tlg¢t 7.4 120 136 2�F 0 0 5,000 0 8 z. ��a� gsaasng no��t� o a as o s a o a za 3. siddiag Anei�teace 0 8 24 0 0 0 0 0 0 H. Flwr R+smx�tilieakion 1. Admiai�trakioa 7 8 16 0 8 U 4 0 � �. riax aeontco�� (ce�po�ry� �c�-day s6s.ao iao $u,zoo 3. F1mo naha Aaalysia 0 8 48 0 16 U 0 0 0 C, RepprC 1. Dr�t Repost {;9 add. Liaaal 0 2 39 � 0 0 0 0 6 1_ Aaviaw ![9at3ag x3th City 0 Z � 0 0 0 0 0 6 3. Fivai 8eport 0 0 1 0 0 0 0 0 0 D. Rahab Dmiga ],. pll�ia 168 pnd 1ki3,gpmpAt &tndy 7sF $13.75 6�631 $91,175 0 0 0 0 0 � 0 0 fl 1. Villaga Cxeek ![iac. Liau BehaH LF $12.57 3,SY9 $54,350 0 0 0 0 0 0 0 0 4 3. La1ce Aslfaaton Itanch Deniva iS 600 $11,5U0 0 0 0 [1 0 0 6 0 D Totnl Hoeea� 1. Lnbar Pa�e iaeluGa 10� mark-up Eor expansea �000 200I Claasification S[hr 51hr P8 Ftiacipal 12d d0 127.�20 S8 - $pnior ffigiaeet 104.00 130.20 88 - Fs'ojeet E7ngiacex 66.00 70.06 ST - Seaiax 4iYiCe T�eL 62.00 65.7G OT - 0£Yice TecLuicisn 50.00 53.00 9H - S�ior Yield Tech 60.0� 63_60 eT - 81a1d Techniaian vk8.00 50.9D Ps - Rart 4ime Teehniciaa 24.I0 25.60 GZ - Clasiea2 so.00 42.40 OA - OPPiCe flnaiatant 30.00 3I.60 Total" Total LabOi/$xC COSt 0 $87,195 $B7,195 0 $7,252 $7,Z52 o 5�.816 ga,ess � 53,265 §3,265 $11,700 0 $5,599 $5,549 0 ¢3,245 $3,245 0 5396 $346 0 577 $77 0 Sa $91,i76 0 59 $44.380 6 Sfl 511,500 � ¢266,5&3 Attachment "B" � WorkActiviry i I TaskA—FieldInvestigation � 1. Sewer Claaning Program Management 2. Prepare Bidding Docnments 3. Bidding Assistance Task B--Flow Quantification a � 1, Administration � 2. Flow Monitaring (temporazy) � 3. F[ow Data Analysis � Tasf� C —Report L DraB Report (39 additionsl lines) 2. Review Meeting With City 3. Final Repprt Task 1)— �iehab Design !. Main 188 andAEignment Study � 2. Viliage Creek Mise. Line Rehab � 3. L�ke Arlington Ranch CDR and Z]es. Project Schedule Village Creek Drainage Area Wastewatier Collectian System Evaluation Study Amendment 1�0.1 Project No. P170-070170410010 2001 2002 Nov �ec Jao Feb Mar Apr May �un Jal _ � � I Aug Sepi Ocf Nov Nov � � —� � i � _ r - � I _. �ity o, f �'o�t Worth, T'exas �r��� �r�� ���r���l ��n�m������;�rn �ATE REFERENCE NUMBER LOG NAME PAGE 1116101 **��� ���� � 60WADE I 1 of 1 SUE3JECT AMENDMENT NO. 1 WITH WADE & ASSOCIATES, INC. FOR THE VILLAGE CREEK DRAINAGE AREA WAST�WATER COLLECTION SYSTEM EVA�UATfON STUDY RECOMMENDATION: It is recommended �hat the City Council authorEze the City Manag�r to execute Amendment No. 1 with Wade & Associates, Inc. in t�e amaunt of $2fi8,583 for t�e Village Creek Drainage Area Wastewater Coll�ction System E�aluation Study, increasing the tatal contract amounf from $457,464 to $726,047. DISCUSSION: � On November 7, 2Q00 {M&C C-18336}, the City Council authorized an engineering agr�ement with Wade & Associates, Inc. for the Village Creek Drainage Area Wastewater Collection System Evaluation Study. Heavy rainfall, in February and March 200'�, caused a number of sanitary sewer manhofes to overflow in the study area. A fallow-�p ir�vestigation by the engineer revealed that a numb�r of sanitary sewer lines are structurally deficient and have major root intrusion. Under this amendment, fhe �ngine�r wilf prepare a closed circuit TV inspection contract to identify defecis and restore pipe capacity. The engineer will evaluate the condition of these lines and make recommendations for inclusion in the final repart, as wefl as des�gn 10,560 linear feet ofi sew�r lines to restore quality of serv�ce fio our customers and to eliminaie sanitary sewer manhole overFlows. Additional flow monitoring will also be conducted. This project is iocated in C�UNCII. DISTRICTS 5, 6 and 8. Wade & Assaciates, Inc. is in compliance wifh the City's MIWBE Ordinance by committing to ar� additinnal 10°{o MWBE participation on this Amendment No. 1. The City's goal on this amendment is 10%. FISCAL INFORMATIONICERTIFICAT[ON: The Finance Director certifies fhat funds are available in the current capiial budget, as appropriated, of the Sewer Capifal Projects Fund. MG:k Submitted for City Manager's Office by: Mike Groomer Originatin� Departtnent Head: Dale Pisseler Additional In�'ormatipn Caa�tact: 1�ale Fissalar � FUND � ACCOUNT � (to} 6144 I I � 8207. � (from) IP 170 53'i 20p � 8207 � CENTER I AM4UNT CITY SECRETARY APPROVED 1 L/06/Oi 070170410010 $268,583.OD � 1