HomeMy WebLinkAboutContract 55324-CO2R21-0056 5/1/2023 City Inspector Contract Time (Calandar Days) 420 240 660 0 660 Date Date Date Date M&C Number M&C Date Approved $1,524,286.78 $1,333,262.50 Amount of Proposed Change Order $401,685.00 $25,000.00 $336,025.00 Credits to Date Contractor's Company Name Inspector Teri Skelly Contractor Name It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. $109,337.28 $149,539.00 Project Manager Willliam J. Schultz, Inc. dba Circle C Additional Funding (if necessary) Revised Contract Amount Contract Cost to Date $81,687.00 Pending Change Orders (in M&C Process) $63,722.50 $1,345,890.00 $71,911.28 Director (Water Dept) 24.99% $3,768,971.88 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT $3,768,520.56 $23,747.50 $158,084.78 $426,685.00$1,417,801.28 $399,747.50 $149,539.00 $25,000.00 Remaining Funds Available for this CO $81,687.00 $27,877.00 $39,975.00 $0.00 $39,975.00 $0.00 Orig. Funds Available for Change Orders Council Action (if required) Senior Assistant City Attorney Assistant City Manager Project Description $0.00 Sewer Storm Water $0.00 $401,685.00 Water $1,333,262.50 $351,658.06 JUSTIFICATION (REASONS) FOR CHANGE ORDER Construction Supervisor Contractor Signature $27,877.00 $3,416,862.50 $191,024.28 $401,685.00 Stephen Martinez 682-432-5485 M&C Change Order # $0.00 Paving Extras to Date $0.00 Phone Number:817-392-2629 $3,015,177.50 Totals Water, Sanitary Sewer and Paving Improvements on Winton Terrace East and Winton Terrace West 2 Date:Contractor City Project Mgr.J. Chris Underwood Phone Number: Original Contract Amount Dept. $1,345,890.00 $336,025.00 Willliam J. Schultz, Inc. dba Circle C City of Fort Worth Project Name Change Order Request Water and Sanitary Sewer Rehabilitation Contract 101 55324 02722 City Sec No. City Pro. No.Project No.(s) This change order will provide for additional water main replacement in the public right-of-way of Wescott Drive from Winton Terrace West to Medford Court West, parallel to the storm sewer line relocated in Change Order 1 and additional storm water mitigation required to complete the storm sewer line relocation. This change order will also provide for an additional sewer lateral rehabilitation by cured-in-place method. This change order will also provide for additional curb and gutter replacement, sidewalk replacement, ADA ramp replacements, sprinkler system repairs and replacement of portions of curb and gutter with mosaic tile street names in order to complete the project. X0A CSC No.55324-CO2 City Project Mgr. Construct ADA Ramp 4 Waste Water Access Device Pre-Construction CCTV Inspection Post-Construction CCTV Inspection 39 50 40 7 Traffic Control for Storm Drain Paving Paving Connect to Junction Box 5 6 38 6-inch Concrete Curb and Gutter (Match Existing) (50/50) 3 7 16 6-inch Concrete Curb and Gutter (Match Existing) (50/50) Storm Water Remove Concrete Curb & Gutter (50/50) Storm Water $750.00Storm Water Storm Water Storm Water $650.00EA $6,500.00 60 Remove & Replace Curb with New Mosaic Tile Street Names (50/50) Paving 2,320.0 M&C 21-0056 56 6-inch Concrete Driveway (50/50)535.0 SF 32 33 35 26 Sprinkler System Repairs (50/50) Remove & Replace Curb with New Mosaic Tile Street Names (50/50)51 27 1,787.5 2 4-inch Concrete Sidewalk 1 City Pro. No. 22 02722 City of Fort Worth Change Order Additions Project Name Water and Sanitary Sewer Rehabilitation Contract 101 55324City Sec No. LF Qty ADDITIONS $32,230.00 $53,465.00 Unit Cost $85.00 UnitITEM DESCRIPTION 5-foot Wide Asphalt Pavement Repair, Residential Water8-inch DIP Water Pipe1 Project No.(s) Project Description Water, Sanitary Sewer and Paving Improvements on Winton Terrace East and Winton Terrace West Contractor Willliam J. Schultz, Inc. dba Circle C 2Change Order # 41 SF $20.00 Date: 629.0 LF 5/1/2023 Stephen Martinez TotalDEPT J. Chris Underwood City Inspector $55.00Water 586.0 Sewer Remove Concrete Curb & Gutter (50/50) 1,787.5 0.50 Sewer Remove ADA Ramp Remove Concrete Driveway (50/50)Sewer Sewer 0.50 6.0 Sewer Remove Sidewalk Paving 2,420.0 Water Water Sewer Sewer Sewer 6-inch CIPP Remove Concrete Curb & Gutter (50/50) 6-inch Concrete Curb and Gutter (Match Existing) (50/50) 5-foot Wide Asphalt Pavement Repair, Residential Access Device Collars 5-foot Inlet Box LF Sewer 0.50 LS Sprinkler System Repairs (50/50) LS 227.0 444.0 227.0 1,029.0 1,787.5 Sewer 0.50 LF 1,787.5Water Water Paving 227.0 EA EA 3.0 3.0 90.0Storm Water Paving 1.0 127.00 127.00 6.0 LF LF MO EA $1,950.00 $6,500.00 19 3.0 3.0 1.0 Trench Safety Boxes 6-inch French Drain 17 18 EA $95.00 $8,550.00 $12,000.00$4,000.00 20 21 Storm Water $3,500.00 LF EA $2,250.00 $40.00 $2,500.00 $7,500.00 $7.00 $17.50 $38,518.46 $42,577.60 $40,600.00 $21,288.80 LF LF LF LF $56,595.00 $13,406.25 EA EA $1,135.00 LF $85.00 $7.00 $19,295.00 $3,108.00 $3,500.00 $3,500.00 $5,080.00 $7.50 $300.00 $1,800.00 $21,000.00 $952.50 $13,406.25 $71,500.00 $7.50 $40.00 $38,518.46 $42,577.60LS $2,724.00 SF $71,500.00 $10,700.00 $19,259.23 SF $55.00 $5.00 LS $19,259.23 $12.00 $21,288.80 $16,940.00 $7.50 $40.00 $219,011.28 Additions Sub Total Sewer Paving $86,372.50 $558,783.06 Storm Water $42,250.00 Water $211,149.28 Page 2 of 4 EA EA $49,050.00 $3,150.00 $1,500.00 $90,000.00 $19,500.00 $750.00 $11,250.00 $12,000.00 8 EA 189.0 LF $20,125.00 $37,800.00 $10,000.00 $200.00 Water 80.513 Sag Repair Sewer 1-inch Private Water Service, Relocation $5,000.00 $2,500.00 EA LF $250.00 4.0 Sewer $20,000.00 Sewer 4.0 City of Fort Worth Change Order Deletions Project Name Water and Sanitary Sewer Rehabilitation Contract 101 City Pro. No. 02722 DELETIONS ITEM Qty UnitDESCRIPTION City Project Mgr. Project No.(s) Project Description Contractor J. Chris Underwood DEPT Unit Cost Total 5/1/2023 Stephen Martinez Water, Sanitary Sewer and Paving Improvements on Winton Terrace East and Winton Terrace West DOE No.21 0056 City Sec No. 55324 Date City Inspector Willliam J. Schultz, Inc. dba Circle C 2Change Order # 2.0 19 Manhole Adjustment, Minor 8.0Sewer Sewer 15.0Service Reinstatement, CIPP including Cleanout24 45 4-foot Shallow Manhole Manhole Cone Section w/Ring Frame & Cover 16 Manhole Adjustment, Minor w/Collar 20 Manhole Adjustment, Major Sewer 12 53 Sewer Construction Allowance Paving 14 Water Valve Box Adjustment w/Collar Sewer Storm Water $1,500.00 Sewer Paving $17,250.00 $350.00EA 13.0 EA 0.545 LS 9.0 $207,125.00 $147,100.00 $22,650.00 Water $20,125.00 $17,250.00 EA $3,500.00 $7,000.00 Deletions Sub Total Paving 10 Curb w/Mosaic Street Names Storm Water 15.0 EA $1,150.00 Page 3 of 4 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Ricochet Fuel Distributors � Supplying Fuel $17,583.00 Total � $17,583.00 Contract Compliance Mana�er By sib ing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. �. C �-✓-�--''�-� - ;� S �gnat�ire �l L �-I f:! � C 1 � � � _ IN.j�i-/: ,��t:� Name of Einployee �l�_ L�l'C�I�_lF:�?in�(,� Title 44p44Un� a F�Rt �ad � p���° °� �L �p ATTE$T: v'�'o � °�1fdd p!`o 0-10 Pvo a=d JJ � PPp * o�� �o *� ���, dd�� nEXASoq� Jannette Goodall City Secretary OPFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Warth, Texas Mayor and Council Cammunication DATE: Tuesday, September 26, 2023 REFERENCE NO.: **M&C 23-0829 LOG NAME: 60S5RC101CO2N-CIRCL.EC SUBJECT: (CD 9) Authorize Execution of Change Order No, 2 in the Amount oF $351,658.Q6 to a Contract with William J. Schuliz, Inc, dba Circle C Construction Company for the Sanitary Sewer Rehabilitaiion Contract 101 Project,,AdoptAppropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023- 2027 Capital Improvements Program, Adopt Appropriation Qrdinance and Amend the Fiscal Years 2023- 2027 Capital Improvement Program (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Change Order No. 2 in the amount of $351,658,06 to City Secreiary No. 55324 a contract with William J. 5chultz, Inc. dba Circle C Gonstruction Company for the Sanitary Sewer Rehabilitation Contract 101 pr�ject for a revised contract amount af $3,768,520.56; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capifal Projects Fund in the amaunt of $262,936.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer Rehabilitation Contract 101 Project (City Project No. CD2722) and to effect a portion of Water's Contribukion to the Fiscal Years 2023-2027 Capital Improvement Program; 3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Stormwater Capital Projects fund, by increasing estimated receipts and appropriations in the Sanitary Sewer Rehabilitation Cantract 101 projeci (City Project No. CO2722), in the amount of $25,000.00 and decreasing estimated receipts and appropriations in the Stormdrain Pipe Rehab Programmable Project (City Project No. P00114) by the same amount; and 4. Amend TPW's Contribution to Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSfON: On January 12, 2021 by Mayor and Council Communication (M&C) 21-0056, the City Council authorized a construction contract with William J. Schultz, Inc, dba Circle C Construction Company in the amount of $3,015,177.50 for Sanitary Sewer Rehabilitation Contract 101 project. The confract was subsequently revised by Change Order No.1 in the amount of $401,685.00 authorized on November 29, 2022 by (M&C) 22-0949, that provided for the relocation of a public storm drain system from across private property into public street right-of-way. Change Order No. 2 will provide for additional water main replacement on Wescott Drive and additional storm water mitigation required to complete the storm sewer line relocation. This change order will also provide for additional sewer lateral rehabilitation by cured-in-place methad, additional curb and gulter replacement, additional sidewalk replacement, Americans with Disabilities Act ramp replacements, sprinkler system repairs and replacement of portions existing of curb and gutter with mosaic tile street names in order to complete the project. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead oF within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: 6DSSRC101CO2N-CIRCLEC Capital Revised Project FY2023 CIP Budget Change Fund Name Appropriations Authority ��ncreaselDecrease) FY2023 Name — ---- — — - — — -- � Budget W&S CO2722 -- Gapital SaniSewer Projects - Rehab $Q.00 This M&C $262,936,00 $262,936,00 Fund Contract I 56002 101 - - --- � - - - -- — Funding is available in the Transfer to Water/Sewer account ot the Water and Sewer operating budget and in the Stormdrain Pipe Rehab project within the Stormwater Capital Projects Fund, for the purpose of funding the SaniSewer Rehab Contract 101 project within the Water & Sewer Capftal Projects Fund. Appropriations for Saniiary Sewer Rehabilitation, Contract 101 project are as depicted below: Fund Existing Additional p�o�ect Total* Appropriations Appropriations Water & Sewer Capital Projects $3,126,555.00 $262,936.00 $3,389,491.00 Fund 56002 General Capital � Projects Fund $417,680.00 $0.00 $4�7,680.00 30100 Stormwater Capital Projects $401,685.00 $25,000.00 $426,685.00 Fund 52002 J - -- - --- - I Project Tofal $3,945,920.00 $287,936.00 $4,233,856.00 *Numbers rounded for presentation purposes. Business Equity — William J. Schultz, Inc. dba Circle C Construction Company, is in compliance with the City's Business Equity Ordinance by committing to five percent MWBE participatlon on this proJecl. The City's MWBE goal for this Change Order on this project is five percent. This project is located in COUNCIL QISTRICT 9. FISCAL. INFORMATION / CERTIFICATIOI�I: 7he Director of �inance certifies that funds are available in the Water & Sewer Fund and fhe Stormdrain Pipe Rehab project within the Stormwater Capital Projects Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the W&S Capital Projects Fund, and the Stormwater Capital Projects Fund for the SaniSewer Ftehab Contract 101 project to support the above recommendations and execuiion of the change order. Prior to any expenditure being incurred, the Water and Transportation & Public Works Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund' Department ccount �'roJect Program ctivity Budgei 1 Reference # moun IT _�___-�D _� � ID_ �_ ____r I Year I (Chartfield 2�� FROM �Fund Department ccount Project Program� ctivify Budget Reference # moun Ip � _ Ip 1 _ � I Year (Chartfield_2)—� � GERTIFICATIONS: Submitted for City Manager's Office by� Dana Burghdoff (801a) Origlnating pepartment Head: Chris Harder (5020) Additional Information Contact; Chris Underwood (2629) + i • � � � � l � � L • � � � � � ��� s •1 � 1 � � � �11• %1 .% 11=11� � � .1 1 • � � � :• _ •1 � 1 • .� �� � • .1 � 1 • i � ��. .1 � 1 • ► C : u �.� i •�f � .1 ; 1 • � � 11 �,� �C �• � • •�� �,•• .1 � 1 • � � .11_ :�. ( �� � From:Sauceda, Norma To:Winterrowd, Elisa Cc:Sholola, Tony; Underwood, (Chris) J.; Tidwell, Allison; Williams, Tressa; Black, Doug Subject:55324 Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Date:Monday, November 27, 2023 11:11:31 AM Elisa, Please read email below with Allison notes and Legal recommendation. Thank you much From: Sauceda, Norma Sent: Saturday, November 25, 2023 10:29 PM To: Tidwell, Allison <Allison.Tidwell@fortworthtexas.gov> Subject: RE: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Allison, I re-sent to you in adobe added text box please take action, thank you much From: Sauceda, Norma Sent: Friday, November 17, 2023 7:26 PM To: Tidwell, Allison <Allison.Tidwell@fortworthtexas.gov> Subject: RE: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Allison, I see that Jannette has signed it Should I send this to you only? Please let me know thanks From: Tidwell, Allison <Allison.Tidwell@fortworthtexas.gov> Sent: Friday, November 17, 2023 12:11 PM To: Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov> Subject: RE: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) It has to go through the same process as all contracts. Add the text box for the contract number. Send to Ronald Gonzales to review first, Jannette Goodall for signature, and me to add contract number. From: Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov> Sent: Thursday, November 16, 2023 10:34 PM To: Tidwell, Allison <Allison.Tidwell@fortworthtexas.gov> Subject: RE: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Hello Allison, Here you go hope this works. Please let me know Thanks From: Tidwell, Allison <Allison.Tidwell@fortworthtexas.gov> Sent: Thursday, November 16, 2023 11:55 AM To: Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov> Cc: Underwood, (Chris) J. <John.Underwood@fortworthtexas.gov>; Williams, Tressa <Tressa.Williams@fortworthtexas.gov>; Black, Doug <Douglas.Black@fortworthtexas.gov>; Sholola, Tony <Anthony.Sholola@fortworthtexas.gov> Subject: RE: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Please change the number to read CSC No. 55324-CO2R on the contract. From: Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov> Sent: Wednesday, November 15, 2023 3:00 PM To: Tidwell, Allison <Allison.Tidwell@fortworthtexas.gov> Cc: Underwood, (Chris) J. <John.Underwood@fortworthtexas.gov>; Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov>; Williams, Tressa <Tressa.Williams@fortworthtexas.gov>; Black, Doug <Douglas.Black@fortworthtexas.gov>; Sholola, Tony <Anthony.Sholola@fortworthtexas.gov> Subject: FW: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Allison Per Doug’s recommendation below, please delete the current CO 2 for CS 55324 and replace it with the attached revised version CS 55324 CO2 R. Please confirm when completed Thank you so much for all your help Norma Sauceda From: Black, Doug <Douglas.Black@fortworthtexas.gov> Sent: Wednesday, November 15, 2023 2:32 PM To: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov> Cc: Underwood, (Chris) J. <John.Underwood@fortworthtexas.gov>; Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov>; Williams, Tressa <Tressa.Williams@fortworthtexas.gov> Subject: RE: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Tony – I have reviewed the substitute (revised) CO2 and find it is in keeping with the M&C. It is ok to swap out the old one. Thanks, Doug Douglas W Black Senior Assistant City Attorney 200 Texas Street Fort Worth, Texas 76102 817-392-7615 Direct 682-328-4583 Mobile Douglas.Black@fortworthtexas.gov City of Fort Worth – Working together to build a strong community. RECIPIENTS - PLEASE CONTACT ME PRIOR TO FORWARDING MESSAGES DESIGNATED AS ATTORNEY-CLIENT COMMUNICATIONS. This e-mail and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to which they are addressed. This communication may contain material protected by the attorney-client privilege. If you are not the intended recipient or the person responsible for delivering the e-mail to the intended recipient, be advised that you have received this e-mail in error and that any use, dissemination, forwarding, printing, or copying of this e-mail is strictly prohibited. If you have received this e-mail in error, please immediately notify Doug Black at the City of Fort Worth City Attorney's Office (817) 392-7615. From: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov> Sent: Wednesday, November 15, 2023 1:24 PM To: Black, Doug <Douglas.Black@fortworthtexas.gov> Cc: Underwood, (Chris) J. <John.Underwood@fortworthtexas.gov>; Sauceda, Norma <Norma.Sauceda@fortworthtexas.gov>; Williams, Tressa <Tressa.Williams@fortworthtexas.gov> Subject: 2722_Change Order 2 (Water and Sanitary Sewer Rehabilitation, Contract 101) Doug: Please give Allison the okay to swap out the current CO 2 (second attachment above) in CSC No. 55324 with 55324 C02 Revised (first attachment above). As you can see on the third attachment, we utilized an old version to route the change order for approval after the M&C was approved by the Council. The fifth attachment is the FID table that was approved with the M&C. Please note that the green highlighted amounts on the FID table are the same amounts in the appropriate columns of revised CO2 and that the total change order amount remains the same. The addition and deletion sheets of revised CO2 match up with the revised totals. We cannot pay the contractor form the second attachment currently located in laser fiche. Please let me know if you need anything else. Thanks