Vendor Name: Gracon Construction, Inc.
Vendor[D#:7000002741
Release Retainage - $276,1 14.69
FID:56003-2060000-103116-RETA[N
FORT WORTH
WATER DEPARTMENT
ENGINEERING AND F[SCAL SERVICES
NOT[CE OF PROJECT COMPLET[ON
CSC No. 56463-FP1
56003-103116
CS 56463
Regarding contract 56463 for the Southside IV Booster Pump Station and Hydropneumatic Tank
project as required by the Water Department and approved by City Council on September 28, 2021 through
M&C 21-0764 the Director of the Water Department, upon the recommendation of the Assistant Director,
Capital Projects Delivery, Water Department has accepted the project as complete.
Original Contract Price:
Amount of Approved Change Orders
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Other Deductions:
Total Deduction Amount:
Total Cost of Work Completed:
Less Previous Payments:
$ 5,588,670.00
$ 0.00 No. 2
$ 5,588,670.00
$ 5,522,293.53
0 Days @ $1,500/Day
$ 0.00
$ 0.00
$
5,522,293.53
Final Payment Due: $ 5,246,178.84
% � � $ 276,1 14.69
/G� � o
Recommended for Acceptance
Assistant Director, Water Department
�l�YlJ'to,�l�e� ffGiY�feY
Christopher Har er (Nov 27, 2023 11:45 CSTj
Accepted
Director, Water Department
�GLf'GGt� �Gf.y'A��
Dana Burghdoff (No 8, 202 0:44 CST)
City Manager
( f'� � Z�
Date
Date
Date
Project Name: Southside IV Booster Pump Station and Hydropneumatic Tank CPIV
103116
Date of Warranty Start: Date of Final Completion:
10/ 10/2023 10/ 10/2023
OFFICIAL RECORD
GTYSECRETARY
FT. WORTH, TX
GRACON CONSTRUCTION
CONTRACTOR'S APPLICATION FOR PAY3NENT
PAY REQUEST NO: 22 - Retainaae PERfOD FROM: 8/14l2023
DATE: 10H0/2023 PERIOD TO: 10H0/2023
Project:
The City of fort Worth, Texas Water Department
Southside IV Booster Pump Station and Hydropneumatic Tank
"Sun Country Pump Station"
City Project No. �03116
Contractor:
Gracon Construction ,Inc
PA. Box 360039
Dallas ,Texas 75336-0039
Greg Graves : 972-33�-8034
Cory Graves: 318-331-8035
Project No. 2110
Contract Summary
Original Contract $ 5,568,670.00
Approved Change Orders $ -
Revised Contract $ 5,588,670.00
Job Status Summary
Total Work Completed $ 5,522,293,53
Totaf Change Order Complete $ -
Material Stored $
Total Contract Completed 5,522,293.53
Less Retainage (5 % ) 50.00
Total Completed Less Retainage $ 5,522,293.53
Less Previous Payments $ 5,246,778.65
QinouqtDue;Thls'f�orLod.".�.. �"�..�..�5".,r�'--T_1.�134.��
WorkCompleted 99%
Owner:
The City of Fort Worth, Texas
200 Texas Street
Fort Worth, Texas 76� 02
Suzanne Abbe
Project No.103116
Engineer:
Freese and Nichols
80� Cherry Street, Suite 2800
Fort Worth, Texas 76102
Olivia Kerss
Projed No. FTW21 158
Substantial Completlon 300
Final Completion 365
Calendar Days Used 721
Notice to Proceed October 19, 2021
SubstanGal Date August 15, 2022
Final Date October 19, 2022
Additianal Days Awarded 0
Revised Substantial Date August 15, 2022
Revised Final Da[e October 19, 2022
Fnal Date Approved Octoher 10, 2023
SUBMITTED BY• GRA N
BY:
DATE Ouober 10. 2023
ENGI ,� (
BY: � �• �
DATE: �� �S �L�
CfTY OF FORT WORTH
BY:/!/�UZ,(t'�J1i �2l'.LG/_ 10/25/2023
DATE:
CITY OF FORT WO TH
BY:
DATE: >>�»�023
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Pape � q0
The Ciry ol Fort worlh, Texes Water Department
Contractor Gramn Construction. Inc DATE: 5 011 012 0 2 7
Engineer. Freese and Nichols Pay Request No: 42 - Ratainage
y � w
�
rw o a
� o
NO. DESCftIP710N UNITS UNITPRICE TOTAL �� TOTALTHIS y � VALUEOF
ESTIMATE � � COMPLETED WORK
aw o �
Q w o
�
1 2a' Sisd AYVWA C408 V7abr Vlp� 210 R E 7 035.00 S 217.350 00 S 210 210 S 217.350.00
�
2 ZO" Steel Water Pipo 50 If S 860 00 S 43,000.00 5 50 50 5 43.000 �0
3 �6' WatorPipa Sxlbn 290 I! S 53000 5 153.700.00 S � 290 290 5 153,70� 00
(
4 12" Wa[or PiDa � 70 I( 5 7<0.00 5 51 800.00 � S 70 70 5 51 B00 00
5 24" Gate Valve w! Vautt � �
SA1 6'Manhole � 3 ea 5 3a,5Q0A0 5 103._'00.00 5 3 3 5 103.:a000
5 02 24" Gate Valve 3 � ea 5 25.000 OO d 5 75,COO.�C S 3 3 S 75.000 00
5A3 Sratl RO��C �CVaNa: 3 ea S 500 00 I 5 �.500 oC 5 3 3 S 7 5�0.00
ToYal Bid Ilem No 5 5 78�,000 00 5 5 1BO,OOOAO
� �
6 ZO" Gato Valve, Direcf Bury 2 en 5 20,00000 5 40,400 00 � 5 2 2 � 5 40,000.00
7 16" Gata Valva, Diroc[ Bury 2 ea� S 12.000.00 S 2a 000 OC S 2 2 S za.000 00
I I
8 72"GaloValvo 9 ea 5 6,00000 S 5<.600.00 b 9 9 5 54.00040
9 12" C�eck Valva antl Vauit
901 PreraslVault 7 Is�S 47.50000 S 47,50000 S 100Ye 100q E <7,50000
902 P�pmaarpVaNc 1 Is 5 27,00000 S 27000.00 3 100% 100% 5 27,OD0_00
9.03 $3mplc St�Uon. Sme.'I Pipv.g � Va'vas 1 Is S 3 000 00 E 3.000.00 S 100 % 100% � 5 3,000.00
9 04 Sumo Pump and Pr,�:nq t � Is � S 1,500 00 S 1,500 GO 5 100 % 10045 S 1,SOR00
9p5 Painl 1 Is b � 00000 S 10W.00 5 10p� 100% S 1A0000
:oLL B�O ltem No 9 I 5 BO,OOa 00 S 5 BO.D00 00
10 ZO^Elactromagn�QcFIaMMamrantlVaWl
10 01 Pre�sl Vault 1 � Is � 5 74 500 00 5 74.500 00 3 100 % 700% 5 74.500 00
10 02 PiDinO 1 � 15 5 8.400 00 � S 8.400 DO S 100% 100% 5 8,400 00
10 03 Sample S1aGon, SmaII Piping and Valves 1 i; 5 3,D00 00 S 3,000 00 S 100% '100 % 5 3,000.00
10.Od SumoPumoandPiDina 1 Is 5 1.500.00 3 1.50000 S 10�% f00% S 1,SD0.�0
1005 Paint 1 Is S 7.00000 S 'I.00�00 S 100% 100Yo 5 1,00000
10 06 P�olec[ Manao�nent 1 ts 5 B,7p0 00 S 8.7C0 UO 5 100% 100% 5 8 7�0 00
�0075u6minalDeveboment 1 �Is 5 d,65J00�5 465000 S 100% 700% S 4656.00
1 o OB 20' Electromaonefic Flow Me1er t Is 5 1�,540 00 5 10.590.00 S 100% 100% 5 10,540 00
10 09 wesswe InO�cafng Trsn:m�tter Assem'�:p 1 is 5 5.2?0 00 S 5.220A0 5 700% 100% 5 5.20-�0
10.10 Pressure Indlcalor 7 Is $ 55000 5 550_00 � 5 100% � t00Y, 5 550�0
10'I1�LevelSWitch � 1 Is E 40000 S 400.00 5 100% � 700°k S 40090
10.72jPLGOIT/SCA�ADevefopmentandPro9ramming 1 Is E 7650�0 5 7,65000 S 700% 100`/o E 7,65000
10.13 Upon Complelion of Inslrumenl CalibraGons i Is S 5,475D0 S 5.475 00 5 � 100% 100 � � 5 5,475 00
10 �4 Inslrumentalion InsmllatloNFinal Field Tertninalions 1 Is 5 9.720 00 5 9.120 00 � 3 1o0%� 100% 5 9.720 00
10 15 � Uoon Comvlelion of Field Testinp 1 Is 5 6.700 00 5 6,100 00 5 '100 % 700% 5 6.10� CO
10?61Preiim�FinaiO6MDeveloDmen[ � Is 5 3,19500 5 3,t9500 S 100� 100°b 5 3.19500
To�18�44lm�b70 5 750.COp.pO 5 5 15�,�0000
� �
1] 24"ProssurePlug t Iea 5 71,0�0� 5 17.00000 �5 100°h 700% 3 11,00040
�Z 116' Gressvn Plug 1 �ea 5 9,000.00 S 9,000 00 S 100 % 100Y S 9.U00.00
13 1"WaIarSBrvICO � 1 led S 14.000.00 5 14,00000 $ 700% 100% $ t4_CC0.00
14 I<" PVC Sewer Piva, 0' [0 6' Misc. Only 110 I1 5 'IEO 00 5 17,600 00 5 710 110 5 77,600.00
15 4' Drainaaa Manhole w! Gravol Bod 1 ea $ 21_QQ(7.q0 S 21.000 OD � S 100% 100% S 21,000 �0
I I
16 Firo Hydrant � ea 3 9.OG0 00 � 5 9,OOo 00 5 t t 5 9,OOOAO
�7 ConnectlontoEzistinq36"Wa[arMain 1 lea S 1200000 5 12.00000 5 7 � 1 S 12,00000
� �
'IB ConnectiontoEsis2inod"-12"WaterMaln 2 ea 5 7.00000�5 74,00000 5 2 2 S 14.00000
19 12"FlexlbleBase � 150 sy 5 4500 S 6,75000 S 'I50 i5U 5 6,750.00
20 T' Concrete Pavement 195 sy 5 270.00 S 50.950 00 S 195 195 5 40.550 00
21 10' Wido Asphal[ Pavomant Rapair, Rosiden6al I 30 If 5 300 00 S 9,000.00 5 30 30 E 9.00000
�
22 Coneroto Pavament Repair, Rasidential 50 sv 5 440 00 8 22.000 00 5 50 50 S 22.000 00
23 Exptontory E�ccava[ion oF Existing Utflitiat 3 ea 5 2.57Q.00 5 7,SC0 Op 5 3 3 5 7,SCO.OL
24 12".18"TreeRemoval 2 ea 5 1.50000 5 3,00000 5 2 2 S 3,000.00
� �
25 6" Chaln Link Fence with 3 S[and Barhed Wire � 259 It 5 90 00 5 23.220 00 5 25B Z58 S 23,220 00
�E
The Ciry of Forl Worth, 7exas Waler Deparvnent
Conlydctor. Grawn Construction. Inc.
DATE: �0/7012023
Engineec Freese and Nichols Pay Reques[ No: 22-Refalnage
_
�
FW O ¢
� f �
� a a O VALUE OF COMPIETED
N0. �ESCRIPTION UNITS UNITPRICE TOTAL E 70TALTHISESTiMATE � � yypRK
�w > �
o � o
26 Seoding,Hydromulch 3800 sy� 5 200 S 7.60000 S 3800 3800 S �,6�0.00
27 ?nfficCqntml t Imo} i �.�0090 g 7.00000 E 1 1 5 t.000.00
26 �Trench Safety 620 IF E 10.00 S 6,2�0.00 S � 620 620 S 6,200.00
� �
29 Consi�uclfon SWkiep 1 Is 5 4,000.00 � S 4.000 00 E 100% 10�% S 4.000.00
�
30 As-BuiltSurvey 1 h 5 1.00000 E �00000 �S 100% 700% S 1.000.00
�
3� M Pumy 5tntlen S�m Work mt apod6nRy fis � 150 cy 5 100 00 5 �5.000.00 S � 150 150 � S 15,000.00
32 Excavallon �nd 6ackfilllAll Structurosl �
3Z.01 Hydro-TankTankFoundalion � 1 �Is 5 SOOOO.OG 5 SO,00000� 5 700Y< 100% 5 50,000.00
3202 GenerdtorFoundation 1 Is 5 40.00OW S AO,00000 5 ��W% 100% 5 40,00000
32,03 Conerete Scrgen Wall � t Is y �9.(q00P 5 10.00000 S ' 100°h 700% 5 10,000,00
Total Bitl Ilem No 32 5 t00,C00 00 S S 1QO.OM-00
33 M[sc. Si[e Conc (All Struc[ures) not specl�caliy listed elsewhera ' �
33.0'I �Gene2torSlab 1 ls 5 3Q0�000 E 30A0000 � 5 - 700% 100Y 5 30,OOOOD
3302 �HVCfo-Tank5laD 1 1s S 40,500.00 E 40,500.00 5 7a095 100Y 5 40.5000�
33.03 Screen WaII Concrele 6 ty 5 900 00 E a B00 00 S 6 6 S Q.B00.00
33.09 Concrele Landinos and Aooroach 9 cv S B00 00 S 7 200.00 � S 9 9 S 7,200 0�
33.05 � SlEewalks SOD sf E 15.00 5 7.500 00 � $ 500 500 E 7.500 00
Tout 8iC Itdn 710 33 S 90.000 OG ; S S 94000 00
I I I I
3a I IyaL+� Paerinuons I I
3f 01 Lintels, Jams, Sills 1 Is � S �?0� W � 5 3,100 OC 5 100% 100% S 3J00 00
3S 02 Meul G2tlna antl C�eckeretl Plale 1 Ls 5 24,100 00 5 24_100 00 5 100% 100% b Za,700 00
37.03 Bollafds � 4 1 ea 5 700.00 S 2.80� 0� $ d { d E 2 B00 00
Totai Bia llem No.34 5 30, W0.00 5 � E 30.000 00
� �
35 PumD3trienBufldinp
35 01 Mabil¢ation 5% 7 Ls S 279 433 50 � S 279 43350 S 700 % 100% 5 279.433.50
35.02 Bond and lnsurance 2% L• E 111 773 40 � 5 717 773 40 S �00 % 100 % � 5 111,773.40
35.03 EzcaYdllon 7 Is E 50.040.001 S 50�000.00 5 10045 100% 5 50,00000
3504 ��ludMal 2B cy 5 7Q0.00 S �9.6G000 5 2B 29 5 19.600.00
3505 rlexhaseFill 1 �Is 5 75A00.00 S 75.00I7,G0 5 100% 700Ye S 75.00000
35 O6 Under5laD PlumCina 1 15 S ?3.993.10 5 t3.89310 S 700% 100% 5 13.893.10
35 �7 Concrete PilSlab Antl Sumo Pit 73 I ry S �,300 00 S 76,900.00 S 13 13 5 16 900 00
35�OB Concre[e Pi[ Walls 30 � cY 5 7.300 00 5 39,000 00 S 30 30 5 39.000 00
35.09 jConcreleSlab '113 Iry 5 130000 5 146900.00 $ 113 113 S 146.90000
3516 Precast Wails � 1 Is 5 250.00� 00 5 250.000 CO E 100% 100% 5 250,00000
35.�'I �RoofFreming 1 � IS 5 BS.00O.OD 5 85,00000 � S 700°l. 100%I S 85.00000
35.12 Roofno � Is 5 39,00000 S 39000.00 S 100% 100% S 39.00000
35.13 Overheatl Door 1 ea 5 33.000 00 5 33.000.00 E 100% 100%� 5 33.000.00
35_�4 HOIIowMetalDoors 7 ea S 3.0000� S 21,00000 E 7 7 S 2�.000.00
35.�5 EpuipmenlPads 6 cy�5 80000 5 4.8�000 S 6 6 S 4.00000
35.16 �ealFloors 1 Is 5 10.000.�0 5 10.000.00 S 700% 700°'a 5 70,OOD00
35.17 PamlCeilingantlTrusses 1 Is 5 3'�,000.00 5 31,00000 S 700% 100%� 5 31,ODOAO
351B IP�.P��n9�AVa:ve: � Is�b 1'�,D0000 s ii000.00� S 100°/. 100%�5 1t.00000
35.19 Caullc Precast Walls � Is S 20D0.00 5 z000 00 � 3 100% 100%� 5 2,000 00
3520 MelalCanooy 3 ea 5 390000 5 t1,700QO` 5 3 3 �5 1t.70000
3521 �Signs 1 Is 5 1.00000 S 1.00OAO 5 700% 100°'0 5 7.00000
35 22 �Flood VeNs 8� ea S 400_00 5 320D.04 E B 8 5 3.200 00
35 23 Fife Exlinauishers 4 ea S 200 00 5 800 a0 S 4 a � 5 B00 00
:obl Bb IMm No.?5 5 1 256,000.00 5 � 5 7 256,00� 00
�
36 Pump SUtion Machanical VaWr, Piyinp. Air Valvas, SuppaK:, Aypur.enancos,
3fi.01 Untlerslabl2"Suc[ian CaiS <0,00000 $ 760,QOO.CO� 5 4 4 S 160,00000
36 02 Pump No.1 Valves and Piping 1 � Is S 56,250 00 � 5 So 250 �0 5 � 1001 1Q0% S 56,250.60
36.03 Pump No 2 Valves and Pioin4 1 fs S 56.250.00 S 56.250A0 � 5 I �00% 1Q0%� S 56,250 00
36.03 ➢ump No.3 Va2vea antl ��O�ng 1 Is 5 Sfi.250.00 � 5 55 250 DO � S 100°/. 100Yo 5 56,250 00
36 04 PumD No 4 Valvcs and Pio��q 1 Is � 5 56,25� 00 � S 56,250 CO � 5 100'/. 100°b S 56.250 00
36 OS 20" Discharge Heatler 1 I5 5 45.000.00 S 45,0�0 00 � S 100% 7Q�: 5 <S,OCO 00
Tolal 8id Ilem Na 36 � S 430.000 00 � 5 5 430.000 00
� �
37 Pump and Motor Package � d ea F F�.040.09 5 2na.00� 40 5 d 4 5 244.000 00
� �
3B Varia6leFreouencyDrive a ea 5 27.00000 S 108,0�000� 5 4 4 S 100,00000
I I
f I I
I
I I
I I I 1
I I I I
�
The Ciry of Fort Worth, Texas Water DeOartment
Conuactoc Gracon Conslruclion, Inc DATE: 10N012023
Engineer. Freese and Nic�als Pay Request No: 22 - Retalnage
CHANGE OR�ERS
z w
� r
xw o a
VALUE OF COMPLEfED
0
NO. DESCRIPTION lJnib UN[Price ToWI �� TOTqLTHISESTIMA7E � � WORK
zy o a
� "' > o
o � �
I
I
I
I I I I
I
I I �
I
I
I
I �
I
I
I
I I
I I
I
I
I
I
I I
I
I
I
I I 1 I f
I �
I I I I
I
I
I
I
f
I
I I I
I I I I
I
I �
I �
I I
I
i
I I
I
1 I
I
I I �
TotaCCfunql�otda's;• � � s � .s _ . 3 .
7F�
The City of Port Worth, Texas Water Deparimenl
Cantraclor G2conConstrucllon, Inc. DATE �OH01T02]
Engineer. Freese and Nichols Pay RequesWo: 22-ReGinaBe
MATERIAL STORED
INVOICE NO. MANUFACTURER AND OESCRIPTION PRtf ON HAND LAST ESTIMATE RECEIVED THIS ESTIMATE INSTALLED THIS ESTINATE ON HAND THIS ESTIMATE
�
� � 5
3
5
S
S
� S
� 5
� S
5
5
� � 5
S
� S
5
I s
s
s
I $
s
s
s
I s
s
f s
I S
� 5
� 5
5
I 5
Is
5
� $
S
� � � g
I 5
f I s
S
S
I s
f s
s
s
I Is
� �5
�S
S
� $
� g
� 3
I S
Is
I i s
� I s
I s
s
I I s
I I I I S
I s
I s
I I s
I I I I S
I s
s
' I s
I s
� I I 5 -
I s
s
� S -
I 5
I 1 I s
I I s
I I I 5
I s
I
roulNaWAalaSlorw� s . S � �s � . !: - - ..
��
FO RT w0 RT H rev 03/OS/07
- -- �-::�; _ -�-�-.-
_�y-�
WATER ENGINEERING & FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATGMENT N0.:22
NAME OF PROJECT: Southside IV Booster Pump Station and Hydropneumatic Tank
PROJECT NO.: ] 03116 CONTRACTOR: Gracon Construction, Inc.
CITY PROJEC'I
PERIOD FROM 10/19/2] TO: 10/10/23 FINAL INSPECTION DATE: 5/2/2023
WORK ORDER EFFECTIVE:10/19/2021 CONTRACT T1ME: 725 Q WD Q CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. I l6.
2. 1 l 7.
3. 1 18.
4. 1 19.
5. 1 20.
6. 1 21.
7. 1 22.
8. 1 23.
9. 1 24.
10. 1 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
3l.
SAT, SUN, RAIN, TOO WET, UTILITIES DAYS TOTAL
& HOLIDAYS & TOO COLD RELOCATTONS OTI-IERS T' CHARGED DAYS
THIS 10 10
PERIOD
PREVIOUS
PERIOD 71I 711
TOTALS 721 721
TO DATE
*REMARKS: 360 days of contract time added by CO2. Stop time 10/10/2023 based on receipt of last O&M manual.
10/25/2023
CONTRACTOR DATE INSPECTOR DATE
Capital Projects Delicer5�, ��'ater Department
The Cit�� of Fort �Uorth • 200 Telas Stieet • Fort R�orth, T� 76012-6311
(817) 392 - 4477 • Fas: (817) 392 - 84G0
�
�
w
CONSENT OF
S�TRETY COMPANY
TO FINAL PAYMENT
AIA DOCUMENT G707
OWNER X
ARCHITECT ❑
CONTRACTOR ❑
suxE�rx ❑
OTHER ❑ Bond # 107494449
PROJECT: Sun Country Pump Station and Hydropneumatic Tank, City Project Number 103116
TO (Owner): CONTR.ACT FOR: Construction
City of Fort Worth
200 Texas St,reet
Fort Worth, TX 76102 CONTRACT DATE: October 19'�', 2021
CONTR.ACTOR:
Gracon Construction, Inc.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
Travelers Casualty and Surety Company of America
One Tower Square
Hartford, CT 06183 , SURETY COMPANY,
on band of
Gracon Construction, Inc.
P. O. Box 360039
Dallas, TX 75336
,CONTRACTOR,
hereby approves of the fmai payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102 , OWNER,
As set forth in the said Surety Company's bond
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this l Oth day of October, 2023.
Travelers Casualty and Surety Comuany of America
Surety
���_ Sigrratw•e o Q211hOT1Z reserrt tive
Attest: .,�,,;
(Seal) � Eric Lesch, Wimess Felix Navejar, Attorney-In-Fact
Name & Title
��': ' ... �iy!`✓� .
', .
_ �;; :l��'�`: �. <
�� • , r y ` c
- J� ��.
. •: �,
" �' • : A -
..... , s� .
AIA DOCUMENT G707 • CONSENT QF SURE'CY COMPANY TO FINAL YAYMENT � APRIL 1970 EDITION � AIA� ,� �" F'� tj� •� _
O 1970 � THE AMERICAN INSTITLTI'E OF ARCHiTECTS, 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 'd
''�ira��,..,.; -
PrJjec[: Sun Cauntry Pumo Station and Hvdronneumatic Tank. C'ttv Proiect Num6er 103116
Obiigee: Gri of Fort Worth
Principal: G2con Construction. Inc.
Bond No.: 107444449
,�� Travelers Casualty and Sureiy Company of America
��AVELERS � Travelers Casualty and Surety Company
St. Pau1 Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEIV BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the
"Companies"), and that the Companies do hereby make, constitute and appoint Felix Navejar of Grapevine, Texas their true and lawful Attorney-
in-Fact(s) to sign, execute, seal an acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the
nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the perFormance of contracts
and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of
April, 2021.
,��y+"op�ji� �.�T,•,w� �tit1�
• �
� `9' �
��� . yuatpoao (aw[
State of Connecticut p�� ;O�C �. �i
City of Hartford ss. �'' •'r'�' 1' ,*,�� r�' �
i
By:
Robert L. Raney, Senior ce President
On this 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the 5enior Vice President of each
of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing
on behalf of by himself as a duly authorized officer. �;�,o�
� !�`� �J' i�Cii�
IN WITNESS WHEREOF, I hereunto set my hand and official seal. p+ � *� �
My Commission expires the 30th day of June, 2026 p���
Anna P_ Nori�k
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the
Companies, which resolutions are now in full force and efFect, reading as follows:
RESOLVED, thai the Chairman, the Presider�t, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporata Secre#ary or any Assistani Secretary may appoint
Aitorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority
may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings
obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Soard of Directors at any time may
remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Uice President, a�y Senior Vice President or
any Vice President may delegate afl or any part of fhe foregoing authority to one or more ofificers or employees of this Company, provided
that each such delegation is in writing and a copy thereof is filed in the office ofithe Secretary: and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance,
or conditional undertaking shall be valid and bindtng upon the Company when (a) signed by the President, any Vice Chairman, any Executive
Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, fhe
Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;
or (b} duly executed (under seal, if required} by one or more Attorneys-in-Fa�t and Agenfs pursuant to the power prescribed in his or her
certificate or their certificates of authority or by one or more Company offrcers pursuant to a writfen delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executiva Vice President, any Senior Vice President,
any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to
any Power of Attorney or to any certificate relating fhereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attomeys-in-
Fact for purposes oniy of executing and attesting bonds and undertakings and other writings obligatory irt the nature thereof, and any such Power of
Attorney or certifrcate bearing such facsimile signature or facs3mile seal shall be valid and hinding upon the Cvmpany and any such power so executed
and certifed by such facsimile signature and facsimile seal shalf be valid and hinding on the Company in the future with respect to any bond or
understanding to which it is attached.
I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and
correct copy ofthe Power of Attorney executed by said Companies, which remains in full force and effect.
Dated this 10th day of Odober, 2023.
.!� ,t�
�/��� qvA �� �MO l�"` � ... +
cGR � �� �i / � � �` 't�.
� 4 � Jy � �'J / .- � e�� L _` . • �-0 -
� � 4 V FiuiTK1"U. n 3 � %�L �ir . . • • .• • •. F �"
�- � ;`f p F � tr � Kevin E. Hughes,Ass'�sta tSecretary : ;� ;,:a � � �l �� �, �. 1 :
�� . I
L :J F4 �`6. : T .
To verify the authenticity of this Power of Attorney, please call us at 1-800-421-3880. .� a�"
Please refer to the above-named Attorney(s)-in-Fact and the details of the bond to which this Power of Attorney i�,attacned.
J. „�..•�,.��'. .
�,�,i��i:ar.,.,
Bond(s) produced hy:
PCL Contract Bonding Agency PO Box 1306, Colleyville, 7X 76034 972�59-4749 ww�v.oclbonds.com bondrequest@pclbonds.com
THE STATE OF TEXAS
COUNTY OF DALLAS
.
CONTRACTOR'S AFFiDAVIT OF
FINAL PAYMENT AND RELEASE
BEFORE ME, the undersigned authority, on this day personally appeared CORY GRAVES
("Affidant"), who, after being by me duly sworn, deposes and says that GRAC�N CONSTRUCTION,
INC., a corporation of Dallas County, State of Texas (the "Contractor"), which said contractor was
awarded the contract dated the 19TH day of OCTOBER, 2021, for the construction of Citv of Fort
Worth Southside IV Booster Pump Station and Hydropneumatic Tank (the "Work"), for a total
consideration of $5,522,293.53 Dollars to be paid to the said Contractor ( the "Contract"), and that
Affiant has full power of authority to make this affidavit.
That the CITY OF FORT WORTH (the "Owner") has approved the final estimate on said Work,
and that the said Contractor has fully satisfied and paid any and all claims that may be covered by
Chapier 53 of the Texas Property Code, and Article 5160 of the Revised Civil Statutes of the State of
Texas, or any other applicable statutes or charter provisions, and that all jus# bills for labor and materials
have been paid and discharged by said Contractor insofar as they pertain to the Work in question.
Thaf in addition to any funds which may have been previously paid by the Owner, the Contractor
hereby accepts the amount of $276,114.68 dollars as FULL AND FINAL PAYMENT under the
aforementioned Contract, and hereby waives and releases any right Affiant and/or the Contractor may
have to pursue claims of any nature against the Owner arising out of or in any manner connected with
the performance of the Work and/or the Contract, including but not limited to claims of third parties that
supplied material and/or labor for the Work for or through the Contractor ("Subcontractors"), as weil as
claims for delay, additional compensation or for recovery of liquidated damages which may have been
withheld by the Owner. The Contractor shall defend, hold harmless and indemnify the Owner from any
such claims of such Subcontractors. The Contractor further releases the Owner from any claim or
liability arising from any act or neglect of the Owner related to or connected with the Contract. This
affidavit is given pursuant to the final payment provisions of the contract, and shall not be deemed #o
alter or modify the terms and provisions of said Contract.
GRACON CQ�l�T�UCTION. INC.
By
CORY GRAVES, PROJECT MANAGER
SUBSCRIBED AND SWORN TO BEFORE ME, this the 10th day of OCTOBER, A.D. 2023.
��+
;���pYP�/��� CHRISTOPHER M ORR (Notary Public, in and for the State of Texas)
_ �* ���Notary Public, State of Texas
y:�{z� Comm.Expires06-20-2025
''�.; o`s;�` Notar Ib 131178722
rnn� Y
C�f�s �iLY� , GFo
My Commission Expires 06/20/2025
C:\My DocumentslLETTERHEAD, PO & SUB\Close Out Job FormslAffidavit of Final Payment
-T�
� ��C��� o
° OO ����'�C��IlOO � ��C� o
� 9
� MAILING ADDRESS: P.O. BOX 360039, DALLAS, TEXAS 75336-0039, PHONE: (972) 222-8533
FAX: (972) 222-8542
State of: Texas
County of: Dafias
FINAL WAIVER OF LIEN
TO WHOM IT MAY CONCERN:
WHEREAS, THE UNDERSIGNED Cory Graves of Gracon Construction, Inc. has been employed by
City of Fort Worth: Owner, for construction of Southside IV Booster Pump Station and Hvdropneumatic
Tank.
NOW, THEREFORE, the undersigned, for and in consideration of the sum of Two Hundred Seventv-
Six Thousand (��ne Hundred Fourteen Dolla� and Sixtv-Eiaht Cents ,($2�6;1�4.681 and other good
and valuable considerations, the receipt whereof is hereby acknowledged, does hereby waive and
release any and all lien or claim or right of lien under the Statutes of the State of Texas, relating to
Mechanics' Lien with respect to and on the above described facility and on the material, fixtures,
apparatus or machinery furnished, and on the moneys, funds or other considerations due or to become
due from the Agency on account of labor services, material, fixtures, apparatus or machinery heretofore
furnished or which may be furnished at any time thereafter, by the undersigned for the above described
facility.
Dated this 10th day of October, 2023.
(Affix Corporate Seal Here)
:
IT
Gracon �Qnstr��tion, 1nc.
(Name of Corporation)
S � .,��
Co raves, Project Manager
aF- .
,�,; .,�
�
��c�o� o
o�����c��Ilo� ��c�o
9
MAILING ADDRESS: P.O. BOX 360039, DALLAS, TEXAS 75336-0039, PHONE: (972) 222-8533
FAX: (972) 222-8542
GRACON CONSTRUCTION, INC.
AFFIDAVlT OF BILLS PAID
BEFORE ME, the undersigned authority, on this day personally appeared CORY
GRAVES, PROJECT MANAGER, who, being duly sworn by me, states:
1. That he is the general contractor employed for the construction work of Citv of
Fflrt Worth Southside IV Booster Pump Station and Hvdropneumatic Tank and
that said construction work was completed Ociober 19. 2023.
2. That there are no claims, liens, suits or causes of action of whatsoever nature
made, asserted, or filed by any person, persons, firm or corporation, against
either him or of City of Fort Worth �outhside IV Booster Pumo St�tion and
Hvdropneumatic Tank by reason of any labor, materials, or services furnished
for the purposes of the construction work of said of Citv of Fort Worth Southside
IV Booster Pump S#atian and Hvdropneumatic Tank
3. That all labor employed, and all materials used, and all services rendered in said
construction job have been fu11y paid for by him.
4. That no patented, registered, or copyrighted machines, materials, methods or
processes were used in said construction job; nor supplied as a part of the
finished work or appurtenant thereto, except with the payment of any or all fee,
royalties, or license charges, and that there exist no claims, liens, suits or
causes of action of whatsoever nature made, asserted or filed by any person,
persons, firm or corporafion by reason of the use of any patented, registered,
copyrighted machines, materials, methods or processes upon said construction
job.
WITNESS MY HAND on this 10th day of October AD, 2023_
( Graves, Project Manager)
SUBSCRIBED AND SWORN TO BEFORE ME on the 10th day of October AD, 2023.
`i;}AY�VB, CHRISTOPHER M ORR
- �% Notary Public. State of Texas
_:':��,P� Comm.Expires06-20-2025
i�: aFS�.`�
.��������� Notary ID 131 178722
(Chris Orr, Notary Public)
My commission expires June 20, 2025.
c���°�►
�3 `
� ;� �
�
,�,
�� i
�� ��
(■ "'��t0
October 10, 2023
CITY OF FORT W�RTH TEXAS
S�UTHSIDE IV BO(7STER
P STATION AND
HYDROPNE TIC T��:NK
LETTER OF FINAL
COMPLETION
��� ��� city of Fort wortn
' 200 Texas Street
� Fort Worth, TX 76102
i.
� Freese and Nichols
801 Cherry Street, Ste. 2800
j Fort Worth, TX 76102
As of this date, Ocfiober 10, 2023, the Cify of Fort Worth Southside 1V
Booster Pump Station and Hvdropneumatic Tank project in Fort Worth
is complete in accordance with the plans and specifications.
��,[��
Co Graves
Gracon Construction, Inc.
October 10, 2023
FORT W�RTH
--�. � .���. -
October 11, 2023
Ken Graves
Gracon Construction, Inc.
4343 Lasater Road
Mesquite, Texas, 75181
RE: Acceptance Letter
Southside IV Booster Pump Station and Hydropneumatic Tank
City Project Number 103116
City Secretary Contract Number 56463
Gentlemen:
The Southside IV Booster Pump Station and Hydropneumatic Tank was inspected on May
2, 2023 and tested Aub st 8, 2023. Gracon addressed all punchlist items on October 10,
2023 marking final completion of the project. The work meets contractual requirements and
is therefore accepted by the City_
If you have any questions concerning this letter of acceptance, please feel free to contact
me at (817) 392-8209.
Sincerely,
� ---�—�-.,;._.�_ .��
Suzanne Abbe
Project Manager, Water Department Capital Delivery
CC: Chris Harder, P.E., Director Water Department
Laura Wilson, P.E., Deputy Director Water Department
Tony Sholola, P.E., Assistant Director, Water Department
Captain Michael Skains, Fire Department
Cesar Zavala, Field Operations Superintendent Water Department
Luke Coffinan, Field Operations Superintendent Water Department
David Johnson, Inspection Supervisor Water Department
Project File
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX