HomeMy WebLinkAboutContract 58122-CO2CSC No. 58122-CO2
Fox_�RTH �,
Project Name University Drive Phase 1
Client Project #(s)l 101588
City of Fort Worth
Change Order Request
City Sec # I 58122
Project University Drive Phase 1 - Paving, striping, sidewalks, traffic signals, street lights, medians and landscape along University Drive
Description
Contractorl Texas Materials Group Inc., dba Texas Bit I Change Order#1 2 1 Date 11/15/2023
City Project Mgr.1 Bereket Birhane l City Inspectorl Stephen Barnard
Dept.
TPW
Water
Contract Time
Totals
(CD)�
Original Contract Amount
$3,039,583.96
$366,472.90
$3,406,056.86
65
Extras to Date
$97,289.30
$0.00
$97,289.30
20
Credits to Date
$0.00
$0.00
Pending Change Orders (in M&C Process)
Contract Cost to Date
$3,136,873.26
$366,472.90
$3,503,346.16
385
Amount of Proposed Change Order
$122,532.96
$0.00
$122,532.96
Revised Contract Amount
$3,259,406.22
$366,472.90
$3,625,879.12
385
Original Funds Available for Change Orders
$340,605.70
$0.00
$340,605.70
Remaining Funds Available for this CO
$243,316.40
$0.00
$243,316.40
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 6.45%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1 $4,257,571.08
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order includes the following items of work:
A - Extra items to connect traffic signal and lighting at Old University to Oncor electrical service (TexasBit RFI#5)
B - Spread footing foundations for street lights to avoid conflicts with underground utilities, including additional utility location (TexasBit RFI#7)
C - Revise location of light pole 1 A-4 to avoid conflict with mature tree (TexasBit RFI #8)
D - Revise location of traffic signal foundation T-1 to avoid underground utility conflict (TexasBit RFI #9)
E - Increase concrete pavement removal for median from 6" to 9" depth. Delete 6" Item, Add 9" Item (TexasBit RFI #10)
F - Additional irrigation required due to widened sidewalk and revised foundation locations for signal poles and light poles (TexasBit RFI#11)
Staff and consultant team evaluated proposed unit prices using recent City, TxDOT and other unit prices sources and found them to be reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractors Company Name Contractor (Nam NEWCntract Signature
Texas Materials Group, Inc Jamie Greenway Nov 17, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
..,.. -/
Nov 17, 2023
a°aa`aea.ea,
Nov 20, 2023
Program Manager
Date
Senior Capital Project Officer
Date
'`
Nov 20, 2023
11
Nov 22, 2023
Assistant Director Dept
fatniva L. Wadrack
Date
Nov 27, 2023
Dire apartment (Dept)
A —"-Az
Date
Nov 27, 2023
Assistant City Attorney
Date
Assistant City Manager
Date
Nov 28, 2023
j—
Nov 28, 2023
Action (if required)
ORM&C Number l 23-0987 M&C Date Approved I 11/14/20231
FT➢�o
OF8°° �i'a0
ATTEST: ae o°o
Jannette Goodall, City Secretary paaaOFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT W RTH City of Fort Worth
° V' Change Order Additions
Project Name I University Drive Phase 1
ClientProjecl# 1 101588
Contractorl Texas Materials Group Inc., dba Texas Bit l
City Sec # I 58122 I
1
PMl Bereket Birhane Inspectorl Stephen Barnard
Change Order Submittal # Date 1 11/15/2023 1
ADDITIONS
IIEM
UESCRIPI IUN
UEPI
U
unit
unit Cost
2805.3U18
2" Condl PVC 6eh 8U Open Cut)
I PW
7U .0000UUUU
LF
$36.15
2605.3019
2" Condit PVC Sch 801Bore)
TPW
500.0000000U
LF
$45.1U
3441.1409
Electric Conductor o.d fnsulaed
TPW
2,000.0000000U
LF
$3.12,
3441.1411
Electric Conductor No. 1 Bare
TPW
250.0000000U
LF
$3.12,
3441.1408
Electric Conductor No. 6/1 Insulated
TPW
500.0000000(1
LF
$3.85
3441.1413
Electric Conductor No. 6) Bare
TPW
250.0000000U
LF
$3.85
9999.0007
Locate Existing Un erground Utilities
TPW
15.0000000U
EA
$498.75
9999.0008
Furnish 6 Install - IC-1 Spread Footer Foundatior
TPW
2.00000000
EA
$7,183.05
9999.0009
Furnish 6 Install - IC-2 Spread Footer Foundatior
TPW
2.00000000
EA
$7,909.65
9999.0010
Remove 9" Concrete Pavement (Median;
TPW
819.0000000(1
SY
$41.82�
9999.0011
Additional Irrigation Relocation
TPW
50,000.0000000U
EA
$1.011
9999.0012
Exploratory Excavation for T-1
TPW
1.00000000
EA
$523.69�
9999.0013
Removal of Existing Abandoned Sewer Line at T-1
TPW
5.00000000
LF
$493.5U�
3441.3323
Furnish/Install Wood Light Pole Arm�Blackl
TPW
1.00000000
EA
$631.06
3441.3201
Furnish/Install LED Lighting Fixture TB2Black)
TPW
1.00000000
EA
$866.84
2605.3018
2" Conduit PVC Sch. 801Open Cut)
TPW
25.00000000
LF
$38.15
3441.1502
Ground Box TY B w/ Ap on
TPW
1.00000000
EA
$1,813.44'
3441.1409
Overhead Electric Conductor (No. 8) Insulated
TPW
165.0000000U
LF
$4.69
TPW
Water
Sub Total Additions
I otal I
$3,615.U01
$22,550.001
$6,240.001
$780.001
$1,925.001
$962.501
$7,481.251
$14,366.101
$15,819.301
$34,250.581
$50,000.001
$523.691
$2,467.501
$631.061
$866.841
$953.751
$1,813.441
$772.201
$166,218.211
$0.001
I
1
$166,218.211
Change Order Additions Page 2 of 6
FORTWORTH City of Fort Worth
w- Change Order Deletions
Project Name I University Drive Phase 1
ClientProjecl# 1 101588
Contractorl Texas Materials Group Inc., dba Texas Bit l
I I LM ULSUKIP I IUN
344'1.33UZ KaWy alum rounaanon I Y 3
0241.1000 Remove Concrete Pavement (Median)
City Sec # 1 58122 1
1
PMl Bereket Birhane Inspectorl Stephen Barnard
Change Order Submittal # 0 Date 1 11/15/2023 1
DELETIONS
uLP I U unit unit Cost I otal 1
IPW 4. UUUUUUU LA $2,454.9U $9,619.bU1
I PW 819.000UU0UU Sy $41.35 $33,865.651
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
T(W $43,685.251
Water $0.001
Sub Total Deletions $43,685.251
Change Order Deletions Page 4 of 6
CO #2
Additions (New Items)
9999.0007 New Locate Existing Underground Utilities
9999.0008 New Funish & Install - IC-1 Spread Footer Foundation
9999.0009 New Funish & Install - IC-2 Spread Footer Foundation
9999.0010 New Remove 9" Concrete Pavement (Median)
9999.0011 New Addition Irrigation Relocation
9999.0012 New Exploratory Excavation for T-1
9999.0013 New Removal of Existing Abandon Sewer Line
Deletions
3441.3302 Existing Rdwy illum Foundation TY 3
0241.1000 Exisiting Remove Concrete Pavement ( Median) 6"
Additions (Overruns of Existing Items)
2605.3018 Existing
2" Condt PVC Sch 80 (Open Cut)
2605.3019 Existing
2" Condt PVC Sch 80 (Bore)
3441.1409 Existing
Electric Conductor ( No.8) Insulated
3441.1411 Existing
Electric Conductor ( No.8) Bare
3441.1408 Existing
Electric Conductor ( No.6) Insulated
3441.1413 Existing
Electric Conductor ( No.6) Bare
3441.3323 Existing
Furnish/Install Wood Light Pole Arm (Black)
3441.3201 Existing
Furnish/Install LED Lighting Fixture ATB2 (Black)
2605.3018 Existing
2" Conduit PVC Sch. 80 (Open Cut)
3441.1502 Existing
Ground Box TY B W/Apron
3441.1409 Existing
Overhead Electric Conductor (No.8) Insulated
Summary
QTY
15 EA
2 EA
2 EA
819 SY
50,000 EA
1 EA
5 LF
-4 EA
-819 SY
100.00 LF
500.00 LF
2,000.00 LF
250.00 LF
500.00 LF
250.00 LF
1 EA
1 EA
25 LF
1 EA
165 LF
UNIT COST
TOTAL
REFERENCE
498.75
7,481.25
RFI# 5 & 7
Spread Footing Foundations
7183.05
14,366.10
RFI# 7
for Street Lights
7909.65
15,819.30
RFI# 7
41.82
34,250.58
RFI# 10
Increase from 6" to 9"
1.00
50,000.00
RFI# 11
523.69
523.69
RFI# 9-Rev
Revise Location of Traffic
493.50
2,467.50
RFI# 9-Rev
I Signal Foundation T-1
Sub -Total
2,454.90
41.35
Sub -Total
38.15
45.10
3.12
3.12
3.85
3.85
631.06
866.84
38.15
1813.44
4.68
Sub -Total
Total
124,908.42
(9,819.60) RFI# 7
(33,865.65) RFI# 10
(43,685.25)
3,815.00
RFI# 5
22,550.00
RFI# 5
6,240.00
RFI# 5
780.00
RFI# 5
1,925.00
RFI#5
962.50
RFI# 5
631.06
RFI# 8
866.84
RFI# 8
953.75
RFI# 8
1,813.44
RFI#8
772.20
RFI# 8
41,309.79
122,532.96
Spread Footing Foundations
for Street Lights
Increase from 6" to 9"
Oncor Electrical Service
Connection at Old
University
Revise Location of Light Pole
1 A-4
C�#2
TEXAS Texas Bit TEXAS
A CRH COMPANY I R F 1 #5 1 A CRH COMPANY
PROPOSED CHANGE ORDER # RF15
OWNER: City of Fort Worth ENGINEER:
Attn: Mark McCoy
200 Texas St PROJECT: University Drive
City, State, Zip
DATE: April 26, 2023
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Location of Street Lighting & Traffic Signal Services at Old University
UNIT
ADD: Description
Quantity
Unit
PRICE
AMOUNT
2" Condt PVC Sch 80 (Open Cut)
100.00
LF
$
38.15
$
3,815.00
2" Condt PVC Sch 80 (Bore)
500.00
LF
$
45.10
$
22,550.00
Electric Conductor ( No.8) Insulated
2,000.00
LF
$
3.12
$
6,240.00
Electric Conductor ( No.8) Bare
250.00
LF
$
3.12
$
780.00
Electric Conductor ( No.6) Insulated
500.00
LF
$
3.85
$
1,925.00
Electric Conductor ( No.6) Bare
250.00
LF
$
3.85
$
962.50
Locate Existing Underground Utilities
5.00
EA
$
498.75
$
2,493.75
Additional Days
7.00
Existing Pricing
36,272.50
Sub Quote (New Item)
2,375.00
Profit 5%
118.75
Total
38,766.25
UNIT
DEDUCT: Description
Quantity
Unit
PRICE
AMOUNT
Change Order Add
$
38,766.25
Change Order Deduct
Total Change Order Amount =
$
38,766.25
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By:
Texas Materials Group, Inc dba: Texas Bit
By: By:
Date:
Jamie Greenway
Project Manager
(214) 543-5705 Cell
[EO#21
TEXAS RFI#7Rev l
420 Decker Drive, Suite 200
Irving, TX 75062
Phone: (214) 741-3531
A CRH COMPANY
RFI No. )07 Revised - CPN 101588 - University Dr
To: Mark McCoy, Aaron Fricke From: Jamie Greenway
Texas Materials Group, Inc.
420 Decker Dr. STE 200
Irving, Texas 75062
Phone: Phone: 214-543-5705
Email: Mark. McCov(@fortworthtexas.aov; Email: jamie.greenway@texasbit.com
AFricke(Wobbfendlev.com
Subiect:
Drawing #: Spec Sect#: Contract Item #:
Addendum: Schedule #:
RFI Detail: Street Light Foundations - University Dr - East Side of Project
Suggestion: Please see attached,
RFI from Bean Electrical, for the issues in the field that have been found, to interfere with the
placement of the proposed Street Lights.
Response:
CO#2
TEXAS Texas Bit TEXAS
A CRH COMPANY I RF 1#7 Rev I A CRH COMPANY
PROPOSED CHANGE ORDER # 7
OWNER: City of Fort Worth ENGINEER:
Attn: Mark McCoy
200 Texas St PROJECT: University Drive
City, State, Zip
DATE: September 14, 2023
DESCRIPTION OF CHANGE AND/OR EXTRA WORK:
RFI#7 - Street Light
Foundations
UNIT
ADD: Description
Quantity Unit
PRICE
AMOUNT
NEW Funish & Install - IC-1 Spread Footer Foundation
2 EA
7,183.05
14,366.10
NEW Funish & Install - IC-2 Spread Footer Foundation
2 EA
7,909.65
15,819.30
NEW Locate Existing Underground Utilities
10 EA
498.75
4,987.50
$
35,172.90
Sub Quote
33,498.00
Profit 5%
1,674.90
Notes
**IC -1 Design will be needed at foundation location 1C-1, 1B-1
**IC -2 Design will be needed at foundation location 1A-2, 1C-2
Above price is for installation only - No Demo of exisiting concrete
is included
Total
35,172.90
UNIT
DEDUCT: Description
Quantity Unit
PRICE
AMOUNT
3441.3302 Rdwy illum Foundation TY 3
-4 EA
2,454.90
(9,819.60)
Change Order Add $ 35,172.90
Change Order Deduct $ (9,819.60)
Total Change Order Amount = $ 25,353.30
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By:
Texas M rials oup, Inc ddbba: Texas Bit
By: By: A �(
Date: Jami Gr enway U
Proj ct anager
(214) 543-5705 Cell
CO#2
RFI#7 Rev
Greenway, Jamie (Texas Materials - North Texas Area)
From: McCoy, Mark <Mark.McCoy@fortworthtexas.gov>
Sent: Monday, September 11, 2023 12:30 PM
To: Greenway, Jamie (Texas Materials - North Texas Area); Beltran, Feliberto; James Riddle;
Harris, Chris M (TexasBit); Lopez, Raul; Acevedo, Lissette
Cc: Guerrero, Pedro; Michael Engle; David Fugitt; Cody Turner; Wolff, Jeffrey A; Perez, Aaron
R (TexasBit); Myers, Michael A; Ayala, Alejandra; Aaron Fricke; Birhane, Bereket B
Subject: RE: [EXT] Re: Spread foundations - Field Meeting 8/17/2023 -
[HtmlAttachmentRemoved]
Attachments: University Drive - street light
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you are expecting
this email and know the contents are safe. If you believe this email may be phishing or malicious, please use the Report Phish
button.
IMPORTANT: For safety reasons, an HTML attachment was removed from this message. If you recognize this sender and
were expecting this email and an attachment, please forward this message to the service desk (crhamat@service-
now.com) asking for it to be delivered to you.
Jamie,
I'm going to try to answer all of these spread footing questions again here in one place, since it feels like there are
several overlapping email chains on the same subject. My responses are in blue below.
Foundation 1A-2
James - It was discussed for foundation 1A-2 the plinth section elevation was too high for being 2' off the roadway, the
answer to this question was to lower the plinth section to 3" above the sidewalk and extend the remaining plinth section
12" below grade. The next issue was that the design is calling for a plinth style foundation top, and the COFW would like
to have a 24" round top. This was agreed that it was acceptable to be round top, due to the fact of it being aesthetically
pleasing and not a structural issue.
Mark/Aaron — Agreed. The structural engineer reviewed the foundation modifications and approved the changes. As
discussed in the field, the width of the foundation will be 7'-7", the depth is 26" deep, and the length is 11'. He also
approved that the Plinth can be offset by going deeper under the pole in the same amount of the decrease from the
top. This means it can be flush with the sidewalk as long as the depth is achieved below the 26" slab. Please let me
know if you have any questions or need any other clarification.
Foundation 113-1
James - Foundation 113-1 we discussed that the foundation exceeded the ROW. For the resolution discussed was,
building the dimensions of the foundation to meet the limits of the ROW and making the volume on the foundation at
the plinth section to go 18 " deeper. Foundation 113-1 the foundation would be tuck back near a large branch of the tree.
The solution was to rotate the spread footing 180 degrees to allow the streetlight to be approximately 2' off face of the
curb. This would also allow for minimal impact to the tree by an arborist, and to have to light pole to be installed to
meet city standards.
Mark/Aaron - Agreed. Use same modified spread footer as discussed for 1A-2 (see above).
Foundation 113-2
CO#2
RFI#7 Rev
James - Aaron is going to investigate relocating this foundation to the south just past the existing storm inlet, due to
ROW, and underground utility conflicts. If this location is clear, we may be able to install a standard foundation in leu of
currently needed spread footing. Additional exploratory excavations will be needed here due to using the current
locates used, trying to install the foundation in the proposed original location.
Mark/Aaron - Agreed. See attached utilities exhibits. 113-2 will be a standard foundation (not a spread footing, so this
affects quantities on the CO), located approximately 2ft south of the curb inlet in front of Eatzi's. Maintain 36" TDLR
clearance behind the pole.
Additional Irrigation Relocation
James - the city is working on generating a Line item to relocate the existing irrigation that impedes the locations of the
spread footing foundations.
Bean will need to generate pricing and submit it to the city to relocate irrigation conduit per LF and sprinkler heads.
Mark/Aaron — Slight correction. We are creating a pay item for Additional Irrigation Relocation ($50,000 total) to be
charged against as needed and irrigation sub invoices are submitted and approved.
Exploratory Excavations
James - the city is working on approval for a bid item to continue to capture this cost. as there are exceedingly hi
amounts of locates cost, due to all the conflicts.
Mark/Aaron - Agreed. Exploratory Excavation item created.
Please let me know if there are still questions.
Thank You,
Mark
Mark A. McCoy, P.E.
Project Manager
Department of Transportation and Public Works
Arterials - Capital Delivery Division
Mobile: 214-908-3772
Email: mark.mccov@fortworthtexas.gov
From: Greenway, Jamie (Texas Materials - North Texas Area) <jamie.greenway@texasmaterials.com>
Sent: Wednesday, September 6, 2023 9:25 AM
To: Beltran, Feliberto <Feliberto.Beltran@fortworthtexas.gov>; McCoy, Mark <Mark.McCoy@fortworthtexas.gov>;
James Riddle <jriddle@bei-tx.com>; Harris, Chris M (TexasBit) <chris.harris@TexasBit.com>; Lopez, Raul
CO#2
RFI#7 Rev
BEAN ly-ELE, CTRICA LLC.
921 E Eti(�n Avenue P 817-561-7400 •
Fort Worth, '[' x;m 76140 F 8 17-61-7 443
Friday, May12, 2023
To: Jamie Greenway I Texas Bit
From: James Riddle I Bean Electrical Inc.
Project: University Drive Improvements — CPN: 101588
RFI: #7 Streetlight Foundation Conflict (1C-2, 1C-1)
Description:
1. 1C-1, 1C-2 Due to the underground franchise utilities preexisting at this location the is not enough room to install
the foundation as designed per plan. PLEASE ADVISE.
Contractors Recommendation
1. 1C-1 foundation can possibly be relocated 10LF off back of curb to face of foundation to miss all franchise utilities.
2. 1C-2 install spread footing foundation, to incorporate the foundation in the back of sidewalk due to the franchise
utilities in the area.
Response:
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
CO#2 I
TEXAS I RFI#8 Rev 420 Decker Drive, Suite 200
Irving, TX 75062
Phone: (214) 741-3531
A CRH COMPANY
RFI No. 008 Revised - CPN 101588 - University Dr
To: Mark McCoy, Aaron Fricke From: Jamie Greenway
Texas Materials Group, Inc.
420 Decker Dr. STE 200
Irving, Texas 75062
Phone: Phone: 214-543-5705
Email: Mark. McCov(@fortworthtexas.aov; Email: jamie.greenway@texasbit.com
AFricke(@Cobbfendlev.com
Subject: I Stamped Integral Colored Conc (Crosswalk)
Drawing #:
Addendum:
Spec Sect#:
Schedule #:
Contract Item #:
RFI Detail: Street Light Foundations 1A-4- University Dr - West Side of Project
Suggestion: Please see attached,
RFI from Bean Electrical, for the issues in the field that have been found, to interfere with the
placement of the proposed Street Lights on the West side of University Dr.
Please review and send response ASAP.
Response:
After additional field meets — attached drawing was the final decision made.
CO#2
TEXAS Texas Bit
ACRHCOMPANY I RFI#8 Rev I
PROPOSED CHANGE ORDER # 9-Revised
OWNER: City of Fort Worth
Attn: Mark McCoy
200 Texas St
City, State, Zip
DATE: September 14, 2023
ENGINEER:
PROJECT: University Drive
TEXAS
A CRH COMPANY
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: RFI#8 - Street Light Foundations - West Side University Dr
UNIT
ADD:
Description
Quantity Unit
PRICE
AMOUNT
Existing Item
Furnish/Install Wood Light Pole Arm (Black)
1 EA
631.06
631.06
Existing Item
Furnish/Install LED Lighting Fixture ATB2 (Black)
1 EA
866.84
866.84
Existing Item
2" Conduit PVC Sch. 80 (Open Cut)
25 LF
38.15
953.75
Existing Item
Ground BoxTY B W/Apron
1 EA
1,813.44
1,813.44
Existing Item
Overhead Electric Conductor (No.8) Insulated
165 LF
4.68
772.20
$
5,037.29
All are existing Items, requesting Over Run
Total 5,037.29
Notes
**This CO is needed to relocate Foundation 1A-4 on West side of University Dr, @ Riverfront Dr.
Total 5,037.29
UNIT
DEDUCT: Description Quantity Unit PRICE AMOUNT
Change Order Add $ 5,037.29
Change Order Deduct
Total Change Order Amount = $ 5,037.29
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By.
Texas terials roup, Inc ddba: Texas Bit
By: By. U
Date: Ja 'e eenway
Pr 'e Manager
(214) 543-5705 Cell
'Alp A
ELECTRICAL
A subsidiary of
LOMIN8 TRANSPORTATION TECHNOLOGIES
Wednesday, September 13, 2023
To: Jamie Greenway I TexasBit
From: Cody Turner I Bean Electrical, LLC.
Project: University Drive
CO: CO#10 — Relocation of Foundation 1A-4
Scope: Per Below Bid Items
C0#2 I
RFI#8 Rev
821 E. Enon Avenue. Fort Worth. TX 76140 / P 817-561-7400
Item
Qty
Unit
Description
1
1
EA
Furnish/Install Wood Light Pole Arm (Black)
2
1
EA
Furnish/Install LED Lighting Fixture AT132 (Black)
3
25
LF
2" Conduit PVC Sch. 80 (Open Cut)
4
1
EA
Ground Box TY B W/Apron
5
165
LF
Overhead Electric Conductor (No.8) Insulated
TOTAL
**Please sign & return**
TexasBit Date
Unit Price Amount
$546.00
$546.00
$750.00
$750.00
$33.00
$825.00
$1,569.00
$1,569.00
$4.05
$668.25
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1 800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
$4,358.25
0
Q
''r^
v!
W
Z
CO#2
INSTALL OVERHEAD RFI#8 Rev I ti
ELECTRICAL CONDUCTOR I
f�A INSULATED x 125LF --- -
(N08)
30' BUILDING LINE E
V\� S 15' UTILITY 20' X 20' P.O.S.E. PER.��
°
O PLAT RECORDED IN
ESMT. V. 388-51 PG 44
VOL. 388-51 PG. 44
.o
w� w�
_�__��_.--..-- -- -- - Q�- �� _-- ----- — ---------- -- ® -T
1 N I /i •£: • ,�. I - ,��^„,,,,_ xx#xxxxxxxxxr_zr2_xwX �—;
a
x 1 xX; r 4 3
GB2 — ——���±�Y• w rc— v„�,— —"—'1-w-/C,J�-� "`
STA. 1+5465 GBi a, REMOVE I-SLB; SEE TABLE
OFF: 47.661 CONNECTLMEBLIEAD, LP2 (n
INI SEE T WIRINGTOGB2
EX OVERHEAD WIRE TO BE RISER TO BE F
TRAN&FERRED TO PROP ADDED TO EX. J
1 Relocate foundation 1A-4
— — UTILITY POLE FOR
rt —
PROP OHE intercept conduit and set 1 new O
f
U I RSITY DR ' type b pull box. Connect to U
3A-1 with OH Electrical '
o- ,+-_wM_Mw__w_--LL.•:,LL:;::... .: z conductor from this street light.
00 z --- + -
WOOD POLE ARM _ 125 LF PROP QHE
FURNISH/INSTALL LED LIGHT -
FIXTURE AT132 (BLACK)-
( —
` 3A 1
_ REMOVE: 1-SLC; SEE TABLE _
iINSTALL: 1-SL3; SEE TABLE
7 N
-V
•• •• •• r ,I•• . �. .. j j j l I I I I I I I I W 11T
ILLUMINATION ASSEMBLY TABLE PR°SESHEET5z�8J
\ STREET LIGHT
TYPE POLE TYPE ARM TYPE LUMINAIRE TYPE FOUNDATION TYPE
\ SLi TYPE 18 33A ATB2 TYPE 3
SL2 — WOOD POLE ARM ATB2
SL3 — — ATB2
�I ILLUMINATION DISASSEMBLY TABLE
I STREET LIGHT DISASSEMBLY PROCEDURE
jA TYPE
�I SLA REMOVE AND SALVAGE EXISTING POLE, ARM, LUMINAIRE, AND OVER HEAD WIRING
II SLB REMOVE AND SALVAGE EXISTING ARM AND LUMINAIRE
I
o GB4 BEWARE OF SILO REMOVE AND SALVAGE LUMINAIRE
4 CONFLICTS WITH \ I 1
� g EX. UTILITIES � I
SEE I S TRAFFIC SGNAL
SEE SHEETS � 5 G65 6 ] I 4 8 G 6 9 — GB] 1 Q
m i
- -
STA: 5+51.32 OFF: 44.121
10' U
pp2 -
If
FF: 46.011
EX POWER POLE TO REMAIN,
INSTALL-19t1-SEE TA
EX POWER POLE TO REMAIN;
REMOVE: 1-SLA; SEE TABLE
EX OVERHEAD ELECTRIC LINE
EX OVERHEAD ELECTRIC
INSTALL: 1-SLi; SEE TABLE
TO BE REMOVED
_ LINE TO BE REMOVED
_
i I
ttHH H} 7 Fr ^"--�TrF a
5+00
6+00
rTtl}?HN yH1nI
��_..nnnnnnn HHHHHHH
............a.......
H H H H HH
[EO#21
TEXASRFI#9 Rev 420 Decker Drive, Suite 200
Irving, TX 75062
Phone: (214) 741-3531
A CRH COMPANY
RFI No. )09Revised - CPN 101588 - University Dr
To: Mark McCoy From: Jamie Greenway
Texas Materials Group, Inc.
420 Decker Dr. STE 200
Irving, Texas 75062
Phone: Phone: 214-543-5705
Email: Mark. McCovna.fortworthtexas. aov Email: jamie.greenway@texasbit.com
Subiect: I Universitv/Old Universitv Foundation Conflict
Drawing #: Spec Sect#: Contract Item #:
Addendum: Schedule #:
RFI Detail:
Telecommunication Line in conflict of New T-1 & T-4 Foundations Please see Bean's Documentation
attached. - After field meeting and re -staking the ROW, we still have a conflict on the Southwest
Corner, as there isn't sufficient ROW to put the foundation where we discussed during this meeting.
Please advise ASAP
After further investigation, there is what appears to be an abandoned sewer line. Once confirmed,
and removed, they can install T-1 in new location.
Response:
TEXAS
ACRHCOMPANY
OWNER: City of Fort Worth
Attn: Mark McCoy
200 Texas St
City, State, Zip
CO#2
Texas Bit
RFI#9 Rev I
PROPOSED CHANGE ORDER # 10
ENGINEER:
PROJECT: University Drive
DATE: September 14, 2023
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: RFI# 9 - T-1 Relocation
TEXAS
A CRH COMPANY
UNIT
ADD: Description Quantity Unit PRICE AMOUNT
New Exploratory Excavation for T-1 1 EA 523.69 523.69
New Removal of Existing Abandon Sewer Line 5 LF 493.50 2,467.50
$ 2,991.19
Sub Quote 2,848.75
Profit 5% (New Items) 142.44
Total 2,991.19
Notes
**This CO is needed to install foundation T-1 where there is an existing streetlight on the NW corner of University &
Old University.
Once we receive confirmation that the sewer line is abandon, then we will be able to remove it.
Total 2,991.19
UNIT
DEDUCT: Description Quantity Unit PRICE AMOUNT
Change Order Add $ 2,991.19
Change Order Deduct
Total Change Order Amount = $ 2,991.19
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By:
Texas Materials Group, Inc dba: Texas Bit
By: By:
Date: Jamie Greenway
Project Manager
(214) 543-5705 Cell
'Alp A
ELECTRICAL
A subsidiary of
LOMIN8 TRANSPORTATION TECHNOLOGIES
Thursday, September 14, 2023
To: Jamie Greenway I TexasBit
From: Cody Turner I Bean Electrical, LLC.
Project: University Drive
CO: CO#9 — REV-1
Scope: Per Below Bid Items.
Item Qty Unit
1 1 EA
2 5 LF
C0#2 I
RFI#9 Rev
821 E. Enon Avenue. Fort Worth. TX 76140 / P 817-561-7400
Description
Exploratory Excavation For T-1 Foundation
Removal Of Existing Abandon Sewer Line
TOTAL
Unit Price
$498.75
$470.00
Amount
$498.75
$2,350.00
$ 2, 848.75
**This CO is needed to install foundation T-1 where there is an existing streetlight on the NW corner of University & Old
University. Once we receive confirmation that the sewer line is abandon then we would be able to remove.
**Please sign & return**
TexasBit
Date
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1 800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
CO#2
I RFI#9 Rev
Greenway, Jamie (Texas Materials - North Texas Area)
From: McCoy, Mark <Mark.McCoy@fortworthtexas.gov>
Sent: Friday, September 1, 2023 1:17 AM
To: Greenway, Jamie (Texas Materials - North Texas Area); Aaron Fricke; Lopez, Raul
Cc: Harris, Chris M (TexasBit); cturner@beanelectrical.com; James Riddle; Wolff, Jeffrey A; Birhane, Bereket B
Subject: [EXT] RE: Revised Proposed CO#10 - From RFI#9 - Signal Foundations @ Old University
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you are expecting this email and know the contents are safe. If
you believe this email may be phishing or malicious, please use the Report Phish button.
Jamie,
Aaron and James met in the field the afternoon of 8/23 and discussed moving the location just north of the street light and 2' away from the roadway. This location
appears clear of utilities and we can avoid the relocating of the OHE conductors. The only item to be included on this change order is the additional "locate
existing underground utilities" that we established a cost for on CH #7 ($498.75). Please see the screenshot below depicting the discussed location.
Please revise the proposed change order accordingly.
Thank You,
Mark
CO#2 I
f RFI#9 Rev
I•
New Proposed location of signal •
foundation to avoid the need to I
remove the light pole foundation.
Re- erial streetli Wit
for temporary r. �=
300LF
OLD UNIVERSITY DRIVE
POSTED SPEED: 30 1APH
_.Win
-WAS
ter■
1
1■■.
Iwo
.CAMON■
�`
■:■■gun■■■
Mason, a �
ON11
�
....-•.Molics
21IJ
1■■■I
r■■�
5WY��X
■�
■■■■ .,r /{*{■■
16.0a.MA
NMCI n■�
� !,E i
/■■■/1.-■■■1
i■./
oit
>
-
T-
r��
t s
W
>_
� a
rr
Pu ed new location of signal
foundati amora is to rero the side
—
walk to the ba ide of foundation.
we will need full d emo of existing
Streetlight fo ation an re -work
aerial s tlight circuit for tem ry
p r.
1 1 1\
Relocated ped 101
foundation SON
C0#2 I
RFI#9 Rev
Greenway, Jamie M (TexasBit)
From: James Riddle <jriddle@bei-tx.com>
Sent: Wednesday, July 12, 2023 11:53 AM
To: Aaron Fricke
Subject: Re: Automatic reply: [EXT] RFI #10 University @ Old University Fiber & Signal
Foundation Conflict
Jamie,
I made it out to Location this morning and verified the ROW was staked.
The right away staked on the south west corner. I do not think that there's sufficient right away to put the foundation
where it was discussed during the field meeting.
On the north west corner, I believe everything will work, as discussed part of the feild meeting.
James Riddle
Traffic Signal Field Superintendant
817-727-1084
Sent from my Phone
On Jul 12, 2023, at 9:04 AM, Aaron Fricke <AFricke@cobbfendley.com> wrote:
I will be out of the office until Friday July 14. If you need immediate assistance, please contact Bobbie Fealy at
bobbie.fealy@cobbfendley.com (817-445-1016) or Ted Sugg at tsugg@cobbfendley.com (972-335-3214).
Thank you,
Aaron
1
CO#2
EA
ELECTRICAL
A subsidiary of
LUMIN8 TRANSPORTATION TECHNOLOGIES
Thursday July 3, 2023
To: Jamie Greenway I Texas Bit
From: James Riddle I Bean Electrical Inc.
Project: University Drive Improvements —CPN: 101588
RFI#9 Rev
821 E. Enon Avenue, Fort Worth, TX 76140 / P 817-561-7400
RFI: #10 University @ Old University Fiber & Signal Foundation Conflict
Description:
Per the plans, on plan sheet 30, it calls out to install both signal foundations, T-1, and T-4 behind the back of
sidewalk. On signal foundation T-1 we located a Fiber/ telecommunication line, at a depth of 9' 4". The lines run
north and south though the center of the foundation and impeding the diameter of the foundation by
approximately 18" into the foundation.
On foundation T-4 at a depth of approximately 8'9", we also located the same fiber/ telecommunication lines.
These lines are impeding the diameter of the foundation by 16".
Due to the location of the Fiber/Telecommunication lines, along with known ROW we cannot install the signal
foundations as per plan.
Contractors Recommendation
PLEASE ADVISE.
Monetary Cost: YES
Bean Electrical, LLC.
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1 800 803 9202, 512 463 6599, website
www.license.state.tx.us/complaints
TEXAS I RFI#1
420 Decker Drive, Suite 200
Irving, TX 75062
Phone: (214) 741-3531
A CRH COMPANY
RFI No. 010 — CPN 101588 — University Dr
To: Mark McCoy From: Jamie Greenway
Texas Materials Group, Inc.
420 Decker Dr. STE 200
Irving, Texas 75062
Phone: Phone: 214-543-5705
Email: Mark. McCov(@fortworthtexas.aov Email: jamie.greenway@texasbit.com
.oprinkler Repairs / Remove Concrete / Median
Subiect: Curbs
Drawing #: Spec Sect#: Contract Item #:
Addendum: Schedule #:
RFI Detail:
Please see attached RFI from Zamora & Proposed Change Order I See RFI#11
Also can we add this to others going to Council on the 1st. for Sprinklers
Suggestion:
Response:
CO#2
7aamora I RFI#10
onstiruction C. C. ZAMORA CONSTRUCTION, LLC
P. O. BOX 10396 1 River Oaks, TX, 76114
REQUEST FOR INFORMATION
To: TexasBIT
Attn: Jamie Greenway RFI No. 01
Project No. CPN 101588 Date Submitted: 07/28/2023.
Project Name: University Drive Improvements Date Needed By:
Regarding Drawing(s): Specification Section(s):
Multiple
Areas
Subject:
Btle to `" idtning (h Addhig Sidewalks, additional concrete thickness to be
removed for Median Landscaping
Request for Information:
The preconstruction Sidewalks were 4'-5' in width the new sidewalks. Per plan Sheet 15 Revised Date
04/04/2023 are Changed to 6' wide which affected multiple Sprinkler systems along S. University Dr.
ENO. DATE COMMENT
02�10(2923 -"-'--E
Q04l04I2023 ADDITIONAL SIDEWALK
The Addition of Sidewalk along Old University behind the Fairfield Inn Also Affected their system.
See Attached Quote for the above work that is needed and changes due to additions required due
to field conditions
By: Chris Barnett
Response:
I See RFI#11 for Sprinklers
By:
(Name) (Signature)
Note:
Date:
Date: 07/28/2023
Page 1 of 1
6i"W
ACRHCOMPANY
OWNER: City of Fort Worth
Attn: Mark McCoy
200 Texas St
City, State, Zip
[EO#21
Texas Bit
RFI#10
ENGINEER:
PROJECT: University Drive
TEXAS
A CRH COMPANY
DATE: July 28, 2023
RFI#3 - Missing Bid Items, & RFI#6 SL Power @ LP-19,
Additional Cable/Conduit @ Collinsworth for Relocation of TS
DESCRIPTION OF CHANGE AND/OR EXTRA WORK: Cabinet
UNIT
ADD: Description Quantity Unit PRICE AMOUNT
RFI#10 Remove 9" Concrete Pavement (Median)
RFI#16
(DEDUCT
IDEDUCT
Description
Remove Concrete Pavement
T,
819 SY $ 41.822 $
I CJ $ 29,4 8.98 0
UNIT
Quantity Unit PRICE
-819 $ 41.35 $
z)
34,251.81
1
See
Zse-9�
RFI#11
for
1
Sprinklers
AMOUNT
(33,865.65)
(33,865.65)
Sub Quote - New Items 60,678.77
Deduct (33,865.65)
Profit 5% 3,033.94
Bond
Insurance
Total $9Fr—
UNIT
Description Quantity Unit PRICE AMOUNT
Change Order Add $29,847-.06
Change Order Deduct
Total Change Order Amount = $ 29- -o4&
All other items and conditions of our contract with you remain the same and this order
is made a part thereof.
Kindly signify your acceptance and approval of this agreement by signing and returning
to us the enclosed copy.
ACCEPTED BY OWNER: Submitted By:
Texas ials Gro p, Inc db'a�Texas Bit
By: By:
Date: Jamie re nway UUU
Proje t nager
(214) 3 5705 Cell
unora
onstruction
CO#2
RFI#10 I
Zamora Construction
P.O. Box 10396
River Oaks, TX 76114
Ph 817 759-0063 Fax 817 759-0064
Customer: Jamie Greenway / Chris Harris
TexasBit Date: JJuly 25, 2023
Quote # 12129
Project: JUNIVERSITY DRIVE IMPROVEMENTS CPN 101588
QUOTE
(Description of Work
We are pleased to offer our quotation for the project named above. This quote is based on the documents
and specifications provided by you. Unless otherwise noted, our pricing includes labor, material, equipment
and is based on the following qualifications and/or exclusions.
Bid Item # I Description I UOM I Bid Qty I Unit Price I Bid Value
Remove 9" Concrete Pavement (For Median SY 819 $ 39.83 $ 32,620.77
Landscaping)
al Cost For Sprinkler Repairs due to the —
2 changes in width of t e i - LO i $ 39.83 $ 28,058.00
Additions of alA duaed were none was
existing
(Exclusions:
Electrical, plumbing, landscaping, permit, bond, topsoil, sprinkler fix, temporary sanitary, traffic control,
erosion control, base preparation, lime stabilization, and not mentioned item on the quote above.
This auote is valid for 30 days from date above Subtotal $ 60,678.77
BSB MBE, DBE, HUB Tax (0.00%) $ -
�" Total $
By signing below, customer agrees to terms of this quote.
Payable [ ] weekly as work progresses; [ ] upon
completion of work.
See
RFI#11
for
Sprinklers
Page 1 of 2
CO#2
6iaw
A CRH COMPANY
RFI#11 420 Decker Drive, Suite 200
Irving, TX 75062
Phone: (214) 741-3531
RFI No. 011 — CPN 101588 — University Dr
To: Mark McCoy From: Jamie Greenway
Texas Materials Group, Inc.
420 Decker Dr. STE 200
Irving, Texas 75062
Phone: Phone: 214-543-5705
Email: Mark. McCov(@fortworthtexas.aov Email: jamie.greenway@texasbit.com
Subject: I Misc Irrigation Re -Location
Drawing #: Spec Sect#: Contract Item #:
Addendum: Schedule #:
RFI Detail:
Irrigation relocation cost when not damaged, but in the way of installing foundations, or
sidewalks.
Suggestion:
New item # with LS to cover cost of relocating irrigation services that are in the way of installation
of items in project?
Response:
We are adding $50,000 for Additional Irrigation Relocation, to be used as needed and
paid upon submittal of invoices from the irrigation subcontractor.
FoRTWORmCity of Fort Worth
ACCEPTANCE OF PREVIOUS M/WBE COMMITMENT FORM
(for use with CHANGE ORDERS or AMENDMENTS greater than $100,000)
To be Completed by City Project Manager
Change Order (for Construction Contract)
Project Name:
University Drive Phase 1
Contractor:
Texas Materials Group Inc., dba Texas Bit
Original Amount of Contract:
$3,406,056.86
Total of Previous Change Orders:
$97,289.30
Amount for this Change Order:
$122,148.03
Revised Amount of Contract:
$3,625,494.19
City Project Number
101588
City Project Manager
Mark McCoy
City's M/WBE Project Goal: 13
Accepted M/WBE Commitment: 14 %
Date of Last M/WBE Report: 10/1 1/2023
Change Order #: 2
Date: 10/9/2023
Language to be inserted in the M&C for this Contract
Texas Materials Group Inc., dba Texas Bit agrees to maintain its initial M/WBE commitment of
14% that it made on the original contract and extend and maintain that same M/WBE commitment
of 14% to all prior change orders up to and inclusive of this Change Order No. 2. Therefore Texas
Materials Group Inc., dba Texas Bit remains in compliance with the City's M/WBE Ordinance and
attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment
form executed by an authorized representative of its company.
To be Completed by the Representative of the Contr for
Jamie Greenway Project Manager
Printed Signature Title Auth iz d Signature/Dat
Texas Materials Group Inc., dba Texas Bit
Company Name Contact Name (if different)
420 Decker Dr, Ste 200
Address
Irving TX 75062
City/State/Zip
iamie.greenwav@texasmaterials.com
E-mail address
214-543-5705
Phone number
6% as of
M/WBE % Paid to Date
Fax Number
10/11 /2023
Date
City Project Manager has reviewed the work associated with this Change Order,
considers it the same or similar to work in the original Contract, and recommends that the
Contractor have the option to retain and confirm its existing MM/WBE commitment.
Mark McCoy " `� l i gb 10/11 /2023
City Project Manager City Project Manager Signature Date
Business Equity Division Staff
ID # MWBE % via Last Online Report Submitted
Business Equity Division Signature Date
TEXAS
MATERIALS
A CRH COMPANY
August 8, 2023
RE: 2018 Rule Changes to Form 1295
Texas Materials
North Texas Area
420 Decker Drive, Suite 200
Irving, TX 75062
T (214) 741 3531
www.texasmaterials.com
Beginning January 1, 2018, changes took effect concerning Form 1295. According to these
changes a publicly traded business entity, including a wholly owned subsidiary of the
business entity is exempt from the Form 1295 filing requirements.
Texas Materials Group, Inc., a
member of the CRH family of
companies that are wholly owned
by CRH pic headquartered in
Ireland.
CRH (LSE: CRH, ISE: CRG,
NYSE: CRH) is the leading
provider of building materials
solutions that build, connect and
improve our world. Employing
c.75,800 people at c.3,160
locations in 29 countries, CRH
has market leadership positions
in both North America and in
Europe.
A Fortune 500 company, CRH is
a constituent member of the FTSE
100 Index, the EURO STOXX 50
Index, the ISEQ 20 and the Dow
Jones Sustainability Index (DJSI)
Europe. The company is ranked
among sector leaders by
Environmental, Social and
Governance (ESG) rating
agencies. CRH's American
Depositary Shares are listed on
The NYSE.
Best Regards,
JL�
%doxi
Chris Michael
North Texas Area
Vice President/General Manager
Texas Materials Group, Inc.
E: chris.michael@texasmaterials.com
0
3,5% 1 1.0 0
16.
19.3%
■ North America
■ United Kingdom
■ Europe / Other
Retail
■ Ireland
■ Treasury
Ownership of Ordinary Shares
Shareholdings as of 31, December 2D22
Geographic Location{i} Numberoilshiares 3i41frTotal
held '4Oo's
North America 241,393 32.1
United Kingdam 210,936 2a.,7
Europe Other 145,E-4S 19.3
Retail 120,7s4 Is., -
Ireland 26,001 3.5
Treasury,;ji: 7,308 =.7
754140 100.0
[i] his rap•esents = best a t'mate of the nur-ber of sraras con -rolled by'urd managers
residert in the geographir region=_ indicated. Priva=esha•e�eldersa•e dassified =_s
reta'I =_hove.
[iijrzae__iled in note29 _othe Corso idated Finarrial5ta_emants.
MAY AND
COUNCIL
COMMUNICATION
CPN 101588
-UNIVERSITY
DR -
TRINITY
RIVER
TO
W. ROSEDALE
ST
FORT WORTH
WEST FWY SR WB
WES-� FWY w
LOCk E AVE O
UO
O
Q
=
r J
LDVELL A/E
MOPp,G �O
ON
C,
CM
M*
■
c
■
a
■
■
■
■
COLLINSWORTH ST ■
■
FiVERFRON `ref
Great
I
Data is provided to Transportation and Public Works by different sources
inside and outside the City, and has not been audited or independently verified by
Transportation and Public Works. The information provided by Transportation and Public Works
is not to be used for survey, design, or construction. We require all receiving entities to tO
enact their own due diligence for any actions. Viewing any data, deems the City of Fort Worth GERS AVEnot liable for any said data and is to be used as a graphical representation only.
0
ST S, W
IRWIN ST
Y
U
HARRISON AVE
gR1D E P`
SCONE EDWIN ST
COLONIAL PKWY ry
ca
O
O w
z F__
2 w
J Q
w �� Y
AT o
Miles r Of
0 0.05 0.1 0.2 I %
AN `
N
Legend
■ ■ 1 UNIVERSITY DR, S
!� ■ ■ 1 OLD UNIVERSITY DR
V
CFW STREETS
��� CLEARFORK TRINITY RIVER
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 11/14/23 M&C FILE NUMBER: M&C 23-0987
LOG NAME: 20UNIV DR CO2 TEXAS BIT
SUBJECT
(CD 3 and CD 9) Authorize Execution of Change Order No. 2 in the Amount of $122,532.96 to a Contract with Texas Materials Group Inc., dba
Texas Bit for the University Drive Corridor Project for a Revised Contract Amount of $3,625,879.12
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 2 in the amount of $122,532.96 to City Secretary Contract
Number 58122 with Texas Materials Group Inc., dba Texas Bit for the University Drive Corridor project for a revised contract amount of
$3,625,879.12 (City Project No. 101588).
11&10111*4103kqF
On August 23, 2022, Mayor and Council Communication (M&C) 22-0637 authorized a contract with Texas Materials Group Inc., dba Texas Bit (City
Secretary Contract Number 58122), in the amount of $3,406,056.86 for the University Drive Corridor project.
Change Order No. 1 was executed administratively for $97,289.30 and allowed for material cost increases, water vault reconstruction, tree
removal, utility relocation and other items. This Change Order No. 2 includes various items needed due to differing site conditions such as
additional conduit to reach a new location of electrical service, replacement of streetlight drilled foundations with spread footings due to depth
constraints, increased depth of median concrete pavement to be removed from six (per construction plans) to nine inches (actual), and an
irrigation allowance to repair/restore irrigation impacts near signal and street light foundations.
The following table summarizes contract actions for City Secretary Contract Number 58122:
Action
Initial contract execution
(M&C 22-0637)
Amount Justification
$3,406,056.86 Original Construction Contract
Date
8/23/2022
Change Order No. 1 $97,289.30 Change order for material cost 7/7/2023
(Administratively increases due to City -requested
Approved) delay start, water vault reconstruction,
tree removal, additional utility
location, traffic items, overhead
conductor for LP-10, cable and
conduit for relocating signal cabinet
at Collinsworth
Change Order No. 2 $122,532.96 Change order for signal and lighting Pending
electrical items, spread footings for
streetlights, increased concrete
pavement removal depth and
irrigation allowance
Contract Total $3,625,879.12
The funding for the project is summarized in the table below:
Fund Existing Additional Project Total
Appropriations Appropriations
Fund Existing Additional project Total
Appropriations Appropriations
34018 - 2018 Bond $5,300,000.00 $0.00 $5,300,000.00
Program Fund
56002 - Water &
Sewer Capital Project $429,049.00 $0.00 $429,049.00
Fund
Project Total $5,729,049.00 $0.00 $5,729,049.00
This change order will be funded within the existing project budget funds and no additional appropriations are required. Funding is budgeted in the
2018 Bond Program Fund for the purpose of funding the University Drive Corridor project as appropriated.
M/WBE OFFICE - Texas Materials Group Inc., dba Texas Bit agrees to maintain its initial M/WBE commitment of 14% that it made on the original
contract and extend and maintain that same M/WBE commitment of 14% to all prior change orders up to and inclusive of this Change Order No. 2.
Therefore Texas Materials Group Inc., dba Texas Bit remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its
signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company.
The project is located in COUNCIL DISTRICTS 3 and 9.
A Form 1295 is not required because: This contract will be with a publicly -traded business entity or a wholly -owned subsidiary of a publicly -traded
business entity: Texas Materials Group, Inc. dba Texas Bit
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated in the 2018 Bond Program Fund
for the University Drive Corridor project to support the approval of the above recommendation and execution of the change order. Prior to any
expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office by
Oriainatina Business Unit Head:
William Johnson 5806
Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:
University Drive Phase 1 CO #2
M&C: N/A
CPN: 101588 CSO: 58122
DOC#: N/A
Date:
11/15/2023
To:
Name
Department Initials
Date Out
I.
Ann Estes
TPW - Review
Nov 17, 2023
2.
Bereket Birhane
TPW - Signature 8
Nov 20, 2023
3.
Jamie Greenway
TexasBit - Signature U `
Nov 17, 2023
4.
Stephen Barnard
TPW - Signature-
Nov 17, 2023
5.
Raul Lopez
TPW - Signature
Nov 20, 2023
6.
Lissette Acevedo
TPW — Signature o�v
Nov 22, 2023
7.
Patricia Wadsack TPW — Signature PAW LPV
Nov 27, 2023
8.
Lauren Prieur
TPW — Signature &
Nov 27, 2023
9.
Doug Black
Legal — Signature dw�
Nov 28, 2023
10.
William Johnson
CMO — Signature W�
Nov 28, 2023
11.
Jannette Goodall
CSO - Signature
Nov 29, 2023
12.
TPW Contracts
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ❑No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(dfortworthtexas.i!ov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!