HomeMy WebLinkAboutContract 27564�o � o��r�
�
._ �
__ . ;� �_ ,.
���
���������
TO:
FROM:
DATE:
A. Douglas Rade�naker, Director, DOE; and
Mike Groomer, l�ssistant City Manager
Rakesh Chaubey, DOE
February Cth, 2002
��iY �����'���X
:UNiR�CT iV� . Y%
�
��: ��s��� ��� �►�������Y �o. � Yo t��T�� A�� s��i���v s�w��
�����►c�n����r co����c�, aoo� s-r�-� .
��E 33�0
SEIf'��� PROJ�CT NO. PS���U�0580��v440
WAiER �R�JECY NO. P!�l53-06��301761�U
The proposed amendment will ailow APM and Associat�s, Inc. ta provide additianai design and survey
services to tl�e praject as requested by the City. .�
During the process of desi�n it was decided by �l�e City Yhat tl�e consultants wauld l�ave to incIude the
Saniiary Sewer line on Mantague St. and Baylor St. in the pxoject. �
APM and Associates, IFic., has submitied a�ee in the amoUnt of $18,850.00 for the additional work as
desciibec� above. This amendment increases tlle cantract fee from $75,800.0� to $94,650.00. I beli:-� �
this fee is fair and reasonable for the additioi�a! seivices that are to be provided. It is recoinniendec� :.��,::
t11e request be appro�eci.
Please autharize additional fee by your signatures on the attacl�ed contzact amendment for�n.
-���.G� r�-�- �"-�'�`r�^-t �
_.�
Rakesh Chaubey
Attachrrient
Cc
,
�•%i►�A
:/,��/�;
,,,w
Berdena Hamilto��, Water Department
Dan Pepon, Water Departmeilt.
(�' �i
��
ENGINEERING DEPARTIV�ENT � �
THE Cl'i'Y Q� FDRT WO[t'fH *' �O�O THROCKMOiiTON STREET * FORT WORTH, TEXAS 7��OZ-G�I� �
(817} 87i-79A1 * FAx (817} 871-7854
� U�L�
����
I . '! ��f
� Printed an recycied �aper
,
�.
AlI o�her pxavisions of the Contract Frhich are n,at expressZy a�raended
herein shall r�ma3.n in full force and effect.
EXECUTED on �his th� ��� day df ���/`��'� ,
2002, in Fort Wo�th, Tarrar�t Caunty, Texas.
A'.I�� S,�' :
.
�
Gloria P��,arson, City Secretary
�E:C6�t��� ;
�.�'NfJ��tE$ ;R
���.� ,����__�
A. Douglas Rademaker, P.E.
Directar, Departrnent of
Engineering
«Nlercre Recard #�>
ENGINEER
BY=
APPRQV�D:
� ����
Bridge �a�rett
Ac�ing Assistant City Manage�
Name:Ronald L. O'Conell. P,E.
Vice President. APM & Assoeiates. Tnc.
lOZ S. Jenninas Ave.: Ste. 210
Fort Worth. TX 7fi�04
APPROVED AS TO F�RM AND LEGAL�TY:
�
� ��
Gary Steinber.ger
Assistant City Attorney
�rrci.FRM(NO M&C)
r2y I �
r ���V���Vb-a�� b'�LlJIF1�
( i. �Gilr, �!�-� *'h`7n � Y
"l
�h1
�` � IN�
� � APM & Associates, Inc.
ENGINE�RS � PLANNERS o SURVEYORS
[�i�. �akesh Chaubey, �.E.
P�-oj�ct Manager
Department of Engineering
City of Fart 11Varth
831 Lamar 5treet, Su�te 310
�ort Worth, Texas i6102
Dalias
Fort Worth
Houston
February 7, 2002
RE: Water and Sanitary Sewer Replacemer�t Cantract 2009 — STM-B
1Nater Project No. PW53-46053Q1761 �0, Sewer Projeci No. PS58-fl7fl580175440
DOE Project No. 3320
Fee P�oposal for Cont�act �►rr�er�dment Plo. 1
Dear Mr. Cha�bey:
We are pleased to submit this fee proposai far Amendment No. 1 to the abave refe�enced
contract far the additional services requested by the City. The following is a brief descriptior�
and fe� for the additional wark:
1. Design of approximately 1,150 LF of water and sanitary sewe� replacement along
Montag�e St.
Subtotai Montague St. Design:
2.
$ 9,0OO.OD
Detailed traffie co�trol plans along M.L.K. Jr. {US Hwy 287), to meet TxDOT
requirements.
5ubtatal Tra�fic Control:
�
$ 3,000.00
Design of approximate�y 450 LF of wat�r and sanitary sewer replacement along Bay{or
5t. and Meadow Dr.
Subtatal Baylar St. and Meadaw Dr. Design:
4
Surveying and Basema}�ping of Montague St.
S�btotal Surveying:
Total Contract Amenc�ment Nio. 1
We hape that yau find this satisfactory.
5incerely,
�
Afisu C. Olabimta�, P.E.
President
$ 3,040.00
$ 3,850.00
$ 9 �,�50A0
Ibq N. Central Expwy., Suike 210 1Q1 S. Jennings A�e., Suite 201 870D Commerce Park Dr., Suite 137
Dallas, TX 7�201 Fart Worth, TX 7610�k Housfon, TX 77036
(214} 748-4888 Fax (214) 7�8-4991 (817) 335-2466 Fax (817) 335-2467 (713) 777-1597 Fax {713) 777-1919
A�A�{dDIVIENT P10. 1
Water and 5anitary Sewer Replacement Contpact �041 S1�IU�-B
IAlate� ��oject Rla. PW,�'s3�06053Q1�6110
Sewer� #'poject Wo. �S�8-010�80175440
DOE Project Plo. 3320
MAN!-iOUR ESTIMA7� BY TASF�
Task
I �esign CA[30 � l �
�� Principal�projectManagerl Engineer l 7echnician Admin I 'FotaSCost
� $115A0 $95.00 $70.00 $55.00 $32,D4
1. Addition of 1,150 LF of
Water anci Sanitary Sewer
Replacemenk in Montague St.
5ubtotal Task 7
2, 7raffic Control P1ans
5ubtotal Task 2
3. Add9t9on of 450 LF of Water
and Sanitary 5ewer
Replacement in Baylor St. and
Meadow Dr.
5ut�total Task 3 '
4. Additional Survey Montague
St.
Subtotal 7ask 4
iotal Amendment No.1 II
7
$805, 00
1
$115.06
4
$115.flD
12
$1,940,00
1
$95.00
35
$2,450.OD
14
�saa.oa
�� 75
$4,125.00
3Q
��,s�o.ao
15
$480.00
5
$'16Q.00
1 14 30 � 5
$95.00 $980.0� $1,650.00 $16Q.bQ
Tota1
��,aaa.00
$3,UQ0.00
33,OOQ.00
$3,850AQ
$18,854.�