HomeMy WebLinkAboutContract 53886-CO2CSC No. 53886-CO2 FORT WORTH. City of Fort Worth Change Order Request Project Name E Long Avenue Bridge Deck and Pavement Rehabilitation City Sec # I 53886 Client Project #(s)l 101384 Project Description) Replacement of bridge deck including bridge sidewalk, railing and steel members. ContractorlRagle,lnc. I Change Order #1 2 I Datel 11/17/2023 City Project Mgr.l Christian Card ma City Inspector) Eddie Walker Dept. TPW Contract Time Totals (CD) Original Contract Amount $6,050,859.05 $6,050,859.05 540 Extras to Date $900,080.56 $900,080.56 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $6,950,939.61 $6,950,939.61 540 Amount of Proposed Change Order $60,644.60 $60,644.60 50 Revised Contract Amount $7,011,584.21 $7,011, 584.21 590 Original Funds Available for Change Orders $99,919.44 $99,919.44 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $60,644.60 $60,644.60 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 15.88% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 255/6) $7,563,573.81 JUSTIFICATION (REASONS) FOR CHANGE ORM IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the attached proposed Change Order #2. This change order is required for lead -based paint abatement of steel members of the bridge. Due to the deterioration of the bridge steel members, there will be a need for replacement or repair of the steel members. However, the steel has tested positive for lead -based paint (a hazardous material) which will need to be removed properly before the contractor can remove/repair the steel members. This change order provides the necessary pay item for removing, containing and hauling of lead -based paint contained at the top of each bridge flange by a Texas -licensed abatement contractor. Cost - The price per SF was compared to a previous, similar bridge project. Days - 40 calendar days were added for the lead abatement work, and an additional 10 days were added for price negotiating, scheduling and routing for a total of 50 calendar days to be added to the contract time. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Ragle,lnc I Troy Ragle "�a 11-20-23 c OT/' c� 11-20-23 c 11/20/23 Rroaram Date S 11/20/23 11/20/23 1. Date Director, Contracting Departure Z- W'A./' - w.e—Ie—scsn 11/20/23 CST) 11/20/23 Assistant City MadE Emmate ,„ „m n,� W.z,.l—NIU.C11 11/21/23 «zL 211211— 11/21/23 onn, M&C Number M&C Date Approved ATTEST:�"�` %' Liars q 'O�°`VRAI'No° <a8 axda V PV g=a OFFICIAL RECORD Jannette Goodall, City Secretary CITY SECRETARY FT. WORTH, TX City of Fort Worth Change Order Additions Project Name I E Long Avenue Bridge Deck and Pavement Rehabilitation City Sec # I 53886 I Client Project # 1 101384 Contractorl Ragle,lnc. I PMI Christian Cardona Inspectorl Eddie Walker Change Order Submittal # Date 1 11/17/2023 I HEM UtJUKIP IIUN bu yy UMb Lead Abatement ADDITIONS UtP I Uty Unit I PVV S,USL.uuuuuuuu Jr Unit Cost $4b.Ub TPW Sub Total Additions I oral I $Z6Z,b44.bU1 I I I I I I I I I I I I I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I $232,644.601 1 1 1 $232,644.601 Change Order Additions Page 2 of 4 FORTWORTH City of Fort Worth V.V., Change Order Deletions Project Name I E Long Avenue Bridge Deck and Pavement Rehabilitation I City Sec # 1 53886 Client Project # 1 101384 1 Contractorl Ragle,lnc. I PMI Christian Cardona Inspector) Eddie Walker Change Order Submittal# Date 1 11/17/2023 1 DELETIONS I I LM ULSUKIN I IUN ULV I 4b 9999.0001 Uonstructlon Allowance IVVv u unit unituost local I .86000UUU Lb $2UU,000.UU' $1/2,000.UUI I I I 1 I I 1 I I I I I I I I I I I I I I 1 I I I I I I I I I I I I 1 I I I I I I I I I I 1 1 I 1 I I I I I I I I I I 1 I I I I I 1 I TPW $172,000.001 I I I Sub Total Deletions $172,000.001 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO # DATE I AMOUNT 6/14/2022 $900,080.56 Total I $900,080.56 I Signature: fil gonio unoz (Nov 17, 202315:19 CST) Email: Filogonio.Munoz@fortworthtexas.gov FORT WORTH,,., Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE• Change Order #2 — E Long Avenue Bridge and Pavement Rehabilitation M&C: CPN: 101384 CSO: 53886 DOC#: Date: To: Name Department Initials Date Out 1. Filogonio Munoz TPW - Initial 11-17-23 2. Troy Ragle Ragle, Inc - signature TR TR 11-20-23 3. Eddie Walker TPW - si-gnature AL 11-20-23 4. Mike Glover TPW - signature T 11/20/23 5. Christian Cardona TPW - signature CC C� 11/20/23 6. Greg Robbins TPW - signature GR 6I 11/20/23 7. Mary Hanna TPW - signature WV 11/20/23 8. Patricia Wadsack TPW - signature PLW➢LW 11/20/23 9. Lauren Prieur TPW - signatures 11/20/2023 10. Doug Black Legal - signature ,Wb 1wb 11/21/23 11. William Johnson CMO - signature 4- 11/21/23 12. Jannette Goodall CSO - signatures 11/21/2023 13. TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ®No RUSH: ®YES ❑No SAME DAY: DYES [—]No NEXT DAY: DYES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(&FortWorthTexas.aov at ext. 7233 for pickup when completed. Thank you!