Loading...
HomeMy WebLinkAboutContract 27573� r CI`�Y ��CRET�RY ; ; , F , , � � , � coN��ac� �o . ���5: � � �.�'i �,�,. ;' � '.� r: A1VIEl�iDME1�IT NO. 1 TQ ARCHITECTUR.AL SERVICES CONTRACT STATE OF TEXAS § C7TY SECRETARY COUNTY OF TARRANT § WHEREAS, the City o� Fort Worih {Ciiy) and Quorum Architects, Inc. ("Architect") made and entered into City Secretary Contract No. 25428 (the "Contract"} on Ocfiober T 9, 1999; and WHEREAS, the Contraet involves a7rchitectural services far the following project: Eugene McCray Community Center WHEREAS, it has become necessary to amend sa.id Contraci to inc�ude an increased scope ofwork and revised maximum fee; NOW THEREFORE, City and Architect, acting herein by and thraugh their duly authorized r�presentatives, enier into the fallawing agreement which amends the Contract: 1, Section I, paragraph 1.1 of the Cantract as amended to include the additional architectural services specified in a proposal letter dated Februa�y Oi., 2041, a copy of which is attached hereto and incorporated herein, The cost to City far the additional services to be performed by 1�rchitect is $1,SO�.QO. 2. Section V, paragraph 1 of the Contract is amended to provide for an increas� in the rnaximwn fee to be paid ta Engineer for all work and services parforn�ed under the Con�ract, as amended, so that the total fee paid by the City fvr all work and serviees shall not exceed the sum of $144,2$0. 3. All o#her provisions of the Coniract, which are not expr�ssly amended herein, shall rernain in full force and effect. , �� ��LU�� 1 � lt,.�� ��1��?li(��� ' ''la EXECUTED on this tihe ��� day of '�%�,�, Fart Worth, Tarrant County, Tex�s. APPROVAL RECOMMENDED: � Hugo alanga Directar, Department of Transportation & Public Warks Ouorum Architects, Inc. ARCHITECT 4� �� David Duman ���� I'1 V J11.;�rti ���r� t� �. A�'TEST: � ' �r ` �ity Secr�taxy � rv� - _ � APPROVED A.� TO FORM AND LEGALITY: � . / Assistant 'ty Attorney , 2002, in APPROVED: � - - Assistant City Manager �� ��1d-�-���'�� Contract Ruthorixation Date � 'Ju u "� • f r I , , �_ 2 � ,��� Gommunity Center, Fzont Caraopy sxtensian Sub3ect: R�: I.VicCray Commuuity Center, Franf Cauopy extension Date: Fri, 2 Feb 2001-10:15:34 -06�D �From: "Richaxdsan, Nancy" <Richa�rN@.ci.fort-warth.t�.us� To: "'�arold Recer"' <haroldr@qaz•ch.com> �C: "Maty�ek, Bill" �Matyse��ci.fort-worth.tx.�xs> Harold- . � Th� aon�ractor is scheduled to b�gin drilling the piers on Feb. 25. Please have the enginaers redesign the pie�s in accordance with this schedule �so we do not delay the con�rac�,ors progress! f�ike Ficke unders�ands �here zs an in�rease in app�oximatel.y $8,000 �o cio this extension. i� we discover any change in thati cost, please let us know as soon as possible. Nancy Richardsan Architectural 5ervices -----dra,ginal Message----_ From: Haro].d R�cer [mailto:haroldr@qarch.aom] Sent: Th�rsday, Eebruary 41, 2041 1Q:30 A[�'! To: RS.cha�dson, Naney; Matysek, Bill; davidd@qarch.com Subject: McCray Cammunity Cen�er� Front Canopy extension Nancy, . I've been talki.ng ta.aux structural angineer on the fx�ont canopy woxk concerning fees � " and schedule, the tatal fee would be 51,504 a.nd approx, two wesks in time before we would have the,deliverables. in the interes� nf �ime the cantractar coul.d proceed ahead with �he pi�r work based the drawing that T had sen� you earlier on G41. spacing and not hold up the projec� o� cause them �o have to bring the drill.ing zig back oufi later, tha cost and number af piers would not ahange if drilled at the same time as the main building. ' This timing sequence wnul.d be made c�.ea� �a the.GC so they aan bid the wa�k accordingly. T will encouxage the engineer �o expedi�e their eifort as much as T can knawing �ha� t�iis vrork has ro get " in line" with ather woric t�hat they have qoirac�. . I waul.d appxeciate a quick response to this 3.etter. Thanks, , .:. harold ' 02I021200I 10.26