HomeMy WebLinkAboutContract 27573� r CI`�Y ��CRET�RY
; ; , F , , � � , � coN��ac� �o . ���5: � �
�.�'i �,�,. ;' � '.� r:
A1VIEl�iDME1�IT NO. 1 TQ ARCHITECTUR.AL
SERVICES CONTRACT
STATE OF TEXAS § C7TY SECRETARY
COUNTY OF TARRANT §
WHEREAS, the City o� Fort Worih {Ciiy) and Quorum Architects, Inc.
("Architect") made and entered into City Secretary Contract No. 25428 (the "Contract"} on
Ocfiober T 9, 1999; and
WHEREAS, the Contraet involves a7rchitectural services far the following project:
Eugene McCray Community Center
WHEREAS, it has become necessary to amend sa.id Contraci to inc�ude an
increased scope ofwork and revised maximum fee;
NOW THEREFORE, City and Architect, acting herein by and thraugh their duly
authorized r�presentatives, enier into the fallawing agreement which amends the Contract:
1,
Section I, paragraph 1.1 of the Cantract as amended to include the additional
architectural services specified in a proposal letter dated Februa�y Oi., 2041, a copy of
which is attached hereto and incorporated herein, The cost to City far the additional
services to be performed by 1�rchitect is $1,SO�.QO.
2.
Section V, paragraph 1 of the Contract is amended to provide for an increas� in the
rnaximwn fee to be paid ta Engineer for all work and services parforn�ed under the
Con�ract, as amended, so that the total fee paid by the City fvr all work and serviees shall
not exceed the sum of $144,2$0.
3.
All o#her provisions of the Coniract, which are not expr�ssly amended herein, shall
rernain in full force and effect.
, �� ��LU��
1 � lt,.�� ��1��?li(���
' ''la
EXECUTED on this tihe ��� day of '�%�,�,
Fart Worth, Tarrant County, Tex�s.
APPROVAL RECOMMENDED:
�
Hugo alanga
Directar, Department of
Transportation & Public Warks
Ouorum Architects, Inc.
ARCHITECT
4� ��
David Duman
���� I'1 V J11.;�rti ���r� t� �.
A�'TEST: � '
�r `
�ity Secr�taxy � rv� - _ �
APPROVED A.� TO FORM AND LEGALITY:
� . /
Assistant 'ty Attorney
, 2002, in
APPROVED:
� - -
Assistant City Manager
�� ��1d-�-���'��
Contract Ruthorixation
Date
� 'Ju u "� •
f r I
, , �_
2
�
,��� Gommunity Center, Fzont Caraopy sxtensian
Sub3ect: R�: I.VicCray Commuuity Center, Franf Cauopy extension
Date: Fri, 2 Feb 2001-10:15:34 -06�D
�From: "Richaxdsan, Nancy" <Richa�rN@.ci.fort-warth.t�.us�
To: "'�arold Recer"' <haroldr@qaz•ch.com>
�C: "Maty�ek, Bill" �Matyse��ci.fort-worth.tx.�xs>
Harold- . �
Th� aon�ractor is scheduled to b�gin drilling the piers on Feb. 25. Please
have the enginaers redesign the pie�s in accordance with this schedule �so we
do not delay the con�rac�,ors progress!
f�ike Ficke unders�ands �here zs an in�rease in app�oximatel.y $8,000 �o cio
this extension. i� we discover any change in thati cost, please let us know
as soon as possible.
Nancy Richardsan
Architectural 5ervices
-----dra,ginal Message----_
From: Haro].d R�cer [mailto:haroldr@qarch.aom]
Sent: Th�rsday, Eebruary 41, 2041 1Q:30 A[�'!
To: RS.cha�dson, Naney; Matysek, Bill; davidd@qarch.com
Subject: McCray Cammunity Cen�er� Front Canopy extension
Nancy, .
I've been talki.ng ta.aux structural angineer on the fx�ont canopy woxk
concerning fees � "
and schedule, the tatal fee would be 51,504 a.nd approx, two wesks in
time before we would have the,deliverables. in the interes� nf �ime the
cantractar coul.d proceed ahead with �he pi�r work based the drawing that
T had sen� you earlier on G41. spacing and not
hold up the projec� o� cause them �o have to bring the drill.ing zig back
oufi later, tha cost
and number af piers would not ahange if drilled at the same time as the
main building. '
This timing sequence wnul.d be made c�.ea� �a the.GC so they aan bid the
wa�k accordingly. T will encouxage the engineer �o expedi�e their eifort
as much as T can
knawing �ha� t�iis vrork has ro get " in line" with ather woric t�hat they
have qoirac�. .
I waul.d appxeciate a quick response to this 3.etter.
Thanks,
, .:.
harold '
02I021200I 10.26