Loading...
HomeMy WebLinkAboutContract 58812-CO1Foxu, Project Name Lake Worth Trail Phase 1 B Client Project #(s)l C01920 Project Description) Contractorl Cole Construction, Inc. City Project Mgr.I Carlos M Gonzalez City of Fort Worth Change Order Request CSC No. 58812-COI City Sec # l 58812 l l Lake Worth Trails Phase 1 B at Marion Sansom Park Change Order#1 1 1 Date 11/21/2023 City Inspectorl William R. Fauver Dept. PARD Contract Time Totals (CD` Original Contract Amount $1,821,821.56 $1,821,821.56 275 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $1,821,821.56 $1,821,821.56 14 275 IGo to ADD & DEL Tabs to Enter CO Backup W $38,135.46 $38,135.46 35 Revised Contract Amount $1,859,957.02 $1,859,957.02 310 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $38,135.46 $38,135.46 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.09% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,277,276.95 JUSTIFICATION (REASONS) FOR CHANGE ORDER • Due to the proximity of the concrete trail next to Cahoba Dr., the City of Fort Worth requested a quote from the contractor to install 625 Linear Feet of guard rail and two maintenance gates next to the trail. The contractor provided a quote, and the city found the quote to be fair. • Per city agreement, all measured field quantities shall be paid (to include overages and shortfalls). It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. qlllJrtr—act,r`s Company Name Irontractor Name Contract Si nature Cole Construction, Inc. Kenneth Thorne Date Nov 21, 2023 Inspector/Inspection Supervisor Date Pro ect and ContraMompliance Manager Date ✓.G0.P-1- Nov 21, 2023 owr Nov 21, 2023 Program Manager Date Senior Capital Project Officer Date Nov 21, 2023 2— Nov 22, 2023 Assistant Director Dept Date Director, Contracting Department Dept Date 7 Nov 27, 2023 Nov 28, 2023 Assistant City Attorney Date Assistant City Manager Date Nov 28, 2023 Nov 30, 2023 Council fired M&C Number I N\A I ATTEST: .h l4 Ic Jannette Goodall, City Secretary foprno a°Fo =9�d 3d44 aEa: 4o4�.d M&C Date Approved I N\A l OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth '!" Change Order Additions Project Name Lake Worth Trail Phase 1 B City Sec # 58812 Client Project # C01920 I Contractorl Cole Construction, Inc. I PMI Carlos M Gonzalez Inspectorl William R. Fauver Change Order Submittal # O1 Date 1 11/21/2023 ADDITIONS IIEM UESCRIPIIUN UEPI Uty Unit Unit Gost total Unit 6 - Road Railing 1 TX Dot Guard Rail PARD 625.00 LF $66.47 $41,543.75 2 Tx Dot Gate PARD 50.01J LF $266.67 $13,333.50 Unit 7 - Clean Up 1 Sodding PARD 23,528.00 SF $0.60 �4,116.80 2 Removal Concrete Sidewalk PARD 173.0U SF $7.7U 1,332.10 3 Trail Embankment PARD 2.01J CY $28.24 $56.48 4 Concrete Trail 10' Wide (Including Subgrade Prep) PARD 164.01J SF $9.50 $1,558.00 5 Metal Rail 1 Beam Fencing PARD 8.01J LF $173.43 $1,387.44 6 Bridge Abutments PARD 0.41J CY $2,605.90 $1,042.36 7 Drilled Shafts PARD 19.01J VF $285.79 $5,430.01 8 Segmental Block Retaining Wall (including Cap) PARD 797.01J SF $29.51 $23,619.47 PARD $103,319.91 Sub Total Additions $103,319.91 Change Order Additions Page 2 of 4 Fox_� City of Fort Worth Change Order Deletions Project Name I Lake Worth Trail Phase 1 B I City Sec # 1 58812 1 Client Project # 1 C01920 I Contractorl Cole Construction, Inc. I PMI Carlos M Gonzalez Inspectorl William R. Fauver Change Order Submittal # Date 1 11121/2023 1 DELETIONS IIEM Ut:bUNIPI IUN DEPI uty unit unit Gost total 15 Trail Excavation PARD 7.00 EA $26.3t; 184.45 3 Allowance No. 2 PARD 1.00000000 LS $5,000.0( $-,000.00 5 Allowance No. 5 PARD 1.00000000 LS $10,000.0(, $10,000.00 9 Allowance No. 9 PARD 1.00000000 LS $50,000.0( $60,000.00 PARD $65,184.45 Sub Total Deletions $65,184.45 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO # DATE I AMOUNT N/A Total I $0.00 1 Cole Construction Inc. 10315 Alta Vista Rd Fort Worth, TX 76244 To: City Of Fort Worth Address: 200 Texas St Fort Worth, TX 76102 USA Project Name: Lake Worth Phase 16 Project Location: 6189 Cahoba Ct E, Fort Worth, TX Item # Item Description 01 TX DOT Gate Includes: • Wooden Post • Wooden Block • Metal Gate 01 TX DOT Guard Rail Includes: • Wooden Post • Wooden Block • Metal Guard Rail • Terminal Anchor Sections (Estimated Lead Time Is 6- 10 Weeks) ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Buyer: Signature: Date of Acceptance: Phone: 817-431-9636 Fax: 817-379-5258 Contact: Carlos M Gonzalez Phone: 817-392-5734 Fax: Bid Number: C01920 Bid Date: 8/4/2022 Estimated Quantity Unit Unit Price Total Price 50.00 LF $266.67 $13,333.50 625.00 LF $66.47 $41,543.75 Total Bid Price: $54,877.25 CONFIRMED: Cole Construction Inc. Authorized Signature: Estimator: Jacob McGregor 817-431-9636 x 306 jacob@colecon.com Page 1 of 1 Cole Construction Inc. 10315 Alta Vista Rd Fort Worth, TX 76244 To: City Of Fort Worth Address: 200 Texas St Fort Worth, TX 76102 USA Project Name: Lake Worth Phase 16 Project Location: 6189 Cahoba Ct E, Fort Worth, TX Item # Item Description 01 Additional Sodding 02 Removal Concrete Sidewalk 03 Trail Excavation 04 Trail Embankment 05 Concrete Trail 10' Wide (Including Subgrade Prep) 06 Metal Rail \ Beam Fencing 07 Bridge Abutments 08 Bridge Abutment Piers 09 Segmental Block Retaining Wall (Including Cap) ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Phone: 817-431-9636 Fax: 817-379-5258 Contact: Carlos M Gonzalez Phone: 817-392-5734 Fax: Bid Number: C01920 Bid Date: 8/4/2022 Estimated Quantity Unit Unit Price 23,528.00 SF $0.60 173.00 SF $7.07 -7.00 CY $26.35 2.00 CY $28.24 164.00 SF $9.50 8.00 LF $173.43 0.40 CY $2,605.90 19.00 VF $285.79 797.00 SF $29.51 CONFIRMED: Cole Construction Inc. Total Bid Price: Total Price $14,116.80 $1,332.10 ($184.45) $56.48 $1,558.00 $1,387.44 $1,042.36 $5,430.01 $23,519.47 $48,258.21 Buyer: Signature: Authorized Signature: Date of Acceptance: Estimator: Jacob McGregor 817-431-9636 x 306 jacob@colecon.com Page 1 of 1 -65C (ASPHANT P G) \ �> _�� TAINING WALL #3 \�6 656\\� ^�` S07 r. 90 LF of _ - (SEE STRUCTURAL guard rail - SHEETS FOR DETAILS) S1 - NOTE: I r 10 CONCRETE TRAIL TO - - - - - HAVE CONTRACTION \\ JOINTS EVERY 10' O.C. - - - �' � RETAINING WALL 4 � - - - rn \', AND EXPANSION JOINTS # ' CO�� - - 3� Gate \ ��� �o EVERY 40' O.C. (TYP. �`O / (SEE STRUCTURAL /� cobs C Entrance \ \ ` I I / / / SHEETS FOR DETAILS) ; ::� t 345 LF of /„ �, , EXI.. �� \\ \ \ \1 \ i ► I I � I I I I I guard rail \ \ \ \ \ I II I I I I I I I I I I g 3. - FORT WORTH CITY OF 200TEXAS ST TWORTH, TX76102-6311 \\\\\\\\o\\\`\\w\ 4 \\\\ AVE `� \\\\ \\\\ \\\ \ \ \ FORT WORTH CITY OF ZY RETAINING WALL #5 \ \�\\\\�\� \\\\ \\\\\�\\\\ \� 200 TEXAS ST (SEE STRUCTURAL I I\\ ` \\\\\\\\\ \\\\ \\\\\ \ FT WORTH, TX 76102-6311 -YP.) SHEETS FOR DETAILS) I I I I I I\111\\\\\\\ \\\\ \\\\\ \\�\\ \\.•,\\\///////�/��III�- 6�� _ �� \\I\II►II1111I1�:►111 :��� ��iii.,,,. 6-71- \\\\\111\I11\� l I I �11 NEW HEADWALL, SEE STRUCTURAL DETAILS Jl/�•T'�- -672� �. - \\\�A\ \\�A\\ \� V .� -,. -� - %� i � RETAINING WALL #7 (SEE STRUCTURAL SHEETS FOR DETAILS) WIDE CONCRETE AIL (TYP.)(SEE FORT WORTH CITY OF EET DT 1.02 FOR 200 TEXAS ST TAILS) FT WORTH, TX 76102-6311 S38 T34 S39 rl 32 S33 T35 534 r'j 3 - T33 EXISTING 12" CONCRETE PIPE -NEW CLASS 3 RPC 48" PIPE. NEW HEADWALL, TYP. (SEE SMALL SIGN - TYPE H STRUCTURAL SHEETS AND DT1.02 FOR NOTE: DETAILS) 10' CONCRETE TRAIL TO HAVE CONTRACTION JOINTS EVERY S36 O.C. AND EXPANSION JOINTS EVERY 40' O.C. (TYP.) S 3 5] MATCH WITH EXISTING EDGE OF ASPHALT ROAD i SMALL SIGN - TYPE D T36 r^ "+.;fir..;• / / TFAADODADY DQ0 IF(`T CI