HomeMy WebLinkAboutContract 28234�i�ry ��e����� �, �� � CON�'RACi �. �.+� :� ,� � CITY OF FQRT 1lISORTH, i�XAS .___. �,. ..,s SiAN�AR� A�RF��M�M� �O� �NGINE�RIfVG SERVIC�S This AGREEMENT is between the Gity of F�rt Warth (fhe "CITY"), and Wendy Lopez & ASSOCI�tB5, Inc. dba LOPEZGARCIA Group, {the "ENGINEER"}, for a PROJECT genera�ly described as: Water and Sanitary Sewer Mains Rosedafe Streei from IJ.S. Hwy. 287 to 1.H. 820. ,4�icEe I Scope of Serrrices A. The Scope of Services is set fort� in Attachmen# A. l�r�icle I! Compensa#i�n A. Th� �NGiN�ER's campensation is set fa�h in Attachment B. Ariicle Ili ierms af Paym�n4 Payments to tt�e ENGINEE� will be made as fallows: I� ��#� Ir�voice and Paymert� ('E) The E�tgineer shall provide the C�ty sufficien# daccrmenta#ion tfl reasonably substantiate the in�oices. (2} Mar�th�y invoic�s will be issued by the �NGW��� for all work �erfo�-med ur►der this AGREEM�Ni. Invaices ar�: due and payable within 30 days of receipt. � (3) Upon campletion af services enumerated in Article I, the frnal payment of ar�y balance wiRl be due within 30 days of receipt of t�e fnal invoiceo (4} fn the event of a d�sput�d or cantested b�lling, only t�at portivn so contested wiil be withhefd from payme�t, and the �ndisputed portion will be paid. �'he CIi�Y wiil exercise reasonableness in cor�testir�g any bill or portion thereaf. h10 interest will accrue on any cantestsd portiar� of the bilfing until mutually resolved. ' (5) If the CITY fails to make payme�t in fulf to �NGINEER far biAings contested in good faith within 6Q days of tF�e ama�nt due, the �NGiN�ER may, after gi�ing seven (7) days' w�itten noiice to ClIY, suspend services ur�der this AGR��M�Ni unt�l paid in fuli, including interest. in the �vent of suspensiort of servic�_the ENGIN��R �ali have no liability to C�TY for delays or darr���s� ��sc�d ���: �� . ,.� ,. , ,,��. .. � �1— , +�fiM�'a e��!� �'-�►�::�;:}���;. ��� ��„P , . � � _ , ,� ._ because of such suspension af services. ArYicle IV ���igs�ion� of the Engine�r Amendments ta Article IV, if any, ara included in Attachment C. A. (3eneral The ENGIN�ER will serve as the CIiY's prafessionat engi�teenng representative under this Agreemet�t, providing professianal engin�ering consu�tation and ad�#ce and furnishing customary services incidentai thereto. �. Sf�r�dard of Ca�� The standard oi care appiicab{e to #he ENGIN��.R's serv�ces wi4! be ihe degr�e of skill and diligence normally empfoyed in the State of Texas by professivna� engineers ar consultants perfiorming the same or simil�r services at the time suc� s�rvices are pertvrmed. C. Su�sueface In�es�ig��iar�s (1) The �NGIN�ER s�alE advise tMe CITY w�th rega�d ta t�e n�cessity for subcontract work such as s�ecial suroeys, tests, test borings, or other subsurface in�estigations in connection r�rith d�sign and engineering work ta be per�ormed �ereunder. The �NGIN��R shal� alsa a�vise the CITY conceming #he results of same. 5uch suiveys, tesi�, and investigations shall be f�mished by the CITY, unless oiherwise speci�ed in Rttacnment A. (2) 1n soifs, foundation, grour�dwater, and other subsurface in�es#igations, the ac#ual character�stics may �ary significantly between successi�e test points a�d sample intervals and at locations other tha� where observa#ions, exploratian, and investigations �ave been made. �ecause of ihe inherent uncertainties in subsurface evaluations, ct�anged or unanticipa#ed underground condit€ans may occur that could affecY the total PROJECT cost and/or executian. Th�se conditions ar�d costlexecution eff�cts are not t�e respar�sibility of thE ENGINEER. �. �r�eparafiicn ofi �ngin�e�ing 9rav�ir�gs �he ENGiNEER will provide to the CIiY the original drawings vf all plans ir� i�k on reproducible �lastic film sheets, or as otherwise appraved by CITY, which shall become #�e proper�y of the CIlY. CETY may use such drawings in any manr�er it desires; provided, however, that the ENGINEI�R shall nat be liable for the use of suc�t drawings for aRy project ather #han the PROJ�CT described herein. ,��������a� ��'���� . ^ � rz ���si�����1�'w�k.:, �, .� �. �ngineer's �ersonnel a� Consfirucfion Sife (1) TY�e presence or duties of the ENGINEER's personnel at a construction site, whether as on-site representatives or otherwise, do not make the ENGINEER or its personnel in any way respansible for fihos� duties that belong to the CITY and/or the GITY's construction contractors or other entities, and da nvt relieve the canstruction co�tractnrs or any ather entity of their obligations, duties, and responsibilifies, i�cluding, but not limited t�, al� constr�ciian methads, means, tec�niq��s, sequences, an� procedures necessary for coordinating and comp�eting all por#Eans o� the construetion work in accordance with the Contract Documents and any heaith or safety prer.autions required by such construction warl�. The ENGaNEER and its personnel have na authori#y to exercise any contro! over any construction contractor ar flt�er entity or their emplayees in connecfion with their work or any health ar safety precautions. {Z} �ccept to the extent of specific site visits expressly detailed and set forih in Attachment A, the ENGINE�R or its perso�ne4 shall have na obiigation or responsibility to visit the construction site tv become familiar with ti�e progress or quality of the completed work on the PRO.�ECT or to deterrnine, in ger�eral, if the war4� an the PROJECT is being perFormed ir� a manner Endicating that the PROJ�CT, when cornpleted, w911 be in accordance with the Co�traci �ocuments, nor shafl anythir�g in the Contrac# Documents ar the agreement betwe�n CITY and ENGINEER be constr�.�ed as requiring ENGiNEER #o make exha�stive or cantin�ous on-site inspections to discover latent d�fects in the worEc or athetwise checic the qua�ity or quantity of the work o� tf�e PROJECT. If, for any reason, #h� ENGIN��R shauld make an an-site observation(s}, on the basis of such o�-site observations, ifi ar�y, the ENG4NEER shall endeavor to ke�p the CI�Y infarmed of any deviatian ftom the Contract Dacuments coming to the ac#ual natice ofi �NG�NE�R regardi�g the PROJECT. � (3) When professional certificafion of perFormance or characteristics of materials, systems ar equipment is �easonably required to perForm the services set farth in t�e Scope of Services, the ENGINEER shall be enti�led to refy upon such certification to establish materia[s, systems flr equipment and perFo�mance Criteria to �e req�ired in the Contract DocUments. �. Opinions af Probable Cosi, l��nancial C�nS�de�a��ons, and 5chedules (1} The ENGINEER shail pravide p�inions o� probable casts based on the current available infonna#ian at #�e time af pre�aration, in accordar�ce with Attachment A. (2) [n �roviding opinions of cost, financial ar�afyses, ecanomic feasibility proj�ctions, ar�d scheduE�s for the PROJECT, the ENGiNEER �as no control over cast or price of tabor and materials; unknown or latent conditions of existing equiprr�ent or structures that may affect aperation or rnaint�nance costs; competitive biddin� prncedures ar�d market _3_ - �,.},r .* i, _ h�, canditions; time or qualify of perfo�rnance by third parties; quality, type, managemen#, or directior� of operating personn�i; and other ecanomic and operational factors that may materially affect the ultimate PROJECT cost or scY�edule. Therefore, the ENGfNEER makes no warranty #�at the CITY's actual PROJECT casts, financial aspects, econornic feasibiiity, or schedules will not vary f�arr� the ENGINEER's opinior�s, aRalyses, projections, ar estimates. G. Construciion �rogr�ss �a�men�s Recommendations by the ENGINE�R to the CITY for periadic construction progress paymen#s to the construcfian contraetor will be based on the ENGENEER's knowledge, information, ar�d belief from selective sampling and observatEon that the wark has progressed to the point indicated. 5uch recammendat�ons do not r�present that coniinuous or detailed examinatians have been made by the ENGINEER #o ascertain that the constructian contractor has c�mpleted th� wor�C in exact accordance with the Cantract Documents; that the final work will be acceptable ir� a!I respecks; that the ENGIN�ER has made an examination to ascertain how or fior what purpdse the cor�struction contractar has us�� the maneys paid; ihat t�tle to any of the worEc, materiafs, or equipment has passed #o the CITY free and clear of �iens, ciaims, security interests, or encum�arar�ces; or #hat t#�ere are nat other matters at issue between t�e CITY and the construction cantractor thafi aff�ct the amount that sho�ld be paid. b. Reco�d ��awings Record drawings, if required, wiil be prepared, in part, on the basis af information compiled and fumished by others, and may no# always represen# the �xact location, type ofi varia�s com�onents, ar exact manner in which the PRQJECT was finaliy cons#ructed. The ENGINEER is riat responsibie for ar�y errors or omissions in the inforrnation frnm oth�rs that is incorporated into tF�e recard draw�ngs. I�ino�i� and Viloman �usiness �nterpn�e (Mfil+'��) pa�icipat�on In accord with City of �or� Wor�h OrdEnance No. 1'i923, as amended by Drdinance 13471, the City has goals for the participation of minority business enterprises and woman business enterprises in City cantracts. �ngEneer acicr�owledges the M/WBE goal established for thts contract and its commitment to meet that goal. Any misrepresentation of facts (other tha� a negligent misrepresenta#iart} ar�d/or the commission of fraud by the �ngir�e�r may resul# in the termination of this agreement and debarment from pa�ticipatir�g in City cvntracts for a periad af time oi �ot less than three (3) y�ars. .!. Righi to Audif {1} ENGINEER agrees #hat the CtTY shall, until the expFratian of three (3) years after fi�al payment under this con#ract, have access to and the right to examine and photocopy any directly ��n¢nt books, documents, papers �rtd records a� the �NGlNEER invai�rir�� fi��ls�ct��s -��iaiimg tc� -4- " J u ie tiL'� . �,7 wnA/� r. _ i� �, this contract. ENGINEER agrees that the CITY shall �ave access during normal working Y►aurs ta all r�ecessary ENGINE�R f�cilities and shail be provided adequate and appropriate wor� space in order ta conduct audits in compfiance with the provisions oi this section. The CITY shall give ENGiNEER reasonable advance no#ice of inte�ded audits. (2) ENGINEER further agre�s to inGude in all its subconsultani agreements hereunder a pravision to the effect #hat the subconsuEtant agrees that the CITY shail, unti� the expiration of three (3) years after final payment under the subcantra�#, have access ta and the r�ght to examine and photocapy any directly pertinent boo�s, documents, papers and records of s�ch subcansultant, invol�ing tr�nsactions to the subcontract, and further, that the CETY sha41 ha�e access d�ring normaf woridng hours to all subcons�ltant facilities, and shall be provided adequate and apprapria#e wor�t space, in ord�r to conduct audits in campliance with the provisians of this articie together with subseciion {3}hereof. CIiY sha�l girre subconsultant reasonable advance natice af intended audFts. (3} ENGIN��R and subco�sultant agree to photo copy such documents as may be requested by the CITY. The CITY agr�es to reimburse ENGiNE�R €or the cost of eopies at the rat� published in the iexas Administrative Cade in effect as o! the fime copying is perFormed. f4. �;1!(3�IV��R's [�suPar��� {1) Ir�suranc� co��rag� and fimits: ENGINE�R shall provide ta the City certificate{s} of insurance documentirtg policies of the following coverage at minimum limifs which ar� to be in effect prior to commencemen� crf wark on the PROJ�CT: Cammereial General Liabiiity $1,0OO,OpQ each accurrence $1,00a,000 aggregate Autamobiie Liability $1,aaa,004 each acc9der�t {or reasonably e4uivalen# Eimits of coverage if written on a split limits basis). Caverag� shall be vn any vehicle used in the cours� of the PROJECT. War�cer's Compensatian Coverage A: statutory limits Caverage B: $100,000 each accident $500,000 disease - palicy limit $100,a00 disease - each employee Professionsl Liabiiity $1,OQQ,D00 �ach claim/anr�ua� aggregate (2} Certificates of insurance e�id��cing that #he E6v�1l���R ; i�s-abxarlrr.ee� �II ��� .. . , -�. � requirsd insurance shal{ be delivered ia the CITY prior to ENGINEER proceeding with th� PROJECT. (a) Applicabie policies sha�l be endorsed to name the CITY an Additional Insured thereon, as Ets interes�s may appear. The term CITY shali include its employees, officers, officials, agents, and volunteers as respects the contracted services. (b) Certificate(s) of insurance shall dac�ment that insurance coverages specified according to items section f�.(1} and K.(2} of this agr�ement ars provided unc�er applicabEe poficies docume�ted thereon. (c) Any failure on documentation requirements. part of t#�e ClTY to requesf required insurance shali nof constitute a waiver of the insurance (d} A minimum of thirty (30} days natic� of cancellation, nor���eneuval or ma#erial change in coverage shail be pravided to the CITY. A ien (10) days natice sha{I be acceptable in the event of nan- payment of premium. Sucl� #erms shall be endarsed onto ENGINEER's insurance poficies. Notice shall be seni ta the respective Department Director (�y name}, City of Fort Worth, 1000 Throcicmorton, Fort Worth, Texas 76102. (e) �nsurers for ali policie5 must be authorized to do business ir� the state of Texas or be otherwise approved by the CITY; anc�, such insurers s�all be acceptable io t�e C1TY in terms of their financial strength and so���ncy. (f} Deducfible limits, ar seif Ensured retentions, affecting insurance required herein may be acceptabfe to the CITY at its sole discretion; and, in lieu of traditional insurance, any altemative caverage mai�tained through insUrance paois or risk reter�tion groups must be also approved. Dedicated financia! reso�arces or letters of credit may alsa be acceptable to the City. (g) Applica�le policies shall each b� endorsed with a waiver of subrogation in favor ox th� CfTY as respects t�e PROJECT. �h) The City sl�all b� entitl�d, upon its request and without incumng expense, tv re�iew tt�e ENGINEER's insurance policies including endorsements tY�ereto and, at the C�iTY's discretfan, the ENGINEER may be requi�ed to provide proof of insurance premium payments. (I) Ti�e Commercial General L,iability insurance pol�cy shall have no exclusians by endorsements uNess sucY� are a�proved by the CITY. � _.., I,�r ����� ��� u���cM�L u : —�= -.-- ������ . J ' ' f- - �' (j) The Professional Liab�lity i�lsurance palicy, if written on a claims made basis shafl be maintained by the ENGINEER for a minimum two (2} year period subsequen� to the term af #he respective PROJECT contract with the CITY unless suc� coverage is provided the ENGINEER on an accurrence basis. (k) The CIT1' shall not be responsible fof the direct payment oi any insurance premiums required by this agreement. lt is understood that insUrance cost is an allowable compor�ent af ENGINEER's overhead. (I) Afl insurance required ir� section K_, except for th� Professiona� Liabili#y ir�surance policy, shall be wri�ten on an occurrence basis in order to be appraved by the CI�Y. (m) Subconsultants to the ENGINEER shall be requi�ed by th� ENGINEER to maintain the same or reasanably equival�nt insurance co�erage as required fo� the ENGINEER. When insurar�ce coverage is maintained by subconsuftants, ENGINE�R shafl provide CITY with documentation thereof on a certifieate of insurance. Notwithstandin� a�nything to the cvnirary contaEned herein, in the event a subcansultant's insurance co�erage is canceied or terminated, such ca�cellation or termina#ion shall not c�nstitute a breac� by ENGIN�ER of the Agreement. L. Independ�n4 Ca�sultant The �NGINEER agre�s to perto�m atl services as an in�ependent consultan# and no# as a subcontrac#or, agent, vr employee af the CITY. fl�. �iscl�s�re The ENGINEER acknow�adges to the CITY tha# it has made full dEsclosure in w�Eting of any existing cor�f{icts of int�res# or potential conflicts of interest, including personal financial interest, direck or indirect, in praperty abutting the proposed PRO.lECT and business rela#ianships wit� abutting property cities. The ENGINEER f�rther acisnowledges that i# will make disclosur� in writing of any canfl�cts af inte�est w�ich develop �ubsequent to the signing of ihis cantract and prior #o �ina! payment under the contract. fi�. Asbe�48s a� Hazardous Substances (1) If asbestas or hazarc�aus s�bstances in any farm ar� encountered or suspected, the ENGINEER wiil stap its own wor� in the affected partions of the PROJECT ta permit #esting and evaluatian. (2} !f asbsstas or other hazardous substances are sc�spected, the ENGENEER will, if requested, assist the C�TY in obtaining the services of a qualified subcontractor to manage the rerr�Qd���or� ��t;�;;+�a� �f �e PR�JECT. � �7� L4� - -- ��., �� �^ �" a O. Permiifing �Authorities - Design Changes If permitting authoriti�s requEre �esign changes so as to comply with pubiished design cri#eria andlor current engineering practEce standards which the ENGiNEER should I�a�e been aware af ai the time this Agreeme�# was executed, ihe ENGIN�ER shali revise pEans and specifications, as requir�d, at its own cast and expense. However, i# design chang�s are required due ta the changes in the permitting authori#ies' published design crit�ria �ncf/or practice standards criteria which are published after the da#� af thEs Agreement which the ENGINEER could not have been r�ason�bly aware of, the Eh1GfNEER shal! natify the C�TY of such c#�anges and an a�justment in compensation wilf be made through an amendment to this AGR�EMENT. Ariicle �l Qbligagions ofi 4he City Amendments to Article V, if any, are included in Attacl�ment C. A. City�Fu�nished �a�a The CITY wilE mak� available to the ENGINEER all technical data in the G1TY's passession reiating to the ENGINEER's services on #he PROJECT. The ENGINE�F� may rely upon the accuracy, timeiiness, and completeness of the information pravided by the CITY. �. �ccess to �aciiiiies and Pro}�erty TY�e CITY will ma�e i#s facilities accessible ta the ENGINEEFi as required far the ENGINEER's pertormance of i#s services and wi�l provide labor and safety equipment as required by i�e ENGINEER for such aecess. The CITY wi�l perForm, at no cosf to the ENGINEER, such tests of equipment, rr�achinery, pipelines, and other compar�e�ts of the ClTY's fiacilities as may ae required in cflnnection with th� ENGINEER's services. The CITY wili be responsible far all acts of the CIiY's persannel. �. Adveriisemeni�, �ermiis, and Access Uniess otherwise agreed ta in the Scope of Services, the CITY will abtain, arrange, and pay for all advertisements for bid�; permits and licenses required by locaf, state, ar federal autl�orities; ar�d land, easements, rights-af-way, and access necessary for the �NG�NEER's senrices or PROJ�GT construction. �. fimely Review The GITY wi�l examine the ENGINEER's studies, repor�s, s�tetches, drawings, speci#ications, pro�osals, and other documents; obtain acfvice of an attomey, insurance co�nselar, accourriant, auditor, bond and financial advisars, and other cansultan#s as ti�e CiTY deems �ppropriate; an� t�t;��r _�� '_r`y��lrj� L{�I51011S �� +�rt r � , ��. requireci by the CETY in a timefy manner ir� accordance with the project schedule in Att�chment D. E. Prompt Notice The CfTY wil� give prompt written notice ta the ENGINEER whenever CITY observes or becomes aware nf any de�e�opment that affiects the scope ar timing of the ENGINEER's se�vices or of any defect in #he vu�ork of tf�e ENGENEER or construction contractors. F. Asbes�os or Fiazardous Substance� and Indemnifeafiion ('�) To th� maximum extent permi�ted by law, t�e CI�Y will indemnify and reEease ENGINEER and its afficers, employees, and subcontractors from all �laims, damages, los�es, and costs, including, but not limited to, attomey's fees and litigation expenses a�ising out of or relating to the presence, discharge, release, or escaPe of �azardaus substances, cor�taminants, or asbestos on or from the PROJ�CT. Nothing cnntained herein s�all be construed to require the CITY to ]e�y, assess or callect any ta�c ta fund this indemnifiication. (2) i't�e indemr�ificatian and release required ab�ve shal! not apply ir� th� �vent the discharge, release or escape of hazardous substances, conta�inants, ar asbestos is a result of �NGINFI�R'S neg�igence or if suc� hazardous substance, contaminant or asbes#os is brought onto the PROJECT by ENGINEER. G. Contwac��r Indemni�caiion and Cfaims The CfTY agre�s to i�c�ude in all canstruction contracts the provisians of Ar�icle IV.E. regarding the ENGINEER's Persannel at Construction Site, and provRsions praviding cor�tractor indemni#ication of the CfTY and the ENGiNEER for contrac#or's negligence. Fi. C�niractor Claims and �hi�d-�a�y �eneficiaries (1) The ClTY agrees ta incfude th� folEawing clause in afl cot�tracts with constructiort contractors and �quipment of mate�ials suppliers: "Contractors, su�contractors and equipment and materials suppliers on the PRO.lECT, or their sureties, shall maintai� no direct actian against fhe ENGiN��R, its officers, empEoyees, and subcontractors, for any claim arising out af, i� connection with, or rasuliir�g firam the �ngineering services performed.' Only the CITY wi�l �e t�e benefiiciary of any unde�aking by the ENGINEER." {2) This AGREEMENT gi�es na rights or benefits to anyone other than #he CI7Y a�nd the ENGINEER and there are no third-party bene�Ficiari�s, {3) The CiTY wiil include in each agreement it enters into with any other entity or persan regarding the PROJECT a provi�ic�r� �t���-���# ��fi�� �r _g_ • ;� � � person shal� have no third-party beneficiary rights under this Agreemer�t. (4) Noth9ng con�ained in this sec#ion V.Fi. shall be canstrued as a waiver o� any rigf�t the CITY has to briRg a cfaim against ENGIIVEER. CITY's Ins��ance (1) The CITY may maintain property insurance DTl certain pre-existing structur�s associatecf witn the PRO.lECT. (2) 7he CITY will ensure that Builders Riskllnsiallation insura�ce is maintained at th� replacement cost valu� of the PROJ�G7. T�te GITY may provide ENGWEER a copy of the paficy or documenta#ion of such o� a certi�icate of insurance. (3) The CIIY will specify that the Builders Risk/lnsta�lation insurance shall be comprei�ensive in coverage a�prap�iate to the PR0.IECT risks. .!. �i�igafEon �ssis�ar�ce The 5cape of Services does nof include casts af the ENGfNE�R for required or requested assisianc� to s�ppart, prepare, docum8nt, bring, defend, or assist fn litigation undertaken ar defended by the CITY. In the e�ent CITY requests s�ch services of the ENGIN��R, this AGREFM�NT shall be amended or a separate agreement will be negotiated beiween the parties. F�. Changes The CITY may ma�e or approve cnanges wi4hin th� g�nerai Scope af Servic�s in this AGREEMENT. If such changes affect the ENGINE�R`s cost of or time required for pertormance af the s�rvices, an equi#able adjustment will be made through an amendment to this AGRE�MENT with appropriate CIiY approval. Article !�1 Gene�al Legal ��o�isi�ns Amendments to Arficle VI, if any, are Enclucfed in Attachment C. A. Aufho�i�a�ion �o �race�d ENGIN��R s�all �e autharized to proceed with this AG��EM�NT up�n receipt af a w�itten Notice to Proceed from #�e CITY. ' �. Reuse ofr p�ojeci Documents All designs, drawings, specifications, documents, and other work prod�cts of the ENGINEER, whether in hard copy or in eRectronic for,�, �rp .instr�m��ts of service far this PROJECi, whether the PRO.IEC� is car����?���� �r ���� f��e� change, or alteration by the CITY or by athers acting thrr��u�,� �� �t, i��s=���� �,� �t�� -10- CITY af any such instruments of service without t�e written p�rmission of ihe ENGfNEER will be at the CITY's sole risk. The final �esigns, drawings, specificativns and documents shail be owned by the CITY. G. �o�ce RAajeure The ENG�NEER is not responsibie far damages or delay in performance caused by acts of God, strikes, IockQuts, accidents, or ather events beyond the cont�ol of the ENCINEER. �. Termina�ion (1) This AGREEMENT may be terminated only by th� City far canvenience or� 30 days' ►nrritten notice. This AGREEMENT may be terminated by either the CITY or the �NGINEER for cause if either party fails substantially to perfiorm through no fault of the o#�ter and does not commence correction of s�ch nonperformance with five (5} days of written natice and diligently compl�te the correction thereaft�r. (2) �f tF�is AGREEMENT is terminated for the convenience of the Ciiy, the ENGIN�ER wilf be paid for terrnination expenses as follows: a) Cost of reproductian of partial or camplete studies, plans, specificatinns or ather forms of ENGINEER'S work product; b} Out of-packet expenses for purchasing storage contair�ers, micrafilm, electronic data fiies, and ather data s#orage su�plies or serwices; c} The fime requirements for the ENGINEER'S persannel to dacument the work underway at the time the CITY'S termination for conveRience so that the work effort is suitabfe far long time storage. {3} Pnor to proceeding with termination services, tl�e ENGIN�ER wifl submit to the CiTY an itemized statement of alf termi�ation expenses. The CITY'S appror�al wifl be obtained in writing prior to proce�ding with terminatio� services. �. Suspension, �elay, o� In�errupfion i� 1+ilar� The GfTY may s�spend, delay, ar interrupt the services of the ENGINEER �or the canve�ience of the CITY. In the event of such 'suspension, deiay, or interrup#ion, an equitable adjustment in the PROJ�Ci's schedule, commitment and cost af the ENGINEER's personnel and subcantractors, and ENGiN�ER's compensatior� will be made. ;� ..r... -11- - - ���-� r�. -� � � ti�i ��{�,�����, ,-, � � ��� � � � � , �, ���' l�!', ���,.;��,.�� �. , F'. Indemnifca4ion ('1} The �NGINEER agrees ta indemnify and defend the CETY from any 1oss, cost, or expense claimed by #hird part�es far property damage and bodily injury, including dea#h, caused solely by the negligence or willful misconduct af the ENGINEER, its employees, officers, and subcontractors in connection with the PROJECT. (2) ]f the negligertce or wilCful misconduct of both the ENG�NEER ar�d the CITY {or a person identified above for whvm each is liable} is a cause af such damage or injury, the loss, cost, or expense shali be shared between the ENGINEER and th� CITY i� proportivn to their relative degrees of n�gligence or willful mis�anduct as determined pursuant to T.C, P. & R. Code, section 33.019 (4) (Vernon Supplement 1996}. (�. Assignme�n# Nett�er party wili ass�gn all or any part of this AGR�EMENT without the prior v�ritten consent of the other party. � H. lnierprefat��n LEmitations on liabili#y and i�demnities in this AGRE�MEN7 are busirtess understandings between the parti�s and shalf apply to all the different #hea�ies af reca�ery, including breach of contract or warranty, tort including negligence, s#rict or statutary liability, or any ather cause af action, except �or willful misconduct or grass negligence for limitafions of fiability and sole �egligence for indemnifiication. Pa�ties means the C1TY and the ENG[NEER, and their officers, emplvyees, agents, and subcontractors. I. J��isdicfior� The law o� th� State of Texas shall govern ihe validity ofi this AGREEMENT, its Interpretatian and performance, and any ot#�er clairns related to it The venue for any litigation retated to this AGRE�MENT shall be Tarrant County, T�xas. J. Alte�a4e �ispu�e Resol�4ion {1} Ail claims, dispu#es, and other matters in q�estion betweer� the GITY and ENGiNEER ar�sing out o€, or in connection with #his Agreement or the PR�JECT, or ar�y breach of any obligation or duty af CITY or ENGINEEFt hereunder, will be submitted to mediation. if inediation is unsucc�ssful, the claim, dispute or a#her matter in questEon shall be submitted to arbitration if both parties acting reasonably agree that the amount of the dispute is iikely ta be Eess thart $5d,000, exclusi�e of attomey's fees, costs ar�d expeRses. Arbitratian shall be in accordance wiih the Constr�,iction Industry Arbitratior� Ru[es of the American Arbitration Assaciation or other applicabl� ru�es of the ASsociation then in effect. Any award rendered by the arbitrators less thar� $50,00(}, exclusive of a#torney's fees, costs at�d expensesF will be final, judgment ' - � � -1�- - + i� � fL may �e entered thereon �n any court having jurisdiction, and will not be subj�ct to appeal or modifiication except to the exter�t permitted by Sections 'i� and � 1 of t�e Federal Arbitra#ian Act (9 U.S.C. 5ectians 1Q and 1'[�. (2) Any aw�ard greater than $50,000, exclusive of attarney's fees, costs and expenses, may be fitigated by either party on a de rrovo basis. The award shall b�come final ninety (90} days from the dat� same is issued. If �itigatian is filed by either �arty within said ninety (90) day period, �he award shalE become null and �oid and shafl r�ot be used by either party for any purpase in the litigation. K. Severaiaility and Sur�►ivai E� any of the provisiflns contained in this AGR��M�Ni are held for ar�y reasan to b� in�afid, illegal, or unenforceable in any respect, such i�vaGdi#y, illegality, or unenfiorcea�aility will not afFect any other provisian, and this AGREEMENT sha11 b� construed as if such invaEid, illegal, or unenforceable provision had ne�er bee� cor�tained herein. Articfes V_F., Vf,B., VI.D., V�.H., VI.I., ar�d Vl.J. shalx s�rvive terminatio� of this AG���MENT for any cause, L. Obser�►e and Comply ENGINEER shali at alf times observe and compiy wit� all federal and State laws and regulations and with ali City ordinances and regulations which in any way affect this AG�EEM�Ni and the worfc hereunder, and sha�l observ� and comp�y with all orders, laws ordinances and regulations which may exist ar may be enac#ed later by goveming bodies having jurisdiction or autharity for such enaetment. Nv plea af misundersta�ding ar ignorance thereof shall be cansidere�. ENGiNEER agrees io defend, ir�d�mnify and hold harmless C�TY and all Of EtS Of�IC9f5, age�#s and empRayees �rom and against all claims .or liability arising out of the violation of any such arder, law, ordinance, or regulation, w��ther it be by Etsel€ vr its emplayees. -13- 0 } Af�acF�m�r�ts, �eh�dules, and Sign��ur�� A�ICI� VII This AGREEMENT, inciudirtg its attachments and schedules, constitutes the entire AGREEM�NT, supersedes all prior written or oral understandings, and may only be changed by a writte�n amendment executed by both parties. The follawing a�tachments and schedules are hereby made a pa�t of t�is RGR��M�NT: Attachment A- Scope of Services Attachment �3 - CompensatEan Atfachm�nt C- Amer�dments to 5tar�dard Agree�nent for Engineering Services Attachment D - Project Scheduie Attachment E - Location Map ATT€ST: �� �:� GEori� Pears � City Secret . - � � �`� Contrca�t 1�utY�o�i�����r� ba�e � APPFtOVE� AS TO FQRM AND LEGALETY B� APPROVAL RECOM1iIIlENDED ��r�,�� - - -� A. Douglas Rademaf�er, P.E. . �irector, Engineering �epartment WEf�DY LOP�Z & ASSOGIAi�S, INC. dba LQPE7�ARCfA CROl1P ENGINE�R � Assistant City Atiorney By' 1�-� �� � Dev Rastagi � Chief Operating Qfficer -14- . � � :, '�, ----- , w _ R C1TY OF �ORT WQRTH Aif AC Fi iV� ENT "A" -� ..- . -■ "Scope of Services set forfh herein can anly ,be moclified ,by adclitions, clari�cafrans, and/or deletions set for�h in fhe supplemental 5cape of Services. !n cases of conflict between fhe Supplemenfal Scope of Services and the General Sco,pe of Services, the Supplemental Scope of Services shall have precedence over fhe General Scnpe of 5ervices." ,► -: * 1) Preliminary Conferenc� with City The Engine�r shall at#end preiiminary conferences wiih auti�orized representatives of the City regarding the scape af project so that the pfans and specifications which are to he devefaped hereunder by the Engineer will result in providing faciliiies which are econamical in design and canfiorm to ihe City's reguirements and budgetary constraints. 2) Coordinafion with Outside AgencieslPuhfic �ntifies The Engineer shall caordinate with afficials of flther autside agenci�s as may be necessary for the design of th� propased �treet, and storm drair� andlo� watar and wastewater facilitieslimprovements. It shail be the Engineer's duty he�eunder to secure necessary information from such outside agencies, to meet their req�irements. 3) Geotechnical lnv�stigations The Engineer shal! advise the Gity of test bnrings, and other subsurFace investigations that may be nesded. In the event it is determinetE necessary to make barings or excavate t�st holes or pits, the Eng�neer shall in coordinafion with the Ci#y ar�d ihe Cify's g�otechnical engineering consu[tant, draw up sp�cifieations fiar such testing program. The cost of the borings or excavations shalf be paid far by the City. 4) Agreem�nts a�d Permits The �ngineer shall com�lete all formslapplications to allow #he City of Fort Wort� to obfiain any and all agreements andlor permits narmally required for a project of t�is size and type. The Engineer wifE be responsibje far negotiating and coordinating to obtain a�proval of fhe agency issuing the agreemenf andlor pe�-mits and will ma�e any revisions necessary to bring �F�e plans into complianc� with the requirements of said agency, inc�uding but not limited to highways, railroads, water autnarities, Corps af Engineers.and other utilities. 5) Design Changes Relating ta Permitting Authorities If permitting authorities require design changes, the Engineer shall revise the plans and speci�Fications as r�qui�-ed at the Engineers own cast and expense, unless such changes are required due fo changes in th� design of the facilities made by the permitting authority. ff such changes are required, the Engineer shall notify the City and an amendmeRt ta fhe contract shall be made if the Engineer incurs additio�al cost. �f there are unavoidabfe -1- delays, a mutually agreeable and reasonable time extensian shall be negoiiated. 6) I'lari Submittal Copies of the original plans s�all be pro�ided on reproducible mylar or approved plastic film sheets, or as otherwise approved by the Department af Engineering and shall become the property of the City. City may use st�ch drawings in any manner it desires; provided, however that the Engineer shall not be [iable.fior the use of such drawings far any project other than fhe praject described herein, and further provided, that tt�e Engineer shall not he liabfe for the consequences of any changes fhat are made ta the drawings or changes that are mad� in the implementation of ihe drawings without the written appraval af the Engineer. PHASE 1 7) Rightnof Way, �asement and Land Acquisitian Needs Tf�e Engineer shall determine the rights-of-way, easem�nt needs for the canstruct'ton of the project. Engineer shall cEetermine ownership of such land and furnish the City with the necessary right-of-way s�cetches, prepare n�cessary easement descriptions for acquiring the �'i�hts-of-way andlor easements for the construction of this pro�ect. Sketches and easement descriptio�s are to be presented in form suitab�e for di�ect use by the Department of Engine�ring in obtaining rights-of-way, easements, permi#s and licensing agreements. A!I materials shall be furnished on the appropriate City forms in a minimum of fo�r (4} capies each. 8} Design Survey The Engineer shall provide necessary field survey fvr use in the prepar�tion of Plans an� Specifications, The �ngineer shall furnish the City ce�tified copies o�F the field data. � 9) Utility Coordination The Engineer shall caordinate with all utilities, including utilifiies owned by the City, as to any proposed utility liens or adjustment to existing utility lines within #he project limits. The information ob#ained shall �e shown on the conceptual plarts. The �ngineer shaq shaw on the preliminary and final pEans the loca#ion of the proposed utility I�nes, existing utility iines, based on the information provid�d by the utility, and any adjustments andlor r�location of the existing lines within the project iimits. T1�e Engineer shalf also evaluate the phasing af tY�e water, wastewater, str�et and drainage work, and shall s�tbmit such evaluation in writing to ihe Ci#y as part of this phase of the project. -2- 10) Canceptual Plans The Er�gineer shall furnish four (4} copies of the Phase � concepf engineering plans which include �ayouts, preliminary right-of-way needs and preliminary estimates of probable construction casts far fhe Engineer's recommended plan. F�r a�l submittals, the Engineer si�all submit plans and documents for street/storm drain and waterlwasfewafer facilities. The Engineer shall receive written approval of the Phase 1 Plans from the City's project manager befare proceeding with Pha�e 2. PHASE 2 11) Design Data The Engineer shall provide design data, reports, cross-seciions, profiles, drainage calculations, and preliminary estimates of probable construction cost. � 2} Preliminary Construcfion Plans and Tect�nical Specrficatians The Engineer shall subrnit twenty {20j copEes of Phase 2 preliminary construction plans and five (5} copies a� the preliminary t�chnica! specifications for review by the City and for submission to utility companies and other agencies for the purpases of coardinating work with existing and prop�sed uti�ities. T�e preliminary construction plans shall indicate locafion of existinglproposed utilities and s#orm drain lir�es. The Engineer shalf recei�e written approval of the Phase 2 plans from the City's project manager before proceeding witf� Phase 3. PHASE 3 13) Fir�al Con�truction �lans The �ngineer shali furnish five {5) capies of the finaf cflnstruction plans and contraci specifications for review by the City. 14} �eta�led Casf Estimate The Engineer shall furnish four (4) copies of �etailed estimates of probable construction costs far t�e authorized constructian project, which shal� include summaries of bid it�ms and quantities. 15} Plans and 5pecification Appro�al The Engineer shall furnish an original cover mylar for the signatures of authorized City afficials. The Cantract Docume�ts shal� comply with appficable lacal, state and federal laws and with applicable rules and regu[ations promulgated by lacal, state and �atior�al boards, bureaus and agencies. The Engineer shall receive writt�n ap�raval of the Phase 3 plans from the City's project manager before proceed9ng with Phase 4. -3- PHASE 4 16) Final Appro�ed Consicruction Plans The Engineer shali furnish 45 bouncE copies of Phase 4 final approved cons#ruction plans and contract specifications. The appraved plans and contract specifications s�all b� used as authorized by the City for use in abtaining bids, awarding contracfs, and consfrueting tt�e project. 17} Bidding Assisfa�ce TY�e Engineer shall issue addencfa as apprapriate #o interpret, clarify, or expand the bidding documents, and assist the owner in determining the qualifications and acceptabilify of praspective consfrucfors, subconfractors, a�d suppliers. When subsfitution prior to the award of contracts is alfawed by the bidding documents, the Engineer wil� advise fhe awner as to th� acceptability of alternate materials and equipment proposed by the prospective constructors. 18} Recommendatio� of poward The Engineer shall assist in the tabuiation and re�iew af alf bids received for t�e construcfion of the project and shafl make a r�commendaiifln of award to the City. 19) Prel�id Conference The �ngir�eer shall attend the prebid can�Ference and the bid opening, prepare bid ta�ulation sheets and provide assistance ta the owner in evaluating bids or proposa�s and in assembling and awarding contracts for construction, materials, equipment, and services. PHASE � 20) Preconstruction Canf�rence The Engineer shall attend the precanstruction conference. 21) Construction Sur�ey The Enginee� shall be available to the City on matters cancerning the layout of the project during its construction and will set contral points in the field to allow City survey crews to stake the project. The setting of [in� and grade stakes and route inspection of cor�stTuc#ion will be p�rfarmed by the City. ' 22) Sifie Visits The Engineer shall rrisit the project site at ap�ropriate intervals as construction proceeds to observe and report on the progress and the qu�lity of the executed work. -4- 23) Sho� Drawing Review The Engineer shail review shop and er�ction drawings submitted by the contractor for compfiance with dasign concepts. The Engineer shall review laborafory, shop, and mill test reports on materia�s and equipment. 24) lnstructions to Conirac�or The Engineer shall provide necessary interpre#atior�s and clarificatians of contraci dacurr�ents, review char�ge ord�rs and make recommencfations as to the acceptability of the warfc, at ihe request of the City. 2�} Differing Sife Concli�ions The Engineer shal[ prepare sketches required to resolve probiems due to actual fie[d canditians encountered. 26} Record Drawings The Engineer sha[l �repare record drawings f�-om informatian submitted by the cantractor. -5- � �XFi1L�IT ���,m� �� SUPPLENYEhliAL SC@�� OF S�RVIC�S {SUPPL�fViENiTO AfT'��Fii9A��V� ��A��) �Fi/�5� 1 m��S1Gl'd S�RViC�S: WATER & SAN�i�RY SEVII�� LI�E R�Pl,AC�i��N�'S 7he following is a clarification af the tasks that the ENGINEER will �erform under ATTkCHMENT "A". Wark under this attachm�nt includes engineering services for water and sar�itary sewer line replac�ments �or t�e falfowing: �ifat�e and Sanitary Sewer �ine RelBcations f�� �as�da[e 5treet #rom U.S. Hwy. 287 to l.H. S�0 Wate� Projsct �o. �W�3m06a�3017f410 Sew�r f'roject Plo. P1A158�Oi05�017'�7�0 �.0.�. No. 366� Upon receipt of Notice ta Proceed, the ENGINEER will perform ti�e fiollowing tasEcs: PART � � ���-�N�INEERIf�C 1. lniiial Data Colfectian a. �re-�esign �C�ordination �eetings ENGINEER will attenc! and document meetings, as requirec�, to discuss a�d caordinate various aspects of the project and to ensure that the proj�ct stays on scheduie. For purposes of establishing a fevel af cQmfort, three (3) meeti�gs are an#icipated. These include the #ollowing: Two (2) �re-design �Cick-off meetings, (including the City's Department af Engin�ering and ather departments that are impacted by the prajectj. 4ne (1) re�iew meeting at campletion af the CITY'S review of the conceptual engineering plans. b. Data Collection ]n addition to data obtained from the CITY, ENGINEER will research and mak� efforts to obtain pertine�t information to aid in coardinatiQn of the propasecf impro�ements with any planned future improvements that may influence the project. ENGI3V�ER will also identify and seek to abtain data foc existing cor�ditions that may impact the project inciuding; private utilities, Rosedaie Street Paving and Drainage Impro�ements, Ci#y water arrd sanitary sewer main�enance EAi-1 records, existing sanitary sewer replacement design projects being performed by oth�r consultants and �roperty ownershi�. c. Coordination with Other Agencies During the concept phase the ENGINEER shal� coordinate witF� all utili#i�s, including utilities owned by the City, TXDOT and raifroads. 7hese entities shall also be contacted if a�plicable, to determine plans for any praposed facilities or adj�stment to existing faciiities within ti�e project limits. The information obtained shall be shown on the concept plans. The ENGINE�R shall show the location ofi the proposed utility lines, existing utility Hnes and any adjustments and/or relocatior� of the existi�g lines w�thin the project limits. ENGINEER shall complete all tarms necessary for Ci�y to obtain permit letters from TXDOT and railroads and submit such farms to the Ci�y. Ci�+ shall be respor�sible for forwarding the �orms to the affected agencies for executian. �. f9�on#hly Progress Report a. The ENGiNEER shall submit a project schedule afit�r the design contract is fu�ly executed. Th� schedule shall be updated and submitted ta #he CITY along rnrith monthly progress reports as required under Attachment B af the contract. P�RT B a C�NS'TF�U�iIOIV ��dhl5 ,�IVD S��C��i�A�iQNS �. �on��ptual �ngineering a. Surveys far �esign i. ENGINEER wilE perform field surveys ta collect horizontal and vertical elevatians and other infarmation needed E�y ENGINEER in design and �reparation ofi plans for #he praject. ClTY shall obiain authorization to use existing tapographic sur�ey files from TXDOT for the area previously surveyed along Rosedale Street from U.S. Hwy. No. 287 to I.H. 820. Additional topographic survey information will b� required �or utility replacements located outside of the propased Rosedale 5treet right of way. ENGINEER will perfarm these surveying services. Information gathered cluri�g the SUCVBy shaEl include topographic data, efevations af all sanitary and adjacent storm sewers, rim and in�ert elevations, lacation of surface features of undergrQund utilities, structures and other features rel�vant to the final plan sheets. Far sewer lines located in a�leys or bacicyards, ENGIN�ER will abtair� the foflowing: �A1-2 �htain permission foc surveying through private property. �acate horizonta! and veriical alignment of utility lines. Tie impro�ements, trees, fences, walls etc., horizontally along rear lines ir► an approximat� 2�' wide strip. !n addition, locate al[ rear house carners and bui[ding corners in bacicyarcts. Profile existing water ar�d/or sewer line centeriine. ii. ENGINEER Will Provide tne Following Informat�on: AI! plans, field notes, plats, rnaps, lega! descripiions and atner specified dacuments prepared in conjunctio� wi�h tfne requested services shall be provided in a digital format compatible with the electronic data collection and computer aided design ar�d drafting software currently in use by the �epartment of Engineerir�g. All text data, such as plan and profile, legal clescriptians, coordinate files, etc., shall be provided in the American Standard Cvde for Infiormation Interchange (ASCII) format. All drawing file� shal[ b� pro�ided in MICROSTATIDN (DGN), or as atherwise appraved in writi�g by the CITY. All data collected and generatec! during the course of the pra�ect sFtall becom� the prr�pe�ty af the CITY. The minimum survey information ta be prv�ided on the pfar�s shall include the following: a) A Project Control 5heet, showing &!�� Cantrof Points, us�d or set � while gathering data. General[y an a scale af r�ot less than �:��0; b) Intormation about each Control Paint; �) Specify as exist9ng or set and ty�e as City Monument #, PK Nail, 5/8" Eron Rod, etc. 2} X, Y and Z Coordinates in an identified coordinate system and a referenced origin point. Z coordinate will be based upon CITY Datum on[y. 3) Descriptiva Locatian (Exampfe: "X" set ir� ihe centeriine of a cur� inlet in the South curb line af Ncarthside ��ive at the East end of radius at the Southeast corner of hlarthside Drive and Narth Main Street). EA 1-3 c) Coordinat�s on all Points of Curvature (PCs), Points o� Tangency (PT's), Points of intersection (PI's), Manholes, Valves, etc., based upon the same arigi� point. d} No less than two (2} horizontal control paints per plan/profile sheet. e) No less than one �1) benchmark {City Monument} per plan/profile sheet. Benchmark shouid be ti�e closest a�ailable monurnent to the project. b. �utalic Notification Prior ta cflnductirtg design survey, ENGINEER will notify affected residents of the project in writing. The notification letter shail be a� company letterhead and shall include the fvllawing: �'roject Name and Prajeci Limits City Project No. D.O. E. No. ENGINEER'S Project Manager's Name and Phane No. Scope of Survey Work Design Survey Schedule The letter wili be reviewed and approved by the ClTY prior ta distri�ution. �. Concep�ual Engineering �lan Submittai Conceptual Engineering P�an shall be submitted to CITY 60 days after Notice to Proceed �etter is issuet�. ii. The �NGINEER shali furnish to CITY faur (�) copies of the Phase f- Conceptual Engineering Plan w�ich wili ir�clude a fayout of the proposed impro�ements, anticipated right-of-way and permitting requirements a�d an ENGWEER'S opinian of probable construction cos#. The EN�INEER shall also identify any exis#ing utifity conflicts that wi11 impact the propasecf imprc��ements. • 2. Preliminary �ngineering Upon approval of khe Conceptual Engineerirtg Plan, ENGINEER will pre�aare constructiar� plans depic#ing the foflowing information: EA1-4 a. Freliminary plan and profile sheets will i�entifiy: Exis#ing Pavement Material and Limits Curb Lines Driveways Medians Sidewaiks Valley Gutters Parking Areas b. Ground profile grades and elevatians aiong centerline of proposed water and sanitary sewer (ine replacements. Existing found praperty corners (e.g. iran t'ods) along t�e existing/proposed rigi�t-of-way. Profil�s of existing and proposed paving, private utilities, storm sewers, waier at�d sanitary s�wer iines. �. Existing utilities and utifity easements wifl be shown on the plan ar�d profile sheets. ENGINEER wil! coordinate with the CITY ta ascertain what, if any, future improvements are planned for private utiiities that may impact tf�e project. d. Ail proposed sani#ary sewer line replacements will l�e shown in pfan and profile. Water line replacements which are 12" or iarger will be profiled. ALL water line replacements, which require vertical adjustmen#, wiil be profiled. e. Proposed plaNprofile st��ets will utilize a standard City of Fort Worth cortstruction legencl. Adequate horizontal and �erticaf control shalf be pro�ided an the plan sheets to I�cate all proposed and existing facilities. Owr�ership, address, lai number, blocic number and adclition name will be provided in the plan view. f. Plan and profile she�ets shal! have a horizantal scaie ofi i" � 4�' and a vertical scale of 1" = 4'. Water iine profiles s�all indicate stationing, p��e material, all fittings, ver�ical angles, connections to existing water lines, utility crossings ar�d any other pertirrent datUm and elevations. Sanitary Sewer line profiles shail indicate siationing, pipe material, percent of grade, connecfians tv existing sanitary sewer lines, utility crossings, grade breaks fiow line and rim elevations. g. Righi af Way Research The ENGINEER will cancluct preliminary research fQr availabi�ity af existi�g right of way and easem�nts where oper�-cut construction or relocatio�t of existing alignmer�ts is �ra8able, Upon GITY a�praval of re-aiignments, the CITY will autharize the ENGINEER to prepare te�nporary construction ancf/or permanent utility easements, as required. �At -5 9 h. Right of Wayl�asement Preparation and 5ubmittal Preparation and submittal of right of way, �asements and temporary right of entry agreements will be in conformance with "Submittal af Informatian to Real Property Division for Acquisition of Praperty". i. lltility �learance Phase The ENGINEEFi will consult with the City's Water Department, Department of Engineering, and other City departments, public utilities, private utilities and governmental agencies to determin� the approximate location af above and underground utiEities that ha�e an impact or influence or� the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities. The ENGINE�R sha�l submit a minimum of 13 sets of approved preliminary construction plans to the Ciijr of Fort Worth - Department af Engineering - Consultant Services - UtElity Coordinatar. The C1TY'S Utility Coardinator wiil cfistribute plans to ail utility compa�ies, which have faciiities within the projeet limits. j. �rel9minary �ans#ru�tian �lan Submittal Preliminary construction plans and specifications shall be submitted to CITY 25U days after CITY approval af Conceptual Engineering Plan. ii. The ENGINEER shall deliver two {2} sets of preliminary construciion plans and two (2) sets o# contrac# documents and specifications to CITY for review. Generally, plan sheets $hall be organized as foliaws: Caver Sheet Project Layout, Controi Paints & Coordinates Temporary Right of Entry A�reement & Easement Information General Construction Nates & Legend Plan & Profile Sheets ' 5pecial Details (If applicable) iii, The preliminary plan submittal shalt include sF�eet quantity estimates and an engineer's apinion of probable construction eost. ENGINEER shal! assist CITY in selecting the most feasibEe and/or economical solution(s) to be pursu�d, EAi-6 k. Review Meetings vuith Ci'TY The ENGiNEER st�all attend one (1 } meeting with CITY io discuss review comments regarding the preliminary ciesign submittal. The C1TY shall direct the ENGIN�ER, in writing, to proceed with �inal Design for Final Review. 3. i�inal �ngineering P'lan Submittai a. Final Construction Plans, Contract Documents and 5pecifica#ians shall be submitted to C�TY 9t} days after Notice to Proceed with Final Design �or Final ReWiew is received by ENGINEER. Following CITY submitta] of Notice ta Proceed with Final Desigr� for Final Review, the ENGINEER sha�l prepare finai plans, specifica�ions and contract documents for GITY (each sheet shall be sealed, dated and signed by the ENGINEER) and submit two (2) se�s o# plans and cantract documents within 45 days of CITY'S final appro�aL Plan sets shall be used far Part C activ9tiss. p. ENGINEER'S Opiniat� of Prabable Construction Cast Th�e ENGINEER shal[ submit a final opir�io� �f probable construction cost with t�e final plans, contract documents and s�ecificatia�s. �ARi C e PRE�CONSiRUG�1BN �SSISTANCE 1. �id �ucumenis Submittal The ENGINEER will make avaifable �or IaEdding, upon r�quest by the CITY, up to forry (40} sets a# the final approved, sealed, dated and signed plans, specifications and contract aocuments ior the project to the CITY for disiri��tior� to patential bidders. Proposal will be provided in electronic format. �. �idding Ass�stance The ENGINEER shall assist the CITY during tY�e biddir�g phase by preparing and distributing addenda and respondi�g to questions submitted to the l�OE by praspe�tive bidders. The EN�INE�R will noi be required fo attend a prebid conference. The CITY shail review tt�e bids for comp�eteness and accuracy, and develop bid ta�ulations. The ENGINEER s�all attend the pre-constr�ction conference for the projsci. EA1-7 AiiACHM�N� "�" COMP�NSAiION AND SCHEDU�� �ngineeri�g �esign Serriices Assa�iated with Design af Water and Sanitary Sewer �ine Relocations far RasedaEe Street from U.S. Hwy, �8� to i.H. 820 Water Project No. �W�3�06053017fi410 5ewer Project No. �S��-070��D1i5780 D.A.�. No. 366� Compensation A. The Engineer shall be compensated a total lurrlp s�m fee of $428,249.a0 as summarized in �xhibit "&3". Payment of the total lump sum fee shall �ae considered full compensatian for the services described in Attachment "A° and E�chibit "A-1" for all labor materia�s, supplies and equipment necessary to complete the project. B. 7he Engineer shall be paid monthly as described ir� Exhibit "B-1", Section 1- Method of Payr�e�t. Each in�oice is #o be verified as #o its accuracy and compliance with fhe terms of this cantract by an officer of the Engineer. Schecfule Final Plans shall be submitted within 400 calendar days after the "Notice Eo Proceed" letter is issued. A. Canceptual Engineering Plar� -- 60 calendar days B. Pr�iiminary Engineering Plans —��0 calendar days C. Final �ngineering Plans — 90 natendar days �GG C22557.Q0 B-1 October 22, 2Q02 �XHIBI� "B-1" (SUPPL�M�NT T� AiiACHFVI�N'� �) �nglneering Design Services Associated vvith Design of Water and Sanitary Sewer l�ine Relocations for Rosedale 5treet from U,S. Fiwy. 28/ to I.Fi. �20 Water Rrajec# Plo. PW�3-06D53Q1�6410 Sewer Project Na. PW�8-0105801757�d i7.0.�, f��. 366� Method of Payment The ENGENEER shaff �e paid monthly as outlined beiow: Conceptual Engineering Plan Submittal, not to exceed 30% of the total I�mp surn fee, shall be payab�e aft�r City approval of Exhibit "A-1 ", Part B, 5ection 7, Sub-section C- Conceptual Engineering Plan Subrnittal. Prefiminary Engineering Plan Submit�al, not ta exceed 80% of the total lump sum fee, less previous payments, shall be �ayable after City appraval of Exhibit "A-� ", Part 8, Section 2, Sub-section J- Preliminary Construction Plan Submittal. Final Engineering Plan Submittal, not to exceed 95% of the total lump sum fee, less previous payments, shall be payabie after City approval of Fxhibit "A-1 ", Pert B, Section 3— Final Engineering Plan Submittal. Pre-construction Assistance, which shafl represent the balance of fees, less previous payments, shall be payable after the pre-construction meeting for the Project has been canducted. Progress Reports A. The Engineer shall s�bmit to tf�e designated representati�e of the Director of the Department of Engineering manti�ly progress reports co�ering all phases o# design by the 15th of e�ery rnonth in #he format req�ired by the City. B. if the Engineer determines in the co�rse of making cfesign drawings and specificatians that fhe opinion o# probable cost of $6,161,056.00 {as estimated in Exhibit "B-3", "8-3A" and "B-3B") wilE be exceeded, whether by ci�ange in the scope of the praject, increased cast or other conditions, the �ngineer shall immediately report such fact to the City's Qirectar of t�e f]epartment of Engineerir�g and, if so irostructed by the Director of the DepartmeRt of Engineerir�g shall suspend all wark hereunder. �G� c2ass�.ao �e�-� Octaber 22, 20d2 EXHIBIT °B-2" {SUPPLEMEN� T'O AT7ACHM�Ni B) Engineering Design 5ervices Assaciatecf with Water and Sanitary Sewer Rehabilitation Contrac# (7XbOT) on Rosedale Street fro�n U.S. Hwy. 287 to I.H. 820 Water Project No. PW53-060530176410 Sewer Praject No. PW58-070580175780 DA,�. No. 3662 2002 Standard Rate Schedu[e � Principal � Project Mar�qer � Senior Civil �nqineer � Civil Engin�=r � Civil Engine�r-in-Trainir�g � Civil DesigrEr � CAbD Technician � Seninr Elec„'.cal �ngineer � �lecirical Er,qineer � Electrical E^qineer-in-Traininq � Efectrical Designer � 5eniar Mec�anical Engineer � Mechanical =nqineer � Mechanica� =ngineer-in-Training j Plumbinq Designer � Senior EnvironmentaE Engineer � Environmertal Enqineer � Environmertai �nqineer-in-iraining � Seniar St►uc-�ral Engineer � Structural E^aineer t Structural E^aineer-in-Training � Senior Pfanrer -- - � Pianner � Junior Planr.�r � Seniar Envircnrt�ental Scientist � Environmen�aE Scientist Junior Envircnmenta[ Scientist Environmertal Fiald Technician � Cultural Resovrce In�estiqator � Project Archaealogist � Archaeologicai Technician II! � Senior GIS I J�nior GIS Senior ClericaUProEect Administrator Juniar ClericaV�raj�ct Administratar Surveyor - RPLS S�rveyor - LSIT Survey 7eehnician Two-Person Survey Crew Three-Person Survey Crew Four-person 5urvey Crew Two-Person Sur�ey Crew (OSHA Trained) Three-Persan Survey Crew (QSHA Trained} Constructio� Manag�r Resid�nt Enaineer Ser�ior Canstruction Inspector Constructian Inspector Reimbursable expenses wilf be billed at cost plus 10%. Emplavee $ 162.75� � � 3s.�o � $ 126.00 � $ 99.75 $ 68.25 � $ 84.00 � $ 52.50 � $ 126.00 $ 99.75 $ 78.75 $ 68.25 � $ �26.�0 � $ 99.75 � $ 68.25 J - $ 68.25 � $ 126.OQ � � 99.75 J � sa.zs � $ 12fi.00 � $ 95.75 � - � 68.25 � � 126.00 $ 99.75 � � 63.00 � $ 105.4Q � - � 78.75 i� $ 52.5� I $ 47.25 � 84.D0 _ $ 57.75 � $ 47.25 � $ 99.75 $ 73.50 _ $ 52.50 $ 42.04 $ � � 0.2� $ 78.75 $ 63.00 $ 99.75 $ 126.D0 $ 152.25 f $ 126.00 , $ 162J2 I $ 94.6Q ' $ 94.50 $ 84.OD $ 68.25 LGG C22557.00 g�-1 June 6, 2002 EXH�BIT "B-3" (SUPPL.�MEN� i0 Ai'TACHMENT B) SUMMARY OF O�SjGN F�ES Engineering Design Ser�ices Associated with Water and Sanitary Sewer Rehabilitatian Contraat (TXDOi} on Rosedale Sireet from U.S. Hwy. 287 to l.ii. 820 Water Projec# No. PW53-�6053D176410 Sewer Project No. PSSS-02058017578U D.a.�. Alo. 3682 August 8, 2002 Mr. �rsd Ehia, P.E. Departrnent of �ngineering City o# Fart Worth 1 Q00 Throckmorton Street Fort Worth, TX 76102-63� 1 Ref�rence: Water and Sanitary Sewer Rehabilitation CoRtract (TXDOT) on Rosedale Street from fJ.S. Hwy. 287 to I.H. 82fl Water Projec# Na. PW53-Q6D530i 764� 0 5ewer Pr4ject No. PS58-070580� 75780 �.O.E. No. 3BG2 Dear Mr. �hia: We appreciate the opportuni#y to present this proposal and fee sc�edule far your consideration. Attached please find construction cost esiimates, schec�u[e, and exhibits depicting the scope of work. We propose to comple#e the proposed work in accordance with the following fee schedule: Estimated Co�structian Costs 1. Basic �ngineering Fee based an 6.25°10 of cnnstruction (Curve A) ($6,�6�,Q57.a0) (6.25%) (d.85} � 0% Subconsultant #ee (a.� 0 x $107,822.Oa} Tota� Basic Engineering _ $ — $ _ $ 6,1 Bi ,057.00 327,306.OD f Q,7�6.0� 338,D12.00 LGG C22557.00 B3 - 1 August S, 20Q2 ¢ Exhihit B-3A Mr. Fred �hia, P.�. Augus# 8, 2QQ2 Pag� iwo .... ,_ _ _ . _ . � — - �_ M/1NBE -I 5cope of Services Total Fee M/WBE Perceniage Wat�r and Sewet Line Design $ 327,306.00 $ 88,327.�0 27.0% Citizens Mee#ings (2} $ 5,334.0� $ 0.40 0.�0% Additional Survey $ 44,895.00 $ 0.00 O.OQ% Traffic Control Details $ i 8,�D0.0� $ O.DO fl.OD% Permits/Easernents and Corps Coordination $ 3,D0�.00 $D.00 Q.OQ% Reproduction $ � 8,736.�0 $ 18,735.00 100% Construction Services $ 273A0 $0.40 0.00% Subconsultan# Fee i10°/ai � i0,706.00 �O.OQ a.oa%, iota! $ 428,249.40 $ � 07,062.D0 25.0% Proposed M/V1fBE % of Consultants Services _ _ Fees _ _ _ _Total Fee , E. Janes Engineering Water and Sewer �$s�3�� Q� 20.6% Services �ine Design Arlington Blueline Repraduction $ 18,735.00 4.4% TOTAL � 1 a�,os2.00 2�.0°l0 LG7G C22557.00 August 8, 2002 83-2 Exhibit 8-36 Mr. Fred �hia, P.E. August 8, 2002 �age Three Sasic �ngineering (0,85•6.25% of Construction Cost) Citizens Meeting �2} Designs Syrveys t$3.40/LF for 13,515 LFj ($150.00lEA fo� 29 SSMN RIM/F�) Traffic Cantroi Details Permits (TXQ�T U.S. NWY 287 & I.H. 820) Repraduction* 24 Sets of �'reliminary i'lans (utiiities, cfear.)($2/sht} 5 Sets of Preliminary Specitications ($3� each) 5a Sets af Final Cnnstructian Plans ($2/sht) 50 5ets of Specificatiar�s ($30 each) Miscelfaneaus Printing {20 sets)($?Jst�t) Mylar Plans (5i31sh#} * Estimated using 85 sheets per plan set Construction Services $ $ $ $ $ � $ $ $ $ $ $ 327,306.OQ 5,334.00 40,545.00 4,3bfl.p0 18,0OO,OQ �,00a.00 4,08Q.00 150.00 8,50Q.00 i ,504.a0 3,400,OQ 1,1 a5.00 Pre-Construction Meeting $ 273.00 Subcansuiiant's Fee (�0°6) $ 10,706,00 TOTAL $ 428,249.Q� Water Design Fee $ 234,aa�.00 Sewer Design Fee $ 194,046.flQ We will be using E. ,iones Engineering Services for the preparatian of construction pfans �nd Arlington Blueline for printing for a total MNVBE Participation of 2�.0°lo which ma#ches the City's MIWBE goal of 2�.aQ�4. If you have any questions or require additional informatior�, Please gi�e me a cafl. Sincereiy, HWB:bel �rtorf, P.E. Dperations Manager 0 LCzC� C22557A� August 8, 2oD2 63-3 � EXHfB[T "B�4" (SUpP��MEMT YD ATTACI�NiENT B} OPlNiOi� �F PRf39A��E C4hl5iRU�T'!ON C05i SUfI�MARY CITY' O� �{)R� WORTH �NG[NE�RING Water and Sani#ary Sewer Rehab'rlita#ion Contract (iX�O'� on Rosedale Street from U.S. Hwy. �8i to I.H. �20 �.O.E. No. 3662 Wa#er �roJect I�o. �W�3mOfi�a3�1�6410 Sewer Prajec# fVo. PSS��O�U��O�i75780 SANiTARY SEViIER L.INE C�NSTRUCTION CONTINGENCY (10°l0) 4-YEAR CONSTFiUCTION COST ESCAL4TION (� Q°lo) SANiTARY SEWER TOTAL WA7�R LiNE CONSTRUCTION CONT�NGENCY (10�10) 4-YEAR C(�NSTRUCT�ON COST ESCALAT]ON (10°Io) WATER TO�"AL i�i�� *REQUIR�� ADDITiONAL SURV�Y* $2,326,382.5Q $232, 638.25 $232, 638.25 $2,791,659.00 $2,807,831.25 $28Q,783.�3 $280,783.13 $3,369,397.50 $6,181,0�6.5U �4�,ss�.ao 6l5I2UO2 g4-1 LGG C22557.OQ �XHlB1T "Bd�l" �PINION O� PROBAB�� COIdSTRl1CTfON COST SUfUI�liARY (SAiVITARY S�,W�R} C��Y O� �ORT WORiH ENG1IV��RI�1G Water and Sanitary Sewer Rehabilitatior� Contract (iXDQT) on Rosedale Street from U.S. Hwy. 287 to l.H. 8�D D.O.�. No. 3662 Water �roject No. PW53�060�30't764'10 Sewer Project No, P5�8-Q705807i578D �INE SI�E I SH��Y M LOCAilON/A�SC�IP�IDN _...� ��7° �:}• �� h�1-�75 M-1�� L-175fi L-1757 L-1758 L-1759 L-1759„A„ L-1759„B" L-4825 L-4826 L-4826"A" �l-a3�' L�a����• L-2955 L-6332 �SQ� M-29 L-207fi L-2a76"A" L1NE "A" L-1117 L-3691 L-2384 L-2�$7 L-2387 L-2387"A" L-2387" B" L-2387"C" L-2388 LINE "B" L-35$2 L.-2564 R-�484 LINE "C" L-4920 �" 15" ���47h. .i�"� 6" to 8" 6"fo8" 6" to B" 6" to 8"` 6" to 8" 6" 6" 6" to 8" 8�� ri� 4 p�i 4 6" ta 8" 6" to 8" �„ 10" ta 12" $�� 5" to 8" 8�� B"to8° 6" B" to 8" �" . . . ,.. 6" to 8" 6" to 8" �,� B" io 8�� 6" to 8" S�� 6" 6" to 8" $' t4 $�� ��� 6" to 8" 1 �' ��la:�n���ne�rE by C]��n�tivay & A�soc. (D.�.C. 2831 �� �1 ` � ���FW Roc�a�estad tVo F�cplacenter�i ;�-��-(}2�. 1 , i` L�OFW Re��R�si�d V�fo R��I��e,arr:� ��I {5-2S-Q21 I ;� `� _ �OFW �Ce�i,�sted i�� F�����crtarnerrt {5=�5-02) 1 A�e. G(East of U.S. Hwy. 287 to Withers St.) 1 �ielocation to Nall 5t. � Re[ocation ta Withers St./Mitchell 81vd. 1 A�e. G(Withers 5t. to Mitchell BIUd_} 7 Mitchell Bf�d. (Ave. G to Rasedale 8t.) � Mitcheil 81vri. (Between A�e. C and Rosedale St.) i Rosedale St. (Hendricks 5t. to Mitchell Blvd.) 1 Ave. G(Hendricks St. to Mitchell Blvd.} i Sfearns St. (Ave. G to Rasadale St.) � :�� `€ �eP]ace�l by 3�ay�e�Na�i � Perkir�s �i�5ij � �. ,', Replae2d byTeagl�e h]ai! &.PerlCilr����99���.. 1 A�e. G& Holmes St. i Ave. G& Alley �ast of Hofines 5t. �3�,�. �.�r.1�.�`tRR :• R��+1,�ce�f byiransy�kerns ��.D.�, ifi�j ,F 3 Ayers 5t. {Flosedale St. to South) 3 A�e. �(Ayers St. to Camp�ell St.) 3 Rosedale St. (Ayers St. to Campbell St.) 3 Rosedale Si. (Ayers St. to West) 3-�4 Rosedake St. (Ayers St. to East) 4 Wallace St. (Rosedale 5t. to North) 4 Rosedale St. (Haynes St. to West) �3 � �I� t���� : , F�e�lacod byTransps�erns �E?.0.�. �372) . 4 �oseclafe St. (Haynes St. to Milier Si.) 4 Rosedale St. (Chicago Ave. to Miller St.) 4 Roseda[e St. (Between Sargent Ave. and Miller 5t.} 4 Miller St. {Rosedale St. to North} 4-b Rasedale St. (Griggs St. to West of Bradley St.} � 5 Bradley St. (Rosedale St. to 150'.North} 5 Between Griggs St. and Bradley St. 5 Windomere St. (Griggs St. to Bradley St.) � 5 D�nr�entraurn {S[a. O+fl� I�s�SIr�;.�f0�}} 5 Fiosedale 5t. (Griggs St. to W�si) 5 Windomer� St. (Mughes 5t. to West) CQNS��UC�I�M CASi �S�INiA�'� :1� �� �''� -.,., ��lA .,,��, . ' #��.� h�1lA -. �.','GG�:� N!A � :r.,__ . . ��A , $87,268.OD $71,755.00 $62,927.50 $�1,952.50 $64, 450.00 $J0.00 $2,190.00 $50,820.OD $45,802.60 - • �� �;�"' � ��#IA , 'I �_�}�__ �f� . $50,237.5D $32, 597.60 � ' � !: - :► � � hJIA i�t''i� $35,100. 00 $54,250.00 $�1,932.50 $23, 877.5D $41,662.50 $1, 920.00 $20,387.5� _ _ _ _ � i JWf'4 C � '�' ���?:Cih $148,5o4.oD $ 60, 932.50 $1,fl32.50 $5, 68D.4Q $67, 834.5D $29,327.50 $1,400.00 $43,743.00 '+�._ ' N{A . F' $25,885.00 $39,26Q.00 s�s�2aoz ea-2 LGG C2255i.04 EXHiBIY "B-4" OPINI�N 4F PROBABL� COfVS�RUCiION COST SUIUIIViARY (SAIVITARY S�WI�H) CI�Y OF FORT WO�t�H �NGINEl�RIPdG Water and Sar�itary Sewer I�ehabilitation Corotract (TXDOT} on Rosedale Street frorr� U.S. Hwy. 2�7 to �.b. ��0 ❑.0.�. No. 3fi62 Water Prnject Na. PW�3o060�301 i64� 0 s�war �ro�ect �o. �s�aeo7a�$o�7�7�a LIN� � 51�� � SHE�Y � �OC�1 f IOiVI��SCf�IP7�04� l.II�E ����� L-�4�s7 LlNE °E' �-�38#3 ` �1-1 ��„�„ L-2775 L-2389 L-2589 L-5505 L-2$23 L-4836 �L-�4235 L-4238 � L-2390 � t.v�3�1� � �-�390 � L-5Q67 � L-4239 _ L-2630 �1-'! 7�R L1NE "F" �.iNE ,�G�� L-5115 �.-sz�z LINE "H" xv1 • 1$� h:i-1 �i8 1-6855 L-3228 ��� �x ��F ���� 8" G" I� �k�� � 0�� u" to S" 6" to 8" 6"to8" 6" to 8" 6" to 8" 6" to S" 6" to S" 6" to B" 8" to 8" s° «a�, 6':' to 3`� 6" to 8" 6" to 8" 6" to 8" i 5" 8" � ��� 6" to 8" 6" ko 8" 8�� 14' 1 �}" 6" to 8" 6" to 8" 5 Rasedale St. (Huc7hes St. to Westj 5 ';;i '�('', �ume���aElle �.���den�(��a.� 0�{1� �ta Sfa. 7�5�� 5 Hughes St. (F3osedale S6. to South) 5 -; Dann+�nbavrn {�ta. 0�4[} I��Sta. 14+86} .5 . �. ,�� V�+ade8�}4sscc. 5 Lloyd St. (Rosedale St. ta NoRh) 5 Rosedale Si. (Lloyd St. to Eas#) 5 Edgewood Terr. (Rosedale St. to Windomere S#.) 5 Edgewood Terr. to Easf 5 Rosedale 5t. (�dgewoad Terr. to East) 5 Edgewood Terr. (Rosedale St. to A�e G} 5 Lindsay St. and Ave. G 5 Langstan St. (Rosedale 5t. to 5outh) 5-6 Roseclale St. {Sta. 9�-00 to Sia. 22+35E) � � ' Ti,rrr��zf Golli+:. �'� E�rac�en (�ta. 3+8� !a SEa. $��€�� G'� F�;a���r� hJa11 &�ofiti�rs {�Ea�, 0+�0 to �ta: 3�C�5} 6 � Rosedale St. (Tierney Rd. to West} 6 Amanda St. (Rosedale St. to 5ouih} 6 Tierney Rci. (Rosedale St. to North) � ` , � . � l^fat�e 8� Ass��. .- � , 6 � Rosedale St. (Liberty Ave. to West) 6 Rosedale St. (Liberty A�e. to East) 7-8 Tension Dr. and Rosedale St. 7-8 Rosedaie St. to Rose Ln. S Rasedaie St. to Terrace St. ��� .:� Fiao� St..lt� Rose�a�� St, (31�. f�+7� tv �k�, �i8�4�� :� �- i�, � H�F� St, �t� I��r�ed�la St, {St�� �h��7� to �l�, #�:�lti) 8 Rosedale St. {[.i-�. 820 to West) 8 I.H. 820 (Hosedale 5t. to South) con�s��uc-rsoN GOS�' �STiMAT'� $29,915.OD +� ��:- Nl�k . .. $29,0$0.00 .:�+ _ � � ; . � N!� �': ; �� a �'. . ,i�' '; �x-: :��� , i0i1�� NfA ,� $35,897.50 $67,949.�4 $78,063.50 $41,046.OD $25,�49.50 $44,767.5Q $$a,198.OQ $52,098.50 $86,921.50 N!� � �1. N�A :.'� `�120,6Z2.04 $74,970.5d $ � 8, � 52.00� N�il :. -�1Ci�! $13,790.00• $39,211.00 $159,07$.00 $80,317.5p $14,134.50 !��lA !�!}p, $48,481.50 $$3,830.00 $�,3�6,382.50 srsr�oaz ga-a LGCs C22557.00 EXHI�Ii "B-4�� OFINION OF PROBABL� GONS�RUCl'ION COST BID ITEM 5U�41MARY (SAPfITARY 5�WER) CITY QF FOR7 WORTH �NGINEERING IT�M 7 B 9 10 11 12 13 14 75 76 17 18 19 20 21 � 23 24 25 28 27 28 29 30 31 32 33 �4 85 36 37 38 39 40 Water and 5anitary Sewer Rehabilltation Contract (TXD07'j an Rosedale 5treet trom U.S, Hwy. 287 to l.H. 82U a.D.E. No. 3662 Water Rrojec# No. PW53-0605301764i0 SBwer Praject No. PW58-U70580175780 DESCRIPifDN OF li�M UNITS GtUANT'liY I�I UNIT I � cos�r 4" PVC SS Pipe for Service �ines (All �epths) 4" 0,1, 5S Pipe for Service Lines {Atl bepths) fi" PVC SS Plpe far Servica lines (All Depihs) 6" �,I. SS Pipe for Private Service Line (All Depths) 8" PVC SS Pipe (All Qeplfis) S" DJ, SS Pipe {Alf Qepthsj 8' H.D.P.E. "By Plpa Enlargament Mathod" i2" PVC SS Pipe {Ail �epths} t2" D.I. 55 Pipe (All deplhs} 4" SS Tap &" SS Tap Two-Way SanRary Sewer Serv(ce Cleanpvt Reconnecdon of Sanitary Sewer Service on Private Property "8y a L€censed Plumher" Std. a� oia. SSMH (o-s�j Addgd �epUi far Std. 4' Oia. SSMH n fi' SM. 4' �la. (Drnp) SShikH {0-6'} Added I]eptl� for Std. 4' Dia. (Drap) SSMN > 6' 5tandard 4' aiameter Shallow (Cane Type) Sanitary Sewer Manhola Remove Existing SSMH Abandon Existing SSMH Concrete Collar for SSMH Watertight Insert fbr SSMH (Polyethylenej Corroslan Protectlon for [nterior of SSMN Clay Dam permaoent Asphalt Pa�ement Rgpair Per Figure 2000-i Permanent Concrete Pa�ement Repalr Per Ffgure 2000-2 Temporary Asphatt Pavement Fepa3r 4" ConcreEe Sfdewalk Reiacement 6" Concrete Driveway Replecement 5i. Aug�stine 6[ock Sodding Broadcast Sesding Concrete Curb & Gutter Replacement Pre-consEructlan Cteaning & N Inspection of Ex€sting SS to be Abancfoned Posl consVuctbn N Inspectian oi fVew SS Trench Safely System for Excavatlons> 5' Depth Vatuum Tast New SSMH'S Concrete Encasament fvr SS Cias� "B" Concreie far Miscelfaneous Placement Class 'E" Concrete far Miscelfaneous Placement GNshad Limestona for Miscellaneaus PlaCement LF LF LF LF LF LF LF LF LF EA EA EA EA EA VF EA VF EA EA EA El1 EA VF EA LF SY LF SY SY LF LF LF LF LF Lp EA LF CY CY CY il 2155 I 2055 I 280 I 19D I 12153 11422 I 275 10D 100 i 238 25 ' 263 29 78 78 i7 f7 5 10 6 h3 92 30 38 7554 1250 142A9 20 � 30 47D 700 1950 3434 2387D 12201 89 10 44 44 44 I$t8.50 I $24.50 $32.00 I $36.50 I $40.G� $49.00 �45.00�, $58.60I $63.00 $287.60 i $3$4.50 � $300.U� $650.00 $i,550.00i $100.Q0� �z,osa.ao� $147.50' $f,200.00', $495.00 $470.60 $215,D0 $55.60 �zoo.ao $SD0.00 $54.00 $S1.a0 $1 Q.Oo $33.50 $43.0� $S.OD $1.60 $20.00 $2.50 $i.00 $1,00 $92.50 $20.OD $50.OU $50.00 $15.00 'iQTA� iOiAL cosr $39,8fi7.50 �"50,592.50 $B,96a.00 $6,570.D0 $a8S,12Q.00 $559,678.00 $i2,375.00 $5,800.00 $8,300.U0 $88,425.00 $9,812.50 $78,900.00 $78,850.00 $12U,900.00 $7,800.00 $35,360.00 $2,507.50 �s,000.00 $4,9fi0.00 52,35D.D0 $9,245.00� ��,oso.oa �s,000.ov $19,000.00� 54p7,916.00f $i0i,25Q.f}0� $142;490.00� $670.00� $1,290.00� $2,350.OQ� �1,120.00� $39,OOO.UO� $8,585.�0� $23,870.a01 $12,201.00� $9,157.50� $200.Q6� $2,200.00 $2.�aa.aa $ssn.ao $2,326,382.50 6/512DQ2 64-4 LGG C22557A0 EXHIBiY "By4" O�IA�ION OF PRO�A��� CONS�'�UCYION C05�' SU�li�A��Y (WAT�,a) C1iY O� �OR7' WO�YH �NCi1V���ING �,I1V� � B C D E F G H I J K L M N O P Q R S T � V W X Y Z AA AB Water and Sanitary Sewer F�eha�ilitation Contract (�X�07� on Rosedale Street from U.S. Hwy. 2�� �o I.H. ��0 p.O.E. No. 36�2 1lMlat�r f�roject No. €�W�3-Q60530�i �6�� 0 Sewer �roject No. �S58eD70580'li5i�30 SI�� I SH�C�Y I LOC�ilON/��SC�I�YEOFd I���S��UCTION CQSi �,STfiV9Ai� g�, 8"to8" 8"to8" 8" to 8" f" to $�� 4"to8" 8�� 20" ia 20�� $�� 6" to 8" 24" to 24" 6" tD S" 8" to S" 8" to S" 10" to 12" 12" to 12" 6" ta 8" 6" to 8" 6" to 8" 6" to 8" ��� 16" to 16" 6" to 8" 6" to 8" 6" to 8" 8" to 8" 8�� 1 S" to 18" 1 1 1 1 1 1 1 1 1 1 3 3 3 3 S-i 4 4 � � 4 4 4 4 4 4 4 4 Rosedale St. {U.S. HWY 287 to 675' East) Rosedale St. (Mitchell 81vd. to B75' West) Hall St. (RosedaEe St, to 85' South) Mitcheil BIvd./Withers St. (Rosedale St_ to 2p0' South} Stearns 5t. (Rosedafe St. to 75' South) Roseda[e St. (Stearns 5t. tv 150' East) Rosedale St. (Hendricks 5t. to � 50` W est} Hendricics Sf. {g0' North & South of Fiosedale St.) Flosedale St. (Mendricks St. to Holmes St} Holrnes St. (Rosedale 5t. to 75' South) Beach St. (135' North & South of Rosedaie St.j Rosadale St. {Collard 5t. #o Ayers Sf.} Ayers 5i. (Rosedale St. to 200' South) Ave. E(Ayars 5t. to West} AVers 5t. (Rosedale St. to 100' North) Rosedale St. {Ayers Si. to Tension �r.) Wallace St. fRosedale Si. to 100' North) Haynes Ave. (Flosedale St. to 1 DO' iVorth} Arch St. iRosedale St. to 50' North) Chicaqo Ave. (Rosedaie 5t. to 50' Nor#h) Rosedale St. (Fiayrtes Ave. to Miller Rd.) Chicaqo A�e. {Rosedale St. to 14�' EVor#h) Newark Ave. (Fiosedale St. to 50' IVorth} Sargent A�e. (ftnsecEafe St. to 50' North) Miller Rd. (Rasedale St. to 30�' North) Miller Rd. (Rosedale St, to iD0' North) Miller Rd. (Crossinq North of Rosedale St.) Miller Rd. (Rosedale St. to 65' South) $59,87�.�0 $40,129.75 $17,011.25 $31,442.50 $ 9 2, 392.QQ $8,282.50 $7,582.5Q $24,467.50 $16,325.00 $15,174.50 $73,275.00 $237,672.5Q $22,478.50 $11,183.50 $1 �4,778.75 $896,275.04 $14.870.25 $7,791.25 $8,37. G.75 $3,536.25 $122,9f 7.00 $ i 5,382.50 $4, � 0125 $4,10 t .25 $34, � 9T.50 $13,492.54 $4,053.75 $14,882.50 e�r�zooz aa-s LGG C22557,00 EXH1B1'i "��4° �PfNION OF PRO�AB�E CDNSTRUCYI�N COS'T SUMIIAARY (W�Ii�R) CiT'Y OF FORT WORiH �NGINEERING Water and Sani#ary Sewer Rehabilita#ion Cantract {'CX90i) on Raseriale Street from LJ.S. Fiwy. 28� to I.Fi. 820 D.O.E. No. 3662 Water Project No. PW53-�60530176410 Sevver Project No. F�S58-070580175780 �ll�� I 51Z1� I SHE1�T LOCATION/D�SCRIPYION AC an AE AF AG AH AI A,] AK AL AM AN A� AP A� AR AS AT AU AV AW AX 6" to 8" $„ 8�� 2" to S" B" t0 8�� 6" to S" B" to 8�� 10 to 12" 8�� 4" to 8" s�� to a�� 8" ta B" s�� to a�� $�� $�� 4" to B" 48" to 48" a° to s° 12" to 12" 8�� &" to 8" S" 5 Bradiey St. (Rosedale St. to 100' North) 5 Rosedale St. (Bradley St. to Hughes 5t.) 5 Coleman St. (ResecEale St. to 280' South) 5 Griqqs St. (Rosedale St. to Windornere St.) 5 Huqhes St. (Ras�dafe St. to 70' South} 5 Hughes St. (Rosedale St. to 30' North� 5 Edqewood Terr. (Rosedale Si. to 46' North) 5 Edqewood 1"err. (Rosedale St. to 125' South) 5-6 Rosedale St. (Edgewood Terr. To Amanda St.) 5 Lindsay 5t. {Rosedafe St. ta Ave. G) 5 Langston St. (Rosedale St. to 50' South} 6 Amar�da St. (Rosedafe St. to 120' South) 6 Etta St. {�asedale S#. to �24' South) 6 Ave. G(Etta St. to 55�' East) 6 Roseda�e St. (Etta St. to Liberty 5t.) 6 Tiern�y Rd. {Rosedale St. to 250' North) 6 biilard St. (200' fVorth & 5outh of Rosedaie St.) 7 Andrew St. (Fiosedale 5t. to 54' South) 7 5tallcup F3d. (100' North & 50' South of Aosedale St.) 7 Rosedale St. {Sta{Icup Rd. to Tension Dr.) 7 Tension Dr. �Rosedale St. to 250' North} 7-8 Rosedale St. Calvery A�e. io �. Loop 820) ���AL CONSTRUCiION COST FST1i�IIlATI� � $7,826.4q $59, 930.00 $25,817,50 $141,862.50 $7,511.25 $3,357.50 $3,937.50 $11,416.25 $ i 33,015.Op $91,040.00 $7,747.50 ' $9,720.DD $9,465.00 $56,079.54 $78,777.5a $47, 729.00 $99,902.50 $4, D28.75 $16,821.25 $72,120.04 $15,846.25 $167, 880.00 $2,�07,837 .25 6f512002 BA-6 LGG C22557.04 17�M 8 9 ia 11 12 13 14 15 16. 17 18 19 20 21 22 23 24 25 26 z� 28 29 30 31 � � 3A 35 3fi 37 38 39 40 43 a2 43 44 45 48 47 48 49 50 51 bZ 53 �n 55 58 57 58 TOTAL �XHISiT "B-4" OPINIOAI 4F PROBABLE COMSTRUCTION GOS7 Bi� ITEM SUMMARY (WA'fERj CtTY OF FORT WORTH �NGIAfEERIiVC� �esign oi Water and Sanitary Sewer Line Relocalfons for Rasedale Stree! from U.S. Hwy. 287 to 1.H. 820 U.O.E. {�o. 3662 Water Praject Nn. PW53-080530176410 Sewer Project EVo. pW58-07056017578p ��SCRIPiI�EV DF IT�M B" �.I. Water Pipe�All f]epthsj 8� o.l, Water Pipe (All Depilu) 8" D.I. Water Plpe (Rerial Brldga Crassingj 12` D.I, Water Pipe (Ail �eplhs) is� q.l. Water Pipe (All �eplhs) 1 S" D.I. Waler Plpe (Ali �epihs) 20' D,L Water Pipe (AIY �eplhs) 24� D,L Water Pipe (AA Deplhsj 48" Conc. Water Pipe �All �eplhsj 6` Gate Valve wlCJ. 6ox & lid S" Gate VaNs wlC, I. Box & Lid 12' Gate Ualve wlC.I. Box & Lid ifi" Gate VaEve & VauH 1 B' Gate Va{ve & Vault 24' Gate Vafve & Vault 4B' Gate Val�e & vauR Cfass'A' Meter 8ox (Single Head Servicej 1" Singie Head Service Tap to Main 1' Cnpper Service Line fram Main �a Meter, Induding Seiting Meter Box Class'6" Meter Box li 112' Single iiead Service Tap lo Main i 1!2' Copper Servica from Ma€n to Meter Box, Including Sehing Meter Bpx 2" Service Tap ta Main 2' Copper Serolca Lioe from tvlain to Maler, Intfuding Setting Meter Box 3/4" Gopper Service une For Private Praperry hy a Licensed Pium6er Relocate Existing Metet Box Remove & Salvage Existing Fir$ Hydrant Standard Frs Hydrart {3'-B' Depth) Slandard �re Hydrant Barrel & Stem F�rtensiqn Trench Safety for Excavations > 5' Depth Temporary AsphaR Pavement Repair Permanent AsphaN Pavement Repair l'er Fig. 2ofl0-1 Permanent Concrete Pavement Repair Per Fig. 2000�2 Wedgemill W/2' HMAC qveday Gast IronlRuclile Iron Fittings St. Augustine Blpck Sodding Broadcast Seeding CEass "B` Concrete far Miscella�a�s Placamgnt Class'E' Concrete far Miscallaneous Placemerrt Crushed Limeslona for Miscellaneous Placemenl Concrete Curb 8 Gutter F3epEacement 6" 61ow-Otf wJB� Gate vahre & Accass Hianhole 1' Alr Releasa VaNe 2' Air and Vaeuum Release Vel�e 2' Temporary Watsr Servics {�n11re Pro�ect) Remove & Salvage Fadsting 48' Gate Valve Remove & Salvage F�dsting 24" Gate VaNe Remove & SaNage Existing 18' Gate Valve Remp�e & Salvage F�lsiing 16' Gate Valvs Removg & SaNage ExisUng 12" Gate Valve Remous 8� Salvage �xisting 10' Gate Val�s xi Remove & Salvage Existing 8' Gate VaNa iiemave & Salvage Ea�isEing 6' Gats Valve Remnva & 9alvage Exisking 4" Gate Valve Remove and Replaca A` Concrele Sidewalk � Remave and Repface 6` Cpncrele f�riveway � Cut & Alug Ex. 12' Water Pre-Construclion Exploratory �ccavallqn (�-Holg) UNIiS QUANYITY LF LF LF LF LF L� LF � LF LF EA EA EA EA EA � EA � �A � EA EA LF EA �A LF EA LF LF EA EA EA VF LF LF LF SY SY TN LF LF CY CY CY LF EA .A �A EA LS EA EA EA EA EA EP� �A EA Ea, SF SF EA EA 550 17405 � 1W � 12575 I 100 I 65 � 175 � 275 I �� I 21 � 56 15 1 1 1 1 232 zsz 67$0 41 20 435 25 645 A44 l5 20 22 71 1q055 27A80 4820 95 3585 33 380 685 3$ 38 38 117D 2 2 2 1 1 1 1 f 11 1 5 23 3 17ii ifi7S, 15 6 UN[T COST S3250 536. W St2o.p0 546.75 562.50 575.Op S80.Ea 59D.00 5250.�0 ^a480.00 56.�0.00 S1,O50.00 � 55,350.00 S7,OOO.CA 522.D00.00 535,�OD.00 5100.OQ si�.ao 513.L�0 51s0.o0 5412.�0 519.00 546256 520,SQ 51950 s�a7� 5.320. W 51,262�01 518125 5'i.00 Si 0.00 S5d.00 S81.W � S50.W � 52,3Dp.00 55.00 51.60 $50.�0 SSU.04 515.00 S20.00 52.300.00 32.m00.00 53.400.00 $50.OD0.00 53,aP0.U0 51,Opp.00 $425.00 5A25.00 $350.00 $354.00 5287.50 521250 $175.p0 533.50 543.04 5150.OQ 51.000.00 i0�'A!� G05� $47,875.W� $62fi,580.OQ� $12,�00.00� 35$7,681.25 5s,zsa.00 S4�8T5.00 514,OD0.00 5za,�so.on $50,000.00 s� o,oao.00 532,500.00 �15,75�,00� 55�350.00 57.000.00� 822.000.00� $35�000.00 � $29.200.p0� $55,4BO.fl0 38$,140.00 38�560.00 sa,aso.ao 58,265.00� Si 1,562.50� St3�222.50� 58,658.OQj 52,715.75 $6�4Q0.6D 527,T75.p0 512,668.75 $10,955.00 $274,800.00 $260,28D.Dpf s7,sss.oa� sns,2so.ao� 575.900.00 �i.900.40 $5,696.#7p �5.900.00 S1.900.OQ y570.00� 523,4QO.p4� $4,600.00� 54.000.40 56��00.00 ssa,000.00 53�006.00 5�,000.00 5425.qOf 3425,00� $3.850.00� 5350.fl0 51,497.50 $4.887.54 ss25.00J $57.318.50{ $72,625.00� $2,250.6Q� $B4OU0.00 $2,BQ7,931.25 El512002 84-7 LGG C22557.00 FXHISI7 "B�4" R�QUif��D ADnI�'IONAL SURVEY SUiUIMA�Y CIT`Y OF �O�Y WORYFi �NGINEER�NG S�MIiARY S€W�R Water and Sanitary Sewer Rehabilitatior� Contrac# {TXD�'1� on �osedale Street from U.S. Hwy. �87 to I.b. 8�0 �.0.�. Na 366� Water �'roject No. PW�3-060530176410 Sewer Project iVo. �S�8n070580i���80 �OCAiIQNID�SCRI��lON �lid� I SIZ� I SH��T L-� 766 L-1757 L-9 758 L-� 759 L-� 759"A" L-4S26 L-4826"A" L-2955 L-B332 M-29 L-2D76 1.-2076��A�� LINE "A" L-3891 L-2387 L-2388 LINE "B" L-2584 L-4920 LIN� "E" L-277S �.-2389 �-2589 l.-5505 L-2823 L-4836 L-423b L-4238 L-2390 L-5067 L-4239 L-2530 LINE "F" L-5115 �-3282 L.-8$5fi L-3229 B"to8" 8"#08" 6"to8" 6" to 8" E" to 8° 6" to $" g�� 6" to 8" B" to 8" 10" to 12" a" 6" to 8" pL 0 6" 6" to 8" 6" to S" 8�� 6" to 8" 6" fo 8" 8�� 6" to 8" 6" to 8" 6" ta 8" 6" to 8" 6" to 8" 6" to 8" 6" to 8" 6" to 8" 6'� t0 $" 6" to g" ��� t4 $n s�� ro s�� 8�� 6" to S" fi" to 8" 6" to 8" 6" to 8" 1 1 1 7 1 � 1 1 1 3 3 3 3 4 4 4-5 5 5 5 5 5 5 5 5 5 5 5 5 5-6 6 6 6 6 7'-8 7-8 8 8 Ave. G(East o{ U.S. Hwy. 287 to Withers St.) Relocation to Hall St. Relocation ta Withers St./Mitchell Bl�d. A�e. G(Withers St, to Mitchell Blvd.) Mitchell Blvd. (Ave. G to Rasedale St.) Ave. G(Hendricks St. to Mitchell Blvci.) Stearns 5t. (Ave, G to Rosedale St.) Ave. G & Holmes 5t. Ave. G& Aliey East af Wolmes St. Ayers St. (Rosedale St. to South) A�e, �(Ayers St. ta Campbell St.) Rosedale St. (Ayers St. to Campbell St.) Rasedale St. (Ayers Si. to West) Wallace St. (Rosedale 5t. to lVorth) Ros�dale St. (Haynes St. to Miller St.) Rosedale Si. (Griggs St, to West of Bradley 8#.} Bradley St. (Rosedale St. io 150' North) WincEomere 5t. (Grfggs St. to Bradley St.) Windomere St. (Hughes St. to West) Hughes St. (Rosedale St. to South} Lloyd St. (Rosedale Sf. to North) Rosedale St. (Lloyd St. to East) Edgewood Terr. (Rosedale St. to Windomere St.} Edgewoad Terr. to East Rosedale St. {�dgewood 7err. to Eastj Edgewopd Terr. (Rosedale St. to Ave G) Lindsay St. and Ave. G Langston St. (F�osedale St. tn South) Rosedale St. (Sta. 9+00 ta Sta. 22+36E) , Rosedale St. (Tierney Rd. to W es#} Amanda St. {Rosedale St. to 5outh} Tierney Rd. (Rosedale St. to North) Rosedale St. (Liberty Ave. to West) Tension Dr. and Rosedale St. Rosedale 5i. to Rose Ln. Rosedale St. (I.H. 820 to West) I.H. 820 (Rasedale St. fa Souih} YO�A� {SANI�ARY S�W�R) SU�V�Y COSi �5�119Adi� $2,325.D0 $7 �48D.QQ $1,200.00 $300.40 $1,2DO.D0 $1,200.00 $960.00 $1,200.Q0 $750.04 $750A4 $1,200.4Q $450.40 $540A0 $150.00 $750.00 $450.00 $600.00 $1,200.00 $900.00 $600.00 $900.OD $45Q.D0 $1,800.OD $9Q0.00 �� so.oa $1,200.OD $2, l 00.Q0 $1,20Q. QO $600.40 $150.00 $1,8Q0.4q �soa.00 $150.00 $2,250.00 $750.00 $300.00 $1,350.00 $34,�45�.00 6f512402 84-8 LGG C22557.00 EXHIBIY "��4„ R�QUfR�D ADDITIO{�AL SURVEY SUNiI1fl�RY CIYY OF FORi W4�iT'H EMGIN�ERING Water and Sanitary 5ewer Rehabi[ita#ion Contract {'TXD07j on Rosedale 5treet fram U.S. Hwy. �8i ta i.H. ��0 �.0.�. No. 3662 1Mater Project No. �W53o06p�30�76410 5ewer �ro�ect No. PS�8-OY0�801 iS7�0 WA`��f� �OC��'I�N/�ESCRIPiION SU�V�Y COST �S�IMAT€ ��,soo.oa $� 50.00 $150.00 $150.00 $300.00 $154.00 $soo.aa $15Q.00 $30Q,00 $15�.D0 $150.a0 $1 �O.QO $990.�Q �22s.ao $ i 50.OQ $900.00 �i,zao.oa $150.00 $1,80�.00 $45Q.00 $15a.00 $225,Q0 �1 o,�4a.oa 1�11V� I SE�� I SH��� A B C E H J K 0 Q R S T Y AA a6 A� AF AH AP AS AT AW �,� 6" to S" 6" to 8" 6" to 8" 20�� to 2a�� 6° to 8" 24" to 24" 7 0" to 12" 6" to 8" 6" to 8" 6"to8" 6" to 8" fi" to e" a�� 18" to 18" ��� 2" to 8" 6" to S" $�� 48" to �48" 8" fo B" 8"to8„ 1 1 1 1 � 1 1 3 4 4 4 4 4 a 4 5 5 5 6 6 7 7 Rosedale St. {l�,S. HWY 287 to 675' Easi) F3osedale St. (Mitchell Bfvd, to 675' Wesi} Nall St. (Rosedale St. to 85' South) Stearns St. (Rosedale St. to i5' South) Hendricks St. (90' iVorth & South af Rosedale St.) Holmes S1. (Rosedale St. to 75` South) Beach St. (i35' North & South of RosecEale St.} Ayers St. (Rosedale St. to 100' North) Wallace St. (Rasedale St. to '!00' North) Haynes Ave. (Rosedale St. to 10D' North) Arch St. (RosedaEe St. to 50' North) Chicago Av�. (Rosedale St. to 50' North} Miller Rd. (Rosedale St. to 3D0' North) MilEer Rd. (Grossing No�th of Rosedale 5i.) Miller Rd. (Rosedale St. to 65' South) Coleman St. (Rosedale 5t. to 280` 5outh) Griggs St. (Rosedal� St. ta Windomere St.} Hughes St. (Rosedale 5t. to 30' North) Ave. G(Etta St. to 550' East) Dillard St. (204' North & South of Rasedale St.) Andrew St. (Rosedale St. to 50' South) Tension br. (Rosedale 5t. io 25Q' North) �OYA� (WA��R) TOTAl� (SANITARY SEWER) TQT,�L (WAi��j ioiA� �3a,a��.ao $10,440.00 $44,89�.�� 6/5/2402 B4•9 LGG C22557.00 AiiAC1r�ME�.Ni "C" CHANG�S �#NE� AM�I�DM�NiS i0 S�'AN�]ARD AGI���M�N7 AN� Ai�'ACHM�Ni A �ngineering Design Services �Issaciated with Water an@ Sanitary Sewer �ehaF�ilitation Cnntract (iXnOT} on Rosedale Street from U.S. Hwy. 287 to l.H, 8�a Water E'rvject No. �W�3a0605301764� 0 Sewer �raJect No. PW�8-47Q5�A17578U [�.0.�. No. 3662 NON� LC,Ct C22557.QQ C•1 June 6, 2fl02 ATTACHMENli „D•' PROJECT SCH�dULE Enginaering �asign Services Associated with Iles[gn af Water and Ssniffiry Sawer Reloca4ions far Rasectale Steet irom V.S. Hwy. 287 TO LH. 820 Watar Pro]ack No. PW53-0605301TS416 Sewer Project No. P558fi70.5801T6780 O.O.E, No. 3662 TASK - -- - -- - - NaHee ta Proeeed �SX Ca(�cep ���ealgn oncea(u UUIi esearch Prepare frleep W1"gnment Pl�par� nceptua Engineering Plans 9ubmif Conc�oivaf Pfans c!]'Y �nEw C�y Revie�' and Commerris to Conceptuai �esign Plans .�j¢ress Cii4 Cafnsnents C1t� A4AInY�IQf CPnG@P�al P��s with N'jf�tar F're1�mNary i'Jesign ��ic Naff��ca4ionOesign Preliminary Properlv Research 8 Field 5urvev Preqare PreliminaN Plans Subm3f Preliminary Plans Submif Preliminary PYans fo� Ut�{ity Clearance RBview 6�?% R@vi�Y Meakns� wit�citv Cl]'Y REVIEyI CiEv Revf�}y b Gomments to Prefimirtary Desiprc Plans s Cftv Commen[s �Ci , � of el' mery Plans with �+ITP for �inal Oesiqr� ���°����� Prepare Fina� Pfans and Spe ' calions Submit Final Plens end S � ealians 90% Review {�eelinq with Ci _ Final Subr�ittal Ci �,ss Cifv Comments proval of Fina3 Pfans and Specific�ions with NTP for ConsVuction nshvctlon Servfces Advertisement CorosSte�ction with Final Inspaction �'� LGG C22557.40 Ai7ACHM�Ni "E" LOCAiION MAPS �ngineering f]esign Ser�ices Associated with Water and Sa�titary 5ewer Reha6ilitation Contract (iX�OT) on �osedale Street from II.S. Hwy. a8� to I.H. 82D Water Project Na. PW�3-D�0�30176410 Sewer �rojec# No. PW�8=�iDS801i57�0 �.0.�. Nn. 366� The toffowing attachmer�ts are the sanitary sewer and water line layout maps identifying individual line replacements for the Rosedala 5treet, U.S. Hwy. 287 to I,H. 820, V1later and Sanitary Sewer Rehabifitation Contract {TXD�T). La�yaut � Sanitary �5ewer �epiacemen#s Sheets 1-8 �ayo�t — Water �ine �eplacements Sheets 1-� LGG C22557.Q0 E-� June S, 2002 �N�� ,w- �a o ' a"� ;o, °�� 4 6 : n s :�Ta�- 1+79 l� � i i � � ,��, i+o� � � � N � � � � J 's �r I Z� � rn 5 �� �/ ��� ����, y- �� �� � V� ii /'�rr��\� p 7i � � � / / 2 ly ' 11 . . � ' � � � � / � I 1 �--> � �o i , i � � ' - g 63+88 �� 3+50� _24 I = 25 �� ��� � ----\ - I� / 1 67+50 , � � � i � � � v� ia*4a � -tl�a+ r0�9�8�= : : : f : " � . T o �+�7�HD � � L � � g � 2 � � � L(7 ����� — Q $ � ����� -- � g::=: n � ssoos g � __a8S � ::: � ,�ggg -- ' � G . �`iiSSi � H ����� � i � � � 0 :� v v '�- � � �r v p tl4Q�: 9d�8� ^:o � O o � h �d�:; :��q a.: �L 4 �+ tl S p 6 a ti S : 4 � `" � � � � F.>��^� s���s _ v� i 6 I �°��� "d e 1 � - - - i2 I - � �� 7+17 ! Jr A tr � �r � r� A ��+5c t �o � r � r 1 r �r AI�O �+ r Q' r! �v "J � —�� 72+00 rr !r '� A! 1 �f r r AR 1 1 LE���D EXI ST. SAN. SEWER REMOVE/ABANDON EXI ST. SAN. SEWEF2 RR6P. SAN. S�WER RELQCATION PROP. SAN. SEWER EXI 57. 55�AH REPLAC� EXI ST. 5SMH PROP. SSMH �u�u�� �.o.w. �3��: AR� /�~ }i r {L r r �i �ii �� � „ „ � „ i� l� �r ,' r� ! � I`� �/ � , ., +�� 67+ I S �il ��l �'I ��, � � � +'t � �'� � � � m r � � � � r r f f ri ii i� ii ,� ,, ,� �! �� �� �+ � f Q� ' � q, , r ! � SYCAMORE P�RK � — ----����Y��� � � � � � 7RQ2 COUNCIL OIST. N0. 5 � � � n ,� cV MAPSCO 77h.�.78J � � S�WER BA5E MAi' iVO. 2Q60-384 � ' }73 - _ � �� � � � �� . 1 I � � � TR I qp � � � � � s rc,a�aRE � � L� I�'J � RECREA T 1 ON ; �� i PROP. 8�� 5S ; , CEAlTER � � � i , � � � �-� I ������„ ' ,,_���. � � � � _ PRQP. 8" SS :� � y �� � v a 3 -� r � I p a�� � a'4�J� R��� r d w � � � ` EASr ' I 6�*69 24�� � � I l �98 ��2 � 'PROP. B"SS � � f � R�� �� y , , � EDq 1 �, �'�1 C _- - � �- � +g � � TR3 �7�J+Q� Sr° �� � 7� i �*�Q q r iA y�f, ��-I� � L��3f�6 � � � � � � � � PROP. � ss , , � 4 8 `� � � ,,, ,o � � � � + 7 � �� , �n � �Ro�. � ss � : . � � , I � � � � I 6 r i I � • �lA� ��� � , � •� ; -n � °�i r � t i i � , �1�, �'� ��. 2 � I t5 �i 2 e IS 6 ��• �� ! 2 I��� I I I� 2�� I I ��.1 2 � Q� i ` �TR3A � � � i ' � � i � I 5�1� � � w ' � t �� �� ♦ 3(, � � 4� � � 3 ♦ � I 9.� 4—�, I 4 I 3 f D � 3� I 0 I I�r "`� � l � � � � �!` � � / �� ie � � � ► i.' — � _ � � ' .�. � � �� �� i � j 4 �� 13�}{�-T-�t � * r= 3R[� 13 4 �' _., g5�cr � q O � g cv q � I � 1 �_ ZR3 �� � _ 5 � �� p,�� � � + i °o � / 1-0 5 � JI I 2 � y 5 , C� 5 a , � � ,� � � ' .. � i c`� 8 � _I � � I 2' 3, 5 ➢ � I � � I � �_,� � ts �+ r J�� � 6 �a I I �r o � }$5 ' � j � J � � 5 7� � 7 ! -2�J�� � +-..( 6 � � � � �� I 7a6' + ,;; �� ,��5 � � 0+7� � �� �- ., �� 3+� i ��� _ � � �� „ � ��;,�7 , io io.+�v�_ 7 � io l � ��3E10a 7 �}� -_ ��` 6332 �- � � PRQPa � S5� �r � .�� � 6, � _ �.� � � + 5 � . � ° � � � � � � . +•..;,_ � �, �t � �, � - � , ' AVEa G �' � — / �5� ��+�� - /-� V a `� � i� 9 8 v � � \� `,` �J+4�V � ��%+�. ,e�, � ��P�o if� � �I � � � L � 8 � �,��dIos ZR � � . pr- (� Q 1 1 � � � I �+ i�� o � I �JU /I: J 1 U 1� ��I! �- 9 l�� lou 3R �� � i I � � 7 � 9 �0 � I —� '� � � � � � J / � p' � 23�2�� �, _ \---�-- �- � � � i � c� � � Ln � ,L" ��9 �a J 8" PV � I +8 E- . _ , , � �o � z `�5 � � � � �RaP. „ss �-�4��6 � -Q� �� - � i �� � o � �� �y �� 4' `r � Q�P iT2. Ir` � �� � PROP. �" SS �;�� 3 I 4 I 5 I 6 � 7 I 8 I 9 `t'� 2 I 22 23 �� ���� i � �; _ 3 � � � � i 3 � � 50, �� � TR5A v �� � � 2fl A'��4 s � TR8A � � �� ti � i q TR5� `.° 4 � CO i�a 4 � � ��i � ~ � � � * a � � � i= 3 J � 4 D I i �o � �`-i t� n 17 +00 LOP�ZGARCIA GROUP OUNAWAY A550C. TEAGUE NALL & PERKi NS TRANSY57EMS ❑ANNENBAl1M 7l�RNER COLLi E & BRADEN waoE & assoc. ���� ���� . D , � , 3, S � -� `�' - � �n 1 c`, z . `� � 2 �-,. � �, �Q � � � 2 $-- a � � � s � � —q ; y � ;� +� �1 i i +�[}� fi�� _� 9 J �� S �� 3� i� TRSA (� z ��I 2 I I I 0 9 S 7 6 5 Q 3 2 I �\� ,, I —� � �2+2� ,� �Q ---�� � '_sL- 6��9�i�°'� L.-36a5 • . \� �`►` � � Qc� T J 0+21 E I I AV�,;�7 H � G� i � 25+�� - - 1� � �� � ,f r� � � � 8" P C 2*�O[,_=� 6�� i TR9A ; �` � � t � � M � i � �— $ C f � � �`� � �+t� t��+�F . � j� G 13 14 15 16 17 18 19 20 21 22 2?� ti , . 1 ��. � 4 65E � � y R9�lY �'�i� �ftOJ�Ci �In. �(;��� � ; � � � � � � A R � ! A � R i5 � P ' CTr1f O� �QR�' 1�O�d7H. 'f�Xd�S z�� ��,�,�, ���,��, �����.�� 9aW ��, : �� -� 5850 Manhattan B�vd., Suite300 WATER AND� SANITARY SEWFR REHABILlTAT10N , _%; s • FartWarth,Texas 76tz0 CONTRACT (iX�071 ON R05E�ALE STREET �'�,,,�,"�'�,, SE1Ad�#i P€30J�Gi �i1o. �p� ��. 4�`_., h.� (��� ��8� FROM U.S. HW!! 287 TO I.H. 820 (817j 44fr1113 Fax Pa� ����%����9��%8�. �s�� - " �} ��kezgar�iagro�;�a.ccm l�IYUUi � Sl�f►�IT.�iY S��€I ii���AC�R�1�R�5 LGG pROJECT � C2255T.00 SHF_ET 1 OF � so��N.- - --- - - ----�.._ - - . .. � � s . n � 8'� � I A�E°� �� WI �� �� L� � � J w� � � AVE4 i � D �� �� �� I I � L��{����� - -- - � � .. � � �l 6 " 3 + a E � � rn rn �� o� � -- — — — � _;? �� I' �' _ COUNCI L DE ST. MQ. 5 � . a�+ � ��L-7�'�'�\� ��IL�(� `�- � � �:� a ' � ± I 2 3 ���\� � 7 8_9 N N I � � 3 4 5 7 �+ 6 5 4 3 2 ��1 i 6 5 4 3 2 MAPSCO 7$J-K ' �O ' fl O�E i L ; TR4QR �l � P-.72?C'�'���`�LP-.]��}��� � _ _P-�2Q('i � 8� fl4 `$'I�� � SEW�R BASEMAP N0. 20fiU-384. � g ' ; - 2* 0 t E i 7 �a � Q 6�� �,� g+ 2 I � �.� 2U66-388 �� � 7 8 9 i0 I I 12 f 7 8 9 f0 I I �� $ ��� �I 22 21 2p 19 IS 17 E6 15 I4 13 12 I� 17 16 15 I�i`" 12 1I w I �� I 10 ,' ` � 1 �o•_ � A V E, 7 � � p �=, � E � a � � � - - .; . n i � �;, � ii� �' POL YTECHN 1 C �1 I� � y � HI GH SCHOOL Q � I � POL Y TECHIV I C � J ,�r,� 6 " � �� � I 2 4 5 6 7 8 g � I I I, I 3 4 5 f 7 8 9 I I 5 � 3 2 I E 5 4 3 2 f �� � � m� �—�.3i� .4D�o `° °° ��° - � N ! �"' � ,� - � .� t L - l 9 I 0 � � , ,� � L I a 1 � � � � 6° VC � 7+62 8" VC� � � 6�� v� � � �" VC I ¢ 6° � � � � .,.., � j 22 2 I 20 I 9 I 7 I 6 I S I 4 I� I 2 ;. 22 20 I 9 I$ I 7 l 6 I 5 I 4 I I 2 * 7 0 f I I 2 � � 8 9 � Q I I � � '�'�- � . .. I � � � 21 '� � g '� 7 . � � : .: � i i � . � � �SGSF j EAST ROSEDALE S7. � EAST R�SEDALE S�o � ; � . . — � —. `�� o Ln � � I ����� � � 7 . ��eiL �2 II 10 9 8 7 6 5 4 3 2 I 12 ]I 10 9 8 6 5 4 3 c.o�2 I t�l t� 10 �$ q� J I 3 2 I �O N�+ �� � ?gggg � I 0' �-�OC�f 7 +I � 6 5 4 3 2 I 6 5 9 3 2��� 8 7 6 5 4 3 2' - - - - - � � L - 1 D.:'6 � Q 1 P- 1 �'3� �+�8 = L. - I 593 � � � ; �S g�o �' rP - - � o a 4 0 0 � �.I 4�'3� I 17{ I 4 I�"� I g-2� � --- `����+ `� �� a+7oE � 3-oa` '� �f T:.� 9 �� „ 8�� ; o 4�� i� � � ������ 2 2 3 2 4 a 1 3 1 4 1 5 1 6 1 7 1 9 2 0 2 1 2 2� E 2� 3 �' z 12 13 14 15 l 6 1 7 I S 1 9 2O 21 � 7 8 9 10 I I 1 2 � 7 8 9 10 I I 12� - C =��_ �� F : : : 'S �: � -' % L(�� I i Z � � � _ � � � 2 I 3 I 4 I 3fl � ! � EX157. SAN. SEWER [al .� ` {'i �i � I � J � 9 C� ��� � " z N � '-`1 a � 1- 1 14 9� n � 1 ��f ��Mov�iaaaraoo�v z � ' -- cr '� �6 2 - � EX15T. SAN. SEWER � i ,� f`�I = W ! r; i �' o � � � i PROP. S11N. SEWER � U �� � � ` z � � � � � � � � � E �)+:��� {�° � �. � � � I � RELOCAT] ON 3 2 I, I 2 I i I Q 9 8 7 6 5 4 � 2 I 2 I � I � ! 0 9 � 7 6 5 3 2 I � � 4 � z Q z � � q 3 2 J _� �� i � � — PROP.SAN.SEWER L _'� �� I �l 2 � � ; � L -g �5 �� m L -�8��4 7f'4 8 i 5 4 � 3 �� � i _` i,� `-"I � � I 1 �'a EXlST.SSMH +'�6E ' 6" I��-�i� � � �fll���� �-� � � `� +;- � ' � ���-�� �G= n ] � 1 � � �' � ..s� � � C)Q�C � Y�aB � � �—�-' $ ��' '� REPLACE EXI ST. SSMH + 23 I 3 I 4 I 5 I 6 1 7� � i�1 � 21 0 2� Zq I 2 E 3 I A I 5 I 6 ! 7 I 8 19 20 2 I 22 7 � q I n I I I 2 7. ��a� .`G I I `D� g�14C91 I I 2 I 3 I q ��, ° � � PROt'. 55MH 2 I� � � . _ ��i � �1 � � �' ��C � �° Q D � � � 1 - � � � " 10+95E i � �x n � � � ■ -- --- — FUTLiFiE R.0.1M. Lp � 4 + 8 I � � �, �r � I � �� 5 9 5 � � � _ �~ � � � �� LOPEZGARCE A GROUP 3 2�I I 2 I I E 0 9� � 6-5 4 3 2 i 2 I ! I I Q 9 $ 7 b 5 3 2 I 6� _ � 02 2 I � 5 4 3 Z I B 7 6 5 4 3 2�° '_ n � � r � pUNAwAY AS50C. �p L 1.�58 L 1 OQD � 7 k7 3�f4 I 3��q $° 1'� � L- � 8, 3 �s � L `���C � � Q i �- � tI � q :, n TEAGUE iVALL � � - - � ` � c� T 3 Q = i� - ' 2 a _ '� � ,� �, � ! �o".. �— s� PE�tKaNs �+SOE'� 6 7+�34 i'-flC ��� i c� o" 9�5(E $Y°�5r: � ���' a N Y 2 23 24 I� I 4 I 5 I 6 ! 7 I 8 I 9 20 2 I 2� ^� ,4 Q � 2 I 3 � 4 I 5 I 6 I 7 1 8°° 20 2 I 22 7 a 9��� 2 � 8 9 I 0 ! I I 2 �+ 9 m� I I I 2 f 3 1 4 !�� � Q `_, ; : � — TRA S STEMS �^ � � � � Cp I ! � � � od � � � � DANNEi�SAUM + � a+C. I � D�� 'C� � � lOO�,f _ � `V + ! `Jri�21�� I * � �' � • � i y� 00 • � � g d� � TURNER COLLI � �o g�� '� 6+ 2 p o �v � 2 3 E 8 P V C� q _ � � ; S 6�' � & BRA�EN �� l9 l� y� '�' ° � c7 l I a � � � o a � . wAQE & ASSOC. � I 3Q'� I I �� I 9 I R � 7 � fi 5 4 � N N �' ���IU„ „ I � I -. I w 7 � 4 � °p -I �� �� 1'' 'I I ! `� { `" I`" f „ , ,. r�l � I , � .,� � 6 H� a 6 ��,,., .., . �_ � 1 e � � m 6 �p p � 3 i �- � � " a►re ���R �RQ.1�G`�' iVO. � ' ` � � ����L ���� SCI�L� s � ` � g z�oa2 ���a�8���19�R0 � —z�a' ` : � s ; aFc.,►uc $�R PROJ�CT f�o. o,,,,,�r, �O� FJo. � g $ $ ; �" PSv�i�5�0'�75780 3fi�2 � �:` . 1 i C�T 1� O� �OR� �OR�W Y�X�.S 4C� PROJECi ' �, � � � � � .� � � i � � �, � �..i � � czzssr.00 � 6850 Manhattan sl�d., Suite 3U0 WATER AND SANlTARY SEWER REHABlLITATION s�� i Fortwordi,Texas 76�20 conrr►�er �raroon onr RosEOACE srR��r t�»�`��g� FROM U.S. HWY. 287 TO I.H. 820 � � {$17j 44b-1113 Fax o� iopezgar�iayroup.cam EJA�+'OUi � Sd�iT'A�iY SE1R'�R H���ICEIViI�F�T'S $ - - --- -a- - - --� - - �$�N� =�w a6 �"� �o; $3. , o� 6 � 0 o::o' --�w. w 4 4 4 � : : : g ; ����� c ; � c , °o °o °o a° °o S tl ~ o Y L L L L L E g g g g 0 �A �a" g W o n N� � �- '- 2 R � o 5� K6 �os"�W u 4 � i a ^��?: s� 0�4 �� og 6 � � � 6 r � w b �$o�� �__�; S 6 6 a N ����a ���q. � S 8 � : ��am. - - -�� _ � �..�., � �,0���[Of11 � `;' I A V F___1�-- 1 I I � I r' / a-' ` �U, ' 3 z i �,-" I TR. 5A � , �. � o � zo6s-38s f I '� } -J = - - COIJNCI L D1 ST. iVO. 5 -� �9 � 9 x G� 4 7� _� ,. ._ J `° 2066-388 � , ____---____ _____�.---- - ---------�-�--- - --- - -__1+05__ _�-�_`� ---------_--_---- -- 0 2066-384 7� 5 4 B � �� i i o �� 2� r z„ , � �' 2066-384 ; � MAPSCO T�K-L � I �_ C�,h � Ie I7 16 15 14 13 12 � ��� � '� o , � � 3+98E L -� �� �� � � � i� �„ � �+ � �s � ��042 TR5AIA n C� � � � �~r` N � � SEWER BAS� MAP N0. 2066-384. F 7 � � I I cO o�o - - - � - - - - - � - � + 5 � � � � � � � � - 1 R n 206�-3�8 + + 8 .. a ^ � • + `. ��� 9 f 0 I I f 2 I 3 I 4 y f 6 � � � / L I� I I 2� I 3 I 4 I 5 �O � �$� ��- �{ � AVE� � i 2 3 a � s 7 � 0� 99E�-�' � er- `"' L-L._*�� � � � I� O W E S L E Y A N � � ____ � �� COL L EGE � � fl �-�— ,� � L - 4 8 ! 9 2 - ; � � � � �'� �`` � -q i 5+�7' J � � � 8 T 6 I� - j��r, _ A � �� 6 �� 4+ D I� � u' 2 q 3 u� `r 4 � i� � C 8 A � 0 2g 27 26 25 'i 24 23 22 21 2D 19 I S 1 7 �� 6 I� � ^•`� ,�-� � I � T7� I L -999 � 1 -9Qc' ,-' 3i �0 29 L--15�4 � ?+Jo___ �_-ZOC'�_ _ _ � . ° s � 5 � � ? p--------------------� � � i,,. ---- — ��__ ----��� � ��------------ . ��9+30E--- q+�� �� � �*7_.�- q,�..__•--_� i -- ` 4 �z� :�f �-?�E - � � �� �� r� � � � � � � g�� 12 13 14 15 16 I 2 3 4 5 6 7 8 9 Mf0 I I 14 15 16 17 f8 i3 20 21 L�G���� ��6�7 � . �F1T ��.O.W.Q � �� r— � i i P�OPe 8 S5 PftOP. SS � a\ � �� � I � � M � � � � � � � AVE. � � � � r U a �'� � �, � � - � -. � � � r �� J I� I� �a� �2 13 14 15 16 17 18 19 20 21 22 �n�����r�b q�5+ ' � � C3 U !�) a Iz 13 �//�i � ' Z�Z � 8 7 6 5 Q 3 2 I 9 8 7 fi 5 4 3 2 I TR2H1 ��e � � wo� � _ � L -- : G28 � 2 L - 1 1 r 9 � * � a�K= � ,�;�,� �� � � d � � � � �= BR � 3 �� � a�o p�� � a ��_ � � �' -______________-_-_--_-- ; �� �� o�� 8 r� E �m 6�� 5�� � �o � � �� �3 14 [5 �6 10 O8 �" �_ 52� � I+ 8 Q : 3_� �c � � �� � � � I II I� 9 8 7 6 5 4 3 2 I TR381 i � ' ; � ` � 10 I I — 13 �4 15 !� � �TZ B ����C+�� 4 3 2 � � � � � Ea ROSEDALE STa � �w ROSEDALE STa � � � �� ��� � � ~� pROA. ' 5S ° � --��— � � B � 2� L� 2�J �"' � � � �° � � a �� l S 7 6 5 4 3 2 I 8 7 6 5 4 2 I 9 8 7 6 5 4 3 I r-; I I IQ 9 8 7 6 5 3 Z I I I �0. `�� 8 7 6 5 4 3 2 I f0 9 8 7� � i -_sih� , �*�� � _ ,� -����r��� � i -�n T -� . �-GF. � -9.�� - �-��� � q� � 0� 2�� 44� � 1 �'+q ? o�� �� � q� f 8 on �� � 6�� 7� � 4-50= c i 5+�C� �� � «'�.�.,�' a - r�� �f � � I6 N 9 10 iI I2 f3 I4 I5 I6 � 9 I0 I I f2 I3 I5 I6 � id II I2 [� I4 I5 I6 fS I2 I3 I4 I5 I6 I7 IS f9 20 2I 22 J I2 I3 I4 1 �I4i ��7 �f$ I9 20 2I 22 � II !2 I3 I4� � (, �,« _ � � c� w 2 3 :� � �� � ������ � � � �� � �� _ � � � �� � n REMOV%ABAN ONR DUNAWA Y A SOC.��P �� � L � ��r. 4 5 U �� L� � a� ����� EXI 57. SAN. SE1kER 2 I � 9 S 7 5 4 3 2 I �' I I I 0 9 8 7 6 5 3 2 I I I I 0 9 8�� 6 5 4 3 2 I I 0 9, S 7� � T�AGU� NALL � 1 � ' � � � � � � � PRQP. SAN. SEWER & PERKINS �� � � � .L -' I U2 I �— L - � D� I T � � �_ E- �28 � I- ' � RELOCATI 4!V ' �� � � TRANSYSTEMS +� �E 4+ � 5� z+7�� 6° 6�� �� r�+r��i� ?���� �� ��� I� � � --� PROP. $AN. S�WER o aANNENBAIJM 5 I 6 I 0 I I I 2 E 3 I 5 I 6 I 7 I 8 � � 2 � I 3 I 4 I 5 I 5 I 7 I 8 20 2 I 22 I 2 I 3 I 4 I 5 I 7 l 8 I 9 20 21 22 * f I I 2 I 3 I� d � EXI ST. SSMH �� 5 '�`� 7� � � REPLACE EXIST. SSMFf &uBRADEN LLIE �._ � � � i � , w � � --� PROP.SSMH - WAOE & A550C. � � , ! � Q— --- - FUY�,�� �.�.w. 3 � 5 f � ' I 9 8 7 6 5 4 3 2 I J I I [0 9 8 7 6 S 4 3 2 I� I I I 10 9 �,� 7� 6 5 4� 3I ,�,,, y � 10� 9 8� � � z � IL I� � li' � �l i'. i� o�,e ��i� �ROJEGi Rio. ����� � � � � � ��/.� � � J .G� � R � � i� � CRi' O� I�URT YdORiH� �S L C�.22557.007 � R . ��°� 6850 i4lanhattan Blvd., 5uite 300 WATER AND SA/VITARY SEWER REHABILfTAT10N Sw� ; 20Da �IfV��O 'rJ��'�%i3�'� i�=��' �. . ForcWorth,ie�s 7b12o CONTR4CT (TXDOTj QN ROSEDALE STREFi � � ��h (8771�-�g� FROM U.S. HWY.287 TO I.H. 820 � eEt,,tuc S�'R �ROJ�Gi IVo. DO� C4�o. ° 8771446-1113 Fax aF o�uww � �; ( � �S��i0��01����� 3��� ` ' " ' lopezg<trCid[a�Ot;A.rOm , �vou� - s�iY�v sew�� ���u�c��w�n�rs � � 55��� ry 4 p � w �� a� o�� 6 ~ x s F a _ i S � ^ 'a i L L � � � Fgggg � � � � � ���o: 4 � 2g2gg � S °a o - 2 ~ � € � � i � � i � C N � `�n � � 5� f I 6 � - � --1-I .. . , .I �i .I� � —�, �� " i AA E V � I I ����rT��f� --- � W I�4 A � 95 � i � � i 66 �� E J � � . I� � 2066-388 �-' �- �� � � i ._5-_ ' ' z2 � � F- - - - F � � 2 z � 2072--388 --- -- ; 4__13_;_.____----- __��___5f___�._�_�5 -,�c,�.---------��_ � aC____�_ CDUNCILDIST.NO. 5 � 2066-384 � � .. _ _ 44 � � � �,'� W 65 r _ y F � F _ � �_ _ _ _ q .. Q�, � z i � q ao ara ,w n ,1; i Y w 2072--384 n � �r i 5 2 i'r7 r'r1 '-V � 3 I 7 ' � , � � G � i: � 7 i� TR5 �� i Q� 3_ G �_ EAST MA�5C0 T8�' ➢ � � " I I ~ 43 ��I' i0 N i J Zq � 54---���_ .H ¢ �_H I'i�o XR� � a M ; GA 7'� n � � �o " 10 A N I c�al,i �-28.� � 13 p O� 7+ 1 9 I, Q 63�� � I I�!1 I� W � J J i CENTE SEWER BASE MAP NQ. 20fi6-3�4. ➢ � ,� -: i '-� - - - - - -� O - - - - N N i � O � � � I S�_ � � _ ADD. 2066-388. n �oT � y� L-�38�7 y � L_ _252� �� � a M� i z—� 3, � o �' � a v a � K� �� 9 Zo�z-�ea, ��� �= - _� - - ^ � . �.�.�/�''�� � ��� �� , - - - - - � + � _� �- � a 6 �rr,; i � a � + � J � 1 � � � _ 2n72-38� � � �� � 8 �� r� ;' nn 4 I v � 55 in I I �... 26 —� � � I w� 2 ,+ U /� L I� f � � r� 8 + r_; � � �N � � s� I � z K =� /Z �n�l � � � i= z ��i - i T w M 4` i � � � � � � � 40�1 N tp 56 � ! D � � w 2 T J � i "' � F / � ' i � ` � 7 � 6Q � TR2 TR2A? i'R�� �� ,� � �. --- - � z % i � �"" i N U� v i q- L 1 � � � 5 � N J i f � �O' �C = �>-- 39N i 57 3 �., �� 2g� Q �� M � � M � � —�� I � TR. 2� � �-� � Q ��� _ � � i �2 � C o �, ��{� 0 ° � 5�l1 jUR� Ft.O.H. 3, i= � 8�1 a� i �� c� � c�. ' � 7 3 ��� � N 1 N � R ��� A5 � FUlURE IR.QoWo � � � �U + i � $ i 29 I .�� i � n �- � �`2��4 � i�n �� 8� 5� a 7 i"' 30 q r^i 3r i � i Q r � J �� �, r3 4 _ „ ' a ! L --277� � L -277G � t � � �'P LI���€�7"�,. �7 � _ ��, �„ � � �� �' E � � 7 � 3 PROP.$ $5 I + --r-T-�-- ---�--�-- --- --,-T---�--- - � � P rn i N � v7 �� � - - - - - - - ; - _ -- -- � - „ - --_�—�—_ :� �ll } 3 5 E � 2 + �° ��tQPi � SS f � � ��� �" S5 � � �1 PfiOP. 8 5 �{ 2 ,q ,_ 6' [;or� . � Cor c.� � ,4 / qs �� 1- �„ _.�_ `� �._�_�_-- ---- � 36 ^._ 34�33 32 31 - � - 5- �--3 — �—_�— . KEEI�S3�15 I 9_ 29 28 _ 2 -- --- •� I � �_ � � � ' 7- `�� , - T _ _ — _ _.,t� � rL � ` _ -- _ ^-� _ � — � � � I�� i � r. �� o�w �_�r�w ��in� n ��ti■ ri �o��orrfl � �� � fY� � L ����i���i 90E �__ 384 � � 1-�,�8 7 I 9 35 i _ � EA5T ROSEQALE STe 0+5� 6�� L-2.3� 7_ �33�97E � o�n� n� � ar�� ���� • � � � . .'�. : �. 1 �� � n �� � �,� . � � — � I� + 5 E� p�� � � I� 7�S m i �i 35 � , ry �� � 33� 39 �. illdl � �I � �r_ � � i � � -, * � I � L -238 7 � C�T �� � � �� L��S��� A Tft�A E ' A ! � BR I 3 4C� � j I 2 3 4 5 6 I� 2 � 4 5 E A B I TFt I B f 2 �, EXIST. SAM. SEWER z � � � TR5AI C� Lm����' � F � �� yS�l��� EX 57 ESAN.ASEW R � Q PRD �. g" $a ' 8 � E1" 4 A P 4�. ' � � � 8' S.� . � 2 � �.�,�1 w 8R2 38 4� `ij � �� PROP. SAN. SEWER TR5A2 I . ; �n �� �� � p `� `� � � REL4CATION i s � � "' �� PR�P. SAN. SEIMER ' 8 7 6 5 X Y Z I � 4` A 4� � 9 C''� � n . 12 II 10 9 8 7 Iq �3 12 !I 10 9 � � �� EXf ST. S SM H q � Z I i � � A B C p � I�7 � �� � REPtAGE EXI 5T. SS�AH I _ �� � PROP. SSMH T � A V� e � � J� G H I J I I L �� �� L-1 I 86 � ^ � 4+ [ 9 L=1 1 c�b � _ i 3+4 I ; �� o------ FUTLIRE R.O.W. � i7+ I 7�_ � ._. �� , � F � a � � �„ il_3+g� N� i � � � ; m� , ��� H ! � ll '� Q� i 6 �— LOPEZGARCI A GFtQUP � Z � N 4� A S 6 t I 2 3 � i � 4 5 I\ � 2 3 4 G F �'`� � d C � 2 I I� � � ; � Q �UiVAWAY AS50C. � i � � �_ \ �/ -� .���� � � � � � �� t � L.p - � �' TEAGIJE NA[.� ,� I � � ! �v � + .'3 f G �� � ? v � � 8[ P�RKI NS ' � 8� _ �J � �� a a U a C� —�t +�3- � �A � i � U �� L ..J � � „ « � � q � TRANSYSTEMS -E I 2F � � G I I H 1 D � p � �- � i�PS , � �� � � r yqd�= � 2 71E � ao 0o B(� g a , i 7 6 s 7 -- �o 9$ o a � �� �ANNEiVBAUAA M lY7 ��i , 1� ° � � q - 3B � � 7B 7A � � I � � � e� 4} � �URNER COLLI E � p � � A� v r r I � i H z � ! a z � ! 6 6 o s � & BRADEN ` _ � N p` v�" _ L 982� �°'� �--l�lo �-l�l� I e a�� s a � wno E a� assoc. I 3�45� 3+ 8 2 E- o o i � � �!+ 0 8� � i a q n 6� o s 6 �� —� I I 1 i I I I I Ir r n N� � � ��+ q'� � � � � � � � F" � � � � � � �� � � , �. � a��' eLL «�; � �a q � �! 4 F ��Y ��� ���� �o. ����� � � � � � � � � � � � � � � � � # W ic ��� ��� { , � Y c� �{��J����3��%�^�A 9� � aQ�• • 6850 Manhattan Blvd 5uite 300 g �- � g g - ��z � : • FoRWortt�,Texas 7b1ZU L } °' � . . . } :x� j (8t 7} q46-1800 "= -"' s�4 �c S�R i�RO.l�Ci Poo. DO� �lo. '�h� . � (8I�1} 44fr1113 Fax ��-. q ` > u�uww i 4. i 4 8 o ti p� ���Gr�/����01 /���� }7��� >-. � � ; � � _ lopt�garciagroup,cnm - — -- —_ s_ C�TY O� �O�'i �+YDRiH, �S WATEl4 AND SANITARY SEWER REHABIL/TATlON COM'RAGT �1'XD07'J ON R05EDALE STREFI' �'ROM U.S HWY. 287 TO I.H. S20 L�►YOUT' - S/�IR1IT�RY S�R R��l�ICI�F.�9��1iS ir,� pqpdEcr C22557.00 s++�r 0 � j ss���: ��o .ao6 '�: a �� a a � a s r � • P --°-- �: �<i ����� L L L L L ::::� 0 o a o � L y ; ti 4 F2�:: 0 o� �_,'- ��� a�5`s �; � �oa�2 -- g g 'a x � °n °y o � a , , � � ` 0. � 's�so y � y gl C W o 6 6 f �LL� os « g � ` « � a o G � � : i �% � 4aLL g�i��$ N;:� � q. S$s�e �n 'd �. w a � � �, � 4 �'�0 L �� II 6 ' C PR�P. s � ss � + � � �lr�P a�s�s --- --- _ _ -- -------- '�1 i � � v ��� H R � I J � AR� 5C 5D 5� - LO������ � ` 2B 3 , - ° 2a72-3s8 . - - - a�`s� —' , _ _ _ _ _ � 5 2o7�-�as _ _- -- 2 \ _ 3 ._ 3B _�A I - - - �------ - � �� ---� -- _ cour�a L oi sT, No. � � 2072-384 c � � 3B 3A � ` -' - - - � , N - _ _ I � _ _5 _ -- _ -� - - - - ZO7Z-�S4 � + � I f ~ ' - - - - - - � 0 z2. 5� �-YY � I� QQMEf�� ,' n r F � � I C/? : � T F— 2C � �d � 9! ��_ � ��� MAPSCO 781ul� 79.! � � + ! - �' Q20 T•� �, � � : � z ��E o �ti �* � aE � � �..� Y � �+�5� � � ��n I I � V cD � q Q� �� �,� 5 � O � ��� � �} i � rn r� r � -1 r _ ,�, �� 2 EJ � g OI R T �_ P f� M �i _ `< H � a '� � V' � n � 3 Q � Cp =� � u nl C° .�� C�' i ��.� , � � � ; 4 �v � � `� �`K ' !_ 18 �- - _I c� ,� �n I 8' 5 � � � - � O �v�,l � `N 23'' � S � � O J � � ���:� 6 ��TUR� -�o.�.a����- � � T � � � � � _ � � . � � �, � � � 41�,� 7 �� ) y q . �. � '�, �' L � ;�, � � o � �" � O g � ?-- = i 'f } � �OP. $" S r � J W �� �'� �� Z J% x G 1 C7 L� �� . �� _ �I �� � ��a ,�s z PR�P. �d"�� E F G H!� o _ �• Ie Q �� 3A 3B 3C 3� � A B = fl- � a�[r - -- F ' 60� � � ____� . �—_-..__��.-- —�---'—'�-- � m ����.. �� � ��.�o �n����� � o n a i �t6 L -2388 � ��I � _�r.,, � Q+ 8 6 0 � � i� o �F � l 3}$ L����� ' � f � � l. E�� ft 1[ i ,... , P�(c�. �° s,. L 1 I�� ,�. . in �-- � - • -- � �� �- � � �� EXf ST. SAN. 5EWER � �R ��� � � � 2 � ���f REMpVE/ABANQON 2 2 3 4 5 6 �� � EXI ST. 5AN. SFWER = 3 �� � � � + , PROP. SAN. SEWER � RELOCATf ON �� PROP. SAN. SEW�R � A4 B� � � -a 26+SF F .� - � EXl ST. SSMH ! � � � REPLACE EXI ST. SSMH I nI `�� � 5A � � � PROP. SSMH � � � �B � � � ---- FUTURE R.o.w. i,.� � � o ! I IQ 9 8 � � 6 �-�--w� LQPEZGARCI A GROUP E F � R � ❑UNAWAY ASSOC. 18' 7 �� TEAGIJE NALL ��� 1 H L 1 7 � r & PERKINS 4+23E _ Y __ _�'J J f — TRANSYST�M5 � a ➢ pANNENBAi1M �� �� 6A N � G A 5A 5B � 9A n TURN�,R COLLIE 6B N � & aR,aoE€� gB � WADE & A550C. Q� 6C tu � — � , .. ... IOA � , �� a � � � � 4c 4D 4� SEW�R BASE MaP Na. 2072-384, I � ' � � 2072-388 � �� � � - --- -�- � � 6� � � I � 3 � 4 I L����� N . �° ��' o � PR4P. 8" 5s � � C� d O� TR2 � 1��25�9 -' � O � _ � '� �� r�� �„ �, � �� � � � � � _ ,� , �` 2 FUTURE R.o.w. L�239� � C� 2 ��' �, PROP. �" S I � � o i � 3 2 3 ��2�2� 2A J� i PRQP. 8" SS ' � 23'._ � � � -_---- --- -- °O � I —�"---- �i -------.--^_.'_.�.� - o,i� �o �ij � �i��o � . � �__--� ----- � � � -2,388 � 0+52 �/��%1���� 3+02E � yL2 � { �+06 i gz' L_��g� 6+31 � �+78E �o %_ � � a1 � I I� f � �� Q = '_ ������ WII _ �o� � � � —I . � � �� �f��P� �" 55 � `9 I� I' I 75 S 7 6 5� I- �' �����I 4 8 iR4�` �n� � 0 � � � 2 � i s�� �' P R C� P. 8�' S� i - � � � I � � � � ' r _ >- � �� � � J � � �-� � a �o � � �' � � -2g���� _ z �E J I { � L� 2 � 2 � �' E �� � � 0}53E ��' �- *� 23�- � 14 `� I Lr-� z � � � `1 � =v' w� '�-'q���l � o CCf�C, ���� � � I TR2C .v TR2 ��� J � i � m J� � �� ,� 20' � I ,� ,� c�l = 5 3 I)P. " + � � I I I I d 9 8 7r 6 I 5 4� Z � j:CJ 4 �f � H B C'� r^ n '-��SE � � ; r] 5a' a� ` � 6 C v�j � � r A;� � I I � � I 3 _I � I �� o=� i i � z �� - ��`�'���_o ��- � 4���� L-423� ��7+ � 8� � V � r . Rl�gR,-g � � � i, i —I � ' � � j �� � � 2 � CL Y ; i � m °� o � � � a � I 3 �I 15 I 17 IS 19 20 21 22 2 ±I � CU�� + I 2 3 4 5� E � ti � �' A � i _ _, _� �.?94b -� �, � � � � � � 3 ��; 3� Q � o �, - MnR F i s �o�� � I� i C � - - -- --- � � 5 0+53 7�+��5 - 2+��8E a Q� � G� q � 9 � � i I � I 14 � 2 l l 10 9 8�7 5 � 5 ,� a � � la � �k � � � � 6� 6 � 7 2 0' _ �-�. t- r � � I -� ��i�� � 269+82 AVEe - H 7+27 �—� �L IJ h� 2 �5� ,,� � 0 2 I � � �� � �� I � 3 � � u� °D� �' � 3 15 16 1 7 I S 1 9 20 21 22 2 + 2 � z��_ ,� 2 �- q � �� �.._.., i n Q � � L-� 9-� 7 � � _ � � I N r (-l� _� ���1 ���.Y � ok,� v�A� �o.��cr �o. �C/�L� -.,._. - .- � i� � � � � � � � t ,� � �? �3 �! � ��z ����6053017�10 ���zau' µ {��_�`������-'�°.��- 6B50ManhatranBlvd.Suite300 ,t,. .,...._,._: �,;.. � Fort Worth, Texas 76120 s�4 M�c �' I8177 44b-180a oa�wm S�fd PROJECi ['�o. 90E l�o. 9' f:'"`r `{ � (817j 44Cri 113 Fax ��,� i��Vr�ll! 0��01��/ �� ���� � = �' ' � !O��Z�dfffll]fS;L117.COf71 Ct3Y O�r FrOR'T 1MDR�r , �S WATER ANI} SANlTARY SEWER REHABILITATION CONTf�4CT (TXDQTJ ON ROSEDALE STREE!" �ROM U.S. HWY. 287 TO I.H. 820 L�1�QY 1 � SNl��M71I aSCY�i�R �iGrlJIRrFG���,s LGC PROJECT k C22557.00 SHE£T � qF O �N��, . ., . .-- --� -- - . _ _ N u � ` � r '— V ' � �� �C� _ I 3 I I , � o �.� d � r & p R � � � 43 � '` '�` '� :� - � — — �O�AYIOIV _ --- � o�: �9, r� r� *' I+ 4 7 � o N i z cn i 2 a z � � � . � a � 0 � GO p IA g I 0. �f � COIiNCI L DI ST. NQ. g � `� ' Q� O O Y I 2�r a � �O1 ' N(V , I I A � � MAF'5C0 79J—K B � � I , —� �60 I 1$ � {) �` e > � `� P"r SEWER BASE MAP N0. 20T2-38q, � �l i 2078-384 � s ��TR3 TR4 I TR5 7R7 5RA �1 � � � � � �A � � 6 i �7 ��xa � r� ` 14C .—� �� I I � �oj w� $ �� �3CI�oo � � � � ' FLl�URf R.O,Y�. (� � �� � 3 N� O� �U I ao �� � �' � �V a ' � I�z I TF�'q y ' / � � 1 � ����7 � L ���� O , �� o S �� 5���-� � 4� � — �� � -Q P � �ROP. 8" SS � PROP. �" SS � �--� � � , �r & ��, p � � � � � � QRA � � I - � ��3 I �� � 22C, � ��f'��' pq�, �.�_1Ti I�iE R. . VC ; � �2+ � --• � �� — * ---�----------_--- --------- ---------r------aO �---�._..—._ q OP. "S �,����^� /�/C a � � � � � o _ _. ` � . �. � p � � : : o - ]� ��390' . ,,. � L -2390 " __ � � � , �I NF '� � o : : : : 9+oa e, � -2 3.90 �° ' --_._ �"° - - � 3 + � 5 � ~ P�o�. ��� ss � ; s . ��� - . iu � i �� � i � � � � �.� - r'+�4 i �+1U i . T�° � � :gg:g �� � �i � `. '�� � -, z�y � o �, i � � i �7 42 ~`—� � ����� �� 33 n � � � 2 � �� a*�o ' 4����°��EAST R�SE �-� ~~�� � �"�` � ���� � `� i ��" . a�L sr g���g R6A � a � � 2 �� 9 8 7 6 5 4 3 2 �, ���4� � . . . . � � PROP. � ` SS � � sss�s z � � � I _�_ _ � � �a -rRi � B ' ����� L -534.3 � � � �� � � � � J � �31 � � TR2 � - ---- - - - --� � n �`---- � ��/� � 2� g g g � �'� � I A B C D 6�� ^F G�H I ���7��� �`if'i � �-���a : �UD � - E G �,.� � � tO A V E o G ; �. � Exi s r. saN. s�w�� � �'29 TR6B � � � ��� REMOVE/ABAN�ON ' I � � � 1 �o���� � ` 6 E X 1 5 T. S A i U. S E W E R o� � �2� I � B � �ROP, �" S$ � ✓ � o L�l ' � . � � r, � f'ROP. SAN. SEWER � � � �27 � � � 1 � a � G� Q � � + � R�LOCATION a� � � � A � � � P I � � ✓ U � PROP. SAN. SEWER � �26 � :� � ` j 1 � v — � � � � � P A � G P�� v� �� I �- REPLACESEXI ST. SSMH �� �Qz� � z� � �9 4 r,� ' �,P m A `� � a24 TR7B p," � e � , � PRQP.55�iH �� � D CO���N ST. Q� 4 � ���a. �' .�_.-- FUTURE R.Q.�r. �� � �9 � 4 � 6 �� � A Y''s� 8 t� � �� � n � � 0 I 7+ I � I cn �� � LOPEZGARCI A GRQL1P � — s;. � 23 TR8 R � i �� __ 7�. � 2 � �l1NAWAY A550C. �� �'_ � 3— 9 0� 22 ,, ,, CALUMET STo o � ��'9 ' � 0 3 TEAGU� NALL � ��a � TR8 TRiO L G�LG I CALUMET --� ��fl —�- 9 $� PERKINS � �y W v � � � I I � 40 � {�" Canc, ��nc. L � — � 4 " � W K : p ' � Q 6�� � 2 I TR I I o ��f' �r' �+ � 2 �� --- -- 1 6 8+ 8 9� �� TRANSYSTEMS � 8 Conce � o � � � j zo `� � JO�IN,V 1 L � � �� L -I �y26c, ' �o °o ,� � P�u� dANNENBAUM • � °� �"s g� � I� 3 4 5 � � � 8 � iv-� � i w I I B � A �� � � '� 6 6 6` � ZR I 2 2 {P � �' ' N a0 -� � 2 3 4 I 2 3F' — � TURNER CQLLIE °� = 6 6 a� � I� _� � 2 � 7 Z � ; I� I� Q � � I 2 Q7 2 --— & BRAQEM �� a� a�`s � I S Q T R I I A iR I 3 TR I I T R T R T R �� I�� "� 3� � I I 6 � � � ; N N I �� 3 �n 3 n C1 �°� w A D E & A 5 5 Q C. �° ', > � :-. - 10 IOAIOC I � � 14 I1 s��ss —�- I e��� }LL�«4 ��� �i , � � g 4 W u�rE W/8� PROJ�CT ii1o. S(;/E1�L� _ i, Q � �.� � � � e`i � ,� � � � � � CIT`Y O� �OiY �idO�iTH �S LCC PROJEC7 ' 4 ���� ��� � � C22557.00 � 6 d� N �� ���Q���.�7�.�� �a^��, fr85UMa�hattanBlvd.,5uite30D WATER AND• 5AN17'ARY SEWER REHABILlTATION sH�T g �$ d - Fort Worth, 7'exas 761 ZO CDNTRACT (TXD07J ON RQSEDALE STREET }. q m ��; '., :, �$1 ���$� FROM U.S. HWY. 287 TO I.hr 820 6 = o n 6 s go�a,ny� $� �Q%�� �O. ��� �1D. (81 n 4-0fr9113 Fd% C1F � � � � T � ����i0��8���/�0 �6�� - ■ ' lopezgarciaqroup.com �vou� - swn��r�a�r s�a ����ac��u�r�s s l Ng��� - - ��� 6� � c.� c� r+ c c u 2 � � � A tf (; U t I- Ci H -' � Q �" I��.;! (. i � I T V o i —. `� o� �o _ �� A � s z�, �I w _ LB��1ilA� ti , � : 200 � i �, _ o 1 , L� � � �a 2x F 9T�2E S�' �� L-J � C� �,� I �' `� � E cauNci� ois�r.No. 5 � 6 n �w 2� ��, -• �� , A C vi� " � 9 z � �- �- I 3� 7 I � P, Ct- �, 5 � f 8` � ° Q � � vI i t �- _ �1APSC0 79�(�L � a ��I 2M1 I J V: �� C� I J � 0 I 5 � AR zN w w � a i*r� t�l 1 J � � i H G F E 5C�' � �— 3 2 � e � � �� � 9� � 20 K z� p Jp,� � 5�� �- � SEWER BAS� MAP tVO. 2078-384 � � ��� I 7 I 8 �i p�, BR I a + � � i i 1—, �- d � j FUTiJRE R.O.W. �I � � cn � v U � J = NDLEY � I I I �� �' 3 � 3 � , . �� � A � 5*5� 19A n - H � p� � �� N C D E F G H M �� �� 3 6 g -�.f �--� � + 8 a' � A D � Ili L-261! ;* L-Z�I I 18= �� � �A�L� � �, .. �nc, _ �— � �7 8Q+C0 � S ��r� I 4R ���n � � 14+92E T�XA � PAG � 1 � � � R,4 / ,40 � � � N��� � . ---=' � � `~� � �` � ° �`S`' �j�� � � : : : o : � � ' O � F�ITfJRE R.OaW. Q�� � �� I I � oo � l�,� �° � � * � A 1 I � ' � � � t � � o ��� ' � _ Cj �ROPQ 8" 55 � � a � :�.:: � _ � T ` � 15A � � ~~~� � � � , ����� �� � — y Q � � �;w _ 1 � a o . : o � '�'''_ - � , ���g� 'n�0 � � ;7t� . �_� � � _ °O_ � � r��� i : : : Yril � ^1 ' � 2 �` 4 � -� � - � _ ! ri � (� e 1� o° o° � °n n � �j I ` V � � � � � � � � f � � � . . - � � — � �7 t �1 O � � oob4g " �C1�' �' - - - � } a . � �s � � � g�... � � L���N� � c� � _ EA�! ROS� � : � p, � 3 4 � q� ����,�� _ , � � E ��o�. � ss � � D Sr 1 EXI ST. SAN. S�WER 5 7 25 � � � �� � _ s 26 27 ��.��, . �� j�j'�f R�MOVE/ABAUDON � � � i�+�i 3� �` ~ ~ - L-`3�8� 8R a I 0 I I �� 7� � � � ! EX I 5T. $AN. $�WER p P I R U 1 � * (� y � • � _ _ _ I 2 3 _ _ ' � 4 + Q S � � � �f � z a I3 �q 15 16 � ���`___ _- __ - ����„ .�6. _e f■� � n q ��� PROP. 5AN. 5EWER Q 1 7 � � ■ RELOCAiION � �� � � � g 2B 29 l �t0�7 Y 5 6 g ' �->, :�.�"� � PROP. SAN. SEWER � f 30 20 � � 22 z3 24 2 3 4 d� I� i� ""r � � EXIST. ss�nH MACq�TH�R pRa �� — z 8 � � �� ' � Z � �}'� v � � ��� REPtACE �XI5T.SSMH JIAN C7o 1 L ,,, � � d � PROP. SSMH I 6 � � 27 I � �g� S � A 5 5F2 � 9 ; ; �� �.Ll � 3 q 5 � � ; - � / � o � ; �� ---- FL]TUR� R.O.W. � V� 7 I �/� i,,z, �,n U _ �. _ 3 8 � 0 ,�f � � 2 � 3 I 4 � O � 2 _�j S ` I I 9 � � io � f i— 18 � 26 i i c� 29� f�+73� _ 4! �� � i� - 18 � � � � i+18 �� i� i i N a 16 '�� � Ir ____ - __-- _ ____ � 17 '� � �^ `Y 15 16 d � � — LOPEZGARCI A GROIJP � � �— I 9 25 � i � 301— � 7 � $ I g �p ~ ' ' � � s �� i-19 . i �_ �,� 21 �2 2� 24 - _ -��"--- J�+ p 13 14 � s„ � - DUNAWAY ASSOC. f 20 I 3 � i 20 � 2 3�� ��_� 3 w 25 �6 �7 28 29 3D , I 0 �� I Z ,R -' �� 3 �� N _ TEAGUE NALL '- � 2 � I 2 � 2 I I I ', � � A! IVINR 1 �H T � — g �' " ���� � & PERK�NS i � � ��� v I 4 Rp 7 8+ 3� -- - e s a I I r, 22 O � � � z . _ � I 2 �_� e f — TRANSYST�MS � �Z2 �+ � p Q' � a I 5 3 4 5 � ' 5 � a � a d�� � ❑ A N I� E N B A U M i n 2 3 a � p I� v- 23 �r � i �" - L `� 8� 7 B�g I 0 � � � 3 4 8� � 2 I F� �y � ':Sqa � —�� i 3 � 24 I 9� i�� �� I C�J I�+� _-- r,� 13 !4 IS � Z L� ` 2Q � � � �_ = g� a� � TLIRNER COLLIE i�24 � 9 � 8 J i i C7 I 7 � I 6� 5 ~�- - _ ` � 9 � o� N e o � & BRADEN i I 25 I �. � � � 7 � 8 I 9 2a � r 3 �� ~~ - - � ~ ~ J I 7 I 8 i�r; � a o a`S a � WADE & AS50C. .� 25 8 ; CQ I S �n 2 I 22 23 ~� ' — -- 7���' f I 4^ I 5 �� � �� 7 � � r � sq�s� � �� �� I , , 2 s � I(', �; — � i - . z 4 2� z6 �� ..., s' J � � �Z �3 0�€6: i �� ���� • , " a $ � " ow'� �Ai�cR �IOJ�Gi �IEo. .���L� � Q i� � � �i .a► � � � �► � � � � #� CiTY O� �O� WORiFi, T�X�65 � C2255T.W T ! �� p�� ���� ���� �v � � 685� ManhatEan Bfvd. suite 30o WATFR ANO SANIT'.4RY S�iNER REHA8ILlTA7'/ON � d � s � ��� ��53—�0�30ii�10 ��=aa4' . _ ` . SHEET Forc wonn.7exas 7fi120 conir�cr s�'= ' . (TXDOTJ ON ROSEDAL� STREET `;}�" ... (ei�)aa6-7aoo FROM U.S. HW1! 287 TO I.H. 820 � ""' c= ��''�'�rc S��R F'ROJ�C`I' Alo. ��� iYo. (877j 446�1 i 13 Fax aw d � S 4 i ���p � � � $ � : �H P���--Oi���01�5�'�� 3��� � - . - �.vavrr - sa����Y s�� ���►c���rr�s g 3 a � � ; � lo��zgarciagroup.com "s o � � ,_ � - — - - ' , � --- . _ -- � � W ��OSF��AN� � `' STo � 1OI'' �'1 �' Q,V '° �__�_ ���° -- -- - — - _ . � � � L�C��I�RN 3 � ('y� ` C. , 1 [Q 00 n � r � CC7 `-Ll � � I A (� V M I'� _ . _ _ _ l �I l . �� , �1� I I v , 4� 3� � � � 1 00 Q � COUNC) L DI ST. N0. 5 5 N a� � 6 � I I � 0 �l MAPSCO ; � 7 s�� � �q ��ROAD N N.l 3a � 7sL-►� w �-� . - � � � s \� PA� �� f C J I ` 4 38 1� 2 I SEWER BASE MAP N0. 2478-3�4. $ �� x� � I 2 3 q t O� 2084-3�4 T� S � i� ie ic� � �0+28 � V n ' o � �-,3 �; � ��-IART� S Ce IR TR �� � �"' i - ' � �� ,�29: � � i3 ��E- �o+oo--i.---- s.. - N �'iayia= 1 �. ,\,�: + � � � � 2 -� �*46 � � � G �� 0 1 2 � V � �� � �QN H/�RT ��a �� - �,P ; �� � � P� �o �,,, � o II� n � - 32.�6 � � �b � � � p. ��� � � � , � , - � � � � 1� - ,, . 4 Q� �� � _ � � ; � 78�42 6,� � 5+00 � 7+46E � v 1 O o 3' ��' j o �-� P § a� o o � � I I —� � � I �R. 2fSA \ � �n _ _ _ "' � I ' I I ! o� ° � � �� � � � 2�70E14 i � . . . � � �' � ` [,'� � � � � � � O ` 5 � S� °���� � �O� i A JJ IA `p o � � [5 C 5R �L ,32� � $ � � � e � � � � �10 � �I � � E6 w`� 16 %�OOE 98 6" 9A & g: g g ' I I'� � ��� 7R3 ! [, I _f € li �- # o s o �� � E i (3 TR3A i �° I J � '. 7� I I 7 I OB I C I �SoBS �� � I O O� � V`a �` I � g� ti IS �= � � � O o : � � ,�nn-� i7� I 16 �1 � g � < < < � � � ; �, �� � ��.� P � � ���� � ��- ,��° 2 � 8 T 2 � € � F 0 R T � LE�EN� � a � i � PROP. �r'' S5 �ROP. �" SS � � � � i �'-- � I 2} I 6 EXI ST. SAN. SEWER � � ° ' � 73+53 G9�95 � � �.--n, : � � q 3 ��'�"—� �� L- �f R�MaV�/ABAN�ON � � �� J — — — — — — — � ���— — — — � � ` � i B q �XI SL SAN. 5EWER � o � � � � 5 �p� ; � � o � � PRQP, SAN. SEWER �. __ ��� � RELOCATION q��82 1+63 + � EAST R05EDALE STo ���� �-68�J�i q+29 L-5856 6" ayg5 ��P $��� 4T5gE � pROP.sAN.SEWER ��il ._ � 67 97 C5+78` � ! Q \`` Q � � � � `\\\�\��t\\\\.�.�f�51tii��������� ♦♦ ���\\\� ��{'�i� � EXEST.SSMH � I I R�� p` 1{�'� ¢� � M_' 8� �� ��_ �— REPLACE EXI S7. SSMH I �� Z i 3� � i C qZq ' 2 �� 6 � d. _—�� PEtDP. ssrn� C o 7 � ��� 3 \ L��G�� �� �.` 12R x�s �/�1, I�1 � 362 � f �+7D 1' ---- FllTIJRE R.O.W. � rPR��o $" 5S g O. I 3 I I R � b J f � � T � a q _ � I 4 l OR � � H g� ,� — LOPEZGARCI A GiiOUP �'^ � g KR � I R 1, I I D DUNAWAY ASSOC. "=� 0 5 7 � I 5 9 R M ' � `� -�, � s � �v � JR `�` L R � pC � � w - a q_ M Q G $ R q�q t I I �� T�AGUE iVAL� � � o �, ° 6 6 !6 � MR �q � �,� C I R. ! � _ .. & PERKIN5 45+85 '! �� 6� a � ! R � 4� I 7 7 R v � R I 2 R I�� � = f r� � 2 a�_ T R A N S Y S 7� M S 0 0=< a � 7 4 � I g ��, � FER NR i �� I I R �'�] r'r� co 5�+� $ 5 I R � E�' � I f 3� 4� 7 2� ---� aANNENBAl1M ' -�ad� N���: � 8 � GR 0 � I OR I 4 ��' ' f 5R I�R 7 TLfRiVER CdLLI E �ssa� 5 {�. CO 0 o a� q r 2 3 �x4 �R OR I� 9R 15R p O \ { I 8R , & BRADEN 0 3 WADE & AS50C. `5�=ss 1 • - • - _. I I � . �.. \9- � ��., � N , �4R ` '� o��� 04 � 4 �. � P � � � � � � I A � � � L� � Cl��' Og �rORi �MO�H. �X�►S Lcc �oJ�C7 k � ° " � � � i9R�,Y 16�dE9T�R �OJ�CY fVEo. ��+%�L� czz5sz.ac 1 � d�� LL ��� ��� ��Z ��, ���������� y� � Z�, 1� z�-. 6850 Man�attan B[�d� 5uite 3oD WATFR AND- SANITARY SFWER REHABIL?AT/O1V sH�er FortWorth,�'exas 76720 �'� � ,� ;., � CONTR,4CT (T'XDQ7] ON ROSEDALE STREE7 g'� q� �1���� FRQM U.S. HWY. 287 7'O I.H. 820 � d� o"'a u�w�taa 5E1RII�R �FiQI�C'� f�1o. �O� F+dO. . 1• _,_ ., :. 617}44Cr1113Fax a� � � � � � � �S��i���A17�7�0 ��C►2 - m ,- ' L�YOU�' — SAF4�1�'qRY SEW�Fi R��L�C@M�FliS 8 I � t d m , spezgarciagroup.com ; . ' . - ' � —_. -, -, , • -. _ , . . . . — - -- - ' — — � i� -- - -- - . . . . �.�� _ 5 S �'�� � �'� � d � ;d� a�- a 6 4 t 0 �"3: ...��L �g�£� €€��� L i L L � : 5 : : : o�s`ss 0000s : 4 � L L L ::::: a s � ao" 0��9 o ,-� 9 a 6 a .'. 9`==0� 0 ;sa6� Nd �.x "S6A$ 0 ��$> 0. a o £] 6 � � o S e " � � g � � w � 4 � € �—iP,�.� ;e a S � .�$a %�_ asg°�o } � � � � ���m,_ � � � 0 o� o N A �� � I 8'_ � � � � ,� 2E CQ 7 22 � �� B -I � U t'�J {� C3 — � — — _� � � � —�---� , �— A I � L� a o ����� � / � � � LI � !� E� R����a L E s T ����� � I � � � � � � � � � � � � AR TR3D TR�A � TRSA 5 � � 1' � , ` �� � r.�GP � J TR9A ' �-I � 8" W L I R�� � PROPe �" i� ` 1 � � �+ � �� �' i� i _, �O��T��� � r + �� � i 5 YCAMORE PARK + �� � couNci � n� s�, No. $ i ----� r + � � i � � MAPSCO 77�1.78J � + i i TR�2 I � � + � � i � WAiER BASE I�AP iVO. 2060-3�4 � i i � e � � � I — _ .� �� � r, � i �. � � � ' i � �� i r : i � � �F a � i � � r �; 5 8 : � � � � � � � V u i i � � i — � i� i � �� Z�Jn ���1 � � ` TR40 � = U � a � i i ('. I ' ti = � �� � � �,�.1 . ���1 � i s i i i (' � !-- � I D O' � � � ° � � �IN� „F � ; _LIN� G � ��'v � �.. � P�o�o e w ,� � P�o�. ��� � �,� � z �� � �� . , Po _ U _ �� � ���� � i i� i� 4 ���� � L��i� � c� � �,. � ' � P�20�. 6" N' �� u� .� . � cv PROP. �" W PRQP. 24" 41P �, � �' � ; � ;�_`_-_ � i � � t�� � � I 4' � 2 � � 1�� �� 3 � I 9 � 3 �ROF'a �" W y` � 4 �J 13� � TR3 � � ryu MORPHY ST. c ��o• 7 $ 4 10 II s �. � ew� ��� ���� �2 e�. �rc CiGrwTi PRH �_ . ----�-- — — -- ,"� - �3 2 _ i � � 5 Q u � ��' �4Q � , � � f U 7 � io J 7 i � T $ I �o �� 9 �'� 8 z3o� ��� I a -� � I �� 15 � � ` 2 � � 5Q� 2 ' I �u B � 3 � � � � � � 3 5�� RS�I � 4 I I 1 4 ❑ I� D � 5 ^� E I g' 5 =C {J � U Q� �� ' 9 _ I 6 I J F A V P �$ H. •;�i 7 —�� � a��,�k t � H . f _ I t � _ f _ ' � � �� 3 C2�!-OL � � _ �� 1 � �� �� � aa�� .��.�_��� �� - 9 � {/� I� �� i I I 1 7 i l I I-�'� L � ' � 5a7 Y+ o�l I 5 f 2 � I 4. 5' 2 I I 2 l 9' � ` � ' � • � ----� �� I 2 I I I 0 Q �'"� 14 � 3R � 14 3 � � p a I 3 �/� I 9' � t o J� � �� -� � �'� I 3 4 9 4D�`� � � � 9 I �L � n rl � T en� � � �J � � >� �� ,� ii� �� �-� � � Q,� �. — $<v� 5 � 4 I 3 I 4 I 5 I 6' � 4 0' � 6 � I I � � 7 f $z`• � � � 6� �, ' • j� � I 7 � IQ 7 �j � � �� � � � � � °� � � $ � � 9,� ' V � 2R � �a � �z � f �� g $ 7 6 5 �i �n _ rF _�� 9�� a � , � � � � ��C��Il�� � � � _ M' � � A � EXI 57. WATER � � �� 'ti �3c?' 15 Is I7 !8 � 20 � �C� TR5A N �� EX1��T.�YPA ER04N �� I � I ` � � �IO2C-�CG� ; , � � � � � � � PROP. WA7ER � ILQOP CONNEGTION) --- 7 1 s � • e � �� PROP. WATER � TRSA �L � 10 9 8 7 6 5 � � � � � EXI ST. FI RE WYDRANT i � � � � e i � � � 3��� i i `, I 4 I 5� I 6 I 7 I 8 I I 9� 20f PROP. FI RE HYDRANT � > _ _ _ . . ' _ _ —� vva�� �o.i�cr wo. SCI�L� ! �, � � � � � .� � � ! A► � � t� U P �V���053�17�90 r=zo� �-• . 685U Manhattan Blvd, s�,�t� 300 Fart Worth, Texas 76t20 �� (817) 44Cr1800 SEiA��i P�OJ�C� {VEo. q0� iWo. (817? A4G-1113 Fax �����%���v�i% 3%�� `���2 ' Iq�ezgarc�agreup.corn � C, 1' �� �OR� �Q��r 1 G/�faaS 4GC PPOJEC7 I C22557.0o i WATER AND SAN�ITARY 5FWER ►4EHABILITATION sH�' CONTR4CT (TXDO7% ON ROSFOALE STREET ,� � FROM U.5 HW}! 287 TO l.H. 82Q OF � - — t�►You-r - v�ar�R ����ac���nrrs � � � ,; . . . - � - : � ��,� . --. _ _ � � o o � `� LOCA�IQIV H ��� � I 2� 3 I 4 5� 6� 7 8 I 9 � M � S�HODL � 5 4 3 2 1 + 6 5+ 4 3 2 I ,— -- -- �o; � I _ __ I f I � � � 21 � d � . � � � � —� � � 6� � �� � R TR 5 � ��. COUNCI L 0! 5i. N0. 5 � r � � -� 22 20 I 9 I 8 I 7_ I 5 I 4 p p . I� 12 � Q � � � Nf I N CV �.. 7 8 9 E 0 I f�p �7 _ I 9 I Q I f I 2.� ' MAF'SCO 7��-�C � = � - �� } i � � _� `�l _ � � I r 4 � � , I f I� �; A V E o p �•, � _ ! �- WATER 8A5E MAP iVO, 2060-384. � � � POL Y TECNN 1 C "� � �� I � _ � 2066-384 a ��� S R. H 1 G H f i c. i o �' 1�9 O � � � i^ — ._ —�. .^_ �� �� S C H D O L� � I 2 3 q 5 5 7 8 9 i d i� " "`� � `� y � t°� POL Y7�ECHN1 C � P� � �� T R 4 0 R a' i g� E , I 2 3 4 5 6 7 G = 6 5 4 3 2 I � � P � � 7 _ i ( , �` EL EM SHCOOL _� � .�_ 6 a' � � � r � ' � � �� � � 8 � I 4 � � � 3 .-� Gc�1, �� � � z 22 0 2p !9 IS 17 � 15 14 I� 9 _ � V �� O o �� � � � NI m 18 l7 16 IS 14 I� Q i I L � 7- s �f] I I - O � � � ` � � �� � � a � �� E � r., , PO i � � , -� - I G ��. �+ i � i 3$� i 7g S5, . o Q � �,� � � I - -�; - ; ; I � � ----------- � i I - i� AV�. � w - 2 ,--------�-.--�_: ��- � r � � � } 4 j , � �� � � � � � � e::e: � � r �� I� � , T : : : : ' I 2 3 4 $ 6 7 $ 9 I Q .�. �-- � .'rD� �_ -�� �tiIETER � � � � L` t` L � � _ I 2 3 4 5 6 7 S 9 � 0 I I 5 4 3 2 I 6 5 4 3 2 1 FL i � ' g o g � g � � �„ � i 0' � � R m C �} � � i � ��n ! �'� — _ � I ^ , � I� _� rVL �C.1� �. �, i�� 1 ����� �� '_ � cv i� � � � � � � yJ � ��- n � �' � o a g o � �: 22 21 20 19 IS 17 f6 15 14 I� f2 �2 21 20 !9 18 17 16 1I �4 13 12 7 q I I 12 7 8 9 10 I 1 12 i i a ; : : : � U , � 1 1 $ � ! ° a � � � Ea ROS�bALE S�o � 8'' ' r --- ' � � � � _ _ _ _ _ � � � J � - -- � ; .. _ . : Ea RflSE�ALE ST4 � � 1 : e � �------ . - . � , . � .. . _ � � ,� � � - . - �� �;� �..�I j c� g � 8 7 6 5 0 3 2 I I 2 I I I 0 m� 8 7 £ 5 4� 2 I � c/� �� 4 R � 3 2 I o I�� --� �� 8- � i_ 4 2. 5` _� I' p or..� � � � - � I�� w 1 0 9 8 6 5 4 3 I Q S 5 4 3 2 I � � I 8 7 6 5 4 3 2 I N- 8 a - � J .� � � i ,'� � J � � N � I J � � ; � � � 7 � G — � � �� 7 I 8 I 9 2[ 22 2� 2q I 3 I 4 I 5 I 6 I 7 I e I 9 . 21 22 2� 2q t_zi_� J � ��� -�� �E �� � ' � ol � � 12 13 14 15 16 17 0 19 20 2f Q 7 8 9- II !2 � 9 lD II J � �� � � C°¢ �p `�� � U �0 2 2 � N z 7 8 I 2� 9 I 0 � I 2 I 3 I 9 N I 6 a 9 �� � � - - � I�. '� _ � �f F— �--� � � i � !� Q �� !— i ' +� � — � .� �, 6"- AV�-o C� r o�� } + AVE. G � � 6' � ! I �.i �d, � i � � - � I � �$ 7 6 4 3 2 I 12 I I ]0 9 S 7 6 5 4 3 2� I I I 10 9 8 7 6 5 4 3 2 I �� / 6 5 43f 2 - 8��4 4 3 2 � 8 7� G � I n � h� i I` R q �� � — 1�= 1 ° -� � �- � �'�' � --� � �'°' r � , � I � ��C��IV� ' � �7 �� � � - a� J ! � -- J � - � v � ��, � � � __ _._... . . . � EXI ST. WATER � � ��1 I� 2Q 2 I 22 23 24 _ I 3 I 4 I S { 6 I 7 I 8 I 9 _ 2 I 22 2� �� I 2 I 3 i 4 f 5 I 6 17 I 9 20 2 I 22 � �— � �� �g � r� 24 7 B 9 I 1 12 7 8 9 IO' I I 9 IC � M � , c.,� i �� NI �� � � REMOVE/A6ANbON n� a ., e .... - � �� EXEST. WATEFi � o �P n �I � a�" � � _ �� � I I I ' I 1 —I — 1 — — � . � . � PROP. war�R � 4 � 6° A V E. F�I � � (LOOP L'ONNECTI ON) � o��� � _ � � " • d � � 0 -� �-� �-� � �" � = ` � � � PR�P. WATER � A�� a� o s 7 6 S q 3 2 l I 2 I I I p 9 8 7 6 5 4 3��� 7 6 5� q 3 2 I 9 � : 9 s � ��$a$ � I I ��� 5 5 4 3 2 I 6 5 Q 3 2 I S � EXl ST. FI RE HYQFtANT I � �¢ ' � &'' I I 5 � c�D � - 24" �o -� r" C� - � 7 — � � a e� a � � � � � I I '' � � P R � P. F l R E H Y D R A N T s � I 1�. � I� I_ � f I I��N ��� :��� f � i f f� i r.� � i� .. i�._ � � � �,.,.d4 7 1 8 1 9 2 0 2 2 2 3 2 9 1 3 1 4 1 5 1 6 I� 1 8 1 9 2 d 2� 2� i� �� i� � �n �i �� 7 a o in __ � A �1 �ni �� __." ._p s��^�s --,� ���m - — e '� '� � ` ���.. _ . S S f"' ��s��� 6��� 6 d� I�4:C � I� ��� F� � C� O� �OR� i�iORTH� �.S LCC PROJEC7 '. s� 4� s �v 16VA'�� �OJECi A1o. R _='�� ��� ���� ��� ��������3a�7�g�� �._a�, s�� 6850 Manhattan BEvd, 5uite 30o WATER A/VD 5ANI7"ARY SE{NER REHABILlTATION c��� 0. 2 n s 8 y y� S - ��.. • ,. R FortlNorti�,Texas 7G120 i CONTRACT (TXD07] ON ROSEDALF STREET : "' '- ' $��' "'� 5��3 �ROJ�Ci No. ' � `� ' � (s��}��� FROM U.S. HWY. 287 TO I.H. 820 � � : � ` ��+ �0� �O• '' _,,_; . (817j 44fr-1113 F�X OP � g g d � ---- - �N �5��--�i��8�1����� 3��� _ - --i_--- �. - ' ' - -- — �. _._ -. �aYotn° d r�v�►�� R�p�.c��u�n�s g I M � t � � � ,:c4 ,'� � �p�zgatti�qtoup.�am NW . , , . . . . . . . . . . . . . 5 d ��� � __ —. , — n —_ _ — _� ?5= o} � ' 1 \ - .. ����►���� n ? � � I 8 37 6 5 4 3 2 I I I$ I� I6 I5 14 13 I2 I I �� �� Eo V� W� -� � � 1 I a � � -- • - - � . a� j , � � �°�. �� I 5 I 6 � ER Y�� y po �„ COUMCI L DI ST. Np. 5 � �� rIA! L�PO(�K = �,2 � s� , � - �. � ' --� 9 I Q I I I 2 13 i�� I 5 I 6 I 8� 1 3 I 4 ---� �- �� � �` I 2 3 9 5 0 7 8 y �� A�fAP5C0 76K-L � ' rEx,a s � � � � 5 0' m� , Q � ° LL � WESL EYAN I 4 -'�� � 2 WATER BASE MRP N0. 2066-3�4 , � ��� COLLEGE � � $�, I � AVF� Q ' F�� � ADD4 �I �� �� 3 �z�_ � PROP. f 2 W k �� n � n �� 8 7 6 5 C B A � 31 30 29 28 27 � 25 24 17 16 I ` \I� � o � I 23 22 21 20 19 18 o �, A �L�J''—��— � � 5 \n\�1\"l�� o � � � �;�II� }3�� ^ � � ���n - - I��� j / � �� L/ o �I �~ �I iV� IV � J V � n � I � n � � 9 I 0 I I I 2 I� I 4_ � 6 � I 2 3 4 5 0 2 I � PROPa I 2" � � 'NaT=� TA�IF � — � 7 8 4 10 I I I 2 I 3 I 4 I 5 I 6 I 7 I 8 I 9 2D , j�� ����j o� , . OP. I � Y� F�JTl1R � m � �n � 303' � -�4VEP —�- -� M� = �� i�� � 6 , � E ReQoN.� � ��I Q------ — ' r— N �ROP. 8" 4i � �� i . . , . . � � g�----�� ---- I � � � � AVE. E � % � J � � � � i �_ _ �_w__�. � � '---- a V � ~ � � � — ➢ I : . : :: � ��' � � _ � _ � � � �= � �� n =� Z 23' ¢ a �� 5 4 3 2 I 9 8 7 6 5 4� 3 2 � i 2 I 3 I 4 I 5 16 I 7 I& I 9 20 2 I 22 T�� ~� �, � � r� � � r ii ° 1 �Q� a �1 F � , � �z �3 � // / � � P � � � g � � � � {� � , � � � � � r � �, �' a t � � � � a� TR3B E � 3 — � , � '� � t � ��,_. � �� Q 9 I0 iI I2 I3 I4 � ��� I0 If I2 I3 I4 I5 I6 � I8 II I0 9 8 7 6 5 4 3 2 m � �/ �� IC 9 8 7 5 5 4 ,-�,� gg��� S 4 O O 9 � L T ._ . _ _ - �� � � ' . �I/ ^ � � ��� � � � � 04Ub � � v1 1 _-_ • i• � ' � � � O O O O O + � 1 � � . _ t ��e�� _ � CLOSEQ � �� � : : 2 g � � ��—"�— �• e � . . . 'Ci � � � N� �—� �'— _ �' LLI � � � �a � I I �, � 0 � s7 6 5 4 2 I � 8 7 6 5 4 3 2 I 9 S 7 6 5 4 3 2 1� I I I 0 9 8 7 6 5 4 3 2 I !. I � a 9 8 7 6 5 4 3 2 f a I 0 9 8 7 6 5 4 �� �� �' � � �� �J � - --i �° - , VO , " �-'--� w � ' � a �a L � � o �;�,�--- -� �q Q 2� `� � I I 12 13 14 15 16 � 9 10 I I 12 I� 14 15 16 10 I f i2 13 14 15 15 17 f8 I- 12 13 l4 15 16 E7 0 19 20 21 22 � 12 13. N 15 15 i7 IS 19 20 21 22 f I fC I� 14 i5 16 -o I£� � � � — — — — J �� � U I � � C° � � ' — � � � �� I, � .. ¢ AVE. G � , I �. I j— �� i n � � �" � �� m� � � J �� 3 � � � _� 6 5 4 3 2 I 8 7 6 5 3 2 [ y $.7 5 4 3 2 I ll 10 9 $ 7 6 5 4 3 2 I li 10 9 8 7 6 5 4 3 2 I� �' !^' °� ° � r G ^ � � � ' % � � � ? � 4 � 5 1� ���1V� � � � � r, , � �, �-- � � � � �, EXI ST. WATER � � � �0 !! I 2 I 3 I q I 5 I 6 9 I 0 I I I 2 I 3 k 4 I 5 � 6 I 0 E I I 2 _ I 4 I 5 ! 6 I 7 I 8 � Z I 3 I 4 I 5 I 6 I 7 Q I 9 20 2 I 22 � 2 I 3 I 4 I 5 I 6 f 7 I S I 3 2Q 2 I 2� R�MOVE/ABAN�ON y� ml Q ^ � EXIST.IWATER � a � � � . "' I � -'�----- H n s g�� � � PRDP. WATER y 4 I I � �� � � o.� - � I � -,------ � �� d o � fL�OP CONN�CTION) � n a o � � � � � o� � � � PROP. WATER � � o ��� K U N EX! ST. Fi RE NY�RANT ����� [�i 5 5 4 3 2 I S 6 5 9 3 2 I 9 8 7 6 5 4 3 2 i Il IO g S 7 6 5 4 3 2 I II la 9 8 7 6 5 4 3 2 I � � ��g�� � I�,T` � � ; � —� r, � � � �I � $ ; � � $ � -� � � � � '- � �I I � PROP. FI R� HYORANT � �.e�� � i T 1 I I I`� I � ,� „ �� ,�I ! .�$� �I—._I ,I._I _I._ ,l._ ._ ._i I I � � ! ! ! I � 1 ! , � �an_� �� �- }���� "� g w G ��, T °"'� w,+�►� �v.�ecr ruo. � crnr r o� �o� wor�r�, r�xxas LGG PROJEC7 � a � - � ���� r � �� SC�4L� � _ � � P �; � t� A � C I A � � � �.I � ��55,.� I � a 4 0� � �� �������������� �qR_��. - 6850Manhattan6lvd.,5uite3o0 WATER ANQ SANITARYSEWER REHABILITATlON 5�� � Fortworth,Texas 767z0 COIVTRACT (TXD07J ON RQSEDALE STREEI' $� k T a - - �5 : �ROM U.5 HWY. 287 TO I.H. $20 _ � v % A . . • (st � a�-i aao 3 a�c. n,t.�c S��fl4�ii PR0.1�Ci Ivn. �O� i�1o. � k � ` $ » c � o�w�a '.��,, �• : - - , (81 � Agfr1113 Fax �� � $ � - — �H �'���70��07'��il�� 3��2 - = � .�*. , - - - ' - _._. �►vou� - ��►�R ����c�w�EPrrs - -$ � d d • � � ''�eezgarc�:�c�roup.ccm � N �� a..� _ —.. _, _ __ ; ,� .? % - - - - - - 0 4Y o � _ � �D o0 ����T��� � n � ' � . � _ _ _ __ . o M � � , 6 LL f �� COLINCI L pl ST. Np. 5 � « � a « ' '� 52 f4 N N � �5 � F I F ! Y � � MAPSCO 78L-M � c r,, � n i? �� �j 44 �O � 23 6q 1 � �; I7. 5' 1� '� O TR2A � ��� � � 43 � (� �°i j H �� XR � � H � O`� WATER BASE MAP Np, 20f6-384. � �� f 10 � d Q' 53 '' 13 ' I 24 _ �1J � H fc�i -(J� yy J � � �-SQ� ^ 2072_384 i�� �` � 6 �� �p, O A w 42 � 54 � I � 2 j 25 - �s�, � �- {I', " � K �� `� � �� � ��u' � �� �-55� O 55 �,OC I� 50, � � 62 � .! � v � �/ /��,, L � Z ����� �� —f� � � $ a � a i � �� I 61 1a , . � � u / r � �=_ � v PROP.��W 2 � I o � c/ K J L� � K � 3 � �� �7 _ 4Q 56 L � 10 �" � 27 21'� ` _ � " ' I �'iO ° T �ci / M ,,' a � �a 7 • l � �� _ a � 39 57 � Q � � 6a � V" � �� �' N E N m�i TR2 � TR4 q Q� oa I 6� � = I �/ 9 i 2 g �.� M � M 5 �C� � d,� ---� � a�' �F UTi.;RE R.O.W. P O 38 58 ", Q g i � EL 72 p 'y�- R �. Q ' i _ ' L � �� � 5 � �p� . . . . . � � � L� i�� ��� i 29 � = 73 � � l �l � ��� A6 7' ;�a PFF�7�. B' h -� � n 1H1 � ..., �� � g, —� ��7 pRC� e 9 W� I 6, 7 i �.a 4 � � I � �� FUTURE R,�I_nl�..—� � � : : : : : Q 3 � �� � � � �J ' � 3� � �1i I �7 � � L L l L L li li � 11 1 � � �� i s� I�� ��� � y I � �' i� � � x � L f i�� � g � g g g g � � �ROP. � �W F�l�DP. � �P i � � l���e �" w z' . �;n � �'ROFo �� �l� PROP. �' W � �� . 2 35 m 34 3 32 31 6 5 q� � A� . ,�8 ' P�� � I� � � � � � � ' �� - ---------- �" ---"' -- ----- _.�_ _,�� _, 2�ri . 5' 3 f 5 I 4 29 28 � 27 � � � v� � � � : e : : ` �� � �- .�.� .i . _ �� �— — ---- — ---�_.—� —�...— r� —.-.._ --.-,��_ M �-,— / / / ^ ��i��� ' � � _ � S,r � —.._ � ' � g ; ; c ; � � / / // / / / /'�/ // // /� ��// ,/� / � n � I r / �/f // '/// / I / • � ' ��' � f%�/�!y f /%%%,�f `/�/ 1 / 1 I Q ,� �- � - : e , �' � , �} , .''//.�/�///. /// //,��//�/:�/ �. �.. //. � � I�! 8 s S ' _ _ �� _ , �_ _ - ` o^ g � � � 1 .. � � �-�:� ° 7`J o} � L R,� �/ N — -�1 , � o li� g � � � � � � � � � TR 5A �i � PR �P. i �� w � � ; �Q �' ��j I N� , , z L � �... 5 �, ' ' � � � �!� 'A � � �.N � a � ; � t�f PiiQ�. � PR Pe 12 W � 2 3 4 � �� BR 5C � . r U-- TR5A I � 5 6 A B I TFi I B I �R� o f$ � � - P40 . 2" � . a � � � � — � � � � — x —1 � J r , � � � � �0 A � � ( Q � � I ���� I TR5A2 I p L' 4 � � � � a BR2 3B 4A 5A 5B �� � 2 f 2 � P U � B � �o `��• ¢_ � i � ; � � Q � -- Q i � � � 12 I I ID 9 S 7 �q 13 12 I I 10 9 8 � 7 6 5 X Y Z I � 1 M I i�L�K 5 I, � r� � � � � i � R J�E.'�� ; �, _ - (,, � �� � 4 a DD "' � � o A $ � .. � 4 � � � � � 3" � N1 - �n �� -- c I H � �� � ° J I .,.� I 0 0 � �'°�--- 1 �_ � � � � � av�. � � -:� . . �� � a ���%� _--�� �� �« ��G��I� � �•"� � � �� 5'' � � , - � - o�� - ! � -, �... _ � fl I � EXI ST. WATER �� `s � , 1 I �17.�' 1 0 4'� �B I i = RE�10V�fABAN00N � _ „ 2 � � � p � � � 2, � 2 � A $ � �� 2 � 3 4 I � � � 2 � 4 � H G F E'`� E �ff EX] 5T, WATER � b � " �-- � -- � � PROP. WATER � � � � � � tp � _ �j I � 1 V ' � � � � � (�DOP CONNECTI pN) � � �n f T P . � P, . 8 ' �-- � t� a � I 9 2fl 3 4 ' Vi' �1' �} 8 C1 � 205' � , � �� PROP. WATER � � d'�� r I 2E I 2F I I G I I H 10 `�R i 7C ap c�p �, sA - = n n� n � �' 5 ' EXI ST. Fl RE HYQRANT � 0 0� � �� D C N r�7 ��8 9 "' 7 1� 1� � 7 6B � ���d~ � �9 N r~ I �\ �� � � - A 8 o fA � � , � e� L .sbv% � � 0 78 7A� � E ��, ' 2 I A PROP. FI RE HYDRANT »4 � \ _ O O . � s� $s �I I � -- � � k' ,- � � � n1 N � ` �- � IE � � � o p --. ., _ .. ---- - __ � � € � � _ LGC PROJECT � a $ � � w'� f�A�A�� PROJ�Lrt htlo. �(���� a _ � � � � � � :� � �' j .� �i � � j� � C T�i OF 1FOHi 'll4d'OR�Fi, �X�.S czzs5-r.ao � � d a$ N ���� ���� ^�2 ��i e����������� �w���, �.- � 685oManhattan Bi�d.,suite3oo WATER AND SANITARY SEWER REHABILlTATIQN � sH�r � g� m g - �;;, . FartSNorth,Texas 76iz0 CQMftACT (FXDOTJ ON ROSFDAL� STREET }.an : H � % : aFc. �e,rc .. . � � � �; 6 " � ` ` °1u"�`+ ��� ���� �a. DO� �Q. �� � ,-...� � (8i7j44Cr1io3Fax FROIVI U.S. HW}! 287 TO I.H. &20 �' � g 8a'� PHH g I � n k m j _ _ _. . _.. __ � - -P���--���a�0i757�� •7��� ` �- � - tugezc��rrragroup.com L�YOUi - I�JAT'gR R��L-AC�14A�i�5 � � 's N �k„�. __�: ��a �,od o� �� �� � u � e==;= ::o:: L i L L � 2g�Fg ����� c L 4 4 � 4 g:�:: goS�. s 2 g g ; 0 s � � � N O � ~ p o���#� d , 5'��s a9 a Q�W W � � �k .;� BSog' 6� de 6 0 0 6 6 p t i ° a `" w � � a o �n �n � m a LL S � � � w x d 4 h ����m AN��a o v a a � o g o `s h���� - � _. LO�A�IB� o � _ . , _ � COUNC! L 01 S7. N0. 5 � � 1 0 � -' 60, in I � � �� � � MAPSCO 781�'J. 79J � ��,: � 6Q O ~ � T 2C 3D I � gq- W f N��OWMER STa � � _-� � � " ; qA _ , WA7ER BASE MAP N0. 2072-384 � '�� I W I NDOMERE STd �' =,,� a' I � .� 4c 4a �►� � �a ; a��, ' — ��� Q �a � �,I � , S � ° � N� � � ` � � � ' J � ��_ 22. 5, B PR �� ° 1M T ' P`� 1� � 1 M � _ 22. 5' � 4 � 3 [� � � �� � � � � � �. 2 2. S' Q 1� � _ I 4 i ��r �� � n � � I -� �� � — �� ' Q � � �l � � �1 " K r`I �� TR2 ZR3 � � ���� � D ?� � J S � � , � tl �_ I � - I �`_��50' e a�� E , ���URE R.�.�'o + T V� i c~'n I� � ,�' �EJTEJR� R.Q.W. �� f� �1� ' x � f G � I G � �a � � \, 1 -' �' z '� � Q° 2 � � 3 V J � � � � � _ �3 � [� 2 � � �� � ��, C'� � � � � � � /� � � � �� � Z �., � �� �vl ; ! 2. 5' � � �� � � � � n — P OP. "�id 36 3C �3� F�tl .�" Y�r � FeFi Pa �"' �� 2� P R Q�. I 2" W\ P R Pe " W �; = PROP. 12" W n � �-�I ��"' —`� ��� _1, " -- -----�-------^---� ----^_�_ �� �------------------ --,,.,.�..----�--� � - �. — � ' ' � i - � � � � � / � ��/ f / /�/ /� - / / / � r � / 1 / � ' ����! / ��l�/ li��/ �� / -1 / / / / .�/ �/ ��� / / / f �����/ /�J / �����! l ��/�7���/ '! / / �/ / ! ��/ r � ////. /. , �`//////,,.1/ . /. //////,�//� / � * � � �� � Ee ROSEDALE STo , . - i d � � � �p � ���oP.i�°w - o � � n 6R � I RA f I �� �� �,� � � � = � [ 1 �` / TR � � � �� � 6��� �� ' I�I I i 19 8 6 c/� L ��� �I� 2 a \ 1 / , 7 5 / � � �PROP. .,�� W PfiO ". !2" � �b� �� I 2 PRQ�. I�" W �� � P�t P. " �p 4� 4� �0 33 H � _ o e 2PROP. 8 �� _ � � ,�� �� �[wf� � � 50� fl li� � 7 B 2 3 4 � 6 t/) �: 1 � _ I ��� �� ["11' � � iiN �� � � I R A 2 I t/� � o I I I 3 ,`� 2� � Z O � � Q o a � r � � � N � �-• I z � � . r O� , 14 ��` f ��� --� �51� ��• 2 � '� 31 � � � � '� �m -� = 4 I � � TR2C �� TR2� ?u5 3 q ,� � EQ 30 � � �� � .� o A4 A5 I I I I 10 9 $ 7 6 5`�' 2 � I -� �� _ � W g� jJ 29 I �� � � 4 �� O i 5�. Z � �� ��� � 3 � I PRO�. �" ly 3 �� � � I � � � � � —$ �, - � i � I ~ 5A � .-- � I 28 � � � � � z P ti c `, � A_V�, G �:� --� . ! �« i � ��G�1V� ° � 5B � 17. 5' 12 I � �- • �� I � �� Q (• � 8 � I 2 >> I 0 9 8 EXI57. WATER � J � I 3 15 16 I7 18 19 20 21 Z2f 2 2 II �'V �� �� � � � / REMOVE/ABAN�30E� � � , � E F 4 C = � 3 I_ 3 7�P I 0 -� ��i EXI ST. WATER � � U � , o� 7 5 `� � — 4 � g IJ! � � � � � (LR OP COMNECT]ONi � � � f � I 4 13 I 2 1 I I� g 8 7 5 G 8 "' '' � � -- � 5n� �, � � � � ti �� PROP. WATER � � — AVte N ,-�� �� � — d S 7-� u� 6� 6 7 i � � � � � I I A V= e I j � � FXI 5T. Fi RE HY�RANT � � p p � 6A I � � � +� � , + �,� I 69' � .' — � A 5A 5B 6B _ 9A I i I � � � I C . ti t 98 l I � I � � r � � .- � i -. I �� �. � � .. ..., ., � I .,.,I � `]�I � 0 I � � I �� PROP. �1 RE HYDfZANT d .. _ ..----- - � �� �� ���� DATE IIVAT�� �O.J6CY WO. �b��� � .. � � � � � � � ,� L.yt � � � � L7 U � C, 1 f O� FUF�T IIYOFf I �"C� �XFiS L�G PROJEC7 ��� C22557.06 ��� ��������•����� y�=��, .. .� . 6850 hAanhattan Bl�d., Suite 300 WATER ANO- SANJTARY SFWFR REHABIL/TAT10N sH�r Forc word,, T�xas 76120 COMRACT (17CD0 ,�.�. •. - 7J ON RQSE'�ALE STREET �E�'� SEII�f[ pROJ�Li iVEo. p0� �o. � x {�17)`��&� FfiOM U.S. HWY. 287 7'O I.H. 820 � �u+� (81 � 44fri 7 7 3 Fax , �N �'S��i0��01�'���� �662 - � - �vou� — wea�� ����c����s s � Ib��zg3rr� �group.tam — — — - ��—�, _ -- - � ; � � ���.�. : �� ; � �� a ;�� o� ss. 8 ' s' 0 0 4 V = i i i �� � ,.._� ����� 1�. l L L L : : : � g g o 0 0 J � : `�t .���� � o.�e so� 0 aW� � � = b L 0 O � L �i ;�a vo a u`. y W S 8 � W � � � a � a gs d�� � s�ess 0��9 ~�3 �OOfe4 ����� �>-' LL "si�sa ; _� :a�c: -;s�a � a� �d��: � � v v t � � � M M � � I N �i e E` �`` � N N 9A � / _'`� j G 0 �� / I 3 �: a� o � j � E�� 98 / ��. 23' �a �3 _� � 18� i0 I�A2 /qF� o I � ,;� I 0 C I 2 � �� Riy � = B � •�. I 4 E . / Q 7�.. Q � O 1" � A `v '-� I 2 B G� � p O� � � I IA !!B � �Q V I � � I � � i S�\ + I 4A i `� i � �fR4 I TR6 TR7 5RA � � �— 1 � � � V� �- ! 3A � I 3g E 3G I 9B � 1� � � � I 14C � V ��b f 3 ` 4� c �_ � `l� n � V 14D � : p FUTURE �0.�. c� S �� �o � _ � f � i � i �� . �, � s � � �� � T � V � � �" � �� ROP�.�f 2" � i PRO� �'� �� � 2 /� �� � 0 4RA i Q I � �� I�� 22E 22F 22G � R 4`=,�t'r � � � � � � .� — _ � _ � _ _ � _ W� — ���� 4 � _ �__._ � ------ _- ----- _ ---- ------ - - ----�--- + -- � �� �� �S � � � � � � � � � f � � � l � � � � � f � � � � � � ■ � � � ■ - ' 1 ��0�� ��r' � \ � �„ii,� ii, �, �i„ i, i„ �i, �„ i� iiiiii�i��,. � �����i�i,��iii„ ii,� � � � I I r_-- � — —� � ~ � � � , � I f�� �9►R� L1 R� A�j� � � �~ - � o�t �RO���° Y� j� �R�P. �" W--� - i 7. 5• I 2 i � , ,. �TR6A � 4 17.5' �I" � � f 2 3 9 8 7 6 5 i 4 3 2. � I N „ � o �� �� �� P � �� �� � ► � � ��, � q � � - 0 ; �a�. s° w r�z �. � �o� �'PROP. s�� w ; ��np ��� � C° � _ � _ � � � � � TR. 6 A B C ---� _ � J � ~� � � `� � � � � _ � a' i � - - - - p �- - � -G -�- -I - �^�j._ �, • � Q H V E v V � I + � � � � � � � � ii o 0 0 � ��n � � i a ai .r o �� � - — f- �i —I _j"' � �TR6B ,Q . � � � � +8' ; AVEe �', 5�#8' �� r� �� � �� � ��1 ' � i � i � Ro� � z° lk �' 1�j� � � l I (� I � -� ��`�� 1� � � � ij� � �� I B' 1 �� A ' P`� � � LP ; �� �= Q � G ,,� P � o � �P 2 � B p.4 a�;;; PO ; PQ �� A � � � o j� � TR7B �J �� � J o \ I" � �i� � � 1/ _ � it B � WEN ST. ;� �, � ' � �o� � � i � �8 ZR� '` � I � oI H � �� � 7 � 2 � U �� ' � �r'I N N � � G' I I 3 rRio -�-- �„ CALUMET STe � ¢ ;�_ -� ��_� � , �� �� ���� aarE 16YA'i� PROJ�Ci N.o. ��J��� .. + �„ �1 � � � � A � � � i�, � F� � L� � !� �� �9�6�����7��,90 �o=��. �� r • 685DManhattan BEvd„ Suite 300 �: : :. , y _ Fort Worlfi,%xas 76120 �� .` (8i7)MF6-1800 s�.,�rc SEIW�A PkqOJECi R�a. p0� {�o. .. . 81 446-1 t 13 Fax �� %4 �-� -t7 { �1 --- QE� _ �S��%�5�017�7'�� 3��2 - � - '� looezgarciagroup.corr� , ^ �O�ATi4N p _ _. _ � COlJNCI L Di ST. N0. � � Q MAPSCO � 79J-it � � WATER BA5E hAAP N0. 2072-38�4� � 2078-384 ° � � � �� � ,� � TUR� F#. . � � � � I �� � � � � Q � �E`R0� — _ `� � SED��� �T1�� � � � 0 ' °� � �� cn ,o ,� a � J �Q � � l 3R � n�� � / E o�, ���� � E � A � R�5 A � �0 `� 29 23 � � g 5 0' � 1 � �1 , � � �i� I � � � 1'G1� � � � 1� �l' � � G� �� o � � [T ] I I 5 �` � � � n � �_ fl �. � � � � � ������ B` EXIST. WATER � ���f RE�AOVE/ABAN�O�! EX15T. WATER � � � �, � PROP. WATER . �LOOP CONNECTIO�f) — � PRtJP. WATER � EXI ST. FI RE HY�RAN7 2 � PROP.FIRE HY�RANT ClT1( O� �Q� k�OR�F�, ��XdS WATER ANO- SANITARY SEWER REHABIL/TATION CpNTRqCT jTXD07J ON RQSEDAL� STREE7' �ROM tI.S. HWY. 287 TO I.H. 820 L-�YOUT - 1!4lAT'�R ��PLAC��A�I+�iS � � � � 1�� D�n � �0 � �� ��n � �� LCC ARUJEC7 cz25s7.oa 51iEET 6 � SS�i• . . .. -- - — -- .- �! 'a_ w ,r � . . �oa � � 1 ��0 � � � � , �� �, � r , , � _ _ _ � ��� i 0 8 E' z� � POSELANE��AST A � � L�G�TI�� ; e�? � GO n � ! 9C � 2J � --� =� 8� 5D' 1" 5H 5J Q �� � � 8� � � — � � � b` � 'Ir L� ° —� AR 2M I � � N P Q R 5 H G F_ c, , � CQUNCI L �I S7. NQ. g � � � � W 2N 20 W � � 1 � . . E �� "� o so I 6 � 7 -+�— �' BR �� - ��1 �, � r�• �' MAP5C0 T9K-L 1 e � ,1�, �' C7 � a V U T S co B -�� �� WA7ER BASE �AAf' N0. 2DT8-384 � g o � �n� Z � w � ��, . (� � i � �� � W o � 6 � � N� ~ � C D E � F G � M � �.5p' f n -�5.� Lp�C• ► 1 �� R, , , � �� q �_ 19A � ��.Q " � � o�� � , � �0�' � � ° . . i 3 � p�, / —�� � �.� � � /� �� L ��� c�n�n � � �, r� & � 4 R 6 _ � � � FEl7URF' RoVa�• f �� �" �'�� �f � I 6 7' � c� y 4 5 � 6 � . � L! Id€ � ;� � � A - � � � �, w� i � , �,� �� , � � � � � � �� ��e � �0 A I C � "O � C� �d'- � � ° d `� - � ��o�e i ��� w o5 P ��° � � • O ~ • • � � ' , t ~ � _ d. � z�� EQ R 0 _�. _� � FEJTURE Roo.�+. � 5 A , �� o� :::e: L L � � � � � �, SEDq�� STo � � `�— LI �� A!� � 'o � � , � � g g ; g ' �� �,.. � _ ��•-�_ �ROP. ��'� � C � � ����� �� I , � ~�' ��� ' ��_ � ` ��� �In���� •� {�f p � ����� � � . � L � � g g � � � � ����• �° � W � . ■ � ``� 1�� 0 � � � _ .. 1 C ' �f2��. ��� � � � =_--J p � 1 � � _ I 2 3 � - � � ; n � I�i1 a � - - - n 4 5 'n� 25 �� � ,� � �1� � � g g_2 � � pp � 7 CO $R � , , ��,t PROP. ° w � ��q • • � g 10 I I � ' �i�� A Z A� R � � 3 ` 4 f � I i 12 I � � il ��i ii�' i p� i � , 15 �� 17 28 _ � 5 6 � � �s��s+�� � �p� 18 �g ��,� � iil�ii � i—� 29 30 20 r' . I�` W 9 !a \ �� � �� 2� - 23 �q 2 3 � � � i � � � � KU7MAN CTo , ��qRTHUR �Ra _ � �� ' �� s 9 2 � � � � � �a `" ! � � , 3 � 2 L E � , �„� _ o [ D 5 �— , � 6 3 u� � � �B — I 16 �� 17 � 27 28 � ✓ 4 6R II 4 � c' I 6 I 7 a S 10 3 2D �� � �� 2 c9 18 26 29 17 � 12 �� 14 f 2 19 � � I �. I 5 I� I 8 q Q � �_ � 17.5' Ig I 15 �� � 17 I 0 I I 9 � 8� � I 9 2p 7 I ' 25 � --- � I 5 0 � ! � r� � 151' 14 �g �4 � 2� 3D � 18 ����� D I I 3 � 20 �� �d I 2 I 3 J wA 1 I wR GH Z� � 26 27 28 29 30 � I Q i I � 2 E}3 I 4 __ . L�����_ ... �� 835 �� 8 12 2 I a 6" PI � � Exlsi. WATER �� s` � � I 2 2 I � I I � q F— / f ��� -'�` , � � � ��; 0 2 I— I 1 22 � I I � _�� I i 0 ��� � I 5' 2 3 4 5 � O 6 7 �1f EXMST.�WA BER DON �� ' ��� ,. a a_ Q � I I 0 �3 e f 0. -� 23 6 7 8 g I 2 !� � � 4 5 PROP. WATER � '��� � 3A � N � 24 I 9 I 6 . .-� �� �� I 3 I 4 I 5 � I 2 3 � r��� {LDOP CONNECTI ON) 1 sW=� � • � d��� � 3B 9 ,`� z4 (� 25 g `-' � 7 I 6 � 7 I B � s ' � . ` �_ �! I 6 � �� P R O P. W A 7 E R � I �y��q � � Z� 8 i Z� 21 22 ♦ � �% � W s ��� � QB 8 � 2� 7` 26 � 7 �� E j��N 23 29 � I 2 3 i�} � 5 �a � EXlST. FIRE HYDRA�ET � � E� s s„ �4a ST, � `_ r 27 `� 6 � 9 �� ER 25 27 2e z9 �Q s � �� I pRo � � - � 6�� 27 6� � � PROP. FIRE HYDRAN7 � � ng�oo a 20 r S a� S b � � J �-+ +� + _ �7 t \ I r 7� I � � I � 1 Ir J� Al JY l _� r o G � + a ' ,-.-_ �. . _ i � $ : � � � � < � � ""E fAdAT'�R �DJ�CT hlo. SCAL� ' L� L� P � � �,�. R � I r� � � � U P ClT� O� �U�iiY {i�ORih1 T�XdS LCG PRDJECT � S d 4 W u ���� ���� Q �•� � � C22557.00 � ',':� �� � G850 Manhattan Blvd Suite 300 WATER AND- SAN!]'ARY SEYVER REHA8ILIFATION � wP�V � .4L a�a �'111�i�8v3�17��0 � .-�a� ���r g��$ ,�;.. Fo r t Wa r t h, 7exas 7 6 1 2 0 CON7'RACT (TXDOTJ ON ROSFDALE STREFT "' ��=� s�,, r� r c `-� �" �`�' � s t 7) 4 4 6- t 8 0 0 F R O M U. S. H W Y. 287 TD I.H. 87U � � ' S�ll�i{ER PFdU,1�Ci 11En. �O� i+�a. ,� •. 31' n 446-1113 Fax o F N�6 � �4. ��,�" LdYO[1T d V11d'�R �iI���AC�M�[�ITS g i � � g � � "�►' ��5�i0��07�'���� 3��� ,.�.�-:.�, - '} k k m , -- - - - - — --� -- � � � --- _ . _ �_ �= t �opezgarci�yrouP.cam ^ - - - 5 S �.y,`; � { � v �� a �i . � ' w 6 : a 0 • • 6 • � o o _ � �o:o� �P�FF ����� ��L� ��g<< SSSo° o w o a o L 4 l L L :g:g: 0 aA� ���" r��o ° � s t � 0. _a¢�� o�'�a � a o 6 ¢ �d�:: S q b ' : e' « ' $ $ 6`"�«S o f L � r � � M1 �a��� o _ : E � � p O ���a - � a � a� _ i � 4 � fl $ � : ���m� n � -- n 237' I � � I 00 00 � _ � � n � � —�-��� � ��i � 5 °a 'q' �' �J \,V � .-�� i� °° -� � � � r � N 4 G � � �.o a � --a� � �� � �=. � u a N A C �� N � � ' ; �}0 3A � � �� � IA � IB IC 2 �3 9 j �,V � 3B �� � - '' � -� �' � HART STo , � " + �� ---�. � � 8� 1 1' I ��l 2 � � P , � � �� HART �� STo � �� 2 � � � �'— I¢ r I p. I � � � ' � ' � ��L � � � � P1, � �11Ia � �� � 1� 1 � 1� L/ c_G I � � 2 , � 1�� � ; 6 �K � a A �,o � , o� �� 1 � A � TR3 IA r IA N d a � TR3A � 1 0 �� a �l� � O' � 1i� . , � :�.� Q i � � � ` ��1 P' _��k_o l �'� � � L � �� �►�: P � �� �',� ° � � �' p�npe ��� �c ; 5 � �0 1 • i• O 0 � l �� �, P �� 1 LQCAiIOf� COUNG L DI 5T. N0. � �f R. � MAPSCO 79L_� I R �1� O1v �1 �1 Pc � 3 � 4R � �a� i q 5R I� � ��, 5 �,f ' ,� _ � 5 � � , TR ' E6 �� �6 � � 60 gg 9A p � o c �� � �7 r,� � 7 i0 ; I o - I OA 6� � ���- �$ � $ io� � iie ii: `�„ 9 F�ORT ` isWORTH AVEn � _ � 13�' � i +� 13A^- fl� � o +► - � � � _ _[� � =015-0O2; � - ; ` `J � � fR .— ���° 4A g A 18' ,�. � i 9 0 30" C�u. �' � � �-- r �a � � �� �o .� � � a � � b � o � �o � � io o � � � � � � o 0 o a � �e � � � � � � � �p � rr � � � � � ii � v r� � n � d o a � o � s � a � o � �� � �o R05EDALE sra � HWY 3 0 3 � � � � � � � 6 � �o IIR < � � � � I I 'Q i 2 zq � � �� I 3R � 0 � I 2Fi ��R o i 00 \- � � Re � E P� �� � �� 9 �3 I IR I Q � m � - � ��� I 4 I OR ��, i 1 V , 1� °� 5� ��. � 7 � I 5 9R KR LR � � R �1J � 6 �� 16 $R /8 J� � � , � �R 5 �-� 17 7R �R �R �2R - —� � � � � HR NR IIR � � r' � � 4 `8 � GR I OR � 4 K�'1 � I 5R I 6R 17R �n 5 � � Z o FR OR I SO• I 5R o0 "�r' (,� I 8R �F_— �n� 3 I 2 �� QR - f6R � O 14R �` � � 1 �-� f ,� 3 „ I��R �V `� SR , N N � 20R 19R, I , -,.. . 3 R , c�l ���� �� °"� FN�Ii�� �OJ�G"i R.�O. �� �Qp� ��a���r�?���o�%��� BFc. �rc S�1di�H �iQJ�C� WO. �� ����/ o��a�%�%�e �... - - - "� -� � ''� 5 A �� :� o ! ,\ 1 -- I� r — � � � �- � �!� � ` 'fl �� � I$R ' 7 - v7 � -`� i a 5�_ti GQODFE�ILOW � S�a 5 6 ; 19I 6 � � ' 7 . L'� V'' � � $ i _ I � � 8 � �R�-P �� L����� H9 � — — � � "L I � EXI 5T. WAiER � � �' � � 2� � p ff�f REMOVE/ABANDON � I I --' 2 4 t �� � � EXfST. WATER � PROP. WATER � �� � 12 � 13 Z�J I� oa�oi 26 i3 � _ � ,.� 0 (LOOP CONNECTI QN) PROP,WATER EXIS7.FIRE HYDf�ANT PROP. FI RE HYDRANT �l+�L� # � � � � � � � P`4 1'C 4.d � I""i � � � � � [ G 1 ■ OF �OR� WO�TF'I� i GH/1S LGG PROJECT . C22557.Da , q� ���. - 5850 Manhattan Blvd. Suite 30o WATER ANQ SANiTARY S�YVER REHABIL/TATION sH�+- �: , Fort worch, Te�ws 7612o CONTR.4CT �T7CDOTj ON ROSEDALE STREET ', �0� Nv {81�416-Z803Fax FROM U.S HWY.287 TO I.H.820 � ' o� : �6�� - ` loFers�arciagrau�.com [.J�YOIfY — 1fi��T�F1 RE�L�IC��I�I�S $ 'I WATER BASE MAP N0. 2078-3��4� 2084-384 City of'�'oYt ��o�th, Tex�s ��a� �r�� ��[�i���� (����1��������r� QATE REFER�NCE NUMBER LOG NAME P,�G� 10/8/02 **��� 9��� � 30LOPEZ � 1 of 7 SiJBJECT ENGIN�ERING AGREEMENT W1TH W�NDY LOPEZ & ASSOClATES, INC. DIBIA LOPEZGARCIA GROUP FOR THE �ESfGN OF WATER AND SANITARY SEWER MAINS �N ROSEDALE STREET _ RECOMMENDATION; It is recommended �hat tne C�ty Cour�ci! authorize the City Manager to execute an engineering agre�ment with Wendy Lapez & Associates, Inc. dlb/a LopezGarcia Group for the design of water and sar�itary sewer mains in Rosedale Str�et from U.S. Highway 287 to I.H. 82� far a�ee not to exceed $42$,249. DlSCUSSION: The Tex�s Department of Transportatian has requested t�at th� City re�ocate the existing water and sanitary sewer mains in Rosedale Street from U.S. Highway 287 to I.H. 820. Since the existing utilities are locafed in the public right-of-way and nat a designated easement, the City is responsibie for 1�0% o# the cost to relocat� th� utifiti�s. Wendy Lopez & Assaciates, fnc. dl�l� �apezGarcia Gro�p, located at 68�0 Manhattan Bou�evard, Suite 300, Fort Worth Texas, proposes to perform the engineering se�vices for a tee not to exceed $428,249. City staff considers this fee to b� fair a�d reasonable for the scope of services proposed. M/WBE - Wendy Lopez & Associates, Inc. dl�la LopezGarcia Group is in compfiance with the City's M/WBE Ordinance �y committing to 25% MIWBE part9cipafion on the a�erall consu�tant contract amour�t. The City's goal on ih�s praject is 2�%. This project fs located in COUNCIL DfSTRICTS 5 and 8, Ma�sco 77M, 78J, K, �, M, 79J, K, L and M. fn addition to the contract arnaunt, $6,�OD is required for re�iew by the Engineering Department. FISCAL fNFORMATfONICERTIFfCATION: - - The �inance Directar cer�ifies that funds are a�ailabl� in the current capital budgets, as appropriated, of the Commercial Paper-Sewer and Commercial Paper-Water Funds. MO:n Subtnitted f'or City N[anager's ot�r�c� t,y: MarC Ott Originating Department Head: DougEas Rademaker Adclitinnal Infarmatian Ca�ttact: Dauglas Rademaker I���b I ACCOUNT I CEIVTEI2 i (to) 8476 I 6157 � (from) I P546 531200 � PW77 531200 � G157 � 07446013692p D6077p157280 AMOU[vT + CITY S�CRETARY 1 I --� . � � �PPROVED 1D108/02 $194,046,Q0 $234,203.00 � �ity of �o� W'orih, Z'exas �ll�y�r �r�d Cou�nci[ Comn�ur�«��io� bATE R���RENC� NUMB�R LOG NAME � ols�az **C�19278 SUBJECT ENGINEERING AGREEMENT WITH i�v'�f�'r' LOPEZGARCfA GROIJP FOR THE DESIGN MAINS IN ROSEDAl�E STREET RECOMMENDATION:' PAGE 30LOP EZ 1 0�€1 L�L7P�� & A��{�G�AT�S, l�IC. DIBlA O� WATER AND SANITARY SEWER It is recommended tha# the City Council authorize the Ci�y Manager to execute an engineering agreeme�tt with Wendy Lopez & Associates, lr�c. dlbla LopezGarcia Group far the design af wa#er and sanifiary sewer mains in RosedaEe Street from U.S. Highway 287 ta I.H. �820 for a fee nat to exceed $428,249. DfSC�SSI�N: The Taxas Department of Transportation has requested that the City relocate fhe �xisfing water and sanitary sewer mains in Rosedale Street fram U.S. Highway 287 to I.H. 820. Since ti�e exisfing utilities ar� located in the public right�of-way and not a designated easement, the City is responsible for � 00% ofi the cost to relocafe the �t9[ities. Wendy Lapez & Associat�s, Inc, dlbla LopezGarcia Graup, focated at fi85fl Manhattan Boulevard, 5uiie 300, Fart Wor�h Texas, proposes to perFarm the engir�eering services for a fee nof to exceed $428,249. City staff considers this fee to be fair and reasonab[e for the scope of services proposed. M/WBE - Vllendy Lapez & Associates, 1nc. dlbla RopezGarcia Group is in compliance with the City's M/WBE Ordinance by committing to 25% MIWBE participation on the averall consultant contract amount. The City's goal on this praject is 25%. This praject is located in COUNCIL DISTRICTS 5 and 8, Mapsco 77M, 78J, K, �, M, 79J, K, L and M. In additian to the contract amount, $6,000 is required for review by the Engineering Department, FESCAL ENFORMATIONICERTE�ICAT�ON; The Finance Dir�ctor ceriifies that funds are available in the current capital budgets, as a�propriated, �f the Cammerciaf Paper-Sewer and Commercial Paper-Water Funds. MO:n � Submitted for City Manager's Oftice by: Matc Ott Origivating Dep�triment Head: Douglas Rademakex Additiouat Information Contact: Douglas Rademaker FUND I ACCOIINT 1 CENTER � AMOUNT (to) 8476 6I57 , (from) I PS45 I PW77 � G157 I 53'�200 07046013fi92D $194,046.OQ - 53'E200 06a77Q15728D $234,203.00 CITY SECRETARY AI�PROVED LO/t38/02