Loading...
HomeMy WebLinkAboutContract 60549Received Date: 12/04/2023 Received Time: 7:58 a.m. Developer and Project Information Cover Sheet: Developer Company Name: TCRG Opportunity VII, LLC Address, State, Zip Code: 5201 Camp Bowie Blvd, Fort Worth, TX 76109 Phone & Email: 817-626-9898, patton(atcr2.com Authorized Signatory, Title: Robert L. Patton, Jr., President Project Name: TCRG Everman Pkwy Brief Description: Water, Paving, Streetlight, and Signal Project Location: SW Corner of Everman Pkwy and Will Rodgers Blvd Plat Case Number: None provided Plat Name: None provided Mapsco: TAR 049V Council District: 8 CFA Number: 23-0103 City Project Number: CPN 103897 1 IPRC22-0010 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 1 of 16 Standard Community Facilities Agreement Rev. 9/21 City Contract Number: 60549 STANDARD COMMUNITY FACILITIES AGREEMENT This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas, acting by and through its duly authorized Assistant City Manager, and TCRG Opportunity VII, LLC, a Texas limited liability company ("Developer"), acting by and through its duly authorized representative. City and Developer are referred to herein individually as a "party" and collectively as the "parties." WHEREAS, Developer is constructing private improvements or subdividing land within the corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as TCRG Everman Pkwy ("Project"); and WHEREAS, the City desires to ensure that all developments are adequately served by public infrastructure and that the public infrastructure is constructed according to City standards; and WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as described in this Agreement ("Community Facilities" or "Improvements"); and WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional obligations contained in this Agreement, and Developer may be required to make dedications of land, pay fees or construction costs, or meet other obligations that are not a part of this Agreement; and WHEREAS, the City is not participating in the cost of the Improvements or Project; and WHEREAS, the Developer and the City desire to enter into this Agreement in connection with the collective Improvements for the Project; NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: 1. CFA Ordinance The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in connection with the work performed by the contractors. If a conflict exists between the terms and conditions of this Agreement and the CFA Ordinance, the CFA Ordinance shall control. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 2 of 16 Standard Community Facilities Agreement Rev. 9/21 2. Incorporation of Engineering Plans The engineering plans for the Improvements that have been approved by the City ("Engineering Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements required by this Agreement. 3. Description of Improvements; Exhibits and Attachments The following exhibits describe the general location, nature and extent of the Improvements that are the subject of this Agreement and are attached hereto and incorporated herein by reference: X❑ Exhibit A: Water ❑ Exhibit A-1: Sewer E Exhibit B: Paving ❑ Exhibit 13-1: Storm Drain X❑ Exhibit C-1: Street Lights, Signs, and Signal The Location Map and Cost Estimates are also attached hereto and incorporated herein by reference. To the extent that Exhibits A, A-1, B, B-1, C-1, the Location Map, or the Cost Estimates conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes. 4. Construction of Improvements Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements until the City receives affidavits and lien releases signed by Developer's contractors verifying that the contractors, and all subcontractors and material suppliers, have been paid in full for constructing the Improvements, and consent of the surety on payment and performance bonds provided for the Improvements. 5. Financial Guarantee Developer has provided the City with a financial guarantee in the form and amounts set forth in this Agreement which guarantees the construction of the Improvements and payment by Developer of all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee"). Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the CFA Ordinance. City of Fort Worth, Texas Page 3 of 16 Standard Community Facilities Agreement Rev. 9/21 6. Completion Deadline; Extension Periods This Agreement shall be effective on the date this Agreement is executed by the City's Assistant City Manager ("Effective Date"). Developer shall complete construction of the Improvements and obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term"). If construction of the Improvements has started during the Term, the Developer may request that this Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement. In no event shall the Term of this Agreement plus any Extension Periods be for more than three years. 7. Failure to Construct the Improvements (a) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements if at the end of the Term, and any Extension Periods, the Improvements have not been completed and accepted by the City. (b) The City may utilize the Developer's Financial Guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of the Improvements before the expiration of the Term, and any Extension Period, if the Developer breaches this Agreement, becomes insolvent, or fails to pay costs of construction. (c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers are not paid for construction costs or materials supplied for the Improvements the contractors and suppliers may place a lien upon any property which the City does not have an ownership interest that is the subject of the Completion Agreement. (d) Nothing contained herein is intended to limit the Developer's obligations under the CFA Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's contractors, or other related agreements. 8. Termination If Developer desires to terminate this Agreement before Developer's contractors begin constructing the Improvements, Developer agrees to the following: (a) that Developer and City must execute a termination of this Agreement in writing; (b) that Developer will vacate any final plats that have been filed with the county where the Project is located; and (c) to pay to the City all costs incurred by the City in connection with this Agreement, including time spent by the City's inspectors at preconstruction meetings. 9. Award of Construction Contracts City of Fort Worth, Texas Page 4 of 16 Standard Community Facilities Agreement Rev. 9/21 (a) Developer will award all contracts for the construction of the Improvements and cause the Improvements to be constructed in accordance with the CFA Ordinance. (b) Developer will employ construction contractors who meet the requirements of the City to construct the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to construct the Improvements in the City. (c) Developer will require Developer's contractors to provide the City with payment and performance bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent (100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and performance bonds shall guarantee construction of the Improvements and payment of all subcontractors and material suppliers. Developer agrees to require Developer's contractors to provide the City with a maintenance bond naming the City as an obligee, in the amount of one hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in materials and workmanship for the Improvements by the contractor and surety for a period of two (2) years after completion and final acceptance of the Improvements by the City. All bonds must be provided to the City before construction begins and must meet the requirements of the City's Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code. (d) Developer will require Developer's contractors to provide the City with insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer -awarded infrastructure construction contracts. The City must be named as an additional insured on all insurance policies. The Developer must provide the City with a Certificate of Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's insurance provider, which shall be made a part of the Project Manual. (e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice of their intent to commence construction of the Improvements to the City's Construction Services Division so that City inspection personnel will be available. Developer will require Developer's contractors to allow construction of the Improvements to be subject to inspection at any and all times by the City's inspectors. Developer will require Developer's contractors to not install or relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives consent to proceed, and to allow such laboratory tests as may be required by the City. (f) Developer will not allow Developer's contractors to begin construction of the Improvements until a notice to proceed to construction is issued by the City. (g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and service lines have been completed to the satisfaction of the City. 10. Utilities Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project; and (2) to construct the Improvements required herein. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the Improvements to be constructed pursuant to this Agreement. City of Fort Worth, Texas Page 5 of 16 Standard Community Facilities Agreement Rev. 9/21 11. Easements and Rights -of -Way Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for the construction and dedication to the City of the Improvements provided for by this Agreement. 12. Liability and Indemnification (a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT. (b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCL UDING DEATH, OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OF ANYACT, INTENTIONAL OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES, WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGESARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. (c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY, INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE, AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS. 13. Right to Enforce Contracts City of Fort Worth, Texas Page 6 of 16 Standard Community Facilities Agreement Rev. 9/21 Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its contractors, along with an assignment of all warranties given by the contractors, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. 14. Estimated Fees Paid by Developer; Reconciliation Prior to execution of this Agreement, Developer has paid to the City the estimated cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the construction of the Improvements, the City will reconcile the actual cost of administrative material testing service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer, the Developer must pay the difference to the City before the Improvements will be accepted by the City. If the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund the difference to the Developer. If the difference between the actual costs and the estimated payments made by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will not be responsible for paying the difference. The financial guarantee will not be released by the City or returned to the Developer until reconciliation has been completed by the City and any fees owed to the City have been paid by the Developer. 15. Material Testing The City maintains a list of pre -approved material testing laboratories. The Developer must contract with material testing laboratories on the City's list. Material testing laboratories will provide copies of all test results directly to the City and the Developer. If the Improvements being constructed fail a test, the Developer must correct or replace the Improvements until the Improvements pass all retests. The Developer must pay the material testing laboratories directly for all material testing and retesting. The City will obtain proof from the material testing laboratories that the material testing laboratories have been paid in full by the Developer before the City will accept the Improvements. 16. Notices All notices required or permitted under this Agreement may be given to a party by hand - delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be deemed to have been received when deposited in the United States mail so addressed with postage prepaid: CITY: Development Coordination Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 With conies to: City of Fort Worth, Texas Standard Community Facilities Agreement Rev. 9/21 DEVELOPER: TCRG Opportunity VII, LLC 5201 Camp Bowie Blvd Fort Worth, TX 76109 Page 7 of 16 City Attorney's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 and City Manager's Office City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Or to such other address one party may hereafter designate by notice in writing addressed and mailed or delivered to the other party hereto. 17. Right to Audit Developer agrees that, until the expiration of three (3) years after acceptance by the City of the Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Developer involving transactions relating to this Agreement. Developer agrees that the City shall have access during normal working hours to all necessary Developer facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. The City shall give Developer reasonable advance notice of intended audits. Developer further agrees to include in all contracts with Developer's contractors for the Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of three (3) years after final payment under the contract, have access to and the right to examine any directly pertinent books, documents, papers and records of such contractor, involving transactions to the contract, and further, that City shall have access during normal working hours to all of the contractor's facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Developer's contractors reasonable advance notice of intended audits. 18. Independent Contractor It is expressly understood and agreed that Developer and its employees, representative, agents, servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to all rights and privileges and work performed under this Agreement, and not as agents, representatives or employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement, Developer shall have the exclusive right to control the details of its operations and activities and be solely responsible for the acts and omissions of its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat superior shall not apply as between the City and its officers, representatives, agents, servants and employees, and Developer and its employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the City of Fort Worth, Texas Page 8 of 16 Standard Community Facilities Agreement Rev. 9/21 creation of a partnership or joint enterprise between City and Developer. It is further understood that the City shall in no way be considered a co -employer or a joint employer of Developer or any employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer. Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be entitled to any employment benefits from the City. Developer shall be responsible and liable for any and all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents, servants, officers, contractors, subcontractors, and volunteers. The City, through its authorized representatives and employees, shall have the sole and exclusive right to exercise jurisdiction and control over City employees. 19. Applicable Law; Venue This Agreement shall be construed under and in accordance with Texas law. Venue shall be in the state courts located in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 20. Non -Waiver The failure of the City to insist upon the performance of any term or provision of this Agreement or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent of City's right to assert or rely on any such term or right on any future occasion. 21. Governmental Powers and Immunities. It is understood that by execution of this Agreement, the City does not waive or surrender any of its governmental powers or immunities. 22. Headings The paragraph headings contained herein are for the convenience in reference and are not intended to define or limit the scope of any provision of this Agreement. 23. Severability In the event that any clause or provision of this Agreement shall be held to be invalid by any court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the remaining provisions hereof. 24. Review of Counsel City and Developer, and if they so choose, their attorneys, have had the opportunity to review and comment on this document; therefore any rule of contract construction or interpretation that would City of Fort Worth, Texas Page 9 of 16 Standard Community Facilities Agreement Rev. 9/21 normally call for the document to be interpreted as against the drafting party shall not apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be construed solely on the basis of the language contained therein, regardless of who authored such language. 25. Prohibition on Boycotting Israel Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code, the City is prohibited from entering into a contract with a company with 10 or more full-time employees that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement. 26. Prohibition on Boycotting Energy Companies Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 27. Prohibition on Discrimination Against Firearm and Ammunition Industries Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City with a company with 10 or more full-time employees unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. City of Fort Worth, Texas Page 10 of 16 Standard Community Facilities Agreement Rev. 9/21 28. Immigration and Nationality Act Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. 29. Amendment No amendment, modification, or alteration of the terms of this Agreement shall be binding unless the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer. 30. Assignment and Successors Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this Agreement without the prior written consent of City. Any attempted assignment or subcontract without the City's prior written approval shall be void and constitute a breach of this Agreement. 31. No Third -Party Beneficiaries The provisions and conditions of this Agreement are solely for the benefit of the City and Developer, and any lawful assign or successor of Developer, and are not intended to create any rights, contractual or otherwise, to any other person or entity. 32. Compliance with Laws, Ordinances, Rules and Regulations Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed and understood that, if City calls to the attention of Developer any such violation on the part of Developer or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately desist from and correct such violation. 33. Signature Authority City of Fort Worth, Texas Page 11 of 16 Standard Community Facilities Agreement Rev. 9/21 The person signing this Agreement on behalf of Developer warrants that he or she has the legal authority to execute this Agreement on behalf of the Developer, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled to rely on this warranty and representation in entering into this Agreement. 34. Counterparts This Agreement may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. 35. Additional Improvements The parties acknowledge and agree that additional sewer improvements will be necessary for the Project which will be added as a change order in the near future ("Future Sewer Improvements"). The Developer recognizes and agrees that no final plat will be issued by City for this Project nor will any execution of a greensheet be provided until a change order is executed between the Parties to incorporate the Future Sewer Improvements. At the time the change order is executed, Developer will be responsible for ensuring the additional amounts necessary for the Future Sewer Improvements are accounted for via an additional financial guarantee or through the existing financial guarantee . 36. Early Water Meter Release Developer shall not obtain an early water meter release until the water and Future Sewer Improvements have been constructed, passed inspection by the applicable Construction Inspection Offices (including passing the backflow prevention testing), and receive the City's final acceptance. In addition, Water and Sewer impact fees must be collected before any water meter release will occur. Final acceptance shall mean the issuance of a letter by the City indicating that the water and Future Sewer Improvements have been constructed in accordance with the City's standards, but shall not mean the execution of a green - sheet, or the maintenance bonds for the water and sewer improvements becoming effective. 37. Entire Agreement This written instrument, together with any attachments, exhibits, and appendices, constitutes the entire understanding between the City and Developer concerning the work to be performed hereunder, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void. [REMAINDER OF PAGE INTENTIONALLY BLANK] City of Fort Worth, Texas Page 12 of 16 Standard Community Facilities Agreement Rev. 9/21 Project Name: TCRG Everman Pkwy CFA No.: 23-0103 Ite ms A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewwr Construction Total 38. Cost Summary Sheet City Project No.: 103897 B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial Guarantee Options, choose one Bond = 100% Completion Aqreement = 100% / Holds Plat Cash Escrow Water/Sanitary Sewer= 125% Cash Escrow Pavinq/Storm Drain = 125% Letter of Credit = 125% Escrow Pledqe Aqreement = 125% Developer's Cost $ 796,939.25 $ 796,939.25 IPRC No.: 22-0010 $ 431,100.16 $ 3,952.00 $ 260,356.42 $ 695,408.58 $ 1,492,347.83 $62,500.00 $2,205.00 $840.00 $ 65,545.00 Choice Amount (Mark one $ 1,492,347.83 X $ 1,492,347.83 $ 996,174.06 $ 869,260.73 $ 1,865,434.79 $ 1,865,434.79 City of Fort Worth, Texas Page 13 of 16 Standard Community Facilities Agreement Rev. 9/21 IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their duly authorized signatories to be effective on the date executed by the City's Assistant City Manager. CITY OF FORT WORTH DEVELOPER TCRG Opportunity VII, LLC S T�c� u��i Dana Burghdoff (Dec , 20231 . CST) By: Texas Capitalization Resource Group, Inc. Dana Burghdoff Its Manager, Assistant City Manager R�6e�tL. P�ttrtrz�,��. Date: Dec 1, 2023 Robert L. Patton. Jr. (Dec 1. 2023 08:21 CST) Robert L. Patton, Jr., President Recommended by: Dec 11 2023 Date: Fichson Nuyen Bichson Nguyen (Dec 1, 23 8:38 CST) Dwayne HollarsBichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: Thomas Royce Hansen Assistant City Attorney II Contract Compliance Manager: M&C No. N/A Date: Dec 1, 2023 By signing, I acknowledge that I am the person responsible for the monitoring and Form 1295: N/A administration of this contract, including ensuring all performance and reporting o M.M. �p ATTEST: ��°°d requirements. a°Le oA.10 d t1S °o=A Rebecca Diane Owen (Dec 1, 202308:48 CST) Jannette S. Goodall Rebecca Diane Owen City Secretary Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Page 14 of 16 Standard Community Facilities Agreement Rev. 9/21 The following attachments are incorporated into this Agreement. To the extent a conflict exists between the main body of this Agreement and the following attachments, the language in the main body of this Agreement shall be controlling. Included Attachment ❑X Attachment 1 - Changes to Standard Community Facilities Agreement ❑ Attachment 2 — Phased CFA Provisions ❑ Attachment 3 — Concurrent CFA Provisions ® Location Map ® Exhibit A: Water Improvements ❑ Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ❑ Exhibit B-1: Storm Drain Improvements ® Exhibit C-1: Street Lights, Signs, and Traffic Improvements ® Cost Estimates (Remainder of Page Intentionally Left Blank) City of Fort Worth, Texas Page 15 of 16 Standard Community Facilities Agreement Rev. 9/21 ATTACHMENT "I" Changes to Standard Community Facilities Agreement City Project No. 103897 Negotiated changes are incorporated into the body of this Agreement. City of Fort Worth, Texas Page 16 of 16 Standard Community Facilities Agreement Rev. 9/21 MDC OHOTV H&P PALETTE T .. RISINGER RMAN PROJECT LOCATION � WAY i TARRANT COUNTY MAPSCO TAR-049V VICINITYMAP (NOT TO SCALE) OWNER/DEVELOPER TCRG PROPERTIES, LLC 5201 CAMP BOWIE BLVD FORT WORTH, TEXAS 76107 (817) 626-9898 Pacheco Koch a Westwood company 4060 BRYANT IRVIN ROAD FORT WORTH, TX 76109 1 817.412.7155 i VICINITY MAP EXHIBIT CITY PROJECT # 103897 IPRC RECORD NO. IPRC22-0010 TCRG EVERMAN PARKWAY - INDUSTRIAL DEVELOPMENT DRJMB BY CHECKEDBY LOCATED IN E� TEXAS F I I N.T.S. I 08/09/23 1 3568N19 349 TARRANT COUNTY,R KwMU "&" o Y QVIELRl MLiRO WIENIEH're CONNECT TO — EXISTING 16" WATER LINEOPROPOSED (X-09141)0" FIRENE TAP 0 50 100 200 GRAPHIC SCALE IN FEET PROPOSED PRIVATE DRIVE --� ter — PROPOSED PUBLIC 12" PROPOSED PUBLIC FIRE WATER MAIN I HYDRANT 1 IQ W 4 2 01 1 ' ii I i li I 1 PROPOSIREED-----------� i I I I W I 10" F Ill PROPOSED 1" LINE TAP PROPOSEDDOES Z DOMESTIC WATER r-------- MEMERTIC WATER ---, —J L------ Z 1 SERVICE - - - - - - - - - - J--------- J =�'Z` PROPOSED PRIVATE DRIVE _ Ca - - - -4-- C 1 PROPOSED PRIVATE PROPOSED PUBLIC FIREI 1 G PROPOSED PUBLIC 2-2" IRR. WATER HYDRANT ' 12" WATER MAIN SERVICE ' PROPOSED PRIVATE BACKFLOW PREVENTER I ' I I I 1 c.i mlw --------------JL----------------Jl----- Z Z- - - ��---- - - - - - - - - - - - J' _ �.Z� _ _ _ _ =ssz� PROPOSED PRIVATE DRIVE -- 'i PROPOSED PUBLIC 12" PROPOSED PUBLIC FIREI 1 C ' WATER MAIN HYDRANT 1 CONNECT TO PROPOSED PUBLIC FIRE I I EXISTING 10" MATCHLINE C (HYDRANT WATER LINE o (X-09968) ICI ------------ 7FIRE PROPOSED 10" FIRE PROPOSED PUBLIC 12"LINE TAP & BACKFLOW WATER MAIN PREVENTER OWNER/DEVELOPER\\`---_ TCRG PROPERTIES, LLC — EAST. WATER LINE 5201 CAMP BOWIE BLVD)FORT WORTH, TEXAS 76107POSED PUBLIC PROPOSED PRIVATE DRIVE (s17) 62s-sass HYDRANT Pacheco Koch a Westwood company 4060 BRYANT IRVIN ROAD FORT WORTH, TX 76109 1 817.412.7155 WATER IMPOVEMENTS EXHIBIT CITY PROJECT #1 03897 IPRC RECORD NO. IPRC22-0010 TCRG EVERMAN PARKWAY - INDUSTRIAL DEVELOPMENT DRJMBev CHECKEDBY LOCATED IN TEXAS RE I 1"C100 I I 08/09/23 I 3J578-7 349 TARRANT COUNTY,REXWASORTH, ENNO OT "B"' o F&WOM ONIPHOOMENEHYS 0 25 50 100 GRAPHIC SCALE IN FEET S TOP OSED EVERMAN PARKWAY ' a AND SOD Iz I V (PROPOSED I ' I CONCRETE SIDEWALK I AREA 'A' U 0_ a r I p a ' PROPOSED TOPSOIL LLAW AND SOD Z LLA Z �. - •e „c o N !b p PROPOSED N CONCRETE o ' SIDEWALK U EVERMAN PARKWAY OWNER /DEVELOPER TCRG PROPERTIES, LLC 5201 CAMP BOWIE BLVD FORT WORTH, TEXAS 76107 (817) 626-9898 LEGEND PROPOSED CONCRETE DRIVEWAY PROPOSED CONCRETE SIDEWALK PROPOSED TOPSOIL AND SOD REMOVE EXISTING ' m EVERMAN PARKWAY IDRIVEWAY W Z W,11� 0 G 1 AREA 'B' PROPOSED CONCRETE SIDEWALK l� (PROPOSED CONCRETE SIDEWALK U U Y - a, H L� Z ' V PROPOSED Q (PROPOSED TOPSOIL DRIVEWAY AND SOD W Z �t 4 Q ' JPROPOSED C CONCRETE — WILL ROGERS BOULEVARD —�- VARIABLE WIDTH M G SIDEWALK AREA 'C' 80' PUBLIC ACCESS EASMT. PUBLIC o ' (BY THIS PLAn ' ACC ES MT. INST. RATE0, \ co4060 BRYANT IRVIN ROAD PAVING IMPROVEMENTS EXHIBIT Pacheco Koch FORT WORTH, TX 76109 CITY PROJECT #103897 a Westwood company 817.412.7155 IPRC RECORD NO. IPRC22-0010 TCRG EVERMAN PARKWAY — INDUSTRIAL DEVELOPMENT 3: DRAWN BY CHECKED BY SCALE DATE JOB NUMBER LOCATED IN THE CITY OF FORT WORTH, TEXAS 0 JMB I RDF I 1"=50' I 08/09/23 I 3568-19.349 TARRANT COUNTY, TEXAS EKHMU STREET MMM8 IrMF DO O�LLRML MPROOWEREHIrS UPGRADE EXISTING co LUMINAIRE ON SIGNAL POLE TO LED cc LZ I II II II II II II UPGRADE EXISTING u LUMINAIRE ON SIGNAL POLE TO LED EVERMAN PARKWAI Y A= II =_ 11= 11= INSTALL LUMINAIRE ON PROPOSED SIGNAL POLE L 0 25 50 100 0- GRAPHIC SCALE IN FEET L �L Hill 16 1111 _ INSTALL LUMINAIRE ON PROPOSED SIGNAL POLE / 0 UPGRADE EXISTING LUMINAIRE ON SIGNAL POLE TO LED LEGEND INSTALL/UPGRADE STREET LIGHT INCLUDING TRAFFIC SIGNAL POLE AND MAST ARM EXISTING STREET LIGHT PROPOSED CONDUIT EXISTING CONDUIT 4060 BRYANT IRVIN ROAD Pacheco Koch FORT WORTH, TX 76109 a Westwood company 1 817.412.7155 DRA WN BY CHECKED BY SCALE DA TE JOB NUMBER JMB I RE I 1"=50' I 08/09/23 I 3568-193EL OWNER /DEVELOPER TCRG PROPERTIES, LLC 5201 CAMP BOWIE BLVD FORT WORTH, TEXAS 76107 (817) 626-9898 STREET LIGHTING IMPROVEMENTS EXHIBIT CITY PROJECT #103897 IPRC RECORD NO.IPRC22-0010 TCRG EVERMAN PARKWAY - INDUSTRIAL DEVELOPMENT LOCATED IN THE CITY OF FORT WORTH, TEXAS TARRANT COUNTY, TEXAS UNIT PRICE BID Bidlist Item No. I 1 I 2 I 3 4 5 6 I 7 8 I 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description Specification Section No. Unit ofMeasure UNIT I: WATER IMPROVEMENTS 3305.0004 10" Waterline Lowerinq 33 05 12 EA 3305.0109 Trench Safety 33 05 10 LF 3311.0001 Ductile Iron Water Fittinqs w/ Restraint 3311 11 TON 3311.0141 6" Water Pipe 3311 10, 3311 12 LF 3311.0341 10" Water Pipe 3311 10, 3311 12 LF 3311.0441 12" Water Pipe 3311 10, LF 3311 12 3311.0451 12" DIP Water 3311 10 LF 3311.0452 12" DIP Water, CSS Backfill 3311 10 LF 3312.0001 Fire Hydrant 33 12 40 EA 3312.0106 Connection to Existinq 16" Water Main 33 12 25 EA 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 3312.1002 2" Combination Air Valve Assembly for 33 12 30 EA 3312.2003 1" Water Service 33 12 10 EA 3312.2203 2" Water Service 33 12 10 EA 3312.3002 6" Gate Valve 33 12 20 EA 3312.3004 10" Gate Valve 33 12 20 EA 3312.3005 12" Gate Valve 33 12 20 EA 3312.4114 16" x 12" Tapping Sleeve & Valve 33 12 25 EA 00 42 43 DAP - BID PROPOSAL Page 1 of 5 Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity 4 2823 5.6 40 51 2422 152 155 5 1 1 1 1 5 5 4 7 1 TOTAL UNIT I: WATER IMPROVEMENTS $7,500.00 $30,000.00 $0.25 $705.75 $3,500.00 $19,600.00 $100.00 $4,000.00 $140.00 $7,140.00 $206.00 $498,932.00 $300.00 $45,600.00 $155.00 $24,025.00 $5,300.00 $26,500.00 $3,760.50 $3,760.50 $1,250.00 $1,250.00 $15,461.00 $15,461.00 $2,885.00 $2,885.00 $3,795.00 $18,975.00 $1,760.00 $8,800.00 $3,575.00 $14,300.00 $4,715.00 $33,005.00 $42,000.00 $42,000.00 $796,939.25 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal DAP UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 00 42 43 DAP - BID PROPOSAL Page 2 of 5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Bidder's Application Project Item Information Description Specification Section No. Unit of Bid Measure Quantity UNIT IV: PAVING IMPROVEMENTS 0241.1100 Remove Asphalt Pvmt 0241 15 SY 273 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 108 3201.0202 Asphalt Pvmt Repair Beyond Defined Width, 3301 17 SY 249 3213.0104 9" Conc Pvmt 32 13 13 SY 116 3213.0301 4" Conc Sidewalk 32 13 20 SY 534 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 6 3216.0101 6" Conc Curb and Gutter 32 16 13 LF 31 3291.0100 Topsoil 3291 19 CY 31 3292.0100 Block Sod Placement 32 92 13 SY 280 3471.0001 Traffic Control 3471 13 MO 1 9999.0003 4" Conc Pilot Channel 00 00 00 SY 782 TOTAL UNIT IV: PAVING IMPROVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 Bidder's Proposal Unit Price I Bid Value $100.00 $27,300.00 $20.00 $2,160.00 $150.00 $37,350.00 $201.00 $23,316.00 $112.00 $59,808.00 $3,500.00 $21,000.00 $30.00 $930.00 $22.70 $703.70 $590.00 $165,200.00 $3,770.00 $3,770.00 $114.53 $89,562.46 $431,100.16 00 42 43_Bid Proposal DAP UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 00 42 43 DAP - BID PROPOSAL Page 3 of 5 Bidder's Application Bidder's Proposal Bidlist Item Description I Specification Section No. I Unit of I Bid Unit Price Bid Value No. Measure Quantity UNIT V: STREET LIGHTING IMPROVEMQNTS 1 3441.3050 Furnish/Install LED Lighting Fixture (70 watt 3441 20 EA 4 $988.00 $3,952.00 ATBO Cobra Head, Gray) Remove Existing Luminaire 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $3,952.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal DAP UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description 00 42 43 DAP - BID PROPOSAL Page 4 of 5 Bidder's Application Bidder's Proposal Specification Section No. Unit of Bid Unit Price Bid Value Measure I Quantity UNIT VI: TRAFFIC SIGNAL IMPROVEME VTS 2605.3011 2" CONDT PVC SCH 40 (T) 26 05 33 LF 110 $33.50 $3,685.00 2605.3012 2" CONDT PVC SCH 40 (B) 26 05 33 LF 325 $43.00 $13,975.00 2605.3014 2" CONDT RM (Riser) 26 05 33 LF 5 $55.00 $275.00 2605.3021 3" CONDT PVC SCH 40 (T) 26 05 33 LF 145 $38.00 $5,510.00 2605.3032 4" CONDT PVC SCH 40 (B) 26 05 33 LF 530 $53.00 $28,090.00 3217.0102 6" SLID Pvmt Marking HAS (Y) 32 17 23 LF 190 $2.25 $427.50 3217.0104 6" DOT Pvmt Marking HAS (W) 32 17 23 LF 300 $2.33 $699.00 3217.0201 8" SLID Pvmt Marking HAS (W) 32 17 23 LF 300 $3.00 $900.00 3217.0403 18" SLID Pvmt Marking HAE (Y) 32 17 23 LF 32 $10.00 $320.00 3217.0501 24" SLID Pvmt Marking HAE (W) 30 17 23 LF 655 $12.50 $8,187.50 3217.0502 Preformed Thermoplastic Contrast Markings - 32 1723 LF 600 $24.20 $14,520.00 3217.1002 Lane Legend Arrow 32 17 23 EA 8 $150.00 $1,200.00 3217.1004 Lane Legend Only 32 17 23 EA 3 $200.00 $600.00 3217.2104 REFL Raised Marker TY II-C-R 32 17 23 EA 15 $7.00 $105.00 3217.4306 Remove 24" Pvmt Marking 32 17 23 EA 32 $7.81 $249.92 3217.4307 Remove Raised Marker 32 17 23 EA 25 $4.00 $100.00 3441.1001 Furnish/Install 3-Sect Signal Head Assembly 3441 10 EA 2 $1,739.00 $3,478.00 3441.1004 Relocate Signal Head Assembly 3441 10 EA 4 $600.00 $2,400.00 3441.1012 Furnish/Install Ped Signal Head Assmbly 3441 10 EA 8 $836.00 $6,688.00 3441.1031 Furnish/Install Audible Pedestrian 3441 10 EA 8 $1,009.00 $8,072.00 3441.1215 Furnish/Install Hybrid Detection Device 3441 10 APR 4 $10,416.00 $41,664.00 3441.1236 Remove Detection Device 3441 10 EA 1 $400.00 $400.00 3441.1260 Furnish/Install CATS Ethernet Cable 3441 10 LF 770 $3.00 $2,310.00 3441.1311 5/C 14 AWG Multi -Conductor Cable 3441 10 LF 1380 $2.85 $3,933.00 3441.1312 7/C 14 AWG Multi -Conductor Cable 3441 10 LF 280 $3.05 $854.00 3441.1315 20/C 14 AWG Multi -Conductor Cable 3441 10 LF 560 $7.55 $4,228.00 3441.1322 3/C 14 AWG Multi -Conductor Cable 3441 10 LF 1370 $2.15 $2,945.50 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 255 $2.85 $726.75 3441.1410 NO 10 Insulated Elec Condr 3441 10 LF 1900 $1.40 $2,660.00 3441.1414 NO 8 Bare Elec Condr 3441 10 LF 1205 $2.45 $2,952.25 3441.1506 Furnish/Install Ground Box Type D 3441 10 EA 2 $1,540.00 $3,080.00 3441.1502 Furnish/Install Ground Box Type B, w/Apron 3441 10 EA 4 $2,403.00 $9,612.00 3441.1506 Furnish/Install Ground Box Type D 3441 10 EA 1 $1,540.00 $1,540.00 3441.1606 Install 10'- 20' Ped Pole Assmblv 3441 10 EA 3 $1,436.00 $4,308.00 3441.1611 Furnish/Install Type 41 Signal Pole 3441 10 EA 1 $11,198.00 $11,198.00 3441.1612 Furnish/Install Type 42 Signal Pole 3441 10 EA 1 $11,801.00 $11,801.00 3441.1623 Furnish/Install Mast Arm 16' - 36' 3441 10 EA 2 $7,006.00 $14,012.00 3441.1703 TY 3 Signal Foundation 3441 10 EA 2 $10,204.00 $20,408.00 3441.2005 Remove Pedestal Pole 3441 13 EA 3 $1,000.00 $3,000.00 3441.3052 Furnish/Install LED Lighting Fixture (187 3441 20 EA 5 $890.00 $4,450.00 3441.4001 Furnish/Install Alum Sign Mast Arm Mount 3441 30 EA 10 $867.00 $8,670.00 3441.4002 Furnish/Install Alum Sign Ground Mount 3441 30 EA 3 TxDOT Std. $618.00 $1,854.00 3441.4109 Remove Sign Panel 3441 30 EA 4 $192.00 $768.00 9999.0004 Remove Siqnal head 00 00 00 EA 1 $300.00 $300.00 9999.0005 Remove Ground Box 00 00 00 EA 8 $400.00 $3,200.00 TOTAL UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $260,356.42 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 00 42 43_Bid Proposal DAP UNIT PRICE BID Bidlist Item No. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description Bid Summary Specification Section No. I Unit of Measure UNIT I: WATER IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS This Bid is submitted by the entity named below: Bid Bid Quantit Total Construction I BIDDER: BY: Gary McKinney TCRG CONSTRUCTION, LLC 5201 Camp Bowie, Suite 200 Fort Worth, TX 76107 TITLE: Construction Manage DATE: 8/16/2023 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. END OF SECTION 200 working