HomeMy WebLinkAboutContract 60549Received Date: 12/04/2023
Received Time: 7:58 a.m.
Developer and Project Information Cover Sheet:
Developer Company Name: TCRG Opportunity VII, LLC
Address, State, Zip Code: 5201 Camp Bowie Blvd, Fort Worth, TX 76109
Phone & Email: 817-626-9898, patton(atcr2.com
Authorized Signatory, Title: Robert L. Patton, Jr., President
Project Name: TCRG Everman Pkwy
Brief Description: Water, Paving, Streetlight, and Signal
Project Location: SW Corner of Everman Pkwy and Will Rodgers Blvd
Plat Case Number: None provided Plat Name: None provided
Mapsco: TAR 049V Council District: 8
CFA Number: 23-0103 City Project Number: CPN 103897 1 IPRC22-0010
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Page 1 of 16
Standard Community Facilities Agreement
Rev. 9/21
City Contract Number: 60549
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and TCRG Opportunity VII, LLC, a
Texas limited liability company ("Developer"), acting by and through its duly authorized representative.
City and Developer are referred to herein individually as a "party" and collectively as the "parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as TCRG
Everman Pkwy ("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement ("Community Facilities" or "Improvements"); and
WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement; and
WHEREAS, the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated
into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Page 2 of 16
Standard Community Facilities Agreement
Rev. 9/21
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
X❑ Exhibit A: Water
❑ Exhibit A-1: Sewer
E Exhibit B: Paving
❑ Exhibit 13-1: Storm Drain
X❑ Exhibit C-1: Street Lights, Signs, and Signal
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, A-1, B, B-1, C-1, the Location Map, or the Cost Estimates
conflict with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 —
Changes to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and
Attachment 3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all
purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance.
City of Fort Worth, Texas Page 3 of 16
Standard Community Facilities Agreement
Rev. 9/21
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement, becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
9.
Award of Construction Contracts
City of Fort Worth, Texas Page 4 of 16
Standard Community Facilities Agreement
Rev. 9/21
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer -awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider, which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
City of Fort Worth, Texas Page 5 of 16
Standard Community Facilities Agreement
Rev. 9/21
11.
Easements and Rights -of -Way
Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCL UDING DEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OF ANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGESARE CAUSED, IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE,
AND INACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
13.
Right to Enforce Contracts
City of Fort Worth, Texas Page 6 of 16
Standard Community Facilities Agreement
Rev. 9/21
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre -approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand -
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY:
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
With conies to:
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 9/21
DEVELOPER:
TCRG Opportunity VII, LLC
5201 Camp Bowie Blvd
Fort Worth, TX 76109
Page 7 of 16
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor's facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
City of Fort Worth, Texas Page 8 of 16
Standard Community Facilities Agreement
Rev. 9/21
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co -employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non -Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
City of Fort Worth, Texas Page 9 of 16
Standard Community Facilities Agreement
Rev. 9/21
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement.
26.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds
of the City with a company with 10 or more full-time employees unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of the contract. The terms "boycott energy company" and "company"
have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature
provides written verification to the City that Developer: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of this Agreement.
27.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly
from public funds of the City with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate
during the term of the contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms
by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm
entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
City of Fort Worth, Texas Page 10 of 16
Standard Community Facilities Agreement
Rev. 9/21
28.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
29.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third -Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
32.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
Signature Authority
City of Fort Worth, Texas Page 11 of 16
Standard Community Facilities Agreement
Rev. 9/21
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
35.
Additional Improvements
The parties acknowledge and agree that additional sewer improvements will be necessary for
the Project which will be added as a change order in the near future ("Future Sewer Improvements").
The Developer recognizes and agrees that no final plat will be issued by City for this Project nor will
any execution of a greensheet be provided until a change order is executed between the Parties to
incorporate the Future Sewer Improvements. At the time the change order is executed, Developer will
be responsible for ensuring the additional amounts necessary for the Future Sewer Improvements are
accounted for via an additional financial guarantee or through the existing financial guarantee .
36.
Early Water Meter Release
Developer shall not obtain an early water meter release until the water and Future Sewer
Improvements have been constructed, passed inspection by the applicable Construction Inspection Offices
(including passing the backflow prevention testing), and receive the City's final acceptance. In addition,
Water and Sewer impact fees must be collected before any water meter release will occur. Final acceptance
shall mean the issuance of a letter by the City indicating that the water and Future Sewer Improvements
have been constructed in accordance with the City's standards, but shall not mean the execution of a green -
sheet, or the maintenance bonds for the water and sewer improvements becoming effective.
37.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 12 of 16
Standard Community Facilities Agreement
Rev. 9/21
Project Name: TCRG Everman Pkwy
CFA No.: 23-0103
Ite ms
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewwr Construction Total
38.
Cost Summary Sheet
City Project No.: 103897
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees)
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
Total Estimated Construction Fees:
Financial Guarantee Options, choose one
Bond = 100%
Completion Aqreement = 100% / Holds Plat
Cash Escrow Water/Sanitary Sewer= 125%
Cash Escrow Pavinq/Storm Drain = 125%
Letter of Credit = 125%
Escrow Pledqe Aqreement = 125%
Developer's Cost
$ 796,939.25
$ 796,939.25
IPRC No.: 22-0010
$
431,100.16
$
3,952.00
$
260,356.42
$
695,408.58
$ 1,492,347.83
$62,500.00
$2,205.00
$840.00
$ 65,545.00
Choice
Amount (Mark one
$ 1,492,347.83 X
$ 1,492,347.83
$ 996,174.06
$ 869,260.73
$ 1,865,434.79
$ 1,865,434.79
City of Fort Worth, Texas Page 13 of 16
Standard Community Facilities Agreement
Rev. 9/21
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
DEVELOPER
TCRG Opportunity VII, LLC
S
T�c� u��i
Dana Burghdoff (Dec , 20231 . CST)
By: Texas Capitalization Resource Group, Inc.
Dana Burghdoff
Its Manager,
Assistant City Manager
R�6e�tL. P�ttrtrz�,��.
Date: Dec 1, 2023
Robert L. Patton. Jr. (Dec 1. 2023 08:21 CST)
Robert L. Patton,
Jr., President
Recommended by:
Dec 11 2023
Date:
Fichson Nuyen
Bichson Nguyen (Dec 1, 23 8:38 CST)
Dwayne HollarsBichson Nguyen
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Thomas Royce Hansen
Assistant City Attorney II
Contract Compliance Manager:
M&C No. N/A
Date: Dec 1, 2023
By signing, I acknowledge that I am the person
responsible for the monitoring and
Form 1295: N/A
administration of this contract, including
ensuring all performance and reporting
o M.M. �p
ATTEST: ��°°d
requirements.
a°Le oA.10
d t1S °o=A
Rebecca Diane Owen (Dec 1, 202308:48 CST)
Jannette S. Goodall
Rebecca Diane Owen
City Secretary
Development Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Page 14 of 16
Standard Community Facilities Agreement
Rev. 9/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
❑X Attachment 1 - Changes to Standard Community Facilities Agreement
❑ Attachment 2 — Phased CFA Provisions
❑ Attachment 3 — Concurrent CFA Provisions
®
Location Map
®
Exhibit A: Water Improvements
❑
Exhibit A-1: Sewer Improvements
®
Exhibit B: Paving Improvements
❑
Exhibit B-1: Storm Drain Improvements
®
Exhibit C-1: Street Lights, Signs, and Traffic Improvements
®
Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 15 of 16
Standard Community Facilities Agreement
Rev. 9/21
ATTACHMENT "I"
Changes to Standard Community Facilities Agreement
City Project No. 103897
Negotiated changes are incorporated into the body of this Agreement.
City of Fort Worth, Texas Page 16 of 16
Standard Community Facilities Agreement
Rev. 9/21
MDC OHOTV H&P
PALETTE
T
.. RISINGER
RMAN
PROJECT LOCATION
� WAY
i
TARRANT COUNTY
MAPSCO TAR-049V
VICINITYMAP
(NOT TO SCALE)
OWNER/DEVELOPER
TCRG PROPERTIES, LLC
5201 CAMP BOWIE BLVD
FORT WORTH, TEXAS 76107
(817) 626-9898
Pacheco Koch
a Westwood company
4060 BRYANT IRVIN ROAD
FORT WORTH, TX 76109
1 817.412.7155
i
VICINITY MAP EXHIBIT
CITY PROJECT # 103897
IPRC RECORD NO. IPRC22-0010
TCRG EVERMAN PARKWAY - INDUSTRIAL DEVELOPMENT
DRJMB BY
CHECKEDBY
LOCATED IN
E� TEXAS
F
I
I
N.T.S.
I
08/09/23
1 3568N19 349
TARRANT COUNTY,R
KwMU "&" o Y QVIELRl MLiRO WIENIEH're
CONNECT TO
— EXISTING 16"
WATER LINEOPROPOSED
(X-09141)0"
FIRENE
TAP
0 50 100 200
GRAPHIC SCALE IN FEET
PROPOSED PRIVATE DRIVE
--� ter —
PROPOSED PUBLIC 12" PROPOSED PUBLIC FIRE
WATER MAIN I HYDRANT
1
IQ
W
4
2
01
1
' ii I i li I 1
PROPOSIREED-----------� i I I I W
I 10" F
Ill PROPOSED 1" LINE TAP PROPOSEDDOES
Z DOMESTIC WATER r-------- MEMERTIC WATER ---, —J L------ Z
1 SERVICE - - - - - - - - - -
J--------- J
=�'Z` PROPOSED PRIVATE DRIVE _
Ca - - - -4--
C 1 PROPOSED PRIVATE PROPOSED PUBLIC FIREI 1 G
PROPOSED PUBLIC 2-2" IRR. WATER HYDRANT
' 12" WATER MAIN SERVICE '
PROPOSED PRIVATE
BACKFLOW PREVENTER
I '
I I I 1 c.i
mlw --------------JL----------------Jl----- Z
Z- - - ��---- - - - - - - - - - - -
J' _ �.Z� _ _ _ _ =ssz� PROPOSED PRIVATE DRIVE -- 'i
PROPOSED PUBLIC 12" PROPOSED PUBLIC FIREI 1 C
' WATER MAIN HYDRANT
1
CONNECT TO
PROPOSED PUBLIC FIRE I I EXISTING 10"
MATCHLINE C (HYDRANT WATER LINE
o (X-09968)
ICI ------------
7FIRE
PROPOSED 10" FIRE PROPOSED PUBLIC 12"LINE TAP & BACKFLOW WATER MAIN
PREVENTER OWNER/DEVELOPER\\`---_ TCRG PROPERTIES, LLC — EAST. WATER LINE
5201 CAMP BOWIE BLVD)FORT WORTH, TEXAS 76107POSED PUBLIC PROPOSED PRIVATE DRIVE (s17) 62s-sass HYDRANT
Pacheco Koch
a Westwood company
4060 BRYANT IRVIN ROAD
FORT WORTH, TX 76109
1 817.412.7155
WATER IMPOVEMENTS EXHIBIT
CITY PROJECT #1 03897
IPRC RECORD NO. IPRC22-0010
TCRG EVERMAN PARKWAY - INDUSTRIAL DEVELOPMENT
DRJMBev CHECKEDBY
LOCATED IN TEXAS
RE I 1"C100
I
I
08/09/23 I 3J578-7 349
TARRANT COUNTY,REXWASORTH,
ENNO OT "B"' o F&WOM ONIPHOOMENEHYS
0 25 50 100
GRAPHIC SCALE IN FEET
S TOP
OSED EVERMAN PARKWAY ' a
AND SOD Iz
I V
(PROPOSED I '
I CONCRETE
SIDEWALK
I
AREA 'A'
U
0_
a r
I
p a ' PROPOSED
TOPSOIL
LLAW AND SOD
Z
LLA
Z �. - •e „c
o
N
!b
p PROPOSED
N CONCRETE
o ' SIDEWALK
U
EVERMAN PARKWAY
OWNER /DEVELOPER
TCRG PROPERTIES, LLC
5201 CAMP BOWIE BLVD
FORT WORTH, TEXAS 76107
(817) 626-9898
LEGEND
PROPOSED CONCRETE
DRIVEWAY
PROPOSED CONCRETE
SIDEWALK
PROPOSED TOPSOIL AND SOD
REMOVE
EXISTING ' m
EVERMAN PARKWAY IDRIVEWAY W
Z
W,11� 0
G
1
AREA 'B'
PROPOSED
CONCRETE
SIDEWALK
l�
(PROPOSED
CONCRETE
SIDEWALK
U
U
Y
-
a,
H
L�
Z '
V
PROPOSED
Q
(PROPOSED
TOPSOIL DRIVEWAY
AND SOD
W
Z �t
4 Q ' JPROPOSED
C CONCRETE — WILL ROGERS BOULEVARD —�- VARIABLE WIDTH
M G SIDEWALK AREA 'C' 80' PUBLIC ACCESS EASMT. PUBLIC
o ' (BY THIS PLAn ' ACC ES MT.
INST.
RATE0,
\
co4060 BRYANT IRVIN ROAD PAVING IMPROVEMENTS EXHIBIT
Pacheco Koch FORT WORTH, TX 76109 CITY PROJECT #103897
a Westwood company 817.412.7155 IPRC RECORD NO. IPRC22-0010
TCRG EVERMAN PARKWAY — INDUSTRIAL DEVELOPMENT
3: DRAWN BY CHECKED BY SCALE DATE JOB NUMBER LOCATED IN THE CITY OF FORT WORTH, TEXAS
0
JMB I RDF I 1"=50' I 08/09/23 I 3568-19.349 TARRANT COUNTY, TEXAS
EKHMU
STREET MMM8
IrMF DO O�LLRML MPROOWEREHIrS
UPGRADE EXISTING co
LUMINAIRE ON SIGNAL
POLE TO LED
cc
LZ
I II II II II II II
UPGRADE EXISTING u
LUMINAIRE ON SIGNAL
POLE TO LED
EVERMAN PARKWAI Y
A=
II =_
11=
11=
INSTALL LUMINAIRE
ON PROPOSED
SIGNAL POLE
L
0 25 50 100
0-
GRAPHIC SCALE IN FEET
L
�L
Hill 16 1111 _
INSTALL LUMINAIRE
ON PROPOSED
SIGNAL POLE
/ 0
UPGRADE EXISTING
LUMINAIRE ON SIGNAL
POLE TO LED
LEGEND
INSTALL/UPGRADE STREET LIGHT
INCLUDING TRAFFIC SIGNAL POLE AND MAST ARM
EXISTING STREET LIGHT
PROPOSED CONDUIT
EXISTING CONDUIT
4060 BRYANT IRVIN ROAD
Pacheco Koch
FORT WORTH, TX 76109
a Westwood company 1 817.412.7155
DRA WN BY CHECKED BY SCALE DA TE JOB NUMBER
JMB I RE I 1"=50' I 08/09/23 I 3568-193EL
OWNER /DEVELOPER
TCRG PROPERTIES, LLC
5201 CAMP BOWIE BLVD
FORT WORTH, TEXAS 76107
(817) 626-9898
STREET LIGHTING IMPROVEMENTS EXHIBIT
CITY PROJECT #103897
IPRC RECORD NO.IPRC22-0010
TCRG EVERMAN PARKWAY - INDUSTRIAL DEVELOPMENT
LOCATED IN THE CITY OF FORT WORTH, TEXAS
TARRANT COUNTY, TEXAS
UNIT PRICE BID
Bidlist Item
No.
I 1
I 2
I 3
4
5
6
I 7
8
I 9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Specification Section No.
Unit ofMeasure
UNIT I: WATER IMPROVEMENTS
3305.0004 10" Waterline Lowerinq
33 05 12
EA
3305.0109 Trench Safety
33 05 10
LF
3311.0001 Ductile Iron Water Fittinqs w/ Restraint
3311 11
TON
3311.0141 6" Water Pipe
3311 10,
3311 12
LF
3311.0341 10" Water Pipe
3311 10,
3311 12
LF
3311.0441 12" Water Pipe
3311 10,
LF
3311 12
3311.0451 12" DIP Water
3311 10
LF
3311.0452 12" DIP Water, CSS Backfill
3311 10
LF
3312.0001 Fire Hydrant
33 12 40
EA
3312.0106 Connection to Existinq 16" Water Main
33 12 25
EA
3312.0117 Connection to Existing 4"-12" Water Main
33 12 25
EA
3312.1002 2" Combination Air Valve Assembly for
33 12 30
EA
3312.2003 1" Water Service
33 12 10
EA
3312.2203 2" Water Service
33 12 10
EA
3312.3002 6" Gate Valve
33 12 20
EA
3312.3004 10" Gate Valve
33 12 20
EA
3312.3005 12" Gate Valve
33 12 20
EA
3312.4114 16" x 12" Tapping Sleeve & Valve
33 12 25
EA
00 42 43
DAP - BID PROPOSAL
Page 1 of 5
Bidder's Application
Bidder's Proposal
Bid Unit Price Bid Value
Quantity
4
2823
5.6
40
51
2422
152
155
5
1
1
1
1
5
5
4
7
1
TOTAL UNIT I: WATER IMPROVEMENTS
$7,500.00 $30,000.00
$0.25 $705.75
$3,500.00 $19,600.00
$100.00 $4,000.00
$140.00 $7,140.00
$206.00 $498,932.00
$300.00 $45,600.00
$155.00 $24,025.00
$5,300.00 $26,500.00
$3,760.50 $3,760.50
$1,250.00 $1,250.00
$15,461.00 $15,461.00
$2,885.00 $2,885.00
$3,795.00 $18,975.00
$1,760.00 $8,800.00
$3,575.00 $14,300.00
$4,715.00 $33,005.00
$42,000.00 $42,000.00
$796,939.25
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 00 42 43_Bid Proposal DAP
UNIT PRICE BID
Bidlist Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
00 42 43
DAP - BID PROPOSAL
Page 2 of 5
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Bidder's Application
Project Item Information
Description
Specification Section No.
Unit of
Bid
Measure
Quantity
UNIT IV: PAVING
IMPROVEMENTS
0241.1100 Remove Asphalt Pvmt
0241 15
SY
273
0241.1300 Remove Conc Curb&Gutter
0241 15
LF
108
3201.0202 Asphalt Pvmt Repair Beyond Defined Width,
3301 17
SY
249
3213.0104 9" Conc Pvmt
32 13 13
SY
116
3213.0301 4" Conc Sidewalk
32 13 20
SY
534
3213.0506 Barrier Free Ramp, Type P-1
32 13 20
EA
6
3216.0101 6" Conc Curb and Gutter
32 16 13
LF
31
3291.0100 Topsoil
3291 19
CY
31
3292.0100 Block Sod Placement
32 92 13
SY
280
3471.0001 Traffic Control
3471 13
MO
1
9999.0003 4" Conc Pilot Channel
00 00 00
SY
782
TOTAL UNIT IV: PAVING IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bidder's Proposal
Unit Price I Bid Value
$100.00 $27,300.00
$20.00 $2,160.00
$150.00 $37,350.00
$201.00 $23,316.00
$112.00 $59,808.00
$3,500.00 $21,000.00
$30.00 $930.00
$22.70 $703.70
$590.00 $165,200.00
$3,770.00 $3,770.00
$114.53 $89,562.46
$431,100.16
00 42 43_Bid Proposal DAP
UNIT PRICE BID
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
00 42 43
DAP - BID PROPOSAL
Page 3 of 5
Bidder's Application
Bidder's Proposal
Bidlist Item Description I Specification Section No. I Unit of I Bid Unit Price Bid Value
No. Measure Quantity
UNIT V: STREET LIGHTING IMPROVEMQNTS
1 3441.3050 Furnish/Install LED Lighting Fixture (70 watt 3441 20 EA 4 $988.00 $3,952.00
ATBO Cobra Head, Gray) Remove Existing Luminaire
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $3,952.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019 00 42 43_Bid Proposal DAP
UNIT PRICE BID
Bidlist Item
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
00 42 43
DAP - BID PROPOSAL
Page 4 of 5
Bidder's Application
Bidder's Proposal
Specification Section No. Unit of Bid Unit Price Bid Value
Measure I Quantity
UNIT VI: TRAFFIC SIGNAL IMPROVEME VTS
2605.3011 2" CONDT PVC SCH 40 (T)
26 05 33
LF
110
$33.50
$3,685.00
2605.3012 2" CONDT PVC SCH 40 (B)
26 05 33
LF
325
$43.00
$13,975.00
2605.3014 2" CONDT RM (Riser)
26 05 33
LF
5
$55.00
$275.00
2605.3021 3" CONDT PVC SCH 40 (T)
26 05 33
LF
145
$38.00
$5,510.00
2605.3032 4" CONDT PVC SCH 40 (B)
26 05 33
LF
530
$53.00
$28,090.00
3217.0102 6" SLID Pvmt Marking HAS (Y)
32 17 23
LF
190
$2.25
$427.50
3217.0104 6" DOT Pvmt Marking HAS (W)
32 17 23
LF
300
$2.33
$699.00
3217.0201 8" SLID Pvmt Marking HAS (W)
32 17 23
LF
300
$3.00
$900.00
3217.0403 18" SLID Pvmt Marking HAE (Y)
32 17 23
LF
32
$10.00
$320.00
3217.0501 24" SLID Pvmt Marking HAE (W)
30 17 23
LF
655
$12.50
$8,187.50
3217.0502 Preformed Thermoplastic Contrast Markings -
32 1723
LF
600
$24.20
$14,520.00
3217.1002 Lane Legend Arrow
32 17 23
EA
8
$150.00
$1,200.00
3217.1004 Lane Legend Only
32 17 23
EA
3
$200.00
$600.00
3217.2104 REFL Raised Marker TY II-C-R
32 17 23
EA
15
$7.00
$105.00
3217.4306 Remove 24" Pvmt Marking
32 17 23
EA
32
$7.81
$249.92
3217.4307 Remove Raised Marker
32 17 23
EA
25
$4.00
$100.00
3441.1001 Furnish/Install 3-Sect Signal Head Assembly
3441 10
EA
2
$1,739.00
$3,478.00
3441.1004 Relocate Signal Head Assembly
3441 10
EA
4
$600.00
$2,400.00
3441.1012 Furnish/Install Ped Signal Head Assmbly
3441 10
EA
8
$836.00
$6,688.00
3441.1031 Furnish/Install Audible Pedestrian
3441 10
EA
8
$1,009.00
$8,072.00
3441.1215 Furnish/Install Hybrid Detection Device
3441 10
APR
4
$10,416.00
$41,664.00
3441.1236 Remove Detection Device
3441 10
EA
1
$400.00
$400.00
3441.1260 Furnish/Install CATS Ethernet Cable
3441 10
LF
770
$3.00
$2,310.00
3441.1311 5/C 14 AWG Multi -Conductor Cable
3441 10
LF
1380
$2.85
$3,933.00
3441.1312 7/C 14 AWG Multi -Conductor Cable
3441 10
LF
280
$3.05
$854.00
3441.1315 20/C 14 AWG Multi -Conductor Cable
3441 10
LF
560
$7.55
$4,228.00
3441.1322 3/C 14 AWG Multi -Conductor Cable
3441 10
LF
1370
$2.15
$2,945.50
3441.1408 NO 6 Insulated Elec Condr
3441 10
LF
255
$2.85
$726.75
3441.1410 NO 10 Insulated Elec Condr
3441 10
LF
1900
$1.40
$2,660.00
3441.1414 NO 8 Bare Elec Condr
3441 10
LF
1205
$2.45
$2,952.25
3441.1506 Furnish/Install Ground Box Type D
3441 10
EA
2
$1,540.00
$3,080.00
3441.1502 Furnish/Install Ground Box Type B, w/Apron
3441 10
EA
4
$2,403.00
$9,612.00
3441.1506 Furnish/Install Ground Box Type D
3441 10
EA
1
$1,540.00
$1,540.00
3441.1606 Install 10'- 20' Ped Pole Assmblv
3441 10
EA
3
$1,436.00
$4,308.00
3441.1611 Furnish/Install Type 41 Signal Pole
3441 10
EA
1
$11,198.00
$11,198.00
3441.1612 Furnish/Install Type 42 Signal Pole
3441 10
EA
1
$11,801.00
$11,801.00
3441.1623 Furnish/Install Mast Arm 16' - 36'
3441 10
EA
2
$7,006.00
$14,012.00
3441.1703 TY 3 Signal Foundation
3441 10
EA
2
$10,204.00
$20,408.00
3441.2005 Remove Pedestal Pole
3441 13
EA
3
$1,000.00
$3,000.00
3441.3052 Furnish/Install LED Lighting Fixture (187
3441 20
EA
5
$890.00
$4,450.00
3441.4001 Furnish/Install Alum Sign Mast Arm Mount
3441 30
EA
10
$867.00
$8,670.00
3441.4002 Furnish/Install Alum Sign Ground Mount
3441 30
EA
3
TxDOT Std.
$618.00
$1,854.00
3441.4109 Remove Sign Panel
3441 30
EA
4
$192.00
$768.00
9999.0004 Remove Siqnal head
00 00 00
EA
1
$300.00
$300.00
9999.0005 Remove Ground Box
00 00 00
EA
8
$400.00
$3,200.00
TOTAL UNIT
VI: TRAFFIC SIGNAL IMPROVEMENTS
$260,356.42
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
00 42 43_Bid Proposal DAP
UNIT PRICE BID
Bidlist Item
No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
Description
Bid Summary
Specification Section No. I Unit of
Measure
UNIT I: WATER IMPROVEMENTS
UNIT IV: PAVING IMPROVEMENTS
UNIT V: STREET LIGHTING IMPROVEMENTS
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS
This Bid is submitted by the entity named below:
Bid
Bid
Quantit
Total Construction I
BIDDER: BY: Gary McKinney
TCRG CONSTRUCTION, LLC
5201 Camp Bowie, Suite 200
Fort Worth, TX 76107 TITLE: Construction Manage
DATE: 8/16/2023
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
200 working