HomeMy WebLinkAboutContract 57922-FP1FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
-FP1
City Secretary No: 57922
Date Received: 12/11/2023
City Project N!?: 102877
57922 North Riverside Dr Pavement Marking & Signage Improvements
Regarding contract for as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 6/14/2022 through
M&C 22-0455 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as
complete.
Original Contract Prices: $ 1,707,683.14
Amount of Approved Change Orders: $ 45,305.56 Ns 2
Revised Contract Amount: $ 1,752,988.70
Total Cost Work Completed: $ 1,594,612.03
Less Deductions:
Liquidated Damages: _ Days @ $ / Day
Pavement Deficiencies:
Total Deduction Amount: $
Total Cost Work Completed: $ 1,594,612.03
Less Previous Payments: $ 1,514,881.43
Final Payment Due $ 79,730.60
At2� L. Gr/alell� Dec 11, 2023
Patricia L. Wadsack (Dec 11, 202310:12 CST)
Recommended for Acceptance Date
Asst. Director, TPW - Capital Delivery
or. �,...
Lauren Prieur (Dec 11, 202310:19 CST)
Dec 11, 2023
Accepted
Date
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
w
William Johnson 202311:40 CST)
Dec 11 ,2023
(Die
Asst. City Manager
Date
Comments:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
C-620 Signature Page
Contractor's Application for Payment
Invoice No. 12 Final
To (Owner) City of Fort Worth Invoicing Period (From -To):
Invoice Date:
10/5/2023-11/09/23
11/13/2023
P. O. FW020-0000008191 From (Contractor):
Remit to ( If Not Automatic Deposit):
Number: Texas Materials Group
Project: 102877 Contractor's CFW Vendor No.:
0000000257
City Secretary Contract 57922 Contract 2021 HMAC 2 N. Riverside Dr Resurfacing
Number: Name:
Application For Payment
Change Order Summary
(Approved Change Orders
11. ORIGINAL CONTRACT PRICE...............................................................
$ $1,707,683.14
Number Additions Deletions
12. Net change by Change Orders.....................................................................1
$ $45,305.56
1 $45,305.56
13. Current Contract Price (Line 1 f 2)............................................................
$ $1,752,988.70
2 $27,291.08 $27,291.08
14. TOTAL COMPLETED AND STORED TO DATE
3
I (Progress Estimate, Construction Allowance and Change Orders).......
$ $1,594,612.03
4
15. RETAINAGE:
5
I a. X $1,594,612.03 Work Completed..........
$
6
I b. X Not Used
$
7
I c. Total Retainage (Line 5a + Line 5b)..................................
$
8
16. AMOUNT ELIGIBLE TO DATE (Line 4 - Line 5c).................................
$ $1,594,612.03
TOTALS $72,596.64 $27,291.08
17. LESS PREVIOUS PAYMENTS (Line 6 from prior Application)...........
$ $1,514,881.43
NET CHANGE BY $45,305.56
8. AMOUNT DUE THIS APPLICATION......................................................
$ $79,730.60
CHANGE ORDERS
9. BALANCE TO FINISH, PLUS RETAINAGE
(Column G on Progress Estimate+ CA + COs +Line 5 above) .................
$ $158,376.67
Contractor's Certification
10. CONTRACT TIME:
The Contractor certifies with the submittal of this document and associated Payment Request Submittal
a. Days Awarded
180
on the City of Fort Worth Buzzsaw system that to the best of their knowledge: (1) all previous progress
b, Days Added by CO
101
payments received from Owner on account of Work done under the Contract have been applied on
account to discharge Contractor's legitimate obligations incurred in connection with Work covered by
C. Total Days
281
prior Applications for Payment; (2) title of all Work, materials and equipment incorporated in said
Work or otherwise listed in or covered by this Application for Payment will pass to Owner at time of
d Days Charged
2g1
payment free and clear of all Liens, security interests and encumbrances (except such as are covered by
a Bond acceptable to Owner indemnifying Owner against any such Liens, security interest or
e, Days Remaining
encumbrances); and (3) all Work covered by this Application for Payment is in accordance with the
Contract Documents and is not defective.
Liquidated Damages $650.00 x day
Affidavit of Bills Paid
a
MAtthew Harper (NOV 30, 20 310:47 CST) Consent of Surety
This document has been modified from its original form as an EJCDC document and the user did not highlight the
modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution.
Progress Estimate
DDLa°t Nam
PO`1t0"18L1i
2021 HMAC 2 N. Riverside fir Resurfacing
APPIuvu"P,"oa-
10/5/2023-11/09/23
A
BmuemNo
D P Ira
wnDfM I Bra
Quemiry
Ilnrt Pr�cn
1
2
RemobilDaLon
Remove Canc Cuh B Geder
sPmLaD ND
1350201
024
EA
LF
100000G
55000000011
51000 y/,'
480
3
I
5
8
]^r'mn nrm antl Gone
Remove Cancreu Dover
IB"Concrete Dnvewav
Removeltlewalk
fio1o�
02410401
132/30401
102410100
LF
SF
SF
SF
55000000,�,ry�
350000000U
350000000
582000000,�,Yy�
Sd34
$3
S10'y
$2
I32130J22
SS
51100000000
8
9
10
ECerbdatbaekof55��p,4 byµ l�y�7'I T.�hP 1
ICmc Ret wall etlmcenl lO s'dewalk 72 Alocd Blw
Remove coot valley Dotter
13.2010o
0241 Lt.SV
IF
SF 1
2111111,�,Yy�
So O.Oo00
$3968_
4569
$384 �
11
I]"t'.r
Remove ADA Ramo
020
'y I
SF
300000
.2000000
"'"
$150_
13
IBamer Free Ramo.Twe R-1
Bartrer Free Re.D. Twe M-1
132130501
1321305m
SF I
SF
30000000,�,ry�
100000000
S2]d�
$257i
15
18
IRame. Free Ram"Tw. M-2
BartKK Free Ramo. Twe P-1
30504
3213 0506
SF I
SF
100000001A
22. 00000�
5252
$2575
1]
18
AsoM1alt Pareme"t Level Lo
AaD1 Pavement Base RZ.11
132120600
31240101
3N I
CY
]00000
20/0000/
51956U
$404 33_
19
20
21
ICrxk s.alm"mFndm"Pawm>n1
2"Surfaw Milline
]"Remove Concrek Pa✓emenl
2120900
0241150
9999 6
GA 2000000
$V 04000.00000
6Y 1000000
5318
$1
Sd39S
22
23
12"Asobali Pavement TvoeD
124-IneM1 antl lamer Tree Removal
132120J03
�31100102
$V 04000.00000
EA 2.0000
$138�,
58260Q
25
B"-12'Tree
131210002
1
EA
Cy
50 00
21
28
1Cum Atltlresa Paineno
Taosoil
32920100
1321]Soo1
32" 010
Sy
EA
GY
�$S3B29O6S_1
151,00000000
0000002
35000001;
10/0000/
$88
Sd08
$43
29
30
1FIev Rac. Tvn.A GR-2
Miacelleneoua Adl.__t Ltj,tl..I
_
1
3ttL
CY
LS
1000000.
1.000006
5126
M,.00-
31
IWATE R VALVE BOX AO.II I88��7FFCRETE RI6ER) 330� 0501
WA TER VALVE BOX AD ON 33 12
-
FA
1600000i
9506�32
$
33
35
38
3]
11- IN�C!Hj BTTANDPA(RO P{{{L113A��� rFf� (jj(
111MNH6�E nU ekf R�SER�LLARI
(MANHOLE AAAef fj�
SCELLANEO(5'STORM
TOP(
3312 03
330501/2
DRAIN INLET 33050108
EA I
EA
EA 1
EA
t00000W
IS 000001
1.000000_
Sd396y�Y?
8 AS18d'i
$4,39500
Q
IMMISC LLANEOUB STRVC ADJVSTMENT(10'STORM
IPBRT BLEMESSyi�N' PIPE
78FT bLE ME 9�E 91GF1
DRAIN INLET I33050108
133460101
_I34T10002
LF
WK
1.000000
100000006.
3000000
$494]2�
4110Q
$499 dA
41
42
1513E CL`E�A(1RryIaNgGT���('7�(}��
199990000
6Y
1000000
1.00000
5223�/
88000000
IGI YA PAVEAIENY AIARKINGOHNDN IGNAGE
2
8" 6LD Pint Marklne HAS IWI
1 6"SLD P-1 Mark no HASM
132170101
I321]0102
LF
LF 1
15]90.00000
12020.0000
$180
518�
3
4
6" BRK P_Marking HAS IWL
6" BRK Pvmt MaAino HAS-1
1321]OIOJ
1321]010]
LF
LF
99000000
'0000000
$180
518�
5
8
8" 6LD Pint Marklne HAS M1NW
12"slnPvml Manion HAF/
32170201
]oiol
LF
LF
4260 00000
240000
$2 30_
5111
8
9
18"SLD Pwnt Marklne HAEM
24" SLD P.t Markme HAE 1W1
Lana Legend Arrow
321]0401
1321]05.I
321] 1002
LF
EA
19000000
15800000
3' 00000�
$1006_
5112
$1812
10
I ......... Only
Lana Legend Bike AT-
1]1004
321] 009
EA
EA
21000001;
2:00000�
U.
$181
12
lane Leoentl Bikerow
1321] 1006
EA
2000001;
.57 3�/
13
14
Lana Legend Sbartar
la".I."end 18^vwtl Tru"nle rwl
321] 100]
121]101
EA
EA
2-00000!
80000001;
$842 ]Q-
Sd94S
15
18
Reiaetl Marker TY W
REFL Raisetl Maker TYII-A-A
321 001
1321]2103
Fh
EA
1]000000�
1SO 00000I1
$340
Sd sr
18
RE FL Raised Marker TY II-C-R
IS
1Fum15M1/I"smIIRRFe Assembly Double Sitletl f8olarl
321]3104
134411&3
EA
EA
14/00000
4.00000r
$480
51018d 0�/
19
Fornl.11Insult Alum ton Gmuntl Mau"t'=
3441400J
EA
20000006
$43421
20
21
Remove Sio" Panel antl Post
Remove antl Remaull Slen Panel and P_
13441 I108
13441411
EA
EA
4.000OOr
2.00000�
5106 31
$543 -
22
23
FumisM1/Insult Alum Sion MaM Arm Moun
FurnlaM1llnaull Alum Sion E. Pale MDon11
3441 I001
134414004
EA
EA
2.000OOr
1500000�
582395
$54860
24
Pavement Ma .. Co"stmcio" Allowance
LS
1.000006-
$20000 Oe
am,
$33.275
5238 865
$11 3]5
53]450
$1? 141
844 fifi0
$a 958
810990
$11
Sd 12020
.2 3350.
58
C
InN miry
200000(
7-OODOIX
7
866 88000t
8025 18I-
1496s 33-
35000(
43 55000t
2471
31s0 03000(
513450Oct
850000 ,
35108 5100IX
34598 510M
2 000Z
212
5 95000(
120009 0(
$25]0320 8
$a 39500
$494129
$1 100
$514159561980308
B14
S223
$000
$25264146
519232001
$1 420
$]9014075
$
5175'0W 11
46
S0838
$d 983T
$a "1l
Se 932 5 �
$128540J
5296]0((II��
$5]800J
591200((ffI 179
$e]2.
1417380((((U II11�� 2
$808520J. 0
Sdn dd�((f77�I 24
8108]9
5166] I
8822900/ 15
$4543980
492812] 94
$2556] 8
5858659
$35 5' 5]
5115 236 89
$513 ]1
SS ]0889
$1882218
Liam
T.M .r
$480227 32
5 $121
832960
53930
818 ]00 00
3$2S1
8261 50
$11 COB 98
$e388 ]O
$6 99] 90
Si 4. SG
$23,46580
31]8128U
$8]200
$1,3. Q
$8392 50
Contractor's Application
µgLcm""NumSer
12 Final
Avvlwro"Daa
11/132023
Pr 11ed W.
Veue 36is P-d MSI:d
I IO % Bila"wto
vnd 5t ve
G
P,,.Wr
(B-P)
yW
C)y
.+� B
42 0. I
1200011 2111 JJ
31000 001
84643888J
$48.439.B1\1398A
$13.16480
33858859HHH1HHH
$$65865.9U
2293�
3d86159011I
S$152388tl
50011 �
$115.236.86 2580�
3]05]8891
$395800
510990001
8513] J
SS]068
$513]1 ....
$5]O68A
484069I
31586391
81S 4.c8
38848805
724%
$JS 86468.05 24%
$86468.05 1050°�
1711
$511805
3452E-
$2 52500
$13.74736
$13.]4].31 2471%
521.3S2S0
$819238
$34,368
$3d.SSSSIL 425%
5136' 001
US 497.
$61439IS
$000
$81,43989 798%
563 0001
$1556011
$480227 S2
8000
$480.227.32 786%
$4395001
$1.A.t'8
318d8
$1648.6 '000°
J
$3930oUof�I
500?
$39300 101099J
3290950J
$18.]0098
52989
$18.]OO.0' 141T86�
$2 SOS. 2100°�
$550000I
3158818
$26150
$O 00
$28150 8O%
$4 133'1
512 690 001
$2,78000
$2.78000 139%
$17,220001
$11,40%
$11.406.96 750%
5109851
43332 1
$5 39d "501
$SC9300
US.]O
$8.888 70 37 5%
5166801
814014 50
$d 39566I
$4 94] 28I
$6997 9O
514.
$8.99] 91, 48 ]%
$14495U 850%
51100001
$] 99] 60
5]8011
880 000 00
823C858$
$23.485.B1\ 829%
81 ]9840
31]8128 �
$1i 612.811 918%
3181.201
$B]21
31800 M(7I
$8]201, 424%
$16000U '000.,�
$912.1
$8392.
$3.39250 34 A%
$6 C65501
5221001
8109008
$1.89008_ 884%
"'M1
312892
$808] 50
$1289?50 ]35%
$BBB] 50 1000°:
54657501
$4 511 T)
Sa sai zk io60°�A
58932 �
$893250 1000°J
$128560J
$1.2854" 10008GA
52967
$5..
$296]OU 1000°
$50881, 8]8%
$7140
58592
J
$8592U .2%
35280II
3203680U��
$20368.00 500%.
SB]2 OOI
$2036800
$808520�
$8,11121, 1100 JJJ
8108]dd6(07Jf7
$108]Bl\ 1,00°�A
316'
$8.22800
$164]9U 1000°
$822900 100t
This dawmenr M1anbem nudr6ed fiom nab. d form eaw Y d10 1m ."d rh<unerE.."orbi�ligM11 rbe
moAO<ano"a You a.e mwu.Peed ro natl Netlowrta"r artNllY and co"aulr Legl Cowin P"orronn execum"
Progress Estimate 57922
PO`1t0"18L1i 2021 HMAC 2 N. Riverside fir Resurfacing o"Y�I rv°m
aPPluvu"P,"oa- 10/5/2023-11/09/23
A e
� Iien
Bid Yam No B P Sxmn No Uml ofMeenure Btl Quenery Bnrt Price Bitl Veloe
C
Nnrellal nary
Contractor's Application
nPvlum""Numder 12 Final
n E F G
P VelNIA I
aila"ceto F�meh
Me�vly Prazwlly �
Veloe y mlletl Ve oe TM1isrnotl 81 lnul " 1 le B (B F)
N' BI
11523A5889 51.52365889 5000 51.523A58.89 892% 1IM YYe 25J
This dawmeni M1ubem mod�Eea fion, GIs o"d"ilfo.m m en Netldedowed Ih<unerd�d "bidaiBM1r ibe
moAS<ano"a You a.e mcomv8ed to natl ow"ml artNllY a"d —14,Ipl Cowin 1
P"oriovn execum"
C620 Change Order
Progress Estimate Construction Allowance Usage
ADDITIONS
For (rono-act): 102877 2021 HMAC 2 N. Riverside Dr Resurfacing C'ty S"re , 57922
Contract Nnm
Applma°°" Pmnd 10/5/2023-11/09/23
Item
Item Number Description
Totals
B C
ty to Add Specification QuantiUnitl . Addition Value Estimated Quannty
Section No Unit ofMeawre hvatallN
D
W.W
P masly
1-11ed Valve
E
Valve This Matmala Presently
Pamd StorN (mtm C)
Contractor's Application
12 Mnal
11/13/2023
F
Tool Completd % Balance. Finish
aM 3t=b Date (F) (B-P)
D+E) B
This documrnl has barn moMfled bum its original form ea an BICDC dowmeot and the user dldoo[ Idghlight the
modifications.Vou 11 rnworaged to read the document ca Wly and —It Legal C-1 prior to its execution.
C-620 Change Order
Progress Estimate Construction Allowance Usage
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
Fm (—,t): 102877 2021 HMAC 2 N. Riverside Dr Resurfacing
Appuwbon I-ed: 10/5/2023-11/09/23
A B C
Item
BsII—Number Desunptmn S-fiwcion Unit of Measure Q..ity.Delete Unic lhice Reduction Value NM Used
Sation No.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I Totals
Applswfion Number:
Appbwfion Date:
D E
Not USN NM Used NM Used Not USN
Contractor's Application
12 Final
11/13/2023
F
Not Used NM Used Nat Us
rn�s daumwl nas hern momnN fiom ns od�nal roan ea an elcDc aowmwt aoa me user manor lagnngnt the
modifications. Voa 11 en 11r d.read.¢aaumenc carefully and —It Legal Couruel prior. its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 1
ADDITIONS
For (wntran0
102877 2021 HMAC 2 N. Riverside Dr Resurfacing
city $ecrecary
Cl— N—
57922
Appheatron Pend
10/5/2023-11/09/23
A
B
C
D
Item
A.—
EstimatedQuantrty
Prenoasly
Change Order Item
Description Sp ficatmn
UnitofMeawre COQoantiryto Add
Unic Puce
Change Order
InsreIIN
VaWe
In11a Value
No.
S--No
Value
43
ove end Reoiece xurorre Toes 11-111 -6tdu real mcurb TPW
EA 10.00000000
11-115.00
111-150.00
10.00WWW
111-150.00
$16.150.00
44
Remave and —I..cmb and¢ utter lbr h--tiles TMLF
1200000WW
$15500
$19,60000
1107000WW
$17,15850
$17.15850
45
Rem—nd reolace 10 Fc. Inlet Too finclodine 2 ft wall) TPW
EA 1.00wwo
$10.555.56
$10.555.56
1.00wwo
$10.555.56
$10.555.56
Touts
$45,30556
$43.964.06
$43,864.06
Value This
Pa.ad
Contractor's Application
12 Final
11/13/2023
F
Tool Completed
Balance to Finish
and Sb .Date (F)
(B-F)
MI E) B
$16.150.00 100.0%
$17,15850 923%
$1.441.501
$10.555.56 100.0%
$43.964.06 968%
$IA41.501
This documwl has bern moMfled bom its original form ea an E1CDC dowmeot and the user didoo[ highlight the
modifications. Vou 11 enworaged W read the document—lWly and —It Legal C-1 prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 1
DELETIONS
E, (rottrract): 102877 2021 HMAC2 N. Riverside Dr Resurfacing
Appl.ea°°" Pe"°d 10/5/2023-11/09/23
A B C
Item CO Q.""to Dd...Gunge Ord, Item D.ipnon S-tfi-lion Unit of Measure Dele[e Unit Pace Change Order Nol Ure
No. S,tion No. Valve
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I Totals
Appliarion Number:
AMI—tan Date
D E
Not USN Not Used N.Ure Nor Used
Contractor's Application
12 Final
11/13/2023
P
Not ure Not ure N. UsN
rn�e daumwl na. bern momnN 6om ne original rorm ea an BICDc aowmwt aoa me user manor lagnngnt the
modifications. Voa 11 en 11,cdroread the aaumenc carefully and —It Legal Couruel prior to its execution.
C- 20 Change Order
Progress Estimate Change Order Number 1 2
Contractor's Application
ADDITIONS
For(--) 102877 2021 HMAC 2 N. Riverside Dr Resurfacing
City Secretary
ApplscanOn Number
12 Final
C-1 Num:
57922
Appl"°tr°n Pe,°a 10/5/2023-11/09/23
^PPI'w1an Date
11/13/2023
A
B
C
D
E
F
Item
Balavicem Finish
Addition Change
Estimated Quantity
Previously
Value This
M1lateruls Presently
Total Completed % B
( P)
CM1ange Order Item D—h'. Speci-in Uvit of Measure CO Quantity m Add
P
Umt Mn Order Value
Installed
Value
InAallei Value
Perlod
StorN (votmC)
aMStorN to Date M
No, Section No.
(D+E) B
Um12-New 25 Fumishllristall-1 Assembly Double Sided(Solar) with svread four EA 2.00000000
$13.645.54 $27291.08
2.00000000
$27291.08
$27291.08
$27.291.08 100.0%
Tatals
$27.291.08
$21191.08
$27.291.08
$27.291.08 IWO%
This document has bern moMfled bom its original form es an EICDC dowmevt and the user dldno[ M1lghlight the
modifications. Vo" 11 enwuraged to read the document carefully and wnsult Legal Couruel prior to its execution.
C-620 Change Order
Progress Estimate Change Order Number 1 2
DELETIONS
F° (convaot). 102877 2021 HMAC 2 N. Riverside Dr Resurfacing
AwI'whmt P-ed` 10/5/2023-11/09/23
A B C
Item CO Quanaty to Delwou Change
Change Ord, item DacriphOn S-fiwcion Unit of Measure Dele[e Unit Pnce Order Value Noc Used
N. S,tion No.
Umt2.l-18 FumiaMnatallR B Assembly Doable Sided lSolarl EA 200000000 $10.1844 $20.j,6800
Umt2.=4 Pavement Markin¢ Construction Alle_M EA 0.34615400 S20.000.06 $6.23.0br
Totals SM291.09
Apphcarion Number:
Application Date:
D E
NM Used Not Used N. Used Noc Used
Contractor's Application
12 Final
11/13/2023
F
NM Used NN Used N. Uaed
This documwl has bern moMfled fiom its original form es an FJCDC dowmeor and the user didoo[ Idghlight the
modifications. Vou 11 enwuraged ro read the document carefully and wnsuh Legal Couruel prior to its execution.
City Secretary Contract Num: 57922
Application Period:
Funding Identification (FID)
On inal Contract
30100-0200431-5740010-102�'/-006280-9999
0
0
0
0
0
0
0
0
0
0
Changye Order 1
30100-0200431-5740010-102877-006280-9999
0
0
0
0
0
0
0
0
0
0
Change Order 2
30100-0200431-5740010-102877-006280-9999
0
0
0
0
0
0
0
0
0
0
City of Fort Worth Summary of Charqes
2021 HMAC 2 N. Riverside Dr Resurfacing P. 0.: FW020-0000008191
10/5/2023-11/09/23 Application 12 Final
Number:
Total Completed Amt Remaining Gross
$1,523,456.89 $184,226.25 $0.00
$43,864.06 $1,441.50
$27,291.08 ($27,291.08)
Project Number: 102877
Application Date: 11/13/2023
Retainage Net
$0.00
City of Fort Worth Summary of Charqes
City Secretary Contract Num: 57922 2021 HMAC 2 N. Riverside Dr Resurfacing P. p, ; FW020-0000008191
Application Period: I 10/5/2023-11/09/23 I Application I 12 Final
Number:
Funding Identification (FID)
I Chan a Order 3
130100-0200431-5740010-10287 _006280-9999
10
10
10
10
10
10
10
10
10
10
I
I Chan eOrder 4
130100-0200431-5740010-10287 _006280-9999
10
10
10
10
10
10
10
10
10
10
I
I Changge Order 5
130100-0200431-5740010-102877-006280-9999
10
10
10
10
10
10
10
10
10
10
I
Total Completed Amt Remaining Gross
Project Number: 102877
Application Date: 11/13/2023
Retainage Net
City of Fort Worth Summary of Charqes
City Secretary Contract Num: 57922 2021 HMAC 2 N. Riverside Dr Resurfacing P. p, ; FW020-0000008191
Application Period: I 10/5/2023-11/09/23 I Application I 12 Final
Number:
Funding Identification (FID)
I Chan a Order 6
130100-0200431-5740010-10287 _006280-9999
10
10
10
10
10
10
10
10
10
10
I
I Chan a Order 7
130100-0200431-5740010-10287 _006280-9999
10
10
10
10
10
10
10
10
10
10
I
I Changge Order 8
130100-0200431-5740010-102877-006280-9999
10
10
10
10
10
10
10
10
10
10
I
Total Completed Amt Remaining Gross
Project Number: 102877
Application Date: 11/13/2023
Retainage Net
City Secretary Contract Num: 57922
Application Period:
Funding Identification (FID)
Totals
30100-0200431-5740010-102877-006280-9999
0
0
0
0
0
0
0
0
0
0
City of Fort Worth Summary of Charqes
2021 HMAC 2 N. Riverside Dr Resurfacing I. 0.: FW020-0000008191 project Number: 102877
10/5/2023-11/09/23 1 Applicatipon Number: 12 Final Application Date: 11/13/2023
Total Completed Amt Remaining Gross Retainage Net
$1,594,612.03 $158,376.67
$0.00
$0.00
Grand Total 1 1 $1,594,612.03 1 1 $158,376.67 1 1 $0.00 1 1 ($79,730.60)1 1 $79,730.60 1
FORT WORTH,
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2021 North Riverside Resurfacinq Proiect, CO 1
M&C CPN 102877 CSO # 57922 DOC#
DATE: 12/1/2022 INITIALS DATE OUT
To1,Alexiz Ramirez Dec 22022
Texas Bit — Macabe Faulkner
Dec 2, 2022
2
s.Tamara Vaughn (Inspector)
Dec 6, 2022
4.Tariqul Islam (PM)
%
Dec 2, 2022
5 Omar Elbagalati (PGM)
°
Dec 6, 2022
6 Leon Wilson (Interim SCPO)
Dec 6, 2022
7. Michael Owen (Interim AD)
Dec 6, 2022
s Lauren Prieur (Interim Director)
Dec 6, 2022
g Doug Black (ACA)
v44
Dec 7, 2022
10. William Johnson (ACM)
IWj
Dec 9, 2022
11, Jannette Goodall (CS)
C)?1a
Dec 9, 2022
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes❑✓ No
RUSH: ❑Y ❑✓ SAME DAY: ❑Yes ❑✓ No NEXT DAY: []Yes ❑✓ No
ROUTING TO CSO: ❑✓ Yes ❑No
Action Required:
❑ As Requested ❑ Attach Signature, Initial and Notary Ta
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call
at ext. for pick up when completed. Thank you.
CSC No. 57922-COl
Fox_ T� x;
Project Namel 2021 North Riverside Resurfacing Project
Client Project #(s)I 102877
City of Fort Worth
Change Order Request
City Sec # I 57922
Project Description) Street resurfacing and signage improvement at N. Riverside Dr from 200 ft south of Clary Ave to NE 28th St
Contractorl Texas Bit Change Order#I 1 1 Date 12/1/2022
City Project Mgr.l Tariqul Islam City Inspector Tamara Vaughn
Dept
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$1,707,683.14
Contract Time
Totals (CD)
$1,707,683.14 180
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.65%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 15%) $2,134,603.93
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order is to add $45,305.56 dollar and 28 calendar days to contract # 57922.
During construction, it was identified that, within the project limit of N. Riverside Dr, there are twelve historic curb tiles. Ajoined evaluation of all curb tiles was done by Riverside
Neighborhood Association, City's Historic Preservation Office and TPW staff. After evaluation, it was found that all tiles are badly cracked and are very fragile for saving.
Considering existing conditions, all parties came to an agreement that out of twelve historic tiles ten of them will be replaced to match with existing as much as possible and best
two of them will be saved. A quote was received from contractor for this special type of work and compared with similar work done in City's recent projects. The price for historic
tile replacement work was found reasonable. Also, the curb and gutter replacement price was negotiated with contractor and staff considered it acceptable for small amount of
concrete pour. This change order also includes removal and replacement of 10 ft curb inlet including 2 ft inlet wall.
To prepare and install ten historic curb tiles and replacement of a curb inlet, 28 calendar days are proposed to add to the contract.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) 111L, Contract Signature I Date 41
Texas Bit Macabe Faulkner tira�-FaulkG�1—z 1— rAm&o� Dec 2, 2022
acner
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
11
c 6, 2022
�-
Dec 2, 2022
Program Manager
Date
7eDc
Senior Capital Project Officer
Date
6, 2022
Dec 6, 2022
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Yr<:&3—
Dec 6, 2022
I.L— P
Dec 6, 2022
nt City Attorney
Date
lAssistant City Manager
Date
L;;
Dec 7, 2022
�`
Dec 9, 2022
m��Council Action (if required)
M&C Number I
ATTEST:
Jannette Goodall, City Secretary
M&C Date Approved
FORTWORTH
Project Name 2021 North Riverside Resurfacing Project
Client Project # 102877
Contractorl Texas Bit
City of Fort Worth
Change Order Additions
I I EM DESCHIP I ION
Unit 1 -New 4$ Remove and Replace Historic Tiles 1 mchX1 inch - 6 tiles tall) in Curb
Unit 1 -New 44 Remove and Replace Curb and Gu er for historic tiles
Unit 1 -New 45 Remove and Replace 10 ft. Inlet Top (including 2 ft wall)
City Sec # 57922 ###
I
lPMl Tariqul Islam Inspectorl Tamara Vaughn
O1 Date j 12/1/2022 1 4/28/2022
ADDITIONS
DEPI
TPW
TPW
TPW
uty Unit Unit Cost I otal
10.0000000U EA $1,615.OU $16,150.00
120.00000000 LF $155.00 $18,600.00
1.00000000 EA $10,555.56 10,555.56
TPW $45,305.56
Sub Total Additions $45,305.56
Change Order Additions Page 2 of 4
ITEM
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name I 2021 North Riverside Resurfacing Project
Client Project # I 102877
Contractorl Texas Bit PMI Tariqul Islam
DELETIONS
DESCRIPTION DEPT
City Sec # 1 57922 ###
Inspeclorl Tamara Vaughn
Date 1 12/112022 4/28/2022
Oty Unit Unit Cost Total
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
TF W $0.001
I
I
I
Sub Total Deletions $0,001
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
2021 North Riverside Resurfacing Project
102877
Total $0.00
Texas Bit
Previous Change Orders
co # DATE AMOUNT
Total I $0.00 1
FORT WORTH,
Routing and Transmittal Slip
Transportation and Public Works
Department
DOCUMENT TITLE: 2021 North Riverside Resurfacing Proiect, CO 2
M&C CPN 102877 CSO #
DATE: 7/13/2023 INITIALS
To: Valentina Riera i�
1.
Texas Bit — Matthew Harper
2.
3. Eric Tinner (Inspector)
%
ET
ET
4.Tariqul Islam (PM)
5 Omar Elbagalati (PGM)O
6 Mary Hanna (SCPO)
W�
7. Patricia Wadsack (AD)
PL w
PLW
s Lauren Prieur (Director)
LP
g Doug Black (ACA)
&b
dwb
10. William Johnson (ACM)
Wj
11, Jannette Goodall (CS)
JS,G
JSG
57922 DOC#
DATE OUT
Jul 14) 2023
Jul 14) 2023
Jul 17, 2023
Jul 15, 2023
J u l 191 2023
Jul 20, 2023
Jul 20, 2023
Jul 21, 2023
Jul 24, 2023
Jul 24, 2023
Jul 24, 2023
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: U Yes❑✓ No
RUSH: ❑Yes ❑✓ No SAME DAY: [:]Yes❑✓ No NEXT DAY: []Yes ❑✓ No
ROUTING TO CSO: ❑✓ Yes [—]No
Action Required:
❑ As Requested ❑ Attach Signature, Initial and Notary Ta
■ Signature/Routing and or Recording
❑ Comment
❑ File
Return to: Please call
at ext. for pick up when completed. Thank you.
CSC No. 57922-CO2
Fox_ T� x;
City of Fort Worth
Change Order Request
Project Namel 2021 North Riverside Resurfacing Project I City Sec # I 57922
Client Project #(s)l 102877
Project Description) Street resurfacing and signage improvement at N. Riverside Dr from 200 ft south of Clary Ave to NE 28th St
Contractorl Texas Bit Change Order #1 2 1 Date
City Project Mgr.l Tariqul Islam City Inspector
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$1,707,683.14
$45,305.56
7/13/2023
Eric Tinner
Contract Time
Totals (CD)
$1,707,683.14 180
$45,305.56 28
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.65%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 15%) $2,134,603.93
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order is to add $0 dollar and 73 calendar days to contract # 57922.1.The plan called for installation of Rectangular Rapid Flushing Beacon (RRFB) at NE corner of
Hollis SUN. Riverside Dr and SE corner Honeysuckle/N. Riverside Dr intersection. However, during construction it was identified that installation of RRFB with drilled shaft
foundation were not possible at these two locations due to existing gas and electrical line. This conflict was resolved by changing drilled shaft foundation with 5ft X 5ft spread
foundation. To accomplish the work, a quote was received from contractor and verified with Traffic Management established unit price for similar work, the staff found that
contractor's quote was reasonable. The change order added $6,923.08 additional amount to the contract cost and deleted the same amount from construction allowance pay
item to make the net change order amount to $0.2.During construction, the Contractor had to stop working until several conflicts were resolved. Due to the type of contract being
calendar days, this necessitated to add 73 additional days to contract time as stated below: -Installation of Ped Pole with Push button at Springdale Intersection (25 days):
During construction it was identified that N. Riverside Dr and Springdale Dr signalized intersection required installation of pedestrian pole with push button at all four curb ramps
to make them ADA compliant. To accomplish this additional work Traffic Management was requested to share cost of the work. Traffic Management came up with their fund to
share and completed the work by their preapproved contractor and pre -established unit cost. To prepare the plan and completion of work by Traffic Management the project work
was stopped from 1/20/2023 until 2/13/2023. -Supply issue of RRFB and sod (35 days): After completion of all major works contractor notified that they had an issue with their
sub to get RRFB with correct materials and supply of sod from their supplier due to persistent wet weather. The work was stopped from 4/19/2022 until 512312022. Contractor's
request letter is attached for reference. -Rain/Weather delays (13 days): Experienced more than average yearly rain days and couldn't do any work on the following days:
8/22/2022, 8/23/2022, 8/31/2022, 9/1/2022, 9/2/2022, 10/24/2022, 10/28/2022, 11/4/2022, 11/14/2022, 12/13/2022, 2/14/2023, 3/2/2023 and 3/16/2023.
The inspector's log and email communications and weather report pertaining to these delays have been documented.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature
Texas Bit Matthew Harper „
I Date
Jul 14, 2023
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
-�•�
Jul 17, 2023
Jul 15, 2023
Program Manager
Date
Senior Capital Project Officer
Date
�a
Ju119,2023
--
Ju120,2023
Assistant Director (De
Date
Director, Contracting Department (Dept)
Date
Ju120, 2023
Jul21, 2023
Date
Assistant City Manager
Date
Lss,,stanl..C,it,,Attome
Ju124,2023
Ju124,2023
Council Action (i
M&C Number I
ATTEST:
a . ..
Jannette Goodall, City Secretary
M&C Date Approved
FORT WORTH City of Fort Worth
Change Order Additions
Project Name 1 2021 North Riverside Resurfacing Project
Client Project # 1 102877
Contractorl Texas Bit I PMI
ADDITIONS
I I EM DtSGRIP I IUN DEP I
Unit 2 -New 25 Furnish/Install RRFB Assembly Double Sided(Solar) with spread foundaiton TPW
City Sec# 1 57922 1 ###
I
Tariqul Islam Inspectorl Eric Tinner I
Ragle, Inc. 0 Date 1 7/13/2023 1 4/28/2022
Qty Unit
2.00000000 EA
Umt cost I otal 1
$13,645.54 $27,291.081
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
TPW $27,291,081
I I
I I
I I
Sub Total Additions $27,291.081
Change Order Additions Page 2 of 4
FORTWORTH
City of Fort Worth
Change Order Deletions
Project Name 1 2021 North Riverside Resurfacing Project
City Sec # 1 57922 1 ###
Client Project # 102877
1
Contractorl Texas Bit
I PMI Tariqul Islam I
Inspector Eric Tinner
Ragle, Inc. F--2
Date 1 7/1312023
4128/2022
DELETIONS
ITEM I DESCRIPTION
DEPT Oty
Unit Unit Cost
Total 1
Umt2,Item1drunmshllnslall KKFB Assembly Double Sided (Solar)
I PW 2.00000000
to $10,184.00
$20,368.001
Unit2,ltem24[Pavemenl Marking Construction Allowance
TPW 0.34615400
EA $20,000.00
$6,923.081
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TF W
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
$27,291.081
1
Sub Total Deletions
1
1
$27,291.081
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
2021 North Riverside Resurfacing Project
102877
2021 North Riverside Resurfacing Project
Total $0.00
Previous Change Orders
co # DATE AMOUNT
12/7/2022 $45,305.56
Total I $45,305.56
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
November 13, 2023
Texas Bit,Texas Materials Group
420 Decker Drive, Suite 200
Irving,Tx 75062
RE: Acceptance Letter
Project Name: North Riverside Dr Pavement Marking & Singnage Impr
Project Type: 03
City Project No.: 102877
To Whom It May Concern:
On June 5, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on November 6, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on November 6, 2023, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
880-4257.
Sincerely,
Tariqul Islam (Dec 8, 202311:43 CST)
Tariqul Islam, Project Manager
Cc: Eric Tinner, Inspector
Wade Miller, Inspection Supervisor
Ariel Duarte , Senior Inspector
Riad Nusrallah, Program Manager
N/A, Consultant
Texas Bit, Contractor
N/A, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OFTARRANT
Before me, the undersigned authority, a notary public in the state and county
aforesaid, on this day personally appeared Donnie Blackburn, Vice President of Texas
Materials Group, Inc., known to me to be a credible person, who being by me duly sworn,
upon his oath deposed and said;
That all persons, firms, associations, corporations, or other organizations
furnishing labor anti/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth has
been paid in full;
That there are no claims pending for personal injury and/or property damages;
On Contract described as;
2021 NMAC 2 N. Riverside Dr Resurfacing CPN 102877
BY Donald Blackburn
Donnie Blackburn
GM/Vice President
Texas Materials Group, Inc.
JNPUBLIC
N �2rn 2023. Subscribed and sworn before me on thi
JAMIE GREENWAY%`Notary Public, State of Taxes
Comm. Expires 09.25.2024 I AND FORD
Notary ID 12115454UNTY, TEXASMy commission expires
` CONSENT OF SURETY
OWNER
TO FINAL PAYMENT
ARCHITECT -_
CONTRACTOR _
AIA Document G707
SURETY
(Instructions on reverse side) Bond No.
014249306 OTHER
TO OWNER:
ARCHITECT'S PROJECT NO:
(Name and address)
City of Fort Worth
200 Texas Street
CONTRACT FOR:
Forth Worth, TX 76102
2021 North Riverside Resurfacing Project, City project
No. 102877
PROJECT: CONTRACT DATED: .rune 14, 2022
(Name and address)
2021 North Riverside Resurfacing Project, City project No. 102877
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(Insert name and address of Surety)
Liberty Mutual Insurance Company
175 Berkeley Street Boston, MA 02116 —SURETY,
on bond of
(Insert name and address of Contractor)
Texas Materials Group, Inc. dba TexasBit, A CRH Company
420 Decker Drive #200 Irving, TX 75062 CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of
any of its obligations to
(Insert name and address of Owner)
City of Fort Worth
200 Texas Street Forth Worth, TX 76102
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date:
(Insert in writing the month followed by the numeric date and year.)
Attest/Witnes ---[�
(Seal):
Bonnie Rice, Witness
November 29, 2023
Liberty Mutual Insurance Company
(Surety)
(Signature of authorizi(d epreseniative) T
Carolyn E. Wheeler, Attorney -In -Fact
(Printed name and title)
AIA DOCUMENT G707 w CONSENT OF SURETY TO FINAL PAYMENT w 1994 EDITION w AIA
01994 w THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, NW, WASH-
INGTON, D.C. 20006-5292 w WARNING: Unlicensed photocopying violates U.S. copy-
right laws and will subject the violator to legal prosecution.
G707-1994
This Power of Attorney limits the acts of those named herein, and they have no authority to
Liberty bind the Company except in the manner and to the extent herein stated.
Mutual. Liberty Mutual Insurance Company
SURETY The Ohio Casualty Insurance Company Certificate No: 8204866
West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly
organized under the laws of the State of Indiana (herein collectively called the "Companies', pursuant to and by authority herein set forth, does hereby name, constitute and appoint,
Carolyn E. Wheeler
all of the city of - Knoxville state of Tennessee each individually if there be more than one named, its true and lawful attomey-in-fact to
make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in
pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their
own proper persons.
IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 15th day of February, 2021.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
P� 1NSU'D P014 INS& � 1NSUq West American Insurance Company
jooaPo� oyn� �J ooaPo�>�yn `VP`oaro&re'LF %�
1912 0 1919 1991
>s �o : �o a o By:
rd,�9�sacttuee aa3 Sp �y"haMPs� aa� �s �Notna� aa�
David M. Carey, Assistant Secretary
m
STATE OF PEN NSYLVANIA ss
- @ COUNTY OF MONTGOMERY
15 15 Co
M On this 15th day of February, 2021, before me personally appeared David M. Carey; who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance Company,
N The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein
p � contained by signing on behalf of the corporations by himself as a duly authorized officer.
N >
— IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
7 91' PAST
pC - �? � °"Wear <e Commonwealth of Pennsylvania - Notary Seal //�,� ,�, '� ,�, ,� '�
ti u s v Teresa Pastella, Notary Public .1�.vLlk����
— oP Montgomery County
aj O My commission expires March 28, 2025 By 4
O 4) 1 ��+ Commission number 1126044 Teresa Pastella, Notary Public
C 03 4Ry Member, Pennsylvania Association of Notaries
ai This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows:
w ARTICLE IV - OFFICERS: Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
ai President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
o ca any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys-in-fact, subject to the limitations set forth in their respective powers of attorney,
o shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
M C: instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the
> m provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.
' �i
ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.
Z c
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attomey, shall have full power to bind
- the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding
as if signed by the president and attested by the secretary.
Certificate of Designation -The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attomeys-
infact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other
surety obligations.
Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary
of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the
Company with the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, of Liberty Mutual Insurance Company, The Ohio Casualty Insurance Company, and West American Insurance Company
do hereby certify that this power of attorney executed by said Companies is in full force and effect and has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 29th day of November 2023
P� 1NSLI POSY INS& 1NSUgq
Jr,ORP ok1T yn� �J�opaP or�r RgyC+ `VP aaoRyro Ica I ��///�
� 1912 � 0 1919 � � 1991
�° By:
d� ss<cr.us` a��+aMPs'� da fs 'Noma► ds Renee C. Llewellyn, Assistant Secretary
Marsh MSurety POA LMIC OCIC WAIC Multi Co 022021
` ) o a
.r U
Cr m
c�
c
a
1_ a
Q �
a=
C .f
Q Lo
oq
L N
19
a)
O� cce)
o0
o'
CD
cCD
M—
a
0 a)
L
Q Q)
u" a