Loading...
HomeMy WebLinkAboutContract 60591CSC No. 60591 CITY OF FORT WORTH, TEXAS STANDARD AGREEMENT FOR ENGINEERING RELATED PROFESSIONAL SERVICES This AGREEMENT is between the City of Fort Worth, a Texas home -rule municipality ("CITY"), and Kimley-Horn and Associates, Inc. authorized to do business in Texas, ("ENGINEER"), for a PROJECT generally described as: Water and Sanitary Sewer Replacement on Camp Bowie Boulevard — Project No. 105062. Article I Scope of Services The Scope of Services is set forth in Attachment A. Negotiated changes to this Agreement, if any, are included in Attachment C. Article II Compensation The ENGINEER's compensation shall be in the amount up to $974,121.00 as set forth in Attachment B. Payment shall be considered full compensation for all labor (including all benefits, overhead and markups), materials, supplies, and equipment necessary to complete the Services. Engineer shall provide monthly invoices to City. The Engineer shall provide the City sufficient documentation, including but not limited to meeting the requirements set forth in Attachment D to this AGREEMENT, to reasonably substantiate the invoices. Payments for services rendered shall be made in accordance with the Texas Prompt Payment Act (Texas Government Code Ch. 2251). Acceptance by Engineer of said payment shall release City from all claims or liabilities under this Agreement for anything related to, performed, or furnished in connection with the Services for which payment is made, including any act or omission of City in connection with such Services. Article III Term Time is of the essence. Unless otherwise terminated pursuant to Article VI. D. herein, this Agreement shall be for a term beginning upon the effective date, as described below, and shall continue until the expiration of the funds or completion of the subject matter contemplated herein pursuant to the schedule, whichever occurs first. Unless specifically otherwise amended, the original term shall not exceed five years from the original effective date. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 1 of 15 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Article IV Obligations of the Engineer A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The ENGINEER shall perform its services: (1) with the professional skill and care ordinarily provided by competent engineers practicing under the same or similar circumstances and professional license; and (2) as expeditiously as is prudent considering the ordinary professional skill and care of a competent engineer. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 2 of 15 D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible mylar sheets and electronic files in .pdf format, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. E. Engineer's Personnel at Construction Site (1) The presence or duties of the ENGINEER's personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the contract documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the contract documents, nor shall anything in the contract documents or this AGREEMENT between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the work or otherwise check the quality or quantity of the work on the PROJECT. If the ENGINEER makes on -site observation(s) of a deviation from the contract documents, the ENGINEER shall inform the CITY. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the contract documents. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 3 of 15 F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the contract documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are no other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. H. Record Drawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 4 of 15 Business Equity Participation City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. In accordance with the City's Business Equity Ordinance No. 25165-10-2021 (replacing Ordinance No. 24534-11-2020, as codified in Chapter 20, Article X of the City's Code of Ordinances, as amended, and any relevant policy or guidance documents), the City has goals for the full and equitable participation of minority business and/or women business enterprises in City contracts greater than $100,000. Engineer acknowledges the MBE and WBE goals established for this contract and its execution of this Agreement is Engineer's written commitment to meet the prescribed MBE and WBE participation goals. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this Agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of five (5) years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of five (5) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3) hereof. CITY shall give subconsultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to reproduce such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of hard copies at the rate published in the Texas Administrative Code in City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 5 of 15 effect as of the time copying is performed. K. INSURANCE Engineer shall not commence work under this Agreement until it has obtained all insurance required under Attachment F and City has approved such insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. The doctrine of respondent superior shall not apply. M. Disclosure The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the CITY may request the ENGINEER to assist in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities - Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 6 of 15 P. Schedule ENGINEER shall manage the PROJECT in accordance with the schedule developed per Attachment D to this AGREEMENT. Article V Obligations of the City A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule prepared in accordance with Attachment D. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 7 of 15 F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at the construction site, and provisions providing for contractor indemnification of the CITY and the ENGINEER for contractor's negligence. H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this Section H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 8 of 15 Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. J. Changes The CITY may make or approve changes within the general Scope of Services in this AGREEMENT. If such changes affect the ENGINEER's cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions A. Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. B. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. C. Force Majeure CITY and ENGINEER shall exercise their best efforts to meet their respective duties and obligations as set forth in this Agreement, but shall not be held liable for any delay or omission in performance due to force majeure or other causes beyond their reasonable control, including, but not limited to: acts of the public enemy, fires, strikes, lockouts, natural disasters, epidemics/pandemics, wars, riots, material or labor restrictions by any governmental authority and/or any other similar causes. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 9 of 15 D. Termination (1) This AGREEMENT may be terminated a.) by the City for its convenience upon 30 days' written notice to ENGINEER. b.) by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and the nonperforming party does not commence correction of such nonperformance within 5 days' written notice or thereafter fails to diligently complete the correction. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Reasonable cost of reproduction or electronic storage of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) The reasonable time requirements for the ENGINEER'S personnel to document the work underway at the time of the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all projected termination expenses. The CITY'S approval shall be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER's personnel and subcontractors, and ENGINEER' compensation will be made. F. Indemnification The ENGINEER shall indemnify or hold harmless the CITY against liability for any damage committed by the ENGINEER or ENGINEER's agent, consultant under contract, or another entity over which the ENGINEER exercises control to the extent that the damage is caused by or resulting from an act of negligence, intentional tort, intellectual City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 10 of 15 property infringement, or failure to pay a subcontractor or supplier. CITY is entitled to recover its reasonable attorney's fees in proportion to the ENGINEER's liability. G. Assignment ENGINEER shall not assign all or any part of this AGREEMENT without the prior written consent of CITY. H. Jurisdiction The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F., VI.H., and VI.I. shall survive termination of this AGREEMENT for any cause. J. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. K. Contract Construction/No Waiver The parties acknowledge that each Party and, if it so chooses, its counsel, have reviewed and revised Agreement and that the normal rule of contract construction, to the effect that any ambiguities are to be resolved against the drafting party, must not be employed in the interpretation of Agreement or any amendments or exhibits hereto. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 11 of 15 The failure of CITY or ENGINEER to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of CITY's or ENGINEER's respective right to insist upon appropriate performance or to assert any such right on any future occasion. L. Immigration Nationality Act ENGINEER shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by CITY, ENGINEER shall provide CITY with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. ENGINEER shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any ENGINEER employee who is not legally eligible to perform such services. ENGINEER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY ENGINEER, ENGINEER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to ENGINEER, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. M. Prohibition On Contracts With Companies Boycotting Israel ENGINEER unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if ENGINEER has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, ENGINEER certifies that ENGINEER'S signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, ENGINEER: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. N. Prohibition on Boycotting Energy Companies ENGINEER acknowledges that in accordance with Chapter 2274 of the City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 12 of 15 Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full- time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. O. Prohibition on Discrimination Against Firearm and Ammunition Industries ENGINEER acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the CITY is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, ENGINEER certifies that ENGINEER's signature provides written verification to the CITY that ENGINEER: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, which supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. This AGREEMENT may be executed in one or more counterparts and each counterpart shall, for all purposes, be deemed an original, but all such counterparts shall together constitute but one and the same instrument. City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 13 of 15 The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A - Scope of Services Attachment B - Compensation Attachment C - Amendments to Standard Agreement for Engineering Services Attachment D - Project Schedule Attachment E - Location Map Attachment F — Insurance Requirements City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 14 of 15 Duly executed by each party's designated representative to be effective on the date subscribed by the City's designated Assistant City Manager. BY: CITY OF FORT WORTH Danai�,24' 0231T) Dana Burghdoff Assistant City Manager Date: Dec 11, 2023 ATTEST: p�6¢pnosos` Jannette S. Goodall City Secretary APPROVAL RECOMMENDED: Chrisfo�lfiarderlfiard - C,, scopher Harder (Dec 11, 202 10:111ITI Y' Chris Harder, P. E. Director, Water Department APPROVED AS TO FORM AND LEGALITY Qcdor— y:-31a :-I11,20i316:27 CST) Douglas W Black Sr. Assistant City Attorney Contract Compliance Manager: BY: ENGINEER Kimley-Horn and Associates, Inc. W, � /1,40, (John Atkins, P. E. Vice President Date: 11 /16/2023 Form 1295 No. 2023-1079833 M&C No.: 23-0908 M&C Date: 10/31 /2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Aze& X-C Preeti KC, P.E. Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas W&SS Repl. on Camp Bowie Boulevard Standard Agreement for Engineering Related Design Services City Project No. 105062 Revised Date: November 23, 2021 Page 15 of 15 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 ATTACHMENT A Scope for Enqineerinq Design Related Services for Water and/or Sanitary Sewer Improvements DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN STREET TO MONTGOMERY STREET CITY PROJECT NO.: 105062 The scope set forth herein defines the work to be performed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. OBJECTIVES Approximately 16,734 linear feet of water replacements, 2,550 linear feet of new water main, and 5,152 linear feet of sanitary sewer replacements are planned, as summarized in the table below: Water Replacements/Additions Street Length Existing Proposed From To Alignment (LF) Size (in) Size (in) Camp Bowie Montgomery Boulevard (East) Street Clifton Street 842 30 36 (Expedited) Camp Bowie Boulevard (East) Watonga Street Montgomery St. 935 30 36 Westside Pump Station Location Camp Bowie Clark Avenue 413 24 24 Boulevard Camp Bowie Boulevard (East) Hulen Street Watonga Street 5,028 20 24 Camp Bowie Boulevard (East) Hillcrest Street Virginia Place 2,000 - 12 W. Will Rogers Lancaster Burnett Tandy 1,697 8 12 Road Avenue Drive Westside Pump Camp Bowie Clark Avenue 26 12 12 Station Location Boulevard Camp Bowie Camp Bowie Western Ave. 115 6 8 Boulevard (East) Boulevard Camp Bowie Camp Bowie Carleton Ave. 114 8 8 Boulevard (East) Boulevard Camp Bowie Camp Bowie Ashland Ave. 105 6 8 Boulevard (East) Boulevard Tremont Avenue Camp Bowie Crestline Road 670 6/8 8 Boulevard Hillcrest Street Camp Bowie Crestline Road 432 6 8 Boulevard Thomas Place Camp Bowie Clark Avenue 1,384 6 8 Boulevard City of Fort Worth, Texas Attachment A PMO Release Date: 07.23.2012 Page 1 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 Washington Camp Bowie Clark Avenue 1,346 6 8 Terrace Boulevard Clover Lane Camp Bowie Clark Avenue 1,271 6 8 Boulevard Virginia Place Camp Bowie Clark Avenue 1,104 6 8 Boulevard Camp Bowie Camp Bowie Belle PI. 179 8 8 Boulevard (East) Boulevard Camp Bowie Camp Bowie Dorothy Ln. 93 6 8 Boulevard (East) Boulevard Alley between Alta Mere Drive Camp Bowie North 640 feet 640 12 12 and Irene Drive Boulevard (Expedited) Camp Bowie Boulevard Marks Place West 485 feet 340 6/12 12 (West) (Expedited) Irene Drive Camp Bowie North 330 feet 550 - 8 (Expedited) Boulevard Total Water Length 19,284 LF Sanitary Sewer Replacements Street Length Existing Proposed Alignment From To (LF) Size (in) Size (in) Camp Bowie Hulen Street Montgomery 712 6/8 8 Boulevard (East) Street Alley between Western Avenue Camp Bowie Crestline Road 1,796 6/8 8 and Carleton Boulevard Avenue Easement between Camp Bowie Ashland Avenue Boulevard North 97 feet 202 6/8 8 and Tremont Avenue Alley between Tremont Avenue Camp Bowie Crestline Road 375 6 8 and Hillcrest Boulevard Street City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 2 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 Sanitary Sewer Replacements (continued) Street From To Length Existing Proposed Alignment (LF) Size (in) Size (in) 220 feet east ad 220 feet North of the East 330 feet Tremont then South 60 481 6 8 Avenue and feet Easement North Camp Bowie of Camp Bowie Boulevard Boulevard Intersection Virginia Place Camp Bowie Crestline Road 151 8 8 Boulevard Easement between Camp Watonga East 275 feet 275 6 8 Bowie and Tulsa Street Way Easement east Camp Bowie of Watonga Boulevard South 275 feet 275 6 8 Street W. Will Rogers Lancaster Burnett Tandy 885 10 12 Road Avenue Drive Total Sewer Length 5,152 LF WORK TO BE PERFORMED Task 1. Design Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services (NOT USED) Task 7. ROW/Easement Services Task 8. Survey and Subsurface Utility Engineering Services Task 9. Plan Submittal Checklists (NOT USED) TASK 1. DESIGN MANAGEMENT. ENGINEER shall make efficient and effective use of ENGINEER's and CITY's time and resources. ENGINEER shall manage change, ■ communicate effectively, ■ coordinate internally and externally as needed, and City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 3 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 ■ proactively address issues with the CITY's Project Manager and others as necessary to make progress on the work. 1.1. Managing the Team • Lead, manage and direct design team activities • Confirm quality control is practiced in performance of the work • Communicate internally among team members • Task and allocate team resources 1.2. Communications and Reporting • Attend a pre -design project kickoff/chartering meeting with CITY staff to confirm and clarify scope, understand CITY objectives, and ensure economical and functional designs that meet CITY requirements • Conduct review meetings with the CITY at the end of each design phase • Prepare invoices and submit monthly in the format requested by the CITY. • Prepare and submit monthly progress reports in the format provided by the Water Department. • Prepare and submit baseline Project Schedule initially, and Project Schedule updates with a schedule narrative monthly, as required in Attachment D to this Standard Agreement and according to the City of Fort Worth's Schedule Guidance Document. • Complete Monthly M/WBE Report Form and Final Summary Payment Report Form at the end of the project • Coordinate with other agencies and entities as necessary for the design of the proposed infrastructure, and provide and obtain information needed to prepare the design • With respect to coordination with permitting authorities, ENGINEER shall communicate with permitting authorities such that their regulatory requirements are appropriately reflected in the designs. ENGINEER shall work with regulatory authorities to obtain approval of the designs, and make changes necessary to meet their requirements, as part of the design scope. • Personnel and Vehicle Identification: When conducting site visits to the project location, the ENGINEER or any of its sub -consultants shall carry readily visible information identifying the name of the company and the company representative. ASSUMPTIONS • Twenty (20) MWBE reports will be prepared • Twenty (20) monthly invoices • Twenty (20) monthly water department progress reports will be prepared • Twenty (20) monthly project schedule updates will be prepared City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 4 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 • Ten (10) monthly design meetings DELIVERABLES A. Meeting summaries with action items B. Monthly invoices C. Monthly progress reports D. Baseline design schedule E. Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes F. Monthly M/WBE Report Form and Final Summary Payment Report Form TASK 2. CONCEPTUAL DESIGN (30 PERCENT). The Conceptual Design shall be submitted to CITY per the approved Project Schedule. The purpose of the conceptual design is for the ENGINEER to ■ Study the project, ■ Identify and develop alternatives that enhance the system, ■ Present (through the defined deliverables) these alternatives to the CITY ■ Recommend the alternatives that successfully addresses the design problem, and ■ Obtain the CITY's endorsement of this concept. ENGINEER will develop the conceptual design of the infrastructure as follows. 2.1. Data Collection • In addition to data obtained from the CITY, ENGINEER will research proposed improvements in conjunction with any other planned future improvements that may influence the project. • The ENGINEER will also identify and seek to obtain data for existing conditions that may impact the project including but not limited to; utilities, agencies (TxDOT and railroads), City Master Plans, and property ownership as available from the Tax Assessor's office. • The data collection efforts will also include conducting special coordination meetings with affected property owners and businesses as necessary to develop sewer re-routing plans. • The ENGINEER shall visit the project site and obtain the meter numbers and sizes on all existing meters to be replaced on the project and shall identify existing sample stations and fire line locations. 2.2 The Conceptual Design Package includes the following scope of services. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 5 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 • Plan and profile exhibits including aerial at a scale of 1" = 50'. Profile will be based upon LiDAR data. • Approximately 23 sheets for the water mains • Approximately 7 sheets for the sewer mains • Proposed phasing of any water and sanitary sewer work that is included in this project documented in both the project schedule and narrative form. • Documentation of key design decisions. • Estimates of probable construction cost. 2.3 Fire Line Reconnection • Engineer shall coordinate with property owners along alignment to identify and locate existing fire lines. • Design shall include connections to existing fire lines and shut down and sequencing to keep lines in service during construction. ASSUMPTIONS • 2 (two) copies of the conceptual design package (30% design) will be delivered and will consist of 11 x1 7 Exhibit and email summarizing alignment and design considerations. • ENGINEER will prepare meeting notes of the Conceptual Design Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Preliminary Design activities without obtaining written approval by the CITY of the Conceptual Design Package. DELIVERABLES A. Conceptual Design Package TASK 3. PRELIMINARY DESIGN (60 PERCENT). Preliminary plans and specifications shall be submitted to CITY per the approved Project Schedule. These services will include 60% design for 842 linear feet of 36" water main improvements to be expedited, 6,376 linear feet of 24" through 36" water main improvements, and 10,536 linear feet of 8" through 12" water main improvements, and 1,530 linear feet of 8" through 12" water main improvements to be expedited. These will be provided as Four (4) separate 60% design submittals. ENGINEER will develop the preliminary design of the infrastructure as follows. 3.1. Development of Preliminary Design Drawings and Specifications shall include the following: • Cover Sheet City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 6 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 A Proiect Control Sheet, showing all Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400. The following information shall be indicated for each Control Point: Identified (existing City Monument #8901, PK Nail, 5/8" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on City Datum only; descriptive location (i.e. set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). • Overall Droiect easement lavout sheet(s) with property owner information. Overall proiect water and/or sanitary sewer lavout sheets. The water layout sheet shall identify the proposed water main improvement/ existing water mains in the vicinity and all water appurtenances along with pressure plane boundaries, water tanks, pump stations, valves, and fire hydrants. The sewer layout sheet shall identify the proposed sewer main improvement/existing sewer mains and all sewer appurtenances in the vicinity. • Overall water and/or sanitary sewer abandonment sheet. • Coordinates on all P.C.'s, P.T.'s, P.I.'s, manholes, valves, mainline fittings, etc., in the same coordinate system as the Control Points. • Benchmarks per 1,000 ft of plan/profile sheet — two or more. • Bearings given on all proposed centerlines, or baselines. • Station eauations relating utilities to paving, when appropriate. • Plan and profile sheets which show the following: proposed water and/or sanitary sewer plan/profile and recommended pipe size, fire hydrants, water service lines and meter boxes, gate valves, isolation valves, manholes, existing meter numbers and sizes that are to be replaced, existing sample locations, existing fire line locations, existing utilities and utility easements, and all pertinent information needed to construct the project. Legal description (Lot Nos., Block Nos., and Addition Names) along with property ownership shall be provided on the plan view. The ENGINEER shall make provisions for reconnecting all identifiable water and/or wastewater service lines which connect directly to any main being replaced, including replacement of existing service lines within City right-of-way or utility easement. When the existing alignment of a water and sanitary sewer main or lateral is changed, provisions will be made in the final plans and/or specifications by the ENGINEER to relocate all service lines which are connected to the existing main and connect said service lines to the relocated main. The following shall be applicable at all locations where it is necessary to relocate or reroute the existing private sanitary sewer service line due to the abandonment or realignment of the existing public sanitary sewer lateral or main: The CITY shall furnish the ENGINEER with a sample format of how the sewer service line reroute/relocation should be designed and submitted for construction. During design survey, if a rod can be inserted through the cleanout to the bottom of the service line, the ENGINEER will obtain the flow line elevation and design the City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 7 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 service line prior to advertising the project for bid. If the service flow line information cannot be obtained during design survey, the ENGINEER shall delay the design of the sewer service line until after a Quality Level A Subsurface Utility Engineering (SUE investigation has been performed). The Level A SUE will be performed; (1) by the ENGINEER if included in the fee proposal; or (2) by the CITY prior to bidding if the CITY determines that it is needed for satisfactory completion of the design; or (3) by the Contractor after the project has been bid, by means of a bid item to that effect. In all options, the ENGINEER shall propose appropriate de - hole locations in the project and collect flow line elevation and other applicable information of the sewer service line. The ENGINEER shall use this information to provide the design for the sanitary sewer service line to be rerouted or relocated. • Provide map showing location of new manhole construction at the end of existing sewer segments, 90 degree bends, or tee connections. Site survey or specific design plans for manhole construction is not included as part of the scope. The contract documents shall specify that it is the Contractor's responsibility to coordinate utility location, etc. manhole construction. The ENGINEER will prepare standard and special detail sheets for water line installation and sewer rehabilitation or replacement that are not already included in the D-section of the CITY's specifications. These may included connection details between various parts of the project, tunneling details, boring and jacking details, waterline relocations, details unique to the construction of the project, trenchless details, and special service lateral reconnections. 3.2. Geotechnical Investigation Soil investigations, including field and laboratory tests, borings, related engineering analysis and recommendations for determining soil conditions will be made. In addition to the above investigations, borings and appropriate field and laboratory analysis will be made at reasonable intervals along the project alignment for the Contractor's use in determining soil conditions for preparing bids and a Trench Safety Plan. 3.3 Constructability Review • Prior to the preliminary design review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. 3.4. Utility Clearance The ENGINEER will consult with the CITY's Transportation and Public Works Department, Water Department, and other CITY departments, public utilities, private utilities, private utilities and government agencies to determine the approximate location of above and underground utilities, and other facilities (current and future) that have an impact or influence on the project. ENGINEER will design CITY facilities to avoid or minimize conflicts with existing utilities, and where known and possible consider potential future utilities in designs. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 8 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 • The ENGINEER shall upload a PDF file of the approved preliminary plan set to the designated project folder in BIM360 for forwarding to all utility companies which have facilities within the limits of the project. CAD files shall be made available to the utility companies, if requested. 3.5 Traffic Control Plan • Develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's BIM360 website. The typicals need not be sealed individually, if included in the sealed contract documents. • Develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. 3.6 Opinion of Probable Construction Cost • ENGINEER will update and prepare preliminary opinion of probable construction cost (OPCC) for the proposed water transmission main. ASSUMPTIONS • Two (2) public meeting(s) will be conducted or attended during the preliminary design phase. • Fourteen (14) borings at an average bore depth of twenty (20) feet each will be provided. • Traffic Control "Typicals" will be utilized to the extent possible. It is assumed an additional eight (8) project specific traffic control sheets will be developed. • Four (4) 60% Design submittal packages as outlined above. • For each submittal package, three (3) sets of 22 x 34 size plans will be delivered for the Constructability Review. • For each submittal package, three (3) sets of 22 x 24 size plans will be delivered for the Preliminary Design (60% design). • For each submittal package, one (1) set of specifications will be delivered for the Preliminary Design (60% design). • DWF files created from design CAD drawings will be uploaded to the designated project folder in BIM360. • The CITY's front end and technical specifications will be used. The ENGINEER shall supplement the technical specifications if needed. • For each submittal package, six (6) sets of drawings will be delivered for Utility Clearance. • ENGINEER shall not proceed with Final Design activities without written approval by the CITY of the Preliminary Design plans. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 9 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 DELIVERABLES A. Geotechnical Report (1 hard copy) B. Preliminary Design drawings and specifications C. Utility Clearance drawings D. Traffic Control Plans E. Estimates of probable construction cost F. Data Base listing names and addresses of residents and businesses affected by the project. TASK 4. FINAL DESIGN (90 PERCENT) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT). Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as follows. These services will include 90% and 100% design for 842 linear feet of 36" water main improvements to be expedited, 6,376 linear feet of 24" through 36" water main improvements, and 10,536 linear feet of 8" through 12" water main improvements, and 1,530 linear feet of 8" through 12" water main improvements to be expedited. These will be provided as four (4) separate 90% and 100% design submittals. • Draft Final plans (90%) and specifications shall be submitted to CITY per the approved Project Schedule. • Following a 90% construction plan review meeting with the CITY, the ENGINEER shall submit Construction Documents (100%) to the CITY per the approved Project Schedule. Each plan sheet shall be stamped, dated, and signed by the ENGINEER registered in State of Texas. • The ENGINEER shall submit a final design estimate of probable construction cost with both the 90% and 100% design packages. This estimate shall use ONLY standard CITY bid items. • Final Design will include Cathodic Protection Design Plans as prepared by ENGINEER's Cathodic Protection subconsultant. • Cathodic Protection Design — ENGINEER's subconsultant will provide Cathodic Protection Design Services for three (3) pipe material alternatives, ductile iron, steel, and bar -wrapped concrete steel cylinder pipe, along the water line alignment. Tasks will include Field Survey, Data Analysis and Lab Work, and Design Recommendations. A report will be prepared that documents test data, analysis, and an opinion of probable construction cost for cathodic protection and interference control systems. ASSUMPTIONS • For each submittal package, three (3) sets of 22 x 34 size drawings and three (3) sets of 11 x 17 size drawings and one (1) set of specifications will be delivered for the 90% Design package. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 10 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 • A DWF file for the 90% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • For each submittal package, three (3) sets of 22 x 34 size drawings and three (3) specifications will be delivered for the 100% Design package. • A DWF file for the 100% Design will be created from design CAD drawings and will be uploaded to the project folder in BIM360. • Cathodic Protection Design Recommendations Report (up to 3 copies) • Final Design will include Cathodic Protection Design Plans as prepared by ENGINEER's Cathodic Protection subconsultant. • Final sheet list: cover (4), index and general notes (4), shutdown and phasing notes (4), control and benchmarks (5), overall location and proposed sheet reference (water and sanitary sewer) (5), overall existing (water & sanitary sewer) (5), line abandonment (water & sanitary sewer) (5), plan and profiles (water & sanitary sewer) (38), detail sheets, erosion control, and traffic control (7). • Two (2) public meeting(s) will be conducted or attended during the final design phase. DELIVERABLES A. 90% construction plans and specifications. B. 100% construction plans and specifications. C. Detailed estimates of probable construction costs including summaries of bid items and quantities using the CITY's standard bid items and format. D. Original cover mylar for the signatures of authorized CITY officials. TASK 5. BID PHASE SERVICES. ENGINEER will support the bid phase of the project as follows. It is assumed there will be two (2) separate bidding units. 5.1. Bid Support • The ENGINEER shall upload all plans and contract documents onto BIM360 for access to potential bidders. • Contract documents shall be uploaded in a .xIs file. • Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal Worksheet Template, and will be populated and configured so that all pages are complete and the Summary Worksheet(s) in the workbook detail and automatically summarize the totals from the inserted Unit Price Proposal document worksheets. • Plan Sets are to be uploaded to BIM360 in two formats, .pdf and .dwf files. The .pdf will consist of one file of the entire plan set. The .dwf will consist of City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 11 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan set index. • The ENGINEER shall sell contract documents and maintain a plan holders list on BIM360 from documents sold and from Contractor's uploaded Plan Holder Registrations in BIM360. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The log shall be housed and maintained in the project's BIM360 folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto BIM360 and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • Assist the CITY in determining the qualifications and acceptability of prospective contractors, subcontractors, and suppliers. • When substitution prior to award of contracts is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials and equipment proposed by bidders. • Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFW Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on BIM360. • Incorporate all addenda into the contract documents and issue conformed sets. 5.2 Final Design Drawings 1) Final Design Drawings shall be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall be created from the original CAD drawing files and shall contain all associated sheets of the particular plan set. Sinqular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: TPW file name example — "W-1956_org47.pdf" where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "47" shall be the total number of sheets in this file. Example: W-0053_org3.pdf and K-0320_org5.pdf City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 12 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 II. Water and Sewer file name example — "X-35667_org36.pdf" where "X- 35667" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of sheets in this file. Example: X-12755_org18.pdf Both PDF and DWF files shall be uploaded to the project's Final Drawing folder in BIM360. 2) In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet as an individual DWG file with all reference files integrated into the sheet. If the plans were prepared in DGN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows: I. TPW files shall use the W number as for PDF and DWF files, but shall include the sheet number in the name — "W-1956_SHT01.dwg", "W- 1956_SHT02.dwg", etc. 11. Water and Sewer file names shall use the X number as for PDF and DWF files, but shall include the sheet number in the name — "X- 12155_SHT01.dwg", "X-12755_SHT02.dwg", etc. For information on the proper manner to submit files and to obtain a file number for the project, contact the Department of Transportation and Public Works Vault at telephone number (817) 392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS • The project will be bid as two separate bidding units and awarded to two contractors. • For each bidding unit, five (5) sets of construction documents will be sold to and made available on BIM360 for plan holders and/or given to plan viewing rooms. • For each bidding unit, six (6) sets of 22 x 34 size and six (6) sets of 11 x 17 size drawings plans and six (6) specifications (conformed, if applicable) will be delivered to the CITY. • PDF, DWF and DWG files will be uploaded to BIM360. DELIVERABLES A. Addenda City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 13 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 B. Bid tabulations C. CFW Data Spreadsheet D. Recommendation of award E. Construction documents (conformed, if applicable) TASK 6. CONSTRUCTION PHASE SERVICES. (NOT INCLUDED) TASK 7. ROW/EASEMENT SERVICES. ENGINEER will support and perform activities related to ROW and land as outlined below, per scoping direction and guidance from the CITY's Project Manager. 7.1. Right -of -Way Research • The ENGINEER shall determine rights -of -way, easements needs for construction of the project. Required permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. 7.2. Right-of-Way/Easement Preparation and Submittal • The ENGINEER shall prepare documents to be used to obtain right-of-way and permanent easements required to construct the improvements. • The ENGINEER shall submit the right-of-way and/or easement documents to CITY PM for real property acquisition • The documentation shall be provided in conformance with the checklists and templates available on the CITY's BIM 360 site. ASSUMPTIONS • Up to three (3) Easements (permanent construction) or right-of-way documents will be prepared. • CITY will provide Appraisals and Easement Acquisition services DELIVERABLES A. Easement exhibits and metes and bounds provided on CITY forms. B. Temporary Right of Entry Letters TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES. ENGINEER will provide survey support as follows. 8.1. Design Survey City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 14 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 • ENGINEER will perform field surveys to collect horizontal and vertical elevations and other information needed by ENGINEER in design and preparation of plans for the project. Information gathered during the survey shall include topographic data, elevations of all sanitary and adjacent storm sewers, rim/invert elevations, location of buried utilities, structures, trees 6-in and larger (measure caliper, identify overall canopy, and have qualified arborist identify species of trees), and other features relevant to the final plan sheets. Existing drainage at intersections will be verified by field surveys. Spot elevations will be shown on intersection layouts with cross slope to fit intersecting grade lines. • The alignment centerline (or offset, as appropriate) will be staked in the field for areas of the alignment not adjacent to street right-of-way. • The minimum survey information to be provided on the plans shall include the following: — A Project Control Sheet, showing ALL Control Points, used or set while gathering data. Generally, on a scale of not less than 1:400: — The following information about each Control Point; a. Identified (Existing. CITY Monument #8901, PK Nail, 5/8" Iron Rod) b. X, Y and Z Coordinates, in an identified coordinate system, and a referred bearing base. Z coordinate on CITY Datum only. C. Descriptive Location (Ex. Set in the centerline of the inlet in the South curb line of North Side Drive at the East end of radius at the Southeast corner of North Side Drive and North Main Street). — Coordinates on all P.C.'s, P.T.'s, P.I.'s, Manholes, Valves, etc., in the same coordinate system, as the Control. — No less than two horizontal benchmarks, per line or location. — Bearings given on all proposed centerlines, or baselines. — Station equations relating utilities to paving, when appropriate. 8.2. Temporary Right of Entry Preparation and Submittal • Temporary Right of Entry will be provided by the ENGINEER as described in Task 7. 8.3. Subsurface Utility Engineering (SUE): • The SUE shall be performed in accordance with Cl/ASCE 38-02. • Four different levels of SUE are identified. The following is a description of each level of SUE used on this project. 1. Level D — Collect level D as part of this scope of services. 2. Level C City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 15 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 a.) Field locate and obtain horizontal position of visible utility surface features for all of the utility systems described within Level D. 3. Level B a.) Indicate by marking with paint, the presence and approximate horizontal location of subsurface utilities using geophysical prospecting techniques, including electromagnetic, sonic, and acoustical techniques. b.) Approximately 4 days of direct buried utilities are identified for Level B location. 4. Level A a.) Location (Test Hole) Services: Locating the horizontal and vertical position of the utility by excavating a test hole using vacuum excavation techniques and equipment. In performing locating (test hole) services ENGINEER will: 1) Excavate Fifteen (15) test holes to expose the utility to be measured in such a manner that ensures the safety of the excavation and the integrity of the utility to be measured. Excavations will be performed using specially developed vacuum excavation equipment that is non-destructive to existing facilities. If contaminated soils are discovered during the excavation process, the ENGINEER will notify the CITY. 2) Obtain x,y and Z information at each test hole. ASSUMPTIONS • Topographic survey will be extended 50-ft on either side of selected alignment. • Topographic survey at intersection will include no more than 100 ft. in each direction. • Level A Subsurface Utility Engineering will be performed for up to fifteen (15) locations and 4 days of Level B Subsurface Utility Engineering. DELIVERABLES A. Copies of field survey data and notes signed and sealed by a licensed surveyor. B. Drawing of the project layout with dimensions and X, Y, and Z coordinate list., when applicable. C. SUE records and measurements will be uploaded to BIM 360. TASK 9. PLAN SUBMITTAL CHECKLISTS (NOT USED) Additional Services not included in the existinq Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks above. However, ENGINEER can provide these services, if needed, upon the City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 16 of 17 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANITARY SEWER REPLACEMENT ON CAMP BOWIE FROM HULEN TO MONTGOMERY CITY PROJECT NO.: 105062 CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary right -of -entries. • Services related to development of the CITY's project financing and/or budget. • Services related to disputes over pre -qualification, bid protests, bid rejection and re- bidding of the contract for construction. • Construction Phase Services, Construction Management, or Inspection services • Performance of materials testing or specialty testing services. • Services necessary due to the default of the Contractor. • Services related to damages caused by fire, flood, earthquake or other acts of God. • Services related to warranty claims, enforcement and inspection after final completion. • Services related to submitting for permits (ie.TxDOT, railroad, etc...), unless specifically addressed in scope of services. • Services related to Subsurface Utility Engineering Levels A, B, C or D, unless specifically addressed in scope of services. • Services related to Survey Construction Staking • Services related to acquiring real property including but not limited to easements, right-of-way, and/or temporary right -of -entries. • Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. • Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth, Texas Attachment A PMO Release Date: 08.1.2014 Page 17 of 17 EXHIBIT "B-1" ENGINEER INVOICE (Supplement to Attachment B) Design Services for Water and Sanitary Sewer Replacement on Camp Bowie Boulevard City Project No. 105062 Lump Sum Project Compensation A. The ENGINEER shall be compensated a total lump sum fee of $974,121.00 as summarized in Exhibit B-1 — Engineer Invoice and Section IV — Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. B. The ENGINEER shall be paid monthly payments as described in Section II - Method of Payment. Method of Payment A. Partial payment shall be made to the ENGINEER monthly upon City's approval of an invoice prepared and submitted by the ENGINEER in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. B. The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. C. The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. D. Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the ENGINEER. III. Progress Reports A. The ENGINEER shall prepare and submit to the designated representative of the Water Department monthly progress reports and schedules in the format required by the City. ATTACHMENT B COMPENSATION IV. Summary of Total Project Fees Firm Primary Responsibility Fee Amount % Prime Consultant Kimley-Horn and Design and Bidding $702,076 72.1 Associates, Inc. Proposed MWBE Sub -Consultants The Rios Group Subsurface Utility Engineering $52,800 5.4 Gorrondona & Survey $158,095 16.2 Associates Non-MWBE Consultants CMJ, Inc. Geotechnical Investigation $36,500 3.8 Black Mesa Engineering and Cathodic Protection $24,650 2.5 Consulting, PLLC Project Number & Name 105062 - Water and Sanitary Sewer Replacements on Camp Bowie From Hulen Street to Montgomery Street City MWBE Goal = 13% City of Fort Worth, Texas Attachment B PMO Official Release Date: 8.09.2012 Page 3 of 3 TOTAL $974,121.00 100% Total Fee MWBE Fee MWBE % $974,121.00 $210,895.00 21.6 Consultant Committed Goal = 21.6 % Attachment D - City Project No. 104940 Northside III TransF�"il'9M6FI'rMin Alignment Study Professional Services Invoice Project Manager: IPreetiKC I Summary Project: JW/SS Replacement - Camp Bowie (Hulen-Montgomo City Project #: 1105062 1 City Sec Number: I I Supplier Instructions Fill in green cells including Invoice Number, From and To Dates and the included worksheets. Company Name: IKimley-Horn and Associates, Inc. When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Suppliers PM: Shelby Warchesik, P.E. email: shelby.warchesik@kimley-horn.corr Supplier Invoice #: Office Address 801 Cherry Street, Unit 11, Suite 1300, Fort Worth, TX 76102 Payment Request #: Telephone: 817-335-6511 Service Date:From Fax: Service Date:To Invoice Date: Remit Address: P.O. Box 951560, Dallas, TX 75395 - 1640 Agreement LTD Agreement Amendment Amount to Completed Percent ($) Invoiced Current Remaining Sheet FID and Work Type Description Amount Amount Date Amount Spent Previously Invoice Balance Work Type 1 Water $769,556.00 $769,556.00 $769,556.00 Work Type 2 Sewer $204,565.00 $204,565.00 $204,565.00 Work Type 3 Work Type 4 Work Type 5 Work Type 6 Totals This Invoice $974,121.00 $974,121.00 $974,121.00 Overall Percentage Spent: Attachment D - City Project No. 104940 Northside III Transftftb§lb1Hn in Alignment Study Professional Services Invoice Project Manager: Preeti KC Project: W/SS Replacement - Camp Bowie (Hulen-Mor City Project #: 105062 Work Type Desc: lWater I Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Name: Kimley-Horn and Associates, Inc. Supplier's PM: Shelby Warchesik, P.E. email: shelby.warchesik@kimley-horn.com Supplier Invoice #: Shelby Warchesik, P.E. Office Address 801 Cherry Street, Unit 11, Suite 1300, Fort Worth, TX 76102 Payment Request #: Telephone: 817-335-6511 Service Date:From Fax: Service Date:To Invoice Date: Remit Address: P.O. Box 951560, Dallas, TX 75395 - 1640 Pay Items Agreement LTD Agreement Amendment Amendment Amount to Completed Description Amount Number Amount Date Amount 30 - Design $769,556.00 $769,556.00 Totals This Unit: $769,556.00 $769,556.00 Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $769,556.00 $769,556.00 Professional Services Invoice Project Manager: Preeti KC Project: W/SS Replacement - Camp Bowie (Hulen-Mont( City Project #: 105062 Work Type Desc: ISewer Supplier Instructions: FID: City Sec Number: Fill in green cells including Percent Complete and Invoiced Previously Quanities Purchase Order: When your Invoice is complete, save and close, start Buzzsaw and Add your invoice to the Consultant folder within Project's folder. Company Name' Kimley-Horn and Associates, Inc. Suppliers PM: Shelby Warchesik, P.E. email: shelby.warchesik@kimley-horn.com Supplier Invoice #: Office Address: 801 Cherry Street, Unit 11, Suite 1300, FortWorth, TX 76102 Payment Request #: Telephone: 817-335-6511 Service Date:From Fax: Service Date:To Invoice Date: Remit Address: P.O. Box 951560, Dallas, TX 75395- 1640 Pay Items Agreement LTD Agreement Amendment Amendment Amount to Complete Description Amount Number Amount Date Amount 30 - Desiqn $204,565.00 $204,565.00 Totals This Unit: $204,565.00 $204,565.00 Overall Percentage Spent: Percent ($) Invoiced Spent Previously Current Remaining Invoice Balance $204,565.00 $204,565.00 EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacement on Camp Bowie (Hulen St. to Montgomery St.) City Project No. 105062 Labor(hnurs) Expense Task No. Task Description Senior Project EIT Administrative Total Labor Subconsultant Professional Manage`ClEpgineer Cost Travel Rate $370 $295 $245 $130 MWBE Non-MWBE 1.0 Project Manaqement 24 53 64 20 $42,79� $0 $0 $0 1.1 Managqing the team $0 1.1.2 QA/QC 16 $3,706 1.2 Communications and Reporting $0 1.2.1 Pre -Design Coordination Meeting 3 6 8 $4,840 Monthly Design Progress Review 1.2.2 Meeting�s/Presi�are Notes ((10) 10 20 30 $16,950 1.2.3 PrepareBaselineSchedule 1 1 6 $2,135 Prepare Monthly Progress Reports with 1.2.4 Schedule (20l 16 20 $9,620 1.2.5 Prepare Monthly MBE/SBE Reports 10 20 $5,550 2.0 Conce�tualDesign (30-Percent) 40 138 183 0 $100,3de $0 $0 $0 2.1 Data Collection 10 15 2S $14,250 2.1.1 Stakeholder Coordination and Log 15 76 20 $31,100 2.2 Conceptual Desi_T Package $0 2.2.1 Plan View (30 sheets 1 "=50') 10 30 90 $34,600 2.2.1 Profile (large/diam/LiDAR) (8 sheets) 2 10 24 $9,570 2.2.2 Alignment Alternatives/Phasing 2 10 20 $8,590 2.2.3 Document Design Decisions $0 2.2.4 Construction Es imate 1 3 4 $2,236' 3.0 Preliminary Design (60 Percent) 104 245 503 20 $236,590 $0 $36,500 $0 3.1 Preliminary Design Package - 4 Plan Sets 3.1.1 Cover f2) 4 $980 3.1.3 Overall Lai out(251 45 $11,025 3.1.4 Plan and P)an/Proti9�e Sheets (38� 6S 114 304 $132,160 3.1.4 Locate Meter Numbers/Fire Services 5 28 28 $16,970 3.1.5 Detail Sheets 22 28 $13,350 3.1.6 Specifications 2 Expedited projects) 1 5 5 $3,816 Specifications (2 sets w/ contract 3.1.7 documents) 8 20 20 15 $15,710 3.2 Geotechnical Investigation 2 2 $1,820 $36,500 Geotech 3.3 Constructability Review 3 3 3 $2,730 3.4 Utility Clearance 1 4 $1,940 3.5 L I raffic Control 6 24 32 $17,140 3.5.1 Coordination for ADA/TPW for Ramps 3 10 $4,060 3.6 Construction Estimate 2 5 12 $5,155 3.7 Public Meeting Prep/Attendance (2) 6 10 16 5 $9,740 4.0 Final Design 49 233 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 470 19r $203,96e $0 $24,650 $0 Total Expense Task Sub Total Budget Reproduction Cost Remaining $0 $0 $42,795 $0 $3,706 $4,840 $16,950 $2,135 $9,620 $5,550 $0 $6 $100,349 $14,250 $31,100 $0 $34,600 $9,570 $8,590 $0 $2,23$ $1,000 $37,500 $274,090 $500 $500 $500 $980 $0 $11,025 $132,160 $16,970 $13,350 $3,816 $15,710 $36,500 $38,320 $2,730 $1,940 $17,140 $4,060 $5,155 $500 $500 $10,240 $1,000 $25,650 $229,619 Percentage Complete Final Draft (90%) Construction Plans and 4.1 Specifications - 4 Plan Sets 4.1.1 Cover/Index/Control (12) 12 4.1.2 Shutdown/SeQuencing/Pump Station (3) 15 22 40 4.1.3 Overall Layouts (19) 19 4.1.4 Plan and Profile Sheets (38) 98 217 4.1.5 Detail Sheets 6 22 4.1.6 Pavement Repair/Coordination 4 12 23 4.1.7 Traffic Control Plans (8 non-std details) 5 10, 30 4.1.8 Erosion Control Plans (22l 7 4.1.9.a Specifications E� ited Rrojects) 3 12 12 12 4.1.9.b Specifications 2 Bidding Unit) 5 30 25 4.1.10 Final Quantities/OPCC 4 8 15 4.2 Cathodic Protection Study 4.3 Public Meeting Prep/Exhibits [2) 4.4 Final % Specifications 6 5 10 20 16 30 (100 )Plans and 4.5 Final Quantities/OPCC 1 2 2 5.0 Bid Phase 18 52 71 5.1 Bid Support (2 Bidding Units 5.1.1 Upload Documents to BIM 60 3 Hold Contract Documents and Maintain 5.1.2 Plan Holders List 8 8 5.1.3 Issue Addenda/Answer Questions 10 22 24 5.1.4 Prep/Attend Pre -Bid -Meeting 3 10 10 5.1.5 Tabulate Bids and Recommend Award 2 2 6 5.2 Mylar Drawings/Conformance Docs 3 10 20 Construction Phase Services (NOT 6.0 USED) 0 0 0 7.0 ROW/Easement Services 0 5 5 7.1 Permanent (3) Easements 2 2 Right-of-Way/Easement Preparation and 7.2 Submittal 7.3 Yemporary Right of Entry Submittal 3 3 8.0 Surve_ /SUE 19 19 8.1 DesignNurvey 6 6 8.2 Ye orary Right of Entry Submittal 3 3 8.3 SIJE 2 10 10 9.0 Permitting (NOT USED) 0 0 0 10.0 t4dditional Services 0 0 0 10.1 Additional Services Totals 237 745 1314 Water Line Footage 19284.00 I Sewer Line Footage 5152.00 24436.00 (A) Total Fee $974,120 (B) Survey Fee $153,595 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 $2,940 $21,840 $4,65� $82,07r $7,160 $10,69r $12,150 $2,600 $7,590 15 $18,77� $7,51 6' $0 $24,650 Cathodic Pror-ction $9,090 $15,100 $1,820 16 $41,417le $0 $0 $735 8 $5,360 $16,070 $6,510 8 $3,840 $8,960 0 $0 $0 $o 0 $2,700 $4,500 $0 $1,080 $4,500.00 Gorrondona $0 $1,620 0 $11,000 $206,395 $0 $3,240 $153,595 Gorrondona $1,620 $6,140 $52,800 SUE 0 $0 $0 $o 0 $30,000 $30,000 71 $668,870 $210,895 $61,150 79% 21% $500 $2,940 $21,840 $4,655 $82,07'6 , $7160 , $10:655 $12,150 $2,600 $7,590 $18,775 $7,51$ $24,650 $9,590 $15,100 $1,820 $500 $24,650 $500 $0 $4,000 $4,000 $45,475 $735 $0 $0 $5,360 $16,070 $1,000 $1,000 $7,516 $3,840 $3,000 $3,000 $11,960 $o $o $o $0 $4,500 $7,200 $1,080 $0 $0 $1,620 $0 $0 $206,396 $217,395 $153,595 $156,835 $1,620 $52,800 $o $o $o $o ry $0 $30,000 $30,000 $0 $6,000 $278,04e $946,915.00 Project Summa Total Hours 2,368 Total Labor $668,870 Total Expense $278,045 MBE/SBE Subconsultant $210,895 Non-MBE/SBE Subconsultan I $61,150 $500 $500 $500 $24,650 $500 $0 $4,000 $4,000 $45,475 $735 $0 $0 $5,360 $16,070 $1,000 $1,000 $7,516 $3,840 $3,000 $3,000 $11,960 $o $o $o $0 $4,500 $7,200 $1,080 $0 $0 $1,620 $0 $0 $206,396 $217,395 $153,595 $156,835 $1,620 $52,800 $o $o $o $o ry $0 $30,000 $30,000 $0 $6,000 $278,04e $946,915.00 Project Summa Total Hours 2,368 Total Labor $668,870 Total Expense $278,045 MBE/SBE Subconsultant $210,895 Non-MBE/SBE Subconsultan I $61,150 $500 $500 JC) Total Fee -`survey Fee $820,525 Waf $648,2 79% of C) I Sew r Fee (21 % f C) Description WP Water Sewer 1 Conceptual Design (30%) 31 $194,465.00 $51,693.00 I Preliminary Desi,QQn 60%) 32 $388,929.00 $103,386.00 I Final Design (10/) 33 $64,822.00 $17,231.00 1 Survey 51 $121,340.00 $32,255.00 I Subtotal I $769,556.00 1 $204,565.001 Total I $974,121.00 1 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 10% Sub Ma rkup$27,205I MBE/SBE Participation 21.6% Total Project Co.I $974,121.00 Kimley-Horn and Associates, Inc. Client: City of Fort Worth W/SS Replacement - Camp Bowie - Hulen to Project: Montgomery KHA No.: 061018XXX Title: Water Line A - Summary JProject Description Water Water Replacements Sanitary Sewer Sanitary Sewer Replacements Paving Basis for Cost Projection: 0 No Design Completed ❑ Preliminary Design ❑ Final Design This total does not reflect engineering or technical services. Opinion of Probable Construction Cost Date: 9/6/2023 SDW Prepared By: Checked By: JRT it Total 1 19,284 LF $10,026,000 5152 LF $1,703,000 $3,570,000 Total: $15.299.000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn and Associates, Inc. Opinion of Probable Construction Cost Client: City of Fort Worth Date: 9/6/2023 Project: W/SS Replacement - Camp Bowie - Hulen to Montgomery Prepared By: SD KHA No.: 061018XXX Checked By: JRT (Title: Water Replacements Line No. I Description Spec L Quantity I Unit Unit Price Cost 1 3311.0842 36" Water Pipe, C55 Backfill 33 11 10,33 11 13,33 11 14 2096 LF $600.00 $1,257,600 2 3311.0642 24" Water Pipe, CSS Backfill 33 11 10, 33 11 12, 33 11 13, 33 11 14 5122 LF $400.00 $2,048,800 3 3305.1104 24" Casing By Other Than Open Cut 33 05 22 230 LF $900.00 $207,000 43305.2004 12" Water Carrier Pipe 330524 230 LF $225.00 $51,750 5 3311.0441 12" Water, CSS Backfill 33 11 10, 33 11 12 4470 LF $250.00 $1,117,500 6 3305.1103 20" Casing By Other Than Open Cut 33 05 22 120 LF $700.00 $84,000 7 3305.2002 8" Water Carrier Pipe 33 05 24 120 LF $155.00 $18,600 8 3311.0242 8" Water Pipe, CSS Backfill 33 11 10, 33 11 12 6816 LF $180.00 $1,226,880 9 3312.3009 30" Gate Valve w/ Vault 33 12 20 1 EA $60,000.00 $60,000 10 3312.3008 24" Gate Valve w/ Vault 33 12 20 4 EA $50,000.00 $200,000 11 3312.3005 12" Gate Valve 33 12 20 7 EA $15,000.00 $105,000 12 3312.3003 8" Gate Valve 33 12 20 32 EA $4,000.00 $128,000 13 3312.1004 4" Combination Air Valve Assembly for Water 33 12 30 3 EA $50,000.00 $150,000 14 3312.6003 8" Blow Off Valve 32 12 25 2 EA $40,000.00 $80,000 15 3312.0109 Connection to Existing 30" Water Main 33 12 25 1 EA $20,000.00 $20,000 16 3312.0108 Connection to Existing 24" Water Main 33 12 25 1 EA $16,000.00 $16,000 17 3312.0107 Connection to Existing 20" Water Main 33 12 25 1 EA $14,000.00 $14,000 18 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 21 EA $10,000.00 $210,000 19 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 45 TON $10,000.00 $450,000 20 3305.0109 Trench Safety 33 05 10 19204 LF $5.00 $96,020 21 3305.0110 Utility Markers 33 05 26 1 LS $1.00 $1 22 3125.0101 SWPPP t 1 acre 31 2500 1 LS $15,000.00 $15,000 23 3291.0100 Topsoil 3291 19 152 CY $20.00 $3,041 24 3292.0400 Seeding, Hydromulch 32 92 13 2326 SY $3.00 $6,977 25 3471.0001 Traffic Control 3471 13 12 MO $10,000.00 $120,000 26 3471.0002 Portable Message Sign 3471 13 52 WK $500.00 $26,000 Subtotal: $7,712,169 Conting. (%, 30 $2313831 Total: $10:026:000 This total does not reflect engineering or technical services. The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kinrley-Horn and Associates, Inc. Client: City of Fort Worth Project: W/SS Replacement - Camp Bowie - Hulen to Montgomery KHA No.: 061018XXX IlTitle: Sanitary Sewer Replacements Line No. I Description 1 3331.4115 8" Sewer Pipe 2 3339.1001 4' Manhole 3 3305.0109 Trench Safety 43301.0001 Pre -CCTV Inspection 5 3301.0002 Post -CCTV Inspection 6 3301.0101 Manhole Vacuum Testing 7 3305.0112 Concrete Collar 83291.0100 Topsoil 9 3292.0400 Seeding, Hydromulch 10 3213.0401 6" Concrete Driveway 11 3213.0301 4" Conc Sidewalk This total does not reflect engineering or technical services. Opinion of Probable Construction Cost Date: 9/6/2023 Prepared By: SDW Checked By: JRT Spec Quantity I Unit ! Unit Price Cost b3 11 10, 33 31 12, 5152 LF $150.00 $772,800 33 31 20 33 39 10, 33 39 20 27 EA $5,000.00 $135,000 33 05 10 5,152 LF $5.00 $25,760 3301 31 5,152 LF $5.00 $25,760 3301 31 5,152 LF $3.00 $15,456 3301 30 27 EA $500.00 $13,500 33 05 17 27 EA $500.00 $13,500 3291 19 133 CY $20.00 $2,667 319213 1600 SY $3.00 $4,800 32 13 20 14040 SF $20.00 $280,800 32 13 20 1600 SF $12.00 $19,200 Subtotal: $1,309,243 Conting. (%, +/-) 30 $393,757 Total: $1,703,000 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. Kimley-Horn and Associates, Inc. Client: City of Fort Worth Project: W/SS Replacement - Camp Bowie - Hulen to Montgomery KHA No. 061018XXX IlTitle: Pavement Repair Line No.I Description 1 3214.0100 Brick Pvmt w/ concrete base material 2 I3212.0302 2" Asphalt Pvmt Type D 3 3201.0113 6' Wide Asphalt Pvmt Repair, Residential 4 0241.1506 2" Surface Milling This total does not reflect engineering or technical services. Opinion of Probable Construction Cost Date: 9/6/2028 Prepared By: SDW Checked By: KLW 11 I Spec I Quantity I Unit I Unit Price 11 Cost 321416 15,114 SY $130.00 $1,964,806 321216 10845 SY $20.00 $216,900 3201 17 6507 LF $80.00 $520,560 32 11 23 10845 SY $4.00 $43,380 I Subtotal: $2,745,646 Continq. (%,+/-) 30 I $824,354 I!I (Total 11 $3,570,000 1 The Engineer has no control over the cost of labor, materials, equipment, or over the Contractor's methods of determining prices or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinions of probable costs. K:\FTW_Marketing\Fort_Worth\2023_CD-Cam pBowie-W-SS\PPP\Exhi bit_B-3_2023-09-10_Pre-Design OPCC.xlsx ATTACHMENT "C" CHANGES AND AMENDMENTS TO STANDARD AGREEMENT Design Services for Water and Sanitary Sewer Replacements on Camp Bowie From Hulen Street to Montgomery Street City Project No. 105062 NO CHANGES City of Fort Worth, Texas Attachment C PMO Release Date: 05.19.2010 Page I of I Attachment D - City Project No. 105062 CAMP BOWIE WATER AND SANITARY SEWER REPLACEMENTS (HULEN ST TO MONTGOMERY ST) ID Task Name Durz[ion Start Finish Predecessl% °m"etePPAP I°`i°'I.IQi,P.'I�`�"Y`.�a�Y`M .I I'`vrla`r.IPV'.I.1�`iMIrI'a7`�I.I'w�� rIa°�M'rlafi�P.`I i�irla°Y�'P`.Ia`�'9`;a"Y�Irl7177.Ia`�� .Ia'P'MI.Ia`iul.II.T.IrI'a��Irla°��'Irlw��'I°iMi.Iw°r P`.I��Y`.�'a"�"r1`a9�vrl;`F. 1 Camp Bowie MUSS Replacements 38 days n 10/16123 Wed 6118125 0% 2 Notice to Proceed 1 day Mon 10/16/23 Mon 10/16/23 0% k, 3 Pre-Eirglneering 10 days Toe 10/17/23 Mon 10/30/23 2 0% 4 Kick -Off Meeting with CIty 3 days Tue 10/1]/23 Thu 10/19/23 01 5 Data GOl6cbon SO days To 10/1]/23 Mon 10/30/23 0% 6 Prepare Subconsultanl Sday Wed 10/18/23 Wed 10/18/23 0% Contracts ] Conceptual Design 88 days Mon 9/25/23 Wed 1/24/24 0% , a Survey -Expedited 36", 12", ISdays Mon 9/25/23 Fri 10/23/23 0% p and 8" WL 9 Field Survey 10 days 10 Su bmittal to KHA 5dy 11 Survey 70 days 12 Field Survey 40 days 13 Submittal to KHA 30 days 14 Conceptual Design Package 60 days (UDAR) - Excluding Expedited 36", 12", and 8" 15 Horizontal Alignment 30 days 16 Conceptual OPCC 5dsys 17 Submit Package to City 5days, 18 City Review 10 days 1s Receive Comments/Approval 5 days from City W Public Meeting 10 days 21 Preliminary Design 193 days 22 Prepare 60 % Documents - ]days Expedited 36", 12", and 8" WL - 2 Plan Sets 23 Profile Water Lines 5ubys 24 Detail Sheets 2dyys 25 KHA Walk Alignment )day 26 KHA CA/QC Review 1day 27 Revisions 1day 2e Preliminary Specifications 5dyys 29 60%OPCC Sday 30 City Review 2days 31 Prepare 60%Documents -2 95 days Plan Sets 2z Set up General Sheets 5aays 33 Profile Water Lines 40daw 34 Detail Sheets 10 days 35 Preliminary SWPPP 5ayys 36 KHA Walk Alignment 5dyys 37 KHA OA/OC Review 10 days 38 Revisions 15 days 3s Preliminary Specifications 10 days 40 60%OPCC 5dyys 41 City Review SO days 42 Submit Plans for Utility 15 days Clearance 43 Final Design 237 days 44 Prepare 90% Documents- 10 days Expedited 36", 12, and 8" WL -2 Plan Sets 45 Cover/Layout Sheets 1day 46 General Notes/Specific 2days Notes, Sequencing Sheets Mon 9/25/23 Fri 1016/23 0% Mon 1O/9/23 Fn 10/13/23 9 0% Thu 10/19/23 Wed 1/2A/24 6 0% Thu 10/19/23 Wed 12/13/23 9 0% Thu 12/14/23 Wed 1//24/24 12 0% Toe 10/31/23 Mon 1/22/24 0% Tue 10/31/23 Mon 12/11/23 5 0% Tue 12/12/23 Mon 12/18/23 15 0% Tue 12/19/23 Mon 12/25/23 15,16 0% Tue 12/26/23 Mon 1/8/24 17 0% Tue 1/9/24 Mon 1/15/24 18 0% Tue 1/9/24 Mon 1/22/24 18 Mon 10/16/23 Wed 6/26/24 0% Mon 10/16/23 Tue 10/2A/23 O% Mon 10/16/23 Fn 10/20/23 10 0% Mon 10/23/23 Tue 10/24/23 23 0% Mon 10/16/23 Mon 10/16/23 0% Tue 10/17/23 Tue 10/17/23 25 0% Wed 10/18/23 Wed 10/18/23 26 0% Mon 10/16/23 Fri 10/20/23 10 0% Thu 10/19/23 Thu 10/19/23 27 0% Fri 10/20/23 Mon 10/23/23 29 0% no 1/25/24 Wed 6/5/24 13,7 0% Thu 1/25/24 Wed 1/31/24 0% Thu 2/1/24 Wed 3/27/24 32 0% Thu 3/28/24 Wed 4/10/24 33 0% Thu 3/28/24 Wed 4/3/24 33 0% Thu 4/4/24 Wed 4/10/24 35 0% Thu 4/11/24 Wed 4/24/24 36 0% Thu 4/25/24 Wed 5/15/24 37 0% Thu 4/11/24 Wed 4/24/24 36 0% Thu 5/16/24 Wed 5/22/24 38 0% no 5/23/24 Wed 6/5/24 40 0% Thu 6/6/24 Wed 6/26/24 41 0% Tue 10/24/23 Wed 9/18/24 - Tue 10/24/23 Mon 11/6/23 30 O% Tue 10/24/23 ITue 10/24/23 30 0% Tue 10/24/23 Wed 10/25/23 I30 0% Project AttachmeMD CPN10 Task Il— Mocsmn. Dale Wed 9/13/23 spin ...... Summer as sum r ----------1 Inactive Milesmne O Manual Task enuelsum ,y son C Fxrmnal Test —dune ♦ Manual g 1-1 Inan —k Ina,me sum ry I 1 ouauon y �I Manuelsum ,y P 1-1 nnis6 y 3 Eaernal Milesmne ♦ Progress Page 1 of 2 Attachment D - City Project No. 105062 CAMP BOWIE WATER AND SANITARY SEWER REPLACEMENTS CHULEN ST TO MONTGOMERY ST) ID Task Name D11— ISM Finish Predecess% °mPk`e�;� P w�IjjjlQi P.'I� q`.�a�rM .IagM°vrla° I°Ia°�'�I.I�iMIrI'a7`.I.I'w�M Ia°�M' I. P.'I i�irla°�P.Ia�9` �'a"Y�I I`w9M``�� .Ia°P'MI.Ia`iul.I'a 'aa°�M'I 'I°iMi.Iw°r P``'a"�"°I`a9.v°I;`�� 4] Locab" Easement Map 3 days Tue 10/24/23 Thu 10/26/23 30 0% it Sheets lil'1 48 Plan& Profile Sheets 2 days Fri 10/27/23 Mon 10/30/23 47 0% 49 Shut -Down and Sequencing 2days Tue 10/31/23 Wed 11/1/23 48 0% Sheet(.) 50 Detail Sheets 1 day Tue 10/31/23 Tue 10/31/23 48 0% I 51 Traffic Control Plan Sheets 2 days Tue 10/31/23 Wed 11/1/23 48 0% I 52 90%Specifications 5day, Tue 10/24/23 Mon 10/30/23 30 i3% 53 90% OPCC 1 day Tue 10/31/23 Tue 10/31/23 48 0% 54 Walk Alignment 1 day Tue 10/31/23 Tue 10/31/23 48 0% I 55 CIA/CC Review 3 days Tue 10/31/23 Thu 11/2/23 48 0% 56 Ravisions 2 days Fn 11/3/23 Mon 11/6/23 55 0% 57 Prepare 90% Documents - 2 60 days Thu 6/6/24 Wed 8/28/24 41 0% , Plan Sets 58 Cover/Layout Sheets 3days Thu 6/6/24 Mon 6/10/24 0% ■ 59 General Notes/Specific 5days Thu 6/6/24 Wed 6/12/24 0% '., ■ Notes, Sequencing Sheets 60 LocaOon/Easement Map 2days Thu 6/6/24 Fri 6/7/24 0% E Sheets 61 Plan&Profile Sheets 40 days Thu 6/6124 Wed 7/31/24 0% 62 Shut -Down and Sequencing 5day, Thu 8/1124 Wed 8/7/24 61 0% Sheet(.) 63 Detail Sheets 10 days Thu 6/6/24 Wed 6/19/24 0% 64 Traffic Control Plan Sheets 10 days Thu 6/6/24 Wed 6/19/24 0%I, sr•I, 65 90%Specifications 15 days Thu 6/6/24 Wed 6/26/24 65 90%OPCC 5days Thu 8/1/24 Wed 8/7/24 61,65 0% 67 Walk Alignment 5day, Thu 8/1/24 Wed 817/24 61,65 0% 68 QA/QC Review SO days Thu:/1/24 Wed 8/14/24 61,65 0% 69 Revisions 10 days Thu 8/15/24 Wed 8/28/24 68 0% ]0 Final Design Package-2 IO days Thu 8/29/24 We 9/11/7A 57 0% Packages 71 Submit Final Design 5days Thu 8/29/24 Wed 9/4/24 on ■ Package to City 72 Submit OPCC to IWWBE for 5day, Thu 8/29/24 Wed 9/4/24 0% ■ Construction Goal 73 City Review 10 days Thu 8/29/24 Wed 9/11/24 090 74 FinalConstNction 5days Thu 9/12/24 Wed9/19/24 70 0% rr Documents Package - 2 Packages 75 Submit Final Const. Docs to 5days Thu 9/12/24 Wed 9/18/24 0% IN City 75 City Approval 5days Thu 9/12/24 Wed 9/18/24 on ■ n Bidding 49 days Thu 9/26/24 Tue 12/3/7A 74 0% 78 First Advadisment lday Thu 1/26/24 Thu 9/26/24 0% 79 Second Advertisement 1 day Thu 10/3/24 Thu 10/3/24 1i]% I 80 Pre Bid Meeting 1 day Tue 10/8/24 Tue 10/8/24 0% I 81 Bid opening 1 day Thu 10/24/24 Thu 10/24/24 0% 82 Bid Tabulation 2days Fri 10/25/24 Mon 10/28/24 81 090 83 Recommendation of Award 3days Fri 10/25/24 Tue 10/29/24 81 0% 80 Conformance Plans 30 days Fri 11/15/24 Thu 11/1/24 81 0% as WWBE Compliance 5days Fri 10/25/24 Thu 10/31/24 81 0% 66 M & C to City Council 24 days Wed 10/30/24 Mon 12/2/24 83 0% 87 Award of Contract 1 day Tue 12/3/24 Tue 12/3/24 86 tr`& 1 88 Construction 325 days Wed 12/4/2A Tue 3/3/26 TT M 89 Public Meeting 15 days Wed 12/4/24 Tue 12/24/24 - 90 Pre -Construction Meeting 25days Wed 12/4/24 Tue 1/7/25 0%, 91 Moblll2atlon/Shop Drawings 60 days Wed 1/8/25 Tue 4/1/25 90 0% 92 Constmction 240 days Wed 4/2/25 Tue 3/3/26 91 0. Project AttachmemD CPN 10 Task r -----------1 inactive rnaesmne O Nanuai Task n.—Isu. sun-miy C nrsdiuP rxrernai Test oeaahne ♦ n7muai Pregress Dale Wed 9/13/23 sPh� ....�.........� summay �1 inanve Txik inarme summary I 1 oua°°n-miy mnishoniy ] [nernai n7nesl°ne Pvgress Page 2 of 2 ATTACHMENT E Fc w 0 lvo w 3 LENOXDR VR 0w >uj > co 5THST c/) Lu _j 6THST Lu w y-4 co 7THST %F5 30 7 MODLINAVE ,,1,.r cn uj Jz Lu MATTISONAVE uj 0 JI �o FIT' 1, f U) I J-7 0 %yj IR 0 Is LANCASTER AVE 1 11 11 11 0� R 11 oil .7 1 0 iz A/GArs' Lu 1. . a2w Lu Lu L, K r-,-.1 I L 1114 r- RD 1 5 — U) U) BURNETT TANDY DR z cy cn z -0 z uj Lu Lu 0 —J Lu Ce z Lu :w L) w z tl, It co Z— w z w U) w wW F- RYCEAVE > < > Lu aBRYCEAVE < z > F- U) z 0 z < cn cl) BYERSAVE Lu w z w> F- Jj �- -i o R '' 0 w cf.)*.Ico)fm- w m L) w W U) LIN NAVE z w -i cl) - 2 -j (e) w a- Lu D Lu m z . ....... '117, COLLIN EL CAMPOAVE D�n "'o, W ELCA > P EA i H I N G A V E <0 -�i o PERSHING C) z BIRCHMANAVE 0, crig - ii BIRCHMANA . w jEi w F- Q --j * cAE-m6' NTAVE C9 CALIVIONTAVE -S*oft " mwmwvmo� . i WEST FWY SR WB. W13 EXITqHULEtjRAMP CLARKE AVE WESTDEPU MP STATION Lu z a. z O. > w z (D 0 z -1 > Gp o z Lu :--i e) WESTSIDE PUMP STATION LOCATION .F,LWY-SR" EB WESTFWY w t'"—V 0— Z %Emir J? .� FRFoRo TRq Otj t � ?l3S3a Al IiW Rv ,as�+adw MARQUITADR' 2•. b a' i t �' m rm4. owl y T D OD a �•a !� n O r r y d I%L JOYCEDR q<TgMF.�': ': y. ' % m IL - — 44 � C� pall r ' 0 Tv IRENEDR 1 `' w ATTACHMENT "f" CERTIFICATE OF INSURANCE Water and Sanitary Sewer Replacement on Camp Bowie Boulevard City Project No. 105062 City of Fort Worth, Texas Attachment F POLICY NUMBER: GL5268169 COMMERCIAL GENERAL LIABILITY CG20101219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations ANY PERSON OR ORGANIZATION WHOM YOU PER THE CONTRACT OR AGREEMENT. BECOME OBLIGATED TO INCLUDE AS AN ADDITIONAL INSURED AS A RESULT OF ANY CONTRACT OR AGREEMENT YOU HAVE ENTERED INTO. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II 6 Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 12 19 (> Insurance Services Office, Inc., 2018 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. Page 2 of 2 (> Insurance Services Office, Inc., 2018 CG 20 10 12 19 POLICY NUMBER: GL5268169 COMMERCIAL GENERAL LIABILITY CG 20 37 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART Name Of Additional Insured Person(s) Or Organization(s) ANY PERSON OR ORGANIZATION WHOM YOU BECOME OBLIGATED TO INCLUDE AS AN ADDITIONAL INSURED AS A RESULT OF ANY CONTRACT OR AGREEMENT YOU HAVE ENTERED INTO. SCHEDULE Location And Description Of Completed Operations PER THE CONTRACT OR AGREEMENT. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. CG 20 37 12 19 0 Insurance Services Office, Inc., 2018 Page 1 of 1 TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective 12:01 AM 04/01/2023 forms a part of Policy No. WC015893685 (Aos) Issued to Kimley-Horn and Associates, Inc. By NEW HAMPSHIRE INSURANCE COMPANY This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule ( ) Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: The premium charge for this endorsement shall be 2 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: WC420304B Countersigned by___________________—_ (Ed. 6-14) Authorized Representative (D Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, October 31, 2023 LOG NAME: 60WWSCAMPBOWIE-KHA REFERENCE NO.: **M&C 23-0908 SUBJECT: (CD 3 and CD 7) Authorize Execution of an Engineering Agreement with Kimley-Horn and Associates, Inc. in the Amount of $974,121.00 for the Water and Sanitary Sewer Replacement on Camp Bowie Boulevard and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an engineering agreement with Kimley-Horn and Associates, Inc. in the amount of $974,121.00 for Water and Sanitary Sewer Replacement on Camp Bowie Boulevard Project; and 2. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $1,424,023.00, from available funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer Replacement on Camp Bowie Boulevard Project (City Project No. 105062) to effect a portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize the preparation of plans and specifications for the replacement of cast iron water mains along with deteriorated sanitary sewer mains on the following streets, alleys, easements, and locations to allow for construction of the project. Street From To Scope of Council Work District Camp Bowie University Boulevard Hulen Street Drive Water/Sewer 7 (East) Tremont Camp Bowie Crestline Water 7 Avenue Boulevard Road Hillcrest Street Camp Bowie Crestline Water 7 Boulevard Road Camp Bowie Clarke Thomas Place Boulevard Avenue Water 7 Washington Camp Bowie Clarke Water 7 Terrace Boulevard Avenue Clover Lane Camp Bowie Clarke Water 7 Boulevard Avenue Virginia Place Camp Bowie Clarke Water 7 Boulevard Avenue Westside Camp Bowie Clarke Pump Station Boulevard Avenue Water 7 Location Alley between Camp Bowie Crestline Sewer 7 Western Boulevard Road Avenue and Carleton Avenue Easement between Ashland Camp Bowie North 97 Sewer Avenue and Boulevard feet Tremont Avenue Alley between Tremont Camp Bowie Crestline Sewer Avenue and Boulevard Road Hillcrest Street 220 feet east ad Easement 220 feet North of East 330 North of Camp the Tremont feet then Bowie Avenue and South 60 Sewer Boulevard Camp Bowie feet Boulevard Intersection Virginia Place Camp Bowie Crestline Sewer Boulevard Road Watonga Camp Bowie South 160 Sewer Street Boulevard feet Easement between Camp Watonga Street Bowie and Tulsa Way Easement east Camp Bowie of Watonga Boulevard Street W. Will Rogers Lancaster Road Avenue Alley between Alta Mere Camp Bowie Drive and Boulevard Irene Drive Camp Bowie Boulevard Marks Place (West) Irene Drive Camp Bowie Boulevard East 275 Sewer feet South 275 Sewer feet Burnett 7 7 U 7 7 7 7 Tandy Water/Sewer 7 Drive North 640 Water 3 feet West 485 Water 3 feet North 330 Water 3 feet In addition to the contract amount, $449,902.00 (Water: $339,602.00; Sewer: $110,300.00) is required for project management, real property acquisitions, utility coordination, and material testing. This project will have no impact on the Water Department's operating budget when completed. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60CAMPBOWIE-KIMLEY HORN Capital Revised Fund Project Name FY2024 CIP authority Budget Change FY2024 Name Appropriations (Increase/Decrease) Bud et g Fund 56002 105062 - W/SS — W&S Repl Camp Capital Bowie Hu- $0.00 This M&C $1,424,023.00 $1,424,023.00 Projects Mont. Fund Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Water and Sanitary Sewer Replacement on Camp Bowie Boulevard project within the Water & Sewer Capital Projects Fund. Appropriations for Water and Sanitary Sewer replacement on Camp Bowie Boulevard project, are as depicted below: Fund Existing Additional project Total* Appropriations Appropriations Fund 56002 - W&S Capital $0.00 Projects Fund Project Total 1 $0.0011 $1,424,023.00 $1,424,023.00 $1,424,023.00 1$1,424,023.00 *Numbers rounded for presentation purposes. BUSINESS EQUITY OFFICE: Kimley Horn and Associates, Inc. is in compliance with the City's Business Equity Ordinance by committing to 21 percent MWBE participation on this project. The City's MWBE goal on this project is 13 percent. The project is located in COUNCIL DISTRICT 3 and 7. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water and Sewer Fund, and upon the approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the W/SS Repl Camp Bowie Hul-Mont. project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund Department 'Accounj Project IProgramActivity Budget Reference # Amount ID ID Year (Chartfield 2) FROM Fund Department Accoun Project ProgramActivity Budget ID I ID Year CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Preeti KC (5467) ATTACHMENTS 1. 60WWSCAMPBOWIE-KHA Comp Memo. Pdf (CFW Internal) 2. 60WWSCAMPBOWIE-KHA FID Table 1.xlsx (CFW Internal) 3. 60WWSCAMPBOWIE-KHA Form 1295.pdf (CFW Internal) 4. 60WWSCAMPBOWIE-KHA M&C Map (1),pdf (Public) 5. 60WWSCAMPBOWIE-KHA Map (2),pdf (CFW Internal) 6. 60WWSCAMPBOWIE-KHA.docx (CFW Internal) 7. Entitvinformation-KHA.pdf (CFW Internal) 8.ORD.APP 60WWSCAMPBOWIE-KHA 56002 A024(r2).docx (Public) Reference # Amount (Chartfield 2) 9. PBS CPN 105062.pdf (CFW Internal) 60WWSCAMPBOWIE-KHA FID Table 2&3 56002 0600430 4956001 105062 2024 $1,109,158.00 2&3 56002 0600430 105602 2024 $1,109,158.00 2&3 56002 0700430 4956001 105062 2024 $314,865.00 2&3 56002 0700430 105062 2024 $314,865.00 2&3 56002 0600430 4956001 105602 001730 9999 ($1,109,158.00) 2&3 56001 0709020 5956001 $314,865.00 2&3 56002 0700430 4956001 105602 001730 9999 ($314,865.00) 2 56002 0600430 5110101 104344 001730 9999 $169,950.00 Water Staff Cost 1 56002 0600430 5330500 104344 001730 9999 $769,556.00 Contract 2 56002 0600430 5310350 104344 001770 9999 $2,500.00 Utility Coordination 2 56002 0600430 5330500 104344 001784 9999 $135,960.00 Soil Lab Consultant 2 56002 0600430 5310350 104344 001784 9999 $27,192.00 Soil Lab TPW Staff 2 56002 0600430 5550102 104344 001730 9999 $4,000.00 Public Outreach 2 56002 0700430 4956001 104344 001730 9999 ($314,865.00) 2 56002 0700430 5110101 104344 001730 9999 $48,300.00 Water Staff Cost 1 56002 0700430 5330500 104344 001730 9999 $204,565.00 Contract 2 56002 0700430 5310350 104344 001770 9999 $2,000.00 Utility Coordination 2 56002 0700430 5710010 104344 001740 9999 $40,000.00 Easement Acquisition 2 56002 0700430 5110101 104344 001740 9999 $10,000.00 Easement Acquisition 2 56002 0700430 5330500 104344 001740 9999 $5,000.00 Easement Acquisition 2 56002 0700430 5740010 104344 001780 9999 $5,000.00 Easement Acquisition