Loading...
HomeMy WebLinkAboutContract 60600W M9 � ' ��itr . � • T;4s� *.:..........................!. RONDA D VIGINTAINER . a :................: 86416 :.. �02- c �•�E N5� `LT�`�� 1 WN 8.6.2023 FORT WORTH CONTRACT FOR THE CONSTRUCTION OF CITY SFrPFTARY co��o Uv .�T PSIS Water & Sanitary Sewer Replacements, Contract 2020 WSM-A City Project No. 103361 Mattie Parker David Cooke Mayor City Manager Chris Harder Director, Water Department Lauren Prieur Director, Transportation/Public Works Department PEE OF JENNIFER G. FRANKLIN j ................................� 141718 : �a ; ���� •• ( O •ate 1,\S/oNAL_EN-:- 8/7/2023 Prepared for The City of Fort Worth Water Department 2023 rEngineering, PLLCL� QUIDDITY Teens Board of Professional Enaneers and Wd Surveyors Be[. No. F-23290 P.O. BOX 2382 a600 Mertantile %aza O rve, Sucre 210 Fort Worth, Teens J613.•6B2 269.2200 Keller, TX76248 xv.99z.32la QuidditY Project No.: 17452-0001-00 3z TBPE Registered Engineering Firm No. F-11598 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX dft ............................. RONDA D VISINTAINER ............................ 86416 ... o •. CENS �• FORTWORTH CONTRACT FOR THE CONSTRUCTION OF Water & Sanitary Sewer Replacements, Contract 2020 WSM-A City Project No. 103361 Mattie Parker Mayor David Cooke City Manager Chris Harder Director, Water Department Lauren Prieur Director, Transportation/Public Works Department Prepared for The City of Fort Worth Water Department 8.6.2023 Visintainer Engineering, PLLC MP P.O. Box 2382 Keller, TX 76248 817.992.3214 TBPE Registered Engineering Firm No. F-11598 PM 2023 E OF T ,gJ�111 *: JENNIFER G. FRANKLIN j ................................ 141718i 1t0% 1l`;�; XL �� 8/7/2023 L� QUIDDITY Teus Board of Prate 'i t EryN!!rt a11d land 6ufvevori N No. F23190 4500 Merunlile Ylatn Drive, Suke 210•fart Worth, Trios 7613, a662.266.2200 Quiddity Project No.: 17452-0001-00 CS-3 REC'0 DEC 13 23 PH4.17 oft FORTWORTH, City of Fort Worth Standard Construction Specification Documents Adopted September 2011 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Pagel of 6 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Last Revised 0005 10 Mayor and Council Communication 07/01/2011 0005 15 Addenda 07/01/2011 0011 13 Invitation to Bidders 07/19/2021 0021 13 Instructions to Bidders 11/02/2021 0035 13 Conflict of Interest Statement 02/24/2020 00 41 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 01/20/2012 0043 13 Bid Bond 09/11/2017 j 00 43 37 Vendor Compliance to State Law Nonresident Bidder 06/27/2011 0045 11 Bidders Prequalifications 08/13/2011 0045 12 Prequalification Statement 09/30/2021 0045 13 Prequalification Application 08/13/2021 00 45 26 Contractor Compliance with Workers' Compensation Law 07/01/2011 00 45 40 Business Equity Goal 10/27/2021 00 52 43 Agreement 11/23/2021 0061 13 Performance Bond 07/01/2011 0061 14 Payment Bond 07/01/2011 0061 19 Maintenance Bond 07/01/2011 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 08/23/2021 00 73 00 Supplementary Conditions 03/09/2020 Division 01 - General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 2500 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 01 3120 Project Meetings 07/01/2011 01 32 16 Construction Schedule 08/13/2021 01 3233 Preconstruction Video 07/01/2011 01 3300 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 03/22/2021 01 5713 Storm Water Pollution Prevention Plan 07/01/2011 01 5813 Temporary Project Signage 07/01/2011 01 6000 Product Requirements 03/09/2020 01 6600 Product Storage and Handling Requirements 07/01/2011 01 7000 Mobilization and Remobilization 11/22/2016 01 7123 Construction Staking and Survey 02/14/2018 01 7423 Cleaning 07/01/2011 01 7719 Closeout Requirements 03/22/2021 01 7823 Operation and Maintenance Data 12/20/2012 j 01 7839 Project Record Documents 07/01/2011 CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A Part 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN I03361 Revised December 9, 2022 dw PE .. goF A if r M M 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents Division 02 - Existing Conditions 1 0241 14 1 Utility Removal/Abandonment Date Modified 1 12/20/2012 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: h ttD://fortworth texas.gOV/taw/contractors/ or httDS://aDus.fortworthtexas.gov/ProiectResources/ Division 02 - Existing Conditions Last Revised n^1� Seleetiye Site rlemelifien n3i1�i 1 0241 14 Utility Removal/Abandonment 12/20/2012 1 0241 15 Paving Removal 02/02/2016 Division 03 - Concrete 1 03 30 00 Cast -In -Place Concrete 1 03 34 13 Controlled Low Strength Material (CLSM) 1 03 34 16 Concrete Base Material for Trench Repair 99 8000 Modifications to Existing Gener-ete Stfuetur-es Division 26 - Electrical 260533 2605 260550 Cefowmnieati %lti i'Act GORdHit Division 31 - Earthwork 31 00oo sit -Elegy 3123 i 6 3 i 23 23 gaff-@ 3124 00 �eH% 1 31 2500 Erosion and Sediment Control 1 31 3600 Gabieiis 1 Division 32 - Exterior Improvements 3201 17 Permanent Asphalt Paving Repair 3201 18 Temporary Asphalt Paving Repair 32 01 29 Concrete Paving Repair 32 11 23 Flexible Base Courses 32 1129 Lime Treated Base Courses 32 11 33 Cement Treated Base Courses 32 1137 Liquid Treated Soil Stabilizer 3212 16 Asphalt Paving 32 1273 Asphalt Paving Crack Sealants CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 9, 2022 03/ 11 /2022 12/20/2012 12/20/2012 1 2/20 /�z nA i�i n1ivr 28QO 1i-3 01 i� Q�1 011wr0900i1 04/29/2021 1 a�/l2 11 iz 12/20/2012 12/20/2012 12/20/2012 12/20/2012 12/20/2012 06/ 10/2022 08/21/2015 12/20/2012 12/20/2012 W&SS Repl Contract 2020 WSM-A Part I CPN 103361 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 32 13 13 Concrete Paving 06/10/2022 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 12/09/2022 32 1131 733 Concrete Paving Joint Sealants T T..:c'vrris 12/2012012 , 32 14 16 32 16 13 Btiek PeA4'Hg Concrete Curb and Gutters and Valley Gutters 11lzzr20001-a 12/09/2022 32 1723 Pavement Markings 06/10/2022 32 17 25 Curb Address Painting 11/04/2013 3231 13 Chain Fences and Gates 12/20/2012 32 31 26 Wire Fences and Gates 12/20/2012 3231 29 Wood Fences and Gates 12/20/2012 32 32 13 Cast -in -Place Concrete Retaining Walls 06/05/2018 3291 19 Topsoil Placement and Finishing of Roadway Right-of-ways 03/11/2022 32 92 13 Sodding 05/13/2021 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 09/07/2018 33 01 31 Closed Circuit Television (CCTV) Inspection — Sanitary Sewer "I'e,ev�jSiAl2TCETVTInspc��ti nn 03/11/2022 33-A4-32 3303 10 93 04 10 d Ctrs�lit Closed ls1� ster Bypass Pumping of Existing Sewer Systems Test 03/11 202 � 12/20/2012 � 2 12 33 04-11 33 04 30 Gef: fesie.. GefAfei StfAi Temporary Water Services 2W201 07/01/2011 33 04 40 Cleaning and Acceptance Testing of Water Mains 02/06/2013 33 04 50 Cleaning of Pipes 03/11/2022 3305 10 Utility Trench Excavation, Embedment, and Backfill 04/02/2021 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings 09/09/2022 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 03/11/2022 Grade 1 3305 17 Concrete Collars 03/11/2022 3g 05 24 • rr Pic k: �;asiag or- 'r.,mnel Liner- AR—te 1:21090012 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/09/2022 33 11 11 Ductile Iron Fittings 09/20/2017 33 11 12 9}1ig Polyvinyl Chloride (PVC) Pressure Pipe 09/09/2022 1�/�z 33 ! 1 14 33 12 10 r uFied Steel Pipe and Fittings Water Services 1-inch to 2-inch i2nr n�z 02/14/2017 33 1220 Resilient Seated Gate Valve 05/06/2015 CITY OF FORT WORTH W&SS Repl Contract 2020 W SM-A Part 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 9, 2022 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 33 1225 22� Connection to Existing Water Mains !`A—m-.:.,et:e„ A:« Velye Assemblies Systef"s 02/06/2013 17/7�1:1 33 1240 f «Potable Water- Fire Hydrants 01/03/2014 33 1250 22� Water Sample Stations Ve1,.e A 12/20/2012 33 31 12 Standard 131w.A, tiff ssefnbly Cured in Place Pipe (CIPP) 06/19/2013 12/20/2012 33-31-43 F-ibz "- j Ra n f e,1 U: for- Gravity Q. :te Sewers Q0Q012 12 -rr=vrcv><r 33 31 15 High Density Polyethylene (HDPE) Pipe for Sanitary Sewer 04/23/2019 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe le,-jd@ /DV!`\ Sewe.. Del,.,.:«yl l7,m,ity Sancta 09/09/2022 Gleee.l Prefile G fy Pipe 33 31 22 Sanitary Sewer Slip Lining 12/20/2012 _ 33 3123 Sanitary Sewer Pipe Enlargement 12/20/2012 �3331 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 12rcr nzv/2vii 33-3-1-7o 3339 10 Cast -in -Place Concrete Manholes 12/20/2012 33 3920 Precast Concrete Manholes 12/20/2012 33 39 30 Fiberglass Manholes A 12/20/2012 1 7 �7irrc000 333940 33 39 60 41 10 sews Chamber- (WAG) Wastewater- Liners for Sanitary Sewer Structures Rein f .eea Gone .ete Ste SeweF Pipeir,.l,.e « P 04/29/2021 07101 i�4 33 32� 23Polyethylene1 ffn High De,..sib, Delyethyle„e (14DPE) Pipe Fri SAM-M. 13 uii4 17�7m'20QO = 11130045 9 92'3173 46 �0v CD-e-1l'„pr-epyle«e Pipe f .. C*a�� �Ct »ttH�e z-ri- !1L/l i 1�z-cQ01:?Qiz 33 4601 93 4602 33 49 10 %eael n Cast -in -Place Manholes and Junction Boxes 0 911- 0�ins 11 12/20/2012 93-49 20 Cufb a d D1q, L-lettt; 03 ilo 1� '. 22 33-49-40 &01'fr .,,,a Wi fi,,, AS- 07i0i Division 34 13n� - Transportation rr�Signals n3it�i = ZA A� 1�1, 34 n�-n-10.02 Atka6! nwd A Gef4Felle,. Cabinet A44aehfnent B Gentrellef Speeifieatien POW 02/2012 34 n� 1 10.03 34 41 11 9n� rArtt-Rely -ei# G, S r—e Spee c&t-}en erw-y T-r-a : e Signals, Removing rr.affieSignals 11,-.,Q2/201 3 n3il�z 34 4128 RefldW£F}- !K-A 1kA9eH-AS9effiblies Qtr 0001i . _ 2 n n�01 3n n�v2 t> 1 14�cr� f J Iv }� ._r.:r�rrs �, Fr-eewety LED nee,l,,.e,. Luminaires 06115001 5 �-.� n6il�. 5Q015 3n n�v3 Residen4ial In Am", 'ay hafninaifes 064c�5 34�41-38 = 2A� ,�'t ff S' Y�Y11�tt11"IY.LrI..(/b l5 Single !'el.le W 11:1001 3 -.-„-.zrrv-ram I 3471 13 Mede Fiber Opt:e Traffic Control 0246Q0-I6 03/22/2021 CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A Part 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 9, 2022 Wq 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 Appendix ++ GC-4.02 Subsurface and Physical Conditions GC-6.06.13 Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements GEN Temporary Right of Entry Document (template) GEN Easement Documents GEN TPW/Water Dept 50/50 Participation Table END OF SECTION ow CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A Part 1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 9, 2022 oft City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, November 14, 2023 LOG NAME: 60WSSC20WSMA-WOODY REFERENCE NO.: **M&C 23-0983 SUBJECT: (CD 7) Authorize Execution of a Contract with Woody Contractors, Inc., in the Amount of $6,411,169.00, for the Water & Sanitary Sewer Replacement Contract 2020, WSM-A Project and Adopt an Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program and Adopt an Appropriation Ordinance to Amend the Transportation and Public Works FY2024- 2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with Woody Contractors, Inc., in the amount of $6,411,169.00, for the Water & Sanitary Sewer Replacement Contract 2020, WSM-A project; 2. Adopt the attached Appropriation Ordinance increasing appropriations in the Water and Sewer Capital Projects Fund in the amount of $6,212,865.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Water Sanitary Sewer Replacement Contract 2020, WSM-A project (City Project No. 103361) to effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program; 3. Adopt the attached Appropriation Ordinance adjusting estimated receipts and appropriations in the General Capital Projects Fund by increasing receipts and appropriations in the Water Sanitary Sewer Replacement Contract 2020, WSM-A project (City Project No. 103361) in the amount of $899,551.00, and decreasing receipts and appropriations in the Contract Street Maintenance programmable project (City Project No. P00020) by the same amount; and 4. Amend the Transportation and Public Works FY2024-2028 Capital Improvement Program. DISCUSSION: This Mayor and Council Communication (M&C) is to authorize a construction contract for the replacement of deteriorated water and sanitary sewer mains on the following streets: Street Edgefield Road Englewood Lane Northwood Road From (Driver Avenue (Driver Avenue lRockwood Park Drive Oaklawn Drive N. Bailey Avenue Springbrook Driver Avenue Drive Easement 235 feet north and 85 west of feet west of the Northwood Northwood Road / Road Springbrook Drive Intersection II To I Scope of l Work lSherwood (Water/Sewer Avenue IlNorthwood Road (Water/Sewer IIWildwood Drive IIWater/Sewer Driver Avenue 1IWater Northwood RoadlIWater North 285 feet Sewer Easement west of Springbrook Drive Rockwood Park Drive Westwood Drive Easement north of N. Bailey Avenue Easement north of Sherwood Avenue Easement west of N. Bailey Avenue 185 feet west and 10 feet south of the Driver Avenue / Springbrook Drive Intersection Lakewood Drive Edgefield Road 180 feet west and 85 feet south of the N. Bailey Avenue / Wildwood Drive Intersection South 60 feet then Sewer southeasterly 500 feet South 403 feet I Sewer Rockwood Park I Sewer Road South 160 feet Sewer 310 feet north of the Sherwood Avenue / East 245 feet Westwood Drive Intersection 170 feet west of the N. Bailey Avenue / Sherwood Avenue Intersection Sewer North 240 feet Sewer Approximately 8,454 linear feet of cast iron pipe will be replaced in this project. Additionally, asphalt pavement rehabilitation will be conducted on all streets subsequent to the water and sanitary sewer main replacement. The Water Department's share of this contract is $5,617,915.50 and the Transportation & Public Works Department's share of the contract is $793,253.50. The project was advertised for bids on August 10, 2023, and August 17, 2023, in the Fort Worth Star - Telegram. On September 14, 2023, the following bids were received: Bidder Woody Contractors, Inc. Venus Construction Company Jackson Construction Ltd. JGra-Tex Utilities, Inc.** Amount 11 Time of Completion 1$6,411,169.00 11500 Calendar Days 1 $6,904,053.50 II 1 �$7,809,411.50� Incomplete Bid ** Gra-Tex Utilities, Inc. has been determined to be nonresponsive to the contract documents due to submitting an incomplete bid. In addition to the contract amount, $493,045.50 (Water: $270,260.00; Sewer: $156,151.50; Paving: $66,634.00) is required for project management, material testing and inspection, and $208,201.50 (Water: $106,235.00; Sewer: $62,303.00; Paving: $39,663.50) is provided for project contingencies. The sanitary sewer component of this project is part of the Water Department's Sanitary Sewer Overflow Initiative Program. This project will have no impact on the Water or Transportation & Public Works Department's operating budget when completed. The action in this M&C will amend TPW's contribution to the Fiscal Years 2024-2028 Capital Improvement Program as approved in connection with Ordinance 25073-09-2021, Section 6. Capital Improvements, page 23, as follows: Capital project FY2024 CIP Budget Revised Fund Name Appropriations Authority Adjustment FY2024 Name Budget 30100 P00020 - General Contract Capital Street Projects Maintenance Fund $32,070,994.00 This M&C $(899,551.00) $31,171,443.00 It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60WSSC20WSMA-WOODY Capital project FY2024 CIP Budget Change Revised Fund Name Appropriations Authority (Increase/Decrease) FY2024 Name Budget W&S 103361 Capital — W&S Projects Contract $0.00 This M&C $6,212,865.00 $6,212,865.00 — Fund 2020 56002 WSM-A Funding is budgeted in the Contract Street Maintenance Programmable project within the General Capital Projects Fund and in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the W&S Contract 2020 WSM-A project within the Water & Sewer Capital Projects Fund. Appropriations for the W&S Contract 2020 WSM-A project are as depicted below: Fund Existing I Additional project Total*l l Appropriations Appropriations W&S Capital Projects Fund $581,321.00 $6,212,865.00'$6,794,186.00 56002 General Capital Projects Fund $0.00 $899,551.00 $899,551.00 30100 Project Total 11 $581,321.001 $7,112,416.00 $7,693,737.00 *Numbers rounded for presentation purposes. Business Equity: Woody Contractors, Inc. is in compliance with the City's Business Equity Ordinance by committing to 12 percent MWBE participation on this project. The City's MWBE goal on this project is 9 percent. The project is located in COUNCIL DISTRICT 7. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget of the Water & Sewer Fund and the Contract Street Maintenance programmable project within the General Capital Projects Fund, and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the W&S Capital Projects Fund and the General Capital Projects Fund for the W&S Contract 2020 WSM-A project to support the above recommendations and execution of the contract. Prior to any expenditure being incurred, the Water and Transportation & Public Works Departments have the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs).: TO Department �Accounj Project ctivity Budget Reference # (Amount) (Fund ID I ID (Program I Year I (Chartfield 2) FROM Fund Department ccoun Project Program ctivity Budget Reference # mount ID 1 ID r Year (Chartfield 2) CERTIFICATIONS: Submitted for Citv Manaqer's Office bv_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Brenda Oropeza (8271) ATTACHMENTS 1. 60WSSC20WSMA-WOODY 1295 Form.pdf (CFW Internal) 2. 60WSSC20WSMA-WOODY Comp Memo.rndf (CFW Internal) 3. 60WSSC20WSMA-WOODY FID Table (WCF 10.09.23).xlsx (CFW Internal) 4. 60WSSC20WSMA-WOODY SAM.pdf (CFWInternal) 5. 60WSSC20WSMA-WOODY.docx (CFW Internal) 6.60WSSC20WSMA-WOODY.pdf (Public) 7.ORD.APP 60WSSC20WSMA-WOODY 30100 A024(r3).docx (Public) 8.ORD.APP 60WSSC20WSMA-WOODY 56002 A024(6.docx (Public) 9. PBS CPN 103361.pdf (CFW Internal) 60WSSC20WSMA-WOODY FID Table 2 56002 0600430 4956001 103361 2024 $3,917,652.00 2 56002 0600430 103361 2024 $3,917,652.00 2 56002 0700430 4956001 103361 2024 $2,295,213.00 2 56002 0700430 103361 2024 $2,295,213.00 3 30100 0200431 4910100 P00020 2024 ($899,551.00) 3 30100 0200431 4910100 103361 2024 $899,551.00 3 30100 0200431 P00020 2024 ($899,551.00) 3 30100 0200431 103361 2024 $899,551.00 2 56001 0609020 5956001 $3,917,652.00 2 56002 0600430 4956001 103361 C01730 9999 ($3,917,652.00) 2 56001 0709020 5956001 2,295,213.00 2 56002 0700430 4956001 103361 C01730 9999 ($2,295,213.00) 2 56002 0600430 4956001 103361 001780 9999 ($3,917,652.00) 2 56002 0600430 5110101 103361 001780 9999 $47,416.00 Water Staff Costs 2 56002 0600430 5540101 103361 001780 9999 $4,000.00 1 56002 0600430 5740010 103361 001780 9999 $3,541,157.00 Pay to contractor 2 56002 0600430 5740010 103361 001780 9999 $106,235.00 Contract Contingency 2 56002 0600430 5330500 103361 001784 9999 $54,711.00 Soil Lab Consultant 2 56002 0600430 5310350 103361 001784 9999 $18,237.00 Soil Lab TPW Staff Cost 2 56002 0600430 5310350 103361 001785 9999 $145,896.00 TPW Inspection Staff 2 56002 0700430 4956001 103361 001780 9999 ($2,295,212.50) 2 56002 0700430 5110101 103361 001780 9999 $27,808.00 Water Staff Costs 1 56002 0700430 5740010 103361 001780 9999 $2,076,758.50 Pay to contractor 2 56002 0700430 5740010 103361 001780 9999 $62,303.00 Contract Contingency 2 56002 0700430 5330500 103361 001784 9999 $32,086.00 Soil Lab Consultant 2 56002 0700430 5310350 103361 001784 9999 $10,695.00 Soil Lab TPW Staff Cost 2 56002 0700430 5310350 103361 001785 9999 $85,562.00 TPW Inspection Staff 1 30100 1 0200431 1 5740010 1 103361 1 002480 9999 $793,253.50 Pay to contractor 1 3 1 30100 1 0200431 1 5740010 1 103361 1 002480 I 9999 1 1 1 $39,663.501 Contract Contingencv CITY OF FORT WORTH, TEXAS WATER DEPARTMENT ADDENDUM NO. 1 To the Specifications and Contract Documents For: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A UNIT I — WATER UNIT II — SANITARY SEWER UNIT III — PAVEMENT IMPROVEMENTS City Project No. 103361 Addendum No. 1 Issued: September 5, 2023 Prebid Conference Date: August 28, 2023 Original Bid Opening Date: September 7, 2023 Revised Bid Opening Date: September 14, 2023 This Addendum forms part of the Specifications and Contract Documents for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum in the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The specifications and contract documents for WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A are hereby revised by Addendum No. 1 as follows: 1. Plans: Construction plans are revised as follows: a. Plan set to be REPLACED in its entirety with Plan set with cover signed 8/9 and 8/10/2023, and with cover stamped with "Addendum No. 1". b. Note addition of sheet 6b. 2. Specifications a. Specifications to be REPLACED in its entirety with Contract Documents with cover signed and sealed 8/6 and 8/7/2023, and with cover stamped with "Addendum No 1". L Note change of Prebid Meeting to 8/28/23. ii. Note 50/50 Paving Quantities added to the end of the Spec Book 3. Bid Proposal Workbook: a. The Bid Proposal Workbook to be REPLACED in its entirety with the revised Bid Proposal Workbook [00 4100 Bid Proposal Workbook CPN 103361 Addendum No. 1] b. Notable changes include: addition of tree replacement bid items and bypass pumping. A-1 Addendum No. 1 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A City Project No. 103361 4. Bidders Questions: a. The bidders questions have been addressed via addendum issuing revised spec book and plans. This Addendum No. 1, forms part of the Specifications & Contract Documents for the above referenced project and modifies the original Project Manual & Contract Documents of the same. Acknowledge your receipt of Addendum No. 1 by completing the requested information at the following locations: (1) In the space provided in Section 00 4100, Bid Form, Page 3 of 3 (2) Indicate in upper case letters on the outside of your sealed bid envelope: "RECEIVED & ACKNOWLEDGE ADDENDUM NO. 1" Include a signed copy of Addendum No. 1 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 1 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. Addendum No. 1 RECEIPT ACKNOWLEDGED: By: f , Company: v��S Christopher Harder, P.E. Director, Water Department By: Tony Sholola, P.E. Assistant Director, Water Department A-1 Addendum No. 1 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A City Project No. 103361 00 42 43 BID PROPOSAL Page 1 of 5 SECTION 00 42 43 PROPOSALFORM Water & Sanitary Sewer Replacements Contract 2020 WSM-A CPN 103361 UNIT PRICE BID Project Item Information Bidlist Item) Description No. 1 3311.0261 8" PVC Water Pipe 2 3311.0251 8" DIP Water Pipe 3 3311.0161 6" PVC Water Pipe 4 3312.3003 8" Gate Valve 5 3312.3103 8" Cut -in Gate Valve 6 3312.3002 6" Gate Valve 7 3305.0003 8" Waterline Lowering 8 0241.1302 Remove 6" Water Valve 9 0241.1303 Remove 8" Water Valve 10 3311.0001 Ductile Iron Water Fittings w/ Restraint 11 0241.1001 Water Line Grouting 12 0241.1510 Salvage Fire Hydrant 13 0241.1511 Salvage 3/4" Water Meter 14 3305.0109 Trench Safety 15 3312.0001 Fire Hydrant 16 3312.2001 1" Water Service, Meter Reconnection 17 3312.2003 1" Water Service 18 3312.2004 1" Private Water Service 19 3312.2101 1 1/2" Water Service, Meter Reconnection 20 3312.2103 1 1/2" Water Service 21 3312.2201 2" Water Service, Meter Reconnection 22 3312.2203 2" Water Service 23 0241.0100 Remove Sidewalk (50/50) 24 3213.0301 4" Conc Sidewalk (50/50) 3213.0301 4" Conc Sidewalk (100% Water), Replace for 25 service cuts as necessary (Edgefield Rd and Englewood Rd) 26 10241.1300 Remove Conc Curb&Gutter (50/50) 27 13216.0101 6" Conc Curb and Gutter (50/50) 3216.0101 6" Conc Curb and Gutter (100% Water) 28 Replace for service cuts as necessary (Edgefield Rd and Englewood Rd) 29 3304.0101 Temporary Water Services 30 13312.0117 Connection to Existing 4"-12" Water Main 31 13305.0111 Valve Box Adjustment w/ Conc Collar (50/50) 32 13201.0400 Temporary Asphalt Paving Repair 33 13201.0112 5' Wide Asphalt Pvmt Repair, Residential 34 13201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 35 13201.0614 Conc Pvmt Repair, Residential 36 10241.1700 11" Pavement Pulverization (50/50) 37 10241.1700 11" Pavement Pulverization (100% Water) 38 13212.0303 3" Asphalt Pvmt Type D (50/50) 39 13212.0303 3" Asphalt Pvmt Type D (100% Water) 40 13123.0101 Unclassified Excavation by Plan (50/50) 41 13123.0101 Unclassified Excavation by Plan (100% Water) 42 10241.1400 Remove Conc Valley Gutter (50/50) Bidder's Application Bidder's Proposal Specification I Unit of I Bid Unit Price I Bid Vaiue Section No. Measure Quantity 3311 12 33 11 10 3311 12 331220 331220 331220 33 05 12 0241 14 0241 14 3311 11 0241 14 ......... .. 02 41 14 0241 14 33 05.10 ................. . 331240 33 12 10 33 12 10 33 12 10 33 12 10 331210 33 12 16 331210 0241 13 32 13 20 LF LF LF EA EA EA EA EA EA TON CY EA EA LF EA EA EA LF EA EA EA EA SF SF I32 13 20 I SF 102 41 15.. LF 132 16 13 1 LF 1321613 I LF 1330430 1 133 12 25 1 33 05 14 13261 18 13201 17 3201 17 13201 29 1 10241 15 1 �0241 15' 132 12 16 1 132 12 16 1 131 2316 1 131 2316 �02 4 f 15 LS EA EA LF LF 6,577 189 17 1 14 4 6 6 6 32 8 195 215 14 191 191 214 1 1 1 1 251 371 661 1,3381 1,3381 938 1� 11� 91 10,2411 1371 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 SY 1 182I I $0.00 SY 1 5441 1 $0.00 SY 1 5,1501 1 $0.00 SY 1 3.5571 1 $0.00 SY 1 5,1501 1 $0.00 SY 1 3,5571 $0.00 CY 1 181 I $0.00 CY 1 51 I $0.00 SY 1 201 1 $0.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 CPN 103361 a 00 42 43 BID PROPOSAL Page 2 of 5 43 3216.0301 7" Conc Valley Gutter, Residential (50/50) 32 16 13 SY 50 $0.00 44 3216.0301 7" Conc Valley Gutter, Residential (100% 32 16 13 SY 94 $0.00 Water) 45 6241.0401 Remove Concrete Drive (50/50) 6241 13 SF 1,771 $0.00 46 3213.0401 6" Concrete Driveway (50/50) 32 13 20 SF 1,771 $0.00 47 3213.0401 6" Concrete Driveway (100% Water) 32 13 20 SF 1,410 $0.00 48 3212.0401 HMAC Transition (50/50) 32 12 16 TN 20 $0.00 49 3212.0401 HMAC Transition (100% Water) 32 12 16 TN 20 $0.00 50 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 8 $0.00 51 3292.0101 Utility Service Surface Restoration Sodding 32 92 13 SY 235 $0.00 52 3292.0100 Block Sod Placement (50/50) 32 92 13 SY 350 $0.00 53 3217.5001 Curb Address Painting (50/50) 32 17 25 EA 12 $0.00 54 3291.0100 Topsoil (50/50) 3291 19 CY 22 $0.00 55 3291.0100 Topsoil (100% Water) 3291 19 CY 18 $0.00 56 3471.0001 Traffic Control 34 71 13 MO 6 $0.00 57 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 32 11 29 TN 76 $0.00 58 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (100% 321129 TN 54 $0.00 Water) 59 3305.0108 Utility Adjustment (irrigation adjustments) 33 05 14 LS 1 $6,250.00 $6,250.00 (50/50) 60 0171 0102 As Built Survey 01 7123 LS 1 $0.00 61 0171.0101 Construction Staking 01 71 23 LS 1 $0.00 62 3125.0101 SWPPP _> 1 acre 31 25 00 LS 1 $0.00 63 9999.0003 Water Construction Allowance 99 99 99 LS 1 $200,000.00 $200,000.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3331.5747 8" Sewer Pipe, CLSM Backfill 3311 10, 3331.4120 8" DIP Sewer Pipe, CSS Backfill, w/ Protecto 3311 10 401 Coating 3331.4119 8" DIP Sewer Pipe w/ Protecto 401 Coating 3311 10 3331.4115 8" Sewer Pipe 3311 10, 3331.4108 6" Sewer Pipe 3311 10, 3331.1102 6" to 8" Pipe Enlargement 3331 23 3331.2101 6" CIPP 3331 12 3331.0102 6" Sewer Pipe, Point Repair -ii 3331 22, 9999.0005 PipAdjustment 0241 14 0241.2201 Remove 4' Sewer Manhole 02 41 14 0241.5001 Abandon Manhole 0241 14 3231.0412 6' Fences, Wood 32 31 29 3231.0123 6' Chain Link, Aluminum 3231 13 3301.0001 Pre -CCTV Inspection 3301 31 3301.0002 Post -CCTV Inspection 33 01 31 3301.0101 Manhole Vacuum Testing 3301 30 3331.3101 4" Sewer Service 33 31 50 3331.3105 4" Private Sewer Service 3331 50 3331.1201 Service Reinstatement, Pipe Enlargement 3331 23 Incluing 4-inch two way cleanout 3331.2201 4" Service Reconnection, CIPP Including 4-inch 3331 12 two way cleanout 3339.1102 5' Drop Manhole 33 39 10, 3339.1004 4' Shallow Manhole 33 39 10, 3339.1003 4' Extra Depth Manhole 33 39 10, 3339.1002 4' Drop Manhole 33 39 10, 3339.1001 4' Manhole 33 39 10, 3339.1105 5' Type A Manhole 33 39 10, 33 39 20 9999.0004 Hydraulic Slide 99 99 99 9999.0005 MH Locking Cover 99 99 99 9999.0004 Connect to Existing SSMH 99 99 99 LF 178 $0.00 LF 45 $0.00 LF 558 $0.00 LF 1,503 $0.00 LF 10 $0.00 LF 752 $0.00 LF 700 $0.00 LF 100 $0.00 LF 100 $0.00 EA 7 $0.00 EA 2 $0.00 LF 110 $0.00 LF 120 $0.00 LF 1,451 $0.00 LF 3,745 $0.00 EA 24 $0.00 EA 50 $0.00 LF 210 $0.00 EA 18 $0.00 EA 23 $0.00 EA 1 $0.00 EA 2 $0.00 VF 10 $0.00 EA 1 $0.00 EA 19 $0.00 EA 1 $0.00 EA 1 $0.00 EA 1 $0.00 EA 6 $0.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 W SS Repl Contract 2020 WSM-A CPN 103361 00 42 43 BID PROPOSAL Page 3 of 5 30 0241,2103 8" Sewer Abandonment Plug 0241 14 EA 9 $0.00 31 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 7 $0.00 32 0241.2001 Sanitary Line Grouting 0241 14 CY 17 $0.00 33 3339.0001 Epoxy Manhole Liner 33 39 60 VF 60 $0.00 34 3305.0112 Concrete Collar 33 05 17 EA 22 $0.00 35 3305.0109 Trench Safety 33 05 10 LF 2,394 $0.00 36 3305.0107 Manhole Adjustment, Minor w/ Conc Collar 33 05 14 EA 4 $0.00 (50/50) 37 3305.0106 Manhole Adjustment, Major 3305 14 EA 1 $0.00 38 3305.0203 Imported Embedment/Backfill, CLSM 33 05 10 CY 3 $0.00 39 0241.1400 Remove Conc Valley Gutter (50/50) 0241 15 SY 20 $0.00 40 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 75 $0.00 41 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, 3201 17 SY 317 $0.00 Residential 42 3201.0400 Temporary Asphalt Paving Repair 3201 18 LF 2,158 $0.00 43 3216.0301 7" Conc Valley Gutter, Residential (50/50) 32 16 13 SY 50 $0.00 44 3216.0301 7" Conc Valley Gutter, Residential (100% 32 16 13 SY 94 $0.00 Water) 45 0241.0401 Remove Concrete Drive (50/50) 0241 13 SF 1,771 $0.00 46 3213.0401 6" Concrete Driveway (50/50) 321320 SF 1,771 $0.00 47 3213.0401 6" Concrete Driveway (100% Water) 32 1320 SF 108 $0.00 48 9999.0000 Replace Gravel Driveway 99 99 99 SF 40 $0.00 49 0241.0100 Remove Sidewalk (50/50) 0241 13 SF 25 $0.00 50 3213.0301 4" Conc Sidewalk (50/50) 321320 SF 43 $0.00 51 3213.0301 4" Conc Sidewalk (100% Water) 32 13 20 SF 45 $0.00 52 0241.1300 Remove Conc Curb&Gutter (50/50) 0241 15 LF 1,337 $0.00 53 3216,0101 6" Conc Curb and Gutter (50/50) 32 16 13 LF 1,412 $0.00 54 3216.0101 6" Conc Curb and Gutter (100% Water) 32 16 13 LF 290 $0.00 55 3212.0303 3" Asphalt Pvmt Type D (50/50) 32 12 16 SY 5,150 $0.00 56 3212.0303 3" Asphalt Pvmt Type D (100% Water) 32 12 16 SY 3,558 $0.00 57 0241.1700 11" Pavement Pulverization (50/50) 0241 15 SY 5,150 $0.00 58 0241.1700 11" Pavement Pulverization (100% Water) 0241 15 SY 3,558 $0.00 59 3212.0401 HMAC Transition (50/50) 32 12 16 TN 20 $0.00 60 3212.0401 HMAC Transition (100% Water) 32 12 16 TN 20 MOO 61 3217.5001 Curb Address Painting (50/50) 32 17 25 EA 13 $0.00 62 3123.0101 Unclassified Excavation by Plan (50/50) 31 2316 CY 19 $0.00 63 3123.0101 Unclassified Excavation by Plan (100% Water) 31 23 16 CY 5 $0.00 64 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 32 11 29 TN 77 $0.00 65 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (100% 32 11 29 TN 54 $0.00 Water) 66 3292.0100 Block Sod Placement (50/50) 32 92 13 SY 350 $0.00 67 3310.0102 6"-12" Tree Removal 33 10 00 EA 2 $0.00 68 3310.0103 12"-18" Tree Removal 33 10 00 EA 2 $0.00 69 3310.0104 18"-24" Tree Removal 33 10 00 EA 1 $0.00 70 3310.0105 24" and larger Tree Removal 33 10 00 EA 1 $0.00 71 3292.0101 Utility Service Surface Restoration Sodding 32 92 13 SY 320 $0.00 72 3291.0100 Topsoil (50/50) 3291 19 CY 23 $0.00 73 3291.0100 Topsoil (100% Water) 3291 19 CY 26 $0.00 74 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 5 $0.00 75 9999.0004 Demo/Remove Shed 99 99 99 EA 1 $0.00 76 3471.0001 Traffic Control 3471 13 MO 3 $0.00 77 0171.0102 As -Built Survey 01 71 23 LS 1 $0.00 78 0171.0101 Construction Staking 01 7123 LS 1 $0.00 79 3303.0001 Bypass Pumping (for CIPP installation) 33 03 10 LS 1 $0.00 80 3125.0101 SWPPP >_ 1 acre 31 2500 LS 1 $0.00 81 ooua.0 lUo Utility tAUJU51nit.'n1 tll llgd1lUf1 dUJU5Ui1Cn15) 33 05 14 LS 1 $6,250 $6,250.00 icnicm 82 9999.0003 Sanitary Sewer Construction Allowance 99 99 99 LS 1 $100,000.00 $100,000.00 Subtotal Sanitary Sewer $106,250.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECLFICATION DOCUMENTS Revised 9/30/2021 W SS Repl Contract 2020 WSM-A CPN 103361 e 00 42 43 BID PROPOSAL Page 4 of 5 1 0241.0100 Remove Sidewalk (50/50) 2 0241.0401 Remove Concrete Drive (50/50) 3 0241.1300 Remove Conc Curb&Gutter (50/50) 4 0241.1400 Remove Conc Valley Gutter (50/50) 5 0241.1700 11" Pavement Pulverization (50/50) 6 0241.1800 Remove Speed Cushion (50/50) 7 3123.0101 Unclassified Excavation by Plan (50/50) 8 3125.0101 SWPPP >_ 1 acre 9 3212.0303 3" Asphalt Pvmt Type D (50/50) 10 3212.0401 HMAC Transition (50/50) 11 3213.0301 4" Conc Sidewalk (50/50) 12 3213.0401 6" Concrete Driveway (50/50) 13 3216.0101 6" Conc Curb and Gutter (50/50) 14 3216.0301 7" Conc Valley Gutter, Residential (50/50) 15 3217.5001 Curb Address Painting (50/50) 16 3291.0100 Topsoil (50/50) 17 3292.0100 Block Sod Placement (50/50) 18 3305.0107 Manhole Adjustment, Minor w/ Conc Collar (50/50) 19 3305.0108 Utility Adjustment (irrigation adjustments) (50/50) 20 3305.0111 Valve Box Adjustment w/ Conc Collar (50/50) 21 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 22 3471.0001 Traffic Control 23 3349.5006 Remove and Replace Inlet Top 10' 24 9999.0003 Paving Construction Allowance Subtotal Paving Subtotal Unit 1 Water Subtotal Unit 2 Sanitary Sewer Subtotal Unit 3 Pavino Total Water, Sanitary Sewer, and Paving CPN 103361 2020 WSM-A 0241 13 SF 50 $0.00 0241 13 SF 3,542 $0.00 0241 15 LF 2,675 $0.00 0241 15 SY 40 $0.00 0241 15 SY 10,300 $0.00 0241 15 EA 1 $0.00 312316 CY 38 $0.00 31 2500 LS 1 $0.00 321216 SY 10,300 $0.00 321216 TN 40 $0.00 32 13 20 SF 75 $0.00 32 13 20 SF 3,542 $0.00 32 16 13 LF 2,675 $0.00 321613 SY 100 $0.00 32 17 25 EA 26 $0.00 3291 19 CY 46 ' $0.00 32 92 13 SY 700 _ $0.00 33 05 14 EA 4 $0.00 33 05 14 I LS 1 $12,500.00 $12,500.00 33 05 14 EA 9 $0.00 321129 TN 155 $0.00 3471 13 MO 4 $0.00 33 49 20 EA 2 $0.00 99 99 99 LS 1 $50,000.00 $50,000.00 END OF SECTION $62,500.00 I $206,250.00 $106,250.00 $62,500.00 I$375,000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 CPN 103361 CITY OF FORT WORTH, TEXAS WATER DEPARTMENT ADDENDUM NO. 2 To the Specifications and Contract Documents For: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A UNIT I — WATER UNIT II — SANITARY SEWER UNIT III — PAVEMENT IMPROVEMENTS City Project No. 103361 Addendum No. 2 Issued: September 12, 2023 Prebid Conference Date: August 28, 2023 Original Bid Opening Date: September 7, 2023 Bid Opening Date: September 14, 2023 This Addendum forms part of the Specifications and Contract Documents for the above referenced Project and modifies the original Specifications and Contract Documents. Bidder shall acknowledge receipt of this addendum in the space provided below and acknowledge receipt on the outer envelope in your bid. Failure to acknowledge receipt of this addendum could subject the bidder to disqualification. The specifications and contract documents for WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A are hereby revised by Addendum No. 2 as follows: 1. Bid Proposal Workbook: a. The Bid Proposal is hereby REPLACED in its entirety with the revised attached Bid Proposal Workbook [00 41 00 Bid Proposal Workbook CPN 103361 Addendum No. 21 to revise manhole quantities and avoid decimals in the workbook This Addendum No. 2, forms part of the Specifications & Contract Documents for the above referenced project and modifies the original Project Manual & Contract Documents of the same. Acknowledge your receipt of Addendum No. 2 by completing the requested information at the following locations: (1) In the space provided in Section 00 4100, Bid Form, Page 3 of 3 (2) Indicate in upper case letters on the outside of your sealed bid envelope: "RECEIVED & ACKNOWLEDGE ADDENDUM NO. 2"' Include a signed copy of Addendum No. 2 in the sealed bid envelope at the time of bid submittal. Failure to acknowledge receipt of Addendum No. 2 below could cause the subject bidder to be considered "NONRESPONSIVE", resulting in disqualification. A-2 Addendum No. 2 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A City Project No. 103361 Addendum No. 2 RECEIPT ACKNOWLEDGED: By: i Company:. L't'l,f Christopher Harder, P.E. Director, Water Department By: 70Aq Sp-/. Tony 5hololV, P.E. Assistant Director, Water Department A-2 Addendum No. 2 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2020, WSM-A City Project No. 103361 ADDENDUM NO.2 00 42 43 BID PROPOSAL Page I of 5 SECTION 00 42 43 PROPOSALFORM Water & Sanitary Sewer Replacements Contract 2020 WSM-A CPN 103361 UNIT PRICE BID Bidlist No. Project Item Information Description 1 3311.0261 8" PVC Water Pipe 2 3311.0251 8" DIP Water Pipe 3 3311.0161 6" PVC Water Pipe 4 3312,3003 8" Gate Valve 5 3312.3103 8" Cut -in Gate Valve 6 3312.3002 6" Gate Valve 7 3305,0003 8" Waterline Lowering 8 0241.1302 Remove 6" Water Valve 9 0241.1303 Remove 8" Water Valve 10 3311.0001 Ductile Iron Water Fittings w/ Restraint 11 0241.1001 Water Line Grouting 12 0241.1510 Salvage Fire Hydrant 13 0241.1511 Salvage 3/4" Water Meter 14 3305.0109 Trench Safety 15 3312,0001 Fire Hydrant 16 3312.2001 1" Water Service, Meter Reconnection 17 3312.2003 1" Water Service 18 3312.2004 1" Private Water Service 19 3312.2101 1 1/2" Water Service, Meter Reconnection 20 3312.2103 1 1/2" Water Service 21 3312.2201 2" Water Service, Meter Reconnection 22 3312.2203 2" Water Service 23 0241.0100 Remove Sidewalk (50/50) 24 3213.0301 4" Conc Sidewalk (50/50) 3213.0301 4" Conc Sidewalk (100% Water), Replace for 25 service cuts as necessary (Edgefield Rd and Englewood Rd) 26 0241.1300 Remove Conc Curb&Gutter (50/50) 27 3216.0101 6" Conc Curb and Gutter (50/50) 3216.0101 6" Conc Curb and Gutter (100% Water) 28 Replace for service cuts as necessary (Edgefield Rd and Englewood Rd) 29 3304.0101 Temporary Water Services 30 3312,0117 Connection to Existing 4"-12" Water Main 31 3305.0111 Valve Box Adjustment w/ Conc Collar (50/50) 32 3201.0400 Temporary Asphalt Paving Repair 33 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 34 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 35 3201.0614 Conc Pvmt Repair, Residential 36 0241.1700 11" Pavement Pulverization (50/50) _ 37 0241.1700 11" Pavement Pulverization (100% Water) 38 3212.0303 3" Asphalt Pvmt Type D (50/50) 39 3212.0303 3" Asphalt Pvmt Type D (100% Water) 40 3123.0101 Unclassified Excavation by Plan (50/50) 41 3123.0101 Unclassified Excavation by Plan (100% Water) 42 0241.1400 Remove Conc Valley Gutter (50/50) Bidder's Application Bidder's Proposal Specification Unit of Bid Unit Price Bid Value Section No. Measure Quantity 331112 LF 1,486 $0.00 331116 LF 6,578 $0.00 331112 LF 190 $0.00 33 12 20 EA 17 $0.00 33 12 20 EA 1 $0.00 33 12 20 EA 14 $0.00 33 05 12 EA 4 $0.00 0241 14 EA 6 $0.00 0241 14 EA 6 $0.00 331111 TON 6 $0.00 0241 14 CY 32 $0.00 0241 14 EA 8 $0.00 0241 14 EA 195 $0.00 ........ ............ . 33 05 10 LF 215 $0.00 33 12 40 EA 14 $0.00 331210 EA 191 $0.00 331210 EA 191 $0.00 331210 LF 215 $0.00 331210 EA 1 $0.00 331210 EA 1 $0.00 331210 EA 1 $0.00 33 12 10 EA 1 $0.00 0241 13 SF 25 $0.00 32 13 20 SF 37 $0.00 32 13 20 SF 66 $0.00 024115 LF 1,338 $0.00 321613 LF 1,338 $0.00 321613 LF 938 $0.00 33 04 30 LS 1 $0.00 33 12 25 EA 11 $0.00 336614 EA 9 $0.00 32 01 18 LF 10,241 $0.00 32 01 17 LF 137 $0.00 3201 17 SY 182 $0.00 3261 29 SY 544 $0.00 0241 15 SY 5,150 $0.00 0241 15 SY 3,557 $0.00 32 12 16 SY 5,150 $0.00 32 12 16 SY 3,557 $0.00 31 2316 CY 18 $0.00 312.316 CY 5 $0.00 0241 15 SY 20 $0.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO. 2 CPN 103361 ADDENDUM NO. 2 00 42 43 BID PROPOSAL Page 2 of 5 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 3216.0301 7" Conc Valley Gutter, Residential (50/50) 3216.0301 7" Conc Valley Gutter, Residential (100% Water) 0241.0401 Remove Concrete Drive (50/50) 3213.0401 6" Concrete Driveway (50/50) 3213.0401 6" Concrete Driveway (100% Water) 3212.0401 HMAC Transition (50/50) 3212.0401 HMAC Transition (100% Water) 3305.0103 Exploratory Excavation of Existing Utilities 3292.0101 Utility Service Surface Restoration Sodding 3292.0100 Block Sod Placement (50/50) 3217.5001 Curb Address Painting (50/50) 3291.0100 Topsoil (50/50) 3291.0100 Topsoil (100% Water) 3471.0001 Traffic Control 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (100% Water) 3305.0108 Utility Adjustment (irrigation adjustments) (50/50) 0171.0102 As -Built Survey 0171.0101 Construction Staking 3125.0101 SWPPP >_ 1 acre 9999.0003 Water Construction Allowance 321613 SY 50 $0.00 321613 SY 94 $0.00 0241 13 SF 1,771 $0.00 321320 SF 1,771 $0.00 32 13 20 SF 1,410 $0.00 321216 TN 20 $0.00 321216 TN 20 $0.00 33 05 30 EA 8 $0.00 32 92 13 SY 235 $0.00 32 92 13 SY 350 $0.00 32 17 25 EA 12 $0.00 3291 19 CY 22 $0.00 3291 19 CY 18 $0.00 3471 13 MO 6 $0.00 321129 TN 76 $0.00 321129 TN 54 $0.00 33 05 14 LS 1 $6,250.00 $6,250.00 017123 LS 1 $0.00 017123 LS 1 $0.00 31 2500 LS 1 $0.00 99 99 99 LS 1 $200,000.00 $200,000.00 3331.5747 8" Sewer Pipe, CLSM Backfill 3311 10, 3331.5748 8" DIP Sewer Pipe, CLSM Backfill, with Protecto 3311 10 401 Coating 3331.4119 8" DIP Sewer Pipe w/ Protecto 401 Coating 3311 10 3331.4115 8" Sewer Pipe 3311 10, 3331.4108 6" Sewer Pipe 3311 10, 3331.1102 6" to 8" Pipe Enlargement 3331 23 3331.2101 6" CIPP 3331 12 3331.0102 6" Sewer Pipe, Point Repair 33 31 22, 9999.0005 Sag Adjustment for Pipe Enlargement 0241 14 0241.2201 Remove 4' Sewer Manhole 0241 14 0241.5001 Abandon Manhole 0241 14 3231.0412 6' Fences, Wood 3231 29 3231.0123 6' Chain Link, Aluminum 3231 13 3301.0001 Pre -CCTV Inspection 3301 31 3301.0002 Post -CCTV Inspection 3301 31 3301.0101 Manhole Vacuum Testing 33 01 30 3331.3101 4" Sewer Service 3331 50 3331.3105 4" Private Sewer Service 3331 50 3331.1201 Service Reinstatement, Pipe Enlargement 33 31 23 Incluing 4-inch two way cleanout 3331.2201 4" Service Reconnection, CIPP Including 4-inch 3331 12 two way cleanout 3339.1004 4' Shallow Manhole 33 39 10, 3339,1003 4' Extra Depth Manhole 33 39 10, 3339.1002 4' Drop Manhole 3339 10, 3339.1001 4' Manhole 33 39 10, 3339.1105 5' Modified Type A Manhole w/ External 8" Drop 33 39 10, Connection 33 39 20 9999.0004 Hydraulic Slide 99 99 99 9999.0005 MH Locking Cover 99 99 99 9999.0004 Connect to Existing SSMH 99 99 99 0241.2103 8" Sewer Abandonment Plug 0241 14 LF 178 $0.00 LF 45 $0.00 LF 558 $0.00 LF 1,503 $0.00 LF 10 $0.00 LF 752 $0.00 LF 700 $0.00 LF 100 $0.00 LF 100 $0.00 EA 7 $0.00 EA 2 $0.00 LF 110 $0.00 LF 120 $0.00 LF 1,451 $0.00 LF 3,745 $0.00 EA 24 $0.00 EA 50 $0.00 LF 210 $0.00 EA 18 $0.00 EA 23 $0.00 EA 2 $0.00 VF 10 $0.00 EA 1 $0.00 EA 19 $0.00 EA 1 $0.00 EA 1 $0.00 EA 1 $0.00 EA 6 $0.00 EA 9 $0.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO. 2 CPN 103361 ADDENDUM NO. 2 00 42 43 BID PROPOSAL Page 3 of 5 30 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 7 $0.00 31 0241.2001 Sanitary Line Grouting 0241 14 CY 17 $0.00 32 3339.0001 Epoxy Manhole Liner 33 39 60 VF 60 $0.00 33 3305.0112 Concrete Collar 33 05 17 EA 22 $0.00 34 3305.0109 Trench Safety 33 05 10 LF 2,394 $0.00 35 3305.0107 Manhole Adjustment, Minor w/ Conc Collar 33 05 14 EA 4 $0.00 (50/50) 36 3305.0106 Manhole Adjustment, Major 33 05 14 EA 1 $0.00 37 3305.0203 Imported Embedment/Backfill, CLSM 3305 10 CY 3 $0.00 38 0241.1400 Remove Conc Valley Gutter (50/50) 0241 15 SY 20 $0.00 39 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 75 $0.00 40 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, 3201 17 SY 317 $0.00 Residential 41 3201.0400 Temporary Asphalt Paving Repair 3201 18 LF 2,158 $0.00 42 3216.0301 7" Conc Valley Gutter, Residential (50/50) 32 16 13 SY 50 $0.00 43 3216.0301 7" Conc Valley Gutter, Residential (100% 32 16 13 SY 94 $0.00 Water) 44 0241.0401 Remove Concrete Drive (50/50) 0241 13 SF 1,771 WOO 45 3213.0401 6" Concrete Driveway (50/50) 32 13 20 SF 1,771 $0.00 46 3213.0401 6" Concrete Driveway (100% Water) 321320 SF 108 $0.00 47 9999.0000 Replace Gravel Driveway 99 99 99 SF 40 $0.00 48 0241.0100 Remove Sidewalk (50/50) 0241 13 SF 25 $0.00 49 3213.0301 4" Conc Sidewalk (50/50) 32 13 20 SF 43 $0.00 50 3213.0301 4" Conc Sidewalk (100% Water) 32 13 20 SF 45 $0.00 51 0241.1300 Remove Conc Curb&Gutter (50/50) 0241 15 LF 1,337 $0.00 52 3216.0101 6" Conc Curb and Gutter (50/50) 32 16 13 LF 1,412 $0.00 53 3216.0101 6" Conc Curb and Gutter (100% Water) 32 16 13 LF 290 $0.00 54 3212.0303 3" Asphalt Pvmt Type D (50/50) 32 12 16 SY 5,150 $0.00 55 3212.0303 3" Asphalt Pvmt Type D (100% Water) 32 12 16 SY 3,558 $0.00 56 0241.1700 11" Pavement Pulverization (50/50) 0241 15 SY 5,150 $0.00 57 0241.1700 11" Pavement Pulverization (100% Water) 0241 15 SY 3,558 $0.00 58 3212.0401 HMAC Transition (50/50) 32 12 16 TN 20 $0.00 59 3212.0401 HMAC Transition (100% Water) 32 12 16 TN 20 $0.00 60 3217.5001 Curb Address Painting (50/50) 321725 EA 13 $0.00 61 3123.0101 Unclassified Excavation by Plan (50/50) 31 2316 CY 19 $0.00 62 3123.0101 Unclassified Excavation by Plan (100% Water) 31 2316 CY 5 $0.00 63 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 3211 29 TN 77 $0.00 64 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (100% 32 11 29 TN 54 $0.00 Water) 65 3292.0100 Block Sod Placement (50/50) 3292 13 SY 350 $0.00 66 3310.0102 6"-12" Tree Removal 33 10 00 EA 2 $0.00 67 3310.0103 12"-18" Tree Removal 33 10 00 EA 2 $0.00 68 3310.0104 18"-24" Tree Removal 33 10 00 EA 1 $0.00 69 3310.0105 24" and larger Tree Removal 33 10 00 EA 1 $0.00 70 3292.0101 Utility Service Surface Restoration Sodding 32 92 13 SY 320 $0.00 71 3291.0100 Topsoil (50/50) 3291 19 CY 23 $0.00 72 3291.0100 Topsoil (100% Water) 3291 19 CY 26 $0.00 73 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 5 $0.00 74 9999.0004 Demo/Remove Shed 99 99 99 EA 1 $0.00 75 3471.0001 Traffic Control 3471 13 MO 3 $0.00 76 0171.0102 As -Built Survey 01 71 23 LS 1 $0.00 77 0171.0101 Construction Staking 01 71 23 LS 1 $0.00 78 3303.0001 Bypass Pumping (for CIPP installation) 33 03 10 LS 1 $0.00 79 3125.0101 SWPPP >_ 1 acre 31 2500 LS 1 $0.00 80 33U0.0 1 U8 UTlllty MUJUblMenl (II I IIJdLIUI I dUJUbLl IIel llb) 33 05 14 LS 1 $6,250 $6,250.00 icniGm 81 9999.0003 Sanitary Sewer Construction Allowance 99 99 99 LS 1 $100,000.00 $100,000.00 Subtotal Sanitary Sewer $106,250.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO, 2 CPN 103361 ,V ADDENDUM NO. 2 00 42 43 BID PROPOSAL Page 4 of 5 1 0241.0100 Remove Sidewalk (50/50) 0241 13 SF 50 $0.00 2 0241.0401 Remove Concrete Drive (50/50) 0241 13 SF 3,542 $0.00 3 0241.1300 Remove Conc CurbBGutter (50/50) 0241 15 LF 2,675 $0.00 4 0241.1400 Remove Conc Valley Gutter (50/50) 0241 15 SY 40 $0.00 5 0241.1700 11" Pavement Pulverization (50/50) 0241 15 SY 10,300 $0.00 6 0241.1800 Remove Speed Cushion (50/60) 0241 15 EA 1 $0.00 7 3123.0101 Unclassified Excavation by Plan (50/50) 31 23 16 CY 38 $0.00 8 3125.0101 SWPPP z 1 acre 31 25 00 LS 1 $0.00 9 3212.0303 3" Asphalt Pvmt Type D (50/50) 32 12 16 SY 10,300 $0.00 10 3212.0401 HMAC Transition (50/50) 32 12 16 TN 40 $0.00 11 3213.0301 4" Conc Sidewalk (50/50) 32 13 20 SF 75 $0.00 12 3213.0401 6" Concrete Driveway (50/50) 32 13 20 _ SF 3,542 $0.00 13 3216.0101 6" Conc Curb and Gutter (50/50) 32 16 13 1 LF 2,675 1 $0.00 14 13216.0301 7" Conc Valley Gutter, Residential (50/50) 32 16 13 1 SY 100 1 $0.00 15 Curb Address Painting (50/50) 132 17 25 1 EA 1 26 1 $0.00 16 13217.5001 3291.0100 Topsoil (50/50) 13291 19 CY 1 46 $0.00 17 Block Sod Placement (50150) 132 92 13 SY 1 700 $0.00 18 13292.0100 3305.0107 Manhole Adjustment, Minor w/ Conc Collar 330514 EA I 4 I $0.00 (50/50) 19 1 3305Utility Adjustment (irrigation adjustments) 330514 LS I 1 $12,500.00I $12,500.00 0/5.0108 i 20 13305.0111 Valve Box Adjustment w/ Conc Collar (50/50) 1330514 EA 9 $0.00 21 13211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50150) 321129 TN 155 $0.00 22 13471.0001 Traffic Control 1347113 MO_ 4 $0.00 23 13349.5006 Remove and Replace Inlet Top 10' 133 49 20 -1 EA 1 2 1 1 $0.00 24 19999.0003 Paving_ Construction_ Allowance 199 99 99 1 LS I_ 1 1 $50,000.001 $50,000.00 Subtotal Paving $62,500.00 Subtotal Unit 1 Water Subtotal Unit 2 Sanitary Sewer Subtotal Unit 3 Pavina Total Water, Sanitary Sewer, and Paving CPN 103361 2020 WSM-A END OF SECTION $206,250.00 $106,250.00 $62„500.00 I$375„000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 ADDENDUM NO.2 W SS Repi Contract 2020 WSM-A CPN 103361 W 0011 13 INVITATION TO BIDDERS Page 1 of 3 SECTION 0011 13 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of Water and Sanitary Sewer Replacements, Contract 2020 WSM-A, City Project No. 103361 ("Projecf') will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST, Thursday, September 14, 2023 as further described below: IdW City of Fort Worth Purchasing Division 200 Texas Street Fort Worth, Texas 76102 Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above;Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers. In lieu of delivering completed Business Equity (M/WBE) forms for the project to the Purchasing Office, bidders shall e-mail the completed Business Equity forms to the City Project Manager no later than 2:00 PM on the second City Business Day after the bid opening date, exclusive of the bid d" opening date. GENERAL DESCRIPTION OF WORK The major work will consist of the (approximate) following: 1485 LF 8-inch PVC Water Pipe 6577 LF 8-inch Ductile Iron Water Pipe 13 EA 8-inch Gate Valves 1 EA 8-inch Cut -In Gate Valve 1503 LF 8" Sanitary Sewer Pipe 178 LF 8-inch Sewer Pipe, CLSM Backfill 45 LF 8-inch DIP Sewer Pipe, CSS Backfill 558 LF 8-inch DIP Sewer Pipe 752 LF 6-inch to 8-inch Pipe Enlargement 699 LF 6-inch CIPP PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at httn://www.fortworthtexas.2ov/nurchasine_/ and clicking on the link to the advertised project folders on the City's electronic document management and collaboration system site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. Bid Document Package CITY OF FORT WORTH W&SS Repl Contract 2020, WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised 7/19/2021 PM 0011 13 INVITATION TO BIDDERS Page 2 of 3 https://docs.b360.aLitodesk.com/shares/9fa87l26-6dl 4-4328-9c81-65b027751708 Addenda Folder https:// docs.b360.a utodesk.com/ shares/f3l 8l 4fb-584a-446f-8624-782b9466e eat Copies of the Bidding and Contract Documents may be purchased from Ronda Visintainer, Visintainer Engineering, PLLC (at the offices of Shield Engineering) located at: 1600 W 7' Street Suite 400 Fort Worth, TX 76102 _ The cost of Bidding and Contract Documents is: Set of Bidding and Contract Documents with full size drawings: $100.00 Set of Bidding and Contract Documents with half size (if available) drawings: $80.00 EXPRESSION OF INTERSEST To ensure potential bidders are kept up to date of any new information pertinent to this project, all interested parties are requested to email Expressions of Interest in this procurement to the City Project Manager and the Design Engineer. The email should include the company's name, contact person and that individual's email address and phone number. All Addenda will be distributed directly to those who have expressed an interest in the procurement and will also be -. posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/ PREBID CONFERENCE - Web Conference _ A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following date, and time via a web conferencing application: DATE: Monday, August 28, 2023 TIME: 2:00 p.m. -- Invitations with links to the web conferencing application will be distributed directly to those who have submitted an Expression of Interest. If a prebid conference is held, the presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders can e-mail questions or comments in accordance with Section 6 of the Instructions to Bidders referenced above to the project manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in writing" If necessary, Addenda will be issued pursuant to the Instructions to Bidders. ft M CITY OF FORT WORTH W&SS Repl Contract 2020, WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised 7/19/2021 M a M MW MM Mft AN Mob i 0011 13 INVITATION TO BIDDERS Page 3 of 3 CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. FUNDING Any Contract awarded under this INVITATION TO BIDDERS is expected to be funded from revenues generated from User Fees and reserved by the City for the Project. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Brenda Oropeza, PM, City of Fort Worth Email: Brenda.Oroveza(a,fortworthtexas.eov Phone: 817.392.8271 . AND/OR Attn: Ronda Visintainer, PE, Visintainer Engineering, PLLC Email: ronda@visintainerengineering.com Phone: 817.992.3214 ADVERTISEMENT DATES August 10, 2023 August 17, 2023 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised 7/19/2021 W&SS Repl Contract2020, WSM-A CPN 103361 SECTION 00 21 13 INSTRUCTIONS TO BIDDERS 1. Defined Terms 0021 13 INSTRUCTIONS TO BIDDERS Page 1 of 10 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1.Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 2.3. Bidding Documents Package available at: httDs:Hdocs.b360.autodesLcom/shares/2b58d31 b-4l 35-4a9b-8762-237fe0b94d05 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 45 11 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate T work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 o* 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 10 Prequalification requirement work types and documentation are available by accessing all "" required files through the City's website at: httDs ://anus. fortworthtexas. eov/Proi ectResources/ PM 3.1.1. Paving — Requirements document located at: httDs://at)Ds.fortworthtexas.eov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocwnents/Contractor%2OPreaualification/TPW%2OPavina ON %20Contractor%2OPrea ualification%2OProjaram/PREOUALIFICATION%20REO UIREMENTS%20FOR%20PAVING%2000NTRACTORS.odf FM 3.1.2. Roadway and Pedestrian Lighting — Requirements document located at: httDs://anus.fortworthtexas.Rov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPreaualification/TP W%2ORoadwa v%20and%20Pedestrian%20LiRhtina%20Preaualification%20Pro1;ram/STREET% 20LIGHT%20PRE0UAL%20REOMNTS.Ddf A 3.1.3. Water and Sanitary Sewer — Requirements document located at: httt)s://arms.fortworthtexas.aov/ProiectResources/ResourcesP/02%20- %20Construction%2ODocuments/Contractor%2OPreuualification/Water%2Oand%2 OSanitarv%20Sewer%20Contractor%20Preaualification%20Proaram/WSS%20nre a ual%20reauirements.Ddf 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2. 1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. -- 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 3.5. Special qualifications required for this project include the following: WW 4. Examination of Bidding and Contract Documents, Other Related Data, and Site CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 ON 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 10 4.1. Before submitting a Bid, each Bidder: 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing —' reliable "technical data." 4.1.5. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.6. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.7. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. MM CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 �w 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 10 4.1.8. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.2. Reference is made to Section 00 73 00 -- Supplementary Conditions for identification of: 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled _ to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4.Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. 5. Availability of Lands for Work, Etc. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 10 " 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. MP 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth 200 Texas Street Fort Worth, TX 76102 Attn: Brenda Oropeza, Water Department Email: Brenda.oropeza(afortworthtexas.gov Phone:817.392.8347 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications may be posted via the City's electronic document management and collaboration system at httas://docs.b360.autodesk.com/shares/cb76ed99-2052-4625- bai6-4e0M3e78690 CITY OF FORT WORTH W&SS Repl Contract 2020 W SM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 10 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued ,. by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to �. have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and ready for Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective �. Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non -responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: PM httt)s://codelibrary.amleizal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593 CITY OF FORT WORTH W&SS Repl Contract 2020 W SM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 i qM 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 10 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents; additional copies may be obtained from the City. 12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. All entries shall be legible. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Revised/Updated November 2, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 i 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 10 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 14. Withdrawal of Bids 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing and delivered to the Purchasing Office to receive a time stamp prior to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if the request is within one hour of bid opening, will not be read aloud and will thereafter be returned unopened. 14.2. In the event any Bid for which a withdrawal request has been timely filed has been inadvertently opened, said Bid and any record thereof will subsequently be marked "Withdrawn" and will be given no further consideration for the award of contract. 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by 'F Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. CITY OF FORT WORTH W&SS Repl Contract 2020 W SM-A i STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 10 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is -- to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1.The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at https://www.ethics.state.tx.us/data/forms/1295/1295.pdf 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. MW 18. Signing of Agreement CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 10336I Revised/Updated November 2, 202I 0021 13 INSTRUCTIONS TO BIDDERS Page 10 of 10 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION .k CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A An STANDARD CONSTRUCTION SPECIFICATION DOCUMENT CPN 103361 Revised/Updated November 2, 2021 00 35 13 CONFLICT OF INTEREST STATEMENT Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. Form CIQ (Conflict of Interest Questionnaire) (state.tx.us) httDs://www.ethics.state.tx.us/data/forms/conflict/CIS.r)df ❑ CIQ Form does not apply 21 CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply ❑ CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: Woody Contractors, Inc. 650 Tower Dr Kennedale, TX 76060 817-483-4787 END OF SECTION By: Troy Signature: Title: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 24, 2020 Bid Proposal Workbook 00 4100 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: Water & Sanitary Sewer Replacements Contract 2020, WSM-A Part 1 City Project No.: CPN 103361 Units/Sections: Unit 1 Water Unit 2 Sanitary Sewer Unit 3 Paving 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, assnciatinn_ nraanizatinn. nr cmmnration. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive Citv of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive IP.VP.IS. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification CITY OF FORT WORTH STANDARD CONSTRUCTION W SS Repl Contract 2020 WSM-A CPN 103361 SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 BID FORM Page 2 of 3 The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a• Water Distribution, Urban and Renewal, 12-inch diameter and smaller b• Sewer CIPP, 12-inches and smaller c• Sewer Collection System, Urban/Renewal, 8-inches and smaller d. Sewer Pipe Enlargement, 12-inches and smaller e. Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 Square Yards) f• Sewer Bypass Pumping, 18-inches and Smaller 9• h. 4. Time of Completion 4.1 • The Work will be complete for Final Acceptance within 500 cal. days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bi J • a• This Bid Form, Section 00 41 00 Jb. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. J C. Proposal Form, Section 00 42 43 J d• Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) / Jf_ Prequalification Statement, Section 00 45 12 J 9. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary Jh. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Total Bid $6,411,169.00 CITY OF FORT WORTH STANDARD CONSTRUCTION W SS Repl Contract 2020 WSM-A SPECIFICATION DOCUMENTS Revised 9/30/2021 CPN 103361 00 4100 BID FORM Page 3 of 3 7. Bid Submittal This Bid is submitted on September 14, 2023 Respectfully submit By: (Signer r v Woody (Printed Name) Title: President Company: Woodv Contractors. Inc. Address: 650 Tower Dr Kennedale, TX 76060 State of Incorporation: Texas Email: twoodv2020Aaol.com Phone: 817-483-4787 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 by the entity named below. Receipt is acknowledged of the Initial following Addenda• i Addendum No. 1: Addendum No. 2: ,sy jAddendum No. 3: 1Addendum No. 4: Corporate Seal: W SS Repl Contract 2020 WSM-A CPN 103361 ADDENDUM NO. 2 00 42 43 BID PROPOSAL Page 1 of 5 SECTION 00 42 43 PROPOSALFORM Water & Sanitary Sewer Replacements Contract 2020 WSM-A CPN 103361 UNIT PRICE BID Bidlist Item No. Project Item Information Description 1 3311.0261 8" PVC Water Pipe 2 3311.0251 8" DIP Water Pipe 3 3311.0161 6" PVC Water Pipe 4 3312.3003 8" Gate Valve 5 3312.3103 8" Cut -in Gate Valve 6 3312.3002 6" Gate Valve 7 3305.0003 8" Waterline Lowering 8 0241.1302 Remove 6" Water Valve 9 0241,1303 Remove 8" Water Valve 10 3311.0001 Ductile Iron Water Fittings w/ Restraint 11 0241.1001 Water Line Grouting 12 0241.1510 Salvage Fire Hydrant 13 0241.1511 Salvage 314" Water Meter 14 3305.0109 Trench Safety 15 3312.0001 Fire Hydrant 16 3312.2001 1" Water Service, Meter Reconnection 17 3312.2003 1" Water Service 18 3312.2004 1" Private Water Service 19 3312.2101 1 1/2" Water Service, Meter Reconnection 20 3312.2103 1 1/2" Water Service 21 3312.2201 2" Water Service, Meter Reconnection 22 3312.2203 2" Water Service 23 0241.0100 Remove Sidewalk (50/50) 24 3213.0301 4" Conc Sidewalk (50/50) 3213.0301 4" Conc Sidewalk (100% Water), Replace for 25 service cuts as necessary (Edgefield Rd and Englewood Rd) 26 0241.1300 Remove Conc Curb&Gutter (50/50) 27 3216.0101 6" Conc Curb and Gutter (50/50) 3216.0101 6" Conc Curb and Gutter (100% Water) 28 Replace for service cuts as necessary (Edgefield Rd and Englewood Rd) 29 3304.0101 Temporary Water Services 30 3312.0117 Connection to Existing 4"-12" Water Main 31 3305.0111 Valve Box Adjustment w/ Conc Collar (50/50) 32 3201.0400 Temporary Asphalt Paving Repair 33 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 34 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, Residential 35 3201.0614 Conc Pvmt Repair, Residential 36 0241.1700 11" Pavement Pulverization (50/50) 37 0241.1700 11" Pavement Pulverization (100% Water) 38 3212.0303 3" Asphalt Pvmt Type D (50/50) 39 3212.0303 3" Asphalt Pvmt Type D (100% Water) 40 3123.0101 Unclassified Excavation by Plan (50/50) 41 3123.0101 Unclassified Excavation by Plan (100% Water) 42 0241.1400 Remove Conc Valley Gutter (50/50) Bidder's Application Bidder's Proposal Specification Unit of Bid Unit Price Bid Value Section No. Measwe Quantity 331112 1,486 $122.00 $181,292.00 3311 10 _LF LF 6,578 $128.00 $841,984.00 331112 LF 190 $110.00 $20,900.00 33 12 20 _ EA 17 $2,500.00 $42,500.00 33 12 20 EA 1 $9,800.00 $9,800.00 33 12 20 EA 14 $1,800.00 $25,200.00 33 05 12 EA 4 $12,750.00 $51,000.00 0241 14 EA 6 $100.00 $600.00 0241 14 EA 6 $100.00 $600.00 331111 TON 6 $10,000.00 $60,000.00 024114 CY 32 $350.00 $11,200.00 0241 14 EA 8 $300.00 $2,400.00 0241 14 EA 195 $40.00 $7,800.00 33 05 10 LF 215 $1.00 $215.00 3312 40 EA 14 $5,800.00 $81,200.00 331210 EA 191 $600.00 $114,600.00 331210 EA 191 $2,400.00 $458,400.00 331210 LF 215 $50.00 $10,750.00 ........ ....... . 331210 EA 1 $2,000.00 $2,000.00 331210 EA 1 $5,000.00 $5,000.00 3312 10 EA 1 $2,150.00 $2,150.00 331210 EA 1 $6,000.00 $6,000.00 024113 SF 25 $17.50 $437.50 321320 SF 37 $18.00 $666.00 32 13 20 SF 66 $18.00 $1,188.00 024115 LF 1,338 $11.50 $15,387.00 321613 LF 1,338 $53.00 $70,914.00 321613 LF 938 $53.00 $49,714.00 33 04 30 LS 1 $250,000.00 $250,000.00 331225 EA 11 $8,000.00 $88,000.00 330514 _ EA 9 $1,100.00 $9,900.00 32 01 18 10,241 $30.00 $307,230.00 _LF 32 01 17 LF 137 $150.00 $20,550.00 3201 17 SY 182 $90.00 $16,380.00 32 01 29 SY 544 $155.00 $84,320.00 02 41 15 SY 5,150 $9.00 $46,350.00 0241 15 SY 3,557 $9.00 $32,013.00 321216 SY 5,150 $26.00 $133,900.00 321216 SY 3,557 $26.00 $92,482.00 312316 CY 18 $83.00 $1,494.00 312316 CY 5 $83.00 $415.00 024115 SY 20 $50.00 $1,000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO. 2 CPN 103361 ADDENDUM NO. 2 00 42 43 BID PROPOSAL Page 2 of 5 43 3216.0301 7" Conc Valley Gutter, Residential (50/60) 32 16 13 SY 50 $148.00 $7,400.00 44 3216.0301 7" Conc Valley Gutter, Residential (100% 32 16 13 SY 94 $148.00 $13,912.00 Water) 45 0241.0401 Remove Concrete Drive (50/50) 0241 13 SF 1,771 $3.50 $6,198.50 46 3213.0401 6" Concrete Driveway (50/50) 32 13 20 SF 1,771 $10.00 $17,710.00 47 3213.0401 6" Concrete Driveway (100% Water) 32 13 20 SF 1,410 $10.00 $14,100.00 48 3212.0401 HMAC Transition (50/50) 132 12 16 TN 20 $230.00 $4,600.00 49 3212.0401 HMAC Transition (100% Water) 132 12 16 TN 20 $230.00 $4,600.00 50 3305.0103 Exploratory Excavation of Existing Utilities 133 05 30 EA 8 $1,200.00 $9,600.00 51 3292.0101 Utility Service Surface Restoration Sodding 132 92 13 SY 235 $15.00 $3,525.00 52 3292.0100 Block Sod Placement (50/50) 132 92 13 SY 350 $15.00 $5,250.00 53 3217.5001 Curb Address Painting (50/50) 132 17 25 EA 12 $75.00 $900.00 54 3291.0100 Topsoil (50/50) 13291 19 CY 22 $90.00 $1,980.00 55 3291.0100 Topsoil (100% Water) 13291 19 CY 18 $90.00 $1,620.00 56 3471.0001 Traffic Control 13471 13 MO 6 $2,400.00 $14,400.00 57 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 13211 29 TN 76 $386.00 $29,336.00 58 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (100% I32 11 29 TN 54 $386.00 $20,844.00 Water) 59 3305.0108 Utility Adjustment (irrigation adjustments) I33 05 14 LS 1 $6,250.00 $6,250.00 (50/50) 60 0171.0102 As -Built Survey 01 71 23 LS 1 $6,000.00 $6,000.00 61 0171.0101 Construction Staking 01 71 23 LS 1 $12,000.00 $12,000.00 62 3125.0101 SWPPP z 1 acre 31 2500 LS 1 3000 $3,000,00 63 9999.0003 Water Construction Allowance 99 99 99 LS 1 $200,000.00 $200,000.00 Subtotal Water $3,541,157.00 SANITARY41T 2: IMPROVEMENTS 1 3331.5747 8" Sewer Pipe, CLSM Backfill 33 11 10, LF 178 $322.00 $57,316.00 2 3331.5748 8" DIP Sewer Pipe, CLSM Backfill, with Protecto 3311 10 LF 45 $303.00 $13,635.00 401 Coating 3 3331.4119 8" DIP Sewer Pipe w/ Protecto 401 Coating 3311 10 LF 558 $210.00 $117,180.00 4 3331.4115 8" Sewer Pipe 3311 10, LF 1,503 $164.00 $246,492.00 5 3331A108 6" Sewer Pipe 3311 10, LF 10 $162.00 $1,620.00 6 3331.1102 6" to 8" Pipe Enlargement 3331 23 LF 752 $113.00 $84,976.00 7 3331.2101 6" CIPP 3331 12 LF 700 $125.00 $87,500.00 8 3331.0102 6" Sewer Pipe, Point Repair 3331 22, LF 100 $165.00 $16,500.00 9 9999.0005 Sag Adjustment for Pipe Entargement 0241 14 LF 100 $165.00 $16,500.00 10 0241.2201 Remove 4' Sewer Manhole 0241 14 EA 7 $500.00 $3,500.00 11 0241.5001 Abandon Manhole 0241 14 EA 2 $2,400.00 $4,800.00 12 3231.0412 6' Fences, Wood 3231 29 LF 110 $70.00 $7,700.00 13 3231.0123 6' Chain Link, Aluminum 3231 13 LF 120 $35.00 $4,200.00 14 3301.0001 Pre -CCTV Inspection 33 01 31 LF 1,451 $7.00 $10,157.00 15 3301.0002 Past -CCTV Inspection 3301 31 LF 3,745 $9.00 $33,705.00 16 3301.0101 Manhole Vacuum Testing 3301 30 EA 24 $150.00 $3,600.00 17 3331.3101 4" Sewer Service 3331 50 EA 50 $2,600.00 $130,000.00 18 3331.3105 4" Private Sewer Service 3331 50 LF 210 $75.00 $15,750.00 19 3331.1201 Service Reinstatement, Pipe Enlargement 3331 23 EA 18 $1,200.00 $21,600.00 Incluing 4-inch two way cleanout 20 3331.2201 4" Service Reconnection, CIPP Including 4-inch 3331 12 EA 23 $3,000.00 $69,000.00 two way cleanout 21 3339.1004 4' Shallow Manhole 33 39 10, EA 2 $7,000.00 $14,000.00 22 3339,1003 4' Extra Depth Manhole 133 39 10, VF 10 $242.001 $2,420.00 23 3339.1002 4' Drop Manhole 133 39 10, EA 1 $11,000.001 $11,000.00 24 3339.1001 4' Manhole 133 39 10, EA 19 $7,400.001 $140,600.00 25 3339.1105 5' Modified Type A Manhole w/ External 8" Drop 33 39 10, EA 1 $63,525.00 $63,525.00 Connection 33 39 20 26 9999.0004 Hydraulic Slide 99 99 99 EA 1 $1.001 $1.00 27 9999.0005 MH Locking Cover 99 99 99 EA 1 $1,700.001 $1,700.00 28 9999.0004 Connect to Existing SSMH 99 99 99 EA 6 $1,500.001 $9,000.00 29 0241.2103 8" Sewer Abandonment Plug 0241 14 EA 9 $250.001 $2,250.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO. 2 CPN 10336I ADDENDUM NO.2 00 42 43 BID PROPOSAL Page 3 of 5 30 0241.2102 6" Sewer Abandonment Plug 0241 14 EA 7 $250.00 $1,750.00 31 0241.2001 Sanitary Line Grouting 0241 14 CY 17 $350.00 $5,950.00 32 3339.0001 Epoxy Manhole Liner 33 39 60 VF 60 $385.00 $23,100.00 33 3305.0112 Concrete Collar 33 05 17 EA 22 $1,700.00 $37,400.00 34 3305.0109 Trench Safety 33 05 10 LF 2,394 $1-00 $2,394.00 35 3305.0107 Manhole Adjustment, Minor w/ Conc Collar 33 05 14 EA 4 $1,700.00 $6,800.00 (50/50) 36 3305.0106 Manhole Adjustment, Major 33 05 14 EA 1 $6,500.00 $6,500.00 37 3305.0203 Imported Embedment/Backfill, CLSM 33 05 10 CY 3 $500.00 $1,500.00 38 0241.1400 Remove Conc Valley Gutter (50/50) 0241 15 SY 20 $50.00 $1,000.00 39 3201.0112 5' Wide Asphalt Pvmt Repair, Residential 3201 17 LF 75 $150.00 $11,250.00 40 3201.0201 Asphalt Pvmt Repair Beyond Defined Width, 3201 17 SY 317 $90.00 $28,530.00 Residential 41 3201.0400 Temporary Asphalt Paving Repair 3201 18 LF 2,158 $35.00 $75,530.00 42 3216.0301 7" Conc Valley Gutter, Residential (50/50) 32 16 13 SY 50 $148.00 $7,400.00 43 3216.0301 7" Conc Valley Gutter, Residential (100% 32 16 13 SY 94 $148.00 $13,912.00 Water) 44 0241.0401 Remove Concrete Drive (50/50) 0241 13 SF 1,771 $3.50 $6,198.50 45 3213.0401 6" Concrete Driveway (50/50) 32 13 20 SF 1,771 $10.00 $17,710.00 46 3213.0401 6" Concrete Driveway (100% Water) 32 13 20 SF 108 $10.00 $1,080.00 47 9999.0000 Replace Gravel Driveway 99 99 99 SF 40 $25.00 $1,000.00 48 0241.0100 Remove Sidewalk (50/50) 0241 13 SF 25 $17.50 $437.50 49 3213.0301 4" Conc Sidewalk (50/50) 32 13 20 SF 43 $18.00 $774.00 50 3213.0301 4" Conc Sidewalk (100% Water) 32 13 20 SF 45 $18.00 $810.00 51 0241,1300 Remove Conc Curb&Gutter (50/50) 0241 15 LF 1,337 $11.50 $15,375.50 52 3216.0101 6" Conc Curb and Gutter (50/50) 32 16 13 LF 1,412 $53.00 $74,836.00 53 3216.0101 6" Conc Curb and Gutter (100% Water) 32 16 13 LF 290 $53.00 $15,370.00 54 3212.0303 3" Asphalt Pvmt Type D (50/50) 32 12 16 SY 5,150 $26.00 $133,900.00 55 3212.0303 3" Asphalt Pvmt Type D (100% Water) 32 12 16 SY 3,558 $26.00 $92,508.00 56 0241.1700 11" Pavement Pulverization (50/50) 0241 15 SY 5,150 $9.00 $46,350.00 57 0241.1700 11" Pavement Pulverization (100% Water) 0241 15 SY 3,558 $9.00 $32,022.00 58 3212.0401 HMAC Transition (50/50) 32 12 16 TN 20 $230.00 $4,600.00 59 3212.0401 HMAC Transition (100% Water) 32 12 16 TN 20 $230.00 $4,600.00 60 3217.5001 Curb Address Painting (50/50) 32 17 25 EA 13 $75.00 $975.00 61 3123.0101 Unclassified Excavation by Plan (50/50) 31 2316 CY 19 $83.00 $1,577.00 62 3123.0101 Unclassified Excavation by Plan (100% Water) 31 2316 CY 5 $83.00 $415.00 63 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 3211 29 TN 77 $386.00 $29,722.00 64 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (100% 32 11 29 TN 54 $386.00 $20,844.00 Water) 65 3292.0100 Block Sod Placement (50/50) 32 92 13 SY 350 $15.00 $5,250.00 66 3310.0102 6"-12" Tree Removal 331000 EA 2 $1,000.00 $2,000.00 67 3310.0103 12"-18" Tree Removal 33 10 00 EA 2 $1,500.00 $3,000.00 68 3310.0104 18"-24" Tree Removal 33 10 00 EA 1 $2,000.00 $2,000.00 69 3310.0105 24" and larger Tree Removal 33 10 00 EA 1 $4,000.00 $4,000.00 70 3292.0101 Utility Service Surface Restoration Sodding 32 92 13 SY 320 $15.00 $4,800.00 71 3291.0100 Topsoil (50/50) 3291 19 CY 23 $90.00 $2,070.00 72 3291.0100 Topsoil (100% Water) 3291 19 CY 26 $90.00 $2,340.00 73 3305.0103 Exploratory Excavation of Existing Utilities 33 05 30 EA 5 $1,200.00 $6,000.00 74 9999.0004 Demo/Remove Shed 99 99 99 EA 1 $500.00 $500.00 75 3471.0001 Traffic Control 3471 13 MO 3 $2,400.00 $7,200.00 76 0171.0102 As -Built Survey 01 71 23 LS 1 $4,000.00 $4,000.00 77 0171.0101 Construction Staking 01 71 23 LS 1 $9,000.00 $9,000.00 78 3303.0001 Bypass Pumping (for CIPP installation) 33 03 10 LS 1 $1.00 $1.00 79 3125.0101 SWPPP >_ 1 acre 31 25 00 LS 1 4000 $4,000.00 80 oouo.v l vo Utility /1U1UStlllelll kli ll9dUUll dU1USL111e1115) 33 05 14 LS 1 $6,250 $6,250.00 81 icnicm 9999,0003 Sanitary Sewer Construction Allowance 99 99 99 LS 1 $100,000.00 $100,000.00 Subtotal Sanitary Sewer $2,076,758.50 _11Wff_W_i&AV1NLi 11IT11111MVEMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO. 2 CPN 103361 ADDENDUM NO.2 00 42 43 BID PROPOSAL Page 4 of 5 1 0241.0100 Remove Sidewalk (50/50) 2 0241.0401 Remove Concrete Drive (50/50) 3 0241.1300 Remove Conc Curb&Gutter (50/50) 4 0241.1400 Remove Conc Valley Gutter (50/50) 5 0241.1700 11" Pavement Pulverization (50/50) 6 0241.1800 Remove Speed Cushion (50/50) 7 3123.0101 Unclassified Excavation by Plan (50/50) 8 3125.0101 SWPPP >_ 1 acre 9 3212.0303 3" Asphalt Pvmt Type D (50/50) 10 3212.0401 HMAC Transition (50/50) 11 3213.0301 4" Conc Sidewalk (50150) 12 3213.0401 6" Concrete Driveway (50/50) 13 3216.0101 6" Conc Curb and Gutter (50/50) 14 3216.0301 7" Conc Valley Gutter, Residential (50/50) 15 3217.5001 Curb Address Painting (50/50) 16 3291.0100 Topsoil (50/50) 17 3292.0100 Block Sod Placement (50/50) 18 3305.0107 Manhole Adjustment, Minor w/ Conc Collar (50/50) 19 3305.0108 Utility Adjustment (irrigation adjustments) (50/50) 20 3305.0111 Valve Box Adjustment w/ Conc Collar (50/50) 21 3211.0601 CEMLIME Stabilization @ 32 Lbs/SY (50/50) 22 3471.0001 Traffic Control 23 3349.5006 Remove and Replace Inlet Top 10' 24 9999.0003 Paving Construction Allowance Subtotal Paving Subtotal Unit 1 Water Subtotal Unit 2 Sanitary Sewer Subtotal Unit 3 Pavina Total Water, Sanitary Sewer, and Paving CPN 103361 2020 WSM-A 0241 13 SF 50 $17.50 $875.00 0241 13 SF 3,542 $3.50 $12,397.00 0241 15 LF 2,675 $11.50 $30,762.50 0241 15 SY 40 $50.00 $2,000.00 0241 15 SY 10,300 $9.00 $92,700.00 0241 15 EA 1 $500.00 $500.00 312316 CY 38 $83.00 $3,154.00 31 2500 LS 1 $3,000.00 $3,000.00 32 12 16 SY 10,300 $26.00 $267,800.00 32 12 16 TN 40 $230.00 $9,200.00 321320 SF 75 $18.00 $1,350.00 32 13 20 SF 3,542 $10.00 $35,420.00 321613 LF 2,675 $53.00 $141,775.00 321613 SY 100 $148.00 $14,800.00 32 17 25 EA 26 $75.00 $1,950.00 3291 19 CY 46 $90.00 $4,140.00 3292 13 SY 700 $15.00 $10,500.00 33 05 14 EA 4 $1,700.00 $6,800.00 3305 14 LS 1 $12,500.00 $12,500.00 330514 EA 9 $1,100.00 $9,900.00 321129 TN 155 $386.00 $59,830.00 34 71 13 4 $2,400.00 $9,600.00 33 49 20 _MO EA 2 $6,150.00 $12,300,00 99 99 99 _ LS 1 $50,000.00 $50,000.00 END OF SECTION $793,253.50 $3,541,157.00 $2,076,758.50 $793,253.50 I$6,411,169.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION W SS Repl Contract 2020 WSM-A DOCUMENTS Revised 9/30/2021 ADDENDUM NO. 2 CPN 103361 BID BOND The American Institute of Architects, AIA Document No. A310 (February, 1970 Edition) KNOW ALL MEN BY THESE PRESENTS, that we Woodv Contractors. Inc. as Principal hereinafter called the Principal, and Vigilant Insurance Company as Surety, hereinafter called the Surety, are held and firmly bound unto Citv of Fort Worth. TX as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Bid Amount (S%) Dollars ('t--------------------- ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for Water & Sanitary Sewer Replacements Contract 2020 WSM-A. Part 1. City Project No. 103361 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this 7th day of September 2023 WOODY CONTRACTORS, INC. Principal al) By: Name/Title VIGILANT INSURANCE COMPANY rety (Seal) By: _ /_�. Kyeney Attorney -in -Fact CHUBB Power of Attorney Federal Insurance Company ► Vigilant Insurance Company ► Pacific Indemnity Company Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation. VIGILANT INSURANCE COMPANY, a New York corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney and Michael A. Sweeney of Fort Worth, Texas ------------------ —------------------- ----------------------------------------------------- -------------------------- each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL. INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested these presents and affixed their corporate seals on this 16" day of September, 2019. '.�L Dawn M-f:hiaca..%-� %tant,,Lx:rLtary STATE OF NEW JERSEY County of Humerdon Stcyrhen ki. Hanc} . Vice Prcridtnt On this 16l day of September, 2019, before me, a Notary Public of New Jersey, personally came Dawn M. Chloros, tome known to be Assistant Secretary of FEDERAL INSURANCE COMPANY. VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which executed the foregoing Power of Attorney, and the said Dawn M. Chloros, being by me duly sworn, did depose and say that she is Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authority; and that she is acquainted with Stephen M. Haney, and knows him to be Vice President of said Companies; and that the signature of Stephen M. Haney, subscribed to said Power of Attorney is in the genuine handwriting of Stephen M. Haney, and was thereto subscribed by authority of said Companies and in deponent's presence. Notarial Seal x °r KATHFRINE J. ADEtMR NOTARY PUBLIC OF NEW JERSEY pU811 No, 2316685 Cammieniw, Expires July 16, 2024 Noary Publir CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016: "RESOLVED, that the following authorizations relate to the execution, for and on behalf of the Company, of bonds, undertakings. recognizance% contracts and other written commitments of the Company entered into In the ordinary course of business (each a "Written Commitrent"): (1) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the seal of the Company or otherwise. (2) Each duly appointed attorney -in -fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company, under the seal of the Company or otherwise, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney -in -fact. (3) Each of the Chairman, the President and the Vice Presidents of the Company Is hereby authorized, for and on behalf of Company, to appoint in writing any person the attomey- In-fact of the Company with full power and authority to execute, for and on behalf of the Company, under the seal of the Company or otherwise, such Written Commitments of the Company as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalfof the Company, to delegate in writing to any other officer of Company the authority to execute, for and on behalf of the Company, under the Company's seal or otherwise, such Written Commitments of the Company as are specified in such written delegation, hichspecifcation may be by general type or class of Written Commitments or byspecification ofoneormore panicularWritten Commitmerim (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seal of die Company, may be affixed by facsintRe on such %Vi itten Commaic wnt or written appointtxnt or dc:egatkn. FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers, employees and other persons to act for and on behalfof the Company, and such Resolution shall not limit or otherwise affect the exercise ofany such power or authority otherwise validly granted or vested." 1, Dawn M. Chloros, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY (the "Companies") do hereby certify that (I) the foregoing Resolutions adopted by the Board of Directors of the Companies are true, correct and in full force and effect, (if) the foregoing Power of Attorney is true, correct and in full force and effect. Given under my hand and seals ofsaid Companies at Whitehouse Station, NJ, this 7th day of September 2023. Wwn ti, Chhrruc. A�v,tant Svcmt u}v IN THE EVENTYOU WISHTA VERIFY THE ADI'HENfICIY OFTHIS BOND OR NOTIFY US OF ANY OTHER MATTER, PLEASE CONTACT US AT: Telephone (909) 903.3493 Fax (908) 903- 3656 e-mail: suretv@chubb.com FED- VIG-PI (rev. 08-18) 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of are not required to underbid resident bidders. , our principal place of business, B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. 0 BIDDER: Woody Contractors, Inc. 650 Tower Dr Kennedale, TX 76060 817-483-4787 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 By: Troy Woody �JJ.8fgnatu Title: President Date: 9/14/2023 Bid Proposal Workbook 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS 1. Summary. A Bidder or their designated subcontractors are required to be prequalified or have applied for prequalification by the City for the work types requiring prequalification prior to submitting bids. To be considered for award of contract the Bidder must submit Section 00 45 12, PREQUALIFICATION STATEMENT for the work type(s) listed with their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed must submit Section 00 45 13, PREQUALIFICATION APPLICATION in accordance with the requirements below. The information must be submitted seven (7) days prior to the date of the opening of bids. Subcontractors must follow the same timelines as contractors for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. The prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. For example, a contractor wishing to submit bids on projects to be opened on the 7th of April must file the information by the 31 st day of March in order to eligible to work on these projects. In orderto facilitate the approval of a Bidder's Prequalification Application, the following must accompany the submission. a. A complete set of audited or reviewed financial statements. (1) Classified Balance Sheet (2) Income Statement (3) Statement of Cash Flows (4) Statement of Retained Earnings (5) Notes to the Financial Statements, if any b. A certified copy of the firm's organizational documents (Corporate Charter, Articles of Incorporation, Articles of Organization, Certificate of Formation, LLC Regulations, and Certificate of Limited Partnership Agreement). c. A completed Bidder Prequalification Application. (1) The firm's Texas Taxpayer Identification Number as issued by the Texas Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification number visit the Texas Comptroller of Public Accounts online at the following web address www.window.state.tx.us/taxtiermit/ and fill out the application to apply for your Texas tax ID. (2) The firm's e-mail address and fax number. (3) The firm's DUNS number as issued by Dun & Bradstreet. This number is used by the City for required reporting on Federal Aid projects. The DUNS number may be obtained at www.dnb.com. d. Resumes reflecting the construction experience of the principles of the firm for firms submitting their initial prequalification. These resumes should include the size and scope of the work performed. e. Other information as requested by the City. 2. Prequalification Requirements a. Financial Statements. Financial statement submission must be provided in accordance with the following: (1) The City requires that the original Financial Statement or a certified copy be submitted for consideration. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Rep1 Contract 2020 WSM-A CPN 103361 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 004511-2 BIDDERS PREQUALIFICATIONS Page 2of3 (2) To be satisfactory, the financial statements must be audited or reviewed by an independent, certified public accounting firm registered and in good standing in any state. Current Texas statues also require that accounting firms performing audits or reviews on business entities within the State of Texas be properly licensed or registered with the Texas State Board of Public Accountancy. (3) The accounting firm should state in the audit report or review whether the contractor is an individual, corporation, or limited liability company. (4) Financial Statements must be presented in U.S. dollars at the current rate of exchange of the Balance Sheet date. (5) The City will not recognize any certified public accountant as independent who is not, in fact, independent. (6) The accountant's opinion on the financial statements of the contracting company should state that the audit or review has been conducted in accordance with auditing standards generally accepted in the United States of America. This must be stated in the accounting firm's opinion. It should: (1) express an unqualified opinion, or (2) express a qualified opinion on the statements taken as a whole. (7) The City reserves the right to require a new statement at any time. (8) The financial statement must be prepared as of the last day of any month, not more than one year old and must be on file with the City 16 months thereafter, in accordance with Paragraph 1. (9) The City will determine a contractor's bidding capacity for the purposes of awarding contracts. Bidding capacity is determined by multiplying the positive net working capital (working capital = current assets — current liabilities) by a factor of 10. Only those statements reflecting a positive net working capital position will be considered satisfactory for prequalification purposes. (10) In the case that a bidding date falls within the time anew financial statement is being prepared, the previous statement shall be updated with proper verification. b. Bidder Prequalification Application. A Bidder Prequalification Application must be submitted along with audited or reviewed financial statements by firms wishing to be eligible to bid on all classes of construction and maintenance projects. Incomplete Applications will be rejected. (1) In those schedules where there is nothing to report, the notation of "None" or "N/A" should be inserted. (2) A minimum of five (5) references of related work must be provided. (3) Submission of an equipment schedule which indicates equipment under the control of the Contractor and which is related to the type of work for which the Contactor is seeking prequalification. The schedule must include the manufacturer, model and general common description of each piece of equipment. Abbreviations or means of describing equipment other than provided above will not be accepted. 3. Eligibility for Award of Contract a. The City shall be the sole judge as to a contractor's prequalification. b. The City may reject, suspend, or modify any prequalification for failure by the contractor to demonstrate acceptable financial ability or performance. c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Repl Contract 2020 WSM-A CPN 10336I ow r r.. W 1 2 3 4 5 6 7 4M M MR aA arr W W i L-1 M 004511 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to perform the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 w 00 45 12 PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Water Distribution, Urban and Renewal, 12-inch diameter and smaller Sewer CIPP, 12-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Pipe Enlargement, 12- inches and smaller r10 PI ICfll r"QV II IV Construction/Reconstruction (LESS THAN 15,000 Square v-4. \ Sewer Bypass Pumping, 18- inches and Smaller Contractor/Subcontractor Company Name Prequalification Expiration Date Woody Contractors, Inc. 4/30/24 Insituform Technologies, LLC 4/30/24 Woody Contractors, Inc. 4/30/24 Excel 4 Construction, LLC 10/31/23 Texas Material Group, Inc. dba Texas Bit 12/31/24 Woody Contractors, Inc. 4/30/24 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently Drequalified for the work types listed. BIDDER: Woody Contractors, Inc. By: Tro 650 Tower Dr Kennedale, TX 76060 a 817-483-4787 Title: Presid Date: 9/14/23 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS W SS Repl Contract 2020 WSM-A Revised 09/30/2021 CPN 103361 _ FORTWORTH SECTION 00 45 13 PREQUALIFICATION APPLICATION Date of Balance Sheet Name underwhichyouwish to qualify Post Office Box City Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company State Zip Code Street Address (required) City State Zip Code Telephone Fax Email I Texas Taxpayer Identification No. I Federal Employers Identification No. DUNS No. (if applicable) Email/mail this questionnaire along with financial statements to the appropriate group below. A separate submittal is required for water/sewer, paving, and lighting: Work Category — Water Dept - Water/seller Work Category — TPW Paving Work Category — TPW Ped/Rdwy Lighting iohn.kasavich�dFortWorthTexas.¢ov Alicia. Garcia/a,,fortmrtht ex as. eov clint.hooverra;fortmrthtexas.eov Mort Worth Water Department Engineering and City othort Worth Transportation and Public City ofhbrt Worth '1'PW Transportation Fiscal Services Division 200 Texas St. Fort Works Dept. 8851 Camp Bowie West Blvd Fort Management Attn: Clint Hoover, P.E. 5001 Worth, TX 76102 Worth, Texas 76116 Attn: Alicia Garcia James Ave. Fort Worth, TX 76115 *Financial Statements must be mailed. Mark the envelope: "Bidder Prequalification Application" OM 00 45 13 -2 BIDDER PREQUALIFICATIONAPPLICATION Page 2 of 8 BUSINESS CLASSIFICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable— Block 3 is to be left blank if Block 1 and/or Block 2 is checked) Has fewer than 100 employees and/or Has less than $6,000,000.00 in annual gross receipts OR Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determining eligibility to become prequalified. Select major work categories for which you would like to be prequalified (City may deem you are not qualified for selected category or may approve you at a lesser size/length and maximum size may not be listed specifically under a major work category): MAJOR WORK CATEGORIES _ Water Department Augur Boring - 24-inch diameter casing and less _ Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less _ Tunneling - 36-Inches — 60 —inches, and greater than 350 LF _ Tunneling — 66" and greater, 350 LF and greater _ Tunneling — 66" and greater, 350 LF or Less _ Cathodic Protection _ Water Distribution, Development, 8-inch diameter and smaller _ Water Distribution, Urban and Renewal, 8-inch diameter and smaller _ Water Distribution, Development, 12-inch diameter and smaller _ Water Distribution, Urban and Renewal, 12-inch diameter and smaller _ Water Transmission, Development, 24-inches and smaller _ Water Transmission, Urban/Renewal, 24-inches and smaller _ Water Transmission, Development, 42-inches and smaller _ Water Transmission, Urban/Renewal, 42-inches and smaller _ Water Transmission, Development, All Sizes _ Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger _ CCTV, 8-inches and smaller _ CCTV, 12-inches and smaller _ CCTV, 18-inches and smaller CCTV, 24-inches and smaller CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 OM M- PM 00 45 13 -3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED _ CCTV, 42-inches and smaller _ CCTV, 48-inches and smaller _ Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller _ Sewer CIPP, 42-inches and smaller _ Sewer CIPP, All Sizes _ Sewer Collection System, Development, 8-inches and smaller _ Sewer Collection System, Urban/Renewal, 8-inches and smaller _ Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller _ Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller _ Sewer Interceptors, Development, 48-inches and smaller _ Sewer Interceptors, Urban/Renewal, 48-inches and smaller _ Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes _ Sewer Cleaning , 24-inches and smaller _ Sewer Cleaning , 42-inches and smaller _ Sewer Cleaning, All Sizes _ Sewer Cleaning, 8-inches and smaller _ Sewer Cleaning, 12-inches and smaller _ Sewer Siphons 12-inches or less _ Sewer Siphons 24-inches or less _ Sewer Siphons 42-inches or less _ Sewer Siphons All Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 15,000 square yards) Asphalt Paving Construction/Reconstruction (15,000 square yards and GREATER) _ Asphalt Paving Heavy Maintenance (UNDER $1,000,000) _ Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construe tion/Reconstruction (LESS THAN 15,000 square yards)* Concrete Paving Construction/Reconstruction (15,000 square yards and GREATER)* Roadway and Pedestrian Lighting NOTE *There is not a prequalifrcation requirement for installation of concrete sidewalk, curb & gutter, driveways, and panel replacement, only concrete paving CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 on i 00 45 13 - 4 BIDDER PREQUALIFICATIONAPPLICATION Page 4 of 8 1. List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER I I � 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b) As a Sub -Contractor. 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY -COUNTY ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER *If requalifying only show work performed s nce last statement. 5.Have you ever failed to complete any work awarded to you? If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. THas any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. 't CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 4" M W 8. In what other lines of business are you financially interested? 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 00 45 13 -5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAILED ADDRESS P" MR W6 W 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY MR 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not five in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. No �w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 10336I Revised August 13, 2021 94 4M CORPORATION BLOCK If a corporation: Date of Incorporation Charter/File No. President Vice Presidents Secretary Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Officers or Managers (with titles, if any) 00 45 13 -6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 PARTNERSHIP BLOCK If a partnership: State of Organization Date of organization Is partnership general, limited, or registered limited liability partnership? File No. (if Limited Partnership) General Partners/Officers Limited Partners (if applicable) Individuals authorized to sign for Partnership Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. no M mm WF ow CITY OF FORT WORTH W&SS Repi Contract 2020 WSM-A P= STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 M MP M 00 45 13 - 7 BIDDER PREQUALIFICAT ION APPLICATION Page 7 of 8 14. Equipment $ TOTAL Similar types of equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. BALANCE SHEET ITEM QUANTITY ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 r. Various - ION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 TOTAL W&SS Rep] Contract 2020 WSM-A CPN 103361 00 45 13 - 8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of , Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A no, STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 go - PM Fps q& M wo me M W MA aq 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 103361. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Company ( 0 lowcr l�r, Address i 76W City/State/Zip THE STATE OF TEXAS § COUNTY OFTARRANT § By: J o W P A, Pease Print)J Signature: Title: ra fil \d e/j-i— (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared o vi , known to me to be the person whose name is subscribed t the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of lAloo 61 Gvr4tv ,S Tn& for the purposes and consideration therein express4 and in the capacity therein stated. GIVEN UNDER MIY HAND AND SEAL OF OFFICE this % / day of _ 41 20.1;. Notary ub - in and for the State of Texas 38 END OF SECTION roe►SV •4��� LL1Z A RAVELO 39 1e0 � Public, efts Of TOM _ My Ccmm*ftn E pn Of "' r NOTARY 1012 027 0 0 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 W&SS Repl Contract 2020 WSM-A CPN 103361 M M 00 45 40 - 1 Business Equity Goal Page I of 2 MOP 1 SECTION 00 45 40 2 Business Equity Goal 3 APPLICATION OF POLICY 4 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 5 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 6 (M/WBEs). 7 8 POLICY STATEMENT 9 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 10 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 11 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 12 2020 (codified at: httns:Hcodelibrarv.amlee_al.com/codes/ftworth/latest/ftworth tx/0-0-0-22593) apply to 13 this bid. 14 15 BUSINESS EOUITY PROJECT GOAL 16 The City's Business Equity goal on this project is 9% of the total bid 17 value of the contract (Base bid applies to Parks and Community Services). 18 19 METHODS TO COMPLY WITH THE GOAL 20 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's 21 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the 22 ordinance through one of the following methods: 1. Commercially useful services performed by a 23 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination 24 of Business Equity prime services and Business Equity subcontracting participation, 4. Business 25 Equity Joint Venture/Mentor-Prot6g6 participation, 5. Good Faith Effort documentation, or 6. 26 Prime contractor Waiver documentation. •. 27 28 SUBMITTAL OF REOUIRED DOCUMENTATION 29 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall 30 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or MP 31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City 32 business day after the bid opening date, exclusive of the bid opening date. 33 —• 34 The Offeror must submit one or more of the following documents: 35 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 36 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if 37 participation is less than stated goal, or no Business Equity participation is accomplished; 38 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform 39 all subcontracting/supplier opportunities; or 40 4. Joint Venture/Mentor-Prot6g6 Form, if goal is met or exceeded with a Joint Venture or Mentor- 41 Protdge participation. 42 43 These forms can be found at: 44 Business Equity Utilization Form and Letter of Intent 45 httDs://anus.fortworthtexas.cov/ProiectResources/ResourcesP/60%20- 46 %20MWBE/NEW%20Business%20Eciuity%200rdinanceBusiness%20Eciuity%20Utilization%20Form. 47 pddf 48 49 Letter of Intent CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised October 27, 2021 W ,m 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 004540-2 Business Equity Goal Page 2 of 2 htt )s:Hanus.fortworthtexas.eov/ProiectResources/ResourcesP/60 - MWBE/NEW Business Ea_uity_ Ordinance/Letter of Intent-2021.Ddf Business Equity Good Faith Effort Form httDs://aDns.fortworthtexas.t?ov/ProiectResources/ResourcesP/60%20- %20MWBE/NEW%20Business%20Eauitv%20Ordinance/Business%20Eauity%20Good%20Faith%20Ef fort0/o20Form.Ddf Business Equity Prime Contractor Waiver Form httDs:HaDvs.fortworthtexas.Qov/ProiectResources/ResourcesP/60%20- %20MW BE/NEW%20Business%20Eauitv%20Ordinance/Business%20Eauity%20Prime%20Contractor %20Waiver.ndf Business Equity Joint Venture Form httDs://anus.fortworthtexas.aov/ProiectResources/ResourcesP/60%20- %20MW BE/NEW%20Business%20Eauity%200rdinanceBusiness%20Eouity%20Joint%20Venture.Ddf FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORIDNINACE WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON-RESONSIVE AND THE BID REJECTED. FAILURE TO SUBMIT THE REOUIRED BUSINESS EOUTY DOCUMENTATION OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON- RESPONSIVE. THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. For Questions, Please Contact The Business Equity Division of the Department of Diversity and Inclusion at (817) 392-2674. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised October 27, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 .+ Or w on an w L_71 so pw PM 00 52 43 - 1 Agreement Page I of 6 SECTION 00 52 43 RE MENT THIS AGREEMENT, authorized on i , is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City'), and UnGiL C p,q_4c"61-5 authorized to do business in Texas, cting by and through ig�� authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water & Sanitary Sewer Replacements Contract 2020. WSM-A CPN 103361 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract six million, four hundred eleven thousand, Dollars Documents an amount, in current funds, Of one hundred sixty-nine dollars and zero cents ($ 6,411,169.00 ). Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within 500 calendar days after the date when the Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that time is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Eight Hundred and Forty Dollars ($840.00) for each day that expires after the time specified in JParagraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised 11/23/2021 00 52 43 - 2 Agreement Page 2 of 6 Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A. The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d, Payment Bond e. Performance Bond f Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or aroven that all or some of the damages being sought were caused. in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised 11/23/2021 005243-3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification urovision is suecifically intended to overate and be effective even if it is alleged d or proven that all or some of the damages being sought were caused. in whole or in cart, by arty act. omission or ne lei ence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article I of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division, 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH W&SS Rep] Contract2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised 11/23/2021 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH W&SS Repl Contract 2020 W SM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised 11 /23/2021 00 52 43 - 5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement for violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible for those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised 11/23/2021 R 00 52 43 - 6 Agreement Page 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: City of Fort Worth By: By: ava &44d4 Danz BurghdoH )DQ If 20B ll: CST) 8�. Dana Burghdoff Assistant City Manager woORb Dec 11, 2023 (Printed N e) & , / Date Title Attest: a vas e ram© `Tpu �c� - a °°°.40,10 Address era ooda , City ecretarov ° o'��d City/StateJZip aal) Q o*0 ii -/N'� 3 M&C: 03 �a��ooTE7i�►�a"pr_r Date Date: �, �tlanaa44 Form Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 4?2¢4d1.,-Z, �28�4GCL Brenda Oropeza Project Manager, Water Dept. Approved as to Form and Legality: -,. , 1n Douglas W. Black Sr. Assistant City Attorney APPROVAL RECOMMENDED: Chri rdor Chnsropher Harde (Dec il, Ml3la.L a17 Chris Harder. P.E. - Director OFFICIAL RECORD Water Department CITY SECRETARY CITY OF FORT WORTH A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ° �`Pj� 1t;61 Revised 11/23/2021 _ _ _ _- _ 0061 13- 1 PERFORMANCE BOND Page I of 2 Bond No. K40202067 1 SECTION 00 61 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Woody Contractors, Inc. , known as "Principal' herein and 9 Viailant Insurance Companv , a corporate surety (sureties, if more than one) 10 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or I 1 more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Six Million, Four 13 Hundred Eleven Thousand, One Hundred Sixtv-Nine Dollars & Zero Cents ($6,411,169.00) 14 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the 15 payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, 16 administrators, successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the 14" day of November . 20 23 , which Contract is hereby referred 19 to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, 20 equipment labor and other accessories defined by law, in the prosecution of the Work, including 21 any Change Orders, as provided for in said Contract designated as Water and Sanitary Sewer 22 Replacements Contract 2020 WSM-A. CPN 103361. 23 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City, then this obligation shall be 28 and become null and void, otherwise to remain in full force and effect. 29 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 30 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 31 Worth Division. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 0061 13-' PI.RFORNIANC1i BOND Pace 2 ol-' Bond No. K40202067 This bond is made and executed in compliance �v ith the provisions of Chapter 2253 of the 2 Texas Government Code. as amended. and all liabilities on this bond shall be determined in 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 28t1i day of November . 20 23. ATTEST: (Principal) Secretary g Witnerincipal Witnes�toSure Elizabeth Gray PRINCIPAL: WOODY CONTRACTORS. INC BY: Siodiure p4/1 f Kam, and tle Address: 650 Tower Drive Kennedale. Texas 76060 SURETY: VIGILANT INSURANCE COMPANY BY: 4SignatuW Kvle W. Sweenev, Attornev-in-Fact Name and Title Address: 2001 Brvan Street. Suite 3400 Dallas. Texas 75201 Telephone Number: 214-754-0777 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract fi-om the by-laws showing that this person has authority to sign such oblivation. If Surety's physical address is different front its mailing address. both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTTI WKSS Rep1 Comract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENT'S CPN 103361 Revised 1uh' 1. 2011 0061 14- 1 Pr1YM12N'I BOND Pa_c I of Bond No. K40202067 I SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Woodv Contractors. Inc. known as "Principal" 9 herein, and Vivilant Insurance Company a corporate surety (sureties), 10 duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or i I more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created 12 pursuant to the laws of the State of Texas, known as "City" herein, in the penal sum of Six 13 Million. Four Hundred Eleven Thousand, One Hundred Sixtv-Nine Dollars & Zero Cents 14 ($6.41 1,169.00) lawful money of the United States, to be paid in Fort Worth, Tarrant County, 15 Texas, for the payment of Which SLIM well and truly be made. we bind ourselves, our heirs, 16 executors, administrators, successors and assigns, jointly and severally, firmly by these presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded 18 the 14" day of November , 2023 , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as Water and Sanitary Sewer Replacements Contract 2020 WSM-A, 22 CPN 103361. 23 NOW, THEREFORE, THE CONDITION OF THiS OBLIGATION is such that if 24 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 25 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 26 the Contract, then this obligation shall be and become null and void: otherwise to remain in full 27 force and effect. 28 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 29 "Texas Government Code, as amended, and all liabilities on this bond shall be determined in 30 accordance with the provisions of said statute. Is CiTY OF FORT WORTH WKSS Repl Contract 2020 WSM-A STANDARD CONSIRIiCiiON SPECIFICATION DOCUMFNTS CPN 103361 Revised .ld\ I. 2011 2 3 4 5 6 7 8 9 0061 14-2 PAYMENTBOND Page 2 of 2 Bond No. K40202067 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 28`h day of November, 20 23, ATTEST: /(Principal) Secretary Witnes Principal ATTEST: (Surety) Secretary Dawn M. Chloros QAA�r- Witnes as to Surety Elizabeth Gra PRINCIPAL: WOODY CONTRACTORS. INC. BY: lgnatur D / Name Ad Title Address: 650 Tower Drive Kennedale, Texas 76060 SURETY: VIGILANT INSURANCE COMPANY ii Signature Kvie W. Sweenev, Attorney -in -Fact Name and Title Address: 2001 Brvan Street, Suite 3400 Dallas, Texas 75201 Telephone Number: 214-754-0777 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. 10 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July I, 2011 W&SS Repl Contract 2020 WSM-A CPN 103361 MAIN I I NAN0 BOND P'ise I of 3 Bond No. K40202067 I SECTION 00 61 19 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Woodv Contractors. Inc. known as "Principal" 9 herein and ViLilant insurance Companv a corporate surety 10 (sureties, if more than one) duly authorized to do business in the State of Texas. known as 1 i "Surety" herein (whether one or more), are held and firmly bound Unto the City of Fort Worth, a 12 municipal corporation created pursuant to the laws of the State of Texas. known as "City" herein, 13 in the sum of Six Million, Four Hundred Eleven Thousand. One Hundred Sixty -Nine Dollars & 14 Zero Cents ($6,411.169.00) lawful money of the United States, to be paid in Fort Worth. Tarrant 15 County, Texas, for payment of which sum well and truly be made unto the City and its 16 successors, we bind Ourselves, our heirs, executors, administrators, successors and assigns, jointly 17 and severally, firmly by these presents. 18 19 WHEREAS, the Principal has entered into a certain written contract with the City awarded 20 the 14" day of November 2023 , which Contract is hereby referred to and a made 21 part hereof for all purposes as if fully set forth herein, to furnish all materials. equipment labor 22 and other accessories as defined by law, in the prosecution of the Work. including any Work 23 resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for 24 in said contract and designated as Water and Sanitary Sewer Replacements Contract 2020 WSM- 25 A. CPN 103361, and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans, specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two (2) years 30 after the date of Final Acceptance of the Work by the City ("Maintenance Period"): and 31 32 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need thereof at any time within the Maintenance 34 Period. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMI-NTS CPN 103361 Reviled.luly I.2011 1 2 3 4 6 7 8 9 10 Il 12 13 14 15 16 17 18 19 20 I1() 61 111 - 2 MAIN I I-NANCI- BOND Pmx2ol'3 Bond No. 1«0202067 NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice Nvas provided by City. to a completion Satisfactory to the City, then this obligation shall become null and void, otherwise to remain in full force and effect. PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond. venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas. Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTI I STANDARD CONSTRUCTION S13ECII-ICA r10N DOCUMENTS Rey iscd .lulu I. 2011 WXSS Rep] Contract 2020 WSM-A CPN 103361 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 OObI 11)- i MAIN I I:NANCF BOND Bond No. K40202067 IN WITNESS WHEREOF. the Principal and the Surety have each SIGNED and SEALED this inshRument by duly authorized ay-ents and officers on this the 28°i day of November. 20 23 ATTEST: rincipal) Secretary Witness a mcipal ATTEST: (Surety) Sgqeccre�9taaryy Dawn M. hloros kJAL lu Witneq as to Surety Elizabeth Gray PRINCIPAL: WOODY CONTRACTORS. INC. BY: S' ture Dame and `title Address: 650 Tower Drive Kennedale, Texas 76060 SURETY: VIGILANT INSURANCE COMPANY BY: /X_X�z // Signature `-' / Kvle W. Sweenev. Attorney -in -Fact Name and Title Address: 2001 Brvan Street, Suite 3400 Dallas. Texas 75201 Telephone Number: 214-754-0777 35 36 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 37 from the by-laws showing that this person has authority to sign such obligation. If 38 Surety's physical address is different from its mailing address, both must be provided. 39 The date of the bond shall not be prior to the date the Contract is awarded. 40 CFI'I' OI FORT WORIII IX&SS Rep! Contract 202U WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised hdv I. 2011 Policyholder Information Notice IMPORTANT NOTICE To obtain information or make a complaint You may call Chubb's toll -free telephone number for information or to make a complaint at 1-800-36-CHUBB You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at 1-800-252-3439 You may write the Texas Department of Insurance P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al numero de telefono gratis de Chubb's para informacion o para someter una queja al 1-800-36-CHUBB Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas P.O. Box 149104 Austin, TX 78714-9104 FAX # (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: Con sumerProtection@tdi. state. tx.us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente primero. Si no se resueve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en pane o condicion del documento adjunto. Form 99-10-02991 ev. 1-08) Power of Attorney Federal Insurance Company I Vigilant Insurance Comparly I Pacific Indemnity Company Know All by These Presents. That FEDERAL INSURANCE COMPANY. an Indian;+ corporation VIGILANT INSURANCE COMPANY, a \e\\ fork unporation..uuf PACIFIC INDEMNITY COMPANY. a Wisconsin corporation. do each herehr constitute and appoint Elizabeth Gray, Charles D. Sweeney, Kyle W. Sweeney and MichaelA. Sweeney of Fort Worth, Texas------------------------------------------------------------------------------------------------------------------------------------- each as their true and ]a\yful Attorney -in -Pact nt Cxect[C under such designation in thennames and tit affix [heir corporate seal, tit and deliver liar :md on their behalf as surety thereon or otherwise. hoods and undertakings and other \\risings ohligahtn in the nature (hereof (Other than ball bonds) given or e\ecuted in the course of hti>fneSs. and ally instruments amending Or altering the same, and consents to the modification or alteralion nl ;mc inan'untenr I clewed In In .aid hand, Or nbhgalinns. In Witness Whereof. said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY. and PACIFIC INDEMNITY COMPANY ha\e each exccu(ed and attested these presents and affixed their corporate seals on this 16" clay of -September, 2019. Pawn it ('hh n'r x , A ist:uH Scrrct;u'y STATE OF NEW JERSEY County of Hunterdon as. �a•1'hcn 11 Ilan\y.1 icy l'rt-�ident K On this 16'" day of September, 2019, before me, a Notary Public of New Jersey, personal]' came Da\vn M. Chloros, tome known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which executed the foregoing Power of Attorney, and the said Dawn M. Chloros, being by me duly sworn, did depose and say that she is Assistant Secretan of FEDERAL. INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affixed (O the foregoing Po\ver of Attorney are such corporate seals :and were thereto affixed by authority of said Companies: and that she signed said Power of Attorney as Assistant Secretary of said Companies by like authorin'; and that she is acquainted with Stephen M. Haney, and knows him to be Vice President of said Companies; and that the signature of Stephen NI. Haney. subscribed to said Poker of Attorney is in the genuine handwriting of Stephen Ni. Haney, and was thereto subscribed by authority of said Companies and fit deponenCs presence. Notarial Sea] RAF KATHERINE J.O Af7E JERSEY IITAgy g NOTARY PUBLIC OF NEW JERSEY �..Affj No-2316685 �UlLtC Ctxnmrsslon Expires JuIY 16. 2024 Wttarypuhllc hPg� CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY. VIGILANT INSURANCE COMPANY. and PACIFIC I \DE XINITY COt\IPANY on August 30, 2016: "RESOLVED. that the following authorizations relate to the execution, for and on behalf of the Company. of bonds. undenakin;N, recognizances, cunu'acts and other written commitments of the Company entered into in the ordinary course of business (each a "\\'I itten Conmtitment`): (1) Each of the Chairman, the ('resident and the Vice I'resrdenis of theContpam isherehy authorized toe\eanean\ too 1vtenCommitment for and on behalf of'tile Compan).under tile seal of -the Company or otherwise. (2) Each du]' appointed attorney -in -fact of the Company is hereby :unhoriMl to e.ec'ure cot) \critten Commitment For and on behalf of the Company, tinder the seal of the Company or uthenytse. to the extent that such action is authorized b) the grails or liom ers pro\ "led for in Such Pet son's o I itten appuuttntcnt as such atmTne\-nrfact. (3) Each of the Chairman, the ]'resident and the Vice ('residents of the Compam is here]) authorized, titr and on Ixhalf of the Compam•, to appoint in\\ riling am' person the attorne}•- in-fact of the Company t\ith full poiyer and authontytoexecute. for and on behalt'4the Conilxim, under the seal ofIheCompany OF0111enyto•.such\\'rittenCommitments ofthe Company as may be specified in such written appointment. \chich specification nta) be h) general Ippe or class of \\fIll ell Conlmnrile ins or b) specification of one or store flarnc'ular \\'ritten Commitments. (1) Each of the Chairman. the ]'resident and the Vice Presidents of the Compam is hereb)authorized. for andon heh:dfnf the Compam'. to delegate in aritingtoam other officer oftbe Company the authority to execute, for and on behalf of the Compam. under the Cnnij)'Im a seal or othercc Ise. such \\t'iuen CnlilmltnICTUS of the Company as are specified tit such \critten delegation. \c hich specitication map he by general q'Pr or c'IasS at \\ riven (',unimrinlents nr b\ specification of one or more Particular \\ ritten Commitments (5) The signature ofany officer or other person executing an) \1 ritten Connniuncm or appoim nnnt or delr;;uion pursuant to this Resolution, and the seal of the Company. ma) he affi\eel b\r facsimile nn such \\'ritten (:ummiunent or oriurn appointment or delegation. FURTHER RRSOLVEU. that the foregoing Resolution shall not he deemed to he,ut e\clusne si.neittent of the p(mel,.ind author It ofullicer,. rmpinyers.md other persons to act tot and tin behalfof the Compam', and such Resolution shall not limit or otherwise atlict the exercise of an% .such INmer nr authority otherwise c alidl) granied or wsted- 1, Dawn M. Chloros, Assistant Secretary of FEDERAL INSURANCE COMPAM. VIGILA\T I\St'RANCE COMPANY. and PACIi']C I\DIiMNiTN COMPANY (the "Companies") do hereby cernf\ that (i) the foregoing Resolutions adopted by the Board of Directors ofthe Companies are true. correct and in full force and effect. (ii) the foregoing Power of Attorney is true, correct and in full forceand effect. Gi\en under my hand and seals ofsaid Companies at U'hitehouse Station. NJ. fills 28th day of November 2023. ikav'n 1i.t:hf„r.>`..ls,lstant>etruary'' IIL I E E\'EN"I' yt /(' \\9511'I'O \`EItIFN' "I'HE ,\U"rtrh:\"I'ICI'll- OF "I'I Its n(t\ U t>It a 1'IIFy CS OF A\N" D I11FI2 Telephone (908)n[r3-3h)3 1ax(908)90r1-3656 e-mail. aIlwlonchubb.cnnt FED- VIG-PI (rev. 08-18) i ," Am mo OR so mm MIL m MIR dER dm Air STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CITY OF FORT WORTH STANDARD CMURU CTION SPECIFICATION DOCUMENTS Revision: 823 20 PM AM STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS PM Page 4w Artick l-[efiobknns and Terminology --.—.-------_-_-_-_-'----_---_'l l.U| Defined Terms --.—_-'--_-.--_-_-_-_-_-_-_-_'--_--'l 1.02 ---.'_-_''--'-.--'---'-'-'''.-_-_---.-.--~_--''.--_-_-'-0 _ ^� Article2- Preliminary Matters ......................................................................................................................... 7 2.01 Copies ofDocuments .................................................................................................................... 7 2.02 Commencement ofContract Time; Notice 0nProceed ................................................................ ? ~~ 2.03 Starting the Work .......................................................................................................................... 0 2.04 Before Starting Construction ........................................................................................................ 0 2.05 Preconstruction Conference .......................................................................................................... 0 R�ft 2.06 Public Meeting --.---'--'----_-'--_-''.-.''-'--'-_-_.-''-'--'--'_—Q o Article 3-Contract Documents: Intent, Amending, Reuse ............................................................................ 0 3.01 Intent .............................................................................................................................................. 0 3.02 Reference Standards ...................................................................................................................... g WE 3.03 Reporting and Resolving Discrepancies....................................................................................... g 3.04 Amending and Supplementing Contract Documents ----'---_-_-_-_-_'lO 3.05 Reuse ofDocuments ................................................................................................................... lO ow Article 4- of�un�'�uh�r�n���Ph��alCmodbkmu' Hazardous Environmental ''.-� , --'- , ReferencePoints ........................................................................................................... |l ~~ 4.01 Availability ofLands .................................................................................................................. D 4.02 Subsurface and Physical Conditions -----_-------.-.--------_—..|2 4.03 Dfffering Subsurface or Physical Conditions ............................................................................. l2 p� 4.04 Underground Facilities ............................................................................................................... l3 4.05 Reference Points ......................................................................................................................... |4 Article 5-Bonds and Insurance ..................................................................................................................... l0 5.01 Licensed Sureties and Insurers ................................................................................................... l6 5.02 Performance, Payment, and Maintenance Bonds ....................................................................... l0 5.03 Certificates mfInsurance ............................................................................................................. l0 5.04 Contractor's Insurance ................................................................................................................ l0 Article 0-Cmobautor`u Responsibilities........................................................................................................ l0 6.01 Supervision and Superintendence ---.--'--_-'--'--'--''----_-_-_-l9 CITY cmFORT WORTH urANoARmCONSTRUnmwSPECIFICATION DOCUMENTS — Revision: 80021 MN 0.02 Luhmc Working Hours ................................................................................................................ 20 0`O3 oo� ---..----.--'-_-_--.-_-------'''--'-'--'-''-20 . . Equipment 0.04 Project Schedule .......................................................................................................................... 2l 6.05 Substitutes and.--._--.-_-_--_.----''-'-.-_--_--2l �06 and <�tb*ro--.---_-'--_-''__-_-_24 6.07 - Wage Rates .................................................................................................................................. 25 6.00 Patent Fees and Royalties --.--'--'--_-'--'--'--__--'-'----'--.-2& 0.09 Permits and Utilities .................................................................................................................... 27 6.10 Laws and Regulations ------_-'-.--_-'--__''-_-_-_----'.-''-'27 6.11 Taxes ........................................................................................................................................... 20 6.12 Use mfSite and Other Areas ....................................................................................................... 2Q 6.13 Record Documents -------_-'-'.-----_-'--'--_--_'`-''----'29 6.14 Safety and Protection .................................................................................................................. 29 6.15 Safety Representative --.-'--_-'''-_-'--'--'--_--'''-'-'---'---'-'3U 6.10 Hazard Communication Programs .---_--_-_-_--.'--.-.__-_-_-38 6.17 Emergencies and/or Rectification .------_---.---'--'--_---_---'-.--.30 6.10 Submittals .................................................................................................................................... 3l �= 6.19 Continuing the Work .-----'--_-''-_-'--_-_-_-'--'----.-._''.32 0.20 Contractor's General Warranty and Guarantee .......................................................................... 32 6.21 Indemnification --.-'-.'--_-_--'''''-_-_--'''''.----_-_-_.33 §K 6.22 Delegation ufProfessional Design Services .............................................................................. 34 6.23 Right to Audit .----.-'--_-''-_-'--_-_-_-'--'--'----------34 6.24 ------.-_-_-_-'--_-'--_-_-'--_-_-'-']5 Article 7- Other Work olthe Site ................................................................................................................... 35 7.0/ Related Work a1Site ................................................................................................................... 35 7.02 Coordination .-------_-'--'_.--.--_-'--_-_-.--'-'--'-_'-.-'36 Artich:W-Cdy^m Responsibilities .--------_-'--'--'--'-----_----_---.---_-'-36 0.01 Communications toContractor ................................................................................................... 36 8.02 Furnish Data ................................................................................................................................ 36 0.03 PuvWbcoDue ............................................................................................................................ 36 0.04 Lands and Euueoento' uodT���.. ,''_,__ -.------_-_---'.---'-__-_- 36 0.05 Change Orders ............................................................................................................................. 30 8.06 Inspections, Tests, and Approvals --.-'--_-'--'--'--'--'-'.'--'--'-_.36 0.07 Limitations ooCitw'mRenpnooibditb:o --.----_---.---.-_-'-----'-_.37 8.00 Undisclosed Hazardous Environmental Condition --.-.-'--_-'--'--''.-----37 0.09 Compliance with Safety Program ----.---_---_-_-_-_-_-'---_-37 Article 9-Cdy`uObservation Status During Construction ........................................................................... 37 -- 9.01 Cby`mProeu1 Manager ------.--''--_-_-_-_-_-'--'---_-'--']7 9.02 Visits toSite ................................................................................................................................ 37 9.03 Authorized Variations bmWork .................................................................................................. 3W 9.04 Rejecting Defective Work .......................................................................................................... 3W 9.05 Determinations for Work Performed .......................................................................................... 30 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY onFORT WORTH ~~ STANDARD ooNSr000now omuIFnurmw mOCoMowro Revision: 9=1 40 AdiclelO- Changes in the Work; Claims; Extra Work ................................................................................ 30 10.01 Authorized Changes in the Work ............................................................................................... 38 10.02 Doun1bmrizcd Changes iothe Work ........................................................................................... 39 10.03 Execution of Change Orders ....................................................................................................... ]9 lO.O4Extra Work .................................................................................................................................. 39 10.05 Notification toSurety .................................................................................................................. 39 Article ll-[mm of the Work; Allowances; Unit Price Work; Plans Quantity MeuoummeoL-._----'4l 11.01 Cost mfthe Work ......................................................................................................................... 4l ll.O2Allowances .................................................................................................................................. 43 ll.03Unit Price Work .......................................................................................................................... 44 Article l2- Change of Contract Price; Change mfContract Time ................................................................. 40 lZOl Change ofContract Price ............................................................................................................ 4M 12.02 Change pfContract Time ...--.---'--_-'—.--'---_-_-'--'--_-_'47 12])3 Delays .......................................................................................................................................... 47 Article l3-Tests and Removal or AcceptancemyDefective Work ...................... 48 l].Ol Notice ofDefects ........................................................................................................................ 48 13.02 Access toWork ........................................................................................................................... 40 l3{8Tests and Inspections --.-.--.'.'-----'--_-'--_-'.-_-'-----'--_'40 13.04DocWork ..------'--_-'--_-_-'--'--'--'--'--_'--_'49 13.05 City May Stop the Work ............................................................................................................. 49 13.00 Correction orRemoval mfDefective Work ................................................................................ 5O 13.07 Correction Period ........................................................................................................................ 5O 13.08 Acceptance of Defective Work ................................................................................................... 5l Article l4-Payments toContractor and Completion --._''_---'--'---.-'--__---'-.--.--.--52 14.01 Schedule ofValues ...................................................................................................................... 52 14.02 Progress Payments ...................................................................................................................... 52 14.03 Contractor's Warranty of Title -..--_-'-------_---_-_-----'--54 14.04 Partial Utilization .--.---_----'---.-'--'--_-'--'--'--_-''-''---55 14.05 Final Inspection .-.-.--__-_-_-'-.---_-_---_-'-'-_-_-'--55 14.06 Fbud Acceptance .-''--_-_-_-'_-_-_-'--'--_-'--_-'--'---55 14.07 Final ----''—'--_-_'.'--''.-'--_-'--''_'--'-_-_--50 14`08 Final Completion Delayed and Partial Retainage Release ........................................................ 56 Article 15 - Suspension mfWork and Termination -.--_-_---_-'—.---_---_-.--57 l101 City May Suspend Work ..--.-'_-'--_--_-'-''---'--_-'---'_--'-_57 15.02 City May Terminate for Cause ................................................................................................... 58 Article l0-Dispute Resolution ...................................................................................................................... 0l orvnFFourvw)ura ur^mo*nonoMr000rmm TEomm^zmw mocnMswTm Revision: MY= = .w am 17.01 Giving Notice .............................................................................................................................. 62 17.02 Computation ofTimes ................................................................................................................ 62 1713 Cumulative Remedies ................................................................................................................. 62 17.04 Sorvivulnf -----''''---_—.—.--_—_—'----_----_'63 17.05 Headings --.—'--'-----_—_—'--'—.---'~---.---'--''—_-'.—_--63 Pw = M wo MR M = ozYorFORT WORTH ~~ STANDARD omarnnrrmmSPECIFICATION DOCUMENTS Revision: WBWI 007200-1 GENERAL CONDITION S Page 1 of 63 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally _ capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda —Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement —The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment —The form acceptable to City which is to be used by Contractor _ during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos —Any material that contains more than one percent asbestos and is friable or is — releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 5. Award— Authorization by the City Council for the City to enter into an Agreement. 6. Bid —The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder —The individual or entity who submits a Bid directly to City. 8. Bidding Documents —The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding Requirements —The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day— A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CIT Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8?3/2021 007200-I GENERAL CONDITIONS Page 2 of 63 12. Change Order —A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 13. City— The City of Fort Worth, Texas, a home -rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform specific duties with responsibility for final enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the Agreement and for whom the Work is to be performed. 14. City Attorney — The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. 15. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 16. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 17. Contract Claim- --A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 18. Contract —The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, or agreements, whether written or oral. 19. Contract Documents —Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 20. Contract Price —The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions —' of Paragraph 11.03 in the case of Unit Price Work). 21. Contract Time —The number of days or the dates stated in the Agreement to: (1) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 22. Contractor —The individual or entity with whom City has entered into the Agreement. 23. Cost of the Work —See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: R23/m2I 007200-1 GENERAL CONDITION S Page 3 of 63 24. Damage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 25. Day or day— A day, unless otherwise defined, shall mean a Calendar Day. 26. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 27. Director of Parks and Community Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Water Department — The officially appointed Director of the Water Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 32. Effective Date of the Agreement —The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver. 33. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the City. 34. Extra Work — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. T- 35. Field Order —A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 36. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 81AIM1 ru 007200-1 GENERAL CONDITION S Page 4 of 63 37. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 38. General Requirements —Sections of Division 1 of the Contract Documents. 39. Hazardous Environmental Condition —The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 40. Hazardous Waste —Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 41. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 42. Liens --Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 43. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 44. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 45. Notice of Award —The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 46. Notice to Proceed —A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 47. PCBs —Polychlorinated biphenyls. 48. Petroleum —Petroleum, including crude o17 or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non -Hazardous Waste and crude oils. 49. Plans — See definition of Drawings. CITY OF FORT WORTH STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 823/2D21 007200-1 GENERAL CONDITIONS Page 5 of 63 50. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 51. Project —The Work to be performed under the Contract Documents. 52. Project Manager —The authorized representative of the City who will be assigned to the Site. 53. Public Meeting - An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. " 54. Radioactive Material —Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 55. Regular Working Hours - Hours beginning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 56. Samples —Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. '^ 57. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 58. Schedule of Values —A schedule, prepared and maintained by Contractor, allocating portions r.. of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 59. Site —Lands or areas indicated in the Contract Documents as being furnished by City upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 60. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be -~ specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 61. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 923=1 007200-1 GENERAL CONDITION S Page 6 of 63 — 62. Submittals —All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 63. Substantial Completion — The stage in the progress of the Project when the Work is sufficiently complete in accordance with the Contract Documents for Final Inspection. 64. Successful Bidder —The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent— The representative of the Contractor who is available at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementary Conditions —That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier —A manufacturer, fabricator, supplier, distributor, material man, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. —' 68. Underground Facilities —All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. = 69 Unit Price Work —See Paragraph 11.03 of these General Conditions for definition. 70. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. 71. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. = 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain Terms or Adjectives: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &MMI t 00 72 00 -1 GENERAL CONDITION S Page 7 of 63 The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as -- directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," groper," "satisfactory," or adjectives of like effect or import are used to describe an action or determination of City as to — the Work. It is intended that such exercise of professional judgment, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furnish, Install, Perform Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known T technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 —PRELIMINARY MATTERS 2.01 Copies of Documents City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given no earlier than 14 days after the Effective Date of the Agreement, unless agreed to by both parties in writing. �~ CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823=1 00 72 00 -1 GENERAL CONDITIONS Page 8 of 63 y 2.03 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Before Starting Construction " Baseline Schedules: Submit in accordance with the Contract Documents, and prior to starting the Work. 2.05 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in r accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823i I a i 00 %2 00 -1 GENERAL CONDITION S Page 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in — making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily limited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the _ Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractors, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: Contractor's Review of Contract Documents Before Starting Work: Before undertaking each _ part of the Work, Contractor shall carefully study and compare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Contractor's Review of Contract Documents During Performance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents, or between the Contract Documents and (a) any applicable _ Law or Regulation , (b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CITY OF FORT WORTH STANDARD CODSTRUCTION SPECIFICATION DOCUMENTS Revision: &23/2021 007200-1 GENERAL CONDITION S Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions shall govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. 3.04 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be �. authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse of Documents A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 823/D711 007200-1 GENERAL CONDITIONS Page I 1 of 63 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retailing copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also known as hard copies) and other Specifications referenced and located on the City's on-line electronic document management and collaboration system site. Files in electronic media format of teat, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be atthe user's sole risk. Ifthere is a discrepancy between the electronic files and the hard copies, the hard copies govern. '! B. When transferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from Y the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4 — AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work. City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record ..4 legal title and legal description of the lands upon which the Work is to be performed. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &232021 007200-1 GENERAL CONDITION S Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 Subsurface andPhysical Conditions A. Reports and Drawings: The Supplementary Conditions identify: y 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and .- 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions, and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing Subsurface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/10L1 007200-1 GENERAL CONDITION S ` Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writing about such condition. B. Possible Price and Time Adjustments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or — 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underground Facilities A. Shown or Indicated- The information and data shown or indicated in the Contract Documents with respectto existing Underground Facilities at or contiguous to the Site is based on information and data furnished to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; -- c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairing any damage thereto resulting from the Work. B. Not Shown or Indicated- 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or — contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any CITY OF FORT WORTH STANDARD CONSTKI CTION SPECIFICATION DOCUMENTS Revision: 823=1 007200-1 GENERAL CONDITION S Page 14 of 63 = Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to = which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Clain against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of i CITY OF FORT WORTH 4W STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 923/ I 007200-1 GENERAL CONDITION S Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified �- in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (n) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Paragraph 6.17.A); and (iii) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessity to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor shall not be required to resume Work in connection with such condition or in any affectedarea until afterCity has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which — such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by Contractoror by anyoneforwhom Contractor is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indemnify any individual or entity from and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 00 72 00 -1 GENERAL CONDITION S Page 16 of 63 ARTICLE 5 — BONDS AND INSURANCE 5.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. '— 5.03 Certificates of Insurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (other evidence of insurance requested by City or any other additional insured) in at least the minimum amount as specified in the Supplementary Conditions which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the City, and all identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. .0 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &23/2021 w 00 7z 00 -1 GENERAL CONDITIONS Page 17 of 63 R" 2. The Contractor's general liability insurance shall include a, "per project" or `per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. if the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor �— of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is _ provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 8. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required Imes of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823Q021 007200-1 GENERAL CONDITION S Page 18 of 63 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history ofthe industry aswell as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to .. conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such ». insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other .r CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITION S Page 19 of 63 ..n insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. _ E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has = been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance of Bondsandlnsurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required -� by the Contract Documents, the City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 80MI 007200-1 GENERAL CONDITION S Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 6.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. q CITY OF FORT WORTH STANDARDCOASTRUCTION SPECIFICATION DOCUMENTS Revision: 80021 00 72 00 -1 GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification 0132 16. 3. Proposed adjustments in the Project Schedule that will change the Contract Time shall be ' submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or-equar item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Item: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equar item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 923/2021 007200-1 GENERAL CONDITION S Page 22 of 63 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items. a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 6.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract ..` with City for other work on the Project) to adapt the design to the proposed substitute item; r. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823=I wr 007200-1 GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, �. or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.05.A and 6.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. " No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by themfrom and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.05.A.2 and 6.05.13. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal' at Contractor's expense. .� CITY OF FORT WORTH STANDARD CONSTRU CT ION SPECIFICATION DOCUMENTS Revision: 823 I 007200-1 GENERAL CONDITION S Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning Subcontractors, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractors, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minority Business Enterprise Compliance: It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for termination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARDCOMTRUCTION SPECIFICATION DOCUMENTS Revision: 823,2021 Q 00 72 00 -1 GENERAL CONDITION S Page 25 of 63 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individua is or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's - determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT WORTH STANDARD COMTRU CTION SPECIFICATION DOCUMENTS Revision: &232021 007200-1 GENERAL CONDITION S Page 26 of 63 D. Arbitration Required if Violation NotResolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreementbefore the 15th day afterthe date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (u) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited �- to all fees and charges of engineers, architects, attorneys, and o therprofessionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resultingfrom CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &M2021 007200-1 GENERAL CONDITION S Page 27 of 63 the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.13. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtainedpermits and licenses. Citywill obtain and pay for all permits and licenses as provide d for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibllity to carry out the provisions of the permit. If the Contractor initiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: 1. Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding permits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limite d to all fees and charges of engineers, architects, attorneys, and other professionals and all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITIONS Page 28 of 63 - court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on _ the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, �- rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruling .011, and any other applicable rulings pertaining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. httpJ/www.window.state.tx.us/taxinfo/taxfortns/93-fortns.htmi 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to fmish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH i STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITIONS Page 29 of 63 ... 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2021 007200-I GENERAL CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who maybe affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for -- removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other .� individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. .,. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH dft STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 823/DD2I 00 72 00 -1 GENERAL CONDITION S Page 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are -� required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. �. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria., materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 80/2021 0— 007200-1 GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuingthe Work Except as otherwise provided, Contractor shall carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract -' Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or r CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/202I w i 007200-1 GENERAL CONDITION S Page 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or final payment; the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense,the City, its officers, servants and employees, from and against any and all claims arising out ol; or alleged to arise out of the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THiS INDEMNIFICATION PROVISION iS SPECIFIC ALLY INTENDED TO OPERATE AND BE. F.FFFCTiVF EVEN iF IT iS ALLEGED OR PROVEN THAT ALL OR SOME OF THF. DAMAGES BEiNG SOUGHT WFRF CAUSED, M WHOLE OR iN PART. BY ANY ACT. OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provisionis intended to include,without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. _. B. Contractor covenants and ag re es to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage ordestruction of property of the City, arising out ol, or alleged to arise out o£, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THiS INDEMNIFICATION PROVISION IS CITY OF FORT WORTH STANDARDCMTRUCTION SPECIFICATION DOCUMENTS Revision: 823/X21 007200-1 GENERAL CONDITIONS Page 34 of 63 01011151 1 REM in i N 0 N XM 9 Mill P1 iii,111131100 0-0 \ ► ■ 6.22 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carryout Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D, Pursuant to this Paragraph 6.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall ' give Contractor reasonable advance notice of intended audits. B. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to r, the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH '' STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823202] 007200-1 GENERAL CONDITION S Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to �^• conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis ofrace,color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE 7 — OTHER WORK AT THE SITE 7.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other — City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &23MI .r 007200-I GENERAL CONDITIONS Page 36 of 63 .. 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: 1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPONSIBILITIES 8.01 Communications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications .— to Contractor. 8.02 Furnish Data City shall timely furnish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. �. 8.04 Lands and Easements; Reports and Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. 8.05 Change Orders City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. am CITY OF FORT WORTH STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 923=1 w 00 72 00 -1 GENERAL CONDITION S Page 37 of 63 8.07 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condition City's responsibility with respect to an undisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's Project Manager — City will provide one or more Project Manager(s) during the construction period. The duties and responsibilities and the limitations of authority of City's Project Manager during construction are set _ forth in the Contract Documents. The City's Project Manager for this Contract is identified in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Manager will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Manager will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Manager will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Manager's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Manager's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 _ GENERAL CONDIT10N S Page 38 of 63 —• 9.03 Authorized Variations in Work City's Project Manager may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly, 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Manager believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Manager will review with Contractor the preliminary determinations on such matters before rendering W a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. City will bethe initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. " B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 843MI M 00 72 00 -1 GENERAL CONDITIONS Page 39 of 63 10.02 Unauthorized Changes in the Work a Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, .. modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Paragraph 10.01.A, (n) required because of acceptance of defective Work under Paragraph 13.08 or Ciy's correction of defective Work under Paragraph 13.09, or (in) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 Extra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a _ corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that time, including without 1nnitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS ..R Revision: 9=21 W 00 72 00 -1 GENERAL CONDITIONS I' Page 40 of 63 no 10.06 Contract Claims Process A. City's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Claims. M' B. Notice: 1. Written notice stating the general nature of each Contract Claim shall be delivered by the +� Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Clain). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the ,..f adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). .* C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial CITY OF FORT WORTH STANDARDCOMTRUCTION SPECIFICATION DOCUMENTS Revision: 843/ I 007200-1 GENERAL CONDITION S Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or -� Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustment in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE I I — COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.01 Cost of the Work A. Costs Included: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.01.13, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.01.13, and shall include but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees shall include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall inc lode; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health .� and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therew ith. 3. Rentals of all construction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any _ such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH STANDARD CONSTRU CTIO N SPECIFICATION DOCUMENTS Revision: 8232021 d" 007200-1 GENERAL CONDITION S Page 42 of 63 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITYOF FORT WORTH STANDARDCOMTRUCTION SPECIFICATION DOCUMENTS Revision: 823/ I 007200-1 GENERAL CONDITIONS Page 43 of 63 OR h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, ' expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph I1.01.A.I or specifically covered by Paragraph I1.0l.A.4, all of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determined as set forth in Paragraph 12.01.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to Paragraphs 11.01.A and 11.01.13, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all ... allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre -bid Allowances: 1. Contractor agrees that: CITYOF FORT WORTH STANDARD COASTRUCTION SPECIFICATION DOCUMENTS Revision: 823202I 007200-1 GENERAL CONDITION S Page 44 of 63 = a. the pre -bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre -bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. ContingencyAllowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 UnitPrice Work A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not identified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and — significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. 1. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH ` STANDARDCOMTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2D21 007200-1 GENERAL CONDITION S Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Quantity Measurement A. Plans quantities may or may not represent the exact quantity of work performed or material moved, — handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correctan error, or to correctanerror on the plans, the plans quantity will be increasedor decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fix the final quantity as a plans quantity. CITY OF FORT WORTH STANDARDCOAMTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITION S Page 46 of 63 E. For callout work or non -site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 12.01 Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.0l.C.2), and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.0I.B.2, on the -- basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (determined as provided in Paragraph 12.01.C). } C. Contractor's Fee: The Contractor's additional fee for overhead and profit shall be determined as follows: 1. a mutually acceptable fixed fee; or 2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.0l.A.1, 11.0l.A.2. and 11.0l.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; i b. for costs incurred under Paragraph 11.01.A.4 and 11.0l.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITYOF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2D21 007200-1 GENERAL CONDITION S Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0l.A.1 and 11.0l.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case shall the cumulative total of fees paid be �- in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.6, and 11.01.13; Cl. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Change of Contract Time A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made —• therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, foods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shall be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &2/2021 007200-1 GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work .� City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CONSTRU CT ION SPECIFICATION DOCUMENTS Revision: 923/ I ,ti.r 007200-1 GENERAL CONDITION S Page 49 of 63 Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Final Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover —' such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specifir instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for all costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to _ the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CITY OF FORT WORTH STANDARD COASTRU CTION SPECIFICATION DOCUMENTS w Revision: 8232021 00 72 00 -1 GENERAL CONDITION S Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction orRenwval of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WORTH STANDARD CONSTRU CT ION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITIONS i Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous service — before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance of Defective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City — shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective _. Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, City shall proceed _ expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. — C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 823/2021 007200-1 GENERAL CONDITIONS Page 52 of 63 = costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01 Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progress Payments A. Applications for Payments: 1. Contractor is responsible for providing all information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to �- City. 4. Beginning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as described in subsection C. unless otherwise stipulated in the Contract Documents. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8232021 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review ofApplicarions: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifications for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing any such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor; or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective or completed Work has been damaged by the Contractor or subcontractors requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH i STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 8Z/2021 007200-1 GENERAL CONDITION S Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Damages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement will be assessed against the monies due the Contractor, not as a penalty, but as damages suffered by the city. E. Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment.• 1. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: &23% I 007200-1 GENERAL CONDITIONS i Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any part of the Work which has specifically been identified in the Contract Documents, or which City determines constitutes } a separately functioning and usable part of the Work that can be used for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is Substantially Complete in accordance with the Contract Documents: 1. Within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective ("Punch List Items"). Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification to the City of Substantial Completion and the date of Final Inspection. 1. Should the City determine that the Work is not ready for Final Inspection, City will notify the _ Contractor in writing of the reasons and Contract Time will resume. 2. Should the City concur that Substantial Completion has been achieved with the exception of any Punch List Items, Contract Time will resume for the duration it takes for Contractor to achieve Final Acceptance. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance. _ CITY OF FORT WORTH STANDARD CONSTRU CTION SPECIFICATION DOCUMENTS Revision: 82T2021 00 72 00 -1 GENERAL CONDITIONS Page 56 of 63 ... 14.07 Final Payment A. Application for Payment: 1. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Payment Becomes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Clain has been reported to Contractor's ,. insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any _ guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.08 Final Completion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make —. payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or corrected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH ^ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823M21 R 007200-1 GENERAL CONDITIONS Page 57 of 63 PM portion of the Work fully completed and accepted shall be submitted by Contractor to City with — the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all other work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Claims The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or furnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERMINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fauh or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall 'T store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determined by the City that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH STANDARDCOMTRUCTION SPECIFICATION DOCUMENTS Revision: 8?32021 007200-1 GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate forCause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-201lestablished under Paragraph 6.06. D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the �- Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.O2A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perform the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety's performance of its CITY OF FORT WORTH STANDARD COAST RUCTION SPECIFICATION DOCUMENTS Revision: 82MI a 007200-1 GENERAL CONDITION S Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the �- Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided = that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. City, notwithstanding the method used in completing the Contract, shall not forfeit the right — to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.02.B, Contractor's services will not be terminated if Contractor — begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by City, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article. CITYOF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: 823/2D21 00 72 00 - I GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effectedby mailing a notice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United StatesPostal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of termination, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of termination; _ 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of termination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the termination; and b. the completed, or partially completed plans, drawings, information and other property a which, if the Contract had been completed, would have been required to be furnished to the City. -' 5. complete performance of such Work as shall not have been terminated by the notice of termination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: 82i/202I 007200-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list = submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to fmal settlement. E. Not later than 60 days after the notice of termination, the Contractor shall submit his termination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on = such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall determine, on the basis of information available to 4 the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. Contractor shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other party to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shall be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.1) shall become final and binding 30 days after termination of the mediation unless, within that time period, City or Contractor: CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: &232021 on 007200-I GENERAL CONDITIONS Page 62 of 63 Me 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or M" 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of WM competent jurisdiction. ARTICLE 17 — MISCELLANEOUS 17.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the fmm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business +* address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH w STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: &M/M21 M ME 007200-1 GENERAL CONDITIONS Page 63 of 63 17.04 Survival of Obligations r. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. " rJ Wft PM w 4'•4 CITY OF FORT WORTH STANDARDCONSTRUCTION SPECIFICATION DOCUMENTS Revision: &ZM1 i SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO GENERAL CONDITIONS 00 73 00 SUPPLEMENTARY CONDITIONS Page 1 of 5 Supplementary Conditions These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. i Defined Terms M Mh The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govern over Specifications. SC-4.01A Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SC4.01A.L, "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of Outstanding Right -Of -Way, and/or Easements to Be Acquired PARCEL OWNER TARGET DATE NUMBER OF POSSESSION None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. rr If Contractor considers the final easements provided to differ materially from the representations on the Contract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. we SC4.01A.2, "Availability of Lands" CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 me Revised March 9, 2020 aw 00 73 00 SUPPLEMENTARY CONDITIONS - Page 2 of 5 Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of August 9, 2023 EXPECTED UTILITY AND LOCATION TARGET DATE OF OWNER ADJUSTMENT None The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" r The following are reports of explorations and tests of subsurface conditions at the site of the Work: A Soil Bore Report No. 103362, dated 9/30/2021, prepared by City of Fort Worth Soils Lab, providing additional information on Bore Samples. The following are drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site of the Work: None SC4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: None. SC-5.03A., "Certificates of Insurance" on The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City ^+ (2) Consultant: Visintainer Engineering, PLLC; Quiddity Engineering, LLC (3) Other: None SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regulations: 5.04A. Workers' Compensation, under Paragraph GC-5.04A. Statutory limits Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit SC-5.04B., "Contractor's Insurance" CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 on Revised March 9, 2020 i� Mo 00 73 00 SUPPLEMENTARY CONDITIONS Page 3 of 5 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Paragraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: MM $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SC-5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and �++ material deliveries to cross railroad properties and tracks: None The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: N/A (2) Each Occurrence: N/A r _ Required for this Contract X Not required for this Contract With respect to the above outlined insurance requirements, the following shall govern: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 9, 2020 W&SS Rep1 Contract 2020 WSM-A CPN 103361 00 73 00 SUPPLEMENTARY CONDITIONS Page 4 of 5 1. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of -way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. 3. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at - grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this project and is provided in the Appendixes: 2013 Prevailing Wage Rats (Heavy and Highway Construction Projects) A copy of the table is also available by accessing the City's website at: httns://apes.fortworthtexas.gov/ProiectResources/ You can access the file by following the directory path: 02-Construction Documents/Specifications/Div00 — General Conditions SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the Contractor: Street Use Permit SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: None CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 9, 2020 6. 04 rr 00 73 00 SUPPLEMENTARY CONDITIONS Page 5 of 5 SC-6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of August 9, 2023 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION TARGET DATE OF POSSESSION Street Use Permit SC-8.01, "Communications to Contractor" None SC-9.01., "City's Project Manager" The City's Project Manager for this Contract is Brenda Oropeza or his/her successor pursuant to written notification from the Director of Water Department. SC-13.03C., "Tests and Inspections" None SC-16.01C.1, "Methods and Procedures" None END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1/22/2016 F. Griffin SC-9.01., "City's Project Representative" wording changed to City's Project Manager. 3/9/2020 D.V. Magaha SC-6.07, Updated the link such that files can be accessed via the City's website. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 9, 2020 W&SS Repl Contract 2020 WSM-A CPN 103361 SECTION 01 1100 SUMMARY OF WORK PART1- GENERAL 011100-1 SUMMARY OF WORK Page 1 of 3 1.1 SUMMARY A. Section Includes: 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. " 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. �r CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 011100-2 SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. .� 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of --way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. -- a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence .. a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the . . project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH W&SS Rep1 Contract 2020 W SM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 20I2 w 011100-3 SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] .r PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION _ I Revision Log DATE NAME SUMMARY OF CHANGE Mvp i CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 M in PART1- GENERAL SECTION 0125 00 SUBSTITUTION PROCEDURES 012500-1 SUBSTITUTION PROCEDURES Page 1 of 4 1.1 SUMMARY A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number i 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. ,.. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 M 01 2500 - 2 SUBSTITUTION PROCEDURES Page 2 of 4 r b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified .� product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size = b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, the resulting cost and/or time reduction will be documented by Change Order in accordance with the General Conditions. " CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 n 012500-3 SUBSTITUTION PROCEDURES Page 3 of 4 .. 4. No additional contract time will be given for substitution. 5. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval ` b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION w Revision Log DATE NAME SUMMARY OF CHANGE w w. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 s ow ow 012500-4 SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: ... Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? mi B. What effect does substitution have on other trades? No C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature _ Recommended _ Recommended as noted Firm _ Not recommended _Received late Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A PW STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 i "M SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 0131 19 - 1 PRECONSTRUCTION MEETING Page 1 of 3 1.1 SUMMARY A. Section Includes: 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 —General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for a future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the .. meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: ,.� a. Project Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 17, 2012 OM 01 31 19 - 2 ow PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section 0132 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification �. n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures i hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 17, 2012 MR 0131 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] �. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] .. END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE r m ■w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August I7, 2012 on r PART1- GENERAL SECTION 01 31 20 PROJECT MEETINGS 013120-1 PROJECT MEETINGS Pagel of 3 1.1 SUMMARY A. Section Includes: 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. a' C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre -Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: .� a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location r, a. Location of meeting to be determined by the City. 3. Attendees CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 4M 01 31 20 - 2 PROJECT MEETINGS Page 2 of 3 a. Contractor b. Project Representative c. Other City representatives In - ow 4. Meeting Schedule " a. In general, the neighborhood meeting will occur within the 2 weeks following the pre -construction conference. b. In no case will construction be allowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an as - needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns _ b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the beginning of each meeting. 4. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City's representatives f. Others, as requested by the Project Representative 5. Preliminary Agenda may include: — a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off -site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards 1. Pending changes and substitutions in. Review proposed changes for: ' 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents Bel o. Review monthly pay request CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 w 01 31 20 - 3 PROJECT MEETINGS Page 3 of 3 p. Review status of Requests for Information 6. Meeting Schedule a. Progress meetings will be held periodically as determined by the Project Representative. 1) Additional meetings may be held at the request of the: a) City b) Engineer c) Contractor 7. Meeting Location a. The City will establish a meeting location. 1) To the extent practicable, meetings will be held at the Site. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE pe CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 i w 01 3216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 10 1 SECTION 0132 16 2 CONSTRUCTION SCHEDULE 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 D. Purpose 16 The City of Fort Worth (City) is committed to delivering quality, cost-effective 17 infrastructure to its citizens in atimely manner. Akey tool to achieve this purpose is a 18 properly structured schedule with accurate updates. This supports effective monitoring 19 of progress and is input to critical decision making by the project manager throughout 20 the life of the project. Data from the updated project schedule is utilized in status 21 reporting to various levels of the City organization and the citizenry. 22 23 This Document complements the City's Standard Agreement to guide the construction 24 contractor (Contractor) in preparing and submitting acceptable schedules for use by the 25 City in project delivery. The expectation is the performance of the work follows the 26 accepted schedule and adhere to the contractual timeline. 27 28 The Contractor will designate a qualified representative (Project Scheduler) responsible 29 for developing and updating the schedule and preparing status reporting as required by 30 the City. 31 1.2 PRICE AND PAYMENT PROCEDURES 32 A. Measurement and Payment 33 1. Work associated with this Item is considered subsidiary to the various items bid. 34 No separate payment will be allowed for this Item. 35 2. Non-compliance with this specification is grounds for City to withhold payment of 36 the Contractor's invoices until Contractor achieves said compliance. 37 1.3 REFERENCES 38 A. Project Schedules CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Repl Contwt2020 WSM-A CPN 103361 w-9 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 01 3216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 10 Each project is represented by City's master project schedule that encompasses the entire scope of activities envisioned by the City to properly deliver the work. When the City contracts with a Contractor to perform constriction of the Work, the Contractor will develop and maintain a schedule for their scope of work in alignment with the City's standard schedule requirements as defined herein. The data and information of each such schedule will be leveraged and become integral in the master project schedule as deemed appropriate by the City's Project Control Specialist and approved by the City's Project Manager. Master Project Schedule The master project schedule is aholistic representation of the scheduled activities and milestones for the total project and be Critical Path Method (CPM) based. The City's Project Manager is accountable for oversight of the development and maintaining a master project schedule for each project. When the City contracts for the design and/or construction of the project, the master project schedule will incorporate elements of the Design and Construction schedules as deemed appropriate by the City's Project Control Specialist. The assigned City Project Control Specialist creates and maintains the master project schedule in P6 (City's scheduling software). 2. Construction Schedule The Contractor is responsible for developing and maintaining a schedule for the scope of the Contractor's contractual requirements. The Contractor will issue an initial schedule for review and acceptance by the City's Project Control Specialist and the City's Project Manager as a baseline schedule for Contractor's scope of work. Contractor will issue current, accurate updates of their schedule (Progress Schedule) to the City at the end of each month throughout the life of their work. B. Schedule Tiers The City has a portfolio of projects that vary widely in size, complexity and content requiring different scheduling to effectively deliver each project. The City uses a "tiered" approach to align the proper schedule with the criteria for each project. The City's Project Manager determines the appropriate schedule tier for each project, and includes that designation and the associated requirements in the Contractor's scope of work. The following is a summary of the "tiers". 1. Tier 1: Small Size and Short Duration Project (design not required) The City develops and maintains a Master Project Schedule for the project. No schedule submittal is required from Contractor. City's Project Control Specialist acquires any necessary schedule status data or information through discussions with the respective party on an as -needed basis. Tier 2: Small Size and Short to Medium Duration Project The City develops and maintains a Master Project Schedule for the project. The Contractor identifies "start" and "finish" milestone dates on key elements of their work as agreed with the City's Project Manager at the kickoff of their work effort. The Contractor issues to the City, updates to the "start" and "finish" dates for such milestones at the end of each month throughout the life of their work on the project. 3. Tier 3: Medium and Large Size and/or Complex Projects Regardless of Duration CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Repl Cal=2020 WSM-A CPN 103361 w w 01 3216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 10 1 The City develops and maintains a Master Project Schedule for the project. The 2 Contractor develops a Baseline Schedule and maintains the schedule of their 3 respective scope of work on the project at a level of detail (generally Level 3) and in 4 alignment with the WBS structure in Section 1.4.H as agreed by the Project 5 Manager. The Contractor issues to the City, updates of their respective schedule 6 (Progress Schedule) at the end of each month throughout the life of their work on the 7 project. 8 C. Schedule Types 9 Project delivery for the City utilizes two types of schedules as noted below. The City 10 develops and maintains a Master Project Schedule as a "baseline" schedule and issue 11 monthly updates to the City Project Manager (end of each month) as a "progress" 12 schedule. The Contractor prepares and submits each schedule type to fulfill their 13 contractual requirements. 14 15 1. Baseline Schedule 16 The Contractor develops and submits to the City, an initial schedule for their scope 17 of work in alignment with this specification. Once reviewed and accepted by the 18 City, it becomes the "Baseline" schedule and is the basis against which all progress 19 is measured. The baseline schedule will be updated when there is a change or 20 addition to the scope of work impacting the duration of the work, and only after 21 receipt of a duly authorized change order issued by the City. In the event progress is 22 significantly behind schedule, the City's Project Manager may authorize an update 23 to the baseline schedule to facilitate a more practical evaluation of progress. An 24 example of a Baseline Schedule is provided in Specification 0132 16.1 25 Construction Project Schedule Baseline Example. 26 27 2. Progress Schedule 28 The Contractor updates their schedule at the end of each month to represent the 29 progress achieved in the work which includes any impact from authorized changes 30 in the work. The updated schedule must accurately reflect the current status of the 31 work at that point in time and is referred to as the "Progress Schedule". The City's 32 Project Manager and Project Control Specialist reviews and accepts each progress 33 schedule. In the event a progress schedule is deemed not acceptable, the 34 unacceptable issues are identified by the City within 5 working days and the 35 Contractor must provide an acceptable progress schedule within 5 working days 36 after receipt of non -acceptance notification. An example of a Progress Schedule is 37 provided in Specification 01 32 16.2 Construction Project Schedule Progress 38 Example. 39 D. City Standard Schedule requirements 40 The following is an overview of the methodology for developing and maintaining a 41 schedule for delivery of a project. ,.. CITY OF FORT WORTH W&SS Repl Cent =2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 3216-4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 10 1. Schedule Framework - The schedule will be based on the defined scope of work and follow the (Critical Path Methodology) CPM method. The Contractor's schedule will align with the requirements of this specification and will be cost loaded to reflect their plan for execution. Compliance with cost loading can be provided with traditional cost loading of line items OR a projected cost per month for the project when the initial schedule is submitted, updated on a quarterly basis is significant change is anticipated. Overall schedule duration will align with the contractual requirements for the respective scope of work and be reflected in City's Master Project Schedule. The Project Number and Name of the Project is required on each schedule and must match the City's project data. E. Schedule File Name All schedules submitted to the City for a project will have a file name that begins with the City's project number followed by the name of the project followed by baseline (if a baseline schedule) or theyear and m onth (if aprogress schedule), as shown below. • Baseline Schedule File Name Format: City Project Number _Project Name —Baseline Example: 101376 North Montgomery Street HMAC Baseline • Progress Schedule File Name Format: City Project Number _Project Name_YYYY-MM Example: 101376 North Montgomery Street HMAC_2018_01 • Project Schedule Progress Narrative File Name Format: City Project Number _Project Name PN_YYYY MM Example: 101376 North Montgomery Street H IAC_PN_2018_01 F. Schedule Templates The Contractor will utilize the relevant sections from the City's templates provided in the City's document management system as the basis for creating their respective project schedule. Specifically, the Contractor's schedule will align with the layout of the Construction section. The templates are identified by type of project as noted below. • Arterials • Aviation • Neighborhood Streets • Sidewalks (later) • Quiet Zones (later) • Street Lights (later) • Intersection Improvements (later) • Parks • Storm water • Street Maintenance • Traffic • Water 48 G. Schedule Calendar CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Reel Cormact2020 WSM-A CPN 103361 r � 01 3216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 10 1 The City's standard calendar for schedule development purposes is based on a 5-day 2 workweek and accounts for the City's eight standard holidays (New Years, Martin 3 Luther King, Memorial, Independence, Labor, Thanksgiving, day after Thanksgiving, 4 Christmas). The Contractor will establish a schedule calendar as part of the schedule 5 development process and provide to the Project Control Specialist as part of the basis 6 for their schedule. Variations between the City's calendar and the Contractor's 7 calendar must be resolved prior to the City's acceptance of their Baseline project _ 8 schedule. 9 10 R WBS & Milestone Standards for Schedule Development 11 The scope of work to be accomplished by the Contractor is represented in the schedule 12 in the form of a Work Breakdown Structure (WBS). The WBS is the basis for the 13 development of the schedule activities and shall be imbedded and depicted in the 14 schedule. 15 16 The following is a summary of the standards to be followed in preparing and 17 maintaining a schedule for project delivery. 18 19 1. Contractor is required to utilize the City's WBS structure and respective 20 project type template for "Construction" as shown in Section 1.4.1-1 below. —� 21 Additional activities may be added to Levels 1 - 4 to accommodate the needs 22 of the organization executing the work. Specifically the Contractor will add 23 activities under WBS XXXXXX.80.83 "Construction Execution" that 24 delineates the activities associated with the various components of the work. «� 25 26 2. Contractor is required to adhere to the City's Standard Milestones as shown 27 in Section 1.4.I below. Contractor will include additional milestones 28 representing intermediate deliverables as required to accurately reflect their 29 scope of work. 30 31 1. Schedule Activities 32 Activities are the discrete elements of work that make up the schedule. They w ill be 33 organized under the umbrella of the WBS. Activity descriptions should adequately 34 describe the activity, and in some cases the extent of the activity. All activities are 35 logically tied with a predecessor and a successor. The only exception to this rule is for 36 "project start" and "project finish" milestones. 37 r' 38 The activity duration is based on the physical amount of work to be performed forthe 39 stated activity, with a maximum duration of 20 working days OR a continuous activity 40 in one location. If the work for any one activity exceeds 20 days, break that activity .. 41 down incrementally to achieve this duration constraint. Any exception to this requires 42 review and acceptance by the City's Project Control Specialist. 43 44 J. Change Orders 45 When a Change Order is issued by the City, the impact is incorporated into the 46 previously accepted baseline schedule as an update, to clearly show impact to the 47 project timeline. The Contractor submits this updated baseline schedule to the City for dn CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Rep1 ConWad 2020 WSM-A CPN 103361 M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 01 3216-6 CONSTRUCTION PROGRESS SCHEDULE Page 6 of 10 review and acceptance as described in Section 1.5 below. Updated baseline schedules adhere to the following: 1. Time extensions associated with approved contract modifications are limited to the actual amount of time the project activities are anticipated to be delayed, unless otherwise approved by the Program Manager. 2. The re-baselined schedule is submitted by the Contractor within ten workdays after the date of receipt of the approved Change Order. 3. The changes in logic or durations approved by the City are used to analyze the impact of the change and is included in the Change Order. The coding for anew activity(s) added to the schedule for the Change Order includes the Change Order number in the Activity ID. Use as many activities as needed to accurately show the work of the Change Order. Revisions to the baseline schedule are not effective until accepted by the City. K City's Work Breakdown Structure WBS Code WBS Name XXXXXX Project Name XXXXXX.30 Design XXXXXX.30.10 Design Contractor Agreement XXXXXX.30.20 Conceptual Design (30%) XXXXXX.30.30 Preliminary Design (60%) XXXXXX.30.40 Final Design XXXXXX.30.50 Environmental XXXXXX.30.60 Permits XXXXXX.30.60.10 Permits - Identification XXXXXX.30.60.20 Permits - Review/Approve XXXXXX.40 ROW & Easements XXXXXX.40.10 ROW Negotiations XXXXXX.40.20 Condemnation XXXXXX.70 Utility Relocation XXXXXX.70.10 Utility Relocation Co-ordination XXXXXX.80 Construction XXXXXX.80.81 Bid and Award XXXXXX.80.83 Construction Execution XXXXXX.80.85 Inspection XXXXXX.80.86 Landscaping XXXXXX.90 Closeout XXXXXX.90.10 Construction Contract Close-out XXXXXX.90.40 Design Contract Closure L. City's Standard Milestones The following milestone activities (i.e., important events on a project that mark critical points in time) are of particular interest to the City and must be reflected in the project schedule for all phases of work. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 w i MP M F0 M M i s, ims i �r 01 32 16 - 7 CONSTRUCTION PROGRESS SCHEDULE Page 7 of 10 1 Activity ID Activity Name 2 Design 3 3020 Award Design Agreement 4 3040 Issue Notice to Proceed - Design Engineer 5 3100 Design Kick-off Meeting 6 3120 Submit Conceptual Plans to Utilities, ROW, Traffic, Parks, Storm Water, 7 Water & Sewer 8 3150 Peer Review Meeting/Design Review meeting (technical) 9 3160 Conduct Design Public Meeting #1 (required) 10 3170 Conceptual Design Complete 11 3220 Submit Preliminary Plans and Specifications to Utilities, ROW, Traffic, 12 Parks, Storm Water, Water & Sewer 13 3250 Conduct Design Public Meeting #2 (required) 14 3260 Preliminary Design Complete 15 3310 Submit Final Design to Utilities, ROW, Traffic, Parks, Storm Water, 16 Water & Sewer 17 3330 Conduct Design Public Meeting #3 (if required) 18 3360 Final Design Complete 19 ROW & Easements 20 4000 Right of Way Start 21 4230 Right of Way Complete 22 Utility Relocation 23 7000 Utilities Start 24 7120 Utilities Cleared/Complete 25 Construction 26 Bid and Award 27 8110 Start Advertisement 28 8150 Conduct Bid Opening 29 8240 Award Construction Contract 30 Construction Execution 31 8330 Conduct Construction Public Meeting #4 Pre -Construction 32 8350 Construction Start 33 8370 Substantial Completion 34 8540 Construction Completion 35 9130 Notice of Completion/Green Sheet 36 9150 Construction Contract Closed 37 9420 Design Contract Closed 38 39 1.4 SUBMITTALS 40 A. Schedule Submittal & Review 41 The City's Project Manager is responsible for reviews and acceptance of the Contractor's 42 schedule. The City's Project Control Specialist is responsible for ensuring alignment of 43 the Contractor's baseline and progress schedules with the Master Project Schedule as 44 support to the City's Project Manager. The City reviews and accepts or rejects the 45 schedule within ten workdays of Contractor's submittal. 46 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 M r� O1 32 16 -8 CONSTRUCTION PROGRESS SCHEDULE Page 8 of 10 1 l . Schedule Format 2 The Contractor will submit each schedule in two electronic forms, one in native file 3 format (.xer, .xml, .mpx) and the second in apdf format, in the City's document 4 management system in the location dedicated for this purpose and identified by the 5 Project Manager. In the event the Contractor does not use Primavera P6 or MS 6 Project for scheduling purposes, the schedule information must be submitted in.xls or 7 .xlsx format in compliance with the sample layout (See Specification 01 32 16.1 8 Construction Project Schedule Baseline Example), including activity predecessors, 9 successors and total float. 10 11 2. Initial & Baseline Schedule 12 The Contractor will develop their schedule for their scope of work and submit their 13 initial schedule in electronic form (in the file formats noted above), in the City's 14 document management system in the location dedicated for this purpose at least S 15 working days prior to Pre Construction Meeting. 16 17 The City's Project Manager and Project Control Specialist review this initial schedule 18 to determine alignment with the City's Master Project Schedule, including format & 19 WBS structure. Following the City's review, feedback is provided to the Contractor 20 for their use in finalizing their initial schedule and issuing (within five workdays) their 21 Baseline Schedule for final review and acceptance by the City. 22 23 3. Progress Schedule 24 The Contractor will update and issue their project schedule (Progress Schedule) by the 25 last day of each month throughout the life of their work on the project. The Progress 26 Schedule is submitted in electronic form as noted above, in the City's document 27 management system in the location dedicated for this purpose. 28 29 The City's Project Control team reviews each Progress Schedule for data and 30 information that support the assessment of the update to the schedule. In the event 31 data or information is missing or incomplete, the Project Controls Specialist 32 communicates directly with the Contractor's scheduler for providing same. The 33 Contractor re -submits the corrected Progress Schedule within 5 workdays, following 34 the submittal process noted above. The City's Project Manager and Project Control 35 Specialist review the Contractor's progress schedule for acceptance and to monitor 36 performance and progress. 37 38 The following list of items are required to ensure proper status information is 39 contained in the Progress Schedule. 40 • Baseline Start date 41 • Baseline Finish Date 42 • % Complete 43 • Float 44 • Activity Logic (dependencies) 45 • Critical Path 46 • Activities added or deleted 47 • Expected Baseline Finish date 48 • Variance to the Baseline Finish Date 49 CITY OF FORT WORTH W&SS Repl Cont-act 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 M w d" Mw Mw M me r. M M w NMI 01 3216-9 CONSTRUCTION PROGRESS SCHEDULE Page 9 of 10 1 B. Monthly Construction Status Report 2 The Contractor submits a written status report (referred to as a progress narrative) at the 3 monthly progress meeting (if monthly meetings are held) or at the end of each month to 4 accompany the Progress Schedule submittal, using the standard format provided in 5 Specification 0132 16.3 Construction Project Schedule Progress Narrative. The content 6 of the Construction Project Schedule Progress Narrative should be concise and complete 7 to include only changes, delays, and anticipated problems. 8 9 C. Submittal Process 10 • Schedules and Monthly Construction Status Reports are submitted in in the City's l 1 document management system in the location dedicated for this purpose. 12 • Once the project has been completed and Final Acceptance has been issued by the 13 City, no further progress schedules or construction status reports are required from 14 the Contractor. 15 1. 16 1.5 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 17 1.6 CLOSEOUT SUBMITTALS [NOT USED] 18 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 19 1.8 QUALITY ASSURANCE 20 A The person preparing and revising the construction Progress Schedule shall be 21 experienced in the preparation of schedules of similar complexity. 22 B. Schedule and supporting documents addressed in this Specification shall be prepared, 23 updated and revised to accurately reflect the performance of the construction. 24 C. Contractor is responsible for the quality of all submittals in this section meeting the 25 standard of care for the construction industry for similar projects. 26 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 27 1.10 FIELD [SITE] CONDITIONS [NOT USED] 28 1.11 WARRANTY [NOT USED] 29 1.12 ATTACHMENTS 30 Spec 01 32 16.1 Construction Project Schedule Baseline Example 31 Spec 0132 16.2 Construction Project Schedule Progress Example 32 Spec 0132 16.3 Construction Project Schedule Progress Narrative 33 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised August 13, 2021 W&SS Rep] Contract 2020 WSM-A CPN 103361 r+ FPw w 013216-10 CONSTRUCTION PROGRESS SCHEDULE Page 10 of 10 1 PW 2 PART - PRODUCTS [NOT USED] 3 PART 3 - EXECUTION [NOT USED] 4 END OF SECTION 5 `I Revision Log DATE NAME SUMMARYOF CHANCE 8/13/2021 Michael Ovren Revised to update specification requirements and eliminate duplicate schedule specifications. 6 w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A im STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised August 13, 2021 PER SECTION 0132 33 PRECONSTRUCTION VIDEO PARTI- GENERAL 013233-1 PRECONSTRUCTION VIDEO Pagel of 2 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. — a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] +� 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 10336I Revised July 1, 2011 w. 01 32 33 - 2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 m on 40 a* pw •W m r M PART1- GENERAL SECTION 0133 00 SUBMITTALS 013300-1 SUBMITTALS Page I of 8 1.1 SUMMARY A. Section Includes: 1. General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) ' c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification i 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division I — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. MP No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities wr c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 r� 01 33 00 - 2 SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. .- A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements _ b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) "By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents + c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 M W 2. The Project title and number 3. Contractor identification 4. The names of a. Contractor b. Supplier c. Manufacturer 013300-3 SUBMITTALS Page 3 of 8 Nor 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions ^w e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting r, for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH W&SS Rep1 Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 rr 01 33 00 - 4 SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: .� 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work .� I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies -- required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals — b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative _ 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH W&SS Repl Contract 2D20 WSM-A ,r STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 20I2 WM Aft 013300-5 SUBMITTALS Page 5 of 8 '~ a. Shop Drawings 1) Distributed to the City 2) Copies 4W a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. 600 b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the �. equipment and/or material for manufacture. b. Code 2 w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 i 4+ 01 33 00 - 6 SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is _ assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked -- b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. — c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for R manufacture. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 MER 013300-7 SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups .. 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. i M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications A+ 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI *� a. Prefix with "RFI" followed by series number, "-xxx", beginning with "01" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further ,., information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] dft 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] M Mr CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 013300-8 SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson I A.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 M w Mot pop WE M ,., M PA dim va on .W 013513-1 SPECIAL PROJECT PROCEDURES Page I of 8 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Use of Explosives, Drop Weight, Etc. 11 e. Water Department Notification 12 f. Public Notification Prior to Beginning Construction 13 g. Coordination with United States Army Corps of Engineers 14 h. Coordination within Railroad permits areas 15 i. Dust Control 16 j. Employee Parking 17 B. Deviations from this City of Fort Worth Standard Specification 18 1. None. 19 C. Related Specification Sections include, but are not necessarily limited to: 20 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 21 2. Division 1 — General Requirements 22 3. Section 33 12 25 — Connection to Existing Water Mains 23 1.2 PRICE AND PAYMENT PROCEDURES 24 A. Measurement and Payment 25 1. Coordination within Railroad permit areas 26 a. Measurement 27 1) Measurement for this Item will be by lump sum. 28 b. Payment 29 1) The work performed and materials furnished in accordance with this Item 30 will be paid for at the lump sum price bid for Railroad Coordination. 31 c. The price bid shall include: 32 1) Mobilization 33 2) Inspection 34 3) Safety training 35 4) Additional Insurance 36 5) Insurance Certificates 37 6) Other requirements associated with general coordination with Railroad, 38 including additional employees required to protect the right-of-way and 39 property of the Railroad from damage arising out of and/or from the 40 construction of the Project. 41 2. Railroad Flagmen CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11.2022 W&SS Repl Contract 2020 WSM-A CPN 103361 M 4M 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 a. Measurement 2 1) Measurement for this Item will be per working day. 3 b. Payment 4 1) The work performed and materials furnished in accordance with this Item 5 will be paid for each working day that Railroad Flagmen are present at the 6 Site. 7 c. The price bid shall include: 8 1) Coordination for scheduling flagmen 9 2) Flagmen 10 3) Other requirements associated with Railroad 11 3. All other items 12 a. Work associated with these Items is considered subsidiary to the various Items 13 bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 A. Reference Standards 16 1. Reference standards cited in this Specification refer to the current reference 17 standard published at the time of the latest revision date logged at the end of this 18 Specification, unless a date is specifically cited. 19 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 20 High Voltage Overhead Lines. 21 1.4 ADMINISTRATIVE REQUIREMENTS 22 A. Coordination with the Texas Department of Transportation 23 1. When work in the right-of-way which is under the jurisdiction of the Texas 24 Department of Transportation (TxDOT): 25 a. Notify the Texas Department of Transportation prior to commencing any work 26 therein in accordance with the provisions of the permit 27 b. All work performed in the TxDOT right-of-way shall be performed in 28 compliance with and subject to approval from the Texas Department of 29 Transportation 30 B. Work near High Voltage Lines 31 1. Regulatory Requirements 32 a. All Work near High Voltage Lines (more than 600 volts measured between 33 conductors or between a conductor and the ground) shall be in accordance with 34 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 35 2. Warning sign 36 a. Provide sign of sufficient size meeting all OSHA requirements. 37 3. Equipment operating within 10 feet of high voltage lines will require the following 38 safety features 39 a. Insulating cage -type of guard about the boom or arm 40 b. Insulator links on the lift hook connections for back hoes or dippers 41 c. Equipment must meet the safety requirements as set forth by OSHA and the 42 safety requirements of the owner of the high voltage lines 43 4. Work within 6 feet of high voltage electric lines 44 a. Notification shall be given to: 45 1) The power company (example: ONCOR) CITY OF FORT WORTH W&SS Repl Contract2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 1 I, 2022 M PM Wh No a~ No i p, no am MW M FEt M w i AN EM 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a) Maintain an accurate log of all such calls to power company and record 2 action taken in each case. 3 b. Coordination with power company 4 1) After notification coordinate with the power company to: 5 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 6 lower the lines 7 c. No personnel may work within 6 feet of a high voltage line before the above 8 requirements have been met. 9 C. Confined Space Entry Program 10 1. Provide and follow approved Confined Space Entry Program in accordance with 11 OSHA requirements. 12 2. Confined Spaces include: 13 a. Manholes 14 b. All other confined spaces in accordance with OSHA's Permit Required for 15 Confined Spaces 16 DELETE the below item, if not required for project. The following link is to Fact Sheet re: Air 17 Permitting: 18 httt)s://www.tcea.texas.2ov/assets/public/Dermittinp-/air/factsheets/t)ermit-factsheet.r)df 19 D. TCEQ Air Permit 20 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. 21 E. Use of Explosives, Drop Weight, Etc. 22 1. When Contract Documents permit on the project the following will apply: 23 a. Public Notification 24 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 25 prior to commencing. 26 2) Minimum 24 hour public notification in accordance with Section 0131 13 27 F. Water Department Coordination 28 1. During the construction of this project, it will be necessary to deactivate, for a 29 period of time, existing lines. The Contractor shall be required to coordinate with 30 the Water Department to determine the best times for deactivating and activating 31 those lines. 32 2. Coordinate any event that will require connecting to or the operation of an existing 33 City water line system with the City's representative. 34 a. Coordination shall be in accordance with Section 33 12 25. 35 b. If needed, obtain a hydrant water meter from the Water Department for use 36 during the life of named project. 37 c. In the event that a water valve on an existing live system be turned off and on 38 to accommodate the construction of the project is required, coordinate this 39 activity through the appropriate City representative. 40 1) Do not operate water line valves of existing water system. 41 a) Failure to comply will render the Contractor in violation of Texas Penal 42 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 43 will be prosecuted to the full extent of the law. 44 b) In addition, the Contractor will assume all liabilities and 45 responsibilities as a result of these actions. 46 G. Public Notification Prior to Beginning Construction CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 W&SS Repl Contract 2020 WSM-A CPN 103361 r, 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 35 13-4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1. Prior to beginning construction on any block in the project, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer and City of Fort Worth Door Hangers, 7 days prior to beginning any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name of Project b) City Project No (CPN) c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number f) Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre -construction notification' flyer is attached as Exhibit A. 3) City of Fort Worth Door Hangers will be provided to the Contractor for distribution with their notice. 4) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 5) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer and door hangers are delivered to all residents of the block. H. Public Notification of Temporary Water Service Interruption during Construction 1. In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary interruption. b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. 1. Coordination with United States Army Corps of Engineers (USACE) CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 W&SS Repl Contract 2020 WSM-A CPN 103361 .-P rr MIL rw W M pa M ow M M MR MR 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 1. At locations in the Project where construction activities occur in areas where 2 USACE permits are required, meet all requirements set forth in each designated 3 permit. 4 J. Coordination within Railroad Permit Areas 5 1. At locations in the project where construction activities occur in areas where 6 railroad permits are required, meet all requirements set forth in each designated 7 railroad permit. This includes, but is not limited to, provisions for: 8 a. Flagmen 9 b. Inspectors 10 c. Safety training 11 d. Additional insurance 12 e. Insurance certificates 13 f. Other employees required to protect the right-of-way and property of the 14 Railroad Company from damage arising out of and/or from the construction of 15 the project. Proper utility clearance procedures shall be used in accordance 16 with the permit guidelines. 17 2. Obtain any supplemental information needed to comply with the railroad's 18 requirements. 19 3. Railroad Flagmen 20 a. Submit receipts to City for verification of working days that railroad flagmen 21 were present on Site. 22 K. Dust Control 23 1. Use acceptable measures to control dust at the Site. 24 a. If water is used to control dust, capture and properly dispose of waste water. 25 b. If wet saw cutting is performed, capture and properly dispose of slurry. 26 L. Employee Parking 27 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 W&SS Repl Contract 2020 WSM-A CPN 103361 i om 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 1.5 SUBMITTALS [NOT USED] w 2 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] .. 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] PW 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] IMF 9 PART 2 — PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION �..r 12 Revision Log DATE NAME SUMMARY OF CHANGE 1.4.13 - Added requirement of compliance with Health and Safety Code, Title 9. 8/31 /2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E - Added Contractor responsibility for obtaining a TCEQ Air Permit Remove references to Air Pollution watch Days and NCTCOG Clean construction 3/11/2022 M Owen Specification requirements. Clarify need for Door Hangers under in addition to contractor notification of public. 13 OM OM M F_-. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A OR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 11, 2022 ow M 013513-7 SPECIAL PROJECT PROCEDURES Page 7 of 8 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11, 2022 W&SS Repl Contract 2020 WSM-A CPN 103361 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 1 EXHIBIT B 2 FORT WORTH: DOE MO. XXXX Projeat Manna: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, ,CONTRACTOR 3 - - 4 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 11.2022 W&SS Repl Contract 2020 WSM-A CPN 103361 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART]- GENERAL 1.1 SUMMARY A. Section Includes: .,. 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 —General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all i Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments *� for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] M 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. *+ b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another external FTP site approved by the City. CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 9, 2020 wh w 01 45 23 TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative i b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of dw Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered d• B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] a•. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log I DATE NAME SUMMARY OF CHANGE PR PM IM FM r, 3/9/2020 D.V. Magaiia Removed reference to Bttzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 9, 2020 rw 01 50 00 - 1 TEMPORARY FACILITIES AND CONTROLS Page I of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PARTI- GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. _ C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 —General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] d" 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as r required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH W&SS Rep1 Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 01 5000 - 2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. .� b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. —` b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing 1. Provide and maintain for the duration or construction when required in contract documents i E. Dust Control CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 01 50 00 - 3 TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 T 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] .� 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] i 3.6 RE -INSTALLATION _ 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities MR CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 w r 01 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION i Revision Log DATE NAME SUMMARY OF CHANGE oft FM PM MR 1w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A om STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 om MER i RM i MER M i MR M w 01 55 26 -1 STREET USE PERMIT AND MODIFICATIONS TOTRAFFIC CONTROL Page 1 of 3 1 SECTION 01 55 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PARTI- GENERAL �9= IuIuFillAli 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 —Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 —General Requirements 15 3. Section 34 71 13 —Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standwd 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. Contractor shall minimize lane closures and impact to vehicular/pedestrian 30 traffic. 31 b. When traffic control plans are included in the Drawings, provide Traffic 32 Control in accordance with Drawings and Section 34 71 13. 33 c. When traffic control plans are not included in the Drawings, prepare traffic 34 control plans in accordance with Section 34 71 13 and submit to City for 35 review. 36 1) Allow minimum 10 working days for review of proposed Traffic Control. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 22, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 2) A traffic control "Typical" published by City of Fort Worth, the Texas 2 Manual Unified Traffic Control Devices (TMUTCD) or Texas Department 3 of Transportation (TxDOT) can be used as an alternative to preparing 4 project/she specific traffic control plan if the typical is applicable to the 5 specific project/site. 6 B. Street Use Permit 7 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 8 a. To obtain Street Use Permit, submit Traffic Control Plans to City 9 Transportation and Public Works Department. 10 1) Allow a minimum of 5 working days for permit review. 11 2) It is the Contractor's responsibility to coordinate review of Traffic Control 12 plans for Street Use Permit, such that construction is not delayed. 13 C. Modification to Approved Traffic Control 14 1. Prior to installation traffic control: 15 a. Submit revised traffic control plans to City Department Transportation and 16 Public Works Department. 17 1) Revise Traffic Control plans in accordance with Section 34 71 13. 18 2) Allow minimum 5 working days for review of revised Traffic Control. 19 3) It is the Contractor's responsibility to coordinate review of Traffic Control 20 plans for Street Use Permit, such that construction is not delayed. 21 D. Removal of Street Sign 22 1. If it is determined that a street sign must be removed for construction, then contact 23 City Transportation and Public Works Department, Signs and Markings Division to 24 remove the sign. 25 E. Temporary Signage 26 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 27 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 28 Devices (MUTCD). 29 2. Install temporary sign before the removal of permanent sign. 30 3. When construction is complete, to the extent that the permanent sign can be 31 reinstalled, contact the City Transportation and Public Works Department, Signs 32 and Markings Division, to reinstall the permanent sign. 33 F. Traffic Control Standards 34 1. Traffic Control Standards can be found on the City's website. 35 1.5 SUBMITTALS [NOT USED] 36 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH W&SSRepl Contract2020 WSM-A ,r STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 22, 2021 01 55 26 - 3 STREET USEPERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 i 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] "F 3 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE [NOT USED] 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 6 1.11 FIELD [SITE] CONDITIONS [NOT USED] 7 1.12 WARRANTY [NOT USED] 8 PART 2 - PRODUCTS [NOT USED] 9 PART 3 - EXECUTION [NOT USED] 10 END OF SECTION •+ 11 Revision Log DATE NAME SUMMARY OF CHANCE 1.4 A. Added language to emphasize minimizing of lane closures and impact to traffic. 1.4 A. 1. c. Added language to allow for use ofpublished traffic control "TypicaW' if 3/22/2021 M Owen MR applicable to specific project/site. 1.4 F. 1) Removed reference to Buzzsaw 1.5 Added language re: submittal of permit w 12 W M M M MW CITY OF FORT WORTH W&SS Rep1 Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 22, 2021 M 015713-1 STORM WATER POLLUTION PREVENTION Page 1 of 3 PM SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL M 1.1 SUMMARY A. Section Includes: MW 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification I. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 —Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than I acre of disturbance +F a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT i 3. Storm Water Pollution Prevention Plan: S WPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards l . Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this i Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. me CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 M 01 57 13 -2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, _ Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 01 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 i oft +, 015713-3 STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 01 33 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1,2011 W&SS Repl Contract 2020 WSM-A CPN 103361 W SECTION 01 58 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1.1 SUMMARY A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS A. Design Criteria 1. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 Meg 01 58 13 - 2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 B. Materials PM 1. Sign a. Constructed of %-inch fir plywood, grade A-C (exterior) or better 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] a� PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] PM 3.4 INSTALLATION A. General 1. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] _ 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] ,.. 3.13 MAINTENANCE A. General 1. Maintenance will include painting and repairs as needed or directed by the City. 3.14 ATTACHMENTS [NOT USED[ END OF SECTION w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A .nr STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 FM on w pop i pml I" 01 58 13-3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 me I" SECTION 01 60 00 PRODUCT REQUIREMENTS M0 PART1- GENERAL W" 1.1 SUMMARY 01 60 00 PRODUCT REQUIREMENTS Pagel of 2 A. Section Includes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division I — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is available through the City's website at: 4W https:Happs.fortworthtexas.gov/ProjectResources/ and following the directory path; 02 - Construction Documents/Standard Products List B. Only products specifically included on City's Standard Product List in these Contract �i Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even ~� though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that i manufacturer's standard product. E. See Section 01 33 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 110 1.9 QUALITY ASSURANCE [NOT USED] dw CITY OF FORT WORTH W&S Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 9, 2020 i 01 60 00 PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 3/9/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH W&S Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 9.2020 016600-1 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. M CITY OF FORT WORTH W&SS Repl Contract 2020 W SM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 016600-2 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. - 4. Restrict storage to areas available on construction site for storage of material and .. equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. -- CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 w OR no 01 66 00 - 3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. +� B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH W&SS Rep] Contract 2020 W SM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July I, 2011 01 66 00 - 4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE n.r F•1 we w 1'* CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 2 3 PARTI- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 ,w 01 70 00 - 1 MOBILIZATION AND REMOBILIZATION Page 1 of 3 SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised November 22, 2016 W&SS Repl Contract 2020 WSM-A CPN 103361 0 01 70 00 - 2 MOBILIZATION AND REMOBILIZATION Page 2 of 3 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment [Consult City Department/Division for direction on if 26 Mobilization pay item to be included or the item should be subsidiary. Include the 27 appropriate Section 1.2 A. 1.] 28 1. Mobilization and Demobilization 29 a. Measure 30 1) This Item is considered subsidiary to the various Items bid. 31 b. Payment 32 1) The work performed and materials furnished in accordance with this Item 33 are subsidiary to the various Items bid and no other compensation will be 34 allowed. 35 1.3 REFERENCES [NOT USED] 36 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 37 1.5 SUBMITTALS [NOT USED] 38 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 39 1.7 CLOSEOUT SUBMITTALS [NOT USED] 40 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 41 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised November 22, 2016 FM r. 01 70 00 - 3 MOBILIZATION AND REMOBILIZATION Page 3 of 3 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] ` 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 2 Revision Log DATE NAME SUMMARY OF CHANGE 11/22/16 Michael Owen 1.2 Price and Payment Procedures - Revised specification, including blue text, to make specification flexible for either subsidiary or paid bid item for Mobilization. 8 WA w w go CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A MR STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised November 22, 2016 M 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 8 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY PART 1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Staking a. Measurement 1) Measurement for this Item shall be by lump sum. _ b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "Construction Staking". 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following: 1) Verification of control data provided by City. 2) Placement, maintenance and replacement of required stakes and markings in the field. 3) Preparation and submittal of construction staking documentation in the ' form of "cut sheets" using the City's standard template. 2. Construction Survey a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 3. As -Built Survey a. Measurement —' 1) Measurement for this Item shall be by lump sum. b. Payment 1) The work performed and the materials furnished in accordance with this Item shall be paid for at the lump sum price bid for "As -Built Survey". wr CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised February 14, 2018 01 71 23 - 2 CONSTRUCTION STAKING AND SURVEY Page 2 of 8 2) Payment for "Construction Staking" shall be made in partial payments prorated by work completed compared to total work included in the lump sum item. c. The price bid shall include, but not be limited to the following:: rt 1) Field measurements and survey shots to identify location of completed facilities. 2) Documentation and submittal of as -built survey data onto contractor redline plans and digital survey files. " 1.3 REFERENCES A. Definitions 1. Construction Survev - The survey measurements made prior to or while construction is in progress to control elevation, horizontal position, dimensions and _ configuration of structures/improvements included in the Project Drawings. 2. As -built Survev —The measurements made after the construction of the improvement features are complete to provide position coordinates for the features of a project. 3. Construction Stakins — The placement of stakes and markings to provide offsets and elevations to cut and fill in order to locate on the ground the designed structures/improvements included in the Project Drawings. Construction staking shall include staking easements and/or right of way if indicated on the plans. 4. Survev "Field Checks" — Measurements made after construction staking is completed and before construction work begins to ensure that structures marked on the ground are accurately located per Project Drawings. B. Technical References 1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw website) — 01 71 23.16.01_ Attachment A Survey Staking Standards 2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available on City's Buzzsaw website). 3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision 4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land Surveying in the State of Texas, Category 5 '^ 1.4 ADMINISTRATIVE REQUIREMENTS A. The Contractor's selection of a surveyor must comply with Texas Government Code 2254 (qualifications based selection) for this project. 1.5 SUBMITTALS A. Submittals, if required, shall be in accordance with Section 0133 00. B. All submittals shall be received and reviewed by the City prior to delivery of work. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Field Quality Control Submittals CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A .. STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised February 14, 2018 01 71 23 - 3 CONSTRUCTION STAKING AND SURVEY Page 3 of 8 1. Documentation verifying accuracy of field engineering work, including coordinate conversions if plans do not indicate grid or ground coordinates. 2. Submit "Cut -Sheets" conforming to the standard template provided by the City (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards). 1.7 CLOSEOUT SUBMITTALS B. As -built Redline Drawing Submittal 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of constructed improvements signed and sealed by Registered Professional Land Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards) . 2. Contractor shall submit the proposed as -built and completed redline drawing submittal one (1) week prior to scheduling the project final inspection for City review and comment. Revisions, if necessary, shall be made to the as -built redline drawings and resubmitted to the City prior to scheduling the construction final inspection. 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Construction Staking 1. Construction staking will be performed by the Contractor. 2. Coordination r. a. Contact City's Project Representative at least one week in advance notifying the City of when Construction Staking is scheduled. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes. If City surveyors are required to re -stake for any reason, the Contractor will be responsible for costs to perform staking. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed disturbed or omitted that the contracted Work cannot take place then the Contractor will be required to stake or re -stake the deficient areas. B. Construction Survey 1. Construction Survey will be performed by the Contractor. 2. Coordination a. Contractor to verify that horizontal and vertical control data established in the design survey and required for construction survey is available and in place. 3. General a. Construction survey will be performed in order to construct the work shown on the Construction Drawings and specified in the Contract Documents. b. For construction methods other than open cut, the Contractor shall perform construction survey and verify control data including, but not limited to, the following: 1) Verification that established benchmarks and control are accurate. i CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised Febnwry 14, 2018 O1 71 23 -4 CONSTRUCTION STAKING AND SURVEY Page 4 of 8 2) Use of Benchmarks to furnish and maintain all reference lines and grades for tunneling. 3) Use of line and grades to establish the location of the pipe. 4) Submit to the City copies of field notesused to establish all lines and grades, if requested, and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City, if requested, to verify the guidance system and the line and grade of the carrier pipe. 6) The Contractor remains fully responsible for the accuracy of the work and correction of it, as required. 7) Monitor line and grade continuously during construction. — 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to the City. 9) If the installation does not meet the specified tolerances (as outlined in Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct the installation in accordance with the Contract Documents. C. As -Built Survey 1. Required As -Built Survey will be performed by the Contractor. 2. Coordination a. Contractor is to coordinate with City to confirm which features require as - built surveying. b. It is the Contractor's responsibility to coordinate the as -built survey and required measurements for items that are to be buried such that construction activities are not delayed or negatively impacted. c. For sewer mains and water mains 12" and under in diameter, it is acceptable to physically measure depth and mark the location during the progress of construction and take as -built survey after the facility has been buried. The Contractor is responsible for the quality control needed to ensure accuracy. 3. General a. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features during the progress of the construction including the following: 1) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Minimum every 250 linear feet, including (2) Horizontal and vertical points of inflection, curvature, etc. (3) Fire line tee (4) Plugs, stub -outs, dead-end lines (5) Casing pipe (each end) and all buried fittings -r 2) Sanitary Sewer a) Top of pipe elevations and coordinates for force mains and siphon sanitary sewer lines (non -gravity facilities) at the following locations: (1) Minimum every 250 linear feet and any buried fittings (2) Horizontal and vertical points of inflection, curvature, etc. 3) Stormwater — Not Applicable CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised February 14,2018 ri 01 71 23 - 5 CONSTRUCTION STAKING AND SURVEY Page 5 of 8 b. The Contractor shall provide as -built survey including the elevation and location (and provide written documentation to the City) of construction features after the construction is completed including the following: 1) Manholes a) Rim and flowline elevations and coordinates for each manhole 2) Water Lines a) Cathodic protection test stations " b) Sampling stations c) Meter boxes/vaults (All sizes) d) Fire hydrants e) Valves (gate, butterfly, etc.) f) Air Release valves (Manhole rim and vent pipe) g) Blow off valves (Manhole rim and valve lid) h) Pressure plane valves i) Underground Vaults (1) Rim and flowline elevations and coordinates for each Underground Vault. 3) Sanitary Sewer a) Cleanouts (1) Rim and flowline elevations and coordinates for each b) Manholes and Junction Structures (1) Rim and flowline elevations and coordinates for each manhole and junction structure. 4) Stormwater — Not Applicable 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY PART 2 - PRODUCTS A. A construction survey will produce, but will not be limited to: 1. Recovery of relevant control points, points of curvature and points of intersection. 2. Establish temporary horizontal and vertical control elevations (benchmarks) sufficiently permanent and located in a manner to be used throughout construction. 3. The location of planned facilities, easements and improvements. — a. Establishing final line and grade stakes for piers, floors, grade beams, parking areas, utilities, streets, highways, tunnels, and other construction. b. A record of revisions or corrections noted in an orderly manner for reference. c. A drawing, when required by the client, indicating the horizontal and vertical location of facilities, easements and improvements, as built. 4. Cut sheets shall be provided to the City inspector and Survey Superintendent for all construction staking projects. These cut sheets shall be on the standard city template which can be obtained from the Survey Superintendent (817-392-7925). 5. Digital survey files in the following formats shall be acceptable: a. AutoCAD (.dwg) b. ESRI Shapefile (.shp) CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN I03361 Revised February 14, 2018 MM 017123-6 CONSTRUCTION STAKING AND SURVEY Page 6 of 8 c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use standard templates, if available) _ 6. Survey files shall include vertical and horizontal data tied to original project control and benchmarks, and shall include feature descriptions PART 3- EXECUTION 3.1 INSTALLERS A. Tolerances: 1. The staked location of any improvement or facility should be as accurate as practical and necessary. The degree of precision required is dependent on many factors all of which must remain judgmental. The tolerances listed hereafter are based on generalities and, under certain circumstances, shall yield to specific requirements. The surveyor shall assess any situation by review of the overall plans and through consultation with responsible parties as to the need for specific tolerances. a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical tolerance. Horizontal alignment for earthwork and rough cut should not exceed 1.0 ft. tolerance. b. Horizontal alignment on a structure shall be within .0. lft tolerance. -- c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and walkways shall be located within the confines of the site boundaries and, occasionally, along a boundary or any other restrictive line. Away from any restrictive line, these facilities should be staked with an accuracy producing no more than 0.05ft. tolerance from their specified locations. d. Underground and overhead utilities, such as sewers, gas, water, telephone and electric lines, shall be located horizontally within their prescribed areas or easements. Within assigned areas, these utilities should be staked with an accuracy producing no more than 0.1 ft tolerance from a specified location. e. The accuracy required for the vertical location of utilities varies widely. Many underground utilities require only a minimum cover and a tolerance of 0.1 ft. should be maintained. Underground and overhead utilities on planned profile, but not depending on gravity flow for performance, should not exceed 0.1 ft. tolerance. B. Surveying instruments shall be kept in close adjustment according to manufacturer's specifications or in compliance to standards. The City reserves the right to request a calibration report at any time and recommends regular maintenance schedule be performed by a certified technician every 6 months. 1. Field measurements of angles and distances shall be done in such fashion as to satisfy the closures and tolerances expressed in Part 3.1.A. 2. Vertical locations shall be established from a pre -established benchmark and checked by closing to a different bench mark on the same datum. 3. Construction survey field work shall correspond to the client's plans. Irregularities or conflicts found shall be reported promptly to the City. 4. Revisions, corrections and other pertinent data shall be logged for future reference. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised February 14,2018 0171 23 - 7 CONSTRUCTION STAKING AND SURVEY Page 7 of 8 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION A. If the Contractor's work damages or destroys one or more of the control monuments/points set by the City, the monuments shall be adequately referenced for expedient restoration. 1. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. a. Contractor shall perform replacements and/or restorations. b. The City may require at any time a survey "Field Check" of any monument ` or benchmarks that are set be verified by the City surveyors before further associated work can move forward. 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD loR] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain all stakes and control data placed by the City in accordance with this Specification. This includes easements and right of way, if noted on the plans. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP A. Survey Checks 1. The City reserves the right to perform a Survey Check at any time deemed necessary. 2. Checks by City personnel or 3`d party contracted surveyor are not intended to relieve the contractor of his/her responsibility for accuracy. _ 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION .M I Revision Log I CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A CPN STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 103361 Revised February 14, 2018 OM r 01 71 23 - 8 CONSTRUCTION STAKING AND SURVEY Page 8 of 8 DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson Added instruction and modified measurement & payment under 1.2; added 8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS ; Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup. Removed "blue text"; revised measurement and payment sections for Construction Staking and As -Built Survey; added reference to selection compliance with TGC 2/14/2018 M Owen 2254; revised action and Closeout submittal requirements; added acceptable depth measurement criteria; revised list of items requiring as -built survey "during" and "after" construction; and revised acceptable digital survey file format +. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A CPN STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 103361 Revised February 14,2018 pq i wa EM po on OM P" w" t rr MER .. PART1- GENERAL 1.1 SUMMARY SECTION 01 74 23 CLEANING 017423-1 CLEANING Page I of 4 A. Section Includes: _ 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 01 74 23 - 2 CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] +� 2.2 MATERIALS A. Cleaning Agents No 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION M 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in ... storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A WE STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 No ... 01 74 23 - 3 CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning 1. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other foreign materials from sight -exposed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. .ar CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN I03361 Revised July 1, 2011 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 M M a, on in 1 2 3 PART 1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 k% 01 7719-1 CLOSEOUT REQUIREMENTS Page 1 of 3 SECTION 01 77 19 CLOSEOUT REQUIREMENTS 1.1 SUMMARY A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 —General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for fmal payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 22, 2021 W&SS Repl Contract 2020 WSM-A CPN 103361 w 01 7719-2 CLOSEOUT REQUIREMENTS Page 2 of 3 1 PART 3 - EXECUTION 2 3.1 INSTALLERS [NOT USED] 3 3.2 EXAMINATION [NOT USED] 4 3.3 PREPARATION [NOT USED] 5 3.4 CLOSEOUT PROCEDURE 6 A. Prior to requesting Final Inspection, submit: 7 1. Project Record Documents in accordance with Section 0178 39 8 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 9 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 10 01 74 23. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. The Right-of-way shall be cleared of all construction materials, barricades, and temporary signage. 4. Upon completion of Work associated with the items listed in the City's written notice, inform the City that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 5. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 22, 2021 W&SS Repl Contract2020 WSM-A CPN 103361 MM MW ow 01 7719-3 CLOSEOUT REQUIREMENTS Page 3 of 3 1 1. Coordinate with the City Project Representative to complete the following 2 additional forms: 3 a. Final Payment Request 4 b. Statement of Contract Time 5 c. Affidavit of Payment and Release of Liens 6 d. Consent of Surety to Final Payment 7 e. Pipe Report (if required) 8 f. Contractor's Evaluation of City 9 g. Performance Evaluation of Contractor _ 10 F. Letter of Final Acceptance 11 1. Upon review and acceptance of Notice of Project Completion and Supporting 12 Documentation, in accordance with General Conditions, City will issue Letter of 13 Final Acceptance and release the Final Payment Request for payment. 14 3.5 REPAIR / RESTORATION [NOT USED] 15 3.6 RE -INSTALLATION [NOT USED] 16 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION [NOT USED] 22 3.13 MAINTENANCE [NOT USED] 23 3.14 ATTACHMENTS [NOT USED] 24 END OF SECTION 25 Revision Log DATE NAME SUMMARY OF CHANGE 3/22/2021 M Owen 3.4 C. Added language to clarify and emphasize requirement to "Clearing ROW" 26 i CITY OF FORT WORTH W&SS Repl Contract2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised March 22, 202I 01 78 23 - 1 OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES f A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product •� shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be i approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 '/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 mob 01 78 23 - 2 OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text _ 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating 0% equipment. 1) Provide typed description of product, and major component parts of equipment. _ 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the — volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement T d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation r 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. .f b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A .� STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 i 01 78 23 - 3 OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking t. d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams RM CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 01 78 23 - 4 OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions .� 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams = d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 po M M w M M PIM 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl Contract 2020 WSM-A CPN 103361 r SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY 01 78 39 - 1 PROJECT RECORD DOCUMENTS Page 1 of 4 A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification R 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] -. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract .+� Documents may rely reasonably on information obtained from the approved Project Record Documents. ,w CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 M 01 78 39 - 2 PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the RM title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH W&SS Repl Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 01 78 39 - 3 PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section 01 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. '— 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 01 78 39 - 4 PROJECT RECORD DOCUMENTS Page 4 of 4 c. Call attention to each entry by drawing a "cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, _ the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD loR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] " 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE M CITY OF FORT WORTH W&SS Rep] Contract 2020 WSM-A M. STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised July 1, 2011 rr 024114-1 UTILITY REMOVAL/ABANDONMENT Page 1 of 17 1 OSECTION 02 41 14 2 UTILITY REMOVAL/ABANDONMENT 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Direction for the removal, abandonment or salvaging of the following utilities: 7 a. Cathodic Protection Test Stations 8 b. Water Lines 9 c. Gate Valves 10 d. Water Valves 11 e. Fire Hydrants 12 f. Water Meters and Meter Box 13 g. Water Sampling Station 14 h. Concrete Water Vaults 15 i. Sanitary Sewer Lines 16 j. Sanitary Sewer Manholes 17 k. Sanitary Sewer Junction Boxes 18 1. Storm Sewer Lines 19 in. Storm Sewer Manhole Risers 20 n. Storm Sewer Junction Boxes 21 o. Storm Sewer Inlets 22 p. Box Culverts 23 q. Headwalls and Safety End Treatments 24 r. Trench Drains 25 B. Deviations from this City of Fort Worth Standard Specification 26 1. Removal of Existing Lead Services - The work for removal and disposal of the 27 existing lead water services to be replaced shall be considered subsidiary to the 28 bid price for the appropriate water service. The lead services shall be disposed 29 of at a certified metal recycling with receipts of said recycling and submitted 30 for verification to the City of Fort Worth Water Department staff. 31 2. Addition of grout inspection by coupon sampling for utilities abandoned in 32 place (See 1.2Ac.9, 3.4C2e-g; italicized herein) 33 C. Related Specification Sections include, but are not necessarily limited to: 34 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 35 2. Division 1 — General Requirements 36 3. Section 03 34 13 — Controlled Low Strength Material (CLSM) 37 4. Section 33 05 10 — Utility Trench Excavation, Embedment and Backfill 38 5. Section 33 05 24 — Installation of Carrier Pipe in Casing or Tunnel Liner Plate 39 6. Section 33 11 11 — Ductile Iron Fittings 40 7. Section 33 11 13 — Concrete Pressure Pipe, Bar -wrapped, Steel Cylinder Type 41 8. Section 33 11 14 — Buried Steel Pipe and Fittings 42 9. Section 33 12 25 — Connection to Existing Water Mains CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 UM 1 1.2 PRICE AND PAYMENT PROCEDURES 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 0241 14 - 2 UTILITY REMOVAUABANDONMENT Page 2 of 17 A. Utility Lines 1. Abandonment of Utility Line by Grouting a. Measurement 1) Measurement for this Item shall be per cubic yard of existing utility line to be grouted. Measure by tickets showing cubic yards of grout applied. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price per cubic yard of "Line Grouting" for: a) Various types of utility line c. The price bid shall include: 1) Low density cellular grout or CLSM 2) Water 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 9) Coupon Sample inspection ofAbandoned lines 2. Utility Line Removal, Separate Trench a. Measurement 1) Measurement for this Item shall be per linear foot of existing utility line to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Line" for: a) Various types of existing utility line b) Various sizes c. The price bid shall include: 1) Removal and disposal of existing utility pipe 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 3. Utility Line Removal, Same Trench a. Measurement 1) This Item is considered subsidiary the proposed utility line being installed. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the installation of proposed utility pipe and shall be subsidiary to the unit price bid per linear foot of pipe complete in place, and no other compensation will be allowed. 4. Manhole Abandonment CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 w 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 Mir 0241 14 - 3 UTILITY REMOVAUABANDONMENT Page 3 of 17 a. Measurement 1) Measurement for this Item will be per each manhole to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Manhole" for: a) Various diameters b) Various types c. The price bid shall include: 1) Removal and disposal of manhole cone 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Concrete 5) Acceptable material for backfilling manhole void 6) Pavement removal 7) Excavation 8) Hauling 9) Disposal of excess materials 10) Furnishing, placement and compaction of backfill 11) Surface restoration 12) Clean-up 5. Cathodic Test Station Abandonment a. Measurement 1) Measurement for this Item will be per each cathodic test station to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Cathodic Test Station". c. The price bid shall include: 1) Abandon cathodic test station 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up B. Water Lines and Appurtenances 1. Installation of a Water Line Pressure Plug a. Measurement 1) Measurement for this Item shall be per each pressure plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Pressure Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing pressure plug CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 024114-4 UTILITY REMOVAUABANDONMENT Page 4 of 17 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess material 6) Gaskets 7) Bolts and Nuts 8) Furnishing, placement and compaction of embedment 9) Furnishing, placement and compaction of backfill 10) Disinfection 11) Testing 12) Clean-up 2. Abandonment of Water Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Water Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 3. Water Valve Removal a. Measurement 1) Measurement for this Item will be per each water valve to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Water Valve" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 4. Water Valve Removal and Salvage a. Measurement CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 i i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14 - 5 UTILITY REMOVAL/ABANDONMENT Page 5 of 17 1) Measurement for this Item will be per each water valve to be removed and salvaged. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Valve" for: a) Various sizes c. The price bid shall include: 1) Removal and Salvage of valve 2) CLSM 3) Delivery to City 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 5. Water Valve Abandonment a. Measurement 1) Measurement for this Item will be per each water valve to be abandoned. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Abandon Water Valve" for: a) Various Sizes c. The price bid shall include: 1) Abandonment of valve 2) CLSM 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 6. Fire Hydrant Removal and Salvage a. Measurement 1) Measurement for this Item will be per each fire hydrant to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Fire Hydrant". c. The price bid shall include: 1) Removal and salvage of fire hydrant 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl Contract 2020 WSM-A CPN 103361 FM 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14 - 6 UTILITY REMOVAUABANDONMENT Page 6 of 17 8) Clean-up 7. Water Meter Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water meter to be removed and salvaged. b. Payment 1) The work performed and materials famished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Meter" for: a) Various sizes 2) If a "Water Meter Service Relocate" is performed in accordance with Section 33 12 10, removal and salvage or disposal of the existing (2-inch or smaller) water meter shall be subsidiary to the cost of the "Water Meter Service Relocate", no other compensation will be allowed. c. The price bid shall include: 1) Removal and salvage of water meter 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 8. Water Sampling Station Removal and Salvage a. Measurement 1) Measurement for this Item will be per each water sampling station to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Salvage Water Sampling Station". c. The price bid shall include: 1) Removal and salvage of water sampling station 2) Delivery to City 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up 9. Concrete Water Vault Removal a. Measurement 1) Measurement for this Item will be per each concrete water vault to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement' shall be paid for at the unit price bid per each "Remove Concrete Water Vault'. c. The price bid shall include: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 C1 Im i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14 - 7 UTILITY REMOVAUABANDONMENT Page 7 of 17 1) Removal and disposal of concrete water vault 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Removal, salvage and delivery of any valves to City, if applicable 4) Removal, salvage and delivery of any water meters to City, if applicable 5) Pavement removal 6) Excavation 7) Hauling 8) Disposal of excess materials 9) Furnishing, placement and compaction of backfill 10) Clean-up C. Sanitary Sewer Lines and Appurtenances 1. Abandonment of Sanitary Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Sewer Abandonment Plug" for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Sanitary Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each sanitary sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Sewer Manhole" for: a) Various diameters c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Cutting and plugging of existing sewer lines 4) Pavement removal 5) Excavation 6) Hauling 7) Disposal of excess materials 8) Furnishing, placement and compaction of backfill 9) Clean-up 3. Sanitary Sewer Junction Structure Removal CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl Contract 2020 WSM-A CPN 103361 i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14 - 8 UTILITY REMOVAUABANDONMENT Page 8 of 17 a. Measurement 1) Measurement for this Item will be per each sanitary sewer junction structure being removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the lump sum bid per each "Remove Sewer Junction Box" location. c. The price bid shall include: 1) Removal and disposal of j unction box 2) Removal, salvage and delivery of frame and cover to City. 3) Pavement removal 4) Excavation 5) Hauling 6) Disposal of excess materials 7) Furnishing, placement and compaction of backfill 8) Clean-up D. Storm Sewer Lines and Appurtenances 1. Abandonment of Storm Sewer Line by Cut and installation of Abandonment Plug a. Measurement 1) Measurement for this Item shall be per each cut and abandonment plug to be installed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid for each "Storm Abandonment Plug" installed for: a) Various sizes c. The price bid shall include: 1) Furnishing and installing abandonment plug 2) Pavement removal 3) Excavation 4) Hauling 5) CLSM 6) Disposal of excess material 7) Furnishing, placement and compaction of backfill 8) Clean-up 2. Storm Sewer Manhole Removal a. Measurement 1) Measurement for this Item will be per each storm sewer manhole to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Manhole Riser" for: a) Various sizes c. The price bid shall include: 1) Removal and disposal of manhole 2) Removal, salvage and delivery of frame and cover to City, if applicable 3) Pavement removal 4) Excavation CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 �fI M" i M we M imp mor i M Em dM i rw i Q 0241 14 - 9 UTILITY REMOVAUA13ANDONMENT Page 9 of 17 1 5) Hauling 2 6) Disposal of excess materials 3 7) Furnishing, placement and compaction of backfill 4 8) Clean-up 5 3. Storm Sewer Junction Box Removal 6 a. Measurement 7 1) Measurement for this Item will be per each storm sewer junction structure 8 to be removed. 9 b. Payment 10 1) The work performed and materials furnished in accordance with this Item 11 and measured as provided under "Measurement" shall be paid for at the 12 unit price bid per each "Remove Storm Junction Box" for: 13 a) Various sizes 14 c. The price bid shall include: 15 1) Removal and disposal of junction box 16 2) Removal, salvage and delivery of frame and cover to City, if applicable 17 3) Pavement removal 18 4) Excavation 19 5) Hauling 20 6) Disposal of excess materials 21 7) Furnishing, placement and compaction of backfill 22 8) Clean-up 23 4. Storm Sewer Junction Structure Removal 24 a. Measurement 25 1) Measurement for this Item will be per each storm sewer junction structure 26 being removed. 27 b. Payment 28 1) The work performed and materials furnished in accordance with this Item 29 and measured as provided under "Measurement" shall be paid for at the 30 lump sum bid per each "Remove Storm Junction Structure" location. 31 c. The price bid shall include: 32 1) Removal and disposal of junction structure 33 2) Removal, salvage and delivery of frame and cover to City, if applicable 34 3) Pavement removal 35 4) Excavation 36 5) Hauling 37 6) Disposal of excess materials 38 7) Furnishing, placement and compaction of backfill 39 8) Clean-up 40 5. Storm Sewer Inlet Removal 41 a. Measurement 42 1) Measurement for this Item will be per each storm sewer inlet to be 43 removed. 44 b. Payment 45 1) The work performed and materials furnished in accordance with this Item 46 and measured as provided under "Measurement" shall be paid for at the 47 unit price bid per each "Remove Storm Inlet" for: 48 a) Various types 49 b) Various sizes CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 10336I M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 0241 14 - 10 UTILITY REMOVAUABANDONMENT Page 10 of 17 c. The price bid shall include: 1) Removal and disposal of inlet 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 6. Storm Sewer Junction Box Removal a. Measurement 1) Measurement for this Item shall be per linear foot of existing storm sewer box to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Storm Junction Box" for all sizes. c. The price bid shall include: 1) Removal and disposal of Storm Sewer Box 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 7. Headwall/SET Removal a. Measurement 1) Measurement for this Item will be per each headwall or safety end treatment (SET) to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per each "Remove Headwall/SET". c. The price bid shall include: 1) Removal and disposal of Headwall/SET 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 8. Trench Drain Removal a. Measurement 1) Measurement for this Item shall be per linear foot of storm sewer trench drain to be removed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" shall be paid for at the unit price bid per linear foot of "Remove Trench Drain' for: a) Various sizes CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 Pin PQ do M 4, OR i as M MW w rr so 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 0241 14 - 11 UTILITY REMOVAUABANDONMENT Page 11 of 17 c. The price bid shall include: 1) Removal and disposal of storm sewer line 2) Pavement removal 3) Excavation 4) Hauling 5) Disposal of excess materials 6) Furnishing, placement and compaction of backfill 7) Clean-up 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Contact Inspector and the Water Department Field Operation Storage Yard for coordinationofsalvage material return. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Protect and salvage all materials such that no damage occurs during delivery to the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 Mh 0241 14 -12 UTILITY REMOVAIAABANDONMENT Page 12 of 17 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 5 2.2 MATERIALS 6 2.3 ACCESSORIES [NOT USED] 7 2.4 SOURCE QUALITY CONTROL [NOT USED] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 REMOVAL, SALVAGE, AND ABANDONMENT A. General 1. Manhole Abandonment a. All manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover as coordinated with City. d. Deliver salvaged material to the City. e. Cut and plug sewer lines to be abandoned. f. Backfill manhole void in accordance with City Standard Details. B. Water Lines and Appurtenances 1. Water Line Pressure Plugs a. Ductile Iron Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. b. PVC C900 and C905 Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug with an MJ Plug with mechanical restraint and blocking in accordance with Section 33 11 11. 3) Perform Cut and Plug in accordance with Section 33 12 25. c. Concrete Pressure Pipe, Bar Wrapped, Steel Cylinder Type Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10 2) Plug using: a) A fabricated plug restrained by welding or by a Snap Ring in accordance with Section 33 11 13; or CITY OF FORT WORTH W&SS Repl. Contract 2020 WSM-A STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 wh i M, i M mi ., r� M+ ..r ar �r 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 0241 14-13 UTILITY REMOVAUABANDONMENT Page 13 of 17 b) A blind flange in accordance with Section 33 11 13 3) Perform Cut and Plug in accordance with Section 33 12 25. d. Buried Steel Water Lines 1) Excavate, embed, and backfill in accordance with Section 33 05 10. 2) Plug using: a) A fabricated plug restrained by welding in accordance with Section 33 11 14; or b) A blind flange in accordance with Section 33 11 14 3) Perform Cut and Plug in accordance with Section 33 12 25. 2. Water Line Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Plug with CLSM in accordance with Section 03 34 13. 3. Water Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater from existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 4. Water Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. 5. Water Valve Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and dispose of valve bonnet, wedge and stem. c. Fill valve body with CLSM in accordance with Section 03 34 13. 6. Water Valve Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove valve bonnet, wedge and stem. c. Deliver salvaged material to the Water Department Field Operation Storage Yard. d. Protect salvaged materials from damage. e. Fill valve body with CLSM in accordance with Section 03 34 13. 7. Water Valve Abandonment a. Excavate and backfill in accordance with Section 33 05 10. b. Remove the top 2 feet of the valve stack and any valve extensions. c. Fill the remaining valve stack with CLSM in accordance with Section 03 34 13. 8. Fire Hydrant Removal and Salvage a. Excavate and backfill in accordance with Section 33 05 10. b. Remove Fire Hydrant. c. Place abandonment plug on fire hydrant lead line. d. Deliver salvaged fire hydrant to the Water Department Field Operation Storage Yard. e. Protect salvaged materials from damage. 9. Water Meter Removal and Salvage a. Remove and salvage water meter. b. Return salvaged meter to Project Representative. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 M R" 0241 14-14 UTILITY REMOVAUABANDONMENT Page 14 of 17 r 1 c. City will provide replacement meter for installation. 2 d. Meter Box and Lid 3 1) Remove and salvage cast iron meter box lid. 4 2) Remove and dispose of any non -cast iron meter box lid. 5 3) Return salvaged material to the Water Department Field Operation Storage 6 Yard. 7 4) Remove and dispose of meter box. 8 10. Water Sample Station Removal and Salvage 9 a. Remove and salvage existing water sample station. 10 b. Deliver salvaged material to the Water Department Field Operation Storage 11 Yard. 12 11. Concrete Water Vault Removal 13 a. Excavate and backfill in accordance with Section 33 05 10. 14 b. Remove and salvage vault lid. 15 c. Remove and salvage valves. 16 d. Remove and salvage meters. 17 e. Deliver salvaged material to the Water Department Field Operation Storage 18 Yard. 19 f. Remove and dispose of any piping or other appurtenances. 20 g. Demolish and remove entire concrete vault. 21 h. Dispose of all excess materials. 22 12. Cathodic Test Station Abandonment 23 a. Excavate and backfill in accordance with Section 33 05 10 24 b. Remove the top 2 feet of the cathodic test station stack and contents. 25 c. Fill any remaining voids with CLSM in accordance with Section 03 34 13. 26 C. Sanitary Sewer Lines and Appurtenances 27 1. Sanitary Sewer Line Abandonment Plug 28 a. Excavate and backfill in accordance with Section 33 05 10. 29 b. Remove and dispose of any sewage. 30 c. Plug with CLSM in accordance with Section 03 34 13. 31 2. Sanitary Sewer Line Abandonment by Grouting 32 a. Excavate and backfill in accordance with Section 33 05 10. 33 b. Dewater and dispose of any sewage from the existing line to be grouted. 34 c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 35 or CLSM in accordance with 03 34 13. 36 d. Dispose of any excess material. 37 e. Perform Coupon Inspections ofgrouted pipe to ensure entire line is filled with 38 grout. 39 f. Coupon samples shall be taken at the center of the abandoned section and at 50 40 foot increments both upstream and downstream from center until approved by 41 the Inspector and the Project Manager. 42 g. During the Final Inspection, all coupons will be provided to Field Operations 43 representatives for a visual inspection approval. 44 3. Sanitary Sewer Line Removal 45 a. Excavate and backfill in accordance with Section 33 05 10. 46 b. Cut existing line from the utility system prior to removal. 47 c. Cut any services prior to removal. 48 d. Remove existing pipe line and properly dispose as approved by City. CITY OF FORT WORTH W&SS Repl. Contract 2020 WSM-A ,,.;■ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 P+ i t. Mb om W man P" 4M v dw 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 0241 14 - 15 UTILITY REMOVALIABANDONMENT Page 15 of 17 4. Sanitary Sewer Manholes Removal a. All sanitary sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Remove and salvage manhole frame and cover. d. Deliver salvaged material to the Water Department Field Operation Storage. e. Demolish and remove entire concrete manhole. f. Cut and plug sewer lines to be abandoned. 5. Sanitary Sewer Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove and salvage manhole frame and cover. c. Deliver salvaged material to the Water Department Field Operation Storage. d. Demolish and remove entire concrete manhole. e. Cut and plug sewer lines to be abandoned. D. Storm Sewer Lines and Appurtenances 1. Storm Sewer Abandonment Plug a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater line. c. Plug with CLSM in accordance with Section 03 34 13. 2. Storm Sewer Line Abandonment by Grouting a. Excavate and backfill in accordance with Section 33 05 10. b. Dewater the existing line to be grouted. c. Fill line with Low Density Cellular Grout in accordance with Section 33 05 24 or CLSM in accordance with 03 34 13. d. Dispose of any excess material. 3. Storm Sewer Line Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipe line and properly dispose as approved by City. 4. Storm Sewer Manhole Removal a. All storm sewer manholes that are to be taken out of service are to be removed unless specifically requested and/or approved by City. b. Excavate and backfill in accordance with Section 33 05 10. c. Demolish and remove entire concrete manhole. d. Cut and plug storm sewer lines to be abandoned. 5. Storm Sewer Junction Box and/or Junction Structure Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete structure. c. Cut and plug storm sewer lines to be abandoned. 6. Storm Sewer Inlet Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. 7. Storm Sewer Box Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Cut existing line from the utility system prior to removal. c. Cut any services prior to removal. d. Remove existing pipe line and properly dispose as approved by City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Repl. Contract 2020 WSM-A CPN 103361 g1 M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 ri 0241 14 - 16 UTILITY REMOVALIABANDONMENT Page 16 of 17 8. Headwall/SET Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Demolish and remove entire concrete inlet. c. Cut and plug storm sewer lines to be abandoned. *w 9. Storm Sewer Trench Drain Removal a. Excavate and backfill in accordance with Section 33 05 10. b. Remove existing pipe line and dispose as approved by City. �,.. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] �r 3.7 FIELD [OR] SITE QUALITY CONTROL 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] is 3.13 MAINTENANCE [NOT USED) 3.14 ATTACHMENTS [NOT USED] ww 'W 60 om CITY OF FORT WORTH W&SS Repl. Contract 2020 WSM-A 0; STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CPN 103361 Revised December 20, 2012 .r 0241 14 - 17 UTILITY REMOVAUABANDONMENT Page 17 of 17 1 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 1.2.C.3.c. — Include Frame and Cover in Payment description 12/20/12 D. Johnson Throughout — added abandonment of storm and sewer manholes when requested and/or approved by City 08/15/19 H. Lundville Utility Grouting Changes 2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 W&SS Rep] Contract 2020 WSM-A CPN 103361 APPENDIX GC-4.02 Subsurface and Physical Conditions GC-6.06D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.24 Nondiscrimination GR-01 60 00 Product Requirements — Available online, not included herein GEN Temporary Right of Entry Document (go-by) GEN Easements GEN TPW/Water Dept 50/50 Participation Table GC-4.02 Subsurface and Physical Conditions VM FORTWORTH.. City of Fort Worth Capital Delivery Division/Soil Lab Phone: 817-392-7920 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 Laboratory Test Results for Cresthaven Terrace, Northwood Road, Ridgewood Road, and Englewood Lane Street Coring Project 09/30/2021 Project: CPN# 103362 Date Tested: 09/22/2021 — 09/24/2021 Requested by: Brenda Oropeza This report presents the results of street coring project for CPN #103362. Mr. Stephen Overton and Mr. Daniel Wright performed the cores, and Mr. Zelalem Arega reviewed and approved the results. r. Englewood Lane (Northwood Road to North Bailey Avenue) HOLE # 1 LOCATION: 3800 Englewood Lane (E/4) 2.00" HMAC �. 3.00" Base material (rock and sand) 11.00" Brown clayey sand with rock HOLE # 2 i LOCATION: 3828 Englewood Lane (W/4) I 2.00" HMAC I 11.00" Base material (rock and sand) 3.00" Brown clayey sand with rock (Non Plastic) Shrinkage %: 2.5 HOLE # 3 LOCATION: 860 Edgefield Road (N/4) i 2.00" HMAC 14.00" Brown clayey sand with rock _ HOLE #4 LOCATION: 833 Edgefield Road (S/4) .w I 2.00" HMAC 14.00" Base material (brown clayey sand with rock) i Page Iof5 i FORTWORTH . City of Fort Worth �, Capital Delivery Division/Soil Lab 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 HOLE #5 LOCATION: 808 Edgefield Road (N/4) 2.00" HMAC 14.00" Base material (brown clayey sand with rock) HOLE #6 LOCATION: 737 Edgefield Road (S/4) 2.00" HMAC 10.00" Base material (Red brown clayey sand with rock) 4.00" Yellowish brown clayey sand HOLE #7 LOCATION: 713 Edgefield Road (N/4) 2.00" MAC 6.00" Base material 2.00" HMAC 6.00" Red brown clayey sand with rock HOLE #8 LOCATION: 625 Edgefield Road (S/4) 2.50" HMAC 13.50" Base material (brown clayey sand with rock) HOLE #9 LOCATION: 3825 Sherwood Avenue (W/4) 2.75" HMAC 13.25" Brown/ Red brown clayey sand with rock HOLE # 10 LOCATION: 3705 Sherwood Avenue (E/4) 2.00" HMAC 2.00" Sand and rock 5.00" Dark brown clay with rock 7.00" Red brown clayey sand (LL- 28, PL- 15, PI- 13) Shrinkage %: 7.5 Phone: 817-392-7920 Page 2of5 dw .., A-h FORT WORTM, City of Fort Worth Capital Delivery Division/Soil Lab 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 Phone: 817-392-7920 Cresthaven Terrace (Rockwood Park Drive to North Bailey Avenue) I HOLE # 1 LOCATION: 3709 Cresthaven Terrace (E/4) 3.50" HMAC I 5.50" Brown/ Light brown clay with rock 6.00" Brown shaley clay (LL- 45, PL - 21, PI- 24) Shrinkage %: 10 HOLE #2 LOCATION: 3724 Cresthaven Terrace (W/4) 5.25" HMAC 1.75" Brown clayey sand with gravel 9.00" Greyish brown sandy clay (LL- 50, PIr 22, PI- 28) Shrinkage %: 10 Northwood Road (Rockwood Park Drive to Wildwood Road) HOLE # 1 LOCATION:1004 Northwood Road (S/4) 1.75" HMAC 8.25" Red brown/ Yellowish brown clay with rock 8.00" Dark brown/ brown sandy clay (LLr 32, PL - 19, PI- 13) Shrinkage %: 7.5 HOLE #2 LOCATION: 900 Northwood Road (N/4) 4.00" HMAC 6.00" Red brown/ Yellowish brown clay with rock 6.00" Brown sandy clay HOLE #3 LOCATION: 849 Northwood Road (S/4) 9.00" HMAC 7.00" Bmv . sandy clay — Page 3 of 5 FORT WORTH City of Fort Worth ��� Capital Delivery Division/Soil Lab Phone: 817-392-7920 ^"+ 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 HOLE #4 LOCATION: 828 Northwood Road (N/4) 3.00" HMAC ' 2.00" Brown clay with rock 4.00" Rock with WA brown clay 1.00" HMAC 3.00" Rock with light brown clay 1 HOLE #5 LOCATION: 805 Northwood Road (S/4) i i 3.00" HMAC 5.00" Brown/ Yellowish brown clay with rock 8.00" Brown sandy clay HOLE #6 LOCATION: 728 Northwood Road (N/4) 2.5 0" HMAC 2.00" Red brown clay with rock 3.50" Brown sandy clay with rock 8.00" Brown sandy clay i HOLE #7 LOCATION: 704 Northwood Road (S/4) 1.50" HMAC 5.50" Red brown clay with rock 9.00" Red brown clayey sand (LL- 29, PLr 17, PI- 12) Shrinkage %: 7.5 Ridgewood Road (Cresthaven Terrace to Crestwood Terrace) HOLE # 1 LOCATION: 304 Ridgewood Road (S/4) 2.50" HMAC 7.50" Brown/ Red brown sandy clay with rock 6.00" Red brown sandy clay (LL- 41, PLr 23, PI- 18) Shrinkage %:10 Page 4 of 5 FORT WORTH City al Fort Worth �. Capital Delivery Division/Soil Lab 8851 Camp Bowie Blvd #300 Fort Worth, TX 76116 HOLE #2 LOCATION: 323 Ridgewood Road (N/4) 3.2 5" HMAC 12.75" Red brown/ Brown clayey sand with rock HOLE #3 LOCATION: 408 Ridgewood Road (S/4) 2.75" HMAC 7.25" Red brown/ Brown sandy clay with rock 6.00" Red brown sandy clay HOLE #4 LOCATION: 430 Ridgewood Road (N/4) 2.5 0" HMAC 13.50" Red brown clayey sand with rock Phone:817-392-7920 Page 5 of 5 R N JEE N G a E f fz • Ir Client: City of Fort Worth/TPW Soil Lab 8851 Camp Bowie Boulevard Fort Worth, TX 76116 3201 NE Loop 820, S. 180, Fort Worth, TX 76137 8908 Ambassador Row, Dallas, TX 76247 Texas Engineering Finn Registration, No. F-1672 Corporate Phone: (214) 630-9746 Report of On Site Activities Report No.: 14372826 Project No.: 2126061 Date of Service: 02/01/2022 Report Date: 02/11/2022 Project: CPN 103361 Cores Jones & Carter Sewer PO-FW020-0000007089 Sewer FID 56002-0700430-5330500=103361-001784-9999 Services: On this date, a representative(s) of Rone Engineering Services, Ltd. arrived on site as scheduled to perform coring for depth and sampling. Technician: Ray Godfrey Started: 08:30am Finished: 04:15pm Rone Engineering Report Distribution: Ong: City of Fort Worth/TPW Soil Lab (Fort Worth, TX) Attn: Ms. Alicia Garcia (1-ec copy) 1-ec Rone Engineering Project Managers �. Attn: Mr. Steve Campbell Steve Campbell, CET Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (SC/SC) Page 1 of 9 Rone Engineering Services, Ltd. Project: Jones & Carter — Sewer CPN: 103361 / PO- 0000007089 / Water FID: 56002- 0700430-5330500-C 103361-0001784-9999 Rone Project No.: 2126061 Rone Report No.: 14372826 Date of Service: February 2022 Depth Checks — Coring On this date a representative of Rone Engineering Services, Ltd. arrived onsite, as scheduled, to perform Core Depth Checks. Please See Below for Locations and Results: Hole #1 Location: See attached map — 4" of Type C HMAC 5" of Flexbase 9" Light Brown Red Clay Stopped coring at 18" Hole #2 Location: See attached map 3.75" of Type C HMAC �- 5" of Flexbase, Atterburg Limits: LL=19, PL=13, PI=6 9.25" Light Brown Red Clay, Atterburg Limits: LL=39, PL=14, PI=25 Stopped coring at 18" Hole #3 Location: See attached map 1.5" of Type C HMAC 3.5" of Flexbase, Atterburg Limits: LL=24, PL=19, PI=5 M PM PO 13.0" Light Brown Red Clay, Atterburg Limits: LL=47, PL=17, PI=30 Stopped coring at 18" Hole #4 Location: See attached map .� 9" of Type C HMAC 5" of Flexbase MO 4" Light Brown Clay with Limestone Fragments Stopped coring at 18" rw Hole #5 MR Location: See attached map 4" of Type C HMAC 4" of Flexbase, Atterburg Limits: LL=29, PL=18, PI=11 10" Light Brown Clay with Limestone Fragments, Atterburg Limits: LL=44, PL=18, PI=26 Stopped coring at 18" Hole #6 Location: See attached map 2" of Type C HMAC 10" of Concrete, 5100psi .r 6" of Flexbase, Atterburg Limits: LL=15, PL=10, PI=5 Stopped coring at 18" Hole #7 Location: See attached map 5.75" of Type C HMAC 12.25" of Flexbase i Stopped coring at 18" M M dw r. Hole #8 Location: See attached map 5.5" of Type C HMAC -* 5" of Concrete, Untestable 7.5" of Flexbase, Atterburg Limits: LL=13, PL=10, PI=3 Stopped coring at 18" Hole #9 Location: See attached map 3.75" of Type C HMAC 10.5" of Flexbase 3.75" Brown Clay Stopped coring at 18" Hole #10 Location: See attached map 2.5" of Type C HMAC r, 11" of Flexbase, Atterburg Limits: LL=28, PL=16, PI=12 4.5" Brown Clay Stopped coring at 18" 4, Hole #11 Location: See attached map 2.5" of Type C HMAC 5" of Flexbase 10.5" Brown Clay Stopped coring at 18" LA Hole #12 Location: See attached map 3" of Type C HMAC 4" of Flexbase, Atterburg Limits: LL=25, PL=16, PI=9 11" Light Brown Red Clay, Atterburg Limits: LL=27, PL=9, PI=18 Stopped coring at 18" Hole #13 Location: See attached map = 2.5" of Type C HMAC 5.5" of Flexbase 10" Light Brown Red Clay Stopped coring at 18" Hole #14 Location: See attached map 5.25" of Type C HMAC 5" of Flexbase, Atterburg Limits: LL=24, PL=16, PI=8 7.5" Light Brown Red Clay, Atterburg Limits: LL=28, PL=7, PI=21 Stopped coring at 18" Hole #15 Location: See attached map 2" of Type C HMAC 6" of Flexbase 10" Light Brown Red Clay Stopped coring at 18" Hole #16 Location: See attached map 2.25" of Type C HMAC L 5.5" of Flexbase, Atterburg Limits: LL=25, PL=14, PI=11 10.25" Light Brown Red Clay, Atterburg Limits: LL=29, PL=12, PI=17 Stopped coring at 18" Hole #17 Location: See attached map 3.25" of Type C HMAC 6" of Flexbase 8.75" Light Brown Red Clay Stopped coring at 18" Hole #18 Location: See attached map 3.5" of Type C HMAC 5.75" of Flexbase 8.75" Brown Clay Stopped coring at 18" Hole #19 Location: See attached map 4.75" of Type C HMAC 6.25" of Flexbase, Atterburg Limits: LL=25, PL=17, PI=8 7" Light Brown Red Clay, Atterburg Limits: LL=29, PL=15, PI=14 Stopped coring at 18" Hole #20 Location: See attached map 2.75" of Type C HMAC 6" of Flexbase 9.25" Brown Clay do Stopped coring at 18" = Hole #21 Location: See attached map .. 4" of Type C HMAC 5" of Flexbase, Atterburg Limits: LL=26, PL=17, PI=9 ,. 9" Brown Clay, Atterburg Limits: LL=41, PL=15, PI=26 Stopped coring at 18" Hole #22 Location: See attached map 3" of Type C HMAC 5" of Flexbase 10" Brown Clay Stopped coring at 18" Hole #23 Location: See attached map 2.5" of Type C HMAC 5.5" of Flexbase, Atterburg Limits: LL=20, PL=13, PI=7 10" Brown Clay, Atterburg Limits: LL=31, PL=13, PI=18 Stopped coring at 18" Hole #24 Location: See attached map 2" of Type C HMAC 4.5" of Flexbase, Atterburg Limits: LL=25, PL=14, PI=11 11.5" Brown Clay, Atterburg Limits: LL=37, PL=14, PI=23 Stopped coring at 18" M .. Please see attached maps for plotted locations referenced above. qq M on we w i Ot am M do w �'� •� p'►�1 '+ '. c,,� 7-'� tom. •' ..cm Will' Ki 1 3 Lev, #6 f , .: '� acts ;. ,�r� '�, • ,t c ��'ra�.•;p.a� .�ix,.. I . tY�"F,'#. �+'.�� ,���, � _.1':ty>: i;, 4��tii=: 7S'',tal;u. i IC GC-6.061D Minority and Women Owned Business Enterprise Compliance W rr FORT WORTH, City of Fort Worth Business Equity Division INSTRUCTIONS TO BIDDERS ABOUT THE BUSINESS EQUITY GOAL Bid number: Business Equity Goal: 9 % It is the policy of the City of Fort Worth to ensure the full and equitable utilization of Business Equity Firms when appropriate, in the procurement of all goods and services. When a Business Equity Goal is established for a bid, it means that the City of Fort Worth believes that there are Business Equity Firms available that can provide goods or services requested by the bid. The Business Equity Goal for Bid number is 9 %. This means that the City believes that there are available Business Equity Firms that can provide goods or services required by this bid and therefore, 9 % of the Bidder's awarded amount must be spent with a Business Equity Firm. All requirements and regulations stated in the City's current Business Equitv Ordinance #25165-10-2021 apply to this bid. Definitions are at the end of this document. Because a Business Equity Goal has been established for this bid, in order for your bid to be considered, a Bidder must satisfv one (1) of the conditions below. A. Commit to Meet or Exceed the Business Equity Goal Hire Business Equity Firm(s) to provide goods or services and spend at least the goal amount with the Business Equity Firm(s). Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of Certified Firms Form" located at the City of Fort Worth's Business Equitv Division website. Step 2: Request bids from Business Equity Firms to provide goods or services at least 10 calendar days before bid opening. Step 3: Submit the following two (2) forms: a. Utilization Plan b. Letter(s) of Intent B. Prove a Good Faith Effort Show attempt to hire Business Equity Firms to meet or exceed the goal, but was unsuccessful. This can occur in two (2) ways: 1) Bidder proposes a smaller Goal Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of Certified Firms Form" located at the City of Fort Worth's Business Equitv Division website. Step 2: Request bids from Business Equity Firms to provide goods or services at least 10 calendar days before bid opening. Step 3: Submit the following three (3) forms: a. Utilization Plan b. Letter(s) of Intent c. Good Faith Effort 2) Bidder proposes a 0% Goal Step 1: Obtain a listing of Business Equity Firms by completing the "Request for Listing of Certified Firms Form" located at the City of Fort Worth's Business Equitv Division website. Step 2: Request bids from Business Equity Firms to provide goods or services at least 10 calendar days before bid opening. Step 3: If unsuccessful, submit Good Faith Effort Form. Please see Ordinance �20-370 (a) page for requirements of an acceptable Good Faith Effort. C. Prove that the Bidder Can Perform the Service and Provide all Materials on the Project as the Prime Contractor Bidder must show that the Bidder is providing all of the goods and services through their own company and that there are no goods or services provided by a third party or an affiliate. Bidder will not purchase any supplies or inventory from a third party. Step 1: Must submit Prime Contract Waiver Form r_ D. Create a Joint Venture with a Business Equity Firm At least one or both of the firms must be a Business Equity Firm Step 1: Must submit Joint Venture Form DEADLINE TO SUBMIT REQUIRED DOCUMENTS AND FORMS Bidders must submit sealed bids to be opened at the date, time, and place stated in the solicitation for the public opening of bids. Faxed copies will not be accepted. FREQUENTLY ASKED QUESTIONS 1. If I am Business Equity Firm, can I count my performance of the bid? Answer. A Business Equity Prime Contractor can count its self -performance towards meeting the Business Equity Goal for the assigned North American Industry Classification System (NAICS) commodity codes on its Minority Business Enterprise (MBE) or Women Business Enterprise (WBE) certification. 2. What if I am a Business Equity Firm, but I am unable to self perform all work or provide all of the goods under the bid, can I count my performance under the Bid? " Answer. If the Business Equity Prime cannot self -perform all of the work, it will be accountable for subcontracting with certified firms to meet the overall goal. Business Equity Firms that qualify under the "Significant Business Presence" definition may count in the Program upon approval of DVIN-BE. 3. This bid does not have a set amount that the City will purchase from the Awarded Bidder, how do I complete the form? Answers: a. For a low bid procurement, the lowest bidder shall submit a Utilization Plan no later than 2:00 PM on the third business day after bids are opened detailing all Subcontractors the Contractor intends to utilize in its performance of a Contract. Contractors that are Business Equity Firms may count their self -performed services towards meeting a Business Equity Goal. b. For a Best Value procurement, all bidders who wish to be considered for evaluation scoring shall submit a Utilization Plan by 2:00 PM on the third business day after the bids are opened detailing all Subcontractors the Contractor intends to utilize in its performance of a Contract. Contractors that are Business Equity Firms may count their self -performed services towards meeting a Business Equity Goal. — c. Non-compliance. If the lowest bidder for a low bid procurement or any bidder for a Best Value procurement does not timely submit its Utilization Plan with the required documents, that bidder will be deemed Non -Responsive. For a low bid procurement, the City will notify the next lowest - bidder who shall then submit a Utilization Plan with required documents no later than 2:00 PM on the third business day after the bidder receives notification. This process will be followed until a bidder submitting the required documents is selected. DEFINITIONS Business Equity Firm means an Independent Firm that is a Certified minority- and/or women -owned business enterprise (M/WBE) with a Significant Business Presence in the City's Marketplace. Business Equity Goal means a calculation prepared by the DVIN-BE that includes all the following factors: the detailed cost estimate of the work to be performed, or goods purchased; the 6-county Marketplace; the availability of Business Equity Firms and non -Business Equity Firms in the Marketplace determined ona Contract -by -Contract basis; and the subcontracting/supplier opportunities of each project. Certified means those firms identified by the North American Industry Classification System (NAICS) that have been determined to be a bona fide MBE or WBE by the North Central Texas Regional Certification Agency (NCTRCA), the Dallas/Fort Worth Minority Supplier Development Council (DFW /MSDC), Women's Business Council -SW (WBCS), Texas Department of Transportation (TxDOT) or another certifying agency that the DVIN-BE may deem appropriate and accepted by the City of Fort Worth. DVIN-BE means the City's Department of Diversity and Inclusion — Business Equity Division Good Faith Efforts means the actions undertaken by a Contractor and approved by DVIN-BE as described inthe Business Equity Ordinance WO-370 (g). Joint Venture means a business entity formed by two or more independent Persons for the purpose of pursuing a common objective, such as a prime contract. The resulting business entity has additional resources and capacity, enhancing its ability to compete for larger awards. A joint venture is generally characterized by shared ownership, shared returns and risks, and shared governance. In a joint venture, the prime managing partner holds 51 % or more interest in the business. Partner(s) hold less than 51 % interest but in most cases, not less than 20%. Marketplace means the geographic area as defined by the City's most current Disparity Study (i.e., Tarrant, Dallas, Denton, Johnson, Parker and Wise counties). Responsive means that a Person is compliant with the requirements of the Business Equity Ordinance. Significant Business Presence means a Person (1) which has its principal place of business located inside the Marketplace; (2) which has its principal place of business located outside the Marketplace but has been verified to be in existence for a minimum of 24 months and from which at least 20% of the business's workforce is based in the Marketplace; or (3) which has cumulative business receipts greater than $1,000,000 for work done in the Marketplace since January 1, 2013. Utilization Plan means the list of Business Equity Firms that a Contractor commits will be utilized to meet the Business Equity Goal for a specific project, the scopes of the work and the dollar values or the percentages of the work to be performed. VIOLATIONS AND SANCTIONS 1. Failure to comply with the City's Business Equity Ordinance will result in the bid being considered "Non -Responsive." 2. Failure to submit the required Business Equity forms and documentation will result in the bid being considered non -responsive and a "written warning" letter that may impact the Offeror's evaluation scoring on future City bid opportunities for up to 12 months, refer to Ordinance �20-373 on VIOLATIONS AND SANCTIONS for continued offenses or failures to comply. If you have any questions, contact Department of Diversity & Inclusion, Business Equity Division Email: DVIN—BE@fortworthtexas.gov I Phone: 817-392-2674 I i City of Fort Worth ATTACHMENT 1A FORT WORTH Business Equity Utilization Form Page 1 of Disadvantaged Business Enterprise Utilization Form (Applicable if Federally -Funded) PRIME/OFFEROR/OWNER COMPANY NAME: �+ �+ p + �+ //�� PROJECT NAME: Water & Sanitary Sewer Replacements Contract 2020 WSM—A PROJECT NUMBER: L BID DATE: City's Business Equity Goal: Offeror's Business Equity (or DBE) 103361 9/7/2023 (Check if addressing DBE Goal) 9 % Commitment: % Check all applicable boxes to describe ❑ Not Certified MBE ❑WBE DBE HUB ❑VOSB Section 3 Prime/Offeror/Owner's Classification: Certifying Agency: E-1 NCTRCA []D/FW MSDC []TX DOT r_]WBCS Other: Ethnicity: ❑African American Hispanic Caucasian 1-1 Asian ❑ Native American Gender: ❑Male []Female1-1 Non -Binary Definitions: Business Equity Firm: Certified MBE Minority Business Enterprise or WBE Women Business Enterprise DBE: Disadvantaged Business Enterprise HUB: Historically Under Utilized Business VOSB: Veteran Owned Small Business Section 3: Certified Housing Urban Development Vendors ALL BUSINESS EQUITY FIRMS MUST BE CERTIFIED BEFORE CONTRACT AWARD Failure to complete this form, in its entirety, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the Citv Proiect Manager if publicly bid or to the Developer if privately bid. The undersigned Prime/Offeror agrees to enter into a formal agreement with the Business Equity firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth (Exception: Developer oroiects). The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non -responsive to bid specifications. Business Equity firms listed toward meeting the project goal must be located in the City's marketplace at the time of bid or the business has a Significant Business Presence in the Marketplace. The marketplace is the Citv of Fort Worth includina portions of Denton. Parker. Wise. and all of Tarrant. Dallas. and Johnson counties. Certified means those Business Equity Firms, located within the Marketplace, that have been determined to be a bona -fide minority or women business enterprise by the North Central Texas Regional Certification Agency (NCTRCA), Dallas/Fort Worth Minority Supplier Development Council (D/FW MSDC) and Women's Business Council -Southwest (WBCS). If hauling services are utilized, the Prime/Offeror will be given credit as long as the Business Equity firm listed owns and operates at least one fully licensed and operational truck to be used on the contract. The Business Equity firms may lease trucks from another Business Equity firm, including Business Equity owner -operated, and receive full Business Equity credit. The Business Equity firm may lease trucks from non -Business Equity firms, including owner -operated, but will only receive credit for the fees and commissions earned by the Business Equity as outlined in the lease agreement. Federally -funded Projects (ONLY), Counting DBE Participation: If materials or supplies are obtained from a DBE manufacturer, count 100 percent of the cost of the materials or supplies towards the goal. If the materials or supplies are purchased from a DBE reaular dealer, count 60 percent of the cost of the materials and supplies toward the DBE goal. When materials or supplies are purchased from a DBE neither a manufacturer nor a reaular dealer. count the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies or fees or transportation charges for the delivery of the materials or supplies delivered to the job site. In all cases, the Prime/Offeror is responsible to identify the amounts to be used toward the committed DBE goal. Note: For DBE Goals, 60% of the services count towards the goal. Effective 01/01/2021 Updated 03/24/2022 FORT WORTH ATTACHMENT 1A Business Equity Utilization Form Page 2 of 19 Please note that only certified Business Equity firms will be counted to meet the Business Equity goal. Prime/Offerors are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Business Equity firms and non -Business Equity firms. Prime/Offerors must identify by tier level all subcontractors/suppliers. Tier: means the level of , subcontracting below the Prime/Offeror i.e. a direct payment from the Prime/Offeror to a subcontractor is considered 1st tier, a payment by a subcontractor to its supplier is considered 2nd tier. Business Equity firms are to be listed before non -Business Equity firms. The Prime/Offeror is responsible to provide proof of payment of all tiered sub-contractors/suppliers identified as a Business Equity firm and counting those dollars towards meeting the contract committed goal. Certified Business Equity Prime/Offeror Contractors counting their self -performance towards meeting the contract goal, must be certified within those NAICS commodity codes with a certifying agency acceptable by the City of Fort Worth. Certified Business Equity Prime/Offeror counting self -performing services towards the goal, the service(s) to be performed should be listed first on the Utilization form. Check this box F�if certified Prime Contractor services will be counting towards the Business Equity contracting goal. Please list services first below. Please list certified Business Equity firm names as listed on their certification, including DBA names. NAMES AND ADDRESSES OF TYPE OF SERVICES/SUPPLIES Specify Tier CONTRACTORS/SUPPLIERS PROVIDED NAICS Required) Certification Agency Gender and Ethnicity: ( q Name 1st Tier Business Name: Type of Service/Supplies: Certified By: Male ❑ Female ❑ Non -Binary Address: ,[:]D/FW MSDC African American E] Hispanic Phone: FINCTRCA Asian Email: NAICS Code: IDTXDOT �WBCS Contact Person: $ AMOUNT: Business Name: Type of Service/Supplies: Address: Phone: Email: Contact Person: Business Name: Address: Phone: Email: Contact Person: NAICS Code: $ AMOUNT: Caucasian ❑ Native American Certified By: ❑ Male ❑ Female Non -Binary EIDFW MSDC RNCTRCA African American Hispanic IITXDOT u �WBCS ❑Asian Other: Caucasian El Native American Type of Service/Supplies: Certified By: ❑ Male ❑ Female ❑ Non -Binary EIDFW MSDC RNCTRCA African American ❑ Hispanic NAICS Code: RTXDOT ❑WBCS ❑ Asian Other: R Caucasian Native $ AMOUNT: American Effective 01/01/2021 Updated 03/24/2022 FORT WORTH ATTACHMENT IA Page 3 of 4 Business E ui Utilization Form Please include multiple copies of this page if needed to list all contractors and suppliers. NAMES AND ADDRESSES OF TYPE OF SERVICES/SUPPLIES Specify Tier CONTRACTORS/SUPPLIERS PROVIDED (NAICS Required) Name 1st Tier Certification Agency Gender and Ethnicity: Business Name: Type of Service/Supplies: Certified By: ❑Male ❑Female ❑Non -Binary Address: ❑D/FW MSDC ❑African American ❑Hispanic ❑NCTRCA Phone: NAICS Code: H TXDOT ❑WBCS ❑Asian Email: Other: —]Caucasian ❑Native American Contact Person: Business Name: Address: Phone: Email: Contact Person: Business Name: Address: Phone: Email: Contact Person: Business Name: Address: Phone: Email: Contact Person: $ AMOUNT: Type of Service/Supplies: NAICS Code: $ AMOUNT: Type of Service/Supplies: NAICS Code: $ AMOUNT: Type of Service/Supplies: NAICS Code: $ AMOUNT: Certified By: ❑ Male ❑Female ❑Non -Binary ❑DFW MSDC ❑African American []Hispanic❑NCTRCA ❑TXDOT ❑WBCS ❑Asian ❑Other ❑Caucasian ❑Native American Certified By: I ❑ Male ❑Female ❑Non -Binary ❑DFW MSDC ❑❑NCTRCA African American ❑Hispanic ❑TXDOT ❑WBCS ❑Asian ❑Other: ❑Caucasian —]Native American Certified By: ❑ Male ❑ Female ❑ Non -Binary ]DFW MSDC ]NCTRCA ❑African American ❑Hispanic ]TXDOT ❑WBCS ❑Asian Other: ❑Caucasian ❑Native American Effective 01/01/2021 Updated 03/24/2022 Fo_ WORTH Business Equity Utilization Form Total Dollar Amount of Certified Prime/Offeror Services towards contract goal $ Total Dollar Amount of Business Equity (or DBE if applicable) Subcontractors/Suppliers $ Total Dollar Amount of Non -Business Equity Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF CERTIFIED PRIME/ALL SUBCONTRACTORS/SUPPLIERS $ ATTACHMENT1A Page 4 of 4 The Prime/Offeror will not make additions, deletions, or substitutions to this certified list without the prior approval of the Business Equity Division through the submittal of a Request for Approval of Change/Addition online. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The Prime/Offeror shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed Business Equity goal. If the detail explanation is not submitted, it will affect the final compliance determination. By affixing a signature to this form, the Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including non -Business Equity firms. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The Prime/Offeror agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the Business Equity firms on this contract, by an authorized officer or employee of the City. A Prime/Offerer who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Authorized Signature Title Company Name Address City/State/Zip Code Department of Diversity and Inclusion - Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Ph: 817-392-2674 Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Effective 01/01/2021 Updated 03/24/2022 ATTACHMENT 1B FORT WORTH Page 1 of 1 .. City of Fort Worth Business Equity (M/WBE) Specifications Prime Contractor Waiver Form OFFEROR COMPANY NAME: Check applicable block to describe Prime PROJECT NAME: Water & Sanitary Sewer Replacement Contract 2020 WSM-A Part 1 BID DATE 9/7/2023 City's MBE Project Goal: Offeror's MBE Project Commitment: PROJECT NUMBER 9 Rio % 103361 If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if bDih answers are yes. _ Failure to complete this form in its entirety and be received by the Pufchasinp Division no later than 2:00 p.m., on the second City business day after bid opening, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including certified M/WBE(s) on this contract, the payment thereof and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract and may result in a determination of an irresponsible Offeror and barred from participatinq in City work for a period of time not less than one (1) year. Authorized Signature Title Company Name Address City/State/Zip Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name (if different) Phone Number Fax Number Email Address Date Rev. 3/1312022 FORT WORTH. City of Fort Worth ATTACHMENT 1C Business Equity Division Pagel of 4 . Good Faith Effort Form PRIME/OFFEROR Check applicable box to describe COMPANY NAME: Prime/Offeror's Certification Non -Business - PROJECT NAME: Equity Firm Water & Sanitary Sewer Replacement Contract 2020 WSM-A Part 1 BID DATE 9/7/2023 Business Equity Goal: Offeror's Business Equity Goal Commitment: PROJECT NUMBER 9 0�, Rio 103361 If the Offeror did not meet or exceed the Business Equity Goal for this project, the Prime/Offeror must complete this form. an If the Prime/Offeror's method of compliance with the Business Equity Goal is based upon demonstration of a "Good Faith Effort", the Prime/Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 10 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Prime/Offeror. Failure to complete this form, in its entirety with supporting documentation, and received by the Purchasing Division no later than 2:00 p.m. on the third City business day after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. Exception: CFA, ICA, and CDBG projects, documents will be submitted to the City Project Manager if publicly bid or to the Developer if privately bid. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a Business Equity firm or non -Business Equity firm. (DO NOT LIST NAMES OF FIRMS). On all projects, the Prime/Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Effective 03/15/2022 ATTACHMENT 1C Page 2 of 4 2.) Obtain a current (not more than two (2) months old from the bid open date) list of Business Equity subcontractors and/or suppliers from the City's Business Equity Division. 11 Yes ❑ No Date of Listing 3.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? ❑ Yes (If yes, attach list to include name of Business Equity firm, person contacted, phone number and date and time of contact.) El No 4.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by fax, exclusive of the day the bids are opened? Yes (If yes, attach list to include name of Business Equity firm, fax number and date and time of contact In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" documentation may render the No GFE non -responsive.) 5.) Did you solicit bids from Business Equity firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? ❑ Yes (If yes, attach email confirmation to include name of Business Equity firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" No documentation may render the GFE non -responsive.) NOTE: The three methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Prime/Offeror must document that either at least two attempts were made using two of the three methods or that at least one successful contact was made using one of the three methods in order to deemed responsive to the Good Faith Effort requirement. NOTE: The Prime/Offeror must contact the entire Business Equity list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 thru S. 6.) Did you provide plans and specifications to potential Business Equity firms? ❑ Yes ❑ No 7.) Did you provide the information regarding the location of plans and specifications in order to assist the Business Equity firms? Yes No Effective 03/15/2022 ATTACHMENT IC Page 3 of 4 8.) Did you prepare a quotation for the Business Equity firms to bid on goods/services specific to their skill set? ❑ Yes (If yes, attach all copies of quotations.) ❑ No 9.) Was the contact information on any of the listings not valid? ❑ Yes (If yes, attach the information that was not valid in order for the Business Equity Division to address the corrections needed.) ❑ No 10.) Submit documentation if Business Equity firms quotes were rejected. The documentation submitted should be in the firms forms of an affidavit, include a detailed explanation of why the Business Equity firms was rejected and any supporting documentation the Prime/Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Prime/Offeror will provide for confidential in -camera access to an inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain Business Equity firm participation on this project. The Prime/Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Prime/Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. A Prime/Offeror who intentionally and/or knowingly misrepresents material facts shall be Debarred for a period of time of not less than three (3) years. Effective 03/15/2022 ATTACHMENT1C Page 4 of 4 The undersigned certifies that the information provided and the Business Equity firms listed was/were contacted in good faith. It is understood that any Business Equity firms listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's Business Equity Division. Authorized Signature Title Company Name Address City/State/Zip Business Equity Division Email: DVIN_BEOffice@fortworthtexas.gov Phone: (817) 392-2674 Printed Signature Contact Name and Title (if different) Phone Number Email Address Date Effective 0311512022 - - Joint Venture Page 1 of 3 FORT WORTH CITY OF FORT WORTH MBE Joint Venture Eligibilitv Form All questions must be answered; use "N/A" ijnot applicable. Name of City project: Water & Sanitary Sewer Replacement Contract 2020 WSM-A Part 1 A joint venture form must be completed on rmh project RFPBld/Project Number: CPN 103361 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail Cellular: Identify the firms that comprise the joint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be perfomred by each Bryn comprising the joint venture MBE firm ( Non -MBE firm name: name: Business Address: Business Address: City, State, Zip: City, State, Zip: Telephone E-mail Telephone E-mail Cellular Facsimile Cellular Facsimile Certification Status: Name of Certifying Agency: 2. Scope of work performed by the Joint Venture: Describe the scope of work of the MBE: Describe the scope of work of the non -MBE: Rev. 5/15/19 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete if this information is described in joint venture agreement) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating f - -------------------I b. Marketing and Sales --- - -- ------------------------ - - c. Hiring and Firing of management personnel --------------------------------------- d. Purchasing of major equipment and/or supplies Supervision of field operations The City's Office of Business Diversity will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amountstpercentages change from the originally approved information, then the participants must inform the City's Office of Business Diversity immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. W+ GM .hb Rev. 5/15/19 ...w Joint Venture Paqe 3 of 3 AFFIDAVIT The undersigned affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision -making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersigned agree to permit audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false statements or willful misre-presentation of facts. Name of MBE firm Name of non -MBE firm Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of County of On this day of , 20 , before me appeared and to me personally known and who, being duly sworn, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires (sea!) Office of Business Diversity Email: mwbeoffice@fortworthtexas.gov Phone: (817) 392-2674 Rev. 5/15/19 GC-6.07 Wage Rates 2013 PREVAILING WAGE RATES - (Heavy and Highway Construction Projects) CLASSIFICATION DESCRIPTION Wage Rate _ Asphalt Distributor Operator $ 15.32 Asphalt Paving Machine Operator $ 13.99 Asphalt Raker $ 12.69 Broom or Sweeper Operator $ 11.74 Concrete Finisher, Paving and Structures $ 14.12 Concrete Pavement Finishing Machine Operator $ 16.05 Concrete Saw Operator $ 14.48 ` Crane Operator, Hydraulic 80 tons or less $ 18.12 Crane Operator, Lattice Boom 80 Tons or Less $ 17.27 Crane Operator, Lattice Boom Over 80 Tons $ 20.52 Crawler Tractor Operator $ 14.07 Electrician $ 19.80 Excavator Operator, 50,000 pounds or less $ 17.19 _ Excavator Operator, Over 50,000 pounds $ 16.99 Flagger $ 10.06 Form Builder/Setter, Structures $ 13.84 Form Setter, Paving & Curb $ 13.16 Foundation Drill Operator, Crawler Mounted $ 17.99 Foundation Drill Operator, Truck Mounted $ 21.07 Front End Loader Operator, 3 CY or Less $ 13.69 Front End Loader Operator, Over 3 CY $ 14.72 Laborer, Common $ 10.72 Laborer, Utility $ 12.32 �. Loader/Backhoe Operator $ 15.18 Mechanic $ 17.68 Milling Machine Operator $ 14.32 _ Motor Grader Operator, Fine Grade $ 17.19 Motor Grader Operator, Rough $ 16.02 Off Road Hauler $ 12.25 Pavement Marking Machine Operator $ 13.63 Pipelayer $ 13.24 Reclaimer/Pulverizer Operator $ 11.01 Reinforcing Steel Worker $ 16.18 Roller Operator, Asphalt $ 13.08 Roller Operator, Other $ 11.51 Scraper Operator $ 12.96 Servicer $ 14.58 Small Slipform Machine Operator $ 15.96 Spreader Box Operator $ 14.73 Truck Driver Lowboy -Float $ 16.24 Truck Driver Transit -Mix $ 14.14 Truck Driver, Single Axle $ 12.31 Truck Driver, Single or Tandem Axle Dump Truck $ 12.62 Truck Driver, Tandem Axle Tractor with Semi Trailer $ 12.86 Welder $ 14.84 Work Zone Barricade Servicer $ 11.68 The Davis -Bacon Act prevailing wage rates shown for Heavy and Highway construction projects were determined by the United States Department of Labor and current as of September 2013. The titles and descriptions for the classifications listed are detailed in the AGC of Texas' Standard Job Classifications and Descriptions for Highway, Heavy, Utilities, and Industrial Construction in Texas. Page 1 of 1 t W. qw GC-6.24 Nondiscrimination GEN Temporary Right of Entry Document (go-by) «City Project —Number and Project Name» Parcel # «Parcel Number>> << Property_Street Number>> «Property_Street_Name>> Lot -«Lot Number», Blk- «Block Number», «Addition_Nameo CITY OF FORT WORTH TEMPORARY RIGHT OF ENTRY STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT § That the undersigned, hereinafter referred to as "Grantor", does by these presents grant and convey to the City of Fort Worth, TX, herein after referred to as "Grantee" a i temporary right of entry onto property described as Block Lot_, Addition as shown on the deed recorded in Volume Page Tarrant County Deed Records and plat recorded in Cabinet Slide Page . Tarrant County Plat Records a/k/a , Fort Worth, Tarrant County, Texas, hereinafter referred to as the "Property", for the purpose of . Upon execution of this agreement, Grantor will grant Grantee and its contractor's access to the Property for the purpose stated herein, until such time as the project is completed and approved by the Grantee, at which time the above described temporary right of entry becomes void. .. This Right of Entry shall include the right of Grantee and its employees, agents, representatives, or contractors to access the aforementioned property. TO HAVE AND TO HOLD the above described right of entry, together with all and singular, the rights and appurtenances thereto, anywise belonging unto the said Grantee, is successors and assigns, for the purposes set forth above. Grantee shall restore the Property to the condition it was in immediately prior to accessing the Property under this Right of Entry. EXECUTED this the day of . 20_. M GRANTOR: (Please Print) (Signature) (Authorized Title) EM TEMPORARY RIGHT OF ENTRY Rev. 10/1/17 Foe1 H. ... GEN Easement Documents 608 Westwood 824 Edgefield 824 Springbrook 828 Springbrook 836 Edgefield (Unofficial 840 Springbrook 848 Edgefield 852 Edgefield 856 Edgefield 860 Edgefield (Unofficial) D223021382 02/09/2023 02:40 PM Page: 1 of 6 Fee: $39.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records —W� MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMA77ON FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 14 SSE 608 Westwood Ave. Fort Worth, TX 76107 t CRESTWOOD ADDITION Block 14 Lot 3 A� AMO TIT ` E C0&JPA1 y STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: 10 fxi /,'&) Aa- GRANTOR: Kathy R. Kelly, a single woman GRANTOR'S MAILING ADDRESS (including County): 608 WESTWOOD AVE. FORT WORTH, TARRANT COUNTY, TX, 76107 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILITY EASEMENT Rev. 20220420 D223021382 Page 2 of 6 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to maintain the permanent building structure existing at the time this Easement is granted and to install and maintain surface improvements such as a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the permanent building structure existing at the time this Easement is granted and the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any fences, sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 101' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever, and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FAQUTY EASEMENT Fosr Wo Rev.2M 420 I 40 D223021382 Page 3 of 6 GRANTOR: Kathy R Kelly, a single woman By: (PrintName) i,u-1 (Title) ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Kathv R Kellv, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Kathv R Kelly and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated.. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of iadq Z Z- __ ."A[) �pnY Aoe AUSTEN LOPES Noftry T�ofTOM No ry ublic, Stat Texas ty }� NoUry ID #13389695.0 Name (printed): ,or C=�Exl).AUG. 08, 2021 Notary's commission expires: SEWER FACUTY EASEMENT FQPWORTH. Rev. 20220420 D223021382 Page 4of6 ACCEPTED BY: GRANTEE: City of Fort Worth nano. aura6rd By (Signature): °anD ghdotfIN- Li,2D 1&56 CST) (Print Name) Dana Burghdoff (Tide) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): ✓� (Print Name) Matt Murray (Title) Assistant City Attorney ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notes Public •n an for the State of Texas, on this day personally appeared Paw 15 Ar � 0 SS►s-�tz r,f ry �6 Matnogef - of the Citj�of Fort Worth, a Texas home rule municipal corporation, known toffie to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of73-int r 3 20 IsEAL1 ���� Notary Public, State o Texas M �,, Name (printed): C/4' � Ay p�� �0�� Notary`s commission expires: 0 7 2 D22 SEWER FACILITY EASEMENT T�. Rev. 20220420 i WN r w D223021382 Page 5 of 6 EXHIBIT 'A if 4'WIDES4AYTARYSE0EREASENEAT 464SpF7OR o.orrACRESOFLAAD JOHNP. THOMA SSLW VEY, ABS7RACT1525 1 G LOT3, BLOCA-J4 CRESTGIWOODAD-MYON O � ' tt 6 YOFFORT WORTH, TARRAA7TCOU=TATAS \ 3 0 ; CII4- Op Of ro 8' UTILRY EASEMENT LOT 23, BLOCK 14 G VOL. 1544, PG. 209 \ \ \ CRESTWOOD ADDITION S IRF 'cs LOT 4 CAB• 388-B, SLIDE 167 5� BLOCK 14 P. R. T. C. T \ \ P.R. T.C. T. Ai N C\ RESTWOOD ADDITION N 72' 34'5T E OPOE4.07 VOL. 1544, PG. 209 pRAYRBNP.R.TC.T. 5ANJJJCMENUME \ pRRAATE IN S L2 \ \ \ LOT 24 POB L3 \ 1 112 IRF \ \ \ ��N P 11 AS o L4 4' WIDE SANITARY \\ \ } 0 SEWER EASEMENT \ \ ABS�C� 4 464 SQUARE FEET Cn \N OR 0.011 ACRES BLOCK 14 e o o \ D210078335 VORLS 988-8 ADDITION 155� Kelly Kathy R LOT 3 P. R.T.C.T. o oo O P J \ \ \ LINE TABLE .1 t5 b LOT 25 �� �*� �L 1 \ \ LINE # BEARING LENGTH Ll N72'34'5rE 115.88' �t(? 8' UTILITY EASEMENTIpF VOL. 388-8, PG. 155 L2 S17'23'23'E 4.00' < P.R. T.C.T. \ \ \ T L3 S72'34'67"W 115.88' c i \ \ \ L4 N 17'23'23" 1N 4.00' LOT 2 \ \ \ 0 N \ 0 40 80 u� LEGEND: POB POINT OF BEGINNING I 3 Poe POINT of COMMENCING GRAPHIC SCALE IN FEET wF IRON Roo FOUND \ LOT 1 ' PRT.C.T. L TMRD RECORDS. TARRANT ' INGH # t. LEGAL DESCRIPTION OF EVEN DATE , I O OIO� I-`vAS N ADCOMPANIES MMS EASDAW DRAWING. f� V'I� 2. BEARGS REFERENCED TO THE MLAS ✓ yv`G�r Y�' 1 Q NORTH PLANESTATE COORDINATE ZONE. HAD V. iu �V 0 Saog BC P4% . ' OE.. U DISTANCES ARE GROUND DISTANCES. 1" � ST "q Q Y • � G o ROBERT P. ALLEN SHIELD � SUV, , w '�'- r �O'uR'� La ENGINEERING GROUP ri ROBERT P. ALLEN 13 Iq® R.P.L.S. No.6495 THPE FIRM OF-11039 - TBLS FIRM #10193890 DATED: 05-06-2022 1600 West 7th Street, SuMe 400. Fort Worth, TX 79102 • 817.81 D.0698 ......I ..,,.�.......... .... . . ........... . D223021382 Page 6 of 6 EXHIBIT T II 4' WOESAAMARYSEWER F4SE.MEAT 464SQfiT0R o.oxzACRE50FF4NW J01BVP. 7NOMASSVRW ABSTRAM525 LOTS, BLOCKxSy CRESYWOODADDI770N =OFFORTWOR772; TARR AFF6VZWJYTF.XAS BEING A TRACT OF LAND SITUATED IN THE JOHN P. THOMAS SURVEY, ABSTRACT NUMBER 1525, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 3, BLOCK 14, CESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 388-8, PAGE 155, PLAT RECORDS, TARRANT COUNTY, TEXAS, (P.R,T.C.T.) AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: BEGINNING AT A 1/2-INCH IRON ROD FOUND FOR THE NORTHWEST CORNER OF THE SAID LOT 3 AND BEING IN COMMON WITH THE SOUTHWEST CORNER OF LOT 4, BLOCK 14, CESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 1544, PAGE 209, (P.R.T.C.T.), ALSO BEING IN THE EAST RIGHT-OF-WAY LINE OF WESTWOOD AVENUE (A 50 FOOT RIGHT-OF-WAY);. THENCE NORTH 72'34'57- EAST, WITH THE SOUTH LINE OF THE SAID LOT 4 AND BEING IN COMMON WITH THE NORTH LINE OF THE SAID LOT 3, A DISTANCE OF 115.88 FEET TO A POINT FOR CORNER; THENCE OVER AND ACROSS THE SAID LOT 3, THE FOLLOWING COURSES AND DISTANCES; SOUTH 17-23'23" EAST, A DISTANCE OF 4.00 FEET TO A POINT FOR CORNER; SOUTH 72-34'57" WEST, A DISTANCE OF 115.88 FEET TO A POINT FOR CORNER IN THE WEST LINE OF THE SAID LOT 3 AND BEING IN COMMON WITH THE EAST RIGHT OF WAY LINE OF THE SAID WESTWOOD AVENUE, FROM WHICH A 1 INCH IRON PIPE FOUND FOR THE SOUTHWEST CORNER OF THE SAID LOT 3 BEARS SOUTH 17"23'23" EAST, A DISTANCE OF 86.11 FEET; THENCE NORTH 17"23 23" WEST, WITH THE WEST LINE OF THE SAID LOT 3 AND THE EAST RIGHT-OF-WAY LINE OF THE SAID WESTWOOD AVENUE, A DISTANCE OF 4.00 FEET TO THE POINT OF BEGINNING, AND CONTAINING 464 SQUARE FEET OR 0.011 ACRES OF LAND. NOTES: 1. EASE" DRAWING OF EVEN DATE ACCOMPANES THIS I EGA, DESCRIPTION. 2. BEARINGS REFERENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONC NAD '53. ALL DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TOPE FIRM OF-11039 • TIBLS FIRM *10193690 1 SOD Wevt 7th Strut, SuNe 40D, Fort Worth, TX 76102 • 817.810.0696 ROBE:RT P. ALLEN R.P.L.S. No. 6495 DATED: 05-06-2022 15 T f;Q 9S A cep ................... ROBERT P. ZLEN � :Q, 6495 FSUR Q v� D223069947 04/26/2023 09:45 AM Page: 1 of 7 Fee: $43.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records r MARY LOUISE NICHOLSON COUNTYCLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU ARE A NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 2 SSE 824 Edgefleld Rd. Fort Worth Tx 76107 CRESTWOOD ADDITION Block 22 Lot 7 T STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: 10 11\ 111 GRANTOR: CHARLES DAVID PARRISH, AN UNMARRIED PERSON AND CAROLINE LOUISE HEDRICK, AN UNMARRIED PERSON t GRANTOR'S MAILING ADDRESS (including County): 824 Edgefield Rd. Fort Worth, Tarrant County, TX, 76107 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described In the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to SEWER FACILITY EASEMENT ` Rev.20220420 D223069947 Page 2 of 7 manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to install and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation cf the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 101' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever; and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument, When the context requires, , singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT Rev. 20220420 For, D223069947 Page 3 of 7 GRANTOR: CHARLES DAVID PARRISH, AN UNMARRIED PERSON AND CAROLINE LOUISE HEDRICK, AN UNMARRIED PERSON By: (Print Name) (Title) Vol *N�— y j ,ram (Print Name) C�o \a l���i) ck, (Title) ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Caroline Louise Hedrick, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Caroline Louise Hedrick and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated. T GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of 10 +r / 1i 22 mEn TEN U ubfio6LtOt of Texas N&A_ * ryTenviCounty 2NotaryEState,lexask—, q +° Notary ID 03389895-0 Name (printed): Exp' AUG. 08' 2028 Notary's commission expires: n SEWER FACILITY EASEMENT F—UH Rev. 20220420 1 D223069947 Page 4 of 7 ACKNOWLEDGEMENT STATE OF TEXAS § i COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Charles David Parrish, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Charles David Parrish and that they executed the same as the act of said _ individual for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of�, AUSTEN LOPES Notary Publio-. t,, of Texas Tertant County Noleyublic, Stated Texas Notary ID #13389895-0 Name (printed): f + Canur"m Exp. AUG. 08, 2026 Notary's commission expires: SEWER FACILITY EASEMENT F0H' Rev. 20220420 'r` D223069947 Page 5 of 7 ACCEPTED BY: GRANTEE: City of Fort Worth o M gist hd By (Signature). >scvr, (Print Name) Dana Burghdoff (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): —4":r (Print Name) Matt Murray (title) Assistant City Attorney ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, Notary Publi in and f r the State of Texas, on this day personally appeared �artaI q.�r of the City of �ort�Texas home rule murnc� ip l corporation, kn n to me t bd a the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and In the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of [SEAQ r.� AUSTEN LOPES Notary Public, gq-'of2as " ro Notary Publio, tS of TOX" Name (printed): Tartant County Notary's commission expires: Notary ID 0133898954 f'rFof comr*alon EV. AU(3, 08, 2= $EftR FACIUYY EAWmENT Rev. 2022U20 D223069947 Page 6 of 7 .EXHIBIT T rr rr' HTDESANITARYSEWERF_1SEMF.1VT 6r6SQFl0R o.or4ACRESOFLAND LOT7,, BLOCK22, CRESTWOO.IDADD.IT,ION FETERSCHOONOV RSURVEY,ABS7RACT-1405 =OFFORTWORTH, TARRAATC0Lnr YTEXfLS BEING A TRACT OF LAND SITUATED IN THE PETER SCHOONOVER SURVEY, ABSTRACT NUMBER 1405, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 7, BLOCK 22, CRESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 3WB, PAGE 159 AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT A 3/8-INCH IRON ROD FOUND FOR THE EAST CORNER OF LOT 24, OF THE SAID BLOCK 22 AND BEING COMMON WITH THE NORTH CORNER OF LOT25, OF THE SAID BLOCK 22, ALSO, BEING IN THE SOUTHWEST RIGHT OF WAY LINE OF SPRINGBROOK DRIVE (A 50 FOOT RIGHT OF WAY); THENCE SOUTH 57'38'18" WEST, WITH THE COMMON LINE OF THE SAID LOT 24 AND THE SAID LOT 25, A DISTANCE OF 120.03 FEETTO THE SOUTH CORNER OF THE SAID LOT 24 AND BEING IN COMMON WITH THE EAST CORNER OF THE SAID LOT 7; THENCE NORTH 32'21'42" WEST, WITH THE COMMON LINE OF THE SAID LOT 24 AND THE SAID LOT 7, A DISTANCE OF 60.00 FEET TO THE NORTH CORNER OF THE SAID LOT 7 AND BEING IN COMMON WITH THE WEST CORNER OF THE SAID LOT 24, ALSO, BEING THE EAST CORNER OF LOT 8, OF THE AFORESAID BLOCK 22; THENCE SOUTH 57'39'18" WEST, WITH THE COMMON LINE OF THE SAID LOT 7 AND THE SAID LOT 8, A DISTANCE OF 4.00 FEET TO THE POINT OF BEGINNING; THENCE OVER AND ACROSS THE SAID LOT 7, THE FOLLOWING COURSES AND DISTANCES: SOUTH 32'21'42" EAST, A DISTANCE OF 56.00 FEET TO A POINT FOR CORNER; SOUTH 57'37'18" WEST, A DISTANCE OF 11.00 FEET TO A POINT FOR CORNER; NORTH 32'21'42" WEST, A DISTANCE OF 56.01 FEET TO A POINT FOR CORNER IN THE NORTHWEST LINE OF THE SAID LOT 7 AND BEING IN THE SOUTHEAST LINE OF THE SAID LOT 8, FROM WHICH A 1-INCH IRON PIPE FOUND FOR THE SOUTH CORNER OF THE AFORESAID LOT 7 BEARS SOUTH 28'3514" WEST, A DISTANCE OF 123.65 FEET; THENCE NORTH 57'39'18" EAST, WITH THE COMMON LINE OF THE AFOREMENTIONED LOT 7 AND THE SAID LOT 8, A DISTANCE OF 11.00 FEET TO THE POINT OF BEGI NNING, AND CONTAINING 616 SQUARE FEET OR 0.014 ACRES OF LAND. NOTES: 1. EASEMENT DRAWING OF EVEN GATE ACCOMPANIES THIS LEGAL DESCRIPTION, 2. REARINGS REFERENCED TO THE TDfAS STATE PLANE COORDINATE SYSTEM, NORTH CENURAL ZONE, NAD '83. All. DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TBPE FIRM RF-11039 • TBLS FIRIM S 10193890 18DO Wert 7th Street, SuNe 400, FortWorth, TX 76102 • 817.010.0696 ROBERT P. ALLEN R.P.LS. No. 6495 DATED: 04-20-2022 E OT T � .�tvG � RFa • J' ................. ROBERT P. ALLEN ..................... 6495 D223069947 Page 7 of 7 dft W.A EXHIBIT 'A " .a a' WIDESANITARYSEWER F. 4SEMEAT &6SQ.FTO.R o w4ACRESOFLAND LOT7 BLOCX22, CRESTWOODADDIHON PL72;R SCHOONOVER SURVEY,.ABMWACTx405 =OFFORTWORTH, TARRANTC Z,-'4 TEXAS \ \ \\ LOT 21 / tvt E, \ sc',;00 \ ?SJSRc"j& r "4 1405 rs \ LOT 22 ABS1�,C� LOT rO s��OQ \ / LOT 23 1 / PROPOSED 1 J' SANITARY SEWER BLOCK 22 EASEMENT BY CRESTWOOD ADDITION / SEPARATE INSTRUMENT VOL. 368-8, PG. 159 / \\\ \ P.R.T.C. T. \ LOT 9 / \ \ \ / LOT 24 \ \ \ 4.JRF 3s1a w G !RF \ / OV 11' WIDE SANITARY Q� \ / 0;a, \ SEWER EASEMENT 616 SQUARE FEET LOT 8 / \\ OR 0.014 ACRES /5gr��� �j% N 32'2f42' W / 3 f \ � ape• j\ 6D.00' / / / JOB. ��� O{� LOT 25 8' UTILITY EASEMENT LOT 7 \�VOL. 388—B, PG. 159 D219225826 LEGEND: \ Charles Parrish , / \ g• PROPOSED 11' \ LINE TABLE � Poe Pow of wmr4 G SANITARY SEWER \ \ \ Pot POINT OF COMMENCING EASEMENT BY \ � LINE # BEARING LENGTH 6aF PON Roo FOUND �SEPARATE INSTRUMENT \ • / \ • � L1 S32'21'42"E 56.00' IPF IRON PIPE FOUND NDTES: F cor s L2 S57°37'18"W 11.00' 1. LEGAL DESCRIPTION OF EVEN DATE " \P AOCOMPANES THIS EASEMENT DRAWING. •� / L3 N32°21'4M 56.01' 2. BEARINGS REFERENCED TO THE TE)(AS \ / STATE PLANE COORDINATE . � L4 N57°39'18"E 11.00' RTH NOCENTRAL ZONE— HAD '03.•e3. ALL DISTANCES ARE GROUND DISTANCES. 0 40 80 / / LOT 5 OF �'�,��1 ST�•R�.9J, GRAPHIC SCALE IN FEET ..................... .ROBERT P. ALLEN 6495 SHIELD f55k���0 ENGINEERING GROUP ROBERT P. ALLEN R.P.L.S. No. 6495 T13PF FIRM OF-11039 • TBLS FIRM #10193890 DATED_ 04-20-2022 1600 Wmt 71h Street, Such 400, Pat Worth, TX 76'102 • 817.810.0696 D223076869 05/04/2023 02:47 PM Page: 1 of 8 Fee: $47.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records ' MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS. IF YOU AREA NATURAL PERSON, YOU MAYREMOVE OR STRIKE ANY OR ALL OF THE FOLLOLWNG INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS. YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103361 Water and Sanitary Sewer Replacements, Contract 2020 WSM-A Services Parcel No. 'I SSE 824 Springbrook Dr. CRESTWOOD ADDITION Block 23 Lot 2 99 STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § CITY SEWER FAC�LI� E�AS1c 61 DATE: 2, 2-02�5 GRANTOR: Collin Ashworth and Lauran T. Ashworth GRANTOR'S MAILING ADDRESS (Including County): 824 SPRINGBROOK DRIVE FORT WORTH, TARRANT COUNTY, TX 76107 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (Including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described In the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, in$pection and repair of a Permanent Sewer Line Facility, hereafter referred to as °Faclk." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to SEWER FACLFrY EASEMENT ' Rov.20220420 D223076869 Page 2 of 8 manholes, manhole vents, lateral line connections, pipelines, and junction boxes In, upon, under and across a portion of the Easement Property, more fully described In Exhibit A and Exhibit B attached hereto and Incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, Inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property In any manner which Interferes in any material way or Is inconsistent with the rights granted hereunder, or (II) erect or permit to be erectedwfthin the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permlL However, Grantor shall be permitted to install and maintain a concre* asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and 'expense, Including the restoration of any sidewalks, driveways, or similar surface Improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace Irrigation systems or other improvements Installed In viblation of the provisions and intended use of this Easement Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 101" anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent domain, and the repurchase price will be the price the Grantee pays Grantor in this aoquisition. The person signing this document on behalf of the Grantor warrents that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and In the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee Is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever, and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend,'all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SeNEA FAMAY E4SFMENT Rev. 20220M FoRrWown W D223076869 Page 3 of 8 GRANTOR Collin Ashworth and Lauran T. Ashworth, (Print Name) �� l L'.� A � oa✓4- 1 (Title) ew— Ott L4, (Print Name) AAA (,AN r. ON W I or (Title) f11Mt QW&V ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT BEFORE ME, the undersigned authority, a Notary Public In and for the State of Texas, on thls day personally appeared __Lauran T. Ashworth , known to me to be the same person whose name is subscribed to the foregoing Instrument, and acknowledged to me that the same was the act of Lauran T. Ashworth and that they executed the same as the act of said [ndMduqLfor the purposes and consideration therein expressed and In the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of aQaa . law moo ANot.aPublic, CRYSTALAhiN HILdERT gotkry to #130600349 µy Cam"ission FjOrn State of Texas Name (printed): C,ryA4 r it I6e - sWmh 30, 20T4 I Notary's commission expires: 03I uI d n MW ER FACILITY EASEME T Rw. 20220420 D223076869 Page 4 of 8 ACKNOWLEDGEMENT STATE'OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Collin Ashworth ,known to me to be the same person whose name Is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Collin Ashworth and that they executed the some as the act of said Individual for the purposes and consideration therein expressed and in the rapacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of ia�l oal�aAa? IBM] TMV,� L►,► AMR Nota Public, Stale of Texas 49 ID 1#t3p6O1W_mlNlaR.Wk" Name (printed): s-hd Hlf6e�. rch 30, 202�4 Notary's commission expires: 03/3 #/a Oa� SEWER FACILITY EASEMENT Ray.20220420 RT1V0 TH. D223076869 Page 5 of 8 ACCEPTED BY: GRANTEE. City of Fort Worth By (Signature): Dana Burghdoff ( .2S.Z0 12:24CDT) (Print Name) Dana Burghdoff (-fie) Assistant City Manager APPROVED AS TO FORM AND LEGALITY .."4W -Xam By (Signature); (Print Name) Matt Murray (Thle) Assistant City Attorney ACKNOWLEDGEMENT STATE OF TEXAS § g COUNTY OF TARRANT § BEFORE ME, the undersigned authority a Notary Public In and for the State of Texas, on this day personally appeared Dana Krghdoff Assistant Citv Manaeer of the City of Fort Worth, a Texas home rule municipal corporation, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and canslderation therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of Apr 28, 2023 . (SEAL] YP SELENA ALA Notary Public + * STATE OF TEXAS Notary I.D. 132422528 My Comm. Exp, Mar, 31, 2024 SEWER FACLrrY EASEMENT Rev, 20220420 Selena Ala (Apr 28, 202314:29 CDT) Notary Public, State of Texas Name (printed): Selena Ala Notary's commission expires: 5-31-2024 D223076869 Page 6 of 8 FIELD NOTES 6' WIDE SANITARY SEWER EASEMENT BEING a 0.013 acre tract of land situated in the P. Schoonever Survey, Abstract No.1405, Tarrant County Texas, being part of tot 2, Block 23 of Crestwood Addition, an addition to the City of Fort Worth, recorded in Volume 388-B, Page 160 of the Plat Records of Tarrant County, Texas, also being the tract of land described in deed to Collin Ashworth and Lauran T. Ashworth, recorded in Document No. D221089171, of the Official Public Records of Tarrant County, Texas, (O.P.R.T.C.T.) and being more particularly described as follows: COMMENCING at a 3/8" iron rod found at the southeast corner of said Lot 2, Block 23; THENCE South 57 Degrees 39 Minutes 43 Seconds West, along the south line of said Lot 2, Block 23, a distance of 4.19 feet to a point for the POINT OF BEGINNING; THENCE South 57 Degrees 39 Minutes 43 Seconds West, along the south line of said Lot 2, Block 23, a distance of 6.28 feet to a point; THENCE North 15 Degrees 03 Minutes 17 Seconds West, over and across said Lot 2, Block 23, a distance of 94.20 feet to a point from which a 1/2" iron rod found bears South 57 Degrees 39 Minutes 43 Seconds West, a distance of 87.51 feet to the northwest corner of said Lot 2, Block 23; THENCE North 57 Degrees 39 Minutes 43 Seconds East, along the north line of said Lot 2, Block 23, a distance of 6.28 feet a point; THENCE South 15 Degrees 03 Minutes 17 Seconds East, a distance of 94.20 feet to the POINT OF BEGINNING and containing 565 square feet or 0.013 acres of land more or less. Bearings are based on the Texas State Plane Coordinate System, NAD 83, North Central Zone 4202. /I 2Z Eduardo Martinez .� OF., l'F Registered Professional Land Surveyor No. 5274 �P ��,�S�Ticp�y Q U ! D D (T YD�U'ARDOMAR'�11dNQ' .......................... Telephone 972-488-3880 Ext. 7177 5274 Texas Board of Professional Engineers and Land Surveyors Engineer Registration No. F-23290 5U R Survey Registration No.10046100 Page 1 of 2 D223076869 Page 7 of 8 EXHIBIT "A" laoib� .idB—�$ lOi7 1 P.R. TG %P}p. 18 � UAW 1K Tabeyy 3 % �� Doe IVa DP,2O11407 aP.R.T.GT. DeG A D �.w r>Sgof L3 1 aPJ6T.GT. er $ 406 1 oQ 1 1 0011, o� 40 6'` BLOCK 23. CRESTWOOD $G11 sot i11 CAB. 388—B, PG. 160 p• po 5��g �► c P.R.T.C.T. 5 5. 19 w � nr«no JA IifoVmm s a1Ckt Pope M Cn aP.R.T.a 7. Q 24 a 18 so / e0 ( IN MT ) 1 inch — 90 ft. LEGEND O.P R T.C.T. OFFICIAL PUBLIC RECORDS RR.T.C.T. COIN YRBC PLAT RECORDS TA�T POB COUNTY TEXAS POINT 00 BEGINNING POC POINT OF COMMENCING CM CONTROL MONUMENT IRF IRON ROD FOUND L',\Nl QUIDDITY Texas eoard of Proledanel En8lneee and land SurvWm RegWraaon Non F-232M 1130046200 280S Mlle Parkway, Suite 600 Plana, 7X 75093 972-488 39W 2 �` _ aM } to G Doe, ft aP.R. T.0 T, p IRF `/8; a,� 0.013 ACRE P.O.C. - ------ so S,AN{TARY SEWER FASEIAENT 4-1------------------- \ P.O.B. 1 Robert B/alvmw Peak Abtaft MOLOUPWk Pam* Doe ft D216IM146 O.P.R.T.DT. LINE TABLE LINE DISTANCE L1 TEARING 5T39"43" W 4.19' L2 S 5T39'43" W I 5.28' 1 L3 N 5T39"43' E 6.28' Bearings are based on the Tme State Plane Coordinate System, NAD a North Central Zone 4202. 6' WIDE SANITARY SEWER EASEMENT BEING 0.013 ACRES OUT OF THE P. SCHOONOVER SURVEY, ABSTRACT NO. 1405 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS JOB No. 17452-0001 JDB2/EM SHEET 2 OF 2 D223076869 Page 8 of 8 CONSENT OF LIEN HOLDER Alamo Title GF# 6000182200807-LSK MIN: 100343100000543092 MERS Phone: 1-888-679-6377 Mortgage Electronic Registration Sv=. Inc,, soleiv as Nominee for City Bank d/b/a City Bank MortaaRe. It's successors and assigns (" Lien Holder"), is the current lienholder of a Mortgage Deed of Trust dated March 26. 2021 . executed by Collin Ashworth and Lauran T. Ashworth. husband and wife, to Allan B. Polunskv. Trustee, as recorded Aoril 1.2021 In clerk file No. D221089172 , in the Real Property Records, of Tarrant County Texas, hereby consents to the foregoing Sewer Facility Easement by Collin Ashworth and Lauran T. Ashworth, husband and wife. to Citv of Fort Worth. and joins in the execution hereof solely as Lien Holder and hereby does agree that in the event of the foreclosure of said mortgage, or other sale of said property described in said mortgage and below under judicial or non -judicial proceedings, the same shall be sold subject to said Easement. "MERS" is a Mortgage Electronic Registration Systems, Inc. MERS is a separate corporation that is acting solely as a nominee for Lender and Lender's successors and assigns. MERS is the beneficiary under this Security Instrument. MERS is organized and existing under the laws of Delaware, and has an address and telephone number of 1901 E Voorhees Street, Suite C, Danville, IL 61834, P.O. Box 2026, Flint, Michigan 48501-2026 tel. (888) 679-MERS. SIGNED AND EXECUTED THIS -30 DAY OF AAe4f f- , 2023. Mo gage Electronic Registration Systems, Inc., solely as nomin a for City Bank d/b/a City Bank Mortgage r s: STATE O COUNTY OF�%+�� 1 A I I BEFORE'M10the undersigned authority, on this day personally appearednnwn.5 Vy�-1�%( as, �V r for MortaaRe Electronic Registration Systems. Inc., solely as nominee for Citv Bank db/a Citv Bank Mortgage, known to me to be the person who acknowledged to me that they executed the same for the purposes and consideration therein expressed, in the capacity therein stated, as the act and deed of said Lienholder. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS SO of.1V1Q,(tW 2023. \\���µl UU lrrgrj Ji szx PRY AV6` CFI,'; Notary Public, State of My commission expires: ......... 112iM20'L A P'1 oft D223074802 05/0212023 01:00 PM Page: 1 of 7 Fee: $43.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103361 Water and Sanitary Sewer Replacements, Contract 2020 WSM-A Services Parcel No. 2 SSE 828 Springbrook Dr. Fort Worth, TX 76107 1 ;+'~ .rIT1 r "NC'1;7 CRESTWOOD ADDITION Block 23 Lot 3 A�'I j�� ��,�%� j��,�; �1�Y�0 (y , (� K et-- L!� 0 l UJ UUU O W � Ali STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: !v l O,� 2-1 2-0 2—3 GRANTOR: Jerry Mills GRANTOR'S MAILING ADDRESS (including County): 9132 Choctaw Trail Flower Mound, Tarrant County, TX 75022 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which Is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly descrlbed In the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as 'Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to SEWER FACILITY EASEMENT Rev.20220420 FORT Woe D223074802 Page 2of7 manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which Interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences orwalls or other structures that require a building permit. However, Grantor shall be permitted to install and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 101' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever, and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACUTY EASEMENT Rev. 20220420 ED—f(TWOUN. D223074802 Page 3 of 7 GRANTOR: Jerry Mills (Print Name)_ (Title) n ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Jerry Mills known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Jerry Mills and that they executed the same as the act of said Individual for the purposes and consideration therein expressed and in the capacity therein stated. V GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of l AUSTEN LOPES Notary Pu Wio-3lats of Tom ' gary�Public, State of Texas Tarrant (printed): CNotary� � AUQ Clog Notary's commission expires: SEWER FACILITY EASEMENT FO.. RTWOR Rev. 20220420 D223074802 Page 4 of 7 ACCEPTED BY: GRANTEE: City of Fort Worth By (Signature): Dana Burghdoff (ApY24, 2023*26:01 CDT) (Print Name) Dana Burghdoff Mbe) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): (Print Name) Matt Murray (Title) Asslstant Cfty Attomey ACKNOWI.PDGEMENT STATE OF TEXAS § g COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Dana Surghdoff AssiAant City Manager of the City of Fort Worth, a Texas home rule municipal corporation, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fork Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of Apr 24, 2023 1SEA1 SELENA ALA Notary Public a a STATE OF TEXAS Notary I.D. 132422528 My Comm. F-xR Mar. 31, 2024 SEWER FA.CILMY EASEMENT Rev. 20220420 ¢-/<LA/ Selena Ala (Apr25, 2023 09:03 CDT) Notary Public, State of Texas Name (printed): Selena Ala Notary's commission expires: D223074802 Page 5 of 7 EXHIBIT "A" FIELD NOTES 10' WIDE SANITARY SEWER EASEMENT BEING a 0.018 acre tract of land situated in the P. Schoonover Survey, Abstract No. 1405,Tarrant County Texas, being part of Lot 3, Block 23 of Crestwood Addition, an addition to the City of Fort Worth, recorded In Volume 388-B, Page 160 of the Plat Records of Tarrant County, Texas, also being the tract of land described In deed to Jerry Mills, recorded In Document No. D221346887, of the Official Public Records of Tarrant County, Texas, (O.P.R.T.C.T.) and being more particularly described as follows; BEGINNING at the southeast corner of said Lot 3, Block 23; THENCE South 57 Degrees 39 Minutes 43 Seconds West, along the south line of said Lot 3, Block 23, a distance of 10.47 feet to a point from which a 1/2" iron rod found bears South 57 Degrees 39 Minutes 43 Seconds West, a distance of 87.51 feet to the southwest corner of said Lot 3, Block 23; THENCE North 15 Degrees03 Minutes 17 Seconds West, over and across said Lot 3, Block 23, a distance of 78.60 feet to a point from which a 1/2" Iron rod found bears South 57 Degrees 39 Minutes 43 Seconds West, a distance of 110.87 feet to the northwest corner of said Lot 3, Block 23; THENCE North 57 Degrees 39 Minutes 43 Seconds East, along the north line of said Lot 3, Block 23, a distance of 10.47 feet to the northeast corner of said Lot 3, Block 23; THENCE South 15 Degrees 03 Minutes 17 Seconds East, along the east line of said Lot 3, Block 23 a distance of 78.60 feet to the POINT OF BEGINNING and containing 786 square feet or 0.018 acres of land more or less. Bearings are based on the Texas State Plane Coordinate System, NAD 83, North Central Zone 4202. Eduardo Martinez Re istered Professional Land Surveyor No. 5274 QUIDDITY Telephone 972-488-3880 Ext. 7177 Texas Board of Engineers and Land Surveyors Engineer Registration No. F-23290 Survey Registration No.10046100 Page 1 of 2 MOF � A�c`p•`9N EDUARDO MARTINEZ 5274 D223074802 Page 6 of 7 EXHIBIT "B" t 17 L'J/ft* B, Zwo- O"w � Chad 6�avad '1 ��Q Dion Ala. DMI210160 aP.R. T.G T. OQer o'jl 'Sp• Q t 1` � 1 t ' Y i� �C 4 • Aa9 Ow. ft D Tz2a04 M , BLOCK 23 c', N CRESTWOOD OP.RTr.T Z �t vl CAB. 388-B, PG. 160 t 0 P.R.T.C.T. LA ,�•�o o�; 18 w_U30 it oh*y N t j' Dow A% 02 P407 : `1 �" aPa rG r. S cp J Q, 0. 1/20IRF 3 i P.0,6. t Jb�ry AtWA* 1 Dry J4M7 aPR2T 1 S.l 6 P 5 S,l 54 /2" IRF a0 ( IN FEET ) i inch a 30 ft LEGEND O.PJLT.C.T, OFFICIAL PUBLIC RECORDS TARRANT COUNTY TEXAS PJLT.C.T. PLAT RECORDS TA� TEXAS POE POIN OI INOBENINO POC POD4T OF COMMENCING CM CONTROL MCNUMENT IRF IRON ROD FOUND L QUIDDITY L Tam Bard of Professional F.rglnaan and land Soveyon Redlrtration Noa, F-23290 A 10N000 280S Ddlaa Parkwvy, SWh 6DD Plww, T%7SD93 97149B.3BB0 r UE CqA JA" Pgt 1B0 P.RT.GT. 19 rhdma M, AAAWw 14s me JJM Pogo J21 aAR.T.a .. Cafh Asbrrth [ovum r AslWwft tt Don ft D22100171 a AR. r.G r. �t t t ------------------ t � t LINE TABLE i�I N 5/I"39"u- D.4!' I Bearings are based on the Texas State Plane Coordinate System, NAD W, North Central Zone 4201 1O' WIDE SANITARY SEWER EASEMENT BEING 0.018 ACRES OUT OF THE P. SCHOONOVER SURVEY, ABSTRACT NO.1405 CITY OF FORT WORM TARRANT COUNTY, TEXAS JOB No. 17452—ODOI JDB2/EM SHEET 2 OF 2 u D223074802 Page 7 of 7 CONSENT OF LIEN HOLDER Alamo Title GFii 6000182200808-LSK Pinnacle Bank ("Lien Holder"), is the current lienholder of a Mortgage Deed of Trust dated June 6. 2022, executed by Jerry D. Mills to Ronnv D. Korb. Trustee, as recorded June 8. 2022 In clerk' s file No. D222147667 , In the Real Property Records, of Tarrant County Texas, hereby consents to the s. foregoing Permanent Sewer Facility Easement executed by Jerry D. Mills to Citv of Fort Worth, and joins in the execution hereof solely as Lien Holder and does hereby agree that in the event of the foreclosure of said mortgage, or other sale of said property described in said mortgage and below under Judicial or non-judiclal proceedings, the same shall be sold subject to said Easement. � T SIGNED AND EXECUTED THIS t 2 DAY OF TA&A4A t e7 , 2023. Pinnacle Bank By:&L"Zx Chuck Wilson, Market President STATE OF~Cg69 S,� COUNTY 0 -� ) BEFORE ME, the undersigned authority, on this day personally appeared Chuck Wilson, as, Market President for Pinnacle Bank. known tome to be the person who acknowledged tome that he executed the same for the purposes and consideration therein expressed, in the capacity therein stated, as the act and deed of said Lienholder. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS I ay of 2023. Notary Public, My commission expires: -pop' BRENDA J OWENS �S Note ry Public, Sate of Taxes y �= CMtr�. Expires 12-08-20U Notary ID 13348195.6 �.r D223087368 05/19/2023 02:06 PM Page: 1 of 7 Fee: $43.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records MARY LOUISE NICHOLSON COUNTYCLERK NOTICE OF CONFIDENTIALITYRIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 6 SSE 836 Edgefield Rd. Fort Worth, TX 76107 A01k) I `Ri 0%s- CRESTWOOD ADDITION Block 22 Lot 10 sk STATE OF TEXAS § § KNOW ALL MEN BY THESE PRE N (Z COUNTY OF TARRANT § CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: U 1 �, �9�► r GRANTOR: Colin M. McConnell & E GRANTOR'S MAILING ADDRESS 836 Edgefield Rd. Fort Worth, Tarr GRANTEE: CITY OF GRANTEE'S MAILIN 200 TI FORT 07 ing County): ARRANT COUNTY, TX 76102 CONS N1ia( Dollars ($10.00) and other good and valuable consideration, the re ipt a s fI e y of which is hereby acknowledged. EA NT OPERTY: BEING a tract of land more particularly described in the attac x it A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILITY EASEMENT RTWO T . Rev. 20220420 Ir— D223087368 Page 2 of 7 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. With reasonable attempt to provide advance notice. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to b erected within the Easement Property a permanent structure or building, including, but n t limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or other structures that require a building permit. However, Grantor shall be permitte I and maintain a concrete, asphalt or gravel driveway, road or parking lot across th nt Property but only to the extent that such surface improvements do not materially n er w h the rights granted hereunder. Grantee shall be obligated to restore th c e Easement Property at Grantee's sole cost and expense, including the a o o any sidewalks, driveways, or similar surface improvements located on ad j c nt he Easement Tract which may have been removed, relocated, alter ag d, troyed as a result of the Grantee's use of the easement granted here d r. Pro a owever, that Grantee shall not be obligated to restore or replace irrigation s ms or t er improvements installed in violation of the provisions and intended use of this se Under Chapter 21, Subchapter E of the Texas F Grantor's heirs, successors, or assigns may be of this acquisition to repurchase or request cel progress made toward the use for which tho domain, and the repurchase price will be the FTrN The person signing this document on legal authority to execute this per r e expressed, and in the capacity by proper order, resolution, i entitled to rely on this warr n d as amended, the Grantor or the Ve 10t' anniversary of the date bout the use and any actual was acquired through eminent pays Grantor in this acquisition. antor warrants that he or she has the for the purposes and consideration therein hat such binding authority has been granted authorization of the Grantor. Grantee is fully an in accepting this permanent easement. TO HAVE AND TO HOLD )KhabqvMescribed permanent easement, together with, all and singular, theAr n Hess thereto in anyway belonging unto Grantee, its successors r; and Grantor does hereby bind itself, its heirs, successors and assigns,ver defend, all and singular, the said easement unto Grantee, its successornst every person whomsoever lawfully claiming or to claim the same opWv T docu erhh e executed in multiple counterparts, each of which will be deemed an o �in ether will constitute one instrument. When the context requires, sinNa o onouns include the plural_ [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT Rev. 20220420 FoR� H. D223087368 Page 3 of 7 GRANTOR: Colin M. McConnell & Emery A. McConnell (Print Name) MV-o.v d (Title) r By: (Print Name) �G t (Title) 0 ACKNOWLEDGEM STATE OF TEXAS § § O lJ COUNTY OF TARRANT § BEFORE ME, the undersigned a o ry Public in and for the State of Texas, on this day personally appeared lin . Mc o nell, known to me to be the same person whose name is subscribed to t r i ent, and acknowledged to me that the same was the act of Colin M. McC e h executed the same as the act of said individual for the purposes and cons' i n er 'n xpressed and in the capacity therein stated GIVEN UNDER M A SEAL OF OFFICE this date of 1 1 6 110 AUST S * Notary T Notary Public, State of exalt o 38 Name (printed): COM �202Q Notary's commission expires: SEINER FACIL!TY EASEMENT FOR—. TT W�ORRTH. Rev. 20220420 i D223087368 Page 4 of 7 ACKNOWLEDGEMENT STATE OF TEXAS COUNTY OF TARRANT BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Emery A. McConnell, known to me to be the same pers whose name is subscribed to the foregoing instrument, and acknowledged to me that the sarSe was the act of Emery A. McConnell and that they executed the same as the act city n�� individual for the purposes and consideration therein expressed and in the capa-tL stated. (� GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of [SEAL] \� r ►� AUSTEN LOPES Notary PubNo-ftlSOfTOM Notary Public, St e T a TarrartCou* Name (printed): P NotaryID #1338989" we+ Como ls" Exp. AUG. 08, 202Q , Notary's mission v SEWER FACILITY EASEMENT FOR_ i WORD. Rev. 20220420 ��� D223087368 Page 5 of 7 ACCEPTED BY: STATE OF TEXAS § COUNTY OF TARRANT § GRANTEE: City of Fort Worth By (Signature): / (Print Name) O (Title) ; U APPROVED AS TO FORM AND LEGALITY By (Signature): AL (Print Name) PAArc M, ,4 \� a (Title) Asbsso-r Gsty r ACKNOWLEDGE \7 O� BEFORE ME, the undersignedublic in d for the State of Texas, A,,f iNa peisopally geared LA-1 f the Ci f Fort Worth, a Texas home rule municipal corporation; i &wn t e person whose name is subscribed to the foregoing instrument, and o e t e that the same was the act of the City of Fort Worth and that they exec the act of the City of Fort Worth for the purposes and consideration therein pr s d in the capacity therein stated. GIVEN UNDE ND SEAL OF OFFICE this date of��'3 ANCHEZ of ID p225649�90 el�l1 z mmission Expires +� Mpmber 19, 2025 Notary ublic, State Of Texas i Name Notary's commission expires: SEWER FACILITY EASEMENT F�.RTWORTH' Rev. 20220420 '�` D223087368 Page 6 of 7 EXHIBIT 'A " yr'WTPESANITARYSEWEREASEAm T 66o SQFTOR o.ov5ACRESOFLANP LOTro, BLOCK22, CRES7W00PADPTT10N PETERSCHOONOVERSURV Y, ABSMCTz¢o5 =OFFORT WORTH, TARRANTCOUN7YTF.XAS \ \ LOT 18 / LOT 14 / \ \ \ \ 8' UTILITY EASEMENT I LINE# / / \ VOL. 388-B, PG. 159 I L1 \ 1r 1Pf \ ` \ \ LOT 19 L2 LOT 13 / \ \ a PROPOSED 11 SANITARY SEWER \ \ `b\"•' / EASEMENT BY \ \ \ LINE TA `y B GTH '1 1.01 S "21' 2" YOU 3 8"W 11.00, 2'2 "W 60.00' `RF / SEPARATE INSTRUMENT 20 \ / 1 �� G O / / Q LOT 12 \ \ / SC 0m40V[,R \ Y Q 0��'�� \ \ / O a.00'38�18" E T`ZA `Q, 1Q05 C ,r / V \ AgS bp �� s / / LOT 11 BL^ 22 \ CRESVOL. A5 Nt lee NIP. 19 LEGEND: POB POINT OF BEGINNING POC POINT OF COMMENCING 6TF IRON ROD FOUND IPF IRON PIPE FOUND NOTES: 1. LEGAL DESCRIPTION OF EVEN ACCOMPANIES TNIS EAS M 2. BEARINGS REFERENC 0 TI STATE PLANE CODRDINA 51 NORTH CENTRAI�.F. GRAPHIC SCALE IN FEET SHIELD ENGINEERING GROUP LOT 21 11- WIDE SANITARY wv, SEWER EASEMENTLOT 22 660 SQUARE FEETOR 0.015 ACRES \\\ LOT 10 PROPOSED 11' \ \\ \ 217288942 SANITARY SEWER \ \\ ` Collin McConnell / EASEMENT BY \ / SEPARATE INSTRUMENT \ ` LOT 9 TBPE FIRM #F-11039 - TBLS FIRM #10193890 1600 West 7th Street, Suite 400, Fort Worth, TX 76102 • 817.810,0696 G\STfRF�9s ................. ................... °po 6495 p� yW b.� c O� `I ROBERT P. ALLEN R.P.L.S. No. 6495 DATED: 04-20-2022 D223087368 Page 7of7 EXHIBIT 'B" 11' 47DESAIVITARYSEWER EASEME'VT 66o SQ.PT OR o. o15ACRES OFLAND LOTro, BLOCX22 CRESTWOODADDITION PETERSCHOONOVERSURVEY, ABSMCT1405 Q7YOFFORTWORTH, TARRAN7COUN7YTEXAS, BEING A TRACT OF LAND SITUATED IN THE PETER SCHOONOVER SURVEY, ABSTRACT NUMBER 1405, CITY OF FORT WORTH, COUNTY, TEXAS, AND BEING A PORTION OF LOT 10, BLOCK 22, CRESTWOOD ADDITION, AN ADDITION TO THE CITY OF FOR TARRANT COUNTY, TEXAS AS SHOWN ON PLATTHEREOF AND RECORDED IN VOLUME 388-B, PAGE 159 AND BEING MORE P DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT A 1/2-INCH IRON ROD FOUND FOR THE WEST CORNER OF THE LOT 12, OF SAID BLOCK 22 AND THE SOUTH CORNER OF LOT 13, OF THE SAID BLOCK 22, ALSO, BEING IN THE NORTHEAST RIGHT OF WAY LINE OF ED FOOT RIGHT OF WAY), FROM WHICH A 1-INCH IRON PIPE FOUND FOR THE WEST CORNER OF THE SAID LOT 13 BEA1 - A DISTANCE OF 60.00 FEET, ,r1 THENCE SOUTH 32`21'42" EAST, WITH THE NORTHEAST RIGHT OF WAY LINE OF SAID EDGEFIELO ROAD A SOUTHWEST LINE OF THE SAID LOT 12 AND THE LOT 11, OF THE SAID BLOCK 22, A DISTANCE OF}2b9G�F SAID LOT 11 AND THE WEST CORNER OF THE SAID LOT 10; ��� THENCE NORTH 57°38'18" EAST, WITH THE COMMON LINE OF THE SAID LOT 10 AND THE SAID �T 11, A POINT OF BEGINNING; THENCE NORTH 57'38'18" EAST, WITH THE COMMON LINE OF THE SAID LOT 10 /�ND�HE SAID CORNER; \ N THENCE SOUTH 32'21'42" EAST, OVER AND ACROSS THE SAID LOT 10, A DI: LINE OF THE SAID LOT 10 AND BEING IN THE NORTHWEST LINE OF THE LOT THENCE SOUTH 57'39'18" WEST, WITH THE COMMON LINE OF FOR CORNER; THENCE NORTH 32*21-42" WEST, OVER AND ACROSS THE AF05tS AND CONTAINING 660 SQUARE FEET OR 0.015 ACRES�AN NOTES: 1. EASEMENT DRAWING OF DATE ACCOMPANIES THIS LEGAL DESCRIPTION. 2. BEARINGS REFERENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONE: HAD 13. ALL DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TOPE FIRM iF-11039 . TOLS FIRM #10193890 1600 West 7th Street, SuNe 400, Fort Worth, TX 76102 - 817.810.0696 [O M H THE NER OF THE OF 105.00 FEET TO THE OF 11.00 POINT FOR TO A POINT FOR CORNER IN THE SOUTHEAST LOT 10, A DISTANCE OF 11.00 FEET TO A POINT A)OISTANCE OF 60.00 FEET TO THE POINT OF BEGINNING, ROBERT P. ALLEN R.P.L.S. No. 6495 DATED: 04-20-2022 At- O ................. ROBERT P. ALLEN .'0po 6495 .Pv::.. 19 SUR E�O� D223093758 05/31/2023 08:56 AM Page: 1 of 7 Fee: $43.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records 13""As MARY LOUISE NICHOLSON COUNTYCLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103361 Water and Sanitary Sewer Replacements, Contract 2020 WSM-A Services Parcel No. 5 SSE 840 Springbrook Dr. Fort Worth, TX 76107 AL, �!.0 T7 r' /`I^%,f^ r �,�.�,r�, lY CRESTWOOD ADDTION Block 23 Lot 6 GF do STATE OF TEXAS COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: // -/0 -d.OD .2 GRANTOR: James Moody GRANTOR'S MAILING ADDRESS (including County): 840 Springbrook Drive Fort Worth, Tarrant County, TX 76107 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to SEWER FACILITY EASEMENT FO-_ RTWORTH' Rev.20220420 D223093758 Page 2 of 7 manholes, manhole vents, lateral .line connections, pipelines, and junction boxes in, upon, under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls r` or other structures that require a building permit. However, Grantor shall be permitted to install and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10t' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual _ progress made toward the use for which this property interest was acquired through eminent domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever; and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, , singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT FoR_ TWORTH. Rev. 20220420 '�� D223093758 Page 3 of 7 GRANTOR: James Moody By: PG""" V (Print Name)gJ,.e (Title) ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared James Moodv, known to me to be the same person whose -- name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of James Moodv and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of d Z [SEAL] 16),commWm AUSTEN LOPES NotwyPubllo-StstedTeow tary Pu � lic, StaWof Texas Tarrant County Name Tinted NotI ry ID A133898954 (P ): Eq. AUG. 08, 2028 Notary's commission expires: SEWER FACILITY EASEMENT Fo--RTWouH. Rev. 20220420 T D223093758 Page 4 of 7 ACCEPTED BY: GRANTEE: City of Fort Worth By (Signature): s (Apt 14,2023 1rr.43 CD-n (Print Name) Steve Cooke (Title) Property Management Director APPROVED AS TO FORM AND LEGALITY By (Signature): �w ✓� (Print Name) Matt Murray (Title) Assistant City Attorney ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority a Notary Public in and for the State of Texas, on this day pe ally appeared I+e five_ rj a Kfi D L 'r v- of the City of Fort Worth, a Texas home rule municipal core ation, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. 2 GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of 11 14 1 - Z3 [SEAL] AUSTEN LOPES Notary Public, State of Texas ao' Notwy Pubfioft% of T.xae Name (printed): Tartantcourdy Notary's commission expires: Notary lD #13389e95-0 ry '' •�+ Com jWw Exp. AUG. 08, 2028 SEWER FACIMY EASEMENT ��' t Rev. 20220420 D223093758 Page 5 of 7 EXHIBIT "A" FIELD NOTES 10' WIDE SANITARY SEWER EASEMENT BEING a 0.007 acre tract of land situated in the P. Schoonover Survey, Abstract No. 1405, Tarrant County Texas, being part of Lot 6, Block 23 of Crestwood Addition, an addition to the City of Fort Worth, recorded in Volume 388-B, Page 160 of the Plat Records of Tarrant County, Texas, also being the tract of land described in deed to James Moody, recorded in Document No. D218092654, of the Official Public Records of Tarrant County, Texas, (O.P.R.T.C.T.) and being more particularly described as follows: COMMENCING at a 1" iron pipe found at the northwest corner of Lot 6, Block 23 of said Crestwood Addition; THENCE North 79 Degrees 42 Minutes 43 Seconds East, along the north line of said Lot 6, Block 23, a distance of 156.16 to the POINT OF BEGINNING of the herein described tract, THENCE North 79 Degrees 42 Minutes 43 Seconds East, along the north line of said Lot 6, Block 23, a distance of 10.03 to the northeast corner of said Lot 6, Block 23; THENCE South 15 Degrees 03 Minutes 17 Seconds East, along the east line of said Lot 6, Block 23, a distance of 15.00 feet a point from which a 112" iron rod found bears South 86 Degrees 15 Minutes 45 Seconds East, a distance of 156,37 feet to the northeast corner of Lot 16, Block 23 of said Crestwood Addition, and continuing for a total distance of 30.00 feet to the most easterly northeast corner of said Lot 6, Block 23; THENCE South 62 Degrees 13 Minutes 43 Seconds West, along the south line of said Lot 6, Block 23, a distance of 10.25 feet to a point; THENCE North 15 Degrees 03 Minutes 17 Seconds West, over and across said Lot 6, Block 23, a distance of 33.09 feet to the north line of said Lot 6, Block 23 and the POINT OF BEGINNING and containing 315 square feet or 0.007 acres of land more or less. Bearings are based on the Texas State Plane Coordinate System, NAD 83, North Central Zone 4202. Eduardo Martinez Registered Professional Land Surveyor No. 5274 L7\ QUIDDITY Telephone 972-488-3880 Ext. 7177 " Texas Board of Engineers and Land Surveyors Engineer Registration No. F-23290 Survey Registration No. 10046100 Page 1 of 2 i 0 EDUARDO MARTINEZ �;... 5274.., y0; D223093758 Page 6 of 7 LINE TABLE��� EXHIBIT ��B�� L1 N 79' 2'43" E 10.03� i i Garde i i IL2 LLL33 fL4 S 15.03'17: E SS ��ij 73'43" W N 1�03'17" SO.gQp� oz. Mat Doc ML D7f19W=P aP.Rrcr. 11' / 15 W 33.09' �g6.16 1 '�• E � i 670 FayD2 1 Obe Na 02aBt10374 aPRT.CT. N 7g 42 P'OO'B' f i S 88'15'45' E 156.37' I O.C. ,1 0.007 ACRE 1" IRON PIPE , 10' SANFrARY SEWER EASEMENT 11;' -Ik , 6 It .b"— ttoody Dan AkxDS/8092&W aP.R T.GT e9 cc 16 o4eT S14,S Ip a 1 Lbynrao d /Armen ma �R 000M4,34 001s 140. Q LaQ 6c. � � ��Bet a P, i Ab s o A. D. Toten end Gcbw* A_ v Dbe Ala D2OD242KB4 •i O aP.R. T.GT Z BLOCK 23 ', ', cart 3�� Ay teo PRTGT. CRESTWOOD 17 CAB. 388—B, PG. 160 , P.R.T.C.T. cy tnaa L2,- erne- dead [larure ItaPR. DO,- NA RM210160 TG T_ 4 1 6arbude Tatar 1 , Dac N. D72CO&MM D.P.R T.0 T. i Bearings are based on the Texas State Plane Coordinate System, NAD 83, North Central Zone 0 15 30 ea 1 I I + 42C2. I 10' WIDE SANITARY SEWER EASEMENT 1 inch = 30 ft. LEGEND BEING 0.007 ACRES O.PRT.C.T. OFFICIAL PUBLIC RECORDS TREE oRw COUNTY iRAANT L� TEXAS QUIDDITY PRT.C.T. OUT OF THE CO TEXAS FOB POudf OAFAR KING P. SCHOONOVER SURVEY, ABSTRACT NO.1405 CITY OF FORT WORTH, Tan Bmu arProf�donel EKYIms end lald Swsyan POC POINT OF CO]Mb¢TrC1NG TARRANT COUNTY, TEXAS Re{htradw Nm E-23290.30MM CIA CONTROL MONUh(Wr 2R05 Deou PrWW, sake Eoo Pi—, a 75M sn-aeeaeao MF IRON ROD FOUND JOB Ne. 17452-0001 JDB2/EM SHEET 2 OF 2 Ap D223093758 Page 7 of 7 CONSENT OF LIEN HOLDER Alamo Title GF# 6000182200811-LSK FNA VI I.I.C. its successors and/or assigns ("Lien Holder), is the current Ilenholder of a Tax Lien Contract dated August 27. 2021. executed by James Moodv as recorded September 7. 2021 in clerws file No. D22126018S, in the Real Property Records, of Tarrant County Texas, hereby consents to the foregoing Sewer Facility Easement executed by James Moodv to Citv of Fort Worth, and Joins in the execution hereof solely as Lien Holder and does hereby agree that in the event of the foreclosure of said lien, or other sale of said property described In said Contract and below under Judicial or non -judicial proceedings, the same shall be sold subject to said Easement. SIGNED AND EXECUTED THIS DAY OF MfAr -&l , 2023. FNA VI LLC, its successor and/ ssig s By: PAAA�., I STATE OF-TJ Xa15 } w COUNTY OF F.lAoky, } BEFORE ME, the undersigned authority, on this day personally appeared �.Ytrf-AYL& e&rr►ty as, —Lo 0 for FNA VI LLC, its successors and/or asslans . known to me to be the person who acknowledged to me that they executed the same forthe purposes and consideration thereln expressed, in the capacity therein stated, as the act and deed of said Lienholder. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS ?, day _of 2023. Notary`Public, State of,-[ My commission expires; s' to aQa(p ALISSA MARIE ODEDRA ir!1... `�•��'s Notary Public, Sty of Taxes i + ° Comm. Expires 064W2026 Notgry ID 133747001 D223005303 01/11/2023 09:40 AM Page: 1 of 6 Fee: $39.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAYREMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 8 SSE 848 Edgefield Rd. Fort Worth TX 76107 CRESTWOOD ADDITION Block 22 Lot 13 ��� = CoWYAKY STATE OF TEXAS § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: -p - 1 1- 20 GRANTOR: Margaret Smith GRANTOR'S MAILING ADDRESS (including County): 7220 Green Meadow Dr. North Richland Hills, Tarrant County, TX, 76180 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, -' maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILITY EASEMENT ORTWORT Rev. 20220420 D223005303 Page 2 of 6 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the _ purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any — material way or is inconsistent with the rights granted hereunder, or (11) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to install — and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that — Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10t' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent �. domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever; and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT FORT WORTH. Rsv. 20220420� D223005303 Page 3 of 6 GRANTOR: Margaret Smith, By: (Print Name)%rar�r�� (Title) ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Margaret Smith, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Margaret Smith and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date ofl"�- (a MEUNDA DAFINEt1 Notary PU Stft of Tams itiMCV No � 92026 SEWER FACILITY EASEMENT Rev. 20220420 Notary Public, State of TexaA Name (printed): ►vr-1i,,,(ci ,q,,e-f f Notary's commission expires: 7 fJ b r 21, FORT WORT . D223005303 Page 4 of 6 ACCEPTED BY: GRANTEE: City of Fort Worth arse. S2sscsrlBy (Signature): Da"a9urghdz (Print Name) Dana Burghdoff (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): `Aa" (Print Name) Matt Murray (Title) Assistant City Attorney - ACKNOWLEDGEMENT y STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authodk, a Notary Public in and for the State of Texas, on this day personally appeared T! of the City of ort Worth, a Texas home rule - municipal corporation, k4own to me o be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the Capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of 17 l zs- 1 2 . [SEAL] a�)t YP& AUAUSTEN LOPES �tR No" Pub1b,% is of Tom Notary Public, State of Texas Twart County Name (printed): y +r Notary ID #13388885.0 commbeft Ep. AUG. 08, 2026 Notary's commission expires: SEWER FACILITY EASEMENT rowwm" Rev.20220420 77" ., ...t:.,,...,,:-,...,,............_......_............. . .................,.... D223005303 Page 5 of 6 c� a EXHIBIT T ff v' WIDESAA7FARYSEWERFFA.S'EMFVT 66o SWTOR o.ouACRES OFLAAD LOT.r3, ELOiX22, CREV WOODADDRYON PETE.RSCHOONO VERSVRVEY, AESTRACTr405 0I7Y0F.AVRTWORTH, TARRANTC0L7v7YTZK4S BEING ATRACT OF LAND SITUATED IN THE PETER SCHOONOVER SURVEY, ABSTRACT NUMBER 1405, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 13, BLOCK 22, CRESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 388-B, PAGE 159 AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT A 1-INCH IRON PIPE FOUND FOR THE WEST CORNER OF LOT 13 AND BEING COMMON WITH THE SOUTH CORNER OF LOT 14, OF SAID BLOCK 22, ALSO, BEING IN THE NORTHEAST RIGHT OF WAY LINE OF EDGEFIELD ROAD (A 50 FOOT RIGHT OF WAY); THENCE NORTH 57'38'18" EAST, WITH THE COMMON LINE OF THE SAID LOT 13 AND THE SAID LOT 14, A DISTANCE OF 105.00 TO THE POINT OF BEGINNING; THENCE NORTH 57'38'18" EAST, WITH THE COMMON LINE OF THE SAID LOT 13 AND THE SAID LOT 14, A DISTANCE OF 11.00 FEET TO A POINT FOR CORNER; THENCE SOUTH 32°21'42" EAST, OVER AND ACROSS THE SAID LOT 13, A DISTANCE OF 60.00 FEET TO A POINT FOR CORNER IN THE SOUTHWEST LINE OF THE AFORESAID LOT 13 AND IN THE NORTHEAST LINE OF LOT 12, OF THE SAID BLOCK 22; THENCE SOUTH 57'38'18" WEST, WITH THE COMMON LINE OF THE AFOREMENTIONED LOT 13 AND THE SAID LOT 12, A DISTANCE OF 11.00 FEET TO A POINT FOR CORNER, FROM WHICH A 1/2-INCH IRON ROD FOUND FOR THE SOUTH CORNER OF THE SAID LOT 13 BEARS SOUTH 57°38'18" WEST, A DISTANCE OF 105.00 FEET; THENCE NORTH 32"21'42" WEST, OVER AND ACROSS THE SAID LOT 13, A DISTANCE OF 60.00 FEET TO THE POINT OF BEGINNING, AND CONTAINING 660 SQUARE FEET OR 0.015 ACRES OF LAND. NOTES: 1. EASDAWr DRAWNC OF EVEN DATE ACCOMPANIES THIS LEGAL DESCRIPTION. 2. BEARINGS REFERENCED 70 THE TOM STATE PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONE. NAD '03. ALL DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TBPE FIRM OF-11039 • TBLS FIRM Ci DIDMO I SOD Weal 7th Sb,"t SuKe 40D, "Worth, TX 761132 • 817.810,0696 ROBERT P. ALLEN R.P.L.S. ND.6495 DATED: 04-20-2022 �E OF p� . ROBERT P. ALLEN o� .Pv.... 6495SSNO ����Su-i; FL�o D223005303 Page 6 of 6 EXHIBIT "A" 11' WIDES4AIT RYSEWER EASEMENT 66oSQFTOR o.oi5ACXBSOFLAND LOT13, BLOCR"22, CRE57WOODADDFIYON PETER SCHOONOVER SURVEY, ABSTRACT1405 =OFFORT WORTI ; TARRANTCOUNTYTRW PROPOSED 11' \ \ \ LINE TABLE N 57'38't 8' E SANITARY SEWER \ \ 4.oa LINE # BEARING LENGTH EASESEPARATEUENT BYINSTRUMENT \ '� \ LOT 18 N \, � I L1 N57°3818'E 11.00' L2 S32°21'42`E 60.00' LOT 14 / / \\ I L3 S57°38'18'W 11.00' �E Q0� ` L4 N32'21'42 W 60.00' p \ / / 11' WIDE SANITARY \ cor 19 SEWER EASEMENT \ / (, 660 SQUARE FEET �,3 \\ 8' UTILITY EASEMENT / R QQ OR 0.015 ACRES / / \ \ VOL. 386—B. PG. 159 ��SC��OVE LOT 13 s�- .4 \ \ \ / 4� 5V CllAo �40: \ D179535630BLOCK 22 o ��d tiargaretSmitjy / CRESTWOOD ADDITION \ \\\ VOL. 388-8, PG. 159 \ LOT 20 P.R.T.C.T \ / cor 12 �{+ PROPOSED 11, \ SANITARY SEWEREASEMENT BY SEPARATE INSTRUMENT \ \ \\ \ o LEGEND; \ \ LOT 21 y POO POINT OF BEGINNING \ POC POINT OF COMMENCING \ LOT 11 IRF IRON ROD FOUND \ \\ \ N PF IRON PIPE FOUND 3 NOTES: 1. LEGAL DE9CRIPIION OF EVEN DATE \ ACDOMPANIES THIS EASEMENT DRAWING. / \ O 2 BEARINGS REFERENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM. LOT 10 J MOM CENTRAL ZONE. MAD '83. &L DISTANCES ARE GROUND DISTANCES. 0 N 0 40 SD OF . TF GRAPHIC SCALE 1N FEET a . 0 ..................... o ROBERT P. AL1EN . 6495���:� ' 9,y i�55 �O Q SHIELD -4 Tr-- i' -4L/ ENGINEERING GROUP ROBERT P. ALLEN z lk R.P.L.S. No. 6495 T SPE FIRM 8F-11039 • TBLS FIRM #10193390 DATED: 04-20-2022 a1600 Went 7th Sbwt State 400, Fort Worth, TX 70102 - 817.810.0096 I D223069751 04/26/2023 07:28 AM Page: 1 of 7 Fee: $43.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records o„ ", R MARY LOUISE NICHOLSON COUNTY CLERK NOTICE OF CONFIDENTIALITYRIGHTS: IF YOU AREA NATURAL PERSON, YOU MAYREMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT, BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS. YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 9 SSE 862 Edgefield Rd. Fort Worth TX 76107 CRESTWOOD ADDITION Block 22 Lot 14�Ny o 0 pa,s STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS COUNTY OF TARRANT § CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: /0 V Ida e� GRANTOR: David Pondt et ux Dana Pondt GRANTOR'S MAILING ADDRESS (including County): 11 Hemingsfords Ct. Arlington, Tarrant County, TX, 76016 GRANTEE: CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described in the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILrTY EASEMENT FoltTwoR� Rev. 20220420 '� D223069751 Page 2 of 7 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (11) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permit However, Grantor shall be permitted to install and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the 10t' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent " domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the t legal authority to execute this permanent easement for the purposes and consideration therein expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever; and Grantor does hereby bind itself, its heirs, successors and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. (SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT Rev. 20220420 T D223069751 Page 3 of 7 GRANTOR: David Pondt et ux Dana Pondt, a married couple By. (Print Name) "72P V (Title) By - (Pint Name) .+ (Title) ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared David Pondt, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of David Pondt and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE �date _ A,/-, AUSTEN LOB Notary ublic, State of exas esNo�ryPumoa tat Name rin Tasant County (p ted): Notary iD #133msipo Notary's commission expires: CommWm Exp. AUG. 00, 2m _ SEWER FACILITY EASEMENT W*P' Rev. 20220420 D223069751 Page 4 of 7 ACKNOWLEDGEMENT STATE OF TEXAS § — COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Dana Pondt, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Dana Pondt and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this d to of 0 z zZ . [SEAL] AUSTEN LOPES Notary Pubtlo-State dTsm Notary Public, State of Texas TOMM CoWly Name (printed): Notary ID 013390898=0 Notar�s commission expires: Canmtatlon Exp, AUG. 08, 2028 — SEWFR FACUry EASEMENT Rev. 20220420 D223069751 Page 5 of 7 ACCEPTED BY: GRANTEE: City of Fort Worth By (Signature): D...Bur d(IJ.n 13,20 6:46CSY (Print Name) Dana Burghdoff (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): 4,7 (Print Name) Matt Murray (Title) Assistant City Attorney ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public ip and f r e State of Texas, on this . day personally a peared t5�4 fs it v-q a o rr S gs-rk ,f C 14: of the City of`Port Worth, a Texas home rule municipal corporation, kn wn to met a the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of JgnMAry r3, 2.0 Z3 [SEAL] e�)k M C �Q. .. /q, '10 OF It - SEWER FACU Y EASEMENT Rev.20220420 441 &4'� Cz---\ Notary Public, State of Texas Name (printed): Notary's commission expires: 1 d�7 JZiJz3 D223069751 =IBIT T // rr'WIDESAA7 ARYSEP "EASWENT 6o5SQFlOR o.or¢ACRESOFL4M LOT14 BLOCA-22, CRESTWOODADDITION FLTERSCFIOONOF"SVRVEY, ABSTRACTlgo5 =OFFORT WORTH,, TARRANTCI9L9VY7=4S BEING A TRACT OF LAND SITUATED IN THE PETER SCHOONOVER SURVEY, ABSTRACT NUMBER 1405, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 14, BLOCK 22, CRESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 388-B, PAGE 159 AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT Al -INCH IRON PIPE FOUND FOR THE WEST CORNER OF LOT 13, OF SAID BLOCK 22 AND BEING COMMON WITH THE SOUTH CORNER OF LOT 14, ALSO, BEING IN THE NORTHEAST RIG14TOF WAY LINE OF EDGEFIELD ROAD ( A 50 FOOT RIGHT OF WAY), FROM WHICH A 1/24NCH IRON ROD FOUND FORTHE SOUTH CORNER OFTHE SAID LOT 13 BEARS SOUTH 32-21'42" EAST, A DISTANCE OF 60.00 FEET; THENCE NORTH 57'38'18" EAST, WITH THE COMMON LINE OF THE SAID LOT 13 AND THE SAID LOT 14, A DISTANCE OF 105.00 TO THE POINT OF BEGINNING; THENCE OVER AND ACROSS THE SAID LOT 14, THE FOLLOWING COURSES AND DISTANCES: NORTH 32'21'42" WEST, A DISTANCE OF 55.04 FEETTO A POINT FOR CORNER; NORTH 58'10'18" EAST, A DISTANCE OF 11.00 FEET TO A POINT FOR CORNER; SOUTH 3r21'42° EAST, A DISTANCE OF 54.94 FEET TO A POINT FOR CORNER IN THE SOUTHEAST UNE OF THE SAID LOT 14 AND BEING IN THE NORTHWEST LINE OF THE SAID LOT 13; THENCE SOUTH 57'38'18" WEST, WITH THE COMMON LINE OF THE SAID LOT 13 AND THE SAID LOT 14, A DISTANCE OF 11.00 FEET TO THE POINT OF BEGINNING, AND CONTAINING 605 SQUARE FEET OR 0.014 ACRES OF LAND. NOTES 1. EAMIENT DPAWM OF EVEN DATE ACCOMPANIES TIS LEGAL DcSORIPmw 2. BEARINGS REFERENCED TO THE TEXAS STA1E PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONE. WAD '63. ALL DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TOPE FIRM iF-11039 • TSLS FIRM Y10193680 ISM WW Tth 30"4 SuIN 400, Fort Worth, TX 76102 • 617.010.0,696 ROBERT P. ALLEN R.P.L.S, No. 6495 DATED: 04-20-2022 �E OF T� CP''157 ............. ROBERTP.ALIEN J / :dP 6495aP�: S SSx���O / Page 6 of 7 I D223069751 Page 7 of 7 EXHIBIT 'A " 11'WIDESAA TARYSATME4SEMENT 6ogSQFPOR o. o-14ACRESOFLAND LOT14 &OCK22, C STWOODADDTff0N PLTERSCHOONOVERSVRVE A,6STRACT14o5 �CI�'OFFORTWORTH,, TARRANTCOMWYTEr" D� TM R A v0L• 388 , �ws9)Y N i 8' UTILITY EASEMENT 0 \ LOT 16 PROPOSED 11' VOL 388-8, PG. 159 N -SANITARY SEWER J I W i SEPARATE INN57RE?VTUMENT j r i spy CORNER r LOT 17 µryllCk 41 W2 p 11 �` 1 N7T'43' J LOT 15 C v BLOCK 22 p�TE �V qp5 CRESTWOOD ADOMON ± S� No t,A C VOL, 388-8, PG. 158 P.R.T.C.T.•— e �Q 1�mkgp a ✓ "�• JOL' � LOT 18 N 57.3311V E 1WIDE SANITARY \.oa 1` M SEWER EASEMENT 605 SQUARE FEET �-�� D208264920 OR 0.014 ACRES LINE TABLE LECENo- avid Pondt LOT 14 E Q� \ LINE # BEARING LENGTH oe PPOKF OF OEGOINNtC [ �/ w Im POINT OF OOMUENCwo �\ L1 N32'21'42W 55.04' w 9f RM ROD F"D / PROPOSED 1 J' L2 N58'10'18'E 11.00, _ SANITARY SEWER � PF IRON P9'E FOUND , 1PF / EASEMENT BY ' I L3 ='21'42"E 54.94' SEPARATE INSTRUMENT Z NO=: 1. UDAL DEsa6Fn0N (IFE14 F N DATE CJG L4 SSMB'18'W 11.00' 3 o ACCOMPANIES THISEASEMEM DRAwNc. LOT 13 / 2 StXrE PLANE NEiERO4CEDRDIN TO THE Toes / j SPATE PIANE COORDINATE S151E76 � NORTH CENTRAL ZONE, NAD 'Su". ALL d DISTANCES ARE OROUW OMANCET. w - N 0 40 80 �� 1RF LOT 12 I! GRAPHIC SCALE IN FEET ..................... ROBERT P. ALLEN SHIELD ENGINEERING GROUP T11PE FVRM OF•11039 . TM FIRM 010193l90 1690 W»t 7th summ subs 40o, Fort Worth, TX 76102 - 617.61 DAMB ROBERT P. ALLEN R.P.L.S. No. 6495 DATED: 04-20-2022 �p 6495 sJo�•P� - �gs•p� D223069958 04/26/2023 10:00 AM Page: 1 of 8 Fee: $47.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records N),� MARY LOUISE NICHOLSON COUNTYCLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 10 SSE 856 Edgefield Rd. Fort Worth, TX 76107 CRESTWOOD ADDITION Block 22 Lot 15 v�dr�aaoa po 3 ,.� s� STATE OF TEXAS COUNTY OF TARRANT KNOW ALL MEN BY THESE PRESENTS CITY OF FORT WORTH SEWER FACILITY EASEMENT DATE: /e� " 9 -�LQ,_ GRANTOR: Melissa Lawson and Steven B Lawson, Wife and Husband GRANTOR'S MAILING ADDRESS (including County): 856 Edgefield Rd. Fort Worth, Tarrant County, TX, 76107 GRANTEE!'_- CITY OF FORT WORTH GRANTEE'S MAILING ADDRESS (including County): 200 TEXAS STREET FORT WORTH, TARRANT COUNTY, TX 76102 CONSIDERATION: Ten Dollars ($10.00) and other good and valuable consideration, the receipt and, sufficiency of which is hereby acknowledged. EASEMENT PROPERTY: BEING a tract of land more particularly described In the attached Exhibit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILrrY EASEMWOENT C1 T�i Rev. 20220420 �� D223069958 Page 2 of 8 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to be erected within the Easement Property a permanent structure or building, including, but not limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences or walls or other structures that require a building permit. However, Grantor shall be permitted to install and maintain a concrete, asphalt or gravel driveway, road or parking lot across the Easement Property but only to the extent that such surface improvements do not materially interfere with the rights granted hereunder. Grantee shall be obligated to restore the surface of the Easement Property at Grantee's sole cost and expense, including the restoration of any sidewalks, driveways, or similar surface improvements located upon or adjacent to the Easement Tract which may have been removed, relocated, altered, damaged, or destroyed as a result of the Grantee's use of the easement granted hereunder. Provided, however, that Grantee shall not be obligated to restore or replace irrigation systems or other improvements installed in violation of the provisions and intended use of this Easement. Under Chapter 21, Subchapter E of the Texas Property Code, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be entitled before the IOt' anniversary of the date of this acquisition to repurchase or request certain information about the use and any actual progress made toward the use for which this property interest was acquired through eminent — domain, and the repurchase price will be the price the Grantee pays Grantor in this acquisition. The person signing this document on behalf of the Grantor warrants that he or she has the legal authority to execute this permanent easement for the purposes and consideration therein " expressed, and in the capacity therein stated, and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the Grantor. Grantee is fully entitled to rely on this warranty and representation in accepting this permanent easement. TO HAVE AND TO HOLD the above -described permanent easement, together with, all and singular, the rights and appurtenances thereto in anyway belonging unto Grantee, its successors and assigns, forever; and Grantor does hereby bind itself, its heirs, successors — and assigns, to warrant and forever defend, all and singular, the said easement unto Grantee, its successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. This document may be executed in multiple counterparts, each of which will be deemed an original, but which together will constitute one instrument. When the context requires, singular nouns and pronouns include the plural. [SIGNATURES APPEAR ON THE FOLLOWING PAGE] -- SEWER FACILITY EASEMENT 0 WOR Rev. 20220420 D223069958 Page 3 of 8 GRANTOR: Melissa Lawson and Steven B Lawson, a Married Couple By: (Print Name) (Title) By. (Print Name) (Title) ACKNOWLEDGEMENT STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, _ on this day personally appeared Melissa Lawson, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Melissa Lawson and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein lstated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of (SEAL] . ,� AUSTEN COPIES :o`"r� NcgaryPa3tataofTeo� 1 1 OA Notary Public, State of Texas TeRe�t cour�y Name (printed): rY's commission }� Notary ID #133898@5-0 Notary's expires: 'aor�' Cpnxt�sion £zp. AUG. 08, iaa$ SEWER FACILITY EASEMENT Fob' Rev. 20220420 '�' D223069968 Page 4 of 8 ACKNOWLEDGEMENT STATE OF TEXAS § § i COUNTY OF TARRANT § BEFORE ME, the undersigned authority, a Notary Public in and for the State of Texas, on this day personally appeared Steven Lawson, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of Steven Lawson and that they executed the same as the act of said individual for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of 116), AUSTEN LDSNotwryublo-Stds of Tom TertwtCOU* Notary Pubic, State of Texallotary ID 0133SM54 Name (printed): owan AUG. �� Notary's commission expires: SEWER FACILITY EASEMENT ORTWO Rev. 20220420 D223069958 Page 5 of 8 ACCEPTED BY: GRANTEE: City of Fort Worth _n4ff . &&064f By (Signature): ox,s�.4, aorl V. rI8.2G U7 160)t1 (Print Name) Dana Burghdo# (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): (Print name) Matt Murray (T►tle) Assistant City Attorney ACKNOWLEDGEMENT '• STATE OF TEXAS § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, atary Pub in andf^owr the State of Texas, on this da personally appeared L"' e /vA&AA 4*- of the City of FA Worth, a Texas home rule i municipal corporation, known to me to be the same person whose name is subscribed to the foregoing instrument, and acknowledged to me that the same was the act of the City of Fort j Worth and that they executed the same as the act of the City of Fort Worth for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this date of 4- I ISEAW ; r r� AU TEN LOPESNotary �fas OM Notary Pub ic, State of T r °f T Name (printed): " NG axn►nF�lonl?13389895-0 went County Notary's commission expires: Ev, AUG. 08, 2026; , SEWER FACILM MEM W LovvVOUH' Rev. 20220420 D223069958 Page 6 of 8 EXHIBIT 'B" 1i 'WIDE SAA7TARYSE WF.R EASEMENT 574SQITOR o.o13ACRESOFLAND LOTI, RLOCK22, CRESTWOODADDITION PETERSCHOONOVERSURV Y, ABSTRACT1405 CF YOFFVRT WORTH, TARRANTC0V2V7YYEXA.S BEING A TRACT OF LAND SITUATED IN THE PETER SCHOONOVER SURVEY, ABSTRACT NUMBER 1405, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 15, BLOCK 22, CRESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTH, TARRANT COUNTY, TEXAS AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 388-8, PAGE 159 AND BEING MORE PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT A 1-INCH IRON PIPE FOUND FOR THE WEST CORNER OF LOT 13, OF SAID BLOCK 22 AND BEING COMMON WITH THE SOUTH CORNER OF LOT 14, OF THE SAID BLOCK 22, ALSO, BEING IN THE NORTHEAST RIGHT OF WAY LINE OF EDGEFIELD ROAD (A 50 FOOT RIGHT OF WAY), FROM WHICH A 1/24NCH IRON ROD FOUND FOR THE SOUTH CORNER OF THE SAID LOT 13 BEARS SOUTH 32'21'42" EAST, A DISTANCE OF 60.00 FEET; THENCE NORTH 57'38'18" EAST, WITH THE COMMON LINE OF THE SAID LOT 13 AND THE SAID LOT 14, A DISTANCE OF 120.00 FEET TO THE SOUTHEAST CORNER OF THE SAID LOT 14 AND BEING IN THE SOUTHWEST LINE OF LOT 18, OF THE SAID BLOCK 22; THENCE NORTH 32'21'42" WEST, WITH THE NORTHEAST LINE OF THE SAID LOT 14, BEING COMMON WITH THE SOUTHWEST LINE OF THE SAID LOT 18, AND BEING COMMON WITH THE SOUTHWEST LINE OF LOT 17, OF THE AFORESAID BLOCK 22, A DISTANCE OF 58.90 FEETTO AN REENTRANT CORNER OF THE SAID LOT 17 AND BEING COMMON WITH THE NORTH CORNER OF THE SAID LOT 14, ALSO, BEING COMMON WITH EAST CORNER OF THE SAID LOT 15; THENCE NORTH 07'07'18" EAST, WITH THE WEST LINE OF THE SAID LOT 17 AND BEING COMMON WITH EAST LINE OF THE SAID LOT 15, A DISTANCE OF 52.40 FEETTO THE NORTHEAST CORNER OF THE SAID LOT 15 AND BEING COMMON WITH THE SOUTHEAST CORNER OF LOT 16, OF THE AFOREMENTIONED BLOCK 22; THENCE SOUTH 81'08'18" WEST, WITH THE COMMON LINE OF THE SAID LOT 15 AND THE SAID LOT 16, A DISTANCE OF 4.16 FEET TO THE POINT OF BEGINNING; THENCE OVER AND ACROSS THE SAID LOT 15, THE FOLLOWING COURSES AND DISTANCES: SOUTH 07'0718" WEST, A DISTANCE OF 49.34 FEET TO A POINT FOR CORNER; SOUTH 58'10'18" WEST, A DISTANCE OF 13.13 FEET TO A POINT FOR CORNER; NORTH 32'21'42" WEST, A DISTANCE OF 1.24 FEET TO A POINT FOR CORNER; NORTH 07'07'18" EAST, A DISTANCE OF 53.49 FEET TO A POINT FOR CORNER IN THE NORTH LINE OF THE SAID LOT 15 AND BEING IN THE SOUTH LINE OF THE SAID LOT 16, FROM WHICH A 1/2-INCH IRON ROD FOUND BEARS SOUTH 81-08-18" WEST, A DISTANCE OF 130.62 FEET TO THE NORTHWEST CORNER OF THE SAID LOT 15 AND NORTH 7243'21" WEST, A DISTANCE OF 0.51 FEET; THENCE NORTH 81'08'18" EAST, WITH THE COMMON LINE OF THE AFORESAID LOT 15 AND THE SAID LOT 16, A DISTANCE OF 11.44 FEET TO THE POINT OF BEGINNING, AND CONTAINING 574 SQUARE FEET OR 0.013 ACRES OF LAND. NOTES: 1. EASEMENT DRAINING OF EVEN DATE ACCOMPANIES THIS LEGNL DESCIRPTIOM. 2. BEARINGS REIMENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM, NORTH CENTRAL ZONE. NAO '83. ALL DISTANCES ARE GROUND DISTANCES. VA F4 k, SHIELD ENGINEERING GROUP TBPE FIRM MF.11039 • TBLS FIRM *10193890 1800 West 7th Street, Suite 400, Fort Worth, TX 70102 • 817.810.0095 ROBERT P. ALLEN R.P.L.S. No. 6495 DATED: 04-20-2022 ROBERT P. ALIEN �:Opo6495�p�:� D223069958 Page 7 of 8 I a EXhHIBIT ':4 if rr'WID.E8AW,ARYSEWEREASElYEAT 574SQFTOR o.or,?ACReSSOFLAND LOTr5 BLOCK22, CRESTWOODADDDYON F=R SCHOONOVER SURVEY, AGSM C71405 ` CITYOFFDRTWORTH, TARRANTCOUNTYTYA.S RA VOL. O WAY 388.8, 159) LOT 16 j f ! �- j 8' UTILITY EASEMENT PROPOSED 11' J 1 VOL. 388-8, PG. 759 SANITARY SEWER~ EASEMENT BY 1 SEPARATE INSTRUMENT j s B1roB 18' w 4.16' SW CORNER 112 III � L5 Front wHCH Zo"w - 0.51 g61. ere+ P06 LOT 17 BRS: N7T4.3' r 130.82! N 07.OTi6' E 1 V WIDE SANITARY Fr'-514W ,on D220335925 SEWER EASEMENT L1 I1GGjyOV� G o ,1 Melissa Lawson 574 SQUARE FEET , PS RXYo 1�p5 UOR 0.013 ACRES 1 LOT 15 L3� p BLOCK 22 < \ CRESTWOOD ADDMON C) VOL. 3 8-B,CPG. 159 �159 d /9G. \ & g LOT 18 i �(1v10, 88.8' \ \ \ IOV LOT 14 / \ \ I LINE TABLE LEGEND: L1NE# BEARING LENGTH PO8 POINT OF BEGINN{NG \ f L1 soroT18'W 49.34' POC POINT OF COMMENCING PROPOSED 11'-/ IRF IRON ROD FOUND SANITARY SEWER \ L2 S58'10'18'W 13.13' \ IPF IRON PIPE FOUND , ,Q� EASEMENT BY L3 N32'21'42"W 124' \ 1 SEPARATE INSTRUMENT N0` OG L4 NO7°OT18'E 53.48' 1. LEG/, DESCRIPRON OF EVEN DATE �j � ACOOWANIES THZ EASEMENT DRAVAND, ` LOT 13 / L5 N81°OB'18"E 11.44' 2. BEAR14GS REFERENCM TO THE TDCAS STATE PLANE CDOFONATE D *63. l / NORTH CENTRAL ZONE NDI AN ALL DISTANCES ARE GROUND DISTANCES. 0 40 80 \� RF LOT 12 1 � -LE GRAPHIC SCALE IN FEET `/ ors , TC+��' Q- Q ' SHIELD ENGINEERING GROUP TBPE FIRM VF-11039-TBL.S FIRM?I DIS M0 1600 West 7th Street, Sulie 400, Fort Worth, T% 76102 • 817.810.0696 ..................... ROBERT P. ALLEN .�p�6495. 9,1DF;5S5\4��0 ROBERT P. ALLEN R.P.L.S. No. 6495 DATED: 04-20-2022 D223069958 Page 8 of 8 CONSENT OF LIEN HOLDER MIN:100287715004239591 Alamo Title GF# 6000182200803-LSK MERS Phone: 1-888-679-6377 Mortgage Electronic Registration Svstems, Inc.. soleiv as Nominee for Gatewav Mortgage Group, a division of Gatewav First Bank. it's successors and assigns ('Lien holder"), is the current Ilenholder of a Mortgage Deed of Trust dated December 18, 2020 , executed by Melissa Lawson and Steven B. Lawson. wife and husband. to Scott Gesell, Trustee, as recorded December 21.2020 in clerk file No. D220335926 . In the Real Property Records, of Tarrant County Texas, hereby consents to the foregoing Sewer Facility Easement by Melissa Lawson and Steven B. Lawson, wife and husband, to City of Fort Worth. and joins in the execution hereof solely as Lien Holder and hereby does agree that in the event of the foreclosure of said mortgage, or other sale of said property described in said mortgage and below under Judicial or non -judicial proceedings, the same shall be sold subject to said Easement. "MERS" is a Mortgage Electronic Registration Systems, Inc. MERS is a separate corporation that is acting solely as a nominee for Lender and Lender's successors and assigns. MERS is the beneficiary under this Security Instrument. MERS is organized and existing under the laws of Delaware, and has an address and telephone number of 1901 E Voorhees Street, Suite C, Danville, IL 61834, P.O. Box 2026, Flint, Michigan 48501-2026 tel. (888) 679-MERS. SIGNED AND EXECUTED THIS ID STATE OF COUNTY OF P✓.cek- ) DAY OF 2023. Mortgage Electronic Registration Systems, inc., solely as nominee for Gateway Mortgage Group, a division of Gateway First Bank. BEFORE ME, the undersigned authority, on this day personally appearedln0W� (11%iYu S . as, for Mortgage Electronic Registration Svstems. Inc., solely as nominee for Gatewav Mortgage Group, a division of Gateway First Bank, known to me to be the person who acknowledged to me that they executed the same for the purposes and consideration therein expressed, in the capacity therein stated, as the act and deed of said Lienhl_older. GIVEN UNDER MY HAND AND SEAL OF OFFICE THIS 10�day of -W6-U Gi 2023. AMY SUE ADDISON NotaryPu ic,State of [_ILiLi�tpmen.- Notary Public, State of Oklahoma = My commission expires: /0I�3 Commission 1 180107 6 My Commission Expires D223087318 05/19/2023 01:38 PM Page: 1 of 6 Fee: $39.00 Submitter: Alamo Title Company - DFW Electronically Recorded by Tarrant County Clerk in Official Public Records r3, 'k.� NJ MARY LOUISE NICHOLSON COUNTYCLERK NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU AREA NATURAL PERSON, YOU MAY REMOVE OR STRIKE ANY OR ALL OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT _ BEFORE IT IS FILED FOR RECORD IN THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER. CPN 103362 Water and Sanitary Sewer Replacements, Contract 2020 WSM-L Services Parcel No. 11 SSE 860 Edgefield Rd. Fort Worth, TX 76107 ALAMO T'TL�' (`t' P.`�( CRESTWOOD ADDITION Block 22 Lot 16 s ` J _ GF Joao/ �� a� s STATE OF TEXAS § I § KNOW ALL MEN BY THESE PR(V" COUNTY OF TARRANT § CITY OF FORT WORTH SEWER FACILITY EASEMEN DATE: 0 f l-1I ZDZ2 GRANTOR: Theodore Robert La Bree O GRANTOR'S MAILING ADDRE C I n 9839 Ca n. n (( n GRANTEE: CITY OF R H\/ GRANTEE'S MAILIN S (including County): 200 =R T 2Z0 1400 40 rN I "x -n o-n , TARRANT COUNTY, TX 76102 CON D TI N: NT6n Dollars ($10.00) and other good and valuable consideration, the r ceipt d R&cy of which is hereby acknowledged. EN OPERTY: BEING a tract of land more particularly described in the atta a !bit A and Exhibit B. Grantor, for the Consideration paid to Grantor, hereby grants, sells, and conveys to Grantee, its successors and assigns, an exclusive, perpetual easement for the construction, operation, maintenance, replacement, upgrade, inspection and repair of a Permanent Sewer Line Facility, hereafter referred to as "Facility." The Facility includes all incidental underground and aboveground attachments, equipment and appurtenances, including, but not limited to manholes, manhole vents, lateral line connections, pipelines, and junction boxes in, upon, SEWER FACILITY EASEMENT Rev.2022D420 Fo�ar,� H. D223087318 Page 2 of 6 under and across a portion of the Easement Property, more fully described in Exhibit A and Exhibit B attached hereto and incorporated herein for all pertinent purposes, together with the right and privilege at any and all times to enter Easement Property, or any part thereof, for the - purpose of constructing, operating, maintaining, replacing, upgrading, inspecting and repairing said Facility. In no event shall Grantor (1) use the Easement Property in any manner which interferes in any material way or is inconsistent with the rights granted hereunder, or (II) erect or permit to erected within the Easement Property a permanent structure or building, including, but limited to, monument sign, pole sign, billboard, retaining walls, brick or masonry fences r or other structures that require a building permit However, Grantor shall be permitt and maintain a concrete, asphalt or gravel driveway, road or parking lot across t e en Property but only to the extent that such surface improvements do not materiall in rfe ith the rights granted hereunder. Grantee shall be obligated to restore t a the Easement Property at Grantee's sole cost and expense, including th MV i any sidewalks, driveways, or similar surface improvements locate o a a en the Easement Tract which may have been removed, relocated, alt e a stroyed as a result of the Grantee's use of the easement granted here n er. P owever, that Grantee shall not be obligated to restore or replace irrigation y tems her improvements installed in violation of the provisions and intended use of this as t. Under Chapter 21, Subchapter E of the Texas Propert9NNe,, as amended, the Grantor or the Grantor's heirs, successors, or assigns may be en o the 101 anniversary of the date of this acquisition to repurchase or request certa' about the use and any actual progress made toward the use for which tro e t was acquired through eminent domain, and the repurchase price will be the i ee pays Grantor in this acquisition. The person signing this document on a rantor warrants that he or she has the legal authority to execute this per ane t ase nt for the purposes and consideration therein expressed, and in the capacl r i to that such binding authority has been granted by proper order, resolutio d r authorization of the Grantor. Grantee is fully entitled to rely on this wa e ntation in accepting this permanent easement. — TO HAVE AND TO HO oVWdescribed permanent easement, together with, all and singular, the rights a ances thereto in anyway belonging unto Grantee, its successors and as g s, er; and Grantor does hereby bind itself, its heirs, successors and assigns, to r n f rever defend, all and singular, the said easement unto Grantee, its successor a against every person whomsoever lawfully claiming or to claim the same n p th re f. .s doc e t be executed in multiple counterparts, each of which will be deemed an igi I, bu w ich together will constitute one instrument. When the context requires, sin I n and pronouns include the plural. -- [SIGNATURES APPEAR ON THE FOLLOWING PAGE] SEWER FACILITY EASEMENT F-T Rev. 20220420 i D223087318 Page 3 of 6 GRANTOR: Theodore Robert La Bree, a single perso By: X n (Print Name) T�� r.St. 1C J _Qr,-*QZ (Title) ACKNOWLEDGEMENT �\ STATE OF TEXAS § l 1 JAarc,_s § �J COUNTY OF TAvrieat VY- § BEFORE ME, the undersigned authority, a Notary Publ in o he State of Texas, on this day personally appeared Theodore RobertL e , kno a to be the same person whose name is subscribed to the foregoing ins nt, and acknowledged to me that the same was the act of Theodore Robert La Bree a executed the same as the act of said individual for the purposes and conOside i th a pressed and in the capacity therein stated. f1 GIVEN UNDER MY HAND AND F E this date ofC F� WLZ. n N ary ublic, State of Texas !� Na (printed).- Lh•Q.Z Notary's commission expires: �Iz,�l2o 2� SEWER FACILITY EASEMENT Rev. 20220420 Fo_�W*o� . D223087318 Page 4 of 6 ACCEPTED BY: GRANTEE: City of Fort Worth By (Signature): Dana Swghdoff ( 2, 20 7:57 CDT) (Print Name) Dana Burghdoff (Title) Assistant City Manager APPROVED AS TO FORM AND LEGALITY By (Signature): ✓"`�" (Print Name) Matt Murray (Title) Assistant City At o ney ACKNOWLEDG E STATE OF TEXAS § COUNTY OF TARRANT § O BEFORE ME, the undersigned a a Public in and for the State of Texas, on this day personally app ared a r off Assistant Citv Manaeer o the City of Fort Worth, a Texas home rule municipal corporation, no e e me person whose name is subscribed to the foregoing instrument, an k e that the same was the act of the City of Fort Worth and that they ex c a s the act of the City of Fort Worth for the purposes and consideration there a re a an in the capacity therein stated. GIVEN UN AND SEAL OF OFFICE this date of May 2, 2023 (SEAL YP SELENA ALA r� Notary Public * STATE OF TEXAS Py Notary I.D. 132422528 My Comm. Exp, Mar, 31, 2024 SEWER FACILITY EASEMENT Rev. 20220420 NO Selena Ala (May 2, 2023 08:22 CDT) Notary Public, State of Texas Name (printed): Notary's commission expires: 0 'WORTH. lI I 1� f I t D223087318 Page 5 of 6 EXHIBIT '27 n' WIDESAN7TARYSEPVER EASLMENT &SSQFT OR o. w4ACRES OFLAND LOTrd, BLOCK22, CRESTWOODADD72YON PETER SCHOONOV RSURVEY, ABSTRACT1405 =OFFORTWORTH, TARRAATC0UN7YTEX2I5 BEING A TRACT OF -LAND SITUATED IN THE PETER SCHOONOVER SURVEY, ABSTRACT NUMBER 1405, CITY OF FORT WORTH, TARRANT COUNTY, TEXAS, AND BEING A PORTION OF LOT 16, BLOCK 22, CRESTWOOD ADDITION, AN ADDITION TO THE CITY OF FORT WORTq TARRANT COUNTY, TEXAS AS SHOWN ON PLAT THEREOF AND RECORDED IN VOLUME 388-B, PAGE 159 AND BEING MORE PARTIC VA DESCRIBED BY METES AND BOUNDS AS FOLLOWS: COMMENCING AT A 1-INCH IRON PIPE FOUND FOR THE WEST CORNER OF LOT 13, OF SAID BLOCK 22 AND BEING SOUTH CORNER OF LOT 14, OF THE SAID BLOCK 22, ALSO, BEING IN THE NORTHEAST RIGHT OF WAY LINE OF EDGEFIE RIGHT OF WAY), FROM WHICH A 1/2-INCH IRON ROD FOUND FOR THE SOUTH CORNER OF THE SAID LOT 13 BEARS Sf DISTANCE OF 60.00 FEET; c THENCE NORTH 57*38-18" EAST, WITH THE COMMON LINE OF THE SAID LOT 13 AND THE SAID LOT 14, A EAST CORNER OF THE SAID LOT 14 AND BEING IN THE SOUTHWEST LINE OF LOT 18, OF THE SAID BLOCK TO THE THENCE NORTH 32°21'42" WEST, WITH THE NORTHEAST LINE OF THE SAID LOT 14, BEING COV90ILVAH E_ 9Q ' [PVEST LINE OF THE SAID LOT 18, AND BEING COMMON WITH THE SOUTHWEST LINE OF LOT 17, OF THE AFORESAID BUSAID 8.90 FEET TO AN REENTRANT CORNER OF THE SAID LOT 17 AND BEING COMMON WITH THE NORTH CORNER14, ALSO, BEING COMMON WITH SOUTHEAST CORNER OF LOT 15, OF THE AFOREMENTIONED BLOCK 22; THENCE NORTH 07"07'18" EAST, WITH THE WEST LINE OF THE SAID LOT 17 AND G COMLINE OF THE SAID LOT 15, A DISTANCE OF 52.40 FEET TO THE NORTHEAST CORNER OF THE SAID LOT 15 AND N OMOUTHEAST CORNER OF THE SAID LOT 16; THENCE SOUTH 81'08'18" WEST, WITH THE COMMON LINE OF THE SAID LOT D H Al LOT16, A DISTANCE OF 4.16 FEET TO THE POINT OF BEGINNING; O THENCE SOUTH 81'08'18" WEST, WITH THE COMMON LINE OF THE SA L 1 A� E SAID LOT 16, A DISTANCE OF 11.44 FEET TO A POINT FOR CORNER, FROM WHICH 1/2-INCH IRON ROD FOUND BEARS S 0 A DISTANCE OF 130.62 FEET TO THE SOUTHWEST CORNER OF THE SAID LOT 16 AND NORTH 72'43'21"WEST, A DI�F 1 ET; THENCE NORTH 07°07'18" EAST, OVER AND ACROSS ID OF THE SAID LOT 16 AND BEING IN THE SOUTH P IT 1F M THENCE SOUTH 78°21'42" EAST, WITH THE THE SAID DRIVER AVENUE, A DISTANCE OF THENCE SOUTH 07`07'18" WEST, OVERAND _ BEGINNING, AND CONTAINING 615 l MOTES: 1. EASEMENT DRAWING OF DATE ACCOMPANIES THIS LEGAL DESCRIPTION. 2, BEARINGS REFERENCED TO THE TEXAS STATE PLANE COORDINATE SYSTEM, NORTH CEMRAL ZONE NAD '83. ALL DISTANCES ARE GROUND DISTANCES. SHIELD ENGINEERING GROUP TBPE FIRM #F-11039 • TBLS FIRM #10193890 1600 West 7th Street, Sufte 400, Fort Worth, TX 76102 • 817.81 D.0696 VCE OF 57.88 FEET TO A POINT FOR CORNER IN THE NORTH LINE AVENUE (A 50 FOOT RIGHT OF WAY); ;AID LOT 16 AND BEING COMMON WITH SOUTH RIGHT OF WAY LINE OF CORNER; REMENTIONED LOT 16, A DISTANCE OF 53.86 FEETTO THE POINT OF ACRES OF LAND, ROBERT P. ALLEN R.P.L.S. No. 6495 DATED: 04-20-2022 J �E OF T �? •��ST I 9 ................. ROBERT P. ALIEN ..................... °p 6495 P D223087318 Page 6 of 6 EXHIBIT '14 " 11' T4=SAAQTARYSEWF.R F.ASFMENT &5SQFTOR o.o14ACRMOFLAND LOT-i6, BLOCA 22, CRF,STWOODADD=ON PETERSCHOONOVERSLWV Y,ARSTRACT14o5 OFJluRT WORTH, TARRAN7'COUN7YTEXAS �205278190 (Theodore Robert La Bree LOT 16 j I 8UTILITY EASEME� 1 V WIDE SANITARY � 1rl VOL. 388-B, PG. 1I J SEWER EASEMENT 615 SQUARE FEET / S81•C818 w OR 0.014 ACRES 4.18' SW FROMCOR HER Jrvj 1• 101 I L '"W IRp 51' s 61'� BRSN7 4J72� � 130:6x I I PROPOSED 11' II D -k AvwE VOL. 388.8, oG W oY SANITARY SEWEREASEMN7 Drt6' E OVA 11 ooN BY o Q \ SEPARATE NSTR MENT I I S CT N 145 00 LOT 15 p d BLOCK 22 +"d CRESTWOOD ADDITION �b VOL. 388-8, PC. 159 Y P.R.T.C.T. 4 LEGEND: POB POINT OF BEGINNING 4 POG POINT OF COMMENCING IRF IRON ROD FOUND ! IPF IRON PIPE FOUND NOTES G \ I LINE # \ Li L2 L3 1. LEGAL DESCIdP ION OF EVEN DA ^l� • v ' I L4 ACCOMPANIES TWS ENT �( 2. BEAR9I(a'S, REFER EN TO T / STATE CENE C ZONE, S / RON NORTH C ZONE, '83. DISTANCES VE VOUND 0 I GRAPHIC SCALE IN FEET SHIELD ENGINEERING GROUP TBPE FIRM tF-11039 - TBLS FIRM #10193890 1600 West 7th Street, SuHe 400, Fort Worth, TX 76102 " 817.810,0696 F \ �RF LOT 12 1�2 7 r ROBERT P. AI LEN R-P.LS. No. 6495 DATED: 04-20-2022 LOT 18 LINE TABLE BEARING LENGTH S81"08'18"W 11.44' N07"07'18"E 57.88' S78"21'42"E 11.03' S07°07'18"W 53.86' OF ................. ROBERT P. ALLEN \ ' ; �p 6495 .Pv.. �OFSUR 11 FOR INFORMATIONAL PURPOSES ONLY d z :: ITEM BID LIST No UNIT ITEM DESCRIPTION 1 3305.01081 LS (Utility Adiustment (Irrigation adjustments) 2 241.13 LF Remove Exi tinqQ Concrete Curb and Gutter 3 3216.0102 LF 6" Concrete Curb and Gutter 4 241.0401 SF 1 Remove Existing Concrete Driveway 6 3213,0401 SF New 6-Inch Concrete Driveway install dewalk Remove rBackete �of 8 3213.03221 LF o crrete CurbSidewalk 10 3213,0301 I SF 14" Concrete Sidewalk 13 241.141 SY I Remove Existing Concrete Valley Gutter 14 3216.0302 SY New 7" Concrete Valley Gutter 15 241.17 SY Innstall 10-Inch Pavement Pulverization 16 241.171 SY 111-Inch Pavement Pulverization 18 1 3211.331 TN Cem-Lime Stabilization 0 32Lbs/SY 19 3123.01011 CY (Unclassified Street Excavation 20 I 3212.03031 SY 13-Inch Surface Course Asphalt TYDe" D" 2 1 9999.00011 EA Remove $ reed Cushion w/ Striping 31 3305.01111 EA Water Valve Box Adiustment with Concrete Collar 34 3305.0107 EA Manhole Adjustment With Concrete Collar 36 3217,5001 EA Painti�p Curb Addresses 37I 3291.01 CY Toosoif 38 3292.0100 SY Block Sod Reolacement 42 9999.0020 EA Remove and ReDlace Inlet Too 44 3471.0001 MO Traffic Control 45 I 3125.0101 LS SWPPP 2 1 acre 46 1 3212.0404I TN HMAC Transition 47 1 9999.0004 LS Pavino Construction Allowance v °�a a .X � p` Q 0 C O O a s o�ao 0 a 0 S p 0 a 0 O 0 3 0 F- 0 3 8-�0 O �a y x 0 H O c� LL 0 oLU 000 oJ0 wp� -To wY QYa a as ada aU ' a C auJF- YC70 w'a �aa ME oada1Z006 z00Cin w-Zi Z) 3u°ft� CITY CITY CITY CITY TOTAL 500 1 500 1 850 3 500 I I I 1 1 500 500 850 30 U 1,428 1 I 6778 1 500 I 1000 1 1,584 �000 4,060 I I 7084 500 1 to1,5084 1,518 860002 1 1 0 0 0 0 i I 0 116 266 I 80 0 1 0 0 1 I I 80 1 80 0 0 120 188 1 388 0 0 I 0 100 I I 100 7,500 2,300 3,000 7,800 6 500 �8 650 27750 I 113 1 35 45 117 10 417 25 1 0 50 10 0 85 7.500 1 2 300 3.000 7 800 6,500 615 27715 1 0 1 a00 1000 6 1 3 4 1 5 18 5 3 8 10 0 20 I, 50 94 I I 84 1 100 100 200 1,000 1400 I 4 1 2 6 0 20 10 1 50 I 80 1 0 1 0 1 1 1 1 1 Page 1 of 1 I 1 1 1 i 1 I I - 1 1 1 1 1 1 I --7 1 1 1