HomeMy WebLinkAboutContract 55171-A2CSC No. 55171-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 55171 WHEREAS, the City of Fort Worth (CITY) and Half Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 55171, (the CONTRACT) which was authorized by M&C 20-0983 on the 12th day of December, 2020 in the amount of $530,314.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $123,768.00 authorized on November 30, 2021 by M&C 21- 0921; and WHEREAS, the CONTRACT involves engineering services for the following project: Northside IV 24-Inch Water Transmission Main; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $42,003.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $696,085.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Northside IV 24-Inch Water Transmission Main Prof Services Agreement Amendment Template CPN. 102687 Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth PJass,-, 13u�*,A Dana Burghdoff(Nov 2023 4 CST) Dana Burghdoff Assistant City Manager DATE: Nov 29, 2023 APPROVAL RECOMMENDED: CH✓isto�hav harder rnr�soopner Hamer Movzs, zozz or iz csrl Christoher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Hal ff Associates, Inc. _\J,- Dennis Haar, P.E. Public Works Team Leader DATE: November 27, 2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Suzanne Abbe, P. E. Project Manager APPROVED AS TO FORM AND LEGALITY: fj� DBlack (Nov 29, 202317:49 CST) Douglas W. Black Sr. Assistant City Attorney F4vOvRop),�4d��°�P� ATTEST: a� 0zg *"d a �bnnoaoo- Jannette Goodall City Secretary M&C Date: N/A N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 Northside IV 24-Inch Water Transmission Main CPN. 102687 .ee haLff November 3, 2023 34486.001 Ms. Suzy Abbe, PE Senior Engineer, Capital Projects Delivery - Facilities City of Fort Worth Water Department 200 Texas Street Fort Worth, Texas 76102 RE: Amendment No. 2 — Northside IV 24-inch Water Line City Project No. 102687 Dear Ms. Abbe: Halff Associates presents this Amendment No. 2 for additional services to City Project No. 102687. Amendment No. 2 includes the effort necessary to modify the original design of transfer valve vault. The modification will allow additional flow to be transferred between the pressure planes during peak demands. The transfer valve vault modification includes civil/mechanical, structural, electrical, instrumentation, and control engineering changes. To perform the EIC engineering, Halff once again utilized Gupta Associates, Inc. (GAI). GAI is a qualified business equity (MBE/WBE) firm. Additionally, this Amendment also includes budget for construction administration. The original contract only contained a limited scope and budget for construction administration. Halff has been asked to attend, etc. the monthly construction meetings. This additional budget would cover monthly meetings (through June 2024). The Level of Effort spreadsheet for Amendment 2 is attached for reference. A summary of the proposed budget for this amendment is as follows: 4.0 Final Design $30,148 6.0 Construction Phase Services $11.855 TOTAL PROPOSED AMENDMENT NO. 2 $42,003 The additional business equity effort included in this amendment is $14,760, or 35% of the amendment total. Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. 2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 1 halff.com .ee haLff Following is project fee summary: Original Contract $530,314 Amendment No. 1 $123,768 Amendment No. 2 $42,003 REVISED CONTRACT AMOUNT $696,085 Sincerely, HALFF ASSOCIATES, INC. Preston C. Dillard, PE Sr. Project Manager 2601 Meacham Blvd., Suite 600, Fort Worth, TX 76137 1 halff.com Task No. Task Description 1.0 Project ManaiQtment 1.1 Man�yTna the Team 1.1. N T ED 1.1 ,' QA/QC 1.2 -Communications and RgPortinq 1.2. Pre -Design Coordination Meeting [monthly, bi-monthly, monthly] Project 1.2t'i Update Meetiq s 1.21 Design Submial Review Meetings 1.2. Prepare Baseline Schedule Prepare Monthly Progress Reports with 1.2�: Schedule 1.21j 1.2. Pyre Monthly MBE/SBE Reports N6T USED 2.0 Conceptual Design (30-Percent) 2.1 Data Collection 2.x NOT USED 2.2 Section 404 of CWA Assessment 2.3 Conceptual Design Package 2.3.1 Corrosion pro tEcjiOn evaluation Concep(us 2.3.2 asigf Memo 2.3.3 Construction Estimate 3.0 Preliminar Design (60 Percent) 3.1 Preliminary Design Drawings 3.2 Geotechnical Investigation 3.x NOT USED 3.3 Utili�' Clearance 3.4 Traffic Control Plan 3.6 NOT USED 3.7 Construction Estimate 3.8 Not Used City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Northside IV 24-inch Water Transmission Main Phase IB City Project No. 102687 Amendment No. 2 Project Director Project Manager Labor Project Engineer hours) EIT CADD Administrative Total Labor Cost E4(pense Subconsultant Travel MWBE I Non-MWBE Reproduction Total Expense Cost Task Sub Total % Complete Budget Remaining $364 $274 $182 $133 $75 $83 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 I $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 01 oF 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 01 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 1 of 3 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Northside IV 24-inch Water Transmission Main Phase IB City Project No. 102687 Amendment No. 2 Task Description Task No. Project Director Project Manager Labor Project Engineer hours) EIT CADD Administrative Total Labor Cost $13,912 Ex ense Subconsultant Travel Reproduction MWBE Non-MWBEI $14,7601 $01 $01 $0 Total Expense Cost $14,760 Task Sub Total $28,672 Budget %Complete Remaining Rate 4.0 Final Desi%n lassume 12,400 LF) $364 $274i $182 $1331 $751 $83 2 20 22 25 5 0 Final Draft ( Y.) Construction Plans and 4.1 Specifications 4.1.1 NOT USED 4.2 Final (100%) Plans and Specifications 4.3 NOT USED 4.4 Construction Estimates (90% and 100%) 5.0 Bid Phase 22 25 5 0 0 0 0 $0 $14,760 $0 $0 EO EO $0 $0 2 201 $0 $13,912 $0 $0 $14,760 $28,672 $0 $0 $0 $0 $0 $0 MEN 0 01 $0 $0 $0 5.1 Bid S9 port Seltntract Documents and Maintain 5.1. - Plan Holders List 5.1 t Issue Addenda 5.1� Attend Pre -bid Conference 5.1. NOT USED 5.1 Tabulate Bids and Recommend Award 5.1. Issue Conformed Contract Documents $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 6.0 Construction Phase Services 0 251 181 131 01 0 $11,855 $0 $01 $0 $0 $0 $11,855 6.1 Construction SupQQort 6.1. Attend Preconstruction Conference 6.1, Monthly Meetings (Assumes 10) 6.1�= ProJ'ecE Site Visits 6.1:= Submittal Review Request for Information/Change Order 6.1�= Review 6.1 Final Walk Through and Punch List 6.2 Record Drawin. 1 151 5 1 101 13 13 $0 $0 $0 $5,020 $0 $0 $5,020 $0 $0 $6,835 $0 $0 $6,835 $0 $0 $0 $0 $0 $0 $0 $0 7.0 ROW/Easement Services 0 0 0 0i 0i 0 $0 $0 $0 $0 $01 $0 $0 7.1 Right -of -Way Research ROW Easement Preparation and Submittal 7.2 (assume 15 perm and 15 temp easements) $0 $0 $0 $0 $0 $0 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 2 of Task No. Task Description 7.3 Temporary Right of Entry Submittal 8.0 Survey 8.1 Design Survey 8.2 Temporary Right of Entry Submittal 8.3 SUE 9.0 Permitting - NOT USED 9.1 SWPPP 9.2 Environmental Services 9.3 Floo Alain Services 9.4 ixD T 9.5 Railroad 9.6 iDLR 9.7 City of Fort Worth Parks Conversion 10.0 Pdditional Services 10.1 Additional Services, as directed by City Totals City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Northside IV 24-inch Water Transmission Main Phase IB City Project No. 102687 Amendment No. 2 Project Director Project Manager Labor Project Engineer hours) EIT CADD Administrative Total Labor Cost $0 EX Subconsultant MWBE Non-MWBE ense Travel Reproduction Total Expense Cost $.0 Task Sub Total $0 Budget %Complete Remaining $364 $274 $182 $133 $75 $83 0 01 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 1 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 01 0 0 0 0 $0 $0 $o $o $0 $0 $0 1 1 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $01 1 $0 $0 21 451 401 381 1 1 5,7671 $0 $0 $0 $14,760 $40,527 Protect SUMMIT � 1'l Hours 130 Total Labor $25,767 Total Expense $14,760 MBE/SBE Subconsultanf $14,760 Non-MBE/SBE Subconsultanf $0 10% Sub Markup $1,476 MBE/SBE Partic'pation 35.1 Total Project Cos4 $42,003 3 Of