Loading...
HomeMy WebLinkAboutContract 59740-CO14 vnonnIl � pF FORr�f ad l.g Attest: /VI da�� nExA5o4p Facility and Project WRMC Sheep and Swine Description: FORTWORTH. City Of Fort worth Change Order Request Funding (FID) No.(s) 34031 0240450 5740010104828 000680 9999 Contractor: I Sedalco, Inc. City Project Mgr. IRonnie Clements Phone Number: 1 (817) 392- 8014 Original Contract Amount------------------------------- --------------------------- Extrasto Date------------------------------- ------------------------------------------ Credits to Date ------------------------------------------------- Pending Change Orders (in M&C Process) --------------------------- Contract Cost to Date------------------------------ --------------------------------- Amount of Proposed Change Order ------------------------------------------------- Revised Contract Amount-------------------------------- ------------------------ Original Funds Available for Change Orders ----------------------------------------------- Remaining Funds Available for this CO ------------------------------------------------- Additional Funding (if necessary) ------------------------------------------------- CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT Change Order # City Inspector: Phone Number: CSC No. 59740-COI City Sec No. 159740 City Proj. No. 104828 0 Date: 1 12/11/2023 lJohn Fowler 1(682) 201-1918 Contract Time (CD) ---------------------- 52,174,556.00 17 ------- -j 0.00 0 ----------------------------------------a -0.00 0 ----------I ' 0.00 0 ---------------- 2,174,5 -6.00 17 � -----------------I 32,041,528.00 365 ----------------------- '34,216,084.00 382 ------- 00 -----------I 00 E00 -------------------{ 0 JUSTIFICATION (REASONS) FOR CHANGE ORDER The purpose of Change Order #1 is to increase the Guaranteed Maximum Price (GMP) of the construction contract for WRMC Sheep and Swing addition. Sedalco Inc. was selected as Construction Manager at Risk (CMAR) in June of 2023, M&C 23-0564. Change Order No. 1 ($32,041,528.00) increasing the original contract amount ($2,174,556.00 for pre -construction and early procurement) for a revised contract amount of $34,216,084.00, approved by M&C 23- 1025. The funding appropriated for the agreement and for the early equipment procurement package included in $4,000,000.00 appropriated in M&C 23-0510, June 13, 2023, however, only $2,149,556 of that $4,000,000 was spent on the early equipment procurement. In addition to the contract price, the contract time will be increase 356 calendar days as stated below in Sedalco's GMP proposal to Change Order #1. The additional project duration for the Work is to be substantially complete by December 1, 2024. It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both Contractor's Company Name Contractor Name Contractor Signature Date Sedalco, Inc. Russ Garrison 0 Dec 14, 2023 PMD Inspector Date Sr Ca ital Projects Officer Date Dec 14, 2023 Dec 14, 2023 PMD Superintendent Date Director/Property Management Department Date Dec 14, 2023 - �"( �'� Dec 14, 2023 rojranager _Tj_ate=PFJ3Mant City Attorney Date W_CA- t' Dec 14, 2023P Dec 19, 2023 Project Architect I Date I Assistant City Manager Darte �-- Dec 14, 2023 a Dec 20, 2023 M&C Number I23-1025 M&C Date Approved 11/28/2023 Contract Compliance Manager: By signing I acknowledge that I am the person responsible OFFICIAL RECORD for the monitoring and adminstration of this contract, including Nikita Watts ensuring all performance and reporting requirements. CITY SECRETARY Sr Capital Projects Officer FT. WORTH, TX M&C Review Page 1 of 3 Official site of the City of Fort Worth, Texas A CITY COUNCIL AGEND FORTWORTH Create New From This M&C DATE: 11/28/2023 REFERENCE M&C 23- LOG NAME: NO.: 1025 CODE: C TYPE: NON- PUBLIC CONSENT HEARING: 21SHEEP AND SWINE CHANGE ORDER 1 AND DESIGN CONSTRUCTION ADMIN NO SUBJECT: (CD 7) Authorize Execution of a Change Order for Construction Manager at Risk Contract with Sedalco, Inc., in the Amount of $32,041,528.00, Including an Owner's Construction Contingency Allowance, and Construction Administration Services Contract in the Amount of $621,370.00 which Includes Reimbursable Expenses to Grace Hebert Curtis Architects, LLC for the Will Rogers Memorial Center Sheep and Swine Barns Renovations RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a Change Order for Construction Manager at Risk Contract with Sedalco, Inc., in the amount of $32,041,528.00, including an owner's construction contingency allowance, for the Will Rogers Memorial Center Sheep and Swine Barns Renovations (City Project No. 104828); and 2. Authorize execution of a Construction Administration Service Contract with Grace Hebert Curtis Architects, LLC in the amount of $621,370.00, including reimbursable expenses. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to take actions associated with the procurement of a Construction Manager at Risk for the renovating and remodeling of the Sheep and Swine Barns and Livestock Handling Facilities (Project) at the Will Rogers Memorial Complex (WRMC). This Project represents one element in the larger capital program for Public Events Department Facilities, which includes substantial investment at the WRMC and the Fort Worth Convention Center over the next several years. Events Facilities Fort Worth contracted with Grace Hebert Curtis Architects, LLC (formally Hahnfeld Hoffer & Stanford, LLC) for the renovation design for the Sheep and Swine Barns and Livestock Handling Facilities (M&C 23-0331). Subsequently, Grace Hebert Curtis Architects, LLC will be retained to provide construction administration services in the amount not to exceed $621,370.000 and includes reimbursable expenses of $5,000.00. A notice to Construction Manager -At -Risk (CMAR) offerors was advertised in the Fort Worth Star - Telegram on Thursday, May 4, 2023 and May 11, 2023 in the Bids and Proposals section. Proposals were due May 29, 2023. The City received five proposals from qualified CMAR contractors. These proposals were evaluated by members of the selection team and Sedalco, Inc. was selected as the Construction Manager at Risk for the project. In order to expedite the project, Sedalco, Inc. assisted with the identification of some construction material which are currently considered long lead time items. M&C 23-0510, June 13,2023, identified these materials and an early procurement package was submitted which allowed Sedalco to order materials and maintain the schedule, which is critical to accommodate events. The design was completed by Grace Hebert Curtis Architects, LLC and a Guaranteed Maximum Price (GMP) was received by Sedalco, Inc. in the amount of $34,216,084.00, which is inclusive of Pre -Construction Services, Early Release Package and the acceptance of additional scope items. http://apps.cfwnet.org/council_packet/mc review.asp?ID=31650&councildate=l1/28/2023 12/11/2023 M&C Review Page 2 of 3 The overall project costs at this time are expected to be as described in table below: SHEEP AND SWINE BARNS RENOVATION TOTALS I Construction Administration Services $621,370.00 1 CMAR Pre -Construction Services (M&C 23-0510, June 13, 2023) $25,000.001 CMAR Preconstruction Services and Early Procurement (M&C 23-0510, II $2,149,556.00I June 13, 2023) 1 Construction Contract Budget including 4.5 percent CMAR Fee II $32,041,528.00 and Owner's Construction Allowance (This M&C) Construction Phase Total 11 $34,216,084.00 1 Project Administration Cost: Site Utilities, Material Testing, IT, Security, Project Management, Contingency, FIFE, EFFW (M&C 23- $5,162,546.00 0331), etc. PROJECT TOTAL 11 $40,000,000.00 1 Funding Source - The funding appropriated for the agreement and for the early equipment procurement package included in $4,000,000.00 appropriated in M&C 23-0510, June 13, 2023, however, only $2,149,556 of that $4,000,000 was spent on the early equipment procurement. The balance of the project will be funded through the issuance of Tax -Exempt Special Tax Revenue Bonds later in the 2023 calendar year. Waiver of Permit Fees - In accordance with the City Code of Ordinances, Part II, Chapter 7-1 Fort Worth Building Administrative Code, Section 109.2.1, Exception 2; "Work by non -City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived." Business Equity - SEDALCO, INC. is in compliance with the City's Business Equity Ordinance by committing to 36\% MWBE participation on this project. The City's MWBE goal on this project is 20\ %. Grace Hebert Curtis Architects, LLC (formally Hahnfeld Hoffer & Stanford, LLC) is in compliance with the City's Business Equity Ordinance by committing to 12\% MWBE participation on this project. The City's MWBE goal on this project is 12\%. The Will Rogers Memorial Center is located in COUNCIL DISTRICT 7. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Spcial Tx Rv Bd Txbl Srs 2023B Fund for the WRMC-Sheep and Swine Barn Ren project to support the approval of the above recommendations and execution of the contracts. Prior to an expenditure being incurred, the Property Management and Public Events Department have the responsibility of verifying the availability of funds. TO Fund Department Account Project ID ID FROM Fund Department Account Project ID ID Submitted for Citv Manaaer's Office bv: Oriainatina Department Head: Program Activity Budget Reference # Year (Chartfield 2) Program Activity Budget Reference # Year (Chartfield 2) Dana Burghdoff (8018) Ricardo Salazar (8379) Amount Amount http://apps.cfwnet.org/council_packet/mc review.asp?ID=31650&councildate=l1/28/2023 12/11/2023 M&C Review Page 3 of 3 Additional Information Contact: Nikita Watts (2028) ATTACHMENTS 21 SHEEP AND SWINE CHANGE ORDER 1 AND DESIGN CONST ADM IN.docx (CFW Internal) 59740 PMD2023-08 CMAR Will Roger Memorial Center Sheep & Swine Barns Renovation CO1 Signed RL.pdf (CFW Internal) CompMemo CPN104828 HHS 10.24.23 GV.pdf (CFW Internal) FID 21 WRMCSHEEPANDSWINEBARNCMARCO1.xlsx (CFW Internal) Form 1295 Certificate 101128396 (1).pdf (CFW Internal) Form 1295.pdf (CFW Internal) SAM Hahnfeld Associates Architects and Planners Inc.pdf (CFW Internal) SAM Sedalco Inc.pdf (CFW Internal) http:Happs.cfwnet.org/council packet/mc_review.asp?ID=31650&counciIdate=ll/28/2023 12/11/2023 SEDA 0 CONSTRUCTION SERVICES September 19, 2023 Mr. Brian Glass, City Architect City of Fort Worth - Property Management Department 401 W 13t" Street Fort Worth, Texas 76102 Reference: Will Rogers Memorial Center — Sheep & Swine Barn Renovations SUBJECT: GUARANTEED MAXIMUM PRICE Dear Mr. Glass: Please consider the following Guaranteed Maximum Price (GMP) associated with the above referenced project. The GMP incorporates the work in the previously approved Early Procurement Package GMP, that was to procure in advance the long -lead items and perform some early utility relocations. A recap of the GMP Development for this GMP is as follows: Early Procurement Package GMP $ 2,149,556 Additional Work incl. Alternates 1-6 $32,041,528 Subtotal $34,191,084 Preconstruction Services $ 25,000 Total GMP $34,216,084 Reference the following items that represent this proposal: • GMP Front Sheet with Breakdown includes accepted Alternates 1-6; • Clarifications and Assumptions associated with this Proposal; • List of Documents (Exhibit A) utilized in developing this Proposal; • Letter pertaining to SEDALCO's commitment to meet the Cit of Fort Worth's Business Equity Goal. Information related to Business Equity inclusion is being submitted in separate correspondence. This proposal is based on an anticipated Notice to Proceed by November 14, 2023. Utility relocate work is scheduled to be completed by December 1, 2023. The balance of this work is scheduled to be completed by December 1, 2024. The price associated with this Guaranteed Maximum Price Proposal is $34,191,084, excluding the Preconstruction Fee. The Preconstruction Fee is $25,000 and will be invoiced separately. Should there be any questions, please advise. Sincerely, 1�_l 4;� Russ Garrison, President / CEO CC: Mr. Matt Carter, FWSSR Mr. Ronnie Clements, CoFW • Corporate Headauarters Houston Division • • 4100 Fossil Creek Blvd. 9400 Grogans Mill Road, Suite 320 • • Fort Worth, Texas 76137-2723 The Woodlands, Texas 77380-3636 • • T:817.831.2245 WWW.SEDALCO.COM T: 281.907.5650 • SEDALC4 CONSTRUCTION SERVICES r?8 WRMC Sheep & Swine Barns Additions & Renovations Guaranteed Maximum Price Proposal Clarifications and Assumptions Our GMP Proposal is based on the plans and specifications itemized in the List of Contract Documents, and the following clarifications: 1.01 This GMP Proposal incorporates and includes the work previously approved in the Early -Out Procurement Package. 1.02 The following recap indicates our base GMP proposal and all accepted Alternates: Base GMP Proposal $33,504,920 Alternate 1 — Upgraded Video Switcher and Graphics Engine$ 180,020 Alternate 2 — Center Direct View LED Wall Display $ 99,192 Alternate 3 — North Arena Platform Area LED Wall Displays $ 66,072 Alternate 4 — Cable/Connectors for Manned Cameras $ 50,664 Alternate 5 — Production Intercom $ 41,944 Alternate 6 — ALPRO Acoustical Panels at Arena Walls $ 273,272 Total GMP Amount $34,216,084 1.03 We have excluded the following items, based on our understanding that the Owner has obtained appropriate exemptions, or has made provisions to include allowances for each in the overall project budget: a. Material and Remodel Tax, as the Owner has tax-exempt status-, b. Davis -Bacon wage scale and certified payroll requirements; c. All building permit fees, municipal, meter and impact fees. d. Construction material testing and inspections and geotechnical lab services; e. Abatement or disposal of lead, asbestos, or other hazardous materials. f. All Owner's Fixtures, Furniture and Equipment (FF&E). WRMC Sheep & Swine Additions & Renovations - Page 1 of 4 SEDALC4 CONSTRUCTION SERVICES r?8 1.04 The following Allowances have been included for work that is anticipated within the scope of the project but not yet defined in the documents: a. Signage $ 65,000 b. Pier Overages $ 10,000 c. Software for Owner's Maintenance $ 10,000 d. Structural Foundation Conflicts $ 50,000 e. Sheep/Swine Barn Bracing Engineering Analysis $ 6,000 f. Sheep/Swine Bracing Installation $ 25,000 g. Unknown Existing MEP Removal/Relocation/Repair $ 50,000 h. Unknown Existing Underground Utility Adjustments $ 50,000 i. Existing Concrete Stemwall Patching $ 40,000 j. Chemical Injection for Show Arena Subgrade (if needed) $ 95,725 k. City Permit Review Comments (beyond RPZAs below) $ 25,000 I. Overtime/Expedite for Weather/Unknown Impacts $100,000 m. RPZAs and related work per City Comments $ 50,000 n. New 8" fire line service to Swine Barn riser $125,000 o. Livers Bronze Railings at Show Arena $255,827 p. Louver Scope Clarifications $ 50,000 q. Cattle Ties Along West Fence (in widened curb) $ 75,000 r. Bleacher Revisions $ 20,000 s. Burnished Block Revisions at Show Arena $112,400 t. Storefront Doors ILO Hollow Metal (HHS email 9/15) $ 20,000 u. Restoration of Irrigation/Sod/Markings $ 50,000 v. Sheep and Swine Stall Mockups $ 50,000 w. Horse Stall Mockup $ 65,000 x. Stall Electrical Service Mockup $ 35,000 y. Pre -Fab Ticket Booth at Gendy & Harley $ 40,000 1.05 We offer the following Unit Prices as requested for Drilled Piers-, Base Bid is based on the use of Auger Cast Piles: a. Add 18" piers $ 40.00/LF b. Deduct 18" piers $-12.00/LF WRMC Sheep & Swine Additions & Renovations - Page 2 of 4 SEDALC4 CONSTRUCTION SERVICES r?8 c. Add Casing for 18" piers $ 62.00/LF d. Deduct Casing for 18" piers $-8.00/LF e. Add 24" piers $ 67.00/LF f. Deduct 24" piers $-20.00/LF g. Add Casing for 24" piers $ 84.00/LF h. Deduct Casing for 24" piers $-10.00/LF i. Add 30" piers $ 116.00/LF j. Deduct 30" piers $-34.00/LF k. Add Casing 30" piers $ 102.00/LF I. Deduct Casing 30" piers $-13.00/LF ❖ Note minimum casing move -in is $4,500 plus applicable unit prices 3.01 Excludes concrete duct banks, as none are indicated in the bid documents. 5.01 Excludes any cold formed stud framing at upper clerestories, consistent with adjacent barns. 8.01 Glazing at all aluminum storefronts/windows included as Guardian SNX 62/27 Low-E #2 per Specification 08 51 13.2.4.F.1.E. This is the same as what was provided on the previous projects. Clarifying due to conflict with Specification 08 80 00.2.3.B.1 which calls for Vitro Solarban 90 Low-E #2. 9.01 We have included Amerlock AL paint for all existing steel trusses, truss modifications, and new exposed steel at the Show Arena. Additional cost savings are available should dryfall paint be deemed acceptable for new exposed steel at the Show Arena. 9.02 Excludes sandblasting of existing steel items. We have included pressure wash of existing steel as well as epoxy paint as required by Specification 09 91 13-Painting. 9.03 Excludes any acoustical treatment on Show Arena walls. An adder for this work is included as Alternate 6. Alternate 6 is priced as 22 gauge Alpro C panels, custom color to match SW#7689 Row House Tan, 3/32" diameter holes on 3/16" staggered centers (+/- 23% open area) on Z furring with 2" thick 2 pound per square foot density sound insulation (black pvc coated) with powder coated fasteners. 10.01 Includes AVAdek canopies for all prefinished canopies, consistent with adjacent renovated barns. WRMC Sheep & Swine Additions & Renovations - Page 3 of 4 SEDALC4 CONSTRUCTION SERVICES r?8 12.01 Excludes window blinds or shades. 21.01 Sprinkler piping included as schedule 10 black pipe with grooved fittings installed per NFPA 13 and city codes, consistent with adjacent renovated barns. 21.02 Excludes fire pump(s) for fire sprinkler system. 22.01 Excludes metal jacketing specified by 22 07 19.3.12.A, consistent with adjacent renovated barns. 22.02 Excludes PVC jacket insulation specified by 22 07 19.3.12.D, consistent with adjacent renovated barns. 22.03 Excludes roof drain insulation, consistent with adjacent renovated barns. 22.04 Excludes removal of existing below grade piping. Intention is to abandon lines in place and cap lines where encountered. 23.01 HVAC systems will be cleaned and protected during installation. No post - installation duct cleaning has been included. 23.02 Excludes anti -microbial coating of new or existing ductwork. 26.01 Detail 4/E302 indicates floor boxes at Sheep/Swine Barns to be an alternate. We have included these boxes in our proposal, as they need to be installed as part of our work. 27.01 Excludes audiovisual equipment noted to be provided by Owner (Brightsign players, switches, 55" television displays/mounts, and video decoders). We suggest the Owner carry a minimum of $75,000 outside of our scope for purchase and installation of these items). 31.01 We have included provisions for auger cast piles in lieu of straight shaft piers. 31.02 Excludes any termite control treatment. 32.01 We will salvage of pavers shown on Drawing C2.0, as pavers are not needed for finished work (broom finished concrete indicated from North entrance of Show Arena to street). 33.01 Allowance for new 8" fire line to Swine Barn fire riser room includes 20x8 tapping sleeve and valve. However, no tap fees that may be assessed by the city have been included in our proposal. WRMC Sheep & Swine Additions & Renovations - Page 4 of 4 S■oAL.C4 N4 (PROJECT WRMC Sheep, Swine, and Show Arena GMP Bid Date 09108123 Leg Damages = $ 5,000.00 19-Sep-23 ILOCATION: Fort Worth Bid Time 5:00:00 PM ltuTnority Goal = 20 % 1:23 PM (ARCHITECT: Hahnfeld, Hoffer, Stanford Project Duration 10.00 Months (OWNER: COFW/FWSSR Project Size 111,800 SF I Row Spec DESCRIPTION ADJUST SCOPED SUB/MATL TOTAL VENDOR $/SF 8 9 012100 Allowances - Signage 65,000 65,000 Specifed Allowance 0.58 10 012100 Allowances - Pier Overars 10,000 10,000 Specifed Allowance 0.09 11 Software for Owner's Maintenance (i.e. Inixta) 10.000 10.000 Contract Allowance 0.09 12 Structural Foundation Conflict Allowance 50,000 50,000 Contract Allowance 0.49 13 Shea,,�(Swine Bracing ligpineering Analysis 6,000 6,000 Jaster-Quintanilla 0.019 14 SheeplSwine Bracinglns allation 25,000 25,000 Contract Allowance 0.99 15 Unknown Existing p Removal/Relocation/Repairs 50,000 50,000 Contract Allowance 0.45 16 Unknown Existing Underground Utility adjustments 50,000 50,000 Contract Allowance 0.49 17 Existing Concrete stemwall patching 40,000 40,000 Contract Allowance 0.36 18 Chemical ingctwn for show arena subgrade (if needed) 95.725 95.725 Contract Allowance 0.86 19 City Permt Review Comments 25,000 25,000 Contract Allowance 0.22 I 20 Overtime/Exe�diil, for WeatherlUnknown Impacts 100,000 100,000 SEDALCO Budget 0.89 21 Add.3 Pending 6" and 2" R Z and related work per city permit review comments (HHS email 9/7) 50,000 50,000 Contract Allowance 0.45 22 Addm 3 Pending New 8" fire line service to Swine Barn riser 125,000 125,000 Contract Allowance 1.12 23 Addm 3 Pending Livers Bronze Railings at Show Arena (HHS email 9112) 255,827 255,827 Contract Allowance 2.29 24 Addm 3 Pending Louver Scope Clarifications (Scope to be revised in Adm 3 50,000 50,000 Contract Allowance 0.49 25 Addm 3 Pending Cattle Tie (set in wider curb�alor� West Fence (Scope to be revised in Adm 1 75.000 75.000 Contract Allowance 0.67 26 Atltlm 3 Pending Bleacher Revisions (ADANi so Platforms) f 20,000 20,000 Contract Allowance 0.18 27 Addm 3 Pending Burnished Block Revisions at Show Arena (East and South Walls) 112,400 112,400 Contract Allowance 1.01 28 Atltlm 3 Pending Storefront Doors in Lieu of Hollow Metal Doors per HHS email 9l1 (5 door (:ayes) 20,000 20,000 Contract Allowance 0.18 29 Addm 3 Pending Gandy & Harley Ticket Booth 40,000 40,000 Contract Allowance 0.36 30 Addm 3 Pending Ornamental Fencing Revisions JScope to be revised in Ad m 3\ included Incorporated in GMP 0.00 31 Atltlm 3yPending Acoustical Metal WQQ@@all Panels a( Arena scope to be revised in ,ldm 3) In Alt 6 In Alt 6 Alternate 6 0.00 33 Earf%y� Out ion of pkg only) Sheeoratnd SwineallMock/Up Allowance 50,000 50,000 50,000 50,000 50,000 y Contract Allowance Earf%y-Out Contract Allowance 0.49 0.45 1 34 Ear -Out all ockup owance Elctrical 65,000 65 out Contract Allowance I 35 Ear -Out Stall Semi el Mock-U Allowance 35,000 35,000 Early -Out Contract Allowance 0.31 I 36 Early -Out GPRS / X-Ral Scanning (for E�package only) 5,000 5,000 0.04 37 Ear -Out Brick Production for Procurement Slol wlmasonry Unit Price PO Issued 0.00 38 Ear -Out Structural Steel and Metal Deck Detailing wlstee - 0.00 39 Ear fy-Out TemyoraL`IV�^Gas Line 90,000 90,000 0.81 41 -Out Earfyy-Out �Relocation Eery VAC nt Ear y-Out Electrical �R u ntrPurchasse Order 477,452 477,452 4.27 42 43 ut Earfry-Out 6ey/n Ear Y-Out Fiber Service Ear v-Out General Conditions 65,000 188,768188,768 65,000 188,768 0.58 1.69 44 Earf Out Ear v-Out General Requirements 20,072 0.18 Seryces yy20,072 b ow 000 I 46 022419 Selec�veaDemolilion nicl Temp Shoring 608.850r 608,850 5.45 I 47 023200 Geotechnical Investyy tion )Forming byy owner 0.00 48 031113 Structural Concrete w/CIP Conc 0.00 49 031115 Expanded Polystyrene Foam Block Formwork w/CIP Conc 0.00 50 031519 Cast -In Anchors and Embeds w/CIP Conc 0.00 51 032000 Concrete Reinforcing w/CIP Conc 0.00 52 033100 Structural Cast -In -Place Concrete 4,695,000 4,695,000 41.99 53 033100 A r-cast➢1les in lieu of stray t-shaft piers Pad (77,000 (77,000{ -0.69 54 No yy�c Ma�s for Dnh/Ayy�er Ran - Poslf Prep 25,00 25,000 0.22, 55 03214 Grouting for Steel Base Pates w/concrete - 0.0d 56 040100 Clay and Stone Restoration and Cleaning 45,625 45,625 0.41 57 Masonry Artwork Protection 10,000 10,000 0.09 58 042000 Unit Masonry (Addenda 3 to include Burnished Block) 935,000 935,000 8.36 59 047200 Cast Stone w/masonry - 0.00 60 051200 Structural Steel Framing (INCL Versadeck) 2,625,859 2,625,859 23.49 61 Steel ErectionIINCL Versadeck) 1,097,150 1,097,150 9.81 62 053123 Steel Roof Decigqyy w/steel 0.00 63 054000 Cold -Formed Mefal Framing w/d% all 0.00 64 055000 Metal Fabrications w s ee( 0.00 I 65 055000.2.13 Steel and Stainless Steel Pipe Railings, Handrails, and Guardr ills (via Addenda A w/steel 0.00 66 055000.2.14 Stainless Steel/Glass Divider Wall w/glass - 0.00 67 055000.2.15 Prefabricated Steel Ladders w/ steel fab - 0.00 68 055000.2.16 Livestock Tie Rails w/steel & conc - 0.00 W RMC Sheep & Swine GMP FS Draft 09.16.2023 1 of 3 Upgraded Direct View View LED Wall Add SMPTE Add Production Alpro Video LED Wall Displays g Hybrid Cable Intercom Acoustical Switcher and Display (in North Arena and Connectors (From manned (connections, cabling, Metal Panels Graphics arena, Platform Area, camera headend gear, in Arena 200 Engine (Ross including including locations in and (per HHS Components mounting and mounting and Arena to AV headsets/beltpe email 9/12/23) ILO Newtek) processor processor) rack room and cks in Arena) Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 Accepted Accepted -tad Accepted I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1:46 PM on 9/19/2023 S■oALCo (PROJECT: ILOCATION: IARCHITECI (OWNER: I Row I 69 05 I 70 05 71 05 72 05 73 05 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 1100 1101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 1122 123 124 125 126 127 128 Spec 5000.2.17 5000.2.18 5000.2.19 5000.2.20 5000.2.21 057000 061053 070533 071113 071324 071416 072100 072119 072500 074113 075323 076200 077200 078413 079200 079500 081113 083113 083323 083324 083325 083326 083613 084113 084413 085113 085810 087100 088000 089119 092400 092900 093000 095113 096513 098433 099113 102113 102800 103500 10"16 105300 110000 111600 122113 126600 133423 210000 220000 230000 260000 270000 274116 283111 Bid Date Bid Time Protect Duration Project Size DESCRIPTION ADJUST Fixed Decorative Bollardsf27 each) Stainless Steel Gutters (2 A8-51 1 Stainless Steel Hose Surrounds 2/P4-04) Pipe Bollards Pipe Bollard Covers Ornamental Steel Fencing and Gates Misc. Carper, Fire and Smoke Assembly Identification DampproofinA Pre-ap,yI d fn Qtally Bonded Sheet Membrane Waterproofing Fluid Aty died N/ a)erproofing Buildinq insulation Thermal Spray Foam Insulation Weather Barriers Metal Roof, Wall, & Liner Panels EPDM Roofing Flashiand Sheet Metal Roof ccessories Firest9ypi y Joint 33eafants Expansion Joint Cover Assemblies Standard Steel Doors and Frames Access Doors OH Coi= Insulated Service Doors OH Coil��Zormtite Service Doors OH Culp, Service Doors OH Rolling Counter Doors Overhead Sectional Doors Aluminum Entrances and Storefronts Glazed Aluminum Cunainwalls Aluminum Windows Aluminum interior Slidinq Service Window Finish Hardware Install Doors and Hardware Glazing Louvers and Ventsvia Addenda 3) ement Portland CP aster Gygsum Board Assemblies Tile Acoustical Panel Ceilir]pi Resilient Tile Flood? Wall Base, and Accessories Sound -Absorbing Wall Panels Painting Toilet Compartments (HDPE) Toilet Accessories Flar)QQPI s Fire Extirl uishers, Cabinets and Accessories ExtrudeAluminumOverhead Support Canopies MiscelveoysFp�lipmefit (Knox Box) Loading ockk E u, menl( Horizonal Louver Blinds Telescoping Bleachers Pre -manufactured Ticket Booth Dr-P(Ve Fire Sprinkler System Plumbing System HVAC SY7tem(includes Test & Balance and Louvers L1 - Lf) Electrical SY�tem Communications (Voice/Data/Cabling) Audiovisual Svstems fADM 1) Digital, Addressable Fire -Alarm System WRMC Sheep, Swine, and Show Arena GMP Fort Worth Hahnfeld, Hoffer, Stanford COFW/FWSSR 09108123 Damages = $ inths 5,000.00 19-Sep-23 5:00:00 PM ority Goal = 20 % 1:23 PM 10.00 111,800 SF SCOPED SUB/MATL TOTAL VENDOR $/SF w/steel - 0.00 w/roofer - 0.00 w/plumber - 0.00 w/steel & conc - 0.00 w/ fixed bollards - 0.00 295,000 295,000 2.64 w/trades - 0.00 w/painting$ - 0.00 w/ sealanfa - 0.00 w/sealants - 0.00 w/sealants - 0.00 wId��ryry''all - 0.00 214,110 214,110 1.92 w/sealants - 0.00 2,230,147 2,230,147 19.99 w/Metal Wall - 0.00 w/Metal Wall - 0.00 w/Metal Wall - 0.00 none found - 0.00 217,334 217,334 1.94 136,352 136,352 1.22 w/DFH - 0.00 w/MEP - 0.00 238.053 238.053 2.13 w/OH Insulated - 0.00 w/OH Insulated - 0.00 w/OH Insulated - 0.00 w/OH Insulated - 0.00 w/Qlass - 0.00 w/ lass - 0.00 w ass 0.00 w ass 0.00 20� ,3 si 209,385 1.87 18,500 18,500 0.17 1,226,500 1,226,500 10.97 w/ HVAC - 0.00 168,730 168,730 1.51 125,000 547,511 672,511 6.02 153,738 153,738 1.38, w/dryialf - 0.0Q w/tile - 0.00 w/dff��yyaif - 0.00 6�(7, i, 617,122 5.52 w1TA 0.00 22,612 22.612 0.20 14,400 14,400 0.13 3,250 3,250 0.03 122,077 122,077 1.09 3,000 3,000 0.03 w/ OH Door - 0.00 none found - 0.00 120,904 120.904 1.08 72,050 72,050 0.64 410,500 410,500 3.67 3,880,526 3,880,526 34.71 w/Pltmbin Combo - 0.00 250,000 2%58,281 2,708,281 24.22 32.111 32.111 0.29 708,500 708,500 6.34 51,826 51,826 0.46 Upgraded Direct View View LED Wall Add SMPTE Video LED Wall Displays (2 @ Hybrid Cable Switcher and Display in p y ( North Arena and Connectors (From manned Graphics arena, Platform Area, camera Engine (Ross including including locations in Components mounting and mounting and Arena to AV ILO Newtek) processor processor) rack room and Alt 1 Alt 2 Alt 3 Alt 4 Add Production Intercom Alpro (connections, Acoustical cabling, Metal Panels headend gear, in Arena 200 and (per HHS headsets/beltpe email 9/12/23) cks in Arena) Alt 5 Alt 6 1 n/a 4,906 1,888 13,087 6,639 155,555 80,806 55,205 30,692 29,605 I I I I I I I I I I I I I I 23,550 I I I I I I I I I I I I I I I I I I I I I 259,684 I I I I I I I I I I I I I I I I I I I I I WRMC Sheep & Swine GMP FS Draft 09.16.2023 2 of 3 1:46 PM on 9/19/2023 S■oAL.C4 (PROJECT: WRMC Sheep, Swine, and Show Arena GMP Bid Date 09108123 Liq Damages = $ 5,000.00 ILOCATION: Fort Worth Bid Time 5:00:00 PM Minority Goal = 20 (ARCHITECT: Hahnfeld, Hoffer, Stanford Protect Duration 10.00 onths (OWNER: COFW/FWSSR Project Size 111,800 SF I Row Spec DESCRIPTION ADJUST SCOPED SUB/MATL TOTAL I 129 311000 Site Preporation and Demolition w/earthwork 130 No Spec GPRS I (-Ray Scanning (for GMP package) 5,000 5,000 131 312000.10 Earthwork 220,365 220,365 132 312200 Trench Safety w/utilities 133 312300 Excavation, Backfillinq, and Compacting for Utilities w/utilities 134 312500 Erosion Control w/earthwork 135 316329 Drilled Piers w/concrete 136 321373 Pavement Joint Sealants w/sealants 137 321743 Pavement Markings 7,498 7,498 138 322520 Concrete Site Improvements w/concrete 139 332668 Wa�gr 237,100 237.100 140 332730 vprovements Sanliia(+( ewer�9� w/utilities - 141 334100 Storm Utility Drainage System w/utilities 142 No Spec Landscapinpllrrigation 33,946 33,946 143 No Spec Temporary luring for Mezz Demo and Lintel Replacement w/demo 144 No Spec En. jneer nd & Temp ReinforcinQfor Barn Skin Demo w/row 14 & 1 145 090561.13 Moisture iitgation control -Slab on Grade 2,540 2,540 146 No Spec RV Pedestals (Conxns w/util & elec) w/plumbinq - I 148 TOTAL DIRECT COST 0 375,000 27,413,934 27,788,934 149 GENERAL CONDITIONS 714,375 254,777 969,152 150 GENERAL REQUIREMENTS 50,550 154,148 204,698 151 SUBTOTAL 764,925 783,925 27,413,934 28,962,784 152 01910 SUBCONTRACTOR BONDS OR SDI 431,902 153 01001 I SAJJFET/�YYJ MAAN`A,1�GEMENT SERVICES 93,744 eOPPS 155 01920 GENEERAL�X SS LIABIIL TY INSURANCE 57402 156 01930 BUILDER'S RISK INSURANCE 39,841 157 01850 TEXO / AGC FEE 37,059 158 01810 BUILDING PERMIT 0 TRANSPORTATION OR OTHER IMPACT FEES 0 160 01900 CONTRACTOR'S PMT/PERF BONDS 233,619 161 OWNERS CONTINGENCY 3.75% 1.122.985 162 CONTRACTORS CONTINGENCY 3.75% 1,122,985 163 SUBTOTAL 32,192,231 164 OVERHEAD & PROFIT (FEE) Percentage > 4.00% 1,287,689 165 TOTAL ESTIMATED COST 33,479,920 166 167 GMP Amount 33,479,920 168 Preconstruction Svcs. 25,000 169 Total 33,504,920 170 171 Upgraded Direct View View LED Wall Add SMPTE Add Production Alpro Video LED Wall Displays (2 @ Hybrid Cable Intercom Acoustical Switcher and Display (in North Arena and Connectors (From manned (connections, cabling, Metal Panels 19-Sep-23 Graphics arena, Platform Area, camera headend gear, in Arena 200 1:23 PM Engine (Ross including including locations in and (per HHS Components mounting and mounting and Arena to AV headsets/beltpa email 9/12/23) ILO Newtek) processor processor) rack room and cks in Arena) VENDOR $/SF Alt 1 Alt 2 Alt 3 Alt 4 Alt 5 Alt 6 1 0.00 1 0.04 1 1.97 1 0.00 1 0.00 I 0.00 I 0.00 I 0.00 I 0.07 1 0.00 1 2.12 I 0.0d I 0.00 I 0.30 I 0.00 I 0.00 1 0.02 1 0.00, o.od 248.56 155,555 85,712 57,093 43,779 36,244 236,1341 8.67 0 0 0 0 0 01 1.83 0 0 0 0 0 01 259.08 155,555 85,71:( 57,093 43,779 36,244 236,1341 3.86 2,589 1,426 950 729 603 3,9301 0.84 504 278 185 142 117 7651 0.19 0 0 0 0 0 01 1.17 702 387 258 198 164 1,0661 0.36 214 118 79 60 50 3251 0.33 199 110 73 56 46 3021 Waived 0.00 0 0 0 0 0 01 Not included. By COFW 0.00 0 0 0 0 0 0 1 2.09 1,256 692 461 354 293 1,9071 10.04 6,038 3,327 2,216 11699 1,407 9,166 1 10.04 6,038 3,327 2,216 1,699 1,407 9,166 1 287.94 173,096 95,377 63,531 48,716 40,331 262,761 1 11.d 6,924 3,815 2,541 1,949 1,613 10,5101 299.46 180,020 99,192 66,072 50,664 41,944 273,2721 0.00 1 $ 299A6 180,020 99,192 66,072 50,664 41,944 273,272 180,020 1 99,192 66,072 50,664 41,944 273,272 WRMC Sheep & Swine GMP FS Draft 09.16.2023 3 of 3 1:46 PM on 9/19/2023 Exhibit A List of Contract Documents Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: ADD Addendum Drawing Issued Date Status Revisions Revision Rev'd Date 1 Addendum No. 001 07/18/23 CD - Issued For Construction N 2 Addendum No. 2 07/31/23 CD - Issued For Construction N Drawing Type: ARCH Architectural Drawing Issued Date Status Revisions Revision Rev'd Date AO-01 Abbreviations, Symbol Legends, Masonry Details 08/11/23 CD - Issued For Construction N AO-02 Mock -Up 08/11/23 CD - Issued For Construction N AO-11 Architectural Site Plan 08/11/23 CD - Issued For Construction N AO-12 Enlarged Site Plans 08/11/23 CD - Issued For Construction N AO-21 Fence Panel Elevations 08/11/23 CD - Issued For Construction N AO-22 Fence Panel Elevations 08/11/23 CD - Issued For Construction N AO-51 Fence and Gate Details 08/11/23 CD - Issued For Construction N AO-52 Site Details 08/11/23 CD - Issued For Construction N Al-01 Overall Floor Plan 08/11/23 CD - Issued For Construction N Al-02 Overall Upper Windows Plan 08/11/23 CD - Issued For Construction N Al-03 Overall Clerestory Plan 08/11/23 CD - Issued For Construction N Al-31 Swine Barn Concourse Enlarged Plan 08/11/23 CD - Issued For Construction N Al-32 Foyer / Restroom Enlarged Plan 08/11/23 CD - Issued For Construction N Al-33 Sheep Barn Concourse Enlarged Plan 08/11/23 CD - Issued For Construction N Al-34 South Entrance Enlarged Plans 08/11/23 CD - Issued For Construction N Al-35 Enlarged Plans 08/11/23 CD - Issued For Construction N Al-36 Enlarged Wash Bay Plans 08/11/23 CD - Issued For Construction N Al-41 Gate 13 Entry Pavilion Plans 08/11/23 CD - Issued For Construction N A2-01 Finish Schedule and Material / Finish Key 08/11/23 CD - Issued For Construction N A2-02 Overall Floor Finish Plan 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 1 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: ARCH Architectural Drawing Issued Date Status Revisions Revision Revd Date A3-01 Door Schedule and Type Elevations 08/11/23 CD - Issued For Construction N A3-02 Window&Louver Sched. Louver, Storefront&Curtainwall Typ.Elev. 08/11/23 CD - Issued For Construction N A3-51 Hollow Metal Door Details 08/11/23 CD - Issued For Construction N A3-52 Overhead Door Details 08/11/23 CD - Issued For Construction N A3-53 Window Details 08/11/23 CD - Issued For Construction N A3-54 Storefront and Curtainwall Details 08/11/23 CD - Issued For Construction N A4-01 Exterior Elevations 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A4-02 Exterior Elevations 08/11/23 CD - Issued For Construction N A4-03 Exterior Elevations 08/11/23 CD - Issued For Construction N A4-04 Exterior Elevations 08/11/23 CD - Issued For Construction N A4-05 Enlarged Elevations 08/11/23 CD - Issued For Construction N A4-06 Exterior Elevations - Gate 13 Pavilion 08/11/23 CD - Issued For Construction N A5-01 Building Sections - Swine Barn 08/11/23 CD - Issued For Construction N A5-02 Building Sections - Arena 08/11/23 CD - Issued For Construction N A5-03 Building Sections - Sheep Barn 08/11/23 CD - Issued For Construction N A5-04 Building Sections - Arena North 08/11/23 CD - Issued For Construction N A5-05 Building Sections - Arena North 08/11/23 CD - Issued For Construction N A5-06 Building Sections - Arena North 08/11/23 CD - Issued For Construction N A5-07 Building Sections - Arena 08/11/23 CD - Issued For Construction N A5-08 Building Sections - Loading Dock 08/11/23 CD - Issued For Construction N A5-09 Building Sections - Loading Dock 08/11/23 CD - Issued For Construction N A5-10 Wall Sections - Clerestory 08/11/23 CD - Issued For Construction N A5-11 Wall Sections 08/11/23 CD - Issued For Construction N A5-12 Wall Sections 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A5-13 Wall Sections 08/11/23 CD - Issued For Construction N A5-14 Wall Sections 08/11/23 CD - Issued For Construction N A5-15 Wall Sections 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 2 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: ARCH Architectural I Drawing Issued Date Status Revisions Revision Revd Date A5-16 Wall Sections 08/11/23 CD - Issued For Construction N A5-17 Wall Sections 08/11/23 CD - Issued For Construction N A5-18 Wall Sections 08/11/23 CD - Issued For Construction N A5-19 Wall Sections 08/11/23 CD - Issued For Construction N A5-20 Wall Sections 08/11/23 CD - Issued For Construction N A5-21 Wall Sections 08/11/23 CD - Issued For Construction N A5-22 Wall Sections 08/11/23 CD - Issued For Construction N A5-23 Wall Sections 08/11/23 CD - Issued For Construction N A5-24 Wall Sections 08/11/23 CD - Issued For Construction N A5-25 Wall Sections 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A5-26 Wall Sections 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A5-27 Wall Sections 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A5-28 Wall Sections 08/11/23 CD - Issued For Construction N A5-29 Wall Sections 08/11/23 CD - Issued For Construction N A5-30 Wall Sections 08/11/23 CD - Issued For Construction N A5-31 Building Sections 08/11/23 CD - Issued For Construction N A5-32 Building Sections 08/11/23 CD - Issued For Construction N A5-51 Section Details 08/11/23 CD - Issued For Construction N A5-52 Section Details 08/11/23 CD - Issued For Construction N A5-53 Section Details 08/11/23 CD - Issued For Construction N A5-54 Section Details 08/11/23 CD - Issued For Construction N A5-55 Section Details 08/11/23 CD - Issued For Construction N A5-71 Stair amd Ramp Plans and Sections 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A5-72 Stair Sections and Details 08/11/23 CD - Issued For Construction N A5-73 Stair Sections and Details 08/11/23 CD - Issued For Construction N A6-01 Interior Elevations - Swine Barn 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 3 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: ARCH Architectural Drawing Issued Date Status Revisions Revision Revd Date A6-02 Interior Elevations - Arena 08/11/23 CD - Issued For Construction N A6-03 Interior Elevations - Sheep Barn 08/11/23 CD - Issued For Construction N A6-11 Interior Elevations - Swine Concourse 08/11/23 CD - Issued For Construction N A6-12 Interior Elevations - Swine Barn 08/11/23 CD - Issued For Construction N A6-13 Interior Elevations - Arena Concourse 08/11/23 CD - Issued For Construction N A6-14 Interior Elevations - Arena 08/11/23 CD - Issued For Construction N A6-15 Interior Elevations - Sheep Concourse 08/11/23 CD - Issued For Construction N A6-16 Interior Elevations - Sheep Barn 08/11/23 CD - Issued For Construction N A6-17 Interior Elevations 08/11/23 CD - Issued For Construction N A6-18 Wash Bay 108 Elevations 08/11/23 CD - Issued For Construction N A6-19 Wash Bay 308 Elevations 08/11/23 CD - Issued For Construction N A7-01 Overall Reflected Ceiliing Plan 08/11/23 CD - Issued For Construction N A8-01 Overall Roof Plan 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction A8-51 Roof Details 08/11/23 CD - Issued For Construction N A9-01 Overall FF&E Plan - Typical Arrangement 08/11/23 CD - Issued For Construction N A9-02 Overall FF&E Plan - Horse Show'A' 08/11/23 CD - Issued For Construction N A9-03 Overall FF&E Plan - Horse Show'B' 08/11/23 CD - Issued For Construction N Al-11A Floor Plan - Area A 08/11/23 CD - Issued For Construction N A1-11 B Floor Plan - Area B 08/11/23 CD - Issued For Construction N Al-11 C Floor Plan - Area C 08/11/23 CD - Issued For Construction N Al-11 D Floor Plan - Area D 08/11/23 CD - Issued For Construction N A7-11A Reflected Ceiling Plan - Area A 08/11/23 CD - Issued For Construction N A7-11 B Reflected Ceiling Plan - Area B 08/11/23 CD - Issued For Construction N A7-11 C Reflected Ceiling Plan - Area C 08/11/23 CD - Issued For Construction N A7-11 D Reflected Ceiling Plan - Area D O8/11/23 CD - Issued For Construction N A8-11A Roof Plan - Area A 08/11/23 CD - Issued For Construction N A8-11 B Roof Plan - Area B 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 4 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: ARCH Architectural I Drawing Issued Date Status Revisions Revision Revd Date A8-11 C Roof Plan - Area C A8-11 D Roof Plan - Area D Drawing Type: ARCHDEMO Architectural Demolition Drawing Revision AD1-01 Overall Demolition Floor Plan 1 Addendum No. 2 AD1-12 Level 2 Demolition Plan AD4-01 Demolition Exterior Elevations AD4-02 Demolition Exterior Elevations AD4-03 Demolition Exterior Elevations AD7-01 Overall Demolition Reflected Ceiling Plan AD8-01 Overall Demolition Roof Plan AD1-11A Demolition Plan -AreaA AD1-11 B Demolition Plan - Area B AD1-11C Demolition Plan -Area C AD1-11 D Demolition Plan - Area D AD7-11A Demolition Reflected Ceiling Plan - Area A AD7-11 B Demolition Reflected Ceiling Plan - Area B AD7-11 C Demolition Reflected Ceiling Plan - Area C AD7-11 D Demolition Reflected Ceiling Plan - Area D AD8-11 A Demolition Roof Plan - Area A AD8-11 B Demolition Roof Plan - Area B AD8-11 C Demolition Roof Plan - Area C AD8-11 D Demolition Roof Plan - Area D Drawing Type: AV Audio -Visual Drawing 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N Issued Date Status I Revisions Rev'd Date 08/11/23 CD - Issued For Construction y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N Issued Date Status I Revisions 1 SEDALCO, INC. Page 5 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: AV Audio -Visual Drawing Revision AVO-01 Audiovisual Legend & Infrastructure Details 1 Addendum No. 001 AVO-02 Audiovisual Power Riser 1 Addendum No. 2 AVO-03 Audiovisual Details 1 Addendum No. 001 AVO-04 Audiovisual Conduit Riser 1 Addendum No. 001 2 Addendum No. 2 AV1-12 Audiovisual Enlarged Details 1 Addendum No. 001 AV5-01 Audiovisual Sections - Arena 1 Addendum No. 001 2 Addendum No. 2 AV5-02 Audiovisual Sections - Exterior Elevations 1 Addendum No. 001 AV5-03 Audiovisual Enlarged Section 1 Addendum No. 001 AV8-01 Audiovisual Overall Roof Plan AV8-50 Audiovisual Floor Plans - Cattle Barn 2 and Poultry Building 1 Addendum No. 001 AV9-01 Audiovisual Onelines 1 Addendum No. 2 AV9-02 Audiovisual Onelines 1 Addendum No. 001 AV9-03 Audiovisual Onelines 1 Addendum No. 2 AV9-04 Audiovisual Onelines AV9-05 Audiovisual Onelines AV9-06 Audiovisual Onelines 1 Addendum No. 001 2 Addendum No. 2 AV9-07 Audiovisual Onelines 1 Addendum No. 001 2 Addendum No. 2 AV9-08 Audiovisual Onelines AV9-09 Audiovisual Onelines AV9-10 Audiovisual Onelines 1 Addendum No. 001 AV9-11 Audiovisual Onelines AV9-12 Audiovisual Onelines 1 Addendum No. 001 2 Addendum No. 2 AV9-13 Audiovisual Onelines AV9-14 Audiovisual Onelines Issued Date Status Revisions Rev'd Date O8/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction O8/11/23 CD - Issued For Construction Y O8/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y O8/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction O8/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N O8/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 6 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: AV Audio -Visual Drawing Issued Date Status Revisions Revision Revd Date AV9-15 Audiovisual Onelines 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction AV9-50 Audiovisual Rack Elevation & Plate Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction AV9-51 Audiovisual Rack Elevation & Plate Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction AV9-52 Audiovisual Rack Elevation & Plate Details 08/11/23 CD - Issued For Construction N AV1-11A Audiovisual Floor Plan - Area A 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction AV1-11 B Audiovisual Floor Plan - Area B 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction AV1-11C Audiovisual Floor Plan -Area C O8/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction AV1-11 D Audiovisual Floor Plan -Area D 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction AV7-11A Audiovisual Reflected Ceiling Plan - Area A 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction AV7-11 B Audiovisual Reflected Ceiling Plan - Area B O8/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction AV7-11C Audiovisual Reflected Ceiling Plan -Area C 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction AV7-11 D Audiovisual Reflected Ceiling Plan -Area D 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction AVD1-01 Audiovisual Overall Demolition Plan 08/11/23 CD - Issued For Construction N Drawing Type: CIVIL Civil Drawing Issued Date Status Revisions Revision Rev'd Date C1.0 General Notes 06/30/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction C1.1 Topographic Survey 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction C1.2 Topographic Survey 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction C2.0 Demolition Plan 06/30/23 CD - Issued For Construction N C3.0 Site Plan 06/30/23 CD - Issued For Construction N C4.0 Paving Plan 06/30/23 CD - Issued For Construction N C5.0 Overall Grading Plan 08/11/23 CD - Issued For Construction N C5.1 Grading Plan 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 7 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: CIVIL Civil I Drawing Issued Date Status Revisions Revision Revd Date C5.2 Grading Plan C5.3 Grading Plan C5.4 Grading Plan C6.0 Utility Layout 1 Addendum No. 2 C7.0 Dry Utility Plan 1 Addendum No. 2 C8.0 Water Plan C9.0 Sanitary Sewer Plan C10.0 Storm Drain Plan C10.1 Storm Drain Profiles C10.2 Storm Drain Profiles C10.3 Site Drainage Area Map C10.4 Hydraulic Calcs C11.0 Erosion Control Plan C11.1 Construction Details C12.0 Construction Details 1 Addendum No. 2 Drawing Type: ELECTRIC Electrical Drawing Revision EO-01 Electrical Abbreviations and Symbols EO-11 Electrical - Site Plan 1 Addendum No. 2 E1-01 Power Plan - Overall E1-21 Electrical - Roof/Joist Plan E2-11 Lighting Plan - Overall E3-01 Electrical Details E3-02 Electrical Details E3-03 Electrical Details 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N O8/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N O8/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction I Issued Date Status Revisions Revd Date 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N O8/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 8 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: ELECTRIC Electrical Drawing Issued Date Status Revisions Revision Rev'd Date E5-01 Electrical One -Line Diagram 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E6-01 Electrical Panel Schedules 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E6-02 Electrical Panel Schedules 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E6-03 Electrical Panel Schedules 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E7-01 Electrical Panel Schedules 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E7-02 Electrical Panel Schedules 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E7-03 Electrical Panel Schedules 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction E9-01 Entry Pavilion Electrical Plans 08/11/23 CD - Issued For Construction N E1-11A Power Plan - UnitA O8/11/23 CD - Issued For Construction N E1-11 B Power Plan - Unit B 08/11/23 CD - Issued For Construction N El-11C Power Plan - Unit C 08/11/23 CD - Issued For Construction N E1-11 D Power Plan - Unit D 08/11/23 CD - Issued For Construction N E2-11A Lighting Plan - Unit A 08/11/23 CD - Issued For Construction N E2-11 B Lighting Plan - Unit B 08/11/23 CD - Issued For Construction N E2-11C Lighting Plan - Unit C 08/11/23 CD - Issued For Construction N E2-11 D Lighting Plan - Unit D 08/11/23 CD - Issued For Construction N ED1-01 Electrical - Site Plan Demolition 08/11/23 CD - Issued For Construction N Drawing Type: FP Fire Protection Drawing Issued Date Status Revisions Revision Rev'd Date FPO-01 Fire Protection General Notes 08/11/23 CD - Issued For Construction N FP1-01 Fire Protection Plan 08/11/23 CD - Issued For Construction N Drawing Type: GENERAL General Drawing Issued Date Status Revisions Revision Rev'd Date GO-01 Cover Sheet 07/05/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction GO-02 Index and Vicinity Map 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 1 SEDALCO, INC. Page 9 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: GENERAL General Drawing Issued Date Status Revisions Revision Rev'd Date 2 Addendum No. 2 09/06/23 CD - Issued For Construction G1-01 Code / Egress Floor Plan 08/11/23 CD - Issued For Construction N G2-01 2012 Texas Accessibility Standards 08/11/23 CD - Issued For Construction N G2-02 2012 Texas Accessibility Standards 08/11/23 CD - Issued For Construction N G2-03 2012 Texas Accessibility Standards 08/11/23 CD - Issued For Construction N G2-04 2012 Texas Accessibility Standards 08/11/23 CD - Issued For Construction N Drawing Type: LAND Landscape Drawing Issued Date Status Revisions Revision Revd Date L1.0 Urban Forestry Phase 1 08/11/23 CD - Issued For Construction N L1.1 Urban Forestry Phase 2 08/11/23 CD - Issued For Construction N L1.2 Urban Forestry Data 08/11/23 CD - Issued For Construction N L2.0 Landscape Plan 08/11/23 CD - Issued For Construction N L2.1 Landscape Notes & Details 08/11/23 CD - Issued For Construction N L3.0 Irrigation Plan 08/11/23 CD - Issued For Construction N L3.1 Irrigation Notes & Details 08/11/23 CD - Issued For Construction N Drawing Type: MECH Mechanical Drawing Issued Date Status Revisions Revision Revd Date MO-01 Mechanical General Notes and Abbreviations 08/11/23 CD - Issued For Construction N MO-02 Mechanical Schedules 06/30/23 CD - Issued For Construction N M5-01 Mechanical Details 08/11/23 CD - Issued For Construction N M6-01 Mechanical Controls 08/11/23 CD - Issued For Construction N M6-02 Mechanical Controls 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction M1-11A Mechanical Floor Plan - Unit "A" 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction M1-11 B Mechanical Floor Plan - Unit "B" 08/11/23 CD - Issued For Construction N M1-11C Mechanical Floor Plan -Unit "C" 08/11/23 CD - Issued For Construction N M1-11 D Mechanical Floor Plan -Unit "D" 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 10 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: MECH Mechanical I Drawing Issued Date Status Revisions Revision Revd Date M1-21A Mechanical Roof Plan - Unit "A" 08/11/23 CD - Issued For Construction N M1-21B Mechanical Roof Plan -Unit "B" 08/11/23 CD - Issued For Construction N M1-21C Mechanical Roof Plan -Unit "C" 08/11/23 CD - Issued For Construction N M1-21 D Mechanical Roof Plan -Unit "D" 08/11/23 CD - Issued For Construction N MD1-11A Mechanical Demolition Plan - Unit "A" 08/11/23 CD - Issued For Construction N MD1-11 B Mechanical Demolition Plan -Unit "B" 08/11/23 CD - Issued For Construction N MD1-11C Mechanical Demolition Plan -Unit "C" 08/11/23 CD - Issued For Construction N MD1-11 D Mechanical Demolition Plan -Unit "D" 08/11/23 CD - Issued For Construction N Drawing Type: PLUMBING Plumbing Drawing Issued Date Status Revisions Revision Rev'd Date PO-01 Plumbing General Notes and Abbreviations 08/11/23 CD - Issued For Construction N PO-02 Plumbing Schedules 08/11/23 CD - Issued For Construction N P4-01 Plumbing Riser Diagrams 08/11/23 CD - Issued For Construction N P4-02 Plumbing Riser Diagrams 08/11/23 CD - Issued For Construction N P4-03 Plumbing Riser Diagrams 08/11/23 CD - Issued For Construction N P4-04 Plumbing Views 08/11/23 CD - Issued For Construction N P5-01 Plumbing Details 08/11/23 CD - Issued For Construction N P1-00A Plumbing Undergrade Floor Plan -Unit A 08/11/23 CD - Issued For Construction N P1-0013 Plumbing Undergrade Floor Plan - Unit B 08/11/23 CD - Issued For Construction N P1-00C Plumbing Undergrade Floor Plan - Unit C 08/11/23 CD - Issued For Construction N P1-00D Plumbing Undergrade Floor Plan - Unit D 08/11/23 CD - Issued For Construction N P1-01A Plumbing Floor Plan - Unit A 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction P1-01B Plumbing Floor Plan - Unit B 08/11/23 CD - Issued For Construction Y 1 Addendum No. 2 09/06/23 CD - Issued For Construction P1-01C Plumbing Floor Plan - Unit C O8/11/23 CD - Issued For Construction N P1-01 D Plumbing Floor Plan - Unit D 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 11 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: PLUMBING Plumbing Drawing Issued Date Status Revisions Revision Revd Date P2-01A Plumbing Roof Plan - Unit O8/11/23 CD - Issued For Construction N P2-01B Plumbing Roof Plan - Unit B 08/11/23 CD - Issued For Construction N P2-01C Plumbing Roof Plan - Unit C 08/11/23 CD - Issued For Construction N P2-01 D Plumbing Roof Plan - Unit D 08/11/23 CD - Issued For Construction N PD1-01A Plumbing Demolition Plan -Unit A 08/11/23 CD - Issued For Construction N PD1-01B Plumbing Demolition Plan -Unit B 08/11/23 CD - Issued For Construction N PD1-01C Plumbing Demolition Plan -Unit C 08/11/23 CD - Issued For Construction N PD1-01 D Plumbing Demolition Plan -Unit D 08/11/23 CD - Issued For Construction N Drawing Type: SPEC Specification Drawing Issued Date Status Revisions Revision Rev'd Date 1 Early Procurement Specifications 06/30/23 CD - Issued For Construction N Drawing Type: STRUCT Structural Drawing Issued Date Status Revisions Revision Rev'd Date S0.01 General Notes 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction 2 Addendum No. 001 08/25/23 CD - Issued For Construction 3 Addendum No. 2 09/06/23 CD - Issued For Construction S0.02 General Notes 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S0.03 Statement of Special Inspections 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S0.04 AXO 08/11/23 CD - Issued For Construction N S0.11 Foundation Demolition Plan - Overall 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S1.13 Low Roof Framing Plans 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction 2 Addendum No. 001 08/25/23 CD - Issued For Construction S1.14 High Roof Framing Plans 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S2.01 Gate 13 Entrance Pavilion 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S2.02 North Entry - Enlarged Plans 08/11/23 CD - Issued For Construction N S2.03 Sheep & Swine Barns Enlarged Plans 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction 2 Addendum No. 001 08/25/23 CD - Issued For Construction 1 SEDALCO, INC. Page 12 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: STRUCT Structural Drawing Issued Date Status Revisions Revision Revd Date S2.04 Sheep & Swine Barn Mezzanine Demolition Plans 08/11/23 CD - Issued For Construction N S3.01 Typical Concrete Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction S3.02 Concrete Details 08/11/23 CD - Issued For Construction N S3.03 Concrete Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S3.04 Concrete Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S3.05 Concrete Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S3.06 Concrete Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction 2 Addendum No. 2 09/06/23 CD - Issued For Construction S3.07 Concrete Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S4.01 Typical Masonry Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S4.02 Masonry Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction 2 Addendum No. 001 08/25/23 CD - Issued For Construction S4.03 Masonry Details 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S4.10 Masonry Wall Elevations 08/11/23 CD - Issued For Construction N S4.11 Masonry Wall Elevations 08/11/23 CD - Issued For Construction Y 1 Addendum No. 001 08/25/23 CD - Issued For Construction S5.01 Typical Steel Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.02 Steel Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.03 Steel Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.04 Steel Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.05 Steel Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.06 Steel Details 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction 2 Addendum No. 001 08/25/23 CD - Issued For Construction S5.10 Building Sections - Arena 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.11 Building Sections - Arena 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.12 Building Sections - Arena 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction S5.13 Building Sections - Arena 06/30/23 CD - Issued For Construction Y 1 Construction Set 08/11/23 CD - Issued For Construction 2 Addendum No. 001 08/25/23 CD - Issued For Construction S5.20 Truss Elevations - Existing 08/11/23 CD - Issued For Construction N 1 SEDALCO, INC. Page 13 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: STRUCT Structural Drawing Revision S5.21 End Wall Elevations - Existing S6.01 Wall Elevations 1 Addendum No. 001 S6.02 Wall Elevations 1 Addendum No. 001 S6.03 Wall Elevations S6.10 Partial Elevations - Door Openings 1 Addendum No. 001 S0.13A Roof Demolition Plan -Area A S0.1313 Roof Demolition Plan - Area B S0.13C Roof Demolition Plan - Area C S0.13D Roof Demolition Plan - Area D S1.11A Foundation & Ground Floor Plan - Area A 1 Addendum No. 001 2 Addendum No. 2 S1.11 B Foundation & Ground Floor Plan - Area B 1 Addendum No. 001 2 Addendum No. 2 S1.11C Foundation & Ground Floor Plan - Area C S1.11 D Foundation & Ground Floor Plan - Area D S1.13A Roof Framing Plan - Area A 1 Construction Set 2 Addendum No. 001 S1.136 Roof Framing Plan - Area B 1 Construction Set 2 Addendum No. 001 S1.13C Roof Framing Plan - Area C S1.13D Roof Framing Plan - Area D Drawing Type: TECH Technology Drawing Revision TO-01 Technology Abbreviations and Symbols 1 Construction Set TO-11 Technology -Fiber Pre -Livestock Show Work -Existing 1 Construction Set TO-12 Technology -Fiber Pre -Livestock Show Work -New 1 Construction Set 2 Addendum No. 2 TO-13 Technology -Fiber Post -Livestock Show 1 SEDALCO, INC. Issued Date Status Revisions Revd Date 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction O8/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 08/25/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N 06/30/23 CD - Issued For Construction Y 08/11/23 CD - Issued For Construction 08/25/23 CD - Issued For Construction 06/30/23 CD - Issued For Construction Y 08/11/23 CD - Issued For Construction 08/25/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction N Issued Date Status I Revisions Rev'd Date 06/30/23 CD - Issued For Construction Y 08/11/23 CD - Issued For Construction 06/30/23 CD - Issued For Construction Y 08/11/23 CD - Issued For Construction 06/30/23 CD - Issued For Construction Y 08/11/23 CD - Issued For Construction 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y Page 14 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: Project: 23536. WRMC Sheep & Swine Barns Renovations and Additions Drawing Type: TECH Technology Drawing Revision 1 Addendum No. 2 T2-01 Technology Entry Pavilion Plans T1-11A Technology Plan - UnitA 1 Addendum No. 2 T1-11 B Technology Plan -Unit B 1 Addendum No. 2 T1-11C Technology Plan -Unit C 1 Addendum No. 2 T1-11 D Technology Plan -Unit D 1 Addendum No. 2 Issued Date Status Revisions Rev'd Date 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction N 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction O8/11/23 CD - Issued For Construction Y 08/11/23 CD - Issued For Construction 08/11/23 CD - Issued For Construction Y 09/06/23 CD - Issued For Construction 1 SEDALCO, INC. Page 15 09/11/23 04:44:55 PM Viewpoint Remote .rpt Initials: