AMENDMENT No . 4
TO CITY SECRETARY CONTRACT No. 50217
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 50217 (the
CONTRACT) which was authorized by M&C C-28545 on the 23rd day of January, 2018 in
the amount of $1,795,070.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No.l in the
amount of $48,720.00 administratively authorized on April 6th, 2021, Amendment
No. 2 in the amount of $49,256.00 administratively authorized on March 3rd,
2022, and Amendment No. 3 in the amount of $263,400.00 authorized by M&C 22-0414
on June 14th, 2022; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Clear Fork Lift Station and Force Main; and
WHEREAS, it has become necessary to execute Amendment No. 4 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional engineering
services specified in proposal attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by Engineer
totals $99,500.00.
0
Article II of the CONTRACT is amended to provide for an increase in the
fee to be paid to Engineer for all work and services performed under the
Contract, as amended, so that the total fee paid by the City for all work and
services shall be an amount of $ 2,255,946.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Clear Fork Lift Station and Force Main]
Page 1 of 2 [CPN 1009961
EXECUTED and EFFECTIVE as of the date subscribed by the City's designated
Assistant City Manager.
APPROVED:
City of Fort Worth
v a`�Dana Burghdoff(Dec 2023 0 CST)
Dana Burghdoff
Assistant City Manager
DATE: Dec 21, 2023
APPROVAL RECOMMENDED,.
CG tk� HA. d1w
Christopher Har er (Dec 20, 202312:37 CST)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Kimlev-Horn and Associates,
2nc A
John Atkins, P.E.
Vice --President
DATE: 12/12/2023
By signing, I acknowledge that I am the person responsible for the monitoring
and administration of this contract, including ensuring all performance and
reporting requirements.
(60A,14vl
Liaih conl.dn
Project Manager
APPROVED AS TO FORM AND LEGALITY:
DBlack (Dec 20, 202317:11 CST)
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
1�r ns A % Ax, x
Jannette S. Goodall
City Secretary
M&C:
Date:
Form 1295:
N/A
N/A
N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021 [Clear Fork Lift Station and Force Main]
Page 2 of 2 ICPN 100996]
Kimley>»Horn
December 9, 2023
Mr. Liam Conlon
Project Manager
City of Fort Worth Water Department
200 Texas Street
Fort Worth, TX 76102
Re: Clear Fork Lift Station and Force Main
Amendment No. 4 — Lift Station and Force Main Additional Construction Phase Services
KHA No. 061018214
City Project No. 100996; CSC 50217
Dear Liam:
This letter is in reference to a contract between Kimley-Horn and Associates, Inc. ("Engineer" or
"Kimley-Horn") and the City of Fort Worth (the City) dated 01-31-2018 referred herein as the
"Contract".
This amendment is to provide additional construction phase services for the construction phase portion
of the project. ENGINEER will provide the services outlined as follows:
CONTRACT TASK 8 — LIFT STATION — CONSTRUCTION PHASE SERVICES:
( Water $0, Sewer $44,400)
$ 44,400 Kimley-Horn
$ 44,400 Total
8.4 Shop Drawing Review
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Review up to fifty (50) additional shop drawings, samples, and other submittals submitted
by the Contractor.
8.5 Request for Information (RFI):
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Provide necessary interpretations and clarifications of the Contract Documents, and make
recommendations as to the acceptability of the work for up to thirty (30) additional RFIs.
8.9 Supplemental Construction Phase Services
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Site Observation
• ENGINEER will be on site for an additional eighty (80) hours to perform site
observation.
• City and Contractor Coordination
• ENGINEER coordinate with City staff and the Contractor on an as -needed basis
for an additional twenty (20) hours.
Kimley»>Horn
Page 2
CONTRACT TASK 15 — FORCE MAIN — CONSTRUCTION PHASE SERVICES:
( Water $0, Sewer $55,100)
$ 55.100 Kimley-Horn
$ 55,100 Total
15.2 Materials Testing Coordination and Evaluation
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Maintain Report Log
• ENGINEER will maintain a log of test results as they are received.
• Coordination with Testing Lab and City
• ENGINEER will coordinate with Testing Lab regarding any discrepancies as well
as timing of proposed testing. ENGINEER will notify CITY of failed tests.
• Review of Testing Reports
• ENGINEER will review materials testing reports as they are received to determine
conformance with the Construction Contract Documents, and whether further
clarification is required from the Testing Lab.
• Limitation of Responsibilities
• ENGINEER shall not be responsible for the acts or omissions of the City's testing
lab. ENGINEER shall not have the authority or responsibility to direct the work of
the City's testing lab.
15.3 On -Site Observation
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Make up to ten (10) additional site visits in order to observe the progress of the Work.
15.5.2 Change Orders
ENGINEER will complete the following additional tasks in accordance with the Original Contract:
• Provide support for up to twenty (20) change order requests, and associated revisions to
the Drawings.
801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102
Kimley»)Horn
Page 3
We recommend that the City increase the budget by $99,500 for these additional services.
The following tables summarize our recommended budget revisions, water and sanitary
sewer design fees, and revised contract amount:
Description
Task 1 — Project Management
Task 2 — Lift Station Site Feasibility and Due Diligence
Task 3 — Lift Station Property Acquisition
Task 4 — Lift Station Preliminary Design
Task 5 — Lift Station Final Design
Task 6 — Lift Station Construction Contract Document Prep.
Task 7 — Lift Station Bid Phase Services
Task 8 — Lift Station Construction Phase Services
Task 9 — Lift Station Record Drawings
Task 10 — Force Main Alignment Study
Task 11 — Force Main Preliminary Design
Task 12 — Force Main Final Design
Task 13 — Force Main Construction Contract Document Prep.
Task 14 — Force Main Bid Phase Services
Task 15 — Force Main Construction Phase Services
Task 16 — Force Main Record Drawings
Task 17 — Permitting Services
Task 18 — ROW/Easement Services
Task 19 — Survey and SUE
Task 20 —Additional Services
Total
Water
Sewer
Total
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$44,400
$44,400
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$55,100
$55,100
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$99,500
$99,500
801 Cherry Street, Unit 11, Suite 1300, Ft. Worth, TX 76102
Kimley»)Horn
Page 4
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Original Amend.
Amend.2 Amend.3 Amend.4
Revised
Contract
Contract
Task 1
$33,000
$33,000
Task 2
$83,330
$83,330
Task 3
$39,700
$39,700
Task 4
$265,230
$265,230
Task 5
$357,710
$357,710
Task 6
$40,060
$49,256
$89,316
Task 7
$43,910
$43,910
Task 8
$173,050
$263,400 $44,400
$480,850
Task 9
$8,900
$8,900
Task 10
$64,900
$64,900
Task 11
$178,460
$178,460
Task12
$111,730
$111,730
Task 13
$14,500
$14,500
Task 14
$23,520
$23,520
Task 15
$91,760
$55,100
$146,860
Task 16
$13,100
$13,100
Task 17
$21,700 $48,720
$70,420
Task 18
$42,570
$42,570
Task 19
$137,940
$137,940
Task 20
$50,000
$50,000
Total
$1,795,070 $48,720
$49,256 $263,400 $99,500
$2,255,946
Project
817-335-6511
Kimley»)Horn
The following breakdown for water and sewer services is recommended:
Water Fee
Sewer Fee
Survey
Total
Fee
Original Contract
$0
$1,657,130
$137,940
$1,795,070
Amendment No. 1
$0
$48,720
$0
$48,720
Amendment No. 2
$0
$49,256
$0
$49,256
Amendment No. 3
$0
$263,400
$0
$263,400
Amendment No. 4
$0
$99,500
$0
$99,500
Total
$0
$2,118,006
$137,940
I $2,255,946
Page 5
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES
fn R. Atkins, P.E.
Vice President
JCK/jra
Copy to: Tony Sholola, P.E., City of Fort Worth
Attachments - Level of Effort Spreadsheet
\\kimtey-hom\TX_FTVV\FT W_Uli I iti es\061018214-Clear-Fork-LS&FM\P PP\POST_NTP\Amendment-No-5lAmendment-No-5_Clear-Fork-LS&FM. doc
12/9/2023
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Amendment No. 4 - Clear Fork Lift Station and
Force Main
City Project No. 100996
Labor (hours)
Task No.
Task Description
Project
Project
Project Engineer
EIT
CADD
Administrative
Total Labor
Subconsultant
Travel Total
Expense
Task Sub Total
Director
Manager
Cost
M/WBE Non-M/waE
Markup
Reproduction I
Cost
Rate
$330.00
$315.00
$255.00
$215.00
$185.00
$135.00
Fees Permitting
8.0
ILS Construction Phase Services 1
0
0
5o
30
0
0
$44,400
$0
$0
$01
$o
$0
$44,400
8.4
Shop Drawing Review (45)
101
201 20
$12.600
1 1
$0
$12.600
1
1
$0
I 1
$0
$0
8.5
Plan/Spec Interpretation/RFI (30)
101
201 20
$12.600
1 1
$0
$12,600
1
1 1
$0
1 1 1
$0
$0
8.9
Supplemental Construction Phase Services
I I
1 1
$0
1 1 1
$0
$0
Site Observation
1
301 301
$14,100
1 1 1
$0
$14,100
City and Contractor Coordination
1
I I
201 1 1
I I
$5,100
1 1 1
I I
$0
$5,100
15.0
IFM Construction Phase Services 1
01 101
66
1631 01 0
$55,100
1 1
$0l $01 $01
$0l $0
$55,100
15.2
Materials Testing Coordination and Evaluation
1 1
I 1 1
$0
1
1 $01
$0
Maintain Report Log
1 1
401 1
$8,600
I I I
I Sol
$8,600
Coordination with Testing tab and City
I I
1 201 1
$4,300
1 1 1
1 $01
$4.300
Review Reports for Conformance with Project
I I
1 801 1
$17,200
I 1
1 $Ol
$17,200
I
1 1 1
$01
1 $01
$0
15.3
On -Site Observation
1 I
$01
I 1
I $DI
$0
10 additional site visits/meetings I1
10
131 I
$6.0001
1 1 1
+ $Dl
$6,000
1
1
1 1
$01
1 1 1
1 $01
$0
15.5.2
Change Orders and Contract Modifications I
I I
I 1 1
$01
1 1 1
1 $01
$0
Plan Revisions - Force Main I
I I
61 701 1 1
$16,6001
1 1 1
1 $01
$16,600
Change Order Review I
I I
1
601 I
1 I
1
I
$15.3001
I
1
I I
1 $01
I
$15,300
J
01 101
1161 1931 01
$99,600;
$01 $01 $01
$01 $0;
$99,500
Project Summary
Total Hours
319
Total Labor
$99,500
Total Expense
$0
SBE Subconsultant
$0
Non-SBE Subconsultant
$0
SBE Participation
0.0%
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
Typical Water and Sewer Replacement
FWWfR Official Release Date: 8.09.2012
Page 1 of 1