HomeMy WebLinkAboutContract 54137-A2AMENDMENT No.2 CSC No. 54137-A2
TO CITY SECRETARY CONTRACT No. 54137
WHEREAS, the City of Fort Worth (CITY) and Criado & Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 54137,
(the CONTRACT) which was administratively authorized on the 17th day of
March, 2022 in the amount of $374,484.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in
the amount of $16,110.00 administratively authorized on August 3, 2023;
and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Water and Sanitary Sewer Replacement Contract 103; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $15,319.00 (Sewer).
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $405,913.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 1 of 2
[W&SS Repl. Contract 103]
[CPN: 02723]
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort worth
riGifZGti �GLYA�L(%d�
Dana Burghdoff (Det L1, 2023�11:10 CST)
Dana Burghdoff
Assistant City Manager
Manager
DATE: Dec 21, 2023
APPROVAL RECOMMENDED:
Christopher H(rder (Dec 20, 2023 12 37 CST)
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Criado & Associates, Inc.
David B. Hawkins, P.E.
Utility Infrastructure Group
DATE: 12/14/2023
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Z�Iee,1271 7P.2E.
Dena Jo nson,
Project Manager
APPROVED AS TO FORM AND LEGALITY:
)9�
DBlack (Dec 20, 2023 17:16 CST)
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
poFFORr1n,,
p �0 Op1 P
�o
Op4� nE4A54go
Jannette S. Goodall
City Secretary
M&C : N/A
Date: N/A
Form 1295 N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 2 of 2
[W&SS Repl. Contract 103]
[CPN: 02723]
November 17, 2023
Ms. Dena Johnson
Project Manager
City of Fort Worth Water Department
Fort Worth, Texas 76102
Re: Water and Sanitary Sewer Replacement Contract 103, CPN 02723 — Amendment No. 2
Sanitary Sewer Realignment along E. 1st Street (L-2567)
Dear Ms. Johnson:
Criado & Associates, Inc. (CRIADO) is pleased to present this Amendment No.2 to the Engineering
Services Contract referenced above. The scope of work is to perform Level A SUE at 2 locations on an
existing 54 concrete box culvert and to collect depth of sewer services at two existing service locations.
This work is needed to determine if the proposed relocation of the sanitary sewer to the south side of
the existing 54" will impact relocation of sewer service from the customers on the north side of 1st Street.
This amendment also includes two separate parts, as described below:
SUE/ SURVEYING SERVICES
CRIADO will perform Subsurface Utility Engineering (SUE) work (Level A) and the associated surveying
services as required to collect horizontal and vertical elevations and other information needed in design
and preparation of plans for the project. The SUE effort will require two Level A holes (estimated depth
8'-13'). Information gathered during the SUE/survey shall include topographic data, elevations of the top
of the existing 54" storm sewer and the flowline elevations of the two existing services (using the service
cleanouts) and any other features the Engineer deems relevant to the final plan sheets. The estimated
effort required to complete the Design SUE/Survey is $6,339.
ENGINEERING SERVICES FOR PRELIMINARY DESIGN (60-PERCENT)
CRIADO will prepare Preliminary Design Drawings and Project Specifications & Estimates (PS&E) for the
proposed lateral improvements of this amendment. Plan and profile geometry will be coordinated with
the proposed and existing sanitary sewer laterals using a 1" = 20' horizontal and 1" = 4' vertical scale.
The estimated effort required to complete the Preliminary Design is $6,270. This fee also includes project
management time.
ENGINEERING SERVICES FOR FINAL DESIGN (90/100-PERCENT)
CRIADO will prepare Draft Final Plans for a 90-percent construction plan review meeting with the CITY,
followed by the submission of the Construction Documents (100-percent) to the CITY per the approved
Project Schedule. CRIADO will also provide a final design estimate of probable construction cost with
both the 90-percent and 100-percent design packages using ONLY standard CITY bid items. The estimated
effort required to complete the Final Design is $2,710.
4100 Spring Valley Road I Suite 1001 1 Dallas, Texas 75244 1 1 (972) 392-9092, (D) (469) 547-6072 1 www.criadoassociates.com
A. C CRIADO
CIVIL ENGINEERING
& LAND SURVEYING
Amendment No.2 total is $15,319.
Project Costs to date are as follows:
Original Contract Amount
Amendment No. 1
Amendment No. 2
Revised Contract Amount
$374,484.00
16,110.00
15,319.00
$405,913.00
The following additional contract documentation is attached with this proposal: Exhibit B-2 Level of Effort
Spreadsheet.
Once easements are obtained for the removed segments, a complete set of contract documents can be
prepared for those segments. An amendment will be prepared to document this effort and the additional
fee required.
We appreciate the opportunity to be of service to you and the City of Fort Worth. If you have any
questions, please do not hesitate to call me at 469-547-6072.
Sincerely,
Criado & Associates, Inc.
David B. Hawkins, PE
Utility Infrastructure Group Manager
Attachment: Exhibit B-2 Level of Effort
N:\PR0JECT\R14746.00_C0FW_SS Rehab CPN 02723\02_Project Information\022_Contract\Amendment No 2\Amend Not CoFW SS Rehab Contr 103_CPN 02723 CRIADO_20231117.docx
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Sanitary Sewer Rehabilitation Contract 103
City Project No. 02723
Amendment No. 2 (E. 1st Street and Chandler - L2567)
Labor (hours)
Expense
Task No.
Task Description
Principal
Senior
Project
Project Senior CAD Total Labor
EIT Administrative Subconsultant
Total
Task Sub Total
Manager
Engineer Technician Cost
SUE Travel Reproduction Expense Cost
Rate
$330
$250
$165 $140 $145 $100 SBE Non-SBE
1.0
Project Management
0
2
1,100 $0
$0 $0 $0 $0
$0
$1,100
1.1
Managing the Team
1.1.1
Internal Team Meetings
0
0 $0
$0
$0
1.1.2
QA/QC
0
2
0 $500
$0
$500
1.2
Communications and Reporting
1.2.1
Pre -Design Coordination Meeting
0
0 $0
$0
$0
1.2.2
Design Submittal Review Meetings
0
0 0 0 0 $0
$0
$0
1.2.3
Prepare Baseline Schedule
0
0 0 0 0 $0
$0
$0
Prepare Monthly Progress Reports with
1.2.4
Schedule
0
0 0 0 0 $0
$0
$0
1.2.5
Prepare Monthly MBE/SBE Reports
0
0
0 0 0 6 $600
$0
$600
2.0
Conceptual Design (30-Percent)
0
0
0 0 0 0 $0 $0
$0 $0 $0 $0
$0
$0
2.1
Data Collection
0
0 $0
$0
$0
2.2
Conceptual Design Package
$0
2.2.1
Cover Sheet
0
0 $0
$0
$0
2.2.2
Conceptual Layouts
0
0 $0
$0
$0
2.2.3
Construction Estimate
0
0 $0
$0
$0
$0
3.0
Preliminary Design (60 Percent)
0
0
6 5 24 0 $5,170 $0
$0 $0 $0 $0
$0
$5,170
3.1
Preliminary Design Package
$0
$0
3.1.1
Cover
0
0 $0
$0
$0
3.1.2
Overall Layout
0
0 $0
$0
$0
3.1.3
Plan and Plan/Profile Sheets
0
6 4 24 0 $5,030
$0
$5,030
3.1.4
Specifications
0
$0
$0
$0
3.1.5
Construction Estimate
0
0 $0
$0
$0
3.2
Constructability Review
0
0 $0
$0
$0
3.3
Utility Clearance
0
1 0 $140
$0
$140
$0
4.0
Final Design
0
1
2 0 4 $2,710 $0
$0 $0 $0 $0
$0
$2,710
Final Draft (90%) Construction Plans and
4.1
Specifications
0
1 4 2 $945
$0
$945
4.2
Final (100%) Plans and Specifications
0
1
1 4 2 $1,195
$0
$1,195
4.3
Project Decision Logs (90% and 100%)
4.4
Construction Estimates (90% and 100%)
0
2
Scope/Plan/Spec Revision (Delete
4.5
easement areas & M51)
0
5.0
Bid Phase
0 0
0
0
5.1
Bid Support
5.1.1
Upload Documents to Buzzsaw
0
Sell Contract Documents and Maintain
5.1.2
Plan Holders List
0
5.1.3
Issue Addenda
0
5.1.4
Attend Bid Opening
0
5.1.5
Tabulate Bids and Recommend Award
0
5.2
Mylar Drawings
6.0
Construction Phase Services
0 0
0
0
6.1
Construction Support
6.1.1
Attend Preconstruction Conference
0
6.1.2
Attend Public Meeting
0
6.2
Record Drawings/As Built
0
7.0
ROW/Easement Services
0 0
0
0
7.1
Right -of -Way Research
Right-of-Way/Easement Preparation and
7.2
Submittal
7.3
Temporary Right of Entry Submittal
8.0
Survey
0 2
2
0
8.1
Design Survey
0 2
8.2
Temporary Right of Entry Submittal
8.3
Construction Survey
8.4
Level A SUE (2 holes, 8' -13' Deep)
Totals
0 5
10
7
Water Line Footage
0�
0%
Sewer Line Footage
350�
100%
3501
100%
(A)
Total Fee
$15,319
(B)
Survey Fee
$0
(C)
Total Fee (-) survey Fee
$15,319
Water Fee (50% of C)
Sewer Fee (50%
of C)
$0.00
$15,319.00
$0
$0
$0
$570
$0
$570
0
$0
$0
$0
0 0
$0
$0
$0
$0
$0
$0 $0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
$0
0 0
$0
$0
$0
$0
$0
$0 $0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
0
$0
$0
$0
$0
0 0
$0
$0
$0
$0
$0
$0 $0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
8 0
$1,990
$0
$0
$4,349
$0
$0 $4,349
$6,339
$1,990
$1,860
$1,860
$3,850
$0
$0
$0
$0
$0
$0
$0
$2,489
$100
$2,589
$2,589
$0
42 10
$10,970
$0
$0
$4,349
$0
$0 $4,349
$15,319
Project Summary
Total Hours
74
Total Labor
$10,970
Total Expense
$4,349
MBE/SBE Subconsultant
$0
Non-MBE/SBE Subconsultant
$0
10% Sub Markup
$0
MBE/SBE Participation
0.0%
Total Project Cost
$15,319.00