Loading...
HomeMy WebLinkAboutContract 54137-A2AMENDMENT No.2 CSC No. 54137-A2 TO CITY SECRETARY CONTRACT No. 54137 WHEREAS, the City of Fort Worth (CITY) and Criado & Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 54137, (the CONTRACT) which was administratively authorized on the 17th day of March, 2022 in the amount of $374,484.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $16,110.00 administratively authorized on August 3, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 103; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $15,319.00 (Sewer). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $405,913.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 1 of 2 [W&SS Repl. Contract 103] [CPN: 02723] EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort worth riGifZGti �GLYA�L(%d� Dana Burghdoff (Det L1, 2023�11:10 CST) Dana Burghdoff Assistant City Manager Manager DATE: Dec 21, 2023 APPROVAL RECOMMENDED: Christopher H(rder (Dec 20, 2023 12 37 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Criado & Associates, Inc. David B. Hawkins, P.E. Utility Infrastructure Group DATE: 12/14/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Z�Iee,1271 7P.2E. Dena Jo nson, Project Manager APPROVED AS TO FORM AND LEGALITY: )9� DBlack (Dec 20, 2023 17:16 CST) Douglas W. Black Senior Assistant City Attorney ATTEST: poFFORr1n,, p �0 Op1 P �o Op4� nE4A54go Jannette S. Goodall City Secretary M&C : N/A Date: N/A Form 1295 N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 [W&SS Repl. Contract 103] [CPN: 02723] November 17, 2023 Ms. Dena Johnson Project Manager City of Fort Worth Water Department Fort Worth, Texas 76102 Re: Water and Sanitary Sewer Replacement Contract 103, CPN 02723 — Amendment No. 2 Sanitary Sewer Realignment along E. 1st Street (L-2567) Dear Ms. Johnson: Criado & Associates, Inc. (CRIADO) is pleased to present this Amendment No.2 to the Engineering Services Contract referenced above. The scope of work is to perform Level A SUE at 2 locations on an existing 54 concrete box culvert and to collect depth of sewer services at two existing service locations. This work is needed to determine if the proposed relocation of the sanitary sewer to the south side of the existing 54" will impact relocation of sewer service from the customers on the north side of 1st Street. This amendment also includes two separate parts, as described below: SUE/ SURVEYING SERVICES CRIADO will perform Subsurface Utility Engineering (SUE) work (Level A) and the associated surveying services as required to collect horizontal and vertical elevations and other information needed in design and preparation of plans for the project. The SUE effort will require two Level A holes (estimated depth 8'-13'). Information gathered during the SUE/survey shall include topographic data, elevations of the top of the existing 54" storm sewer and the flowline elevations of the two existing services (using the service cleanouts) and any other features the Engineer deems relevant to the final plan sheets. The estimated effort required to complete the Design SUE/Survey is $6,339. ENGINEERING SERVICES FOR PRELIMINARY DESIGN (60-PERCENT) CRIADO will prepare Preliminary Design Drawings and Project Specifications & Estimates (PS&E) for the proposed lateral improvements of this amendment. Plan and profile geometry will be coordinated with the proposed and existing sanitary sewer laterals using a 1" = 20' horizontal and 1" = 4' vertical scale. The estimated effort required to complete the Preliminary Design is $6,270. This fee also includes project management time. ENGINEERING SERVICES FOR FINAL DESIGN (90/100-PERCENT) CRIADO will prepare Draft Final Plans for a 90-percent construction plan review meeting with the CITY, followed by the submission of the Construction Documents (100-percent) to the CITY per the approved Project Schedule. CRIADO will also provide a final design estimate of probable construction cost with both the 90-percent and 100-percent design packages using ONLY standard CITY bid items. The estimated effort required to complete the Final Design is $2,710. 4100 Spring Valley Road I Suite 1001 1 Dallas, Texas 75244 1 1 (972) 392-9092, (D) (469) 547-6072 1 www.criadoassociates.com A. C CRIADO CIVIL ENGINEERING & LAND SURVEYING Amendment No.2 total is $15,319. Project Costs to date are as follows: Original Contract Amount Amendment No. 1 Amendment No. 2 Revised Contract Amount $374,484.00 16,110.00 15,319.00 $405,913.00 The following additional contract documentation is attached with this proposal: Exhibit B-2 Level of Effort Spreadsheet. Once easements are obtained for the removed segments, a complete set of contract documents can be prepared for those segments. An amendment will be prepared to document this effort and the additional fee required. We appreciate the opportunity to be of service to you and the City of Fort Worth. If you have any questions, please do not hesitate to call me at 469-547-6072. Sincerely, Criado & Associates, Inc. David B. Hawkins, PE Utility Infrastructure Group Manager Attachment: Exhibit B-2 Level of Effort N:\PR0JECT\R14746.00_C0FW_SS Rehab CPN 02723\02_Project Information\022_Contract\Amendment No 2\Amend Not CoFW SS Rehab Contr 103_CPN 02723 CRIADO_20231117.docx EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Sanitary Sewer Rehabilitation Contract 103 City Project No. 02723 Amendment No. 2 (E. 1st Street and Chandler - L2567) Labor (hours) Expense Task No. Task Description Principal Senior Project Project Senior CAD Total Labor EIT Administrative Subconsultant Total Task Sub Total Manager Engineer Technician Cost SUE Travel Reproduction Expense Cost Rate $330 $250 $165 $140 $145 $100 SBE Non-SBE 1.0 Project Management 0 2 1,100 $0 $0 $0 $0 $0 $0 $1,100 1.1 Managing the Team 1.1.1 Internal Team Meetings 0 0 $0 $0 $0 1.1.2 QA/QC 0 2 0 $500 $0 $500 1.2 Communications and Reporting 1.2.1 Pre -Design Coordination Meeting 0 0 $0 $0 $0 1.2.2 Design Submittal Review Meetings 0 0 0 0 0 $0 $0 $0 1.2.3 Prepare Baseline Schedule 0 0 0 0 0 $0 $0 $0 Prepare Monthly Progress Reports with 1.2.4 Schedule 0 0 0 0 0 $0 $0 $0 1.2.5 Prepare Monthly MBE/SBE Reports 0 0 0 0 0 6 $600 $0 $600 2.0 Conceptual Design (30-Percent) 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 2.1 Data Collection 0 0 $0 $0 $0 2.2 Conceptual Design Package $0 2.2.1 Cover Sheet 0 0 $0 $0 $0 2.2.2 Conceptual Layouts 0 0 $0 $0 $0 2.2.3 Construction Estimate 0 0 $0 $0 $0 $0 3.0 Preliminary Design (60 Percent) 0 0 6 5 24 0 $5,170 $0 $0 $0 $0 $0 $0 $5,170 3.1 Preliminary Design Package $0 $0 3.1.1 Cover 0 0 $0 $0 $0 3.1.2 Overall Layout 0 0 $0 $0 $0 3.1.3 Plan and Plan/Profile Sheets 0 6 4 24 0 $5,030 $0 $5,030 3.1.4 Specifications 0 $0 $0 $0 3.1.5 Construction Estimate 0 0 $0 $0 $0 3.2 Constructability Review 0 0 $0 $0 $0 3.3 Utility Clearance 0 1 0 $140 $0 $140 $0 4.0 Final Design 0 1 2 0 4 $2,710 $0 $0 $0 $0 $0 $0 $2,710 Final Draft (90%) Construction Plans and 4.1 Specifications 0 1 4 2 $945 $0 $945 4.2 Final (100%) Plans and Specifications 0 1 1 4 2 $1,195 $0 $1,195 4.3 Project Decision Logs (90% and 100%) 4.4 Construction Estimates (90% and 100%) 0 2 Scope/Plan/Spec Revision (Delete 4.5 easement areas & M51) 0 5.0 Bid Phase 0 0 0 0 5.1 Bid Support 5.1.1 Upload Documents to Buzzsaw 0 Sell Contract Documents and Maintain 5.1.2 Plan Holders List 0 5.1.3 Issue Addenda 0 5.1.4 Attend Bid Opening 0 5.1.5 Tabulate Bids and Recommend Award 0 5.2 Mylar Drawings 6.0 Construction Phase Services 0 0 0 0 6.1 Construction Support 6.1.1 Attend Preconstruction Conference 0 6.1.2 Attend Public Meeting 0 6.2 Record Drawings/As Built 0 7.0 ROW/Easement Services 0 0 0 0 7.1 Right -of -Way Research Right-of-Way/Easement Preparation and 7.2 Submittal 7.3 Temporary Right of Entry Submittal 8.0 Survey 0 2 2 0 8.1 Design Survey 0 2 8.2 Temporary Right of Entry Submittal 8.3 Construction Survey 8.4 Level A SUE (2 holes, 8' -13' Deep) Totals 0 5 10 7 Water Line Footage 0� 0% Sewer Line Footage 350� 100% 3501 100% (A) Total Fee $15,319 (B) Survey Fee $0 (C) Total Fee (-) survey Fee $15,319 Water Fee (50% of C) Sewer Fee (50% of C) $0.00 $15,319.00 $0 $0 $0 $570 $0 $570 0 $0 $0 $0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 $0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 0 $0 $0 $0 $0 0 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 8 0 $1,990 $0 $0 $4,349 $0 $0 $4,349 $6,339 $1,990 $1,860 $1,860 $3,850 $0 $0 $0 $0 $0 $0 $0 $2,489 $100 $2,589 $2,589 $0 42 10 $10,970 $0 $0 $4,349 $0 $0 $4,349 $15,319 Project Summary Total Hours 74 Total Labor $10,970 Total Expense $4,349 MBE/SBE Subconsultant $0 Non-MBE/SBE Subconsultant $0 10% Sub Markup $0 MBE/SBE Participation 0.0% Total Project Cost $15,319.00