HomeMy WebLinkAboutContract 55603-R1CSC No. 55603-R1
FIRST RENEWAL TO CITY SECRETARY
CONTRACT NO. 55603
WHEREAS, on April 20, 2021, the City of Fort Worth ("City") and Pape -Dawson
Engineering, Inc. ("Engineer"), collectively the ("Parties"), made and entered into City Secretary
Contract No. 55603 (M&C 21-0278, April 13, 2021) (the "Contract") for Citywide Drainage
Improvements Design, City Project No.: 100092; and
WHEREAS the Contract may be renewed once, in the amount of $300,000.00, under the
same terms, conditions, and as approved through M&C 21-0278;
NOW, THEREFORE, the Parties, hereby agree as follows:
I.
a. The Contract is hereby renewed in the amount not to exceed $300,000.00 under the
same terms and conditions.
b. Task (work) orders will continue to be issued and remain contingent upon the
availability of funds and the availability of the Engineer.
II.
All other terms and conditions of the Contract remain unaffected and in full force and
effect.
IN WITNESS WHEREOF, the City and the Engineer have each executed this First
Renewal by and through each Party's duly authorized signatory, effective as of the date subscribed
by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
William Johnson (D c 23, 202317:44 CST)
Date:
William Johnson
Assistant City Manager
Dec 23, 2023
APPROVAL RECOMMENDED:
BY:
Pape -Dawson Consulting Engineers,
LLC
Zubin Sukheswalla (Dec 20, 2023 05:24 GMT+5.5)
Zubin Sukheswalla, PE, CFM
Managing Vice President
Date: Dec 20, 2023
CONTRACT RENEWAL No. 1 CS NO. 55603
Citywide Drainage Improvements Design, City Project No. 100092
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
By: Lauren Prieur (Dec 21, 2023 10:20 CST)
Lauren Prieur
Director, Transportation and Public Works
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Geoffrey Smith
Geoffrey Smith (Dec 20, 2023 08:26 CST)
Geoffrey Smith, PE, CFM
Project Manager
APPROVED AS TO FORM AND LEGALITY
By:
DBlack (Decec 2� 9 CST)
Doug Black
Assistant City Attorney
ATTEST: va'w�
aye "�� §'_&
a,Ilao 4$gaa
Jannette Goodall
City Secretary
Form 1295 No.: 2021-713546
M&C No.: 21-0278
M&C Date: 04/13/2021
CONTRACT RENEWAL No. 1 CS NO. 55603
Citywide Drainage Improvements Design, City Project No. 100092
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 04/13/21 M&C FILE NUMBER: M&C 21-0278
LOG NAME: 20SWM PAPE-DAWSON CITYWIDE DRAINAGE IMPROVEMENTS DESIGN
SUBJECT
(ALL) Authorize Execution of an Engineering Agreement with Pape -Dawson Consulting Engineers,
Inc. in an Amount Not to Exceed $300,000.00 for Drainage Improvement Projects Citywide
RECOMMENDATION:
It is recommended that the City Council authorize execution of an engineering agreement with
Pape -Dawson Consulting Engineers, Inc. in an amount not to exceed $300,000.00 for the
Citywide Drainage Improvements programmable project (City Project No. P00043) with one
renewal at the City's sole option and a maximum contract duration of five years.
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to provide for task -ordered
engineering services to design various citywide minor drainage improvement projects that may be
needed from time to time. These projects may involve storm drain extensions, inlets and outfalls,
correcting drainage deficiencies, and other minor drainage improvements. This contract is a tool
to quickly respond to small, yet high priority drainage improvement design needs throughout the
City that are identified by community members or staff.
In May 2018, the Transportation and Public Works Department (TPW), Stormwater Management
Division, published a Request for Qualifications (RFQ) for various engineering consulting
services. Based on the results of the RFQ, Pape -Dawson Consulting Engineers, Inc. was selected
as the most qualified consultant to perform these services.
Individual task orders will be issued for each project identified to address a local flooding or
drainage need. The cost of each task order will be based on the hours worked at agreed -upon
hourly rates. The total cost of all task orders performed will not exceed $300,000.00. Staff
considers the proposed hourly rates to be fair and reasonable for the size and complexity of the
contemplated projects. This agreement may be renewed one additional time at the City's sole
option subject to available funding.
M/WBE Office - Pape -Dawson Consulting Engineers, Inc. is in compliance with the City's BDE
Ordinance by committing to 9.00% SBE participation on this project. The City's SBE goal on this
project is 9%.
This project is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously
appropriated, in the Stormwater Capital Projects Fund for future identified task order projects
related to the Drainage Improvement Projects programmable project to support the approval of the
above recommendation and execution of the engineering agreement. Prior to any expenditure
being incurred, the Transportation & Public Works Department has the responsibility to validate the
availability of funds.
Submitted for City Manager's Office by: Dana Burghdoff 8018
Originating Business Unit Head: William Johnson 7801
Additional Information Contact:
Linda Young 2485
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Pape -Dawson Contract 1st Renewal
M&C: 21-0278
CPN: 100092
CSO: 55603
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1
Zubin Sukheswalla (ZSukheswalla@pape-
dawson.com)
Engineer
Dec 20, 2023
=RSZR5'
2.
Geoffrey Smith
TPW Project Mgr.
-
Dec 20, 2023
3.
Justin Naylor (sub for Linda Young)
TPW Program Mgr.
»'
Dec 20, 2023
4.
Lissette Acevedo
TPW Sr. CPO
oN
Dec 21, 2023
5.
Patricia Wadsack
TPW Asst. Dir.
PL'
Dec 21, 2023
6.
Lauren Prieur
TPW Dir.
?!-
Dec 21, 2023
7.
Doug Black
Legal
Dec 21, 2023
8.
William Johnson
CMO
,
Dec 23, 2023
9.
Ronald Gonzales
CSO
Dec7.26, 2023
10.
Jannette Goodall
CSO
,7Se
Dec 26, 2023
,S
11.
Allison Tidwell
CSO
Dec 27, 2023
12.
TPW SW Contracts
TPW SW
CC: Program Manager — Linda Young, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon Team —
Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: EYES No
RUSH: OYES XNo SAME DAY: OYES ❑No NEXT DAY: DYES No
ROUTING TO CSO: ®YES ❑No
Action Required:
n As Requested
❑ For Your Information
171 Signature/Routing and or Recording
n Comment
File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(a,fortworthtexas.gov Ca11 817-229-3283 with questions. Thank you!