Loading...
HomeMy WebLinkAboutContract 58748-A1City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58748 Page 1 of 5 Date Received: _______________ City Secretary Time Received: ______________ Contract No.: ____________ FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 58748 A COMMUNITY FACILITIES AGREEMENT BETWEEN THE CITY OF FORT WORTH AND GCP VAN ZANDT, LLC This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 58748 (“First Amendment”) is made and entered into by and between the City of Fort Worth (“City”), a home-rule municipal corporation of the state of Texas, and GCP Van Zandt, LLC (“Developer”), a Nebraska limited liability company. WHEREAS, the City and Developer entered into a Community Facilities Agreement for the construction of public infrastructure Improvements for a Project known as The Van Zandt, City Project Number 101488 (“CFA”); and WHEREAS, Developer’s name was GCP III Van Zandt, LLC at the time the Secretary Contract Number 58748 was executed, and the Developer’s name has recently been amended to GCP Van Zandt, LLC on September 7, 2023; and WHEREAS, Developer provided the City with a development bond as the financial guarantee for the Improvements in the CFA; and WHEREAS, Developer has hired a new contractor to construct the Improvements pursuant to the CFA and added water improvements to the scope of work, and the estimated construction costs have decreased from the previous contractor’s estimated costs; and WHEREAS, the City and Developer desire to amend the CFA to reflect the revised Cost Estimates and Cost Summary Table; and WHEREAS, Developer has provided a bond rider to reflect the Developer’s name change and reflect the additional water improvements; NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends City Secretary Contract Number 58748: 1. Section 36 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of this First Amendment, which is attached hereto and incorporated herein by reference. The revised Cost Summary Table reflects revisions made by Change Order 1. 2. City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58748 Page 2 of 5 The Cost Estimates in the CFA are amended in their entirety to be and read as set forth in Exhibit B of this First Amendment, which is attached hereto and incorporated herein by reference. 3. a. All other provisions of City Secretary Contract No. 58748 which are not expressly amended herein, shall remain in full force and effect. b. All terms in this First Amendment that are capitalized, but not defined, shall have the meanings ascribed to those terms in City Secretary Contract No. 58748. [SIGNATURES ON FOLLOWING PAGE] City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58748 Page 3 of 5 IN TESTIMONY WHEREOF, the City and Developer have executed this First Amendment to be effective on the date signed by the City’s Assistant City Manager. CITY OF FORT WORTH Dana Burghdoff Assistant City Manager Date: Recommended by: Dwayne Hollars/Bichson Nguyen Contract Compliance Specialist Development Services Approved as to Form & Legality: Thomas Royce Hansen Assistant City Attorney II M&C No. N/A Form 1295: N/A Date: ________________ DEVELOPER GCP Van Zandt, LLC Zach Wiegert Manager Date: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including all performance and reporting requirements. Name: Rebecca Owen Title: Development Manager ATTEST: Jannette S. Goodall City Secretary City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58748 Page 4 of 5 EXHIBIT A 36. Cost Summary Sheet Project Name: The Van Zandt CFA No.: CFA18-0113 City Project No.: 101488 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction 190,255.00$ 2. Sewer Construction 137,056.00$ Water and Sewer Construction Total 327,311.00$ B. TPW Construction 1. Street 205,540.00$ 2. Storm Drain -$ 3. Street Lights Installed by Developer -$ 4. Signals -$ TPW Construction Cost Total 205,540.00$ Total Construction Cost (excluding the fees): 532,851.00$ Estimated Construction Fees: C. Construction Inspection Service Fee $28,250.00 D. Administrative Material Testing Service Fee $1,470.00 E. Water Testing Lab Fee $150.00 Total Estimated Construction Fees: 29,870.00$ Financial Guarantee Options, choose one Amount Choice (Mark one) Bond = 100% 532,851.00$ x Completion Agreement = 100% / Holds Plat 532,851.00$ Cash Escrow Water/Sanitary Sewer= 125% 409,138.75$ Cash Escrow Paving/Storm Drain = 125% 256,925.00$ Letter of Credit = 125% 666,063.75$ City of Fort Worth, Texas First Amendment to City Secretary Contract No. 58748 Page 5 of 5 EXHIBIT B Cost Estimates DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME: CONTRACT: CFA # CITY PROJECT # FID # FILE # X # INSPECTOR:Phone No: PROJECT MANAGER:Phone No: Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $0.00 $373,179.00 $201,045.00 $0.00 $0.00 50 EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE $0.00 $0.00 $373,179.00 $0.00 $201,045.00 $0.00 $0.00 $0.00 $0.00 $0.00 50 AMOUNT OF PROP. CHANGE ORDER $ 190,255.00 $ (236,123.00) $ 4,639.00 25 REVISED CONTRACT AMOUNT $190,255.00 $0.00 $137,056.00 $0.00 $205,684.00 $0.00 $0.00 $0.00 $0.00 $0.00 75 TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE Dev. Cost: City Cost: TOTAL REVISED CONTRACT 1* 3305.0109 175 LF $ 20.00 $ 3,500.00 2* 3311.0141 95 LF $ 175.00 $ 16,625.00 3* 3311.0241 80 LF $ 223.50 $ 17,880.00 4* 3312.0116 3 EA $ 1,250.00 $ 3,750.00 5* 3312.2003 1 EA $ 2,500.00 $ 2,500.00 6* 3312.2803 1 EA $ 10,000.00 $ 10,000.00 7* 3312.3002 1 EA $ 1,000.00 $ 1,000.00 8* 3312.3003 1 EA $ 1,000.00 $ 1,000.00 9* 3312.4106 1 EA $ 4,500.00 $ 4,500.00 10* 3312.4107 1 EA $ 4,500.00 $ 4,500.00 11* 3305.1101 100 LF $ 1,110.00 $ 111,000.00 12* 241.1512 7 EA $ 2,000.00 $ 14,000.00 $ 190,255.00 1 241.2012 -243 LF $ 125.00 (30,375.00)$ 2 241.2103 -1 EA $ 2,377.00 (2,377.00)$ 3 241.2201 -1 EA $ 4,723.00 (4,723.00)$ 4 3301.0001 -243 LF $ 114.00 (27,702.00)$ 5 3301.0002 -358 LF $ 82.00 (29,356.00)$ 6 3301.0101 -4 EA $ 200.00 (800.00)$ 7 3305.0103 -1 EA $ 16,000.00 (16,000.00)$ 8 3305.0109 -358 LF $ 22.00 (7,876.00)$ 9 3305.0116 -3 CY $ 590.00 (1,770.00)$ 10 3302.0122 -4 EA $ 275.00 (1,100.00)$ 11 3305.3002 -30 LF $ 358.00 (10,740.00)$ 12 3331.4115 -296 LF $ 360.00 (106,560.00)$ 13 3331.4116 -32 LF $ 150.00 (4,800.00)$ 14 3339.1001 -5 EA $ 25,600.00 (128,000.00)$ 15 3339.1003 -4 EA $ 250.00 (1,000.00)$ 16* 241.2012 343 LF $50.00 17,150.00$ 17*241.2103 1 EA $250.00 250.00$ 18*241.2201 1 EA $1,500.00 1,500.00$ 19*3301.0001 343 LF $17.00 5,831.00$ 20*3301.0002 270 LF $17.00 4,590.00$ 21*3301.0101 4 EA $350.00 1,400.00$ 22*3305.0103 1 EA $5,250.00 5,250.00$ 23* 3305.0109 270 LF $20.00 5,400.00$ 24* 3305.0116 4 CY $1,250.00 5,000.00$ 25*3302.0122 3 EA $500.00 1,500.00$ 26*3331.4208 270 LF $247.50 66,825.00$ 27*3331.4209 32 LF $292.50 9,360.00$ 28*3339.1001 4 EA $3,250.00 13,000.00$ $ (236,123.00) 1 241.1 -200 SY $ 50.00 $ (10,000.00) 2 3201.0127 -194 LF $ 75.00 $ (14,550.00) 3 3201.0616 -182 SY $ 160.00 $ (29,120.00) 4 3211.0111 -385 SY $ 45.00 $ (17,325.00) 5 3213.0101 -560 SY $ 160.00 $ (89,600.00) 6 3216.0101 -30 LF $ 25.00 $ (750.00) No CONTRACT DAYS $0.00 $0.00 STREET LIGHTSDRAINAGE CONTRACT UNIT 56008-0700430-101488-001380 CITY PARTICIPATION:18-0113 $190,255.00 $137,056.00 PAVING CHANGE ORDER No: 1 WEST 7TH Paving, Grading, and Utility Improvements 101488 K-2628 X-25612 QUANTITY UNIT TOTAL $0.00 $532,995.00 WATER SEWER PAY ITEM # UNIT PRICE $532,995.00 ITEM DESCRIPTION Russell Rogers Andrew Goodman 214-980-2068 817-392-6251 CITY BID ITEM # $205,684.00 Salvage 1" Water Meter UNIT I: WATER IMPROVEMENTS SUBTOTAL 8" Gate Valve (Work Only) 12" x 6" Tapping Sleeve (Work Only) 12" x 8" Tapping Sleeve (Work Only) 12" Casing By Other Than Open Cut (Work Only) 4' Manhole* 4' Extra Depth Manhole* Pre-CCTV Inspection* Post-CCTV Inspection* Manhole Vacuum Testing* Exploratory Excavation of Existing Utilities* 8" Sewer Pipe* 8" Sewer Pipe, CSS Backfill* 12" Sewer Pipe (Work Only) 12" Sewer Pipe, CSS Backfill Remove 6" Sewer Line 8" Sewer Abandonment Plug (Work Only) Remove 4' Sewer Manhole Pre-CCTV Inspection 4' Manhole UNIT II : SEWER IMPROVEMENTS SUBTOTAL UNIT IV : PAVING IMPROVEMENTS Trench Safety* Concrete Encasement for Utility Pipes* Concrete Collar* 8" Sewer Carrier Pipe* UNIT I : WATER IMPROVEMENTS Trench Safety 6" Water Pipe (Work Only) 8" Water Pipe (Work Only) Connection to Existing 4"-12" Water Main* 1" Water Service (Work Only) 6" Water Meter & Vault (Work Only) 6" Gate Valve (Work Only) UNIT II : SEWER IMPROVEMENTS Remove 6" Sewer Line* 8" Sewer Abandonment Plug* Remove 4' Sewer Manhole* Post-CCTV Inspection Manhole Vacuum Testing Exploratory Excavation of Existing Utilities Trench Safety Concrete Encasement for Utility Pipes (Work Only) Concrete Collar Remove Conc Pvmt 10' Wide Asphalt Pvmt Repair, Arterial Conc Pvmt Repair, Arterial/Industrial 4" Flexible Base, Type A, GR-1 6" Conc Pvmt Conc Curb and Gutter Revised: 10-12-2011 Page 1 7 3217.0201 -7 LF $ 15.00 $ (105.00) 8 3217.0201 -10 LF $ 15.00 $ (150.00) 9 3217.0501 -45 LF $ 15.00 $ (675.00) 10 3217.2104 -10 LF $ 50.00 $ (500.00) 11 3471.0001 -1 EA $ 38,270.00 $ (38,270.00) 12* 241.1 270 SY $ 40.00 $ 10,800.00 13*3217.2104 220 LF $ 30.00 $ 6,600.00 14* 3471.0001 1 EA $ 40,000.00 $ 40,000.00 15* 241.11 245 SY $ 40.00 $ 9,800.00 16* 3212.0503 245 SY $ 100.00 $ 24,500.00 17* 3201.015 177 LF $ 261.00 $ 46,197.00 18* 3201.0301 273 SY $ 69.00 $ 18,837.00 19*9999.0001 250 SF $ 50.00 $ 12,500.00 20*3213.0403 270 SY $ 135.00 $ 36,450.00 $ 4,639.00 (41,229.00)$ REASONS FOR CHANGE ORDER RECOMMENDED:APPROVED:APPROVED: Kimley-Horn and Associates, Inc. GCP Van Zandt, LLC Dagger By: By: By: Name: Name: Name: Title: Title: Title: 2" Extra Width Asphalt Pavment Repair (7th Street) NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. 7. Irrigation Scope per Redesign 8. Change of City Approved Contractor 3. Due to alley abandonment, which has been approved at CPC, the grading and pavement of the proposed alley extension has been removed from the plans. Changes correspond to Revision 01 as shown on Sheets C-03, C-04, C-05 and C-10 of the construction plans. 4" DOT Pvmt Marking HAS (W) 8" SLD Pvmt Amrking HAS (W) 4. Water Boring per City of Fort Worth TPW Requirements 5. Sanitary Sewer Night Work per City of Fort Worth TPW Requirements 6. Repavement of W 7th & Foch Intersection per City of Fort Worth TPW Requirements 1. Water services for the proposed development were added to the plans as a requirement from City of Fort Worth Miscellaneous Projects. Changes correspond to Revision 01 as shown on Sheets C-07 of the construction plans.25 Additional working day s. This item will be 100% developer cost. 24" SLD Pvmt Marking HAE (W) REFL Raised Marker TY II-C-R Traffic Control Remove Conc Pvmt 2. Realignment and size change of Sanitary Sewer Line A due to MEP design within the proposed building as a result of minimum IBC pipe slopes. Changes correspond to Revision 01 as shown on Sheets C-08 and C-09 of the construction plans. No change in the number of working days. This item will be 100% developer cost. GRAND TOTAL Repair Bike Lane 8" Concrete Driveway REFL Raised Marker TY II-C-R Traffic Control Remove Asphalt Pvmt 6" Asphalt Base Type B Asphalt Pvmt Repair, Sewer Service*(Foch Street) UNIT IV : PAVING IMPROVEMENTS SUBTOTAL Revised: 10-12-2011 Page 2 Jennifer Gansert, P.E. Associate