NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Walsh Ranch Quail Valley – Planning Area 3 West
City Project No.: 103899
Improvement Type(s): Water Sewer
Original Contract Price: $1,829,666.00
Amount of Approved Change Order(s):-$97,794.00
Revised Contract Amount:$1,731,872.00
Total Cost of Work Complete:$1,731,872.00
Contractor Date
Title
Conatser Construction
Company Name
Project Inspector Date
Project Manager Date
CFA Manager Date
_______________________________________ __________________________________
TPW Director Date
Asst. City Manager Date
Page 2 of 2
Notice of Project Completion
Project Name: Walsh Ranch Quail Valley – Planning Area 3 West
City Project No.: 103899
City’s Attachments
Final Pay Estimate
Change Order(s):Yes N/A
Pipe Report:Yes N/A
Contractor’s Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 160 WD
Work Start Date: 11/19/2022
Days Charged: 237
Work Complete Date: 10/31/2023
Completed number of Soil Lab Test: 660
Completed number of Water Test: 20
CITY OF FORT WORTH
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST - PHASE
Contract Limits
Project Type WATER & SEWER IMPROVEMENTS
DOE Number 3899
Estimate Number 1 Payment Number 1 For Period Ending 11/1/2023
FINAL PAYMENT REQUEST
City Secretary Contract Number
237
WD
Contract Date
CONATSER CONSTRUCTION TxLP
NA
5327 WICHITA ST
FORT WORTH TX 76119
G. DEYON S. WESTER
160WDContract Time
Days Charged to Date
CompleteContract is 100.00
Contractor
,
/Inspectors
Project Manager
City Project Numbers 103899
Tuesday, November 7, 2023 Page 1 of 5
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST - PHAS
Contract Limits
Project Type WATER & SEWER IMPROVEMENTS
DOE Number 3899
Estimate Number 1
Payment Number 1
For Period Ending 11/1/2023
Project Funding
City Project Numbers 103899
UNIT I: WATER IMPROVEMENTS
Item
No.Description of Items Estimated
Quanity Unit Unit Cost Estimated
Total
Completed
Quanity
Completed
Total
1 REMOVE 8" WATER LINE 11 LF $20.00 $220.00 11 $220.00
2 4" - 12" PRESSURE PLUG 1 EA $1,500.00 $1,500.00 1 $1,500.00
3 8" DIP WATER 430 LF $64.00 $27,520.00 430 $27,520.00
4 8" DIP WATER, CLSM BACKFILL 376 LF $74.00 $27,824.00 376 $27,824.00
5 8" PVC WATER PIPE 5174 LF $52.00 $269,048.00 5174 $269,048.00
6 CONCRETE ENCASEMENT FOR UTILITY PIPES 5 CY $400.00 $2,000.00 5 $2,000.00
7 FIRE HYDRANT 9 EA $4,600.00 $41,400.00 9 $41,400.00
8 DUCTILE IRON WATER FITTINGS
W/RESTRAINT (CO #1 & #2)
4.3 TN $9,000.00 $38,700.00 4.3 $38,700.00
9 CONNECTION TO EXISTING 16" WATER MAIN 2 EA $5,500.00 $11,000.00 2 $11,000.00
10 CONNECTION TO EXISTING 4" - 12" WATER
MAIN
3 EA $2,000.00 $6,000.00 3 $6,000.00
11 1" WATER SERVICE 117 EA $1,100.00 $128,700.00 117 $128,700.00
12 8" GATE VALVE 17 EA $1,600.00 $27,200.00 17 $27,200.00
13 TRENCH SAFETY 5980 LF $1.00 $5,980.00 5980 $5,980.00
14 16" X 8" TAPPING SLEEVE & VALVE (CO #2)2 EA $7,500.00 $15,000.00 2 $15,000.00
15 1" WATER SERVICE - TAP EXISTING MAIN (CO
#1)
1 EA $2,100.00 $2,100.00 1 $2,100.00
16 REMOVE AND RELOCATE FIRE HYDRANT
(CO#4)
1 EA $3,500.00 $3,500.00 1 $3,500.00
17 6" GATE VALVE (CO#4)1 EA $1,500.00 $1,500.00 1 $1,500.00
18 1" IRRIGATION SERVICE (CO#4)1 EA $1,100.00 $1,100.00 1 $1,100.00
19 1 1/2" IRRIGATION SERVICE (CO#4)2 EA $2,500.00 $5,000.00 2 $5,000.00
$615,292.00 $615,292.00Sub-Total of Previous Unit
UNIT II: SANITARY SEWER IMPROVEMENTS
Item
No.Description of Items Estimated
Quanity Unit Unit Cost Estimated
Total
Completed
Quanity
Completed
Total
1 REMOVE 10" SEWER LINE 42 LF $30.00 $1,260.00 42 $1,260.00
2 CONCRETE ENCASE SEWER PIPE (CO #2)4 CY $400.00 $1,600.00 4 $1,600.00
3 CONC PVMT REPAIR, RESIDENTIAL (CO #2)55 SY $120.00 $6,600.00 55 $6,600.00
4 8" SEWER PIPE (CO #1 & #2)4819 LF $56.00 $269,864.00 4819 $269,864.00
5 8" SEWER PIPE, CSS BACKFILL (CO #1 & #2)434 LF $66.00 $28,644.00 434 $28,644.00
Tuesday, November 7, 2023 Page 2 of 5
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST - PHAS
Contract Limits
Project Type WATER & SEWER IMPROVEMENTS
DOE Number 3899
Estimate Number 1
Payment Number 1
For Period Ending 11/1/2023
Project Funding
City Project Numbers 103899
6 10" SEWER PIPE 610 LF $80.00 $48,800.00 610 $48,800.00
7 10" SEWER PIPE, CSS BACKFILL 61 LF $90.00 $5,490.00 61 $5,490.00
8 10" SEWER CARRIER PIPE 70 LF $126.00 $8,820.00 70 $8,820.00
9 20" CASING BY OTHER THAN OPEN CUT 70 LF $740.00 $51,800.00 70 $51,800.00
10 4' MANHOLE (CO #1 & #2)59 EA $4,400.00 $259,600.00 59 $259,600.00
11 4' DROP MANHOLE (CO #2)4 EA $6,400.00 $25,600.00 4 $25,600.00
12 4' EXTRA DEPTH MANHOLE (CO #1 & #2)265 VF $215.00 $56,975.00 265 $56,975.00
13 EPOXY MANHOLE LINER (CO #1 & #2)400 VF $425.00 $170,000.00 400 $170,000.00
14 4" SEWER SERVICE (CO #1)117 EA $850.00 $99,450.00 117 $99,450.00
15 TRENCH SAFETY (CO #1)5924 LF $1.00 $5,924.00 5924 $5,924.00
16 POST-CCTV INSPECTION (CO #1)5924 LF $4.00 $23,696.00 5924 $23,696.00
17 MANHOLE VACUUM TESTING (CO #1)60 EA $150.00 $9,000.00 60 $9,000.00
18 CONCRETE COLLAR 6 EA $1,500.00 $9,000.00 6 $9,000.00
19 UTILITY MARKERS 5 EA $367.00 $1,835.00 5 $1,835.00
20 RECONFIGURE 8" SANITARY SEWER PIPE (CO
#2)
327 LF $86.00 $28,122.00 327 $28,122.00
21 DISPOSAL OF MANHOLE (CO #2)3 EA $1,500.00 $4,500.00 3 $4,500.00
$1,116,580.00 $1,116,580.00Sub-Total of Previous Unit
Tuesday, November 7, 2023 Page 3 of 5
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST - PHAS
Contract Limits
Project Type WATER & SEWER IMPROVEMENTS
DOE Number 3899
Estimate Number 1
Payment Number 1
For Period Ending 11/1/2023
Project Funding
City Project Numbers 103899
Contract Information Summary
Change Orders
$1,829,666.00Original Contract Amount
$1,731,872.00Total Contract Price
$1,731,872.00
Less
Total Cost of Work Completed
% Retained $0.00
Net Earned $1,731,872.00
Plus Material on Hand Less 15%$0.00
Balance Due This Payment $1,731,872.00
Less Liquidated Damages
Days @ / Day
$0.00
Less Penalty
LessPavement Deficiency $0.00
$0.00
$0.00Less Previous Payment
Earned This Period
Retainage This Period
$1,731,872.00
$0.00
1 ($35,400.00)Change Order Number
1 ($145,851.00)Change Order Number
2 $6,600.00Change Order Number
2 $65,757.00Change Order Number
4 $11,100.00Change Order Number
Tuesday, November 7, 2023 Page 4 of 5
Contract Name WALSH RANCH - QUAIL VALLEY - PLANNING AREA 3 WEST - PHAS
Contract Limits
Project Type WATER & SEWER IMPROVEMENTS
DOE Number 3899
Estimate Number 1
Payment Number 1
For Period Ending 11/1/2023
Project Funding
City Project Numbers 103899
Line Fund Account Center
Amount
Funded Gross Retainage Net
CITY OF FORT WORTH
SUMMARY OF CHARGES
$1,731,872.00
Less
Total Cost of Work Completed
% Retained $0.00
Net Earned $1,731,872.00
Plus Material on Hand Less 15%$0.00
Balance Due This Payment $1,731,872.00
Less Liquidated Damages
0 Days @ $0.00 / Day $0.00
Less Penalty
LessPavement Deficiency $0.00
$0.00
$0.00Less Previous Payment
Earned This Period
Retainage This Period
$1,731,872.00
$0.00
City Secretary Contract Number
237
WD
Contract Date
CONATSER CONSTRUCTION TxLP
NA
5327 WICHITA ST
FORT WORTH TX 76119
G. DEYON S. WESTER
160
WD
Contract Time
Days Charged to Date
CompleteContract is 100.000000
Contractor
,
/Inspectors
Project Manager
Tuesday, November 7, 2023 Page 5 of 5
Walsh Ranch - Quail Valley - PA3W - C
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
PROJECT NAME: Walsh Ranch - Quail Valley - PA3W - C CHANGE
CONTRACT: Water (A), Sewer (B), Drainage (C), Paving (D), Street Lighting (E) ORDER No:
CFA #: 22-0022 CITY PARTICIPATION: No
CITY PROJECT #: � 03899
DOE #: N/A �
FID #: 301'140200431-103899-E07685
FILE #: X-27223, W-2816
INSPECTOR: Steven Wester Phone No: (682) 287-3465
PROJECT MANAGER: Sandip Adhikari Phone No: (817) 392-8424
CONTRACT UNIT
1 WATER 2 SEWER 3 DRAINAGE 4 PAVING 5 STREET LIGH7ING CONTRACT
DAYS
Developer Cost Ci Cost Developer Cost Ci Cost Deveioper Cost C Cost Developer Cost Ci Cost Developer Cost Ci Cost
COST PARTICIPATION h 1 �0.00 % 100.D0 % 100.00 % 1 �0.00 % i oo.00 i
ORIGINAL CONTRACT S 632,992.00 5 1,196,674.00 5 701,087.00 S 1,577,'166.75 S 529,533.00 160
EXTRAS TO DA7E
CREDITS TO DATE
CONTRACTTODATE 5 632,992.00 5 1,196,674.�0 5 707,087.0� S 1,577,�66.75 S 529,533.00 160
AMOUNT OF PROP. CHANGE ORDER S (35,400_DO) (145,65�.00) 5 (e� 42TDC� l420 E73.00� 81.32�.00)
REVISEDCONTRACTAMOUNT 5 597,592.D0 $ 1,D50,823,00 5 615,660.OD 4 1,156,293.75 S 448,210.00 160
TOTALREVISEDCONTRACTAMOUNTPER g597,592.D0 S1,D50,823.00 5615,660.00 51,156,293.75 5448,210.00
UNIT
REVISED COST SHARE Dev. Cost: 53,868,578.75 City Cost:
TOTAL REVISED CONTRACT $3,868,578.75
Ci Costfrom Chan e Order: 50.00
REV►EWED
By Sandip Adhikari at 11:02 am, Dec 14, 2022
Page 1
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT
15 3312.2003 -19 EA 1" Water Service - Tap Existing Main
8 3311.0001 0.5 TON Ductile Iron Water Fittings w/ Restraint
ITEM DESCRIPTION
I UNIT PRICE I TOTAL
$2,100.00 539,900.00)
$9,000.00 $4,500.00
Unit I: Water Imorovements S (35,400.00)
REVIEWED
By Sandip Adhikari at 11:02 am, Dec 14, 2022
Page 2
Walsh Ranch - Quail Valley - PA3W - C
REVI EWED
By Sandip Adhikari at 11:02 am, Dec 94, 2022
Page 3
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
Unit III: Drainage Improvements
1 3341 A201 -82 LF 21" RCP, Class III $65.00 S5,330.00)
2 3341.0205 -466 LF 24" RCP, Class III $75.00 �34,950.00
6 3349.0001 -2 EA 4' Storm Junction Box $7,000.00 514,000.00
10 3349.5001 -4 EA 10' Curb Inlet $4,000.00 516,000.00
15 3305.0109 -548 LF Trench Safet $1.00 S548.00
16 9999.0002 -2 EA Facto Storm W e Connection $500.00 �1,000.00
17 3301.0002 -4533 LF Post-CCTV Ins ection $3.00 '�13.599.00
Unit III: Drainage Improvements S (85,427.00)
REVIEWED
By Sandip Adhikari at 11:02 am, Dec 94, 2022
Page 4
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
Unit IV: Pavin Improvements
2 3213.0103 -3741 SY 8" Conc Pvmt $58.50 $218,S48.50)
3 9999.0008 -603 SY 6" Conc Unrein Pvmt $40.00 $24,120.00)
6 3211.0502 -4135 SY 8" Lime Treatment $3.50 �14,472.50
7 3211.0400 -74.4 TN H drated Lime 8" Pave 36 Ibs/s $210.00 �15,624.00��
8 3213.0302 -13376 SF 5" Conc Sidewalk $4.75 563,536.00
9 3213.0501 -10 EA Barrier Free Ram , T e R-1 $1,900.00 S19,000.00)
11 0241.1300 -604 SY Remove Conc Pavin $20.00 512,080.00
12 9999.0003 -3 EA Furnish/Install Walsh Ranch St le Si n Post & Foundation w/Re ulato Si n& Name Blades $1,700.00 S5,100.00)
14 9999.0005 -44 LF "No Parkin "Stri in $4.00 $176.00
15 3217.000'I -198 LF 4" SLD Pvmt Markin HAS W $4.00 5792.00
16 3217.0501 -312 LF 24" SLD Pvmt Markin HAE W �20.00 �6,240.00
17 9999.0009 -540 LF 6" SLD Pvmt Markin HAE B $6.00 53,240.00
18 3217.0102 -1634 LF 6" SLD Pvmt Markin HAS $6.00 �9,E04.00
19 2605.3031 -62 LF 4" CONDT PVC SCH 40 T $32.00 S1,984.00
20 3292.0100 -2042 SY Block Sod Placement $8.00 $16,336.00
21 3291.1000 -340 CY To soil $28.00 �9,520.00
Unit IV: Paving Improvements $ (420,873.00)
REVIEWED
By Sandip Adhikari at 91:02 am, Dec 94, 2022
Page 5
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL
Unit V: Street Light Improvements
2 9999.0007 -3 EA Furnish/Install Walsh Ranch 30' Street Li ht Pole & LED Fixture $14,500.00 $43,500.00)
4 3441.3301 -3 EA Rdw Illum Foundation TY 1,2, and 4 $1,500.00 �,4,500.00'
5 3441.1408 -2271 LF NO 6 Insulated Elec Condr $8.00 $18,168.00
6 3441.1501 -4 EA Ground Box T e B $950.00 �3,800.00
7 2605.3015 -757 LF 2" CONDT PVC SCH 80 T $15.00 511.355.00
8 3441.1771 -1 EA Furnish/Install 240-480 Volt Sin le Phase Metered Pedestal �9,500.00 59,500.00
New 9 3441.1771 1 EA Furnish/Install 120-240 Volt Sin le Phase Metered Pedestal $9,500.00 $9,500.00
Unit V: Street Light Improvements 3 (81,323.00)
REVIEWED
By Sandip Adhikari at 11:02 am, Dec 14, 2022
Page 6
DocuSign Envelope ID: 949CD44F-7E5B-4C8D-9967-F22B656BC12A
Walsh Ranch - Quail Valiey - PA3W - C
REASONS FOR CHANGE ORDER
1 Removed Walsh Ave from this set of plans, including all infrastructure within Walsh Ave. These items were added to CPN103935
2 Water line removed curves and added fittings
3
4
5
6
7
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
inc.
�.tti, M.avl.ia
By:
966tSEQ3c�Yl4i2...
Name: Jordan V. Marlia, P.E.
Title: Project Manager
Quaii Valley Devc V�,_LL� %_,___ ,_ f_, ,_
(,II,(, �,arpc,v�dc,v
By:
�—
Name: Seth Caroenter
Titie: Vice President
DoeuSigned by.
Conatser Construc ion TX., ,
By:
5D50600229CF44A...
Name: Brock Huaoins
Title: President
REVIEWED
By Sandip Adhikari at 91:02 am, Dec 14, 2022
9/28/2022 2:38:24 PM Page 7
Waish Ranch - Quail Valley - PA3W - C
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
INSPECTOR: Steven Wester Phone No: (682) 287-3465
PROJECT MANAGER: Sandip Adhikari Phone No: (817) 392-8424
CONTRACT UNIT
1 WATER 2 SEWER 3 DRAINAGE 4 PAVING 5 STREET LIGHTING CONTRACT
DAYS
Developer Cost Ci Cost Developer Cost Ci Cost Developer Cost Cit Cost Developer Cost Cit Cost Developer Cost Ciry Cost
COSTPARTICIPATION % 100.00% 100.00% 100.00% '100.00% 100.00%
ORIGINALCONTRACT S 632,992.00 S 1,196,674.00 $ 701,087.00 5 1,577,766.75 5 0.00 730
EXTRAS TO DATE
CRE�ITS TO DATE 5 (�5,400.00) (�45.851.00) i"c5 a27.On1 5 (a20,E7a.001
CONTRACTTODATE S 597,592.00 $ 1,050,823.00 S 615,66�.00 5 1,156,293.75 S 0.00 130
AMOUNT OF PROP. CHANGE ORDER $ fi,60D.00 S 65,757.00 S 400.00
REVISEDCONTRACTAMOLINT $ 6D4,192.00 $ '1,116,580.00 5 616.060.OD S 1,156,293.75 S 0.00 130
TOTAL REVISED CONTRACT AMOUNT PER $604,�92.00 51,'116,580,00 5616,060.00 51,156,293.75 50.00
UNIT
REVISED COST SHARE Dev. Cost: $3,493,125.75 City Cost:
TOTAL REVISED CONTRACT 53,493,125.75
Ci Cost from Chan e Order: $0.00
REVIEWED
By Sandip Adhikari at 10:37 am, Mar 23, 2023
Page 1
Walsh Ranch - Quail Vailey - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT
ITEM DESCRIPTION
14 3312.4112 1 EA 16" x 8" Tapping Sleeve & Valve
8 3311.0001 -0.1 TON Ductile Iron Water Fittings w/ Restraint
REVIEWED
By Sandip Adhikari at 10:37 am, Mar 23, 2023
UNIT PRICE � TOTAL
$7,500.00 $7,500.00
$9,000.00 (S900.00j
Unit I: Water Improvements $ 6,600.00
Page 2
Walsh Ranch - Quail Valley - PA3W - C
REVIEWED
By Sandip Adhikari at 10:37 am, Mar 23, 2023
Page 3
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT
ITEM DESCRIPTION � UNIT PRICE � TOTAL
Unrt III: Dramage Improvements
New 18 3341.3501 40 LF 24" PP Pi e $85.00 $3,400.00
2 3341.0205 -40 LF 24" RCP, Class III $75.00 53,000.00
Unit III: Drainage Improvements $ 400.00
REVIEWED
By Sandip Adhikari at 10:37 am, Mar 23, 2023
Page 1
DocuSign Envelope ID: 2E5BA218-B2B0-44D7-A884-DE148606D307
Walsh Ranch - Quail Valley - PA3W - C
REASONS FOR CHANGE ORDER
1 Revised design of Santiarty & Storm Drain around gas crossings in coordination with gas company.
2 Revised Water connection to existing 16" main to provide tapping sleeve.
3 Revised Pavement Removal for Full Panei Replacement
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
wFT tt-Co� a�rs,�l b�' Quail Val y Dev�cjo. VC LG '- . L •- Conatser onst D�eu�IRne�d�y:
Y.l�r�`�^""' I�I.A.YUCI. By�C�Iw��U�' y ������db-
�g� g E g � 5 5q 44A
�7 g Fo3� 0 F 8192 9428... SD 0 0229CF ...
Name: JO9da6V. N�ar�is�E�. Name: Setl� Garpenter Name: Brock Huqqins
Title: Project Manager Title: Senior Vice President Title: President
REVIEWED
By Sandip Adhikari at 10:37 am, Mar 23, 2023
Page 5
DocuSign Envelope ID: 59532C19-1946-4E16-BA95-C900D35283C6
Waish Ranch - Quail Valley - PA3W - C
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
INSPECTOR: Steven Wester Phone No: (682) 287-3465
PROJECT MANAGER: Sandip Adhikari Phone No: (817) 392-8424
CONTRACT UNIT
1 WATER 2 SEWER 3 DRAINAGE 4 PAVING 5 STREET LIGHTING CONTRACT
DAYS
Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost Ciry Cost
COSTPARTICIPATION % 100.00% 100.00% 100.00% ioo.00i 100.00%
ORIGINAL CONTRACT 5 632,992.00 S '1,196,674.00 S 70'1,087.00 5 1,577,166.75 S 0.00 130
EXTRAS TO DATE S 6,600.�0 S 65,757.00 5 400.0�
CREDITS TO DATE S (35 a00.0o) S (145,E51.00) '05,42ZOOj V+20,L73_00)
CONTRACTTODATE S 604,192.00 5 1,116,580.00 S 616,060.00 S 1,156,293.75 5 0.00 130
AMOUNT OF PROP. CHANGE ORDER S 27,745.5�
REVISEDCONTRACTAMOUNT 5 604,192.00 5 '1,1'16,580.00 S 641,805.50 5 1,156,293.75 $ 0.00 130
TOTALREVISEDCON7RACTAMOUNTPER $604,'I92.00 51,'116,560.00 5645,805.50 51,156,293.75 50.00
UNIT
REVISED COST SHARE Dev. Cost: 53,520,87� 25 City Cost:
TOTAL REVISED CONTRACT $3,520,871.25
Ci Cost from Chan e Order: $0.00
REVIEWED
By Sandip Adhikaii at 10:45 am, Jun 21, 2023
Page 1
DocuSign Envelope ID: 59532C19-1946-4E16-BA95-C900D35283CB
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT
t
2 3341.0205 158 LF 24" RCP, Class III
14 3137.0104 47 SY Medium Stone Ri
15 3305.0109 158 LF Trench Safe
New 19 3349.4105 2 EA 24" SET, 1 i e
New 20 9999.0013 195 SY Landlok 450 TRM
d
ITEM DESCRIPTION
I UNIT PRICE I TOTAL
$75.00 $11,850.00
$105.00 $4,935.00
$1.00 $158.00
$3,500.00 $7,000.00
$19.50 $3,802.50
Unit III: Drainage Improvements $ 27,745.51
REVIEWED
By Sandip Adhikari at 10:45 am, Jun 21, 2023
Page 2
DocuSign Envelope ID: 59532C19-1946-4E16-BA95-C900D35283CB
Walsh Ranch - �uail Valley - PA3W - C
REASONS FOR CHANGE ORDER
1 Added culvert under roadway to avoid water pooling on gas company stand pipes.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT 6Y THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
C��u�tt-c�l�ar�s, I�ic.
�jev'D�.ain, M.a.Yi,ia
Name: ��ordan�V�M�ar4a?P:E.
Title: Project Manager
DoeuSl ned by.
Quail V leB f�,�vcpVL LLC �
Y `� w
9308FE819299426...
Name: Seth Carpenter
Title: Senior Vice President
REVIEWED
By Sandip Adhikari at 10:45 am, Jun 21, 2023
Conatse Cons�ru , Sl�d�b�: `
� ��
Name: SHro�k Nuq9C544A...
Title: President
Page 3
DocuSign Envelope ID: 59809B2D-4C35-4E5E-9C55-01A39AC9EOF7
Walsh Ranch - Quail Vailey- PA3W - C
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
INSPECTOR: Steven Wester Phone No: (682) 287-3465
PROJECT MANAGER: Sandip Adhikari Phone No: (817) 392-8424
CONTRACT UNIT
1 WATER 25EWER 3DRAINAGE dPAVING SSTREETLIGHTING CONTRACT
DAYS
Developer Cost Ciry Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost
COST PARTICIPATION % 1 D0.�0� 100.00 % 10�.00 % 100.00 % 100.00 %
ORIGINALCONTRACT S 632,992.00 S 1.'196,674.00 S 701,087.OD S 1,577,'166.75 S 0.00 '130
EXTRAS TO DATE S 6,600.00 5 65,757.00 5 26,'145.50
CREDITS TO DATE S (35,A00.00) 1145.851.00) 5 (85,527 00) ;.20,67�.�01
CONTRACTTODATE $ 604,192.00 5 1,116,580.00 5 643,805.50 5 1,156,293.75 5 0.00 '130
AMOUNTOFPROP.CHANGEORDER 5 ii,ioo.00
REVISEDCONTRACTAMOUNT S 615,292.00 $ 'I,1'16,580.00 S 643,805.50 S 1,156,293.75 S 0.00 130
TOTALREVISEDCONTRACTAMOUNTPER $615,292.00 51,116,560.00 $649,805.50 $1,�56,293.75 50.00
UNIT
REVISED COST SHARE Dev. Cost: 53,531,971.25 City Cost:
TOTAL REVISED CONTRACT $3,53�,971.25
Ci Cost from Chan e Order: SD.00
REVIEWED
By Sandip Adhikari at 2:55 pm, Ocf 03, 2023
Page 1
DocuSign Envelope ID: 59809B2D-4C35-4E5E-9C55-01A39AC9EOF7
Walsh Ranch - Quail Valley - PA3W - C
You are directed to make the following changes in the contract documents:
PAY ITEM # CITY BID ITEM # QUANTITY UNIT
New 16 9999.0014 1 EA Remove and R
New 17 3312.3002 1 EA 6" Gate Valve
New 18 3312.2003 1 EA 1" Irrigation Sei
New 19 3312.2103 2 EA 1 1/2" Irrigation
ITEM DESCRIPTION
Unit I: Water Imp
ate Fire Hvdrant
REVIEWED
By Sandip Adhikari at 2:55 pm, Oct 03, 2023
UNIT PRICE I TOTAL
� $2
Unit I: Water Imoro�
Page 2
DocuSign Envelope ID: 59809B2D-4C35-4E5E-9C55-01A39AC9EOF7
Walsh Ranch - Quail Valley - PA3W - C
REASONS FOR CHANGE ORDER
1 Plan Revision 4-Added Irrigation Meters
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
�pweeuoS or�se, dn Quail Vaile evc DoeuSlgned hy:
ry-it-Zl�g i bcy' ��� �� �' Conatser onstrvct' TX., L P
y: .�bY'D�aan. �l.aY�,ta Y: Sc.Tw �'c.In�U'' �� %��''���
g6 d4 8FEB �SD50600229CF44A...
Name: Jortla66�0�1�a P�': Name: carpe �28_"
Zt� }t�f Name: Brock Huqgins
Title: Project Manager Title: Senior Vice President Title: President
REVIEWED
By Sandip Adhikari at 2:55 pm, Oct 03, 2023
Page 3
CITY PROJECT NUMBER:
PROJECT NAME:Walsh Ranch - Quail Valley PA3W-C
103899
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
SIZE TYPE OF PIPE
DIP 8 Ductile Iron Pipe
PVC 8 C900
PIPE LAID
FIRE HYDRANTS:9 VALVES (16" OR LARGER)N/A
LF
PIPE ABANDONED SIZE TYPE OF PIPE
N/A
DENSITIES:Yes All Passed
1.5" Copper pipe
NEW SERVICES:1" Copper pipe
SIZE TYPE OF PIPE
N/A
SIZE
Ductile iron pipe
TYPE OF PIPE
PVC 8" SDR 26
PVC 10" SDR26
PIPE LAID
ductile iron pipe 10"
DENSITIES:
WATER
Yes All Passed
LF
430
5174
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
4"NEW SERVICES:SDR 26 1750
1790
10
LF
LF
SEWER
4819
610
70
PIPE ABANDONED
Rev. 8/20/19
TRANSPORTATION AND PUBLIC WORKS
November 7, 2023
Conatser Construction TX, L.P.
5327 Wichita St
Fort Worth, Texas 76119
RE: Acceptance Letter
Project Name: Walsh Ranch Quail Valley – PA3W-C
Project Type: Water , Sewer, Storm Drain, Paving
City Project No.: 103899
To Whom It May Concern:
On October 31, 2023 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on November 7, 2023. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on November 7, 2023, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-8424.
Sincerely,
Sandip Adhikari, P.E. , Project Manager
Cc: Steven Wester , Inspector
Gary Deyon , Inspection Supervisor
Troy Gardner, Senior Inspector
Andrew Goodman, P.E. , Program Manager
Huitt- Zollars , Consultant
Conatser Construction , Contractor
Quail Valley Devco VLO, LLC , Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Constructian TX. LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending far personal injury and/or property damages;
On Contract described as:
WALSH — PA3W-C
WATER, SANITARY SEWER, DRAINAGE,
& PAVING IMPROVEMENTS
CFA PRJ #: 22-0022
CITY PROJECT #:103899
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
Brock Hug� s
Subscribed and sworn to before me this 18�' day of October, 2023.
` ^ ��.�
ot�+'p� KAtHER1N R 5E
2��' Notary Pubflc, state otTexas Notary Public in Tarrant County, Texas
,g „ !D# 133467933
�`'�,oFt�+e My Commissfon Expires
Novemter 30, 2025
�ONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
own�E� ❑
ARCHI7ECT ❑
Ct3NTRACTOR ❑
SURETY ❑
QTHEi�
Bond No 0247476
PROJECT:
(name, edd�eSS)Walsh Ranch-Quail Valley-Planning Area 3 West Ph C
Fort Worth, TX
TQ (Owner)
QUAIL VALLEY DEVCO VLO, LLC AND THE CiTY 4F� ARCHITECT'S PROJECT NO: CFA No. D2-0022
F(1RT 1IV(1RTH
400 S. Record St., Suite 1200
Dallas
C�NTRACT FOR:
IPRC22-D014 - Walsh Ranch - Quail Valley�- Planning Area 3 West -
Phase C (PA3W-C) - Uiilities & Paving
Tx �52a2 � CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated abave, the
(hare insert name end addreu of Surety Companyl
BFRKLFYJNSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bflnd of ihere insert name end address of Contrector)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035
3rd
hereby approves of the final payment to the Con�ractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (hare inseR name and addrass of �wner)
QUAIL VALLEY DEVCO VLO, LLC AND THE CITY QF FORT WORTH
400 S. Record St., Suite 1200
Dallas TX 75202
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest: /1 - �c��_
(Seal); `��''-�
day of October, 2023
, CONTRACTOR,
, owNER,
BERKLEY INSURANCE COMPANY
Surety Company
�.� � -7vi
Signature of Authorized Regresentative
b i [e Attorne -in-Fact
Title
NOTE: This form is to be used es a companian document to AIA �OCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Currertt Edition
ONE PAGE
POWER OF .ATTORNEY
BERIa�EY INSURANCE COMPriNY
WILMINGTON, DELAVJ,ARE
No. BI-7280k
NOTICE: The warnmg. found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
-o
�
�
x
� �
.b ...
a �
� �
�:
� .�
� �,
� �
� �;
� �
� �
�
�
❑ a�
� �
� �
o a,
> �
� o
.� �
a� �
� K
o .�
� U
4; °
o �
�:
i �
oC
a. �
� �
,S' U
E"" W
�L
"C� y
� �
� 'n
� �
0 o,i
a. �
.� �
� �
� '
� �
� � �,
U �
'O �
� ..,
b
� �
`'" c
0
� o0
o .x
U
� �
ip
� v
� �
. H
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMP,ANY (the "Company�'), a corporation duly
organized and.existing under the ]aws of the State of Deiaware, having its principal affice in Greenwich, CT, has :made, constituted
and ap,p.ointed, and does by these presents make, canstitute and appoinr iefcacdo J. Reyna; Don � ConteU; Sopliinie Flunfer,•
Robbi Morales; ICelly A. Westbrook; Ti�xa McEwatt; Jnslcua Sauxrlers; Touie Petrm:ek; or Mikaela Peppets of Aon Risk
Services Soutluuest, lnc. of'Dal/as, TX its true and la�ufui Atitorney-in-Fact, to sign its name as surety only as delineated below
and to execute, seal, aclrnowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty Miilion and 00/100 U.S. Dollars {IT.S.S50,000,000.00), to the
same .extent as if such bonds had been duly executed and acIrnowledged by the regularly elected officers .of the Gompany at its
principal office in their own proper persons.
Tlus Ppwer of Attorney shall be construed and enforced in accardance with, and governed by, the laws of the SEate oi Delaware,
without giying e. ffect to the principles of conflicts of [aws thereof This Power of Attomey is granted pucsuant to #he following
resolutions wliicti were duly and validly adopted at a meeting of the $oard of Directors of the Company held on January 25, 2010:
RESOLVED, that, v✓ith respect to the Surety business written by Berkley Surety, the Chaiiman of the Board, Chief
Executive Officer, President or any Viee President of the Company,_ in conjunction with the Seeretary or .any Assistant
Secretary are hereby authorized ta execute powers of attorney authorizing .and qualifying the attomey-in-faef named therein
to execute bonds, undertakings, recognizances, or other sucetyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attomey executed pursuant bereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attomey limits the acts caf those named therein tb the bonds, undertakings, recognizances,
or other suretyship ohligations specificaily named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attomey revokes al[ previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature_ of any authorized officer aiEd the seal of the Company may be �xed by facsimile to any
power of attorney or certification thereof authorizing the execufion and delivery of any bond, undertaldng, recna 77ance, or
other sureryship obligation of the Company; and such signattire and seal when so used sha[i have the same force and effect as
though manually affixed. The Company may continve to ase for ihe purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such .at the time when such instruments shail be issued.
iN WI'f'i3ES5 «!i�R�OF; thc Company h2s c�used these presenYs to: be si�ed. aud attesied by its appxop[iate a fFicers a:nd ils
c.or�oratz seal hereunCo affuced this ��"'day of 3b�_,
r�[tesL' Bcrkl Tnsur2nce (�ompany
(Seaf) By �y ;{, , �✓.
. ederrttan 7e �er_
F�cecufive Vi�e �'rrsideuf & SecreEary '4. S'. ice es�iclent
'�'+r�1�NiNG: T�ITS 7'O'R!�A.I�fVf1Y;Ti� 1It NOT PiZI�`�EIl ON�3LU� "13�1tYS��Y" SECURITY PA:P�K
STATB O�' C07�IhI�C'�`IC[JT )
) ss:
COi9NTX Uk' FAIItFZL'�LD )
Sivarn to before me, a Natary Public: in the State of �onneciic�t, this � d�} of. M ,���. `by La. S. Lcderman
and Jeffircp I��. Ei�i�et' �vho are .t�vorn in me #o �be ihe Ex4ctrtivc Vice 1'resirien. Secretazy, and Seniar ��irz .PresidenL
respcctitiely; �of Perkley Insurance Company. f�'4N�T�y ���A;� ' �
co►�rafCr�cu�'
� CO�L�Q���a� otaz;� �tibtic; State oC Connecticm
C�RTTF. I�AT�
I, ihc undersi�ned;.Assistarit Secretary of BEIKKL� INSI3iU'�I�EC�. COlti!1PANY IiO.HEREBY CERTIFY thatt6c t:ore�oing is a
tYue, correcr and compl�te copp of tlye ori,�al Pov��er of�ft�irne�; t�iat said Power o£/�ttorney has not be,enrevoked or resoinded
and that the aufharicy a�f il�e r'1tEornevan-l;act set #"ocih tl�crein, �ho exeCuted Lhe bond or tutdertaldt}g to �vhicb: t.his J�o�i'eC o.f
ltforney is attached; _is;in fuil ffli�ce:and e�fect as bLihis date. %�1
Give� under'myband.and seai of ftte Coinpait}; this 3�C� tia3+ of � C t O 2 � 2 3
(Sca1)
'Vinccnt P. rort2
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Constructian TX. LP, known to me to be a credible person, who
being by me duly sworn, upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending far personal injury and/or property damages;
On Contract described as:
WALSH — PA3W-C
WATER, SANITARY SEWER, DRAINAGE,
& PAVING IMPROVEMENTS
CFA PRJ #: 22-0022
CITY PROJECT #:103899
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX, LP
Brock Hug� s
Subscribed and sworn to before me this 18�' day of October, 2023.
` ^ ��.�
ot�+'p� KAtHER1N R 5E
2��' Notary Pubflc, state otTexas Notary Public in Tarrant County, Texas
,g „ !D# 133467933
�`'�,oFt�+e My Commissfon Expires
Novemter 30, 2025
�ONSENT OF
SURETY COMPANY
TO FINAL PAYMENT
Conforms with the American Institute of
Architects, AIA Document G707
own�E� ❑
ARCHI7ECT ❑
Ct3NTRACTOR ❑
SURETY ❑
QTHEi�
Bond No 0247476
PROJECT:
(name, edd�eSS)Walsh Ranch-Quail Valley-Planning Area 3 West Ph C
Fort Worth, TX
TQ (Owner)
QUAIL VALLEY DEVCO VLO, LLC AND THE CiTY 4F� ARCHITECT'S PROJECT NO: CFA No. D2-0022
F(1RT 1IV(1RTH
400 S. Record St., Suite 1200
Dallas
C�NTRACT FOR:
IPRC22-D014 - Walsh Ranch - Quail Valley�- Planning Area 3 West -
Phase C (PA3W-C) - Uiilities & Paving
Tx �52a2 � CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated abave, the
(hare insert name end addreu of Surety Companyl
BFRKLFYJNSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bflnd of ihere insert name end address of Contrector)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035
3rd
hereby approves of the final payment to the Con�ractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (hare inseR name and addrass of �wner)
QUAIL VALLEY DEVCO VLO, LLC AND THE CITY QF FORT WORTH
400 S. Record St., Suite 1200
Dallas TX 75202
as set forth in the said Surety Company's bond.
IN WITNESS, WHEREOF,
the Surety Company has hereunto set its hand this
Attest: /1 - �c��_
(Seal); `��''-�
day of October, 2023
, CONTRACTOR,
, owNER,
BERKLEY INSURANCE COMPANY
Surety Company
�.� � -7vi
Signature of Authorized Regresentative
b i [e Attorne -in-Fact
Title
NOTE: This form is to be used es a companian document to AIA �OCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Currertt Edition
ONE PAGE
POWER OF .ATTORNEY
BERIa�EY INSURANCE COMPriNY
WILMINGTON, DELAVJ,ARE
No. BI-7280k
NOTICE: The warnmg. found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
-o
�
�
x
� �
.b ...
a �
� �
�:
� .�
� �,
� �
� �;
� �
� �
�
�
❑ a�
� �
� �
o a,
> �
� o
.� �
a� �
� K
o .�
� U
4; °
o �
�:
i �
oC
a. �
� �
,S' U
E"" W
�L
"C� y
� �
� 'n
� �
0 o,i
a. �
.� �
� �
� '
� �
� � �,
U �
'O �
� ..,
b
� �
`'" c
0
� o0
o .x
U
� �
ip
� v
� �
. H
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMP,ANY (the "Company�'), a corporation duly
organized and.existing under the ]aws of the State of Deiaware, having its principal affice in Greenwich, CT, has :made, constituted
and ap,p.ointed, and does by these presents make, canstitute and appoinr iefcacdo J. Reyna; Don � ConteU; Sopliinie Flunfer,•
Robbi Morales; ICelly A. Westbrook; Ti�xa McEwatt; Jnslcua Sauxrlers; Touie Petrm:ek; or Mikaela Peppets of Aon Risk
Services Soutluuest, lnc. of'Dal/as, TX its true and la�ufui Atitorney-in-Fact, to sign its name as surety only as delineated below
and to execute, seal, aclrnowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty
Insurance, providing that no single obligation shall exceed Fifty Miilion and 00/100 U.S. Dollars {IT.S.S50,000,000.00), to the
same .extent as if such bonds had been duly executed and acIrnowledged by the regularly elected officers .of the Gompany at its
principal office in their own proper persons.
Tlus Ppwer of Attorney shall be construed and enforced in accardance with, and governed by, the laws of the SEate oi Delaware,
without giying e. ffect to the principles of conflicts of [aws thereof This Power of Attomey is granted pucsuant to #he following
resolutions wliicti were duly and validly adopted at a meeting of the $oard of Directors of the Company held on January 25, 2010:
RESOLVED, that, v✓ith respect to the Surety business written by Berkley Surety, the Chaiiman of the Board, Chief
Executive Officer, President or any Viee President of the Company,_ in conjunction with the Seeretary or .any Assistant
Secretary are hereby authorized ta execute powers of attorney authorizing .and qualifying the attomey-in-faef named therein
to execute bonds, undertakings, recognizances, or other sucetyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attomey executed pursuant bereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted; and further
RESOLVED, that such power of attomey limits the acts caf those named therein tb the bonds, undertakings, recognizances,
or other suretyship ohligations specificaily named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attomey revokes al[ previous powers issued on behalf of the attorney-in-fact named; and
further
RESOLVED, that the signature_ of any authorized officer aiEd the seal of the Company may be �xed by facsimile to any
power of attorney or certification thereof authorizing the execufion and delivery of any bond, undertaldng, recna 77ance, or
other sureryship obligation of the Company; and such signattire and seal when so used sha[i have the same force and effect as
though manually affixed. The Company may continve to ase for ihe purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
ceased to be such .at the time when such instruments shail be issued.
iN WI'f'i3ES5 «!i�R�OF; thc Company h2s c�used these presenYs to: be si�ed. aud attesied by its appxop[iate a fFicers a:nd ils
c.or�oratz seal hereunCo affuced this ��"'day of 3b�_,
r�[tesL' Bcrkl Tnsur2nce (�ompany
(Seaf) By �y ;{, , �✓.
. ederrttan 7e �er_
F�cecufive Vi�e �'rrsideuf & SecreEary '4. S'. ice es�iclent
'�'+r�1�NiNG: T�ITS 7'O'R!�A.I�fVf1Y;Ti� 1It NOT PiZI�`�EIl ON�3LU� "13�1tYS��Y" SECURITY PA:P�K
STATB O�' C07�IhI�C'�`IC[JT )
) ss:
COi9NTX Uk' FAIItFZL'�LD )
Sivarn to before me, a Natary Public: in the State of �onneciic�t, this � d�} of. M ,���. `by La. S. Lcderman
and Jeffircp I��. Ei�i�et' �vho are .t�vorn in me #o �be ihe Ex4ctrtivc Vice 1'resirien. Secretazy, and Seniar ��irz .PresidenL
respcctitiely; �of Perkley Insurance Company. f�'4N�T�y ���A;� ' �
co►�rafCr�cu�'
� CO�L�Q���a� otaz;� �tibtic; State oC Connecticm
C�RTTF. I�AT�
I, ihc undersi�ned;.Assistarit Secretary of BEIKKL� INSI3iU'�I�EC�. COlti!1PANY IiO.HEREBY CERTIFY thatt6c t:ore�oing is a
tYue, correcr and compl�te copp of tlye ori,�al Pov��er of�ft�irne�; t�iat said Power o£/�ttorney has not be,enrevoked or resoinded
and that the aufharicy a�f il�e r'1tEornevan-l;act set #"ocih tl�crein, �ho exeCuted Lhe bond or tutdertaldt}g to �vhicb: t.his J�o�i'eC o.f
ltforney is attached; _is;in fuil ffli�ce:and e�fect as bLihis date. %�1
Give� under'myband.and seai of ftte Coinpait}; this 3�C� tia3+ of � C t O 2 � 2 3
(Sca1)
'Vinccnt P. rort2